Attachment C - VPC Summaries - Z-87-22-6.pdf

City of Phoenix — Formal (2024-09-18)

View PDF Meeting page

Extracted text (via pymupdf) 10496 characters
City of Phoenix • Planning & Development Department 
200 West Washington Street, 3rd Floor • Phoenix, Arizona  85003-1611 • (602) 262-6882 
Village Planning Committee Meeting Summary 
Z-87-22-6
INFORMATION ONLY 
Date of VPC Meeting 
November 14, 2023 
Request From 
C-3
Request To 
PUD  
Proposal 
Multifamily residential and commercial uses 
Location 
Approximately 875 feet south of the southwest corner 
of 56th Street and Van Buren Street 
VPC DISCUSSION: 
No member of the public registered to speak on this item. 
APPLICANT PRESENTATION: 
George Pasquel, representing the applicant with Withey Morris Baugh, PLC, 
introduced himself and discussed the location of the proposal noting the adjacent 
streets, parks and light rail stations. Mr. Pasquel stated the history of the areas noting 
the local industrial and commercial uses in the area. Mr. Pasquel displayed maps 
showing adjacent multifamily developments and the industrial areas that include outdoor 
storage. Mr. Pasquel discussed the development of the site which include five parcels 
and a current development to the north by the Arizona Humane Society. Mr. Pasquel 
displayed pictures of the existing site and conceptual drawings of the site. Mr. Pasquel 
discussed the development density noting that no General Plan amendment would be 
needed. Mr. Pasquel stated the existing and adjacent zoning and the proposed site plan 
which was uniquely oriented which required design adjustments which feature a podium 
style with parking below the residential units which allows the amenity deck to be 
elevated. Mr. Pasquel stated that the primary access for the development is off 56th 
Street. Mr. Pasquel said that the street frontage includes bicycle amenities and prevents 
direct view of the garage units and on the west side of the site the buildings are 
organized to accommodate lower building heights. Mr. Pasquel stated the shape of the 
site required a unique design for the different units and the inclusion of landscaping 
areas. Mr. Pasquel stated that Alliance, the development company, was located in 
Phoenix and have experience in multifamily development with extensive amenities. Mr. 
Pasquel stated that a PUD was best suited because of the shape of the site to adjust 
the setback and customize the units. Mr. Pasquel stated that the site allowed the 
development to use the Walkable Urban Code which would be suited to the site 
because of the proximity to the light rail stations and provide some flexibility for height.  
ATTACHMENT C

Camelback East Village Planning Committee 
Meeting Summary 
Z-87-22-6 Info Only 
Page 2 
 
City of Phoenix • Planning & Development Department 
200 West Washington Street, 3rd Floor • Phoenix, Arizona  85003-1611 • (602) 262-6882 
 
and lot coverage. Mr. Pasquel described their outreach process and submittal, and 
some issues arose with utility placement which caused a delay. 
 
QUESTIONS FROM THE COMMITTEE: 
 
Committee Member Augusta asked about the availably of electric vehicle charging 
infrastructure. Mr. Pasquel responded that there will be electric vehicle available 
parking that will be wired and ready which is a common development feature.  
 
PUBLIC COMMENTS: 
 
None. 
 
 
APPLICANT RESONSE: 
 
None. 
 
FLOOR/PUBLIC DISCUSION CLOSED: COMMITTEE DISCUSSION:  
 
None.  
 
STAFF COMMENTS REGARDING VPC RECOMMENDATION: 
 
Staff have no comments.

City of Phoenix • Planning & Development Department 
200 West Washington Street, 3rd Floor • Phoenix, Arizona  85003-1611 • (602) 262-6882 
 
 
Village Planning Committee Meeting Summary 
Z-87-22-6 
 
 
Date of VPC Meeting 
January 9, 2024 
Request From 
C-3 
Request To 
PUD 
Proposal 
Multifamily residential and commercial uses per the 
Walkable Urban Code, Transect 5:6 
Location 
Approximately 875 feet south of the southwest corner 
of 56th Street and Van Buren Street 
VPC Recommendation 
Approval per the staff recommendation 
VPC Vote 
16-0 
 
VPC DISCUSSION & RECOMMENDED STIPULATIONS: 
 
One member of the public registered to speak on this item. 
 
STAFF PRESENTATION: 
 
John Roanhorse, staff, provided an overview of the rezoning request, describing the 
location, general plan designation, existing and proposed zoning district, and the 
surrounding uses. Mr. Roanhorse stated the proposal will apply the Walkable Urban 
Code. 
 
APPLICANT PRESENTATION: 
 
George Pasquel, representing the applicant with Withey Morris Baugh, PLC, 
introduced himself and noted the developer as Alliance Residential. Mr. Pasquel noted 
that the presentation has been provided to the Committee at a previous meeting and 
some details have been added in consultation with the design team.   Mr. Pasquel 
provide background on the location of the proposal and some of the adjacent amenities, 
landmarks and accessibility to the light rail. Mr. Pasquel described the current site that 
has heavy commercial, outdoor storage and industrial type uses. Mr. Pasquel stated 
that with the light rail nearby the area has been changing and there will be continued 
improvements to elevate the area and with the PUD redevelopment that area will have 
high quality residential units. Mr. Pasquel described the current aesthetics of the area 
and the opportunity to create a responsive streetscape along 56th Street which will 
include some landscaping and promote pedestrian movement. Mr. Pasquel stated that 
the proposal meets the intent General Plan which encourages higher density residential

Camelback East Village Planning Committee 
Meeting Summary 
Z-87-22-6 
Page 2 of 3 
 
 
 
City of Phoenix • Planning & Development Department 
200 West Washington Street, 3rd Floor • Phoenix, Arizona  85003-1611 • (602) 262-6882 
development. Mr. Pasquel displayed the zoning map and noted surrounding zones 
which is one reason that a PUD was the best option for this proposal. Mr. Pasquel 
expressed the design process for Alliance Residential and the custom development for 
the location which focused on a two-building concept. Mr. Pasquel noted that building 
one features podium parking will surrounding residential units and building two is a 4-
story townhouse design with individual tuck under parking garages. Mr. Pasquel stated 
that this design provides an improved response to the existing townhomes to the west 
of the site. Mr. Pasquel stated that the primary entrance along 56th Street will also 
provide pedestrian level activation and the garage parking for building one will be 
entirely screened. Mr. Pasquel noted that in the center podium area of building one 
there will be a pool and cabana area. Mr. Pasquel displayed streetscape renderings of 
the proposal noting the landscaping, detached sidewalks, and entry features. Mr. 
Pasquel stated the development Alliance Residential is a Phoenix based company that 
builds high quality projects that are highly amenitized. Mr. Pasquel described the unique 
shape off the site which is larger on the east side and has three road frontages that 
require differing setbacks and streetscape conditions, and a PUD was the best 
approach. Mr. Pasquel stated that the proposal is located close to the light rail station 
which is in Tempe. Mr. Pasquel stated that the site is not within the Walk Urban Code 
District, but it is close to the light rail and incorporates high density and does allow 
customized design standards. Mr. Pasquel noted the building height of 80 feet is 
allowed in the Walkable Urban Code T5:6 which provides variation for the proposed 
design. Mr. Pasquel stated in the development review process outreach was very 
important and two public meetings were conducted and no negative comments were 
received. Mr. Pasquel also note that the Humane Society has completed a development 
to the north of the project, and this represents a big investment in the area.          
 
QUESTIONS FROM THE COMMITTEE: 
 
Committee Member Schmieder asked if the project is in the Sky Harbor flight path. 
Mr. Pasquel responded that for the project they do have to submit a FAA clearance 
form in order to build. Committee Member Schmieder asked if noise would impact the 
residence. Mr. Pasquel responded that construction will include wall thickness and other 
measures to reduce sound. 
 
Committee Member Whitesell asked about the rental unit price range. Mr. Pasquel 
responded that price is hard to predict because they are far out of when construction 
would begin but at the last analysis it would estimate a studio would be about $1500 for 
a studio and $2700 for a two bedroom unit and there are 299 units. Mr. Pasquel stated 
they typically are above market rates. Committee Member Whitesell asked about 
comparative rental rates to existing multifamily developments in the area. Mr. Pasquel 
responded that the developments in the area were constructed approximately 12 years 
ago, and some were apartments that were converted to condominiums. Committee 
Member Whitesell asked if any of the adjacent developments were in the market rate 
category or rental fees. Mr. Pasquel responded, yes, the adjacent developments were 
built at market rate. Committee Member Whitesell asked where residents would go to a 
grocery store and if there could be something incorporated into the project. Mr. Pasquel

Camelback East Village Planning Committee 
Meeting Summary 
Z-87-22-6 
Page 3 of 3 
 
 
 
City of Phoenix • Planning & Development Department 
200 West Washington Street, 3rd Floor • Phoenix, Arizona  85003-1611 • (602) 262-6882 
responded that in some Alliance projects a bodega has been added to the ground floor 
of other projects and this could be a possibility if the demand was there and there could 
be space made available.     
 
PUBLIC COMMENT: 
 
Rich Barber a resident in the Camelback East Village stated he supports this project. 
 
APPLICANT RESPONSE: 
 
None.  
 
QUESTIONS FROM THE COMMITTEE: 
 
None.  
 
FLOOR/PUBLIC DISCUSSION CLOSED: MOTION, DISCUSSION, AND VOTE 
 
MOTION: 
 
Committee Member Barry Paceley motioned to recommend approval of Z-87-22-6 per 
the staff recommendation. Committee Member Sharon Schmieder seconded the 
motion. 
 
VOTE: 
 
16-0; motion to recommend approval of Z-87-22-6 per the staff recommendation passes 
with Committee members Abbott, Augusta, Baumer, Bayless, Beckerleg Thraen, 
Garcia, Grace, Jurayeva, Langmade, O’Malley, Paceley, Schmieder, Sharaby, 
Whitesell, Fischbach, and Swart in favor. 
 
 
STAFF COMMENTS REGARDING VPC RECOMMENDATION & STIPULATIONS: 
 
Staff has no comments.