Attachment B - Approval Report 240014.pdf

City of Phoenix — Formal (2024-08-26)

View PDF Meeting page

Extracted text (via pymupdf) 2117 characters
1 
Planning and Development Department 
CONDITIONAL APPROVAL – ABND 240014 
Your abandonment request was granted CONDITIONAL APPROVAL. 
This request will NOT be completed until all the stipulations have been met and this request is 
formally adopted by City Council. Please contact the Abandonment Coordinator at (602) 
262-7403 for questions regarding this report.
Upon receipt of the legal description from our Real Estate division, your request will be 
scheduled for City Council formal approval. You will receive a copy of the resolution from the 
City Clerk after Council adoption. 
ATTACHMENT B

2 
 
 
 
Planning and Development Department  
 
 
May 9, 2024 
Abandonment Staff Report: ABND 240014 
Project# 00-5136 
Council District: 2 
 
 
 
 
 
Location: 
6902 E Greenway Parkway, Scottsdale, AZ 
85254 
 
 
Applicant:  
KBell Engineering 
 
 
Request to abandon:  
To abandon a 77-foot-wide by 235-foot-long 
drainage easement (DE). 
  
 
Purpose of request:  
The applicant states the abandonment will 
allow for the construction of an outdoor bar 
to be constructed in the existing drainage 
easement area.

3 
 
 
 
 
City Staff Comments and Recommendations: 
 
PDD Civil Reviewer – BreAnne Ritcher 
There is no City of Phoenix infrastructure in the drainage easement. The easement is to take on 
flows to the existing lake and the lake’s capacity is staying the same for the project. Lastly, the 
easement portion that is being abandoned does not affect flows.   
 
Water Services Department – Donald Reynolds 
WSD has no stipulations for this abandonment of the drainage easement only. All easements 
must remain. 
 
PDD Site Planner – Dru Maynus 
Recommend Approval.

4 
The request of abandonment ABND 240014 is conditionally approved and will be 
forwarded to Council for formal adoption and recordation. 
Signature: ____________________________________________    Date: ________________ 
REPORT SUBMITTED BY: Dru Maynus, Abandonment Coordinator 
cc 
KBell Engineering, Applicant/Representative 
Miguel Victor, Deputy Director of PDD 
Aracely Herrera, Site Planning Supervisor, Planner lll 
5.17.24