Attachment A - Stipulations - PHO-4-20_Z-125-01-2.pdf

City of Phoenix — Formal (2020-11-18)

View PDF Meeting page

Extracted text (via pymupdf) 7924 characters
Attachment A- Stipulations- PHO-4-20_Z-125-01-2 
 
Location:  Approximately 2,146 feet west of the southwest corner of Black Mountain 
Parkway (48th Street Alignment) and Carefree Highway 
 
Stipulations: 
 
Stipulations for the Eastern Portion of the Site 
 
 
1. 
That dTHE Development shall be in general conformance to the site plan 
dated May 5, 2004 as approved by the Planning and Development 
Department. 
 
 
2. 
That dTHE Development shall be in general conformance to the 
elevations dated May 5, 2004 or as approved or modified by the Planning 
and Development Department. That tThe level of architectural detail shall 
be provided on all sides of structures, including the same colors and 
materials. That tThe same architectural theme shall be consistent 
throughout the site. 
 
 
3. 
That aA comprehensive sign package shall be developed for the site, as 
approved by the Planning and Development Department. 
 
 
4. 
That aAll building elevations visible from the public right-of-way or 
adjacent residential property SHALL include variations in colors, textures, 
and/or materials to break up the massing of long walls, and provide a 
sense of human scale and visual interest. 
 
 
5. 
That aA full archaeological testing and data recovery report be submitted. 
 
 
6. 
That tThe development of the project SHALL be limited to three Phases. 
Phase I the Pharmacy, Phase II retail surrounding pharmacy, and Phase 
III remaining retail/office at west end of property. 
 
 
7. 
That the dDriveways SHALL be limited to five on Carefree Highway and 
three on Black Mountain Parkway. 
 
 
8. 
That rRight-of-way shall be dedicated and a bus bay constructed (P1256) 
with a transit pad (P1261) for southbound on Black Mountain Parkway 
south of Carefree Highway at a location approved by the Phoenix Public 
Transit Department. 
 
 
9. 
That tThe landscape setback along Carefree Highway shall be dedicated 
as a landscape easement and the scenic corridor shall include only 
natural materials and native vegetation as approved by the Planning and 
Development Department. 
 
 
10. 
That tThe wash along the southern border SHALL be treated as a natural 
amenity per plans approved by the Planning and Development 
Department and that no construction, filling or grading SHALL occur 
within the 100 year floodplain.

11. 
That sShaded pedestrian paths shall be provided within the proposed 
parking areas to connect customers of retail establishments with the 
sidewalks along Black Mountain Parkway. Landscaping of these shaded 
walkways shall reflect a common landscaping theme and include a 
minimum of 2-inch caliper shade trees placed 20 feet on center.  
 
 
12. 
That aA 10-foot sidewalk SHALL be constructed along Carefree Highway 
and a 5-foot sidewalk SHALL be provided along Black Mountain 
Parkway. Trail needs to be within a 25-foot landscape setback as 
approved by THE Parks AND , Recreation, and Library Department. 
 
 
13. 
That lLighting shall be shielded with cut-off fixtures and deflectors to 
direct light downward and limit on-site lighting levels to a maximum of 
one foot candle at the property line. That aAll lighting shall be shielded to 
prevent direct visibility of the light source from adjacent properties. That 
lLighting shall be limited to 15 feet in height. Site lighting shall be 
administratively approved by the Planning Hearing Officer prior to 
preliminary site plan approval. 
 
 
Stipulations for the Western Portion of the Site 
 
 
1. 
That dTHE Development shall be in general conformance to the site plan 
date stamped March 30, 2017, with regards to setbacks, circulation and 
the scenic corridor, as modified by the following stipulations and Planning 
and Development Department review. 
 
 
2. 
That dTHE Development shall be in general conformance to the 
elevations date stamped March 30, 2017 with regards to architectural 
theme. The building elevation theme should assure the building/canopy 
colors, elevations, exterior materials, landscaping, lighting and signage 
convey a sense of continuity throughout the development, as approved 
by the Planning and Development Department.  
 
 
3. 
THE WESTERNMOST PORTION OF THE DEVELOPMENT SHALL BE 
IN GENERAL CONFORMANCE WITH THE SITE PLAN DATE 
STAMPED SEPTEMBER 22, 2020 AND ELEVATIONS DATE STAMPED 
SEPTEMBER 4, 2020, AS MODIFIED BY THE FOLLOWING 
STIPULATIONS AND APPROVED BY THE PLANNING AND 
DEVELOPMENT DEPARTMENT. 
 
 
4. 
3. 
That aA comprehensive sign package shall be developed for the site, as 
approved by the Planning and Development Department. 
 
 
5. 
4. 
That aAll building elevations visible from the public right-of-way or 
adjacent residential property SHALL include variations in colors, textures, 
and/or materials to break up the massing of long walls, and provide a 
sense of human scale and visual interest. 
 
 
6. 
5. 
That aA full archaeological testing and data recovery report SHALL be 
submitted.

7. 
6. 
That tThe development of the project SHALL be limited to three Phases, 
Phase I the Assisted Living/Independent Living Building, Phase II the 
Memory Care Building, and Phase III future. 
 
 
8. 
7. 
That tThe driveways SHALL be limited to five on Carefree Highway.  
 
 
9. 
8. 
That tThe parking provided along the north end of the property  
SHALL not follow a hard edge along the Carefree Scenic Corridor. The 
parking shall consist of a delineated pattern using landscape features to 
create a softer edge.  
 
 
Landscape/Screening 
 
 
10. 
9. 
That tThe fifty foot landscape setback from the seventy foot right of way 
(one hundred twenty feet from center line of Carefree Highway) shall be 
landscaped with plants from Lists A, B and/or C from the “Area C & D 
Zoning Guidelines Manual Draft” dated September 1995 and shall be 
designated as a scenic landscape easement. Accent walls and only low 
scale directional signage may be allowed within the setback if determined 
appropriate by the Planning and Development Department site plan and 
sign review staff.  
 
 
11. 
10. 
Areas within the 100 year floodplain will not impede the 100 year storm 
water flow. 
 
 
12. 
11. 
That aA 6-foot sidewalk SHALL be constructed along Carefree Highway 
connecting to the existing development to the east, with the western 
extent terminating at the new proposed entrance to site. Trail needs to be 
within a 25-foot landscape setback as approved by THE Parks, AND 
Recreation and Library Department. 
 
 
13. 
12. 
The applicant shall hold a neighborhood meeting to work with adjacent 
property owners on the proposed lighting, landscaping, and fencing prior 
to preliminary site plan approval. 
 
 
13. 
The future phase portion of the site shall return to the Desert View Village 
Planning Committee and Planning Hearing Officer for review and 
approval. 
 
 
14. 
A minimum 20-foot landscape setback shall be required on all property 
lines that are adjacent to single family residential zoning districts. 
 
 
ARCHAEOLOGY 
 
 
15. 
IF DETERMINED NECESSARY BY THE PHOENIX ARCHAEOLOGY 
OFFICE, THE APPLICANT SHALL CONDUCT PHASE I DATA 
TESTING AND SUBMIT AN ARCHAEOLOGICAL SURVEY REPORT 
OF THE DEVELOPMENT AREA FOR REVIEW AND APPROVAL BY

THE CITY ARCHAEOLOGIST PRIOR TO CLEARING AND GRUBBING, 
LANDSCAPE SALVAGE, AND/OR GRADING APPROVAL. 
 
 
16. 
IF DETERMINED NECESSARY BY THE PHOENIX ARCHAEOLOGY 
OFFICE, THE APPLICANT SHALL CONDUCT PHASE I DATA 
TESTING AND SUBMIT AN ARCHAEOLOGICAL SURVEY REPORT 
OF THE DEVELOPMENT AREA FOR REVIEW AND APPROVAL BY 
THE CITY ARCHAEOLOGIST PRIOR TO CLEARING AND GRUBBING, 
LANDSCAPE SALVAGE, AND/OR GRADING APPROVAL. 
 
 
17. 
IN THE EVENT ARCHAEOLOGICAL MATERIALS ARE 
ENCOUNTERED DURING CONSTRUCTION, THE DEVELOPER 
SHALL IMMEDIATELY CEASE ALL GROUND DISTURBING 
ACTIVITIES WITHIN A 33- FOOT RADIUS OF THE DISCOVERY, 
NOTIFY THE CITY ARCHAEOLOGIST, AND ALLOW TIME FOR THE 
ARCHAEOLOGY OFFICE TO PROPERLY ASSESS THE MATERIALS.