Attachment B - Community Engagement Summary

City of Phoenix — Transportation, Infrastructure, and Planning Subcommittee (2025-09-17)

View PDF Meeting page

Extracted text (via pymupdf) 20079 characters
Community 
Engagement 
Summary
Phase III Alternatives Analysis - BRT Lane Options for 35th Avenue
2025
February - April
Phoenix Bus Rapid Transit Program 
35th Avenue Corridor
Attachment B

Community Engagement Summary Phase III - 35th Avenue Corridor | 2025
Table of Contents
Introduction........................................................................................................1
Notifications and Metrics................................................................................2
Water Bill Inserts...................................................................................................3
Direct Mailers........................................................................................................3
Business Door Hangers........................................................................................3
Poster Distribution................................................................................................4
Online Metrics.......................................................................................................5
Social Media..........................................................................................................6
Email Blasts............................................................................................................7
Press Releases......................................................................................................8
Spanish Radio Ads................................................................................................8
Digital and Print Ads ............................................................................................9
Community & Business Meetings and Events ............................................10
Community Workshops ........................................................................................11
Business Workshops ...........................................................................................11
Pop-Up Events ......................................................................................................11
BRT Lane Option Survey Results....................................................................12

1
Community Engagement Summary Phase III - 35th Avenue Corridor | 2025
Introduction
In Spring 2025, the Phoenix Bus Rapid Transit (BRT) team launched the third phase 
of community outreach to educate and engage the public on the BRT Program. 
Outreach was targeted to surrounding communities, residents, and private business 
owners along the 35th Avenue Corridor. Outreach focused on providing the latest 
program information and collecting community and stakeholder input on the 
proposed BRT lane options—side-running or center-running—to help guide the 
next phase of the program, which is design. Between February and April 2025, the 
BRT Program team successfully connected with nearly 9,000 people including 
community leaders, elected officials, business owners, residents, and transit riders. 
We used 12 different methods of communication to reach stakeholders along 
the corridor and the community at large. More than 550 people took our survey. 
Read on to learn about our outreach strategies, metrics, and the results of the Lane 
Option Survey.

2
Community Engagement Summary Phase III - 35th Avenue Corridor | 2025
Notifications 
and Metrics
To reach multiple audiences, the BRT team used a variety of communication 
tools and notifications to share project information, invite the public to attend 
workshops, and encourage input and survey participation. All notifications 
were created in English and Spanish. A summary of the notifications and 
metrics can be found on the following pages.
Phoenix BRT is 
checking in again!
The City of Phoenix Bus Rapid Transit (BRT) 
Program is moving forward with its first 
corridor – 35th Avenue – and we want to 
hear from businesses like yours! 
 
Visit MeetPhoenixBRT.com to  
share your feedback.
Be connected. Stay informed. Co-create.
602.262.7242 | connect@meetphoenixbrt.com
302 N 1st Ave, Suite 900, Phoenix, AZ 85003  
Collaborate with Us!
Business Workshops
Full meeting  
details found here!
PhoenixBRT
FEB
19
Alta Vista Elementary
8710 N 31st Ave 
Phoenix, AZ 85051
 6:00 PM
MAR
1
Carl Hayden High School
3333 W Roosevelt St 
Phoenix, AZ 85009
 9:30 AM
MAR
12
Bret Tarver Learning Center
1516 N 35th Ave
Phoenix, AZ, 85009
 6:00 PM
To request interpretation or other reasonable 
accommodations, call 602.262.7242.
 
Para solicitar interpretación u otras adaptaciones 
razonables, llame al 602.262.7242.
The City of Phoenix Bus Rapid  Transit 
(BRT) program is moving forward with 
its first corridor - 35th Avenue - and we 
want to share next steps and hear your 
thoughts on what it will look like!
Community  
Workshop 1
Tuesday, February 18, 2025
Alta Vista Elementary School
8710 N 31st Ave
Phoenix, AZ 85051
 6:00 PM 
Community  
Workshop 2
Saturday, March 8, 2025
Carl Hayden High School
3333 W Roosevelt St
Phoenix, AZ 85009
 11:00 AM 
Take our survey 
and be entered 
to win! More 
details on  
our site!
El Programa de Autobús de  Transporte 
Rápido de la ciudad de Phoenix avanza 
con su primer corredor - 35th Avenue - ¡y 
queremos compartir los próximos pasos y 
escuchar su opinión sobre cómo será!
Taller 
Comunitario 1
martes 18 de febrero de 2025
Alta Vista Elementary School
8710 N 31st Ave 
Phoenix, AZ 85051
 6:00 PM 
Taller 
Comunitario 2
sábado 8 de marzo de 2025
Carl Hayden High School
3333 W Roosevelt St 
Phoenix, AZ 85009
 11:00 AM 
¡Responda a 
nuestra encuesta 
y podría ganar 
un premio! ¡Más 
información en 
nuestro sitio web! 
PhoenixBRT
Come On Board!
 
¡Suban a bordo!
 MeetPhoenixBRT.com |  602.262.7242 |   connect@meetphoenixbrt.com
¡Más información sobre los 
talleres, la reunion en línea y las 
ubicaciones de otros eventos!
More workshop details, online 
open house, and pop-up locations!
SCAN ME! / 
¡ESCANÉAME!
Kids activities  
provided at  
workshops!
¡Habrá actividades  
para niños en  
los talleres!
Hi Neighbor!
¡Hola vecino!
PhoenixBRT
Full meeting 
details 
found here!
i added a call 
to action to 
the QR Code
City of Phoenix BRT c/o HDR, Inc. 
20 E. Thomas Rd, Suite 2500  
Phoenix, AZ 85012
Indicia 
clearance 
area
Address 
and barcode
clearance area

3
Community Engagement Summary Phase III - 35th Avenue Corridor | 2025
In February, we utilized the PHX at Your Service 
newsletter, included with water bill inserts, to share 
notifications with all Phoenix city services customers. 
The insert included a link to MeetPhoenixBRT.com 
directing residents to additional information regarding 
the workshops, online open house, and survey.
Water Bill 
Inserts
5,500 businesses along the corridor received a 
hand-delivered door hanger.
Business 
Door Hangers
4 direct mailers were sent to residents, businesses, 
and property owners within a 1/2 mile of the 
BRT corridor. 
Direct 
Mailers
2 mailers were sent to residents and businesses
and 2 mailers were sent to offsite property owners.

4
Community Engagement Summary Phase III - 35th Avenue Corridor | 2025
Poster Distribution
Buses
44 posters were displayed at bus shelters 
along the 35th Avenue corridor 

517 buses displayed posters:
	» South Facility – 218 posters
	» North Facility – 129 posters
	» West Facility – 170 posters    
8  Light Rail Station Ad Kiosks
	» 19th Avenue/Montebello Avenue
	» Central Avenue/Camelback Road
	» McDowell Road/Central Avenue
	» Van Buren Street/Central Avenue
	» Van Buren Street/1st Avenue
	» 3rd Street/Washington Street
	» 12th Street/Washington Street
	» 38th Street/Washington Street
4  Transit Centers   
	» Ed Pastor 
	» Greg Stanton Central Station 
	» Thelda Williams  
	» Sunnyslope

5
Community Engagement Summary Phase III - 35th Avenue Corridor | 2025
Online Metrics
The MeetPhoenixBRT.com website is designed to create transparent communication, 
foster community collaboration and build connections. We updated the website on 
February 5, 2025, to include project information, blog posts, workshop details, the 
survey, and more!  
Website
Total Views: 
10,965
Returning Users: 
439 
Total Users: 
6,765 
New Users: 
6,326 
Top Trends: 
Access by device:
Mobile: 
4,044
Desktop: 
2,492  
Tablet: 
214 
Smart TV: 
3 
»	 4,300 users accessed 
the site through paid digital 
and email ads 
»	 The most accessed blog was 
“Upcoming Community & 
Business Events” 
»	 3,200 users were 
located in Phoenix 
	» 390 users utilized the 
Spanish Language tool 
on the site

6
Community Engagement Summary Phase III - 35th Avenue Corridor | 2025
Social Media


Facebook 
Unpaid & Paid 
	» Posts: 10 English and 10 Spanish 
	» Comments: 15 
	» Reactions: 76 
	» Reach: 32,449 
	» Impressions: 123,228 
Twitter (X) 
	» Tweets: 12 English and 7 Spanish 
	» Views: 4,574 
	» Likes: 26 
	» Comments: 3 
	» Reposts: 4 
Nextdoor 
	» Posts: 3 English 
	» Impressions: 16,784 
	» Likes: 15

7
Community Engagement Summary Phase III - 35th Avenue Corridor | 2025
Email Blasts
Email blasts were sent through the project email to our stakeholder list and 
several paid email blasts were geofenced to specifically garner feedback from 
residents and businesses along the corridor.
Stakeholder Email Blasts: 
PHX BRT: Business Workshops Announcement 
	Sent on February 6, 2025 
	Opens: 112 
	 Clicks: 4 
	Replies: 0 
PHX BRT: Community Workshops 
Announcement 
	Sent on February 6, 2025 
	Opens: 640 
	 Clicks: 38 
	Replies: 3 
REMINDER: Phoenix BRT is Seeking Feedback 
on Proposed BRT Lane Options 
	Sent on February 26, 2025 
	Opens: 328 
	 Clicks: 1 
	Replies: 2 
REMINDER: Phoenix BRT is Seeking Feedback 
on Proposed BRT Lane Options 
	Sent on March 6, 2025 
	Opens: 341 
	 Clicks: 122 
	Replies: 3 
There’s Still Time: Take The PHX BRT 
2025 Survey 
	Sent on March 25, 2025 
	Opens: 428 
	 Clicks: 1 
	Replies: 3 
Paid Email Blasts: 
BRT Spring 2025 Eblast (Workshops) – English  
Hey there! It’s Phoenix BRT! 
	Sent on February 11, 2025 
	Audience: 57,000 
	Views: 8,661 
	 Clicks: 1,584 
BRT Spring 2025 Eblast (Workshops) – Spanish 
¡Hola! ¡Es Phoenix BRT!
	Sent on February 12, 2025 
	Audience: 22,000 
	Views: 3,381 
	 Clicks: 644 
BRT Spring 2025 Reminder Eblast - English 
Hey there! It’s Phoenix BRT! 
	Sent on February 18, 2025 
	Audience: 57,000 
	Views: 10,083 
	 Clicks: 1,184 
BRT Spring 2025 Reminder Eblast – Spanish  
¡Hola! ¡Es Phoenix BRT!
	Sent on February 19, 2025 
	Audience: 22,000 
	Views: 3,442 
	 Clicks: 626

8
Community Engagement Summary Phase III - 35th Avenue Corridor | 2025
We distributed a press release to over 320 media outlets 
and contacts on February 11, 2025, informing the public 
about our outreach events and survey. 
The press release was viewed 39 times as of April 13, 2025.
	» ABC 15 
	» KTAR 
	» Arizona Republic 
	» Signals AZ 
	» Telemundo 
	» The Associated Press 
	» City Sun Times 
	» FOX 10 
	» KJZZ 
	» Arizona Informant 
	» La Voz Arizona 
	» Prensa Hispana 
	» Axios 
	» Phoenix Business Journal 
	» AZ Family 
	» 12 News 
	» Cronkite News 
	» Univision 
	» Phoenix New Times 
	» Arizona Mirror 
	» Downtown Devil 
Key Media
Press 
Releases
Spanish 
Radio 
Ads
La Campesina 101.9 FM (February 10 – March 23, 2025) 
»	 KNAI-AM 
»	 72 spots  
»	 Coverage: Phoenix and the greater Phoenix area, Tucson, 
and Prescott 
»	 Listeners: 500,000 daily  
Contacto Total (February 5 – March 21, 2025) 
»	 KNUV-AM 
»	 90 spots  
»	 Coverage: Phoenix and the greater Phoenix area 
Radio advertisements were a great way to reach the Spanish 
speaking communities.

9
Community Engagement Summary Phase III - 35th Avenue Corridor | 2025
Digital and print advertisements were published to 
announce the community engagement activities. Most 
of the advertisements were geofenced and/or targeted 
specifically to the corridor and reached both English and 
Spanish speakers in the area.    
Digital 
and Print 
Ads 
English Digital Ads 
	» Campaign dates: February 4 – March 6, 2025 
	» Impressions: 60,235  
	» Clicks: 107 
Spanish Digital Ads 
	» Campaign dates: February 4 – March 6, 2025 
	» Impressions: 19,482   
	» Clicks: 43 
Print Ads
One Spanish print advertisement ran in the Contacto Total Magazine 
beginning February 5, 2025. This magazine distributes over 30,000 
copies per month to more than 300 locations across the valley.

10
Community Engagement Summary Phase III - 35th Avenue Corridor | 2025
Community & 
Business Meetings 
and Events 
Providing an opportunity for in-person interaction with the BRT Program team was 
an important component to our outreach.

11
Community Engagement Summary Phase III - 35th Avenue Corridor | 2025
Community Workshops 
	» #1 – Tuesday, February 18, 2025, at 6 p.m. – Alta Vista Elementary School – 16 people attended 
	» #2 – Saturday, March 8, 2025, at 11 a.m. – Carl Hayden High School – 19 people attended 
 
Business Workshops 
	» #1 – Wednesday, February 19, 2025, at 6 p.m. – Alta Vista Elementary School – 5 people attended 
	» #2 – Saturday, March 1, 2025, at 9:30 a.m. – Carl Hayden High School – 5 people attended 
	» #3 – Wednesday, March 12, 2025, at 6 p.m. – Bret Tarver Learning Center – 7 people attended 
 
Pop-Up Events 
Seven informal pop-up events were set up at various locations along the corridor. 
Pop-up events are temporary, unexpected events hosted for a few hours in high 
traffic/activity areas.  
	» #1 – Thursday, February 20 – Thelda Williams Transit Center 
	» #2 – Monday, February 24 – Helen Drake Senior Center 
	» #3 – Friday, February 28 – DoubleTree by Hilton Phoenix North 
	» #4 – Tuesday, March 4 – Thelda Williams Transit Center 
	» #5 – Tuesday, March 25 – Grand Canyon University 
	» #6 – Saturday, March 29 – Grand Canalscape 
	» #7 – Wednesday, April 2 – Taco Tote 
Online Open House Analytics  
As part of the engagement process, the Phoenix BRT team developed an online 
open house and launched it on February 17, 2025. The site was easy to navigate and 
provided BRT 101 information, lane option information, the survey, and more. 
Total Users: 1,495 
New Users: 1,493 
Views: 2,074 
Mobile: 
32.8%
Desktop:  
66.9%  
Access by device:

12
Community Engagement Summary Phase III - 35th Avenue Corridor | 2025
BRT Lane Option 
Survey Results
We asked, you answered... 

The survey was available on the www.MeetPhoenixBRT.com website and 
printed within the activity book used at the workshops. In all, 552 Phoenix 
community members, residents, and business owners participated in the 
survey. Here’s what we heard!

13
Community Engagement Summary Phase III - 35th Avenue Corridor | 2025
You are a:
Homeowner (21.6%), resident (14.6%), and transit rider (13.6%) were the top three types of 
participants who submitted surveys.  
0
5%
10%
15%
20%
25%
Property manager
Other
Business manager
Property owner
Employed at a location along the corridor
Business owner
Renter
Frequent Driver along the corridor
Student 
Transit Rider
Resident
Homeowner
21.6%
14.6%
13.6%
10.9%
10.2%
6.9%
5.4%
5.0%
4.4%
3.3%
2.7%
1.3%
After learning about the impacts of center-running versus side-running 
dedicated BRT lane options, which lane option do you prefer? 
Center-running BRT was the most popular choice among overall respondents with 
54% of the responses.
Lane Option A: Side-Running
36.1%
No Preference
10.1%
Lane Option B: Center-Running 53.8%
All Responses
545 survey responses
Results

14
Community Engagement Summary Phase III - 35th Avenue Corridor | 2025
Community-Specific
454 survey responses
No Preference
10.6%
Lane Option A: Side-Running
34.1%
Lane Option B: Center-Running 55.3%
Business-Specific
88 survey responses
No Preference
7.9%
Lane Option B: 
Center-Running 
45.5%
Lane Option A: Side-Running 46.6%

15
Community Engagement Summary Phase III - 35th Avenue Corridor | 2025
Why do you prefer this option? 
General travel safety - felt 
this was overall safer, less 
confusing for drivers and 
would create better travel 
flow; safer for all modes
Pedestrian safety - creates 
safer pedestrian spaces by 
having shorter crossings
Traffic - would alleviate traffic 
overall through dedicated 
lanes and support transit flow
General travel safety - felt 
this would limit crashes due 
to U-turns, general driver 
confusion and buses being in 
the middle of the road
Pedestrian safety - creates 
safer pedestrian spaces by 
keeping access on the side
Does not support dedicated 
lanes or BRT - chose side 
running to limit dedicated 
lanes that impede vehicle 
travel or voiced concern over 
project overall
Center-Running
(53.8%)
Side-Running
(36.1%)
X

16
Community Engagement Summary Phase III - 35th Avenue Corridor | 2025
Please rank the following design considerations in order of importance with 
1 being the most important factor to you and 5 being the least important. 
The following response rates highlight the average rank score per category.
3.7
3.5
3.2
2.6
1.8
Right-of-way
Left-turn 
access 
throughout 
the corridor
Pedestrian 
access 
and safety
Faster 
travel 
times
Dedicated lanes 
with no impacts from 
local bus or 
general traffic
Community-Specific
Business-Specific
All Responses
3.4
3.3
3.3
3.0
2.0
Right-of-way
Pedestrian 
access 
and safety
Faster
 travel 
times
Left-turn 
access 
throughout 
the corridor
Dedicated lanes 
with no impacts from 
local bus or 
general traffic
3.8
3.6
3.3
2.5
1.8
Right-of-way
Left-turn 
access 
throughout 
the corridor
Pedestrian 
access 
and safety
Faster 
travel 
times
Dedicated lanes 
with no impacts from 
local bus or 
general traffic

17
Community Engagement Summary Phase III - 35th Avenue Corridor | 2025
If a business assistance program is offered as part of this BRT project, what 
type of assistance would be most helpful to your business? 
4.3
3.8
3.3
2.5
Professional 
business consulting
Marketing/
Advertising
Financial assistance 
(grants or loans)
Customized business 
access signage
$
$
$
Are you interested in participating in a BRT business focused working group 
or committee? 
Yes 23.2%
No 76.8%
76.8% of business owners 
indicated they were not 
interested in participating in a 
BRT business focused working 
group or committee despite 
23.2% expressing interest.

18
Community Engagement Summary Phase III - 35th Avenue Corridor | 2025
Where do you live? 
85009 (13%), 85051 (12.6%), and 85017 (7%) were the top three zip codes where survey 
participants live.

19
Community Engagement Summary Phase III - 35th Avenue Corridor | 2025
Where do you work?
85009 (22%), 85051 (13%), and 85017 (10%) were the top three zip codes where survey 
participants work.

20
Community Engagement Summary Phase III - 35th Avenue Corridor | 2025
Who Participated
White 
40.9%
Hispanic 38.0%
Not Provided 
11.3%
Black or African 
American 5.2%
Other 2.6%
Asian or Asian American 1.5%
Native Hawaiian or other 
Pacific Islander 0.5%
Community-Specific
White 
34.1%
Asian or Asian 
American 8.0%
Not Provided 8.0%
Hispanic 45.4%
Other 3.4%
Black or African 
American 1.1%
Business-Specific
All Responses
White 
39.7%
Asian or Asian 
American 2.5%
Not Provided 10.9%
Hispanic 39.3%
Other 2.7%
Black or African 
American 4.5%
Native Hawaiian or other Pacific 
Islander 0.4%
What is your ethnicity?

21
Community Engagement Summary Phase III - 35th Avenue Corridor | 2025
What is your age?
All Responses
15.9%
15.4%
15.2%
14.9%
13.9%
9.4%
9.1%
6.2%
5%
10%
15%
20%
Not 
Provided
18-24
Under 18
45-54
35-44
55-64
25-34
65 and 
over
Community-Specific
17.2%
14.6%
13.9%
13.9%
13.7%
9.4%
8.9%
6.5%
5%
10%
15%
20%
Not 
Provided
18-24
Under 18
45-54
35-44
55-64
25-34
65 and 
over
11.3%
Business-Specific
22.7%
20.5%
19.3%
14.8%
10.2%
9.1%
3.4%
5%
10%
15%
20%
25%
Not 
Provided
18-24
65 and 
over
45-54
25-34
35-44
55-64

22
Community Engagement Summary Phase III - 35th Avenue Corridor | 2025
What is your gender?
Female
46.7%
Male
45.1%
Not 
Provided 
6.9%
Non-binary 
or other
1.3%
All Responses
Community-Specific
Female
47.8%
Male
43.5%
Not 
Provided 
7.6%
Non-binary 
or other
1.1%
Business-Specific
Female
40.9%
Male
53.4%
Not 
Provided 
3.4%
Non-binary 
or other
2.3%

MeetPhoenixBRT.com