Attachment B - VPC Summary - PHO-2-24--Z-69-08-8.pdf
Extracted text (via pymupdf)
20083 characters
Village Planning Committee Meeting Summary
PHO-2-24--Z-69-08-8
Date of VPC Meeting
June 11, 2024
Date of Planning
Hearing Officer Hearing
June 12, 2024
Request
1) Modification of Stipulation No. 1 regarding general
conformance with the site plan date stamped
October 18, 2021.
2) Modification of Stipulation No. 4 regarding the
number of bicycle parking spaces.
Location
Northwest corner of 36th Street and Southern Avenue
VPC Recommendation
Approval with a modification and additional stipulations
VPC Vote
13-0-1
VPC DISCUSSION & RECOMMENDED STIPULATIONS:
Committee Members Emma Viera, Tamala Daniels, Fatima Muhammad Roque and
Tremikus Muhammad joined during this item bringing quorum to 14 members (ten
needed for a quorum).
No members of the public registered to speak on this item.
STAFF PRESENTATION
John Roanhorse, staff, provided an introduction and overview of the request, identifying
the size, location, zoning, adjacent streets and General Plan Land Use Map designation.
Mr. Roanhorse discussed the PHO (Planning Hearing Officer) process, history of site
and displayed the proposed site plan, landscape plan and approved and proposed
stipulations.
Chair Marchuk asked staff if any support or opposition correspondence have been
received prior to the Village Planning Committee meeting. Mr. Roanhorse indicated that
prior to the meeting no correspondence has been received.
APPLICANT PRESENTATION
ATTACHMENT B
South Mountain Village Planning Committee
Meeting Summary
PHO-2-24--Z-69-08-8
Page 2 of 9
Taylor Earl, representing the applicant with Earl & Curley, PC, introduced himself and
provided and introduction to the request. Mr. Earl stated with the PHO they have
provided information to the community in advance of the scheduled hearing.
Committee Member Tamala Daniels asked when the public was notified about the
PHO. Mr. Earl responded that mailers were sent out and the distance for recipients was
expanded and included property owners in the area, and the notice was sent out in
English and in Spanish. Mr. Earl stated there is no neighborhood meeting requirement
for the PHO but they held a virtual meeting and no participants attended.
Mr. Earl discussed the PHO and noted the difference from the previous rezoning case
and the residential product they expect to bring to the village for the current
development. Mr. Earl stated the proposal is intended to provide housing for ownership
occupancy. Mr. Earl said the design concept for housing are single family units and they
need to modify the stipulations to allow for the type of housing product they expect to
develop. Mr. Earl stated the zoning is C-1, Neighborhood Retail, on a 4.2-acre site that
was approved in 2008 for an office complex that was never built. Mr. Earl stated that
with the site being available a PHO request was approved for a rental community with
two-story residential units that included parking. Mr. Earl stated with the PHO they are
presently proposing is a townhome development that would include garages and
backyards. Mr. Earl displayed the land use map and identified the adjacent land uses
and zoning. Mr. Earl identified the commerce park to the east and an existing adjacent
industrial park. Mr. Earl stated the proposal is for 40 dwelling units which is a reduction
from the original proposal. Mr. Earl stated the shift from rental units to a community
intended for ownership provides an opportunity to accommodate the missing middle.
Mr. Earl discussed the need for duplexes, triplexes, and townhomes as opportunities for
a variety of housing options available. Mr. Earl stated the first stipulation will change the
site plan from the previously proposed multifamily residential product and will include
landscaping, garages, amenities, and open space. Mr. Earl noted that in a rental
community it makes sense to have bike parking and now there are garages so people
can store their bicycles within them. Mr. Earl stated there are four secured parking
spaces as approved by the Street Transportation Department which was a
recommendation they will maintain. Mr. Earl stated they have responded to the
archaeological language and noted that these requirements are satisfied, and a report
was completed.
QUESTIONS FROM THE COMMITTEE
Committee Member Gene Holmerud asked if there was any walkway or subterranean
connection between the north and south parcels. Mr. Earl responded that there is a
walkway connection along 36th Street which will be a requirement and there will be
additional street and sidewalk improvements.
Committee Member George Brooks asked if there were any discoveries as a result of
the archaeological study. Mr. Chuck Chisholm with K. Hovnanian Homes ("KHOV")
South Mountain Village Planning Committee
Meeting Summary
PHO-2-24--Z-69-08-8
Page 3 of 9
responded that the conclusion from the archaeological study included extensive
excavation on both parcels and there were no findings and stated that during
construction if anything is discovered they will have to call a city archaeologist.
Committee Member George Brooks asked if anything was found would that go to Gila
River or Salt River Tribes. Mr. Earl responded that they would have to find out that
information.
Committee Member Tamala Daniels asked if the development was a change from
multifamily to condominiums. Mr. Earl responded that the change is to townhomes for
home ownership. Committee Member Tamala Daniels asked if there were any
architectural, site plans or landscape plans to review for approval. Mr. Earl displayed
the site plan and landscape plan and stated the buildings would not change from the
initial proposal. Committee Member Tamala Daniels asked if there were changes to the
elevations. Mr. Earl responded that there were no changes to the elevations which will
feature three to five-plex designs that are different sizes and there was no general
conformance stipulation to the elevations. Committee Member Tamala Daniels asked
what the variations would be between the different design styles which were stated as
contemporary, Spanish and ranch style. Mr. Earl responded that the architectural styles
would remain the same with various numbers of units. Committee Member Tamala
Daniels asked if they could get a list of the requirements for single family homes,
townhomes and condominiums regarding the exterior features. Mr. Roanhorse
responded that the discussion presently is for the PHO and when plans are submitted
for development that is when they are reviewed for the architectural elements including
site planning and all the design details. Committee Member Tamala Daniels asked if the
developer would come back to the committee for review of the elevations or any
additional information. Mr. Earl responded that the project would be subject to a
separate design review process that would address the design details. Chair Marchuk
stated that in previous cases they have stipulated that the applicant would return to the
village for review and comment prior to preliminary submittal. Committee Member
Tamala Daniels stated concerns with the proposed colors and appearance of the
elevations. Mr. Earl responded that there would be various colors for the elevations.
Chair Marchuk stated that from Committee Member Tamala Daniels comment the
committee can request to have the applicant come back to the village planning
committee for review and comment on the elevations.
Committee Member Tamala Daniels asked if a detached sidewalk would contribute to
the tree line street mandate for all communities for shaded walk paths. Mr. Roanhorse
responded that having shade trees is part of the city’s Tree and Shade Master Plan but
for this case adding trees may depend on the location and how much space would be
allocated for a detached sidewalk and landscaping. Mr. Earl responded that the City's
Tree and Shade Master Plan items are usually required by stipulation, and they will
include additional shade trees where they can.
South Mountain Village Planning Committee
Meeting Summary
PHO-2-24--Z-69-08-8
Page 4 of 9
Chair Marchuk asked if staff could include standard language for reference for shade
requirements for tree lined streets and a detached sidewalk. Ms. Sarah Stockham,
staff, responded that language will be provided to the committee.
Committee Member Kay Shepard asked if there was a retention basin on the site. Mr.
Earl responded that the retention basin would be located on the lower southern portion
of the site and referenced the site plan.
Committee Member George Brooks asked if the response for the inclusion of shade
trees and sidewalks was sufficient. Committee Member Tamala Daniels responded
that the request would be included as a stipulation.
Committee Member Fatima Muhammad Roque asked about parking on the site and
how it would be accommodated. Mr. Earl responded that each unit would have a
garage and a driveway and there will be some communal parking as well. Mr. Earl
stated they will not be requesting variances for parking.
Committee Member Tremikus Muhammad asked if there will be a stipulation to allow
the committee to review the elevations and detached sidewalks with tree alignment.
Chair Marchuk respond that the stipulations will be addressed during the voting
process.
Committee Member Emma Viera commented for pedestrians and a walkable
community there needs to be full shade where possible which is part of a bigger climate
action and heat mitigation plan, and it is preferred to have sidewalks with full tree shade
coverage.
Committee Member Kay Shepard commented that including a detachable sidewalk
provides safety for pedestrians.
Committee Member Emma Viera asked about the location of the bicycle parking and
where they would be located on the site plan, noting that the location is important and
pedestrian access should be considered as part of the active transportation plan for the
site. Mr. Earl responded that the Street Transportation Department requested that bike
parking language be included for four spaces, which would remain.
Committee Member Tamala Daniels asked that the location of the bicycle parking be
shown on this site plan which would be near the amenity area next to the playground.
Mr. Earl stated that they had planned to remove the bicycle parking, but it will remain as
part of the proposal. Mr. Earl stated that they can include bicycle parking where the
committee would like it to be on the site plan.
Committee Member Fatima Mohammed Roque asked where visitor parking would be
located and how emergency vehicles would access the site. Mr. Earl responded that
since this development is for single family homes that additional parking would be
South Mountain Village Planning Committee
Meeting Summary
PHO-2-24--Z-69-08-8
Page 5 of 9
available on the street and each residential unit would have a parking garage and a
driveway for residential use and emergency vehicles will have full access to the
community.
Mr. Earl stated to Chair Marchuk and the committee that he is providing a landscape
plan as part of the record and can be used for the stipulation requirement.
Chair Marchuk asked staff if the standard language was readily available for the
discussed stipulations where the applicant would come back to the committee with the
elevations and detached sidewalks. Ms. Stockham stated the suggested language for
the committee:
1. Building elevations shall be presented for review and comment to the South
Mountain Village Planning Committee prior to final site plan approval.
2. The public sidewalk along 36th Street shall be detached with a minimum five-
foot wide landscaped strip located between the sidewalk and back of curb and
planted to the following standards, as approved by the Planning and
Development Department:
a. Minimum 3-inch caliper large canopy, single-trunk, shade trees planted a
minimum of 25 feet on center or in equivalent groupings to provide
shade to a minimum 75 percent of the sidewalk.
b.
Drought tolerant vegetation designed to grow to a maximum mature
height of 24 inches and achieve 75 percent live coverage.
Where utility conflicts exist, the developer shall work with the Planning and
Development Department on alternative design solutions consistent with a
pedestrian environment.
3. The development shall be in general conformance with the site plan date
stamped APRIL __ 2024 and the landscape plan date stamped June 11,
2024, as modified by the following stipulations and approved by the Planning
and Development Department.
Committee Member Gene Holmerud asked about additional cooking and dishwashing
facilities for each unit regarding multigenerational living accommodations. Mr. Earl
responded that the proposal does not have floorplans for multigenerational living.
Committee Member Kay Shepard asked the square footage for the proposed floorplan
designs. Mr. Earl responded that the square footage is from 1,582 to 1,864 square feet.
Committee Member Tamala Daniels ask what the proposed unit price would be. Mr.
Earl responded that pricing is dependent on the market, and the proposal is not market
South Mountain Village Planning Committee
Meeting Summary
PHO-2-24--Z-69-08-8
Page 6 of 9
ready however based on similar communities with a similar housing product the
anticipated cost would be from low to mid $400,000’s.
Committee Member Tamala Daniels asked if the units would have one or two-car
garages. Mr. Earl responded the square footage of the units would determine the
number of garages. Mr. Chisolm responded that in addition to the garages each unit
will have a full driveway.
Committee Member Tamala Daniels asked if the proposal was a gated community
with private streets. Mr. Earl responded affirmatively that the development will be a
gated community with private streets that will allow on street parking.
Committee Member Gene Holmerud asked that with the units with one garage and
one driveway this would be tandem parking. Mr. Earl responded affirmatively.
PUBLIC COMMENT
None.
APPLICANT RESPONSE
None.
FLOOR/PUBLIC DISCUSSION CLOSED: MOTION, DISCUSSION, AND VOTE
MOTION
Committee Member Kay Shepard made a motion to recommend approval of PHO-2-
24--Z-69-08-8 with a modification and additional stipulations. Committee Member
Tamala Daniels seconded the motion.
VOTE
13-0-1, motion to recommend approval of PHO-2-24--Z-69-08-8 with a modification and
additional stipulations passed with Committee Members Aldama, Alvarez, Beehler,
Brooks, Busching, T. Daniels, Falcon, Holmerud, T. Muhammad, F. Muhammad,
Shepard, Viera, and Greathouse in favor and Chair Marchuk abstained.
Chair Marchuk explained that he abstained because there was no tie to break.
VPC RECOMMENDED STIPULATIONS:
1. The development shall be in general conformance with the site plan date
stamped APRIL __ 2024 October 18, 2021 AND THE LANDSCAPE PLAN
DATE STAMPED JUNE 11, 2024, as modified by the following stipulations and
approved by the Planning and Development Department.
South Mountain Village Planning Committee
Meeting Summary
PHO-2-24--Z-69-08-8
Page 7 of 9
2. The development shall comply with Mixed-Use Agricultural (MUA) Zoning
District standards pertaining to quantity and type of landscape materials and
parking lot landscaping standards, as approved or modified by the Planning
and Development Department.
3. Building elevations shall be developed to the following standards, as approved
by the Planning and Development Department.
a.
Building elevations shall contain multiple colors, exterior accent materials
and textural changes that exhibit quality and durability such as brick, stone,
colored textured concrete, or stucco, to provide a decorative and aesthetic
treatment.
b.
All building elevations shall contain architectural embellishments and
detailing such as textural changes, pilasters, offsets, recesses, variation in
window size and location, and/or overhang canopies.
4.
The developer shall provide 4 secured bicycle parking SPACES for residents at
a minimum rate required by Chapter 13, Section 1307.H for multi-family
development, as approved by the Planning and Development Department.
5.
If determined necessary by the Phoenix Archaeology Office, the applicant shall
conduct Phase I data testing and submit an archaeological survey report of the
development area for review and grubbing, landscape salvage, and/or grading
approval.
6.
If Phase I data testing is required, and if, upon review of the results from the
Phase I data testing, the City Archaeologist, in consultation with a qualified
archaeologist, determines such data recovery excavations are necessary, the
applicant shall conduct Phase II archaeological data recovery excavations.
7.
If any archaeological materials are encountered during construction, the
contractor shall cease all ground disturbing activities within 33 feet of the
discovery and notify the City of Phoenix Archaeology Office immediately to
allow time to properly assess the materials.
8.
The property owner shall record documents that disclose the existence and
operational characteristics of Phoenix Sky Harbor International Airport to future
owners or tenants of the property. The form and content of such documents
shall be according to the templates and instructions provided that have been
reviewed and approved by the City Attorney.
9.
The following street transportation improvements shall be provided and
approved by the Planning and Development Department:
South Mountain Village Planning Committee
Meeting Summary
PHO-2-24--Z-69-08-8
Page 8 of 9
a.
Right-of-way totaling 60 feet shall be dedicated for the north half of
Southern Avenue.
b.
Right-of-way totaling 30 feet shall be dedicated for the west half of 36th
Street.
c.
A 25 foot by 25-foot right-of-way triangle shall be dedicated at the
northwest corner of 36th Street and Southern Avenue.
10. The developer shall construct all streets within adjacent to the development
with paving, curb, gutter, sidewalk, curb ramps, streetlights, landscaping, and
other incidentals as per plans approved by the Planning and Development
Department. All improvements shall comply with all ADA accessibility
standards.
11. Prior to preliminary site plan approval, the landowner shall execute a
Proposition 207 waiver of claims in a form approved by the City Attorney’s
Office. The waiver shall be recorded with the Maricopa County Recorder’s
Office and delivered to the City to be included in the rezoning application file for
record.
12. THE PUBLIC SIDEWALK ALONG 36TH STREET SHALL BE DETACHED
WITH A MINIMUM FIVE-FOOT WIDE LANDSCAPED STRIP LOCATED
BETWEEN THE SIDEWALK AND BACK OF CURB AND PLANTED TO THE
FOLLOWING STANDARDS, AS APPROVED BY THE PLANNING AND
DEVELOPMENT DEPARTMENT:
A. MINIMUM 3-INCH CALIPER LARGE CANOPY, SINGLE-TRUNK,
SHADE TREES PLANTED A MINIMUM OF 25 FEET ON CENTER OR IN
EQUIVALENT GROUPINGS TO PROVIDE SHADE TO A MINIMUM 75
PERCENT OF THE SIDEWALK.
B. DROUGHT TOLERANT VEGETATION DESIGNED TO GROW TO A
MAXIMUM MATURE HEIGHT OF 24 INCHES AND ACHIEVE 75
PERCENT LIVE COVERAGE.
WHERE UTILITY CONFLICTS EXIST, THE DEVELOPER SHALL WORK
WITH THE PLANNING AND DEVELOPMENT DEPARTMENT ON
ALTERNATIVE DESIGN SOLUTIONS CONSISTENT WITH A PEDESTRIAN
ENVIRONMENT.
13. BUILDING ELEVATIONS SHALL BE PRESENTED FOR REVIEW AND
COMMENT TO THE SOUTH MOUNTAIN VILLAGE PLANNING COMMITTEE
PRIOR TO FINAL SITE PLAN APPROVAL.
South Mountain Village Planning Committee
Meeting Summary
PHO-2-24--Z-69-08-8
Page 9 of 9
STAFF COMMENTS REGARDING VPC RECOMMENDATION:
None.