PUBLIC TRANSPORTATION AGENCY SAFETY PLAN City of Phoenix Public Transit Department December 2020 DRAFT Attachment A The City of Phoenix Public Transit Department (PTD) has prepared the Public Transportation Agency Safety Plan (PTASP, or Plan) to comply with the Federal Transportation Administration’s (FTA) PTASP final rule 49 Code of Federal Regulations (CFR) Part 673, published on July 19, 2018. The rule requires public transportation system operators receiving federal Section 5307 funds to develop safety plans with processes and procedures that implement safety management systems (SMS) principles and methods. The SMS includes the PTASP’s Safety Management Policy Statement, Safety Risk Management, Safety Assurance and Safety Promotion policies and procedures that encompass a top-down and data-driven approach to safety risk management and ensuring the effectiveness of safety risk mitigation. Phoenix Transit Operations PTD operates fixed local bus service, neighborhood bus circulators, commuter bus service, and paratransit services in an area of approximately 518 square miles, with a population of nearly 1.8 million. Transit services are operated in partnership with three contractors (Contractors): First Transit Inc., Transdev Services Inc., and MV Transportation Inc. Day-to-day bus operations and maintenance originate with each contractor, and PTD works with each contractor individually to ensure an effective safety program for the entire Phoenix-operated transit system. Safety Plan Regulatory Background On July 19, 2019, the FTA PTASP Final Rule (49 CFR Part 673.11(a)(3)) became effective. FTA established the PTASP compliance date to be July 20, 2020 and extended it to December 31, 2020. PTASP Elements Safety Management Policy A documented commitment to safety that defines safety objectives, as well as the accountabilities and responsibilities of employees in regard to safety. Safety Assurance A federally mandated process for safety performance monitoring and measurement. As a large transit provider, it is required to develop processes that address management of change and promote continuous improvement. Safety Risk Management An established and documented process for identifying, analyzing, assessing, and mitigating safety risks and hazards. Safety Promotion A process for safety training and communication. Key Performance Indicators Established safety performance targets, including the process and timeline for conducting an annual review and update. Developed a system-specific safety plan for motor bus system. Developed a system-specific safety plan for motor bus system. Developed a system-specific safety plan for demand response system. City of Phoenix Public Transportation Agency Safety Plan Executive Summary DRAFT Regional Relationships PTD is responsible for overseeing the city's transit program and, at the same time, serves as the designated recipient for federal funding under FTA's Section 5307, 5309, 5310, 5316, 5317, 5337 and 5339 programs in the Phoenix-Mesa Urbanized Area. This includes the cities of Phoenix, Tempe, Mesa, Scottsdale, Glendale, Avondale, Fountain Hills, Peoria, Paradise Valley, Goodyear, Litchfield Park, Surprise, Tolleson, Youngtown and areas of Maricopa County. In addition to managing FTA grant subrecipients, PTD is responsible for ensuring compliance with federal rules and guidelines for itself and the region’s subrecipients. Each subrecipient enters into a Grant Pass-Through Agreement with PTD for the receipt of FTA funds. PTD provides FTA funding for two transit agencies as subrecipients: the Regional Public Transportation Authority (RPTA) and Valley Metro Rail, Inc. (VMR). RPTA is a public agency, duly organized under the laws of the State of Arizona to operate regional bus service and is overseen by a board of its members’ elected officials. Membership is open to all municipalities in Maricopa County and to the county government. VMR is a non-profit, public corporation that is responsible for the design, construction and operation of the 26-mile light rail system and future extensions. In addition, Scottsdale, Peoria, and Glendale provide local transit service within their jurisdictions, all as small transit agencies as defined in the PTASP final rule. The Arizona Department of Transportation (ADOT) serves as the State Safety Oversight Agency for PTD and the Maricopa Association of Governments (MAG) serves the metropolitan Phoenix area as the regional Metropolitan Planning Organization for the agencies within Maricopa County. Plan Development PTD requires transit system Contractors to develop and implement safety plans unique to each contractor’s system and scope of operation. In addition, PTD coordinated with MAG to develop regional transit system performance targets in the PTASP. Certification and Implementation The Phoenix City Council adopted and certified the PTASP. The PTASP was shared with ADOT and MAG and implemented by PTD and Contractors. Roles Defined in the PTASP This is the PTASP life cycle from the inception of FTA’s mandate to the Plan’s annual maintenance and certification. Accountable Executive An individual who has signing authority for the Plan. Examples of an accountable executive may include a city manager or department director. Board of Directors A board that must approve the Plan. In Phoenix, the City Council is the equivalent authority to the board of directors. Chief Safety Officer An individual who is responsible for safety within the transit agency and usually reports directly to the agency’s chief executive officer or the equivalent position. FTA Final Rule July 19, 2019 Update Safety Performance Targets Annually Review Safety Performance Draft and Certify city of Phoenix PTASP DRAFT System: City of Phoenix Public Transit Department Document No: PTASP Revision # Initial - DRAFT Issue Date: 09/18/2020 City of Phoenix - Public Transportation Agency Safety Plan, 2020 i Table of Contents 1. Plan Adoption and Certification ..................................................................................................... 1-1 1.1 Plan Adoption ......................................................................................................................... 1-1 1.1 Certification of Compliance ..................................................................................................... 1-1 2. Introduction ...................................................................................................................................... 2-1 3. Safety Plan Regulatory Background .............................................................................................. 3-1 3.1 Plan Development .................................................................................................................. 3-1 3.2 Certification and Implementation ............................................................................................ 3-1 4. Transit Agency Information ............................................................................................................ 4-1 4.1 General Information ................................................................................................................ 4-1 4.2 Agency Description ................................................................................................................. 4-2 5. Safety Plan Development and Maintenance .................................................................................. 5-1 5.1 PTASP Development .............................................................................................................. 5-1 5.2 Annual Internal Review and Update Process ......................................................................... 5-1 5.2.1 PTD ............................................................................................................................ 5-1 5.2.2 Contractors ................................................................................................................ 5-1 5.3 PTASP Audit Process ............................................................................................................. 5-1 5.4 PTASP Documentation and Recordkeeping .......................................................................... 5-2 5.4.1 PTD ............................................................................................................................ 5-2 5.4.2 Contractors ................................................................................................................ 5-2 6. Safety Performance Targets ........................................................................................................... 6-1 7. Safety Management Systems.......................................................................................................... 7-1 7.1 Safety Management Policy ..................................................................................................... 7-1 7.1.1 PTD ............................................................................................................................ 7-1 7.2 State and Metropolitan Planning Organization Coordination ................................................. 7-1 7.3 Safety Goals ........................................................................................................................... 7-1 7.4 Safety Management Policy Communication ........................................................................... 7-1 7.4.1 PTD ............................................................................................................................ 7-1 7.4.2 Contractors ................................................................................................................ 7-2 7.5 Authorities, Roles and Responsibilities .................................................................................. 7-2 7.5.1 PTD ............................................................................................................................ 7-2 7.5.2 Contractors ................................................................................................................ 7-7 7.6 Employee Safety Reporting Program ..................................................................................... 7-7 7.6.1 PTD ............................................................................................................................ 7-7 7.6.2 Contractors ................................................................................................................ 7-8 7.7 Administrative Regulation Reporting Policy ........................................................................... 7-8 7.7.1 PTD ............................................................................................................................ 7-8 7.7.2 Contractors ................................................................................................................ 7-8 DRAFT System: City of Phoenix Public Transit Department Document No: PTASP Revision # Initial - DRAFT Issue Date: 09/18/2020 City of Phoenix - Public Transportation Agency Safety Plan, 2020 ii 7.8 Safety Risk Management ....................................................................................................... 7-9 7.8.1 Safety Hazard Identification....................................................................................... 7-9 7.8.2 Safety Risk Assessment .......................................................................................... 7-12 7.8.3 Safety Risk Mitigation .............................................................................................. 7-13 7.9 Safety Assurance ................................................................................................................. 7-16 7.9.1 Safety Performance Monitoring and Measurement ................................................. 7-16 7.9.2 Management of Change .......................................................................................... 7-19 7.9.3 Continuous Improvement ........................................................................................ 7-19 7.10 Safety Promotion .................................................................................................................. 7-20 7.10.1 Safety Communication ............................................................................................ 7-20 7.10.2 Safety Training ........................................................................................................ 7-21 List of Appendices Appendix A. City Council Minutes or Resolution Appendix B. First Transit Abbreviated Safety Plan Appendix C. Transdev Abbreviated Safety Plan Appendix D. MV Transportation Abbreviated Safety Plan Appendix E. PTASP Activity Log Appendix F. PTASP Performance Target Log 1. PTASP Performance Target Log 2. PTASP Baseline Performance Log Appendix G. PTASP Supporting Documents 1. NTD Monthly Reports 2. PTD’s Critical & Emergency Incident Communication Map 3. Employee Critical Incident Training 4. City of Phoenix Administrative Regulations 5. Public Transit Department Facility Inspection Report DRAFT System: City of Phoenix Public Transit Department Document No: PTASP Revision # Initial - DRAFT Issue Date: 09/18/2020 City of Phoenix - Public Transportation Agency Safety Plan, 2020 iii List of Tables Table 1. Bus Service Safety Performance Baseline and Targets .............................................................. 6-1 Table 2. Paratransit Service Safety Performance Baseline and Targets .................................................. 6-2 Table 3. Safety Roles and Responsibilities ................................................................................................ 7-4 Table 4. Safety Hazard Type Identification (Step 2) ................................................................................ 7-11 Table 5. Safety Hazard Risk Probability (Step 3) .................................................................................... 7-11 Table 6. Safety Hazard Risk Severity Categories (Step 4) ...................................................................... 7-12 Table 7. Safety Hazard Risk Assessment Matrix (Step 5) ....................................................................... 7-12 Table 8. Safety Hazard Risk Index Matrix (Step 6) .................................................................................. 7-13 Table 9. Hazard Identification and Risk Assessment Log (Step 7).......................................................... 7-13 Table 10. Hazard Mitigation Actions (Step 8) .......................................................................................... 7-14 List of Figures Figure 1. Public Transit Department Regional Chart ................................................................................. 2-2 Figure 2. City of Phoenix Public Transit Department Safety Organizational Chart ................................... 7-3 Figure 3. Safety Risk Management Eight Step Process ............................................................................ 7-9 Figure 4. Hazard Identification and Documentation (Step 1) ..................................................................... 7-9 Figure 5. Safety Risk Management Scenario .......................................................................................... 7-15 Figure 6. PTD and Contractor Monthly Communication .......................................................................... 7-17 DRAFT System: City of Phoenix Public Transit Department Document No: PTASP Revision # Initial - DRAFT Issue Date: 09/18/2020 City of Phoenix - Public Transportation Agency Safety Plan, 2020 iv Glossary of Terms 49 CFR Part 673: The final rule for the Public Transportation Agency Safety Plan as authorized by the Moving Ahead for Progress in the 21st Century Act (MAP-21). This final rule requires states and certain operators of public transportation systems that receive federal financial assistance under 49 U.S.C. Chapter 53 to develop Public Transportation Agency Safety Plans. Accident: An event that involves a loss of life, a serious injury to a person, a collision of transit vehicles, an evacuation for life safety reasons or any derailment of a transit vehicle, at any location, at any time, whatever the cause. Accountable Executive: Typically, the highest executive in the agency. A single, identifiable person who has ultimate responsibility for carrying out the safety management system of a public transportation agency, and control or direction over the human and capital resources needed to develop and maintain the agency’s Public Transportation Agency Safety Plan, in accordance with 49 U.S.C. 5329(d), and the agency’s Transit Asset Management Plan in accordance with 49 U.S.C. 5326. Chief Safety Officer: An adequately trained individual who has responsibility for safety and reports directly to a transit department’s chief executive officer, general manager, president, or equivalent officer. A Chief Safety Officer may not serve in other operational or maintenance capacity, unless employed by a department that is either a small public transportation provider, or a public transportation provider that does not operate a rail fixed guideway public transportation system. Critical Incident: An occurrence, natural or human-caused, that requires a response to protect life or property. Incidents can, for example, include major disasters, emergencies, terrorist attacks, terrorist threats, civil unrest, wildland and urban fires, floods, hazardous materials spills, nuclear accidents, aircraft accidents, earthquakes, hurricanes, tornadoes, tropical storms, tsunamis, war-related disasters, public health and medical emergencies, and other occurrences requiring an emergency response. Departmental Leadership and Executive Management: Members of an agency who have authorities or responsibilities for day-to-day implementation and operation of an agency’s safety management system. Designated Recipient: An entity that has been designated by the state governor or his/her designee to receive and/or sub-allocate FTA funding. Equivalent Authority: An entity that carries out duties similar to that of a Board of Directors, for a recipient or subrecipient of FTA funds under 49 U.S.C. Chapter 53, with sufficient authority to review and approve a recipient or subrecipient’s Public Transportation Agency Safety Plan. Event: An accident, incident, or occurrence. Grant Pass-Through Agreement: A non-federal entity that provides a subaward to a subrecipient to carry out part of a federal program. Hazard: Any real or potential condition that can cause injury, illness, or death; damage to or loss of the facilities, equipment, rolling stock or infrastructure of a public transportation system; or harm to the environment. Incident: An event that involves personal injury that is not a serious injury; one or more injuries requiring medical transport; or damage to facilities, equipment, rolling stock or infrastructure that disrupts the operations of a transit agency. DRAFT System: City of Phoenix Public Transit Department Document No: PTASP Revision # Initial - DRAFT Issue Date: 09/18/2020 City of Phoenix - Public Transportation Agency Safety Plan, 2020 v Investigation: Process of determining the causal and contributing factors of an accident, incident or hazard for the purpose of preventing recurrence and mitigating risk. Key Staff: A group of staff and their direct reporting personnel that support the Accountable Executive, Chief Safety Officer or Safety Management System Executive in developing, implementing, and operating the department’s safety management system. Major Mechanical Failure: Failure caused by vehicle malfunction or subpar vehicle condition that requires that the vehicle be pulled out of service. National Public Transportation Safety Plan: A plan to improve the safety of all public transportation systems that receive federal financial assistance under 49 U.S.C. Chapter 53. Occurrence: An event without any personal injury in which damage to facilities, equipment, rolling stock or infrastructure does not disrupt the operations of a transit agency/department. Operator: Provider of public transportation as defined under 49 U.S.C. 5302(14). Passenger: A person, other than an operator, who is boarding onto, riding on, or alighting from a vehicle on a public transportation system for the purpose of travel. Performance Measure: An expression based on a quantifiable indicator of performance or condition that is used to establish targets and to assess progress toward meeting the established targets. Performance Target: A quantifiable level of performance or condition, expressed as a value for the measure, to be achieved within a time period required by FTA. Potential Hazard: Any possible future condition that may cause injury, illness, or death; damage to or loss of the facilities, equipment, rolling stock or infrastructure of a public transportation system; or harm to the environment. Preventive Maintenance: Regular, scheduled and/or recurring maintenance of assets (equipment and facilities) as required by the manufacturer’s or vendor’s requirements, typically for the purpose of maintaining assets in satisfactory operating condition. Preventive maintenance is conducted by providing systematic inspection, detection, and correction of anticipated failures either before they occur or before they develop into major defects. Preventive maintenance is maintenance, including tests, measurements, adjustments, and parts replacement, performed specifically to prevent faults from occurring. The primary goal of preventive maintenance is to avoid or mitigate the consequences of equipment failure. Public Transportation Agency Safety Plan: The documented comprehensive agency safety plan for a transit agency that is required by 49 U.S.C. 5329. Rail Fixed Guideway Public Transportation System: Any fixed guideway system that uses rail, operates for public transportation, and serves within the jurisdiction of a state (and is not subject to the jurisdiction of the Federal Railroad Administration), or any such system undergoing engineering or construction. Rail fixed guideway public transportation systems include rapid rail; heavy rail; light rail; monorail; trolley; and inclined plane, funicular, and automated guideway. Reportable Event: A safety or security event occurring on transit right-of-way or infrastructure, at a transit revenue facility, at a maintenance facility or rail yard, during a transit related maintenance activity or involving a transit revenue vehicle. The following types of events are excluded from reporting requirements: events that occur off transit property where affected persons, vehicles, or objects come to DRAFT System: City of Phoenix Public Transit Department Document No: PTASP Revision # Initial - DRAFT Issue Date: 09/18/2020 City of Phoenix - Public Transportation Agency Safety Plan, 2020 vi rest on transit property after the event; OSHA events in administrative buildings; deaths that are a result of illness or other natural causes; other events occurring at bus stops or shelters that are not on transit- controlled property; collisions that occur while travelling to or from a transit-related maintenance activity; and collisions involving a supervisor car or other transit service vehicle operating on public roads. Risk: The composite of predicted severity and likelihood of the potential consequences of hazards. Risk Mitigation: A method or methods to eliminate or reduce the effects of hazards. Root Cause Analysis: A systematic process for identifying root causes of safety events and an approach for responding to them. Safety Assurance: The process within a transit agency’s Safety Management System that functions to ensure the implementation and effectiveness of safety risk mitigation and the satisfaction of safety objectives through the collection, analysis, and assessment of information. Safety Management Policy: A transit agency’s documented commitment to safety, which defines the transit agency’s safety objectives and the transit agency employees’ accountabilities and responsibilities in regard to safety. Safety Management System: The formal, top-down, data-driven, organization-wide approach to managing safety risk and ensuring the effectiveness of a transit agency’s safety risk mitigation. Safety management system includes systematic procedures, practices, and policies for managing risks and hazards. Safety Objective: A general goal or desired outcome related to safety. Safety Performance: An organization’s safety effectiveness and efficiency, as defined by safety performance indicators and targets, measured against the organization's safety objectives. Safety Performance Indicator: A data-driven, quantifiable parameter used for monitoring and assessing safety performance. Safety Performance Measure: An expression based on a quantifiable indicator or condition of performance that is used to establish targets and to assess progress toward meeting the established targets. Safety Performance Monitoring: Activities aimed at the quantification of an organization’s safety effectiveness and efficiency during service delivery operations, through a combination of safety performance indicators and safety performance targets. Safety Performance Target: A quantifiable level or condition of performance, expressed as a value for a given performance measure, achieved over a specified timeframe related to safety management activities. Safety Promotion: A combination of training and communication of safety information to support safety management system as applied to the transit agency’s public transportation system. Safety Risk: Assessed probability and severity of the potential consequence(s) of a hazard, using as reference the worst foreseeable, but credible, outcome. DRAFT System: City of Phoenix Public Transit Department Document No: PTASP Revision # Initial - DRAFT Issue Date: 09/18/2020 City of Phoenix - Public Transportation Agency Safety Plan, 2020 vii Safety Risk Assessment: Formal activity whereby a transit agency determines safety risk management priorities by establishing the significance or value of the safety risks. Safety Risk Management: A process within a transit agency’s safety plan for identifying hazards, assessing the hazards, and mitigating safety risk. Safety Risk Mitigation: Activities whereby a public transportation agency controls the probability or severity of the potential consequences of hazards. Safety Hazard Risk Probability: Likelihood that a consequence might occur, taking as reference the worst foreseeable, but credible, condition. Safety Hazard Risk Severity: Anticipated effects of a consequence, should hazards materialize, taking as reference the worst foreseeable, but credible, condition. Serious Injury: Any injury that: • Requires hospitalization for more than 48 hours, commencing within 7 days from the date the injury was received • Results in a fracture of any bone (except simple fractures of fingers, toes or nose) • Causes severe hemorrhages, or nerve, muscle, or tendon damage • Involves any internal organ • Involves second- or third-degree burns, or any burns affecting more than 5% of the body surface State: A state of the United States, the District of Columbia or the Territories of Puerto Rico, the Northern Mariana Islands, Guam, American Samoa, and the Virgin Islands. State of Good Repair: Condition in which a capital asset can operate at a full level of performance. State Safety Oversight Agency: An agency established by a state that meets the requirements and performs the functions specified by 49 U.S.C. 5329(e) and the regulations set forth in 49 CFR Part 674. Transit Agency: An operator of a public transportation system. Transit Asset Management Plan: Strategic and systematic practice of procuring, operating, inspecting, maintaining, rehabilitating and replacing transit capital assets to manage their performance, risks and costs over their life cycles for the purpose of providing safe, cost-effective and reliable public transportation, as required by 49 U.S.C. 5326 and 49 CFR 625. Vehicle Revenue Mile: The miles that vehicles are scheduled to or travel while in revenue service. Vehicle revenue miles include layover/recovery time and exclude deadhead, operator training, vehicle maintenance testing and school bus and charter services. DRAFT System: City of Phoenix Public Transit Department Document No: PTASP Revision # Initial - DRAFT Issue Date: 09/18/2020 City of Phoenix - Public Transportation Agency Safety Plan, 2020 viii Acronyms ADOT Arizona Department of Transportation CFR Code of Federal Regulations CSO Chief Safety Officer CTC Citizens Transportation Commission DASH Downtown Area Shuttle FTA Federal Transit Administration MAG Maricopa Association of Governments NSP National Safety Plan NTD National Transit Database PTASP Public Transportation Agency Safety Plan PTD Public Transit Department RPTA Regional Public Transportation Authority SMS Safety Management Systems TI&I Transportation, Infrastructure and Innovation Subcommittee U.S.C. United States Code VMR Valley Metro Rail DRAFT System: City of Phoenix Public Transit Department Document No: PTASP Revision # Initial - DRAFT Issue Date: 09/18/2020 City of Phoenix - Public Transportation Agency Safety Plan, 2020 1-1 1. Plan Adoption and Certification 1.1 Plan Adoption This Public Transportation Agency Safety Plan (PTASP) is approved by the Phoenix City Council and is hereby adopted, certified as compliant and signed by the Accountable Executive and the Chief Safety Officer: Jesus Sapien Accountable Executive Date Lars Jacoby Chief Safety Officer Date 1.1 Certification of Compliance The city of Phoenix certified on TBD, 2020, that this PTASP is in full compliance with 49 Code of Federal Regulations (CFR) Part 673, as required by 49 U.S.C. 5329, and is adopted and implemented by the city of Phoenix as evidenced by the Plan adoption signature and necessary Phoenix City Council approvals in Appendix A of this Plan. DRAFT System: City of Phoenix Public Transit Department Document No: PTASP Revision # Initial - DRAFT Issue Date: 09/18/2020 City of Phoenix - Public Transportation Agency Safety Plan, 2020 2-1 2. Introduction The City of Phoenix Public Transit Department (PTD) has prepared the Public Transportation Agency Safety Plan (PTASP) to comply with the Federal Transportation Administration’s (FTA) PTASP final rule 49 CFR Part 673. The rule requires public transportation system operators receiving federal Section 5307 funds to develop safety plans with processes and procedures that implement safety management system (SMS) principles and methods. The SMS includes the PTASP’s Safety Management Policy Statement, Safety Risk Management, Safety Assurance and Safety Promotion policies and procedures that encompass a top-down and data-driven approach to safety risk management and ensuring the effectiveness of safety risk mitigation. PTD operates fixed local bus service, neighborhood bus circulators, commuter bus service, and paratransit services in partnership with three Contractors: First Transit, Transdev and MV Transportation, which are all responsible for the day-to-day operations and maintenance, although PTD works individually with each contractor to ensure an effective safety program for the city’s transit system. PTD is also part of an overall regional transit system in partnership with the Regional Public Transportation Authority (RPTA) and Valley Metro Rail (VMR). The City of Phoenix is the designated recipient of FTA funding for the Phoenix-Mesa Urbanized Area, and distributes funds to subrecipients including RPTA, VMR, Tempe, Mesa, Scottsdale, Glendale, Avondale, Fountain Hills, Peoria, Paradise Valley, Goodyear, Litchfield Park, Surprise, Tolleson, Youngtown, and unincorporated areas of Maricopa County. In addition, Glendale, Peoria, and Scottsdale operate bus transit service in their jurisdictions, and PTASP regulations also apply to those transit agencies. This complex regional relationship is illustrated on Figure 1. This PTASP represents PTD’s relationship with its bus transit service contractors and includes safety management as it also relates to PTD employees, particularly those employees in safety-sensitive positions. As such, the preponderance of PTD transit budget is contracted service (89% of PTD’s budget is contracted services). No city employees are bus operators; the city does not provide maintenance, fueling or direct management of the contracted bus service. Where applicable, each section of this Plan includes the safety management processes and procedures of PTD and/or the safety management processes and procedures of the contractors. Contractors’ abbreviated safety plans are included in Appendices B through D. Their full safety plans are referenced in each abbreviated plan and are available upon request. DRAFT System: City of Phoenix Public Transit Department Document No: PTASP Revision # Initial - DRAFT Issue Date: 09/18/2020 City of Phoenix - Public Transportation Agency Safety Plan, 2020 2-2 Figure 1. Public Transit Department Regional Chart City of Phoenix FTA Designated Recipient of Federal Funds (5307, 5309, 5310, 5337, 5339, CMAQ, STP) Phoenix Public Transit Department Operates bus & paratransit 60% of region’s bus ridership Governance • CTC • TI&I Subcommittee • Phoenix City Council Valley Metro Rail Operates 26 miles of light rail Governance • RTAG • RMC • VMR Board • Phoenix* • Tempe* • Mesa* • Chandler * Current light rail service RPTA Regional Public Transportation Authority Operates Bus & Paratransit Governance • RTAG • TMC • RPTA Board *19 board members 40% of region’s bus ridership 57 current 5310 Subrecipients • Avondale • Buckeye • Chandler • El Mirage • Gilbert • Goodyear • Maricopa County • Mesa • Queen Creek 5307 City of Phoenix • CTC – Citizens Transportation Commission • TI&I – Transportation, Infrastructure and Innovation Subcommittee Valley Metro • VMR – Valley Metro Rail • RMC – Rail Management Committee • RTAG – Regional Transit Advisory Group • TMC – Transit Management Committee Federal • CMAQ – Congestion Mitigation and Air Quality • FTA – Federal Transit Administration • STP – Surface Transportation Program Acronyms & Abbreviations Subrecipients • Surprise • Tempe • Tolleson Operates Service • Glendale • Scottsdale • Phoenix • Peoria DRAFT System: City of Phoenix Public Transit Department Document No: PTASP Revision # Initial - DRAFT Issue Date: 09/18/2020 City of Phoenix - Public Transportation Agency Safety Plan, 2020 3-1 3. Safety Plan Regulatory Background The FTA PTASP Final Rule (49 CFR Part 673.11(a)(3)) became effective July 19, 2019. The rule requires public transportation system operators receiving federal Section 5307 funds to develop safety plans with processes and procedures for implementing the SMS. The PTASP contains the following four SMS elements: • Safety Management Policy: A documented commitment to safety that defines PTD’s objectives, as well as the accountabilities and responsibilities of its employees in regard to safety. • Safety Risk Management: An established and documented process for identifying, analyzing, assessing, and mitigating safety risks and hazards. • Safety Assurance: A federally mandated process for safety performance monitoring and measurement. PTD is a large transit provider and therefore required to develop management of change and continuous improvement processes. • Safety Promotion: A process for safety training and communication. The PTASP also contains established safety performance targets for contracted service operators, including the process and timeline for conducting an annual PTASP review and update. 3.1 Plan Development PTD requires Contractors to develop and implement safety plans unique to each Contractor’s system and scope of operation. The PTASP rule is also applicable to the PTD Contractors. PTD coordinated with the Maricopa Association of Governments (MAG) to collaborate on regional transit system performance targets in the PTASP. 3.2 Certification and Implementation The Phoenix City Council adopted and certified the PTASP, which was then shared with the Arizona Department of Transportation (ADOT) and implemented by PTD staff and Contractors. DRAFT System: City of Phoenix Public Transit Department Document No: PTASP Revision # Initial - DRAFT Issue Date: 09/18/2020 City of Phoenix - Public Transportation Agency Safety Plan, 2020 4-1 4. Transit Agency Information 4.1 General Information General Agency Information City of Phoenix Public Transit Department 302 North 1st Avenue, Suite 900 Phoenix, Arizona 85003 Number of Employees: 115 Contractor Information (as of this writing) Transdev Number of Employees: 952 Buses (40 and 60 foot): 330 Circulator Cutaways: 10 PTD Fiscal Year Revenue Miles: 2018 - 14,924,290 2019 - 15,191,569 2020 - 13,878,353 First Transit Number of Employees: 510 Buses (40 and 60 feet): 159 Circulator Cutaways: 6 PTD Fiscal Year Revenue Miles: 2018 - 6,453,377 2019 - 6,274,901 2020 - 6,810,813 MV Transportation Number of Employees: 249 Dial-A-Ride Cutaways: 123 PTD Fiscal Year Revenue Miles: 2018 - 322,914 2019 - 331,731 2020 - 288,763 Note: PTD’s fiscal year is July 1 through June 30, each year. Accountable Executive Jesús Sapien Public Transit Director Chief Safety Officer Lars Jacoby Management Assistant II, Director’s Office Mode Applicability Operated: Bus and Paratransit Plan Applicability: Bus and Paratransit Types of Funding Section 5307 DRAFT System: City of Phoenix Public Transit Department Document No: PTASP Revision # Initial - DRAFT Issue Date: 09/18/2020 City of Phoenix - Public Transportation Agency Safety Plan, 2020 4-2 4.2 Agency Description The city of Phoenix purchased the Phoenix Transit System from a private company in 1971, and since then is responsible for overseeing the city's transit programs and serves as the designated recipient for federal funding under FTA's Section 5307, 5309, 5310, 5316, 5317, 5337 and 5339 programs in the Phoenix-Mesa Urbanized Area. PTD's service area is 518 square miles, consisting of a population of approximately 1.7 million people. In addition to managing FTA grants subrecipients, PTD is responsible for ensuring compliance with federal rules and guidelines for itself and the region’s subrecipients. Each subrecipient signs a Grant Pass Through Agreement with PTD for the receipt of FTA funds. PTD contracts the operation of the city’s transit network of 38 local fixed routes, four circulator routes and six RAPID (commuter bus) routes, as well as Phoenix Dial-A-Ride, the city’s paratransit service. CITY OF PHOENIX CONTRACTORS First Transit operates 11 local and one circulator routes from the city’s West Transit Facility. For additional information, see the First Transit Abbreviated Safety Plan (Appendix B). Transdev operates 27 local, six RAPID, and three circulator routes. Transdev operates from the city’s North and South Transit Facilities. For additional information on Transdev, see the Transdev Abbreviated Safety Plan (Appendix C). MV Transportation operates the Phoenix Dial-A-Ride paratransit service for persons with disabilities certified under the Americans with Disabilities Act of 1990 guidelines. The company operates from an operator-leased facility. To supplement Dial-A-Ride, PTD’s Alternative Transportation Programs are also provided by MV Transportation for transportation assistance via taxi vouchers and to operate a shuttle service for seniors and persons with disabilities or are receiving dialysis treatment. For additional information on MV Transportation, see the MV Transportation Abbreviated Safety Plan (Appendix D). OTHER AGENCIES PTD provides FTA funding for two transit agencies and three small transit agencies as subrecipients: RPTA, VMR, city of Scottsdale, city of Glendale, and city of Peoria respectively (see Figure 1). Each small transit agency maintains a standalone PTASP for their respective programs. RPTA is overseen by a board of elected officials from member agencies, including Avondale, Buckeye, Chandler, El Mirage, Gilbert, Glendale, Goodyear, Maricopa County, Mesa, Peoria, Phoenix, Scottsdale, Surprise, Tempe, Tolleson and Wickenburg. RPTA is responsible for transit marketing and financial management of the transit component of the Maricopa County regional transportation program. RPTA also contracts for the operation of the local and commuter bus and paratransit services it operates outside of Phoenix. VMR is a non-profit, public corporation that is responsible for the design, construction and operation of the 26-mile light rail system and future extensions. The board includes representatives from the member cities of Chandler, Mesa, Phoenix and Tempe. The light rail system currently serves Phoenix, Tempe and Mesa. DRAFT System: City of Phoenix Public Transit Department Document No: PTASP Revision # Initial - DRAFT Issue Date: 09/18/2020 City of Phoenix - Public Transportation Agency Safety Plan, 2020 4-3 ADOT is the state’s transportation agency responsible for planning, building and operating the highway system, as well as building and maintaining bridges and the operation of the Grand Canyon Airport. ADOT serves as the State Safety Oversight Agency for PTD. MAG serves the metropolitan Phoenix area as the regional Metropolitan Planning Organization for Maricopa County and its 27 member cities and agencies. DRAFT System: City of Phoenix Public Transit Department Document No: PTASP Revision # Initial - DRAFT Issue Date: 09/18/2020 City of Phoenix - Public Transportation Agency Safety Plan, 2020 5-1 5. Safety Plan Development and Maintenance 5.1 PTASP Development The PTASP was written and reviewed by PTD subject matter experts and a third-party consultant to ensure it meets current (2020) safety industry standards and follows 49 CFR Part 673. Through its written agreements with multiple service providers, PTD requires Contractors to develop and implement safety plans unique to their respective scope of operations, while providing oversight and input to ensure compliance. Throughout each process, each Contractor develops and implements safety plans that address safety needs. As shown in Figure 1, the PTASP went through a three-step formal approval process: 1. Phoenix Citizens Transportation Commission (CTC) – a 15-member committee appointed by the Phoenix Mayor and City Council to provide oversight of the Phoenix Transportation plan (T2050). 2. Transportation, Infrastructure and Innovation (TI&I) Subcommittee – a four-member subcommittee of the Phoenix City Council that provides policy guidance on a range of issues, including transit. 3. Phoenix City Council – Comprised of nine members (the Mayor and eight Council members), who provide approval and direction on policies and initiatives citywide. The Phoenix City Council adopted the PTASP on XXX., XX, 2020. 5.2 Annual Internal Review and Update Process 5.2.1 PTD PTD management and staff will review the PTASP on an annual basis prior to December 31st of each year beginning in 2021 and make updates to the plan as necessary. Review of the PTASP along with any subsequent updates, addendums, adoption, and distribution activities will be documented in the PTASP Activity Log (Appendix E) and tracked through the date and version provided in the header on the individual pages. Approval of each updated Plan will be completed by the Accountable Executive, the Chief Safety Officer (CSO) and the Phoenix City Council; and self-certification will be completed annually by the Accountable Executive and CSO in compliance with 49 CFR Part 673.13. 5.2.2 Contractors At a minimum, Contractors are required to update their plans annually. Each Contractor has developed their own review process and will submit updates to PTD. For more details on each contractor’s safety plan review and update process, see: • First Transit – Appendix B.2 (Plan Development, Approvals, and Updates) • Transdev – Appendix C.5.1.3 (Agency Safety Plan Review Process) • MV Transportation – Appendix D.2 (Plan Development, Approvals, and Updates) 5.3 PTASP Audit Process Following PTD’s annual review and update process, PTD will consult with third-party subject matter experts for independent auditing of the PTD PTASP. Reviews of its three service contractors will occur on DRAFT System: City of Phoenix Public Transit Department Document No: PTASP Revision # Initial - DRAFT Issue Date: 09/18/2020 City of Phoenix - Public Transportation Agency Safety Plan, 2020 5-2 a biennial basis. The auditor will ensure the plan’s compliance with 49 CFR Part 673 and any accompanying mandates. In addition, the VMR and RPTA PTASPs will be independently audited annually, while the Glendale, Scottsdale, and Peoria PTASPs will be audited triennially. 5.4 PTASP Documentation and Recordkeeping 5.4.1 PTD PTD will maintain the documents set forth in the PTASP, including those documents related to implementation of the SMS (in tandem with operations contractors) and results from SMS processes and activities. PTD will also maintain documents that are included in whole, or by reference, that describe the programs, policies, and procedures that PTD uses to carry out the PTASP and all iterations of those documents. These documents will be made available upon request to FTA or other federal entity, or ADOT. PTD will, at a minimum, retain these documents as outlined in the federal and local records retention policies and schedules or for three years. 5.4.2 Contractors Each Contractor maintains individual policies on safety-related documentation and recordkeeping for no less than three years. All Contractors are committed to maintaining documents and records related to their plans, including the safety plan itself and other associated safety records and documentation. For more information about each Contractor’s policy on documentation and recordkeeping, see: • First Transit – Appendix B.4 (Annual Review and Update of the Public Transportation Safety Plan) • Transdev – Appendix C.0 - Transdev (Safety Plan Documentation and Recordkeeping) • MV Transportation – Appendix D.4 (Annual Review and Update of the Public Transportation Safety Plan) DRAFT System: City of Phoenix Public Transit Department Document No: PTASP Revision # Initial - DRAFT Issue Date: 09/18/2020 City of Phoenix - Public Transportation Agency Safety Plan, 2020 6-1 6. Safety Performance Targets The PTASP Final Rule requires public transportation providers to develop a PTASP that includes safety performance targets based on the seven safety performance measures established under the FTA’s National Public Transportation Safety Plan (NSP). The safety performance measures outlined in the NSP, which are based on data currently being submitted to the National Transit Database (NTD), are developed to ensure applicability to all modes of public transportation and are based on data submitted using the NTD and are each listed as categories in Table 1 and Table 2. The NTD is maintained by FTA and serves as a reporting system for public transit information tracking, such as agency funding sources, inventories of assets, safety reports and measures of transit service. The safety performance measures included in the NSP are fatalities, injuries, safety events and system reliability. Given that PTD does not directly operate the Phoenix transit system or other operations in the region, the safety performance baselines and targets presented in the PTASP are established and directly monitored by Contractors across the region. Each Contractor baseline was established as the actual safety performance value recorded at the end of the federal fiscal year 2019, except for ‘System ‘Reliability, which is a contractual performance target. All safety performance metrics use the federal fiscal calendar, which begins October 1 and ends on September 30. In future versions of the PTASP, a record of prior safety performance baselines and targets will be found in the PTASP Performance Target Log (Appendix F). Table 1 and Table 2 present the safety performance baselines and targets for bus service and paratransit service, respectively. Table 1. Bus Service Safety Performance Baseline and Targets Category First Transit Transdev Fatalities: total number of reportable fatalities Baseline: 0 Target: 0 Baseline: 0 Target: 0 Fatalities: reportable rate per total vehicle revenue miles by mode Baseline: 0/100,000 Target: 0/100,000 Baseline: 0/100,000 Target: 0/100,000 Injuries: total number of reportable injuries Baseline: 31 Target: 28 Baseline: 7 Target: 5 Injuries: reportable rate per total vehicle revenue miles by mode Baseline: 0.44/100,000 Target: 0.39/100,000 Baseline: 0.05/100,000 Target: 0.03/100,000 Safety Events: total number of reportable events (reportable events are defined in the NTD) Baseline: 55 Target: 42 Baseline: 39 Target: 34 DRAFT System: City of Phoenix Public Transit Department Document No: PTASP Revision # Initial - DRAFT Issue Date: 09/18/2020 City of Phoenix - Public Transportation Agency Safety Plan, 2020 6-2 Category First Transit Transdev Safety Events: reportable rate per total vehicle revenue miles by mode Baseline: 0.66/100,000 Target: 0.49/100,000 Baseline: 0.26/100,000 Target: 0.22/100,000 System Reliability: mean distance between major mechanical failures by mode Baseline: 11,000 miles Target: 12,000 miles Baseline: 11,000 miles Target: 17,000 miles Table 2. Paratransit Service Safety Performance Baseline and Targets Category MV Transportation (Operates Paratransit Service) Fatalities: total number of reportable fatalities Baseline: 0 Target: 0 Fatalities: reportable rate per total vehicle revenue miles by mode Baseline: 0 Target: 0/100,000 Injuries: total number of reportable injuries) Baseline: 36 Target: 0 Injuries: reportable rate per total vehicle revenue miles by mode Baseline: 0.87/100,000 Target: 0/100,000 Safety Events: total number of reportable events Baseline: 176 Target: 140 Safety Events: reportable rate per total vehicle revenue miles by mode Baseline: 4.26/100,000 Target: 3.28/100,000 System Reliability: mean distance between major mechanical failures by mode Baseline: 11,000 miles Target: 30,000 miles Table 1 and Table 2 definitions: • Fatality: A death or suicide confirmed within 30 days of a reported event. Does not include deaths in or on transit property that are a result of illness or other natural causes. • Injury: Any damage or harm to persons as a result of an event that requires immediate medical attention away from the scene. • Safety Event: A collision, derailment, fire, hazardous material spill, act of nature (Act of God), evacuation or OSONOC (other safety occurrence not otherwise classified) occurring on transit right- of-way, in a transit revenue facility, in a transit maintenance facility, or involving a transit revenue vehicle that meets the established NTD reportable thresholds. • System Reliability: The rate of vehicle failures in service, defined as mean distance between major mechanical failures. DRAFT System: City of Phoenix Public Transit Department Document No: PTASP Revision # Initial - DRAFT Issue Date: 09/18/2020 City of Phoenix - Public Transportation Agency Safety Plan, 2020 7-1 7. Safety Management Systems 7.1 Safety Management Policy 7.1.1 PTD The city of Phoenix is committed to safety management as a systematic, comprehensive, and ongoing approach to identifying hazards and risks associated with transit system operations, facilities and related preventive maintenance activities. PTD adopted an SMS framework as an element of its responsibility by establishing: • A safety policy • Identifying hazards and controlling risks • Goal setting, planning, and measuring performance. PTD follows safety management policies as directed in the city of Phoenix’s safety program outlined in Administrative Regulation 2.31 (AR 2.31). See the City of Phoenix Administrative Regulations (Appendix G.4). Contractors Each Contractor has adopted their own safety management policies that are compliant with 49 CFR Part 673 and are complementary to PTD’s policy. For specific details regarding each contractor’s safety management policy, see: • First Transit – Appendix B.4 (Safety Management Policy) • Transdev – Appendix C.1 (Safety Policy Statement) • MV Transportation – Appendix D.4 (Safety Management Policy) 7.2 State and Metropolitan Planning Organization Coordination The city of Phoenix will provide annual PTASP updates to ADOT and MAG, as well as provide ongoing updates to key safety performance targets. 7.3 Safety Goals To address the ongoing oversight and review required to ensure the proper implementation of this plan, the following safety goals are set: • Establish a safety and training committee with key representatives from PTD to review policies and procedures related to the PTASP. • Encourage and improve safety communication strategies and awareness with both internal and external stakeholders. • Identify roles and responsibilities for the transit system’s safety program and develop a training curriculum. 7.4 Safety Management Policy Communication 7.4.1 PTD Methods used to communicate the safety management policy include the following: DRAFT System: City of Phoenix Public Transit Department Document No: PTASP Revision # Initial - DRAFT Issue Date: 09/18/2020 City of Phoenix - Public Transportation Agency Safety Plan, 2020 7-2 • Safety presentations at quarterly PTD staff meetings. • Annual safety training with key PTD staff. • PTASP and safety training information uploaded to PTD’s employee-accessible SharePoint site. 7.4.2 Contractors PTD Contractors have included a Safety Management Policy Communication section in their safety plans regarding their communications to their staff. The Contractors plan to communicate safety information to their employees by creating accessible safety reports, implementing training programs, posting information on general bulletin boards, and sending safety emails. For more information on each Contractor’s individual policies related to safety communication, see: • First Transit – Appendix B.4 (Safety Management Policy Communication) • Transdev – Appendix C.1.1.2 (Communication) • MV Transportation – Appendix D.4 (Safety Management Policy Communication) 7.5 Authorities, Roles and Responsibilities 7.5.1 PTD The key to a successful safety plan is fostering a culture focused on safety. With this philosophy in mind, all PTD employees are responsible for implementing the safety practices and being safe every day. Figure 2 illustrates the organizational structure for PTD’s SMS. Table 3 defines the specific responsibilities and accountabilities each role has in achieving safety targets, program oversight and implementation. DRAFT System: City of Phoenix Public Transit Department Document No: PTASP Revision # Initial - DRAFT Issue Date: 09/18/2020 City of Phoenix - Public Transportation Agency Safety Plan, 2020 7-3 Figure 2. City of Phoenix Public Transit Department Safety Organizational Chart Albert Crespo Deputy Director – Operations, Technology, & Planning Roberto Valentin Transit Superintendent First Transit Jesús Sapien Public Transit Department Director Accountable Executive Joe Bowar Deputy Director – Facilities & Contracts Ken Kessler Deputy Director – Management Services Carl Montgomery Transit Asset Manager Herb Muñoz Transit Superintendent Sharyn Zlotnick Management Assistant II Jennifer Lugo Administrative Assistant II TransDev MV Transportation Management Key Staff Contractors Lars Jacoby Management Assistant II Chief Safety Officer DRAFT System: City of Phoenix Public Transit Department Document No: PTASP Revision # Initial - DRAFT Issue Date: 09/18/2020 City of Phoenix - Public Transportation Agency Safety Plan, 2020 7-4 Table 3. Safety Roles and Responsibilities Role Name of Staff Member Safety Responsibilities Public Transit Department Director Accountable Executive Management Jesús Sapien • Ensure compliance with FTA’s safety policies. • Oversee the Plan for PTD. • Control and direct staff and capital resources needed to create and maintain the PTASP. • Create a safety-oriented culture across the department. • Work with the CSO to monitor safety performance. • Ensure that PTD’s Contractors are working toward achieving the safety performance targets. • Periodically review customer comments related to safety concerns. Management Assistant II - Director’s Office Chief Safety Officer Lars Jacoby Chief Safety Officer • Promote safety awareness throughout the organization. • Ensure that safety documentation and training are current. • Communicate changes in safety processes to all applicable personnel. • Monitor the effectiveness of corrective actions. • Provide periodic reports on safety performance. • Render independent advice to managers and other personnel on safety-related matters as needed. • Ensure that safety is a high priority throughout the organization. • Review customer comments related to safety concerns. • Work with other divisions within PTD to implement safety practices. • Promote a safety culture across the department and to contractors. • Provide oversight of contractor safety plans through periodic reviews and audits. • Provide oversight of RPTA, VMR, Scottsdale, Glendale and Peoria safety plans through periodic reviews and formal audits. DRAFT System: City of Phoenix Public Transit Department Document No: PTASP Revision # Initial - DRAFT Issue Date: 09/18/2020 City of Phoenix - Public Transportation Agency Safety Plan, 2020 7-5 Role Name of Staff Member Safety Responsibilities Deputy Director - Facilities & Contracts Management Joe Bowar Deputy Director – Facilities • Ensure transit facilities are well-maintained and meet state of good repair requirements. • Implement hazard mitigation strategies related to transit infrastructure. • Collaborate with other divisions to address safety concerns related to facilities and operations. • Review customer comments related to safety concerns. • Communicate safety practices and policies to staff in the Division. Deputy Director - Operations, Technology & Planning Management Albert Crespo • Communicate safety practices and policies to staff within the Division. • Ensure Contractor compliance with their safety plan, policies, and training requirements. • Collaborate with other divisions to address safety concerns related to operations and facilities. • Review customer comments related to safety concerns. Deputy Director - Management Services Management Ken Kessler • Communicate safety practices and policies to staff within the Division. Transit Superintendent (Operations, Technology & Planning) Key Staff Roberto Valentin • Supervise the contract monitoring for bus service Contractors (First Transit and Transdev). • Respond to and communicate safety concerns with bus service Contractors. • Ensure bus service Contractors implement their safety plan and related policies and training. • Track safety performance for bus Contractors. • Monitor the quality of maintenance and repairs performed by Contractors on vehicles owned by PTD. • Oversee the inspection of all transit vehicles for safety and direct corrective action. • Review all customer comments related to safety concerns. DRAFT System: City of Phoenix Public Transit Department Document No: PTASP Revision # Initial - DRAFT Issue Date: 09/18/2020 City of Phoenix - Public Transportation Agency Safety Plan, 2020 7-6 Role Name of Staff Member Safety Responsibilities Administrative Assistant II (Operations, Technology & Planning) Key Staff Jennifer Lugo • Serve as the contract monitor for the paratransit service Contractor (MV Transportation). • Respond to and communicate safety concerns with paratransit service Contractor. • Ensure paratransit service Contractor implements their safety plan and related policies and training. • Track safety performance of the paratransit service Contractor. • Review all customer comments related to safety concerns. Transit Superintendent (Facilities & Contracts) Key Staff Herb Muñoz • Oversee maintenance at all transit facilities. • Inspect transit facilities for safety issues and recommend corrective action. • Incorporate safety requirements for contractors in on-site contracted maintenance and repairs. • Review customer comments related to safety concerns at facilities. Transit Asset Manager (Facilities & Contracts) Key Staff Carl Montgomery • Manage PTD’s Transit Asset Management Plan. • Provide oversight and technical assistance to regional partners with their own Transit Asset Management Plans. • Oversee the State of Good Repair program. Management Assistant II (Facilities & Contracts) Key Staff Sharyn Zlotnick • Support CSO in the review of regional safety plans. • Periodically review bus service Contractor safety plans to ensure they follow FTA’s regulations and meet the requirements contained in their respective safety plan. • Provide written feedback on such review to the CSO and respective contract monitor. • Support the CSO in the annual PTASP update. DRAFT System: City of Phoenix Public Transit Department Document No: PTASP Revision # Initial - DRAFT Issue Date: 09/18/2020 City of Phoenix - Public Transportation Agency Safety Plan, 2020 7-7 Role Name of Staff Member Safety Responsibilities Contractors First Transit • Paul Meredith, Senior Director of Safety • Adrian Green, Safety Manager MV Transportation • Jon Huynh, General Manager • Victoria Hensley, Safety Manager Transdev • Dave Todd, General Manager • Kathleen Webb, Director of Safety and Training • Update safety plans for compliance with federal regulations. • Update safety plans as necessary in response to safety issues and provide training to facilitate those changes to the safety plan. • Perform regular safety checks. • Implement safety policies applicable to operating and maintaining transit vehicles and maintaining a safe work environment. • Report and investigate safety hazards and safety events. • Implement and track regular safety training for employees. • Receive employee and customer comments related to safety concerns. See Appendices B through D for specific safety practices of each Contractor. 7.5.2 Contractors Each of the Contractors have identified authorities, roles and responsibilities related to safety within their individual organizations. As part of their safety plans, Contractors identified a Chief Safety Officer, an Accountable Executive, as well as supporting staff. For each role, the Contractors specify the responsibilities that each person has related to safety. For specific details on each Contractor’s authorities, roles, and responsibilities, see: • First Transit – Appendix B.4 (Authorities, Accountabilities, and Responsibilities) • Transdev – Appendix C.2 (Safety Accountability and Responsibility) • MV Transportation – Appendix D.4 (Authorities, Accountabilities, and Responsibilities) 7.6 Employee Safety Reporting Program 7.6.1 PTD Reporting safety observations and safety events is an important part of every employee’s role in creating a safe environment. PTD encourages all employees to report potential hazards and any safety events that occur through the safety reporting program. The safety reporting program includes anonymous contact methods such as the city of Phoenix employee-wide integrity hotline (602-262-7555, or email hrc@phoenix.gov), in addition to the PTD employee exclusive work order hotline (602-495-7011) that provides contact information for safety observations and safety events to be communicated to appropriate PTD staff. PTD management also maintains an open-door policy allowing for prompt communication of safety concerns. PTD utilizes the MPulse work order system to aid in communicating potential safety issues in the transit system. The MPulse program is a computerized work order maintenance management system that centralizes data, organizes maintenance data and facilitates the processes of maintenance operations. Safety issues can be entered into MPulse for mitigation and resolution. Identified PTD staff and DRAFT System: City of Phoenix Public Transit Department Document No: PTASP Revision # Initial - DRAFT Issue Date: 09/18/2020 City of Phoenix - Public Transportation Agency Safety Plan, 2020 7-8 contractors are notified by either email, the Work Order line or in person. The issue(s) are then entered into MPulse as a request for service and tracked through closure. MPulse tracks the operation and inventory of assets such as equipment, vehicles, machinery, and facility infrastructure. Asset data that are collected via the MPulse program are utilized to determine the transit system’s state of good repair condition and potential future asset replacement needs. For more information on the PTD safety reporting program, see Administrative Regulation 1.2 (Fraud Prevention and Reporting Policy [Integrity Line]) (Appendix G.4). 7.6.2 Contractors Each Contractor has developed and documented an Employee Safety and Reporting Program as a part of their individual safety plan and maintain an open door policy for safety concerns. Contractors additionally utilize their own systems for reporting safety concerns. For specific information on each Contractor’s employee safety reporting program, see: • First Transit – Appendix B.4 (Employee Safety Reporting Program) • Transdev – Appendix C.5.1.8 (Employee Safety Reporting) • MV Transportation – Appendix D.4 (Employee Safety Reporting Program) 7.7 Administrative Regulation Reporting Policy 7.7.1 PTD PTD is committed to providing a safe transit operating environment. To achieve this, PTD maintains unrestricted and confidential reporting of all incidents and occurrences that may compromise the safe conduct of operations. Every employee is responsible for the communication of any information that may affect the integrity of transit safety to management as outlined in AR 2.31 (Appendix G.4). The department’s management hold the primary responsibility for providing and maintaining a safe workplace. Any safety problems that are beyond the supervisor’s control shall be reported to management immediately upon detection as outlined in AR 2.31 (Appendix G.4). PTD will not retaliate or take punitive actions in any way against an employee, applicant, or former employee who, in good faith, makes a complaint, safety report or report of discrimination/harassment or participates in the investigation of such complaint or report. This policy shall not apply to information that involves an illegal act, or a deliberate or willful disregard of promulgated regulations or procedures. The PTD method of collecting, recording, and disseminating information obtained from transit safety reports is intended to protect, to the extent permissible by law, the identity of any employee who provides transit safety information and wishes to remain anonymous. For further information on PTD’s reporting policies, refer to the City of Phoenix Administrative Regulations (Appendix G.4). 7.7.2 Contractors Each Contractor has their own administrative regulation reporting policy. All Contractors strive to deliver safe transit service and to accomplish this each Contractor has developed its own system to encourage employees to report safety incidents and observations and determine the necessary actions that need to be taken following an incident. For more details on each Contractor’s Administrative Regulation Reporting Policy, see: DRAFT System: City of Phoenix Public Transit Department Document No: PTASP Revision # Initial - DRAFT Issue Date: 09/18/2020 City of Phoenix - Public Transportation Agency Safety Plan, 2020 7-9 • First Transit – Appendix B.4 (Employee Safety Reporting Program) • Transdev – Appendix C.5.1.8 (Employee Safety Reporting) • MV Transportation – Appendix D.4 (Employee Safety Reporting Program) 7.8 Safety Risk Management The safety risk management process is an eight-step process that aims to provide a standard method for identifying, assessing, and mitigating safety hazards in the bus transit system as defined in the NSP (Figure 3). Descriptions of each step are detailed in the following sections. The risk management process allows for careful examination of hazards, assessment of existing mitigation sufficiency, and the determination of additional mitigation measures. Figure 3. Safety Risk Management Eight Step Process 7.8.1 Safety Hazard Identification 7.8.1.1 PTD An effective hazard identification program is fundamental to safety management. PTD’s safety risk management process starts with an effort to proactively identify safety hazards that could result in negative safety outcomes. The first step of the safety risk management process is visualized in the hazard identification and documentation flow chart (Figure 4). First, upon receiving communication from the on-site staff of a potential hazard, the supervisor communicates the hazard to the division safety representative or the CSO for review and formal documentation. Figure 4. Hazard Identification and Documentation (Step 1) Hazard identification focuses on conditions that need special attention or immediate action, including new procedures or training to resolve the condition. PTD uses a variety of mechanisms for identifying and documenting hazards, namely: 1. Identify and Document Hazard 2. Assign Hazard Type 3. Assign Hazard Probability 4. Assign Hazard Severity 5. Determine Hazard Level of Risk 6. Determine Hazard Risk Index 7. Catalog Hazard Information 8. Take Hazard Mitigation Action Hazard is Documented Hazard Identified in Field Safety Representative or CSO Communication DRAFT System: City of Phoenix Public Transit Department Document No: PTASP Revision # Initial - DRAFT Issue Date: 09/18/2020 City of Phoenix - Public Transportation Agency Safety Plan, 2020 7-10 • Through training and reporting procedures, PTD ensures employees can identify hazards and that each employee understands the responsibility to report any safety hazards to the employee’s supervisor or the safety representative. Continued refresher training helps employees improve skills to identify hazards as outlined in AR 2.31 (Appendix G.4). This regulation outlines the responsibility of supervisors to keep informed on safety subjects through training courses, and employees to attend all job required safety training and refresher courses as needed. The regulation also sets operational procedures to ensure employees receive and document the appropriate safety and health training. • In an effort to identify potential hazard recurrence, PTD uses incident reports and records to determine specific areas of training, whether individually or for a group or common classification, that need to be covered with employees. • Incident reports are analyzed by safety staff to identify recurring patterns, as well as known patterns or themes that would help identify underlying hazards and root causes of the event to mitigate or prevent recurrence. • To increase safety knowledge, staff is encouraged to participate in professional development activities, including peer-to-peer exchanges, which are a source to share information on lessons learned and best practices. Other sources for hazard identification include: • Employee safety reporting program • State of Good Repair reports • Inspections of personnel job performance, vehicles, facilities and other data • Investigations of safety events • Lessons learned from root cause analysis after safety incidents • Safety trend analysis on data currently collected • Training and evaluation records • Internal safety audits External sources of hazard information could include: • FTA and other federal, state, county, or city authorities, including peer transit agencies • Reports from the public • Safety bulletins from manufacturers or industry associations Following the identification of the safety hazard, the second step of the risk management process determines the hazard by type – organizational, technical or environmental – to assist in identifying the expertise needed to assess the hazard. Hazard types are also categorized by subcategory as shown in the Safety Hazard Type Identification chart in Table 4. For example, organizational hazards can be further detailed in a subcategory as either a resource, procedural, training, or supervisory hazard. Each subcategory helps later define the different types of mitigation strategies and potential effects of the safety hazard in the following steps. DRAFT System: City of Phoenix Public Transit Department Document No: PTASP Revision # Initial - DRAFT Issue Date: 09/18/2020 City of Phoenix - Public Transportation Agency Safety Plan, 2020 7-11 Table 4. Safety Hazard Type Identification (Step 2) Organizational Technical Environmental Resourcing Operational Weather Procedural Maintenance Natural Training Design Supervisory Equipment Hazard types may be defined using the following descriptions: • Organizational Resourcing – A hazard that is related to the supply of resources. Procedural – A hazard that is linked to established procedures. Training – A hazard that is related to inadequate or incomplete training. Supervisory – A hazard that is related to ineffective supervision. • Technical Operational – A hazard that relates to standard operations. Maintenance – A hazard that is linked to asset maintenance. Design – A hazard that is related to inadequate design. Equipment – A hazard that is linked to inappropriate, incorrect, or faulty equipment. • Environmental Weather – A hazard that is linked to unfavorable weather conditions. Natural – A hazard that is related to unfavorable natural environmental conditions. In the third step of the safety risk management process, the hazard’s probability is then identified by matching the hazard to each probability description shown in the Safety Hazard Risk Probability chart in Table 5. Table 5. Safety Hazard Risk Probability (Step 3) Probability Criteria Not Likely A hazard that is unlikely to occur but is still possible. Likely A hazard that is possible to occur several times. Imminent A hazard that is continuously expected to occur. In the fourth step of the safety risk management process, the hazard’s severity can then be categorized with the use of the Safety Hazard Risk Severity Categories chart in Table 6 by comparing the hazard to the listed severity criteria. DRAFT System: City of Phoenix Public Transit Department Document No: PTASP Revision # Initial - DRAFT Issue Date: 09/18/2020 City of Phoenix - Public Transportation Agency Safety Plan, 2020 7-12 Table 6. Safety Hazard Risk Severity Categories (Step 4) Severity Criteria Not Severe A hazard that may result in a minor injury, non-life-threatening illness, or system damage. Severe A hazard that may cause severe injury, severe illness, equipment failure, or major system damage Critical A hazard that may cause death or major system damage. 7.8.1.2 Contractors To identify safety hazards, Contractors hold monthly safety meetings and facility inspections to identify safety risks and determine if prior issues and risks had been addressed. In addition to these practices, Contractors encourage employees to report safety observations to management so they can be assessed and mitigated before an incident occurs. For more detail about each Contractor’s individual policies and procedures for safety hazard identification, see • First Transit – Appendix B.5 (Safety Risk Management) • Transdev – Appendix C.4.1 (Safety Hazard Identification) • MV Transportation – Appendix D.4 (Safety Risk Management) 7.8.2 Safety Risk Assessment 7.8.2.1 PTD Identified hazards are assessed to determine the potential consequences of each hazard. Factors that are used in assessing safety hazards are: • probability of occurrence • severity of the consequences should there be an occurrence • level of exposure to the hazard In the fifth step of the safety risk management process, the Risk Assessment Matrix (Table 7) takes identified hazards and assesses the level of risk based on the hazard’s probability and severity of the hazard’s consequences. The results of the risk assessment matrix process aids in determining whether the risk should be managed, controlled, or eliminated in the following safety risk management steps. Table 7. Safety Hazard Risk Assessment Matrix (Step 5) Probability Severity Not Severe Severe Critical Not Likely Low Medium High Likely Low Medium High Imminent Medium High High The sixth step of the safety risk management process is completed by inputting the Risk Assessment Matrix results into the Safety Hazard Risk Index Matrix (Table 8). This allows staff to determine the safety hazard’s risk index for each hazard that was identified. DRAFT System: City of Phoenix Public Transit Department Document No: PTASP Revision # Initial - DRAFT Issue Date: 09/18/2020 City of Phoenix - Public Transportation Agency Safety Plan, 2020 7-13 If the risk index is acceptable, the hazard must be monitored. If the risk index is undesirable, the hazard requires careful monitoring and may also require steps taken to lower the risks at the discretion of Executive Management. If the risk index is unacceptable, steps are taken by PTD to lower the risk to an acceptable or tolerable level, or to remove or avoid the hazard. Table 8. Safety Hazard Risk Index Matrix (Step 6) Risk Level Risk Index High Unacceptable Risk must be removed or mitigated. Medium Undesirable Management is to determine whether additional risk mitigation is required or whether the risk is acceptable with monitoring. Low Acceptable Risk is acceptable. 7.8.2.2 Contractors Each Contractor has developed a procedure to assess safety hazards that includes the use of a Safety Hazard Risk Matrix that determines the severity and probability of the hazard. Based on the matrix, each Contractor has a process to determine the level of risk a safety hazard poses to the organization. For more information on the procedures each Contractor has on assessing safety risks, see: • First Transit – Appendix B.4 (Safety Risk Management) • Transdev – Appendix C.4.2 (Safety Hazard Assessment) • MV Transportation – Appendix D.4 (Safety Risk Management) A third party may conduct a Contractor’s risk assessment review. 7.8.3 Safety Risk Mitigation 7.8.3.1 PTD The risk assessment process may indicate that certain hazards are low risk, while others require mitigation to achieve an acceptable level. In the seventh step of the safety risk management process, staff catalogue hazard information as illustrated in the Hazard Identification and Risk Assessment Log (Table 9). After the completion of the exercises previously detailed, the hazard description, type, probability, severity, and risk index information can be populated in the log. The previous steps of the risk management process are summarized in Table 9. Table 9. Hazard Identification and Risk Assessment Log (Step 7) Description Type Probability Severity Risk Index Step 1 Step 2 Step 3 Step 4 Step 6 The intention of the Table 9 Hazard Identification and Risk Assessment Log is to ensure that all available safety hazard information is considered when determining the appropriate hazard mitigation measures. In the eighth and final step of the safety risk management process, PTD may determine and implement safety mitigation actions to reduce or eliminate all identified safety hazards. Mitigation actions that may be taken can be categorized into three broad mitigation action categories as illustrated in Table 10. DRAFT System: City of Phoenix Public Transit Department Document No: PTASP Revision # Initial - DRAFT Issue Date: 09/18/2020 City of Phoenix - Public Transportation Agency Safety Plan, 2020 7-14 Table 10. Hazard Mitigation Actions (Step 8) Category Mitigation Action Physical Barriers Includes objects and technologies that are engineered to discourage, warn against, or prevent inappropriate action or mitigate the consequences of events (e.g., traffic control devices, fences, safety restraining systems, transit controls/signals, transit monitoring systems). Administrative Actions Includes procedures and practices that mitigate the probability of accident/incident (e.g., safety regulations, standard operating procedures, personnel proficiency, supervision inspection, training). Behavior Modification Includes behavioral interventions through education and public awareness campaigns aimed at reducing risky and reckless behavior of motorists, passengers, and pedestrians; includes factors outside the control of PTD and the Contractors. Once a mitigation action has been identified, staff will assess all changes that result from the mitigating actions and their impacts to the transit safety performance targets. If existing mitigation measures are sufficient, then no further mitigation actions are necessary. If a change is determined to impact a safety performance target, then the change is evaluated through the safety risk management process. For clarity, a scenario that properly utilizes the safety risk management process is detailed in Figure 5. DRAFT System: City of Phoenix Public Transit Department Document No: PTASP Revision # Initial - DRAFT Issue Date: 09/18/2020 City of Phoenix - Public Transportation Agency Safety Plan, 2020 7-15 Figure 5. Safety Risk Management Scenario 7.8.3.2 Contractors Contractors undergo independent safety risk mitigation of all identified hazards. Contractors utilize, at a minimum, the same hazard information that is illustrated in Table 7 and Table 9 to help prioritize all hazards and all safety risks are documented and prioritized according to the level of risks. Each Contractor outlines their Safety Risk Management Scenarios in each of their own safety plans: • First Transit – Appendix B.5 (Safety Risk Mitigation) Safety Hazard Scenario Staff discovered that the wheel balancer has not been calibrated since 2017. Although a specialist is brought in to calibrate the machine, a transit safety specialist decides to complete the safety risk management process to determine whether further mitigation is needed on the vehicles the machine directly serves. Step 1: The hazard is identified by staff to be “an out of calibration wheel balancer” and is communicated to a safety representative, as depicted on Figure 4. Step 2: Using Table 4, the hazard is determined to be of a “Technical Equipment” type, as the hazard most closely resembles that description. Step 3: Using Table 5, the probability is determined to be in the “Not Likely” category based on available historical information that most closely resembles that probability criteria. Step 4: Using Table 6, the severity is determined to be in the “Critical” category, as the worst credible outcome to maintaining the hazard closely matches that criteria. Step 5: Using Table 7, the risk assessment matrix results in a “High” level of risk after considering the information from Table 5 and Table 6. Step 6: Using Table 8, the risk index determines the level of risk to be “unacceptable” based on the level of risk determined by Table 7. Step 7: Using Table 9, the relevant information for the determination of the necessary risk mitigation actions, if any, is noted to be the following: • A wheel balancer is out of calibration. • There is a technical equipment hazard. • The hazard is not likely to occur. • The hazard’s consequences are critical to the transit system’s operation. • The risk to the transit system posed by the hazard is determined to be unacceptable. Step 8: Staff determined, in part with the use of Table 10, that an “Administrative Action” will reduce the level of risk posed by the hazard to an acceptable level. The administrative actions may include the introduction of wheel balancer calibration training and the establishment of routine calibration maintenance procedures, for example. DRAFT System: City of Phoenix Public Transit Department Document No: PTASP Revision # Initial - DRAFT Issue Date: 09/18/2020 City of Phoenix - Public Transportation Agency Safety Plan, 2020 7-16 • Transdev – Appendix C.4.3 (Safety/Risk Hazard Mitigation) • MV Transportation – Appendix D.5 (Hazard Resolution) 7.9 Safety Assurance Safety assurance is a process that functions to ensure the implementation and effectiveness of safety risk mitigation, and to ensure that PTD meets or exceeds its safety objectives through the collection, analysis, and assessment of information. 7.9.1 Safety Performance Monitoring and Measurement Contractors collect and monitor data on safety performance indicators through a variety of mechanisms, including collecting data on key metrics on a regular basis and preparing regular reports on safety performance. Contractors then use that data to measure effectiveness of current mitigation strategies, to identify safety problems and track the organization’s overall progress towards meeting their performance targets. For specific details about each Contractor’s Safety Performance Monitoring and Measurement methods, see: • First Transit – Appendix B.6 (Safety Performance Monitoring and Measurement) • Transdev – Appendix C.5.1 (Performance Monitoring and Measurement) • MV Transportation – Appendix D.6 (Safety Performance Monitoring and Measurement) 7.9.1.1 Monitoring Compliance and Sufficiency of Procedures PTD Employee and Contractor Safety Monitoring PTD employee compliance with standard safety operating procedures is monitored by department staff through observation and review of information submitted from both employees and customers. Contractor compliance is monitored by PTD staff through the routine and frequent monitoring activities at transit facilities and in the field. Staff complete inspection reports that include safety reporting (Appendix G.5). PTD staff also submits monthly compliance reports to their respective supervisors. This reporting system addresses non-compliance with standard procedures for operations and preventive maintenance activities through a variety of actions, including revising training materials, and when necessary, providing systemwide employee and supervisor training. When non-compliance is situational, mitigation activities can include individualized training, coaching and heightened management oversight. When non-compliance is determined to be a result of inadequate operations or preventive maintenance procedures, the identified deficient procedures are submitted to the risk management process. At the conclusion of the risk management process, the deficiencies are addressed to resolve the non-compliant issue. PTD assigns specific staff to the role of a contract monitor. Each contract monitor oversees the Contractors for compliance with PTD contracts, safety performance targets, compliance with NTD safety reporting standards, information accuracy and adherence to operations and safety procedures. In addition, each month, or as needed, Contractors share their safety performance data, incident and safety reports, and safety observations with PTD and hold an Operations meeting as illustrated on Figure 6. The performance data is communicated to FTA’s NTD monthly using the Uniform System of Accounts document as circumstances dictate. Samples of these reports are provided in the appendix under NTD Monthly Reports (Appendix G.1). DRAFT System: City of Phoenix Public Transit Department Document No: PTASP Revision # Initial - DRAFT Issue Date: 09/18/2020 City of Phoenix - Public Transportation Agency Safety Plan, 2020 7-17 Figure 6. PTD and Contractor Monthly Communication Contractors On a monthly basis, Contractors document safety performance data, incident and safety reports, recap reports, and safety observations, and present this information to PTD during the Operations meeting. Contractors also monitor bus and paratransit systems for compliance with PTD and FTA operations and maintenance procedures and communicate findings to PTD monthly. In addition, Contactors are responsible for independently monitoring their employee’s compliance with the company’s standard operating procedures as outlined in their individual safety plans, found in: • First Transit – Appendix B.6 (Safety Performance Monitoring and Measurement) • Transdev – Appendix C.5.1 (Performance Monitoring and Measurement) • MV Transportation – Appendix D.6 (Safety Performance Monitoring and Measurement) 7.9.1.2 Monitoring Safety Events PTD All investigation reports of safety events and risk management resolution reports are monitored by assigned staff and reported to the CSO and the accountable executive. These reports are provided by the Contractor upon the conclusion of a safety event investigation conducted by the Contractor. Additionally, Contractors provide PTD with monthly NTD safety reports that staff use to identify safety risk mitigation measures that may be ineffective, inappropriate or not implemented as intended. If the safety risk mitigation measure does not bring the risk to an acceptable level or otherwise fails to meet safety objectives, then staff resubmit the safety risk/hazard to the risk management process. The CSO then works with staff, the Contractor, and subject matter experts, to identify and implement additional mitigation measures. Contractors Each Contractor develops their own individual procedures for monitoring the effectiveness of safety hazard mitigation measures. The Contractors closely manage their safety performance data and conduct audits to ensure they are effectively addressing safety risks within their organization. Safety Performance Data Incident & Safety Reports Safety Observations Operations Meeting Contractor Department DRAFT System: City of Phoenix Public Transit Department Document No: PTASP Revision # Initial - DRAFT Issue Date: 09/18/2020 City of Phoenix - Public Transportation Agency Safety Plan, 2020 7-18 For specific safety monitoring procedures, see: • First Transit – Appendix B.6 (Safety Performance Monitoring and Measurement) • Transdev – Appendix C.5.1 (Performance Monitoring and Measurement) • MV Transportation – Appendix D.6 (Safety Performance Monitoring and Measurement) 7.9.1.3 Safety Event Investigation PTD PTD employees follow the department’s operational safety procedures as outlined in AR 2.31 (Appendix G.4). These operational procedures help identify initial information that may be utilized in an internal safety event investigation and include the following: • Establish and maintain a system for reporting accidents. • Analyze accidents to learn cause and prevention. • Solicit suggestions from employees and promptly adopt good ideas that will promote better safety. • Solicit the advice of the safety committees where applicable. For example, at the scene of a collision, PTD employees follow the Action at Scene of Collison steps that are outlined in AR 2.31 (Appendix G.4). Steps to be taken are categorized by severity and include drivable vehicles, non-drivable vehicles, injury accidents, non-injury accidents and general, and vary in their prescribed actions. If incident is determined to be critical, employees would then take steps to first contact the appropriate emergency services and then their supervisor. Note: A critical incident as defined in the FTA Critical Management Guidelines is an occurrence that requires a response to protect life or property. Contractors Contractors conduct their own investigations of safety events and notify PTD staff. The PTD CSO may assign staff to the event investigation and request a debrief of the safety event investigation, as well as review all related investigation documentation. The objective of the review of the Contractor safety event investigation is to determine whether the event is considered preventable and if there were any policy violations. Additionally, assigned CSO representatives may develop strategies that the Contractor and staff can employ to address the identifiable root cause of any organizational, technical, or environmental hazards. Each Contractor has created their own procedures and subject matter experts for investigating safety events, and their company practice include using data and statements from the involved parties to determine the cause of the incident, and mitigation measures that need to be taken to ensure the safety event does not reoccur. For specific details about the Contractors’ safety event investigation procedures, see: • First Transit – Appendix B.6 (Safety Performance Monitoring and Measurement) • Transdev – Appendix C.5.1 (Performance Monitoring and Measurement) • MV Transportation – Appendix D.6 (Safety Performance Monitoring and Measurement) 7.9.1.4 Monitoring Internal Safety Reporting Programs PTD PTD employees are encouraged to report any safety-related issues and incidents to their supervisor or using the department’s escalation ladder. However, when an employee wishes to remain anonymous, the DRAFT System: City of Phoenix Public Transit Department Document No: PTASP Revision # Initial - DRAFT Issue Date: 09/18/2020 City of Phoenix - Public Transportation Agency Safety Plan, 2020 7-19 city of Phoenix’s City Auditor operates the “Integrity Line,” as outlined in Administrative Regulation 1.2 (Fraud Prevention and Reporting Policy [Integrity Line]) (Appendix G.4). Safety reports that are directly communicated to a supervisor for evaluation, and management is informed as prescribed, or when the issue is out of the supervisor’s control. When a report is submitted to the city’s Integrity Line, it is initially reviewed by the Integrity Line Committee, which is comprised of representatives from offices of the City Auditor, the City Attorney, and the City Manager. The committee then refers the issue(s) to PTD’s Director and CSO for review and possible investigation. Contractors Through their respective agreements with the city, each Contractor is tasked to identify safety hazards and monitor performance metrics and prepare investigation reports on safety incidents for the city’s review. All the Contractors use the data to identify trends of reoccurring safety events that need to be mitigated. For the specific procedures for monitoring internal safety reporting programs for each individual Contractor, see: • First Transit – Appendix B.6 (Safety Performance Monitoring and Measurement) • Transdev – Appendix C.5.1 (Performance Monitoring and Measurement) • MV Transportation – Appendix D.6 (Safety Performance Monitoring and Measurement) 7.9.2 Management of Change 7.9.2.1 PTD Proposed or future changes in the public transit system may introduce new hazards and safety risk into transit operations. Therefore, staff are charged with identifying system changes and determining when a change must be evaluated through the safety risk management process. To accomplish this, staff proactively monitor planned changes and utilize PTD and Contractor field monitoring personnel to identify any changes in the transit system. Following the identification of a change, the change is submitted to the risk management process to assess the change and determine whether mitigation measures for newly identified hazards, if any, are appropriate. 7.9.2.2 Contractors Each Contractor has developed procedures to assess how changes may create new hazards and impact safety performance. The Contractors all have a process to review the proposed change and assess how the change could impact safety. Depending on the level of impact the proposed change is anticipated to have on safety, the Contractors takes actions to minimize and/or eliminate the safety risk associated with the proposed change. For specific details about each Contractor’s process for reviewing proposed changes, see: • First Transit – Appendix B.6 (Management of Change) • Transdev – Appendix C.5.2 (Management of Change) • MV Transportation – Appendix D.6 (Management of Change) 7.9.3 Continuous Improvement 7.9.3.1 PTD Evaluation of the SMS is necessary to ensure that allows PTD to meet safety objectives and performance targets. As a result, PTD reviews the system safety plan during annual self-certification. DRAFT System: City of Phoenix Public Transit Department Document No: PTASP Revision # Initial - DRAFT Issue Date: 09/18/2020 City of Phoenix - Public Transportation Agency Safety Plan, 2020 7-20 PTD also uses this data to assess identified deficiencies in SMS organizational structures, processes and resources. If deficiencies are found as part of the safety performance assessment, staff then develops and implements a plan to address any identified deficiencies. 7.9.3.2 Contractors Each Contractor has their own procedures to ensure their organizations are constantly striving to improve safety. The Contractors have committed to regularly reviewing and updating their safety policies and procedures, both through the annual review process and other review processes and audits that are specific to each company. For more detailed information on each Contractor’s process for continuous improvement, see: • First Transit – Appendix B.6 (Continuous Improvement) • Transdev – Appendix C.5.3 (Continuous Improvement) • MV Transportation – Appendix D.6 (Continuous Improvement) 7.10 Safety Promotion Management support is essential for developing and implementing SMS. Safety promotion includes all aspects of “who, what, when, where, why and how” PTD and its Contractors communicate safety related topics. 7.10.1 Safety Communication 7.10.1.1 PTD PTD regularly communicates safety information regarding hazards and safety risks relevant to employee roles and responsibilities and informs employees of safety actions taken in response to all reports submitted. Methods of communication include: • The Employee Critical & Emergency Incident Communication Map (Appendix G.2) • Safety updates incorporated in quarterly PTD meetings • Safety information uploaded to PTD’s employee accessible SharePoint site • On-site management and inspections PTD collects, catalogs and, where appropriate, analyzes and reports safety and performance information to all staff. Staff answer the following questions to help facilitate accurate safety reporting: • What information does this individual need to do their job? • How can we ensure the individual understands what is communicated? • How can we ensure the individual understands what action must be taken because of the information? • How can we ensure the information is accurate and kept up to date? • Are there any privacy or security concerns to consider when sharing information? If so, what should we do to address these concerns? In addition, staff routinely reviews existing communication strategies to determine if additional measures are needed to effectively reach staff and Contractors. As part of this effort, PTD uses a “safety culture survey” to understand how safety is perceived in the workplace and what areas should be addressed to fully implement a culture of safety. The CSO and relevant PTD staff are responsible for preparing and distributing all related safety materials and communications. DRAFT System: City of Phoenix Public Transit Department Document No: PTASP Revision # Initial - DRAFT Issue Date: 09/18/2020 City of Phoenix - Public Transportation Agency Safety Plan, 2020 7-21 7.10.1.2 Contractors Each Contractor has adopted a comprehensive safety communication program to communicate safety information to their employees. This includes monthly safety meetings to brief staff in safety sensitive positions about safety trends and other safety related topics. The Contractors also have programs where they use various means to promote safety within the company, including having a safety bulletin board and sending out emails about safety. For specific details about how each Contractor disseminates safety information to its employees, see: • First Transit – Appendix B.7 (Safety Communication) • Transdev – Appendix C.6.2 (Safety Communication) • MV Transportation – Appendix D.7 (Safety Communication) 7.10.2 Safety Training 7.10.2.1 PTD PTD has a safety training program aimed at informing employees who are directly responsible for safety of potential hazards and understand safety policies. The city’s Human Resources Department is responsible for assigning the appropriate training to PTD staff as outlined in the city of Phoenix Administrative Regulation 2.31 (Safety Program) (Appendix G.4). PTD provides safety training for all staff who are directly responsible for safety and/or have safety risks associated with their responsibilities. To develop a safety training program compliant with FTA requirements, PTD: • Reviewed general staff categories (e.g., administrative, driving position, supervisor, maintenance) and respective safety related responsibilities. • Assessed the training requirements of 49 CFR 672 and the courses required for different positions. • Assessed the training material available on the FTA PTASP Technical Assistance Center website. • Reviewed other training material available from industry sources such as the Community Transportation Association of America and the American Public Transportation Association websites. • Developed a set of competencies and trainings required to meet the safety related activities for each general staff category. • Developed expectations for ongoing safety training and safety meeting attendance. • Adjusted job notices associated with general staff categories to ensure that new personnel understand the safety related competencies and training needs, and the safety related responsibilities of the job. The following training programs are implemented by PTD: • Annual training to include new hazards and refresher courses • Safety meetings • New hire and orientation safety training 7.10.2.2 Contractors PTD contract monitors actively monitor each Contractor, which in turn provide their staff with appropriate safety training. Contractors are required to administer the appropriate safety training to their employees, including transit system administrative, operators, mechanics, fuelers, cleaners and other staff responsible for safety within their organization. Each Contractor has developed comprehensive training programs for these employees that include new hire training, as well as ongoing training for their employees. DRAFT System: City of Phoenix Public Transit Department Document No: PTASP Revision # Initial - DRAFT Issue Date: 09/18/2020 City of Phoenix - Public Transportation Agency Safety Plan, 2020 7-22 For details about each Contractor’s training programs, see: • First Transit – Appendix B.7 (Competencies and Training) • Transdev – Appendix C.6.1 (Competency & Training Program) • MV Transportation – Appendix D.7 (Competencies and Training) DRAFT System: City of Phoenix Public Transit Department Document No: PTASP Revision # Initial - DRAFT Issue Date: 09/18/2020 City of Phoenix - Public Transportation Agency Safety Plan, 2020 Appendix A. City Council Minutes or Resolution DRAFT System: City of Phoenix Public Transit Department Document No: PTASP Revision # Initial - DRAFT Issue Date: 09/18/2020 City of Phoenix - Public Transportation Agency Safety Plan, 2020 To be added DRAFT System: City of Phoenix Public Transit Department Document No: PTASP Revision # Initial - DRAFT Issue Date: 09/18/2020 City of Phoenix - Public Transportation Agency Safety Plan, 2020 Appendix B. First Transit Abbreviated Safety Plan DRAFT System: City of Phoenix Public Transit Department Document No: PTASP Revision # Initial - DRAFT Issue Date: 09/18/2020 City of Phoenix - Public Transportation Agency Safety Plan, 2020 Appendix C. Transdev Abbreviated Safety Plan DRAFT System: City of Phoenix Public Transit Department Document No: PTASP Revision # Initial - DRAFT Issue Date: 09/18/2020 City of Phoenix - Public Transportation Agency Safety Plan, 2020 F-1 Appendix D. MV Transportation Abbreviated Safety Plan DRAFT System: City of Phoenix Public Transit Department Document No: PTASP Revision # Initial - DRAFT Issue Date: 09/18/2020 City of Phoenix - Public Transportation Agency Safety Plan, 2020 Appendix E. PTASP Activity Log DRAFT System: City of Phoenix Public Transit Department Document No: PTASP Revision # Initial - DRAFT Issue Date: 09/18/2020 City of Phoenix - Public Transportation Agency Safety Plan, 2020 G-1 PTASP Activity Log Version Number Section/Pages Affected Reason for Change Date Issued Initial Version All December 2020 DRAFT System: City of Phoenix Public Transit Department Document No: PTASP Revision # Initial - DRAFT Issue Date: 09/18/2020 City of Phoenix - Public Transportation Agency Safety Plan, 2020 Appendix F. PTASP Performance Target Log 1. PTASP Performance Target Log 2. PTASP Baseline Performance Log DRAFT System: City of Phoenix Public Transit Department Document No: PTASP Revision # Initial - DRAFT Issue Date: 09/18/2020 City of Phoenix - Public Transportation Agency Safety Plan, 2020 1. PTASP Performance Target Log Contractor Date Fatalities Fatalities/ 100,000mi Injuries Injuries / 100,00mi Safety Events Safety Events / 100,000mi System Reliability First Transit 5/15/2020 0 0 28 0.39 42 0.49 12,000 Transdev 5/15/2020 0 0 5 0.03 34 0.22 17,000 MV Transportation 5/15/2020 0 0 0 0 140 3.28 30,000 DRAFT System: City of Phoenix Public Transit Department Document No: PTASP Revision # Initial - DRAFT Issue Date: 09/18/2020 City of Phoenix - Public Transportation Agency Safety Plan, 2020 2. PTASP Baseline Performance Log Contractor Federal Fiscal Year Fatalities Fatalities/ 100,000mi Injuries Injuries / 100,00mi Safety Events Safety Events / 100,000mi System Reliability First Transit 2019 0 0 31 0.44 55 0.66 11,000 Transdev 2019 0 0 7 0.05 39 0.26 11,000 MV Transportation 2019 0 0 36 0.87 176 4.26 11,000 DRAFT System: City of Phoenix Public Transit Department Document No: PTASP Revision # Initial - DRAFT Issue Date: 09/18/2020 City of Phoenix - Public Transportation Agency Safety Plan, 2020 Appendix G. PTASP Supporting Documents 1. NTD Monthly Reports 2. PTD’s Critical & Emergency Incident Communication Map 3. Employee Critical Incident Training 4. City of Phoenix Administrative Regulations 5. Public Transit Department Facility Inspection Report DRAFT System: City of Phoenix Public Transit Department Document No: PTASP Revision # Initial - DRAFT Issue Date: 09/18/2020 City of Phoenix - Public Transportation Agency Safety Plan, 2020 1. NTD Monthly Reports DRAFT System: City of Phoenix Public Transit Department Document No: PTASP Revision # Initial - DRAFT Issue Date: 09/18/2020 City of Phoenix - Public Transportation Agency Safety Plan, 2020 DRAFT System: City of Phoenix Public Transit Department Document No: PTASP Revision # Initial - DRAFT Issue Date: 09/18/2020 City of Phoenix - Public Transportation Agency Safety Plan, 2020 S&S-50 (Minor Incidents) Month: One or more persons were transported from scene for medical treatment due to a Safety Occurrence Total Occurrences Transported Customers Transported Workers Transported Others In Transit Vehicles while Boarding/Alighting: Stairs 0 while Boarding/Alighting: Lift or Ramp 0 while Boarding/Alighting: Other 0 Other in Vehicle: Securement Issue 0 Other in Vehicle: Non-Securement Issue 0 In Revenue Facilities Ramps 0 Stairs 0 Escalators 0 Elevators 0 Other 0 In Non-Revenue Facilities 0 Other 0 Number of Occurrences of Fire In Transit Vehicles 0 In Revenue Facilities 0 In Non-Revenue Facilities 0 On Right-of-Way 0 Click here to copy: *Note: This form is meant to simplify reporting for operators of purchased transportation to reporting agencies. It is not a replacement for submission of reports to the National Transit Database. Please see the Thresholds tab for more information on reportable minor incidents. Please note that if the incident involved more than $25,000 in damage, a fatality, an evacuation, or a mainline derailment, it is to be reported as a major incident on the S&S-40. Also, if a fire met any of these thresholds or caused an injury, it should be reported on the S&S-40. The completed form can be copied and pasted into an email to the reporting agency, or saved and sent as an attachment. Copy Summary Clear Data DRAFT System: City of Phoenix Public Transit Department Document No: PTASP Revision # Initial - DRAFT Issue Date: 09/18/2020 City of Phoenix - Public Transportation Agency Safety Plan, 2020 DRAFT System: City of Phoenix Public Transit Department Document No: PTASP Revision # Initial - DRAFT Issue Date: 09/18/2020 City of Phoenix - Public Transportation Agency Safety Plan, 2020 2. PTD’s Critical & Emergency Incident Communication Map DRAFT System: City of Phoenix Public Transit Department Document No: PTASP Revision # Initial - DRAFT Issue Date: 09/18/2020 City of Phoenix - Public Transportation Agency Safety Plan, 2020 3. Employee Critical Incident Training DRAFT System: City of Phoenix Public Transit Department Document No: PTASP Revision # Initial - DRAFT Issue Date: 09/18/2020 City of Phoenix - Public Transportation Agency Safety Plan, 2020 4. City of Phoenix Administrative Regulations DRAFT System: City of Phoenix Public Transit Department Document No: PTASP Revision # Initial - DRAFT Issue Date: 09/18/2020 City of Phoenix - Public Transportation Agency Safety Plan, 2020 DRAFT System: City of Phoenix Public Transit Department Document No: PTASP Revision # Initial - DRAFT Issue Date: 09/18/2020 City of Phoenix - Public Transportation Agency Safety Plan, 2020 DRAFT System: City of Phoenix Public Transit Department Document No: PTASP Revision # Initial - DRAFT Issue Date: 09/18/2020 City of Phoenix - Public Transportation Agency Safety Plan, 2020 DRAFT System: City of Phoenix Public Transit Department Document No: PTASP Revision # Initial - DRAFT Issue Date: 09/18/2020 City of Phoenix - Public Transportation Agency Safety Plan, 2020 DRAFT System: City of Phoenix Public Transit Department Document No: PTASP Revision # Initial - DRAFT Issue Date: 09/18/2020 City of Phoenix - Public Transportation Agency Safety Plan, 2020 DRAFT System: City of Phoenix Public Transit Department Document No: PTASP Revision # Initial - DRAFT Issue Date: 09/18/2020 City of Phoenix - Public Transportation Agency Safety Plan, 2020 DRAFT System: City of Phoenix Public Transit Department Document No: PTASP Revision # Initial - DRAFT Issue Date: 09/18/2020 City of Phoenix - Public Transportation Agency Safety Plan, 2020 DRAFT System: City of Phoenix Public Transit Department Document No: PTASP Revision # Initial - DRAFT Issue Date: 09/18/2020 City of Phoenix - Public Transportation Agency Safety Plan, 2020 DRAFT System: City of Phoenix Public Transit Department Document No: PTASP Revision # Initial - DRAFT Issue Date: 09/18/2020 City of Phoenix - Public Transportation Agency Safety Plan, 2020 DRAFT System: City of Phoenix Public Transit Department Document No: PTASP Revision # Initial - DRAFT Issue Date: 09/18/2020 City of Phoenix - Public Transportation Agency Safety Plan, 2020 DRAFT System: City of Phoenix Public Transit Department Document No: PTASP Revision # Initial - DRAFT Issue Date: 09/18/2020 City of Phoenix - Public Transportation Agency Safety Plan, 2020 DRAFT System: City of Phoenix Public Transit Department Document No: PTASP Revision # Initial - DRAFT Issue Date: 09/18/2020 City of Phoenix - Public Transportation Agency Safety Plan, 2020 DRAFT System: City of Phoenix Public Transit Department Document No: PTASP Revision # Initial - DRAFT Issue Date: 09/18/2020 City of Phoenix - Public Transportation Agency Safety Plan, 2020 DRAFT System: City of Phoenix Public Transit Department Document No: PTASP Revision # Initial - DRAFT Issue Date: 09/18/2020 City of Phoenix - Public Transportation Agency Safety Plan, 2020 DRAFT System: City of Phoenix Public Transit Department Document No: PTASP Revision # Initial - DRAFT Issue Date: 09/18/2020 City of Phoenix - Public Transportation Agency Safety Plan, 2020 5. Public Transit Department Facility Inspection Report DRAFT