Attachment D - PHO Application - PHO-2-24--Z-69-08-8.pdf
Extracted text (via pymupdf)
48642 characters
To: Date: May 10, 2024 From: Departments Concerned Joshua Bednarek Planning & Development Department Director Subject: P.H.O. APPLICATION NO. PHO-2-24--Z-69-08-8 – Notice of Pending Actions by the Planning Hearing Officer 1. Your attention is called to the fact that the Planning Hearing Officer will consider the following case at a public hearing on June 12, 2024. 2. Information about this case is available for review at the Zoning Counter in the Planning and Development Department on the 2nd Floor of Phoenix City Hall, telephone 602-262-7131, Option 6. 3. Staff, please indicate your comments and respond electronically to pdd.pho@phoenix.gov or you may provide hard copies at the Zoning Counter in the Planning and Development Department on the second floor of Phoenix City Hall by May 17, 2024. DISTRIBUTION Mayor’s Office (Tony Montola), 11th Floor City Council (Stephanie Bracken), 11th Floor Aviation (Jordan D. Feld ) CED (Michelle Pierson), 20th Floor Fire Prevention (Joel Asirsan), 2nd Floor Neighborhood Services (Gregory Gonzales, Lisa Huggins), 4th Floor Parks & Recreation (Todd Shackelford), 16th Floor Public Transit (Michael Pierce) Street Transportation Department (Maja Brkovic, Josh Rogers, Alan Hilty, Chris Kowalsky), 5th Floor Street Transportation - Ped. Safety Coordinator (Kurt Miyamoto), 5th Floor Street Transportation - Floodplain Management (Tina Jensen, Priscilla Motola, Rudy Rangel), 5th Floor Water Services (Don Reynolds, Victor Romo), 8th Floor Planning and Development (Joshua Bednarek, Tricia Gomes), 3rd Floor Planning and Development/Information Services (Ben Ernyei, Andrew Wickhorst), 4th Floor Planning and Development/Historic Preservation Office (Kevin Weight), 3rd Floor Planning Hearing Officer (Byron Easton, Teresa Garcia), 2nd Floor Village Planner (Samuel Rogers, South Mountain Village) Village Planning Committee Chair (Trent Marchuk, South Mountain Village) ATTACHMENT D PLEASE RESPOND ELECTRONICALLY TO TERESA GARCIA 2ND FLOOR, 602-262-7399 200 W. Washington St., 2nd Floor, Phoenix, AZ 85003 ● 602-626-7131 APPLICATION FOR PLANNING HEARING OFFICER ACTION APPLICATION NO: PHO-2-24--Z-69-08-8 Council District: 8 Request For: Stipulation Modification Reason for Request: Request to modify Stipulation 1 regarding general conformance with the site plan date stamped October 18, 2021.;Request to modify Stipulation 4 regarding the number of bicycle parking spaces. Contact Information Name Relationship Type Address Phone Fax Email Taylor Earl Applicant United States 6022650094 tearl@earlcurley.com Taylor Earl Representative United States 6022650094 tearl@earlcurley.com Ryan Hartman - 36th St & Southern NWC, LLC Owner 7377 East Doubletree Ranch Road, Suite 270, Scottsdale AZ 85258 Property Location: Northwest corner of 36th Street and Southern Avenue Acreage: 5.04 Geographic Information Zoning Map APN Quarter Section 122-70-102 Village: South Mountain An applicant may receive a clarification from the city of its interpretation or application of a statute, ordinance, code or authorized substantive policy statement. To request clarification or to obtain further information on the application process and applicable review time frames, please call 602-262-7131 (option 6), email zoning@phoenix.gov or visit our website at https://www.phoenix.gov/pdd/licensing-time-frames A Filing Fee had been paid to the City Treasurer to cover the cost of processing this application. The fee will be retained to cover the cost whether or not the request is granted I declare that all information submitted is true and correct to the best of my knowledge and belief. I acknowledge that any error in my application may be cause for changing its normal scheduling. Signature: ____________________________________________________ DATE: ___________________ Fee Information Fee Fee Waived Fee Date Purpose $1,080.00 $0.00 04/25/24 PHO (1-2 stipulations) PHO Project Narrative - 36th & Southern Proposed Single-Family Subdivision (PHO-2-24—Z-69-08) NWC of 36th Street & Southern Avenue Phoenix, Arizona PREPARED BY For KHOVNANIAN HOMES Submitted: April 25, 2024 2 | P a g e Introduction This PHO request is for a remnant infill parcel on the northwest corner of 36th St. and Southern Avenue. The original C-1 rezoning for this site was for an office development, but that never went forward. Years later a PHO was processed to change the zoning to accommodate a multifamily development, but that too never went forward. Now, a respected homebuilder, K. Hovnanian Homes (“KHOV”), is proposing a single-family townhome development with opportunities for home ownership. The new community would include the subject parcel shown above in gold (Parcel A) and the larger parcel to the north, outlined in Green (Parcel B). Parcel A and Parcel B were the subjects of two separate zoning cases, and thus separate PHO applications and narratives are being filed for each. Home Ownership As home prices and interest rates have increased, a growing number of Arizonans are being priced out of the opportunity to buy a home. This has been one of the contributing factors to the increase of multifamily development over the past five years. But KHOV’s proposal for this parcel would provide home-ownership opportunities to many families. KHOV has been developing the same type of townhome-style community being proposed here in other areas 3 | P a g e of Phoenix and those communities have been well received. KHOV is proposing 40 townhomes for parcel A, with a gross density of 8.0 dwelling units per acre. Another 192 townhomes are proposed for Parcel B. KHOV would integrate the two parcels together to form a single residential community that fits seamlessly into the surrounding community. Combining the two parcels into one community is a superior option to leaving the two parcels to develop separately. Development Information As noted in the map above, the subject site’s zoning designation is C-1, which allows for the type of product being proposed. The maximum building height proposed is 30 feet and two stories. The project would provide 4.86 acres of open space, which equates to approximately 26 percent of the site (gross). The landscape pallet will incorporate the use of drought tolerant trees and groundcovers that will provide a sense of identity and be compatible with the neighborhood and environmental conditions of the region. Stipulation Modification Requests Stipulation 1 – New Site Plan Below is our proposed revision to stipulation 1: The development shall be in general conformance with the site plan date stamped April _____, 2024 October 18, 2021, as modified by the following stipulations and approved by the Planning and Development Department. 4 | P a g e A new plan with a new product is proposed and thus the site plan must be updated. The 2021 site plan was for a multifamily rental product, whereas the present proposal is for a townhome ownership community. Because this narrative is limited to addressing the stipulations that apply to Parcel A, the new site plan to be substituted in would be the portion of the overall community plan that is outlined in gold to the right. This proposal for a townhome community will address the problem of the “missing middle.” This term was coined in 2010 and refers to a housing type that is between detached single-family and large multifamily complexes. Examples include duplexes, courtyard apartments, cottage clusters and townhomes. This type of product is an appropriate transition between single-family homes to the west and north and commerce park to the east. Moreover, in today’s housing climate, it is a housing type that offers home ownership at an accessible level. Stipulation 4 - Bike Parking Below is our proposed revision to stipulation 4: 4. THE DEVELOPER SHALL PROVIDE 4 SECURED BICYCLE PARKING SPACES FOR RESIDENTS AT A MINIMUM RATE REQUIRED BY CHAPTER 13, SECTION 1307.H FOR MULTI-FAMILY DEVELOPMENT, AS APPROVED BY THE PLANNING AND DEVELOPMENT DEPARTMENT. 5 | P a g e The phrasing of the original stipulation makes sense for multifamily development. In multi-level apartments, it’s important to have bike parking in common areas. Otherwise, people are forced to haul their bikes up and down the stairs every day or to fit them into an apartment that may more limited space. Here, the residents of this townhome community will all have garages, backyards and first-floor living space. They will have no reason to park bicycles in a common area. That is why this type of stipulation is not appropriate for single-family communities. KHOV is, however, willing to install four bicycles parking spaces. This will accommodate anyone cycling to the open space and wishing to lock their bike while they play—even though this too is not terribly likely. Stipulation 5 and 6 – Standard Archaeological Stipulations Stipulations 5 and 6 are the standard archaeological stipulations. Both of these have been satisfied and thus it makes sense to simply remove them. Conclusion The modifications requested in this PHO are reasonable and will help to provide for the missing middle housing options. The requested modifications in this application and the companion application will align the stipulations of the two sites to allow for a new for-sale housing product type that is in short supply and very much needed to help provide solutions for home ownership. The core of our request is the modification of several stipulations that were either geared toward a rental multifamily community or have already been completed and are no longer required. The requested stipulations are reasonable under the context. The site plan is changed and should be updated. The bicycle parking requirement needs to be updated to reflect a single-family environment where homeowners have garages and places to store their personal belongings, and satisfied stipulations can be removed. The City has succeeded in increasing the supply of apartments and other for-rent housing products. But there has been a shortage of entry-level housing products that allows young families to enter into the housing market. We feel the proposed subdivision meets the needs of the community and provides this missing middle. We urge the city to grant the requested modifications. Mod Mod CP/GCP S-1 CP/BP C-2 * * Z-11-90 Z-11-98 36TH ST 36TH ST SOUTHERN AV 34TH PL APP MUA * Z-150-99 APP R-5 * Z-189-05 400 0 400 200 Feet * Maximum Units Allowed with P.R.D. Bonus APPLICANT'S NAME: DATE: REVISION DATES: REQUESTED CHANGE: GROSS AREA INCLUDING 1/2 STREET AND ALLEY DEDICATION IS APPROX. AERIAL PHOTO & QUARTER SEC. NO. ZONING MAP MULTIPLES PERMITTED CONVENTIONAL OPTION * UNITS P.R.D. OPTION FROM: TO: CITY COUNCIL DISTRICT: NORTH BROADWAY RD BASELINE RD DOBBINS RD 27TH AVE 19TH AVE 7TH AVE CENTRAL AVE 7TH ST 16TH ST 40TH ST 48TH ST 24TH ST 32ND ST SOUTHERN AVE I-10 !"a$ Z-96-08 APPLICATION NO. CITY OF PHOENIX PLANNING DEPARTMENT CITY OF PHOENIX PLANNING DEPARTMENT (N:\IS_Team\Core_Functions\Zoning\sketch_maps\2008\July\Z-69-08.mxd) 7/8/2008 07-08-2008 SOUTH MOUNTAIN VILLAGE 5.00 Acres Z-69-08 R1-6 BAPOD (Approved MUA), (5.00 a.c.) Q3-35 D10 8 C-1 BAPOD, (5.00 a.c.) David Kenyon R1-6 C-1 25 31 72 88 S-1 R1-6 ALLEY PRIVATE PRIVATE PRIVATE PRIVATE PRIVATE S 34TH PL ALLEY E WAYLAND DR PRIVATE E SOUTHERN AVE S 36TH ST PRIVATE S 35TH PL R1-6 CP/GCP* R-3* S-1 R-5 * C-1* C-2 CP/BP CP/GCP* S-1 Planning & Development Department PHO-2-24--Z-69-08-8 Property Location: Northwest corner of 36th Street and Southern Avenue 0 190 380 95 Feet ´ ALLEY PRIVATE PRIVATE PRIVATE PRIVATE S 34TH PL ALLEY E WAYLAND DR PRIVATE E SOUTHERN AVE S 36TH ST PRIVATE S 35TH PL R1-6 CP/GCP* R-3* S-1 R-5 * C-1* C-2 CP/BP CP/GCP* S-1 mapservices@phoenix.gov Planning & Development Department PHO-2-24--Z-69-08-8 Property Location: Northwest corner of 36th Street and Southern Avenue 0 200 400 100 Feet ´ 2 SHEET LEGEND: FOR OF THE GILA AND SALT RIVER MERIDIAN, MARICOPA COUNTY, ARIZONA LOCATED IN A PORTION OF SECTION 25, TOWNSHIP 1 NORTH, RANGE 3 EAST VICINITY MAP N.T.S. SITE 25 MISCELLANEOUS NOTES: INDEX OF SHEETS SHEET NO. DESCRIPTION CSP01 COVER SHEET CSP02 ENGINEER: ADDRESS ASSESSORS PARCEL NO. NO ADDRESS AVAILABLE BENCHMARK: BASIS OF BEARING: BASE FLOOD ELEV.: N/A FIRM ZONE: X-SHADED FIRM DATE: 9/18/2020 SUFFIX: M PANEL DATE: 9/18/2020 PANEL NUMBER: 2220 FIRM: 04013C2220M UTILITIES: - CITY OF PHOENIX REFUSE - CITY OF PHOENIX POLICE/FIRE - CITY OF PHOENIX WATER - CITY OF PHOENIX SEWER - COX COMMUNICATIONS CABLE TV - SOUTHWEST GAS COMPANY GAS - SALT RIVER PROJECT (SRP) ELECTRIC - CENTURY LINK/ COX TELEPHONE EMAIL: MATT@3ENGINEERING.COM PHONE: (602) 334-4387 CONTACT: MATTHEW J. MANCINI, P.E. SCOTTSDALE, ARIZONA 85251 6370 E. THOMAS ROAD, SUITE 200 3 ENGINEERING FLOODPLAIN INFORMATION: 2 CSP01 APPLICANT: PROJECT DESCRIPTION: SINGLE FAMILY DESIGN REVIEW A PLANNED RESIDENTIAL SUBDIVISION SUBJECT TO 36TH & SOUTHERN CONCEPTUAL SUBDIVISION PLAN N.T.S. 36TH STREET PUBLIC R/W PLAN SUBDIVISION CONCEPTUAL TRACT USE A B C AREA TOTAL LANDSCAPE, RETENTION, DRAINAGE, PUE PARCEL "A" TRACT AREA AND USE TABLE TRACT USE A B AREA LANDSCAPE, RETENTION, DRAINAGE, PUE PARCEL "B" TRACT AREA AND USE TABLE C D E F LANDSCAPE, RETENTION, DRAINAGE, PUE LANDSCAPE, RETENTION, DRAINAGE, PUE TOTAL 0.68 AC 1.18 AC 0.40 AC 2.26 AC 3.19 AC 0.85 AC 2.68 AC 0.65 AC 0.39 AC 0.29 AC 8.05 AC PRIVATE STREETS, DRAINAGE, PUE, SWE PRIVATE STREETS, DRAINAGE, PUE, SWE LANDSCAPE, RETENTION, DRAINAGE, PUE 32ND STREET 40TH STREET ROESER ROAD BROADWAY ROAD SOUTHERN AVENUE 36TH STREET 10% 40% 40% + 10% SHADE AVERAGE AREA/LOT NET/40 (GROSS-R/W-PRIVATE ACCESS) NET AREA GROSS AREA PARCEL "A" 122-70-069 122-70-097 122-70-096 122-70-066 122-70-067 122-70-068 122-70-070 122-70-071 122-70-072 122-70-073 122-70-074 122-70-075 122-70-099 122-70-033 122-70-032 122-70-031 122-70-030 122-70-029 122-70-028 M.C.R. 076-26 BERRY HOMES 122-71-002 ESTEBAN PARK M.C.R. 864-05 YANCHE SUBDIVISION CARDENAS VILLAS AT 122-70-076 122-70-077 122-70-078 122-70-079 122-70-080 122-70-081 122-70-082 122-70-083 122-70-084 122-70-085 122-70-086 122-70-087 122-70-088 122-70-089 122-70-090 122-70-091 122-70-092 122-70-093 122-70-094 122-70-098 36TH STREET TRACT "A" TRACT "B" TRACT "C" TRACT "A" TRACT "A" TRACT "A" TRACT "A" TRACT "D" TRACT "D" TRACT "B" TRACT "C" TRACT "F" TRACT "C" TRACT "C" TRACT "E" TRACT "B" 3 RETENTION RETENTION RETENTION RETENTION RETENTION RETENTION RETENTION RETENTION RETENTION SOUTHERN AVENUE CL S/W 4' 2' 2' C&G LOCAL STREET C&G S/W 4' B/C 14.58' B/C 14.58' LEGEND R/W S/W C&G (TYP) LS B/C VNAE PUE RIGHT-OF-WAY SIDEWALK CURB & GUTTER TYPICAL LANDSCAPE BACK OF CURB VEHICULAR NON-ACCESS EASEMENT PUBLIC UTILITY EASEMENT SUBDIVISION CORNER PROPOSED MONUMENT PROPOSED HYDRANT SETBACK LINE EASEMENT LINE CENTERLINE EX. R/W LINE LOT OF R/W LINE PROPERTY / BOUNDARY LINE APN 122-70-101 & 122-70-102 SITE DATA: PARCEL "A" 10% 40% 40% + 10% SHADE AVERAGE AREA/LOT NET/192 (GROSS-R/W-PRIVATE ACCESS) NET AREA GROSS AREA 324.20 SF 1,296.82 SF 1,621.02 SF 3,242.04 SF (622,472 SF) 14.29 ACRES (801,219 SF) 18.39 ACRES PARCEL "B" SITE DATA: PARCEL "B" DESIGN. FIRE FLOW TEST TO BE COMPLETED AT FINAL COMPLETED DURING FINAL DESIGN. NATIVE PLANT INVENTORY & SALVAGE TO BE DESIGN. STREET LIGHTS TO BE DETERMINED AT FINAL DESIGN. RETAINING WALLS TO BE DETERMINED AT FINAL 1 of 4 CONCEPTUAL SUBDIVISION PLAN - PARCEL "A" CONCEPTUAL SUBDIVISION PLAN - PARCEL "B" CSP03-04 LANDSCAPE, RETENTION, DRAINAGE, PUE LANDSCAPE, RETENTION, DRAINAGE, PUE 3 4 PRIVATE ACCESSW AY PRIVATE ACCESSW AY PRIVATE ACCESSW AY PRIVATE ACCESSWAY PRIVATE ACCESSW AY PRIVATE ACCESSWAY PRIVATE ACCESSW AY PRIVATE ACCESSWAY PRIVATE ACCESSW AY PRIVATE ACCESSWAY MAXIMUM LOT COVERAGE: MAXIMUM LOT COVERAGE: TRACT 29.16' PUE/SWE 10' PUE/SWE 10' 2' B/C 16.58' C&G EX. R/W 30' CL EX. R/W 30' EX. PUE 8' S/W 5' 5' "PARCEL B" "PARCEL A" PRIVATE ACCESSWAY PHONE: (480) 824-4175 EMAIL: CCHISHOLM@KHOV.COM CONTACT: CHUCK CHISHOLM SCOTTSDALE, AZ 85260 8800 E. RAINTREE DRIVE, SUITE 300 K HOVNANIAN GREAT WESTERN HOMES, LLC AND PUBLIC SEWER. PROJECT IS ZONED R3 PROPOSES A TOTAL OF 192 LOTS WITH PRIVATE ACCESSWAY, PUBLIC WATER, DEVELOPMENT WITH A GROSS DENSITY OF 10.44 LOTS/AC. THE PROJECT THIS PROJECT IS PROPOSED AS A ATTACHED SINGLE FAMILY RESIDENTIAL PARCEL B AND PUBLIC SEWER. PROJECT IS ZONED R3. PROPOSES A TOTAL OF 40 LOTS WITH PRIVATE ACCESSWAY, PUBLIC WATER, DEVELOPMENT WITH A GROSS DENSITY OF 8.00 LOTS/AC. THE PROJECT THIS PROJECT IS PROPOSED AS A ATTACHED SINGLE FAMILY RESIDENTIAL PARCEL A C.O.P. DATUM NGVD-29 ELEVATION: 1136.60 E. SOUTHERN AVE. & S. 36TH ST. LOCATED AT THE INTERSECTION OF FOUND BRASS CAP IN HANDHOLE CITY OF PHOENIX NO. 757 MARICOPA COUNTY RECORDER. WEST PER BOOK 864, PAGE 05 EAST, BEARING SOUTH 88°49'00" 25, TOWNSHIP 1 NORTH, RANGE 3 SOUTHWEST QUARTER OF SECTION THE SOUTH LINE OF THE CL S/W 4' 2' 2' C&G LOCAL STREET C&G S/W 4' B/C 16.58' B/C 16.58' TRACT 33.16' PUE/SWE 10' PUE/SWE 10' N.T.S. PRIVATE ACCESSWAY N.T.S. PARCEL A 4 PARCEL A RESIDENT ACCESS ONLY & PARCEL B TOTAL: PARKING SPACE: DRIVEWAY: GARAGE: PARKING ZONING LOT COVERAGE (ALLOWED) LOT SALES PROPOSED AREA OF PRIVATE ACCESS AREA OF PUBLIC R/W AREA OF OPEN SPACE AREA OF LOTS MAX. BLDG. HEIGHT GROSS DENSITY GROSS AREA (INC. R/W) TOTAL LOTS PARCEL #'S TOTAL: PARKING SPACE: DRIVEWAY: GARAGE: PARKING: ZONING LOT COVERAGE (ALLOWED) LOT SALES PROPOSED AREA OF PRIVATE ACCESS AREA OF PUBLIC R/W AREA OF OPEN SPACE AREA OF LOTS MAX. BLDG. HEIGHT GROSS DENSITY GROSS AREA (INC. R/W) TOTAL LOTS PARCEL #'S 384.42 SF 1,537.67 SF 1,922.09 SF 3,844.18 SF (153,767 SF) 3.53 ACRES (218,002 SF) 5.00 ACRES 114 0 57 57 R3 40% + 10% FOR SHADE YES 0.68 ACRES 0.79 ACRES 1.58 ACRES (31.60% GROSS) 1.95 ACRES 30' (2-STORY) 8.00 DU/AC 5.00 ACRES 40 122-70-102 610 54 278 278 R3 40% + 10% FOR SHADE YES 3.19 ACRES 0.91 ACRES 4.86 ACRES (26.43% GROSS) 9.43 ACRES 30' (2-STORY) 10.44 DU/AC 18.39 ACRES 192 APN 122-70-101 AMENTITY 3 engineering planning surveying civil engineering REVISIONS ENGINEER: CAD TECH: DESIG NER: C:\M y SecuriSync\Projects_5000\5319_36th & Southern\5319preapp_csp01-cover.dgn CO PYRIG HT 3 ENGINEERING, LLC 2024 SHEET NO. PROJECT NO. working days before you begin excavation Contact Arizona 811 at least two full Call 811 or click Arizona811.com R WWW.3ENGINEERING.COM FAX: (602) 490-3230 PHONE: (602) 334-4387 SCOTTSDALE, ARIZONA 85251 SUITE # 200 6370 E. THOMAS ROAD 3 ENGINEERING, LLC A R IZ O N A, U. S . A . MATTHEW J. MANCINI D t e S i g n e d .. .. . .. .. C E R TI F I C A T E N O . 45652 R e g is t e r e d P ro f e s s io n l E n g in e e r ( C i vil ) CO VER SHEET APPROVALS EXPIRES: 12/31/2024 5319 D. DENTON M. MANCINI PHOENIX, ARIZONA 85040 XX of XX 2/23/24 DATE: 2/23/24 36TH & SOUTHERN M. MANCINI QS 3-35,3-36 KIVA 20-4112, 21-671 KIVA 20-4112, 21-671 QS 3-35,3-36 2' C&G 4' S/W 6' 20' B/C B/C CL F/C-F/C 10' PUE 4' S/W 18' (1) 2' C&G (1) (1) ROLL OR VERTICAL DEPENDING ON DRAINAGE YARD OPEN 10' YARD OPEN 10' YARD OPEN (2) (2) (2) (2) NO ATTACHED SHADE STRUCTURES PERMITTED 1' VNAE 1' VNAE NOTES BUILDING N.T.S. TYPICAL INTERIOR LOT DETAIL 10' 14.58' 14.58' S W 89' (MIN) 24'(MIN.) 24'(MIN.) PRIVATE ACCESSWAY /PAE /PAE TYPE VEHICLES) EMERGENCY & SERVICE REFUSE COLLECTION, AND (ESMT. FOR W/S DRAINAGE, 10' PUE 28' 1' VNAE 6' TRACT A PRIVATE ACCESSWAY SEE NOTES - SIDE SETBACKS = 0' 20' WIDE 24'.), INSIDE UNITS ARE YARD, BUT UNIT IS STILL INCLUDE 5-FT SIDE LINE PREFERRED TO WIDE MIN. (29' WIDE LOT - OUTSIDE UNITS ARE 24' PARCEL B. ACCESS ONLY AND FOR PARCEL A RESIDENT IS 29.16' WIDE FOR FOR PARCEL A. TRACT A - TRACT A IS 33.16' WIDE PHO-2-24--Z-69-08 Proposed Conceptual Site Plan Hearing Date: June 12, 2024 1135 1135 1135 1135 PUE EX. 8' SWE 10' EX. EX. 5' LS ESMT. EX. 5' LS ESMT. RETENTION RETENTION RETENTION SCALE: 1"= 40' 0' 20' 40' 80' CSP02 2 of 4 E. SOUTHERN AVENUE S. 36TH STREET S. 35TH PLACE E. WAYLAND DRIVE PAGE 24, M.C.R. PER DOCKET 7945, INCIDENTAL PURPOSES EASEMENT AND 7' COMMUNICATION PAGE 25, M.C.R. PER DOCKET 7945, INCIDENTAL PURPOSES EASEMENT AND 7' COMMUNICATION PG. 14, M.C.R. ON BK. 909, AS SHWON PG. 530, M.C.R. OF DEEDS, PER BK. 202 EASEMENT CENTERLINE 2203.38' CAP FLUSH FD. BRASS 98.87' (M) 99.02' (R) CAP FLUSH FD. BRASS 47.01' (M) S88°49'00"W (M&R&R1) 2632.90' (M) (BASIS OF BEARING) 330.63' (R) 330.64' (M) N00°03'56"W 5.00' 7.04' (R) 7.05' (M) N00°04'34"W 789.30' (R) N00°04'52"W 792.36' (M) S00°04'34"E 659.28' (R) S00°04'52"E 659.25' (M & R2) 612.24' 330.40' (R2) S88°48'43"W 330.78' (R) S88°48'27"W 330.82' (M) 305.82' 30' BRASS CAP FLUSH FD. CITY OF PHOENIX 130.09' (M) 130.03' (R) CAP FLUSH FD. BRASS 429.73' (M) 429.83' (R) 289.46' (M) 302.45' (R) CAP FLUSH FD. BRASS S88°48'27"W 719.18' (M) CAP FLUSH FD. BRASS S88°48'43"W 732.28' (R) 659.30' (M & R) S00°03'48"E 2648.00' (R) S00°03'56"E 2647.91' (M) APN 122-70-082 LOT 34 APN 122-70-083 LOT 35 APN 122-70-084 LOT 36 APN 122-70-085 LOT 37 APN 122-70-086 LOT 38 APN 122-70-087 LOT 39 APN 122-70-089 LOT 41 APN 122-70-090 LOT 42 APN 122-70-091 LOT 43 APN 122-70-092 LOT 44 APN 122-70-093 LOT 45 APN 122-70-081 LOT 33 APN 122-70-080 LOT 32 APN 122-70-079 LOT 31 APN 122-70-078 LOT 30 APN 122-70-077 LOT 29 APN 122-70-076 LOT 28 APN 122-70-094 LOT 46 APN 122-70-098 TRACT "D" CAP FLUSH FD. BRASS 74.02' S88°49'00"W N33°16'43"E 27.28' 5.00' N00°03'56"W 180.63' S88°49'00"W PER 91-013237, M.C.R. AND INCIDENTAL PURPOSES 10' LANDSCAPE EASEMENT BRASS CAP IN HANDHOLE FD. CITY OF PHOENIX BRASS CAP IN HANDHOLE FD. CITY OF PHEONIX S ‚ COR. SEC. 25 HANDHOLE BRASS CAP IN PHOENIX FD. CITY OF SW COR. SEC. 25 31.01' S88°49'00"W RLS 26404 NO I.D. - SET CAP FD. REBAR BENT W/ CAP RLS 26404 SET 1/2" REBAR EX. R/W 30' N00°03'56"W 589.79' APN 122-70-088 LOT 40 14 13 12 11 10 9 8 7 6 5 4 3 2 1 40 39 38 37 36 35 34 33 32 31 30 29 28 27 26 25 24 23 22 21 20 19 16 17 18 ACCESSWAY PRIVATE TRACT "A" TRACT "A" PRIVATE ACCESSW AY TRACT "A" TRACT "B" TRACT "B" TRACT "C" TRACT "B" 15 APN 122-76-112 BUSINESS PARK SOUTH MOUNTAIN R/W 47' EX. R/W 30' N.T.S. 36TH STREET PUBLIC R/W PARCEL "B" TRACT AREA AND USE TABLE CL S/W 4' 2' 2' C&G LOCAL STREET C&G S/W 4' B/C 14.58' B/C 14.58' TRACT 29.16' PUE/SWE 10' PUE/SWE 10' 2' B/C 16.58' C&G EX. R/W 30' CL EX. R/W 30' EX. PUE 8' S/W 5' 5' PRIVATE ACCESSWAY CL S/W 4' 2' 2' C&G LOCAL STREET C&G S/W 4' B/C 16.58' B/C 16.58' TRACT 33.16' PUE/SWE 10' PUE/SWE 10' N.T.S. PRIVATE ACCESSWAY N.T.S. PARCEL A PARCEL A RESIDENT ACCESS ONLY & PARCEL B 1' VNAE 89' 89' 89' 89' 95' 89' 29' 29' 20' 24' 29' 20' 20' 20' 20' 20' 89' 20' 20' 89' 20' 20' 89' 20' 20' 89' 20' 20' 89' 20' 20' 89' 20' 20' 89' 20' 20' 89' 20' 20' 89' 20' 20' 89' 20' 20' 89' 20' 20' 89' 20' 20' 89' 20' 20' 89' 20' 20' 89' 20' 20' 89' 20' 89' 20' 20' 89' 20' 20' 89' 20' 20' 89' 20' 20' 89' 79' 19' 89' 29' 29' 78' 89' 89' 89' 89' 89' 89' 29' 29' 89' 29' 29' 89' 29' 29' 89' 29' 29' 89' 29' 29' 89' 29' 29' 89' 29' 29' 89' 29' 29' 89' 29' 29' 1' VNAE 1' VNAE 1' VNAE 29' 29' 29' 29' 29' 29' 29' 14' 29' 19' 14' 1' VNAE 1' VNAE 1' VNAE 1' VNAE 1' VNAE 1' VNAE 1' VNAE (TYPICAL) FIRE HYDRANT 10' 50' 40' 40' 20.00' 20.00' 20.00' ENTRY GATED 52' 33' 10' (TYPICAL) ENCLOSURE TRASH 1' VNAE AREA LOT TOT ONLY ACCESS RESIDENCE 20' 20' 3 engineering planning surveying civil engineering REVISIONS ENGINEER: CAD TECH: DESIG NER: C:\M y SecuriSync\Projects_5000\5319_36th & Southern\5319preapp_csp02-site plan.dgn CO PYRIG HT 3 ENGINEERING, LLC 2024 SHEET NO. PROJECT NO. working days before you begin excavation Contact Arizona 811 at least two full Call 811 or click Arizona811.com R WWW.3ENGINEERING.COM FAX: (602) 490-3230 PHONE: (602) 334-4387 SCOTTSDALE, ARIZONA 85251 SUITE # 200 6370 E. THOMAS ROAD 3 ENGINEERING, LLC PRELIM INARY SITE PLAN APPROVALS XX of XX A R IZ O N A, U. S . A . MATTHEW J. MANCINI D t e S i g n e d .. .. . .. .. C E R TI F I C A T E N O . 45652 R e g is t e r e d P ro f e s s io n l E n g in e e r ( C i vil ) EXPIRES: 12/31/2024 M. MANCINI D. DENTON M. MANCINI PHOENIX, ARIZONA 85040 36TH & SOUTHERN 2/23/24 DATE: 2/23/24 5319 KIVA 20-4112, 21-671 QS 3-35,3-36 QS 3-35,3-36 KIVA 20-4112, 21-671 PHO-2-24--Z-69-08 Proposed Conceptual Site Plan Hearing Date: June 12, 2024 PHO-2-24--Z-69-08 Stipulated Site Plan Hearing Date: June 12, 2024 PHO-2-24--Z-69-08 Stipulated Site Plan Hearing Date: June 12, 2024 REPORT OF PLANNING HEARING OFFICER ACTION Mr. Adam Stranieri, Planner III, Hearing Officer Bradley Wylam, Planner I, Assisting October 20, 2021 ITEM NO: 5 DISTRICT 8 SUBJECT: Application #: PHO-1-21--Z-69-08-8 Location: Northwest corner of 36th Street and Southern Avenue Existing Zoning: C-1 Acreage: 5.0 Request: 1) Modification of Stipulation 1 regarding general conformance with the site plan and elevations date stamped July 3, 2008. 2) Technical corrections to Stipulations 4 and 5. Applicant: Avenue North Owner: Hermes, Inc. Representative: Benjamin Tate, Withey Morris PLC ACTIONS Planning Hearing Officer Recommendation: The Planning Hearing Officer recommended approval with a modification and additional stipulations. Village Planning Committee (VPC) Recommendation: The South Mountain Village Planning Committee heard this case on October 12, 2021 and recommended denial as filed and approval with a modification and an additional stipulation by a vote of 9-0-1. DISCUSSION Benjamin Tate, representative with Withey Morris, provided an overview of the original rezoning case and the PHO request. He stated the request to modify Stipulation 1 regarding general conformance with the site plan and elevations will retain the MUA landscaping standards as desired by the South Mountain Village Planning Committee (VPC). He noted that the VPC recommended additional stipulations regarding the elevations to include enhanced architectural standards. He stated that the stipulation was intended to address the street-facing sides of each building. Adam Stranieri, Planning Hearing Officer, stated there were no concerns regarding the intensity, use, or layout provided on the proposed site plan. He reviewed the language recommended by the VPC regarding elevations and Planning Hearing Officer Summary of October 20, 2021 Application PHO-1-21--Z-69-08-8 Page 2 design guidelines. Ryan Hartman, representative with Avenue North, stated they are comfortable with the language as recommended by the VPC. Mr. Stranieri asked for clarification regarding the proposed language of Stipulation 1 regarding MUA standards. Mr. Tate stated the intent of the proposal is to follow the landscaping standards per the MUA zoning district, but not the common open space standards which require 25% open space. Mr. Stranieri noted that he proposes that the content regarding MUA landscaping standards be separated from the other language in Stipulation 1 regarding conformance with the site plan. He stated that the Archaeology Department recommends additional stipulations regarding archaeologically sensitive areas. He stated that the Street Transportation Department recommends an additional stipulation regarding bicycle parking. FINDINGS 1) The stipulated site plan depicts a large-scale, mixed-use development consisting of two approximately 20,000 square foot buildings providing ground-floor retail space and second-floor office uses. Proposed buildings were two stories and 30 feet in height. The project did not develop, and the property remains vacant. The proposed site plan depicts a multifamily residential development consisting of 47 units at a density of 9.39 dwelling units per gross acre. The buildings are two stories and approximately 28 feet in height. Proposed open space is approximately 5.3%. The proposal is compatible with the diverse land uses in the surrounding area. Immediately to the east is a large amount of employment-generating Commerce Park type uses. To the north are existing single-family residences and a planned multifamily development. To the south are extensive agricultural uses. To the west is a mixture of single-family, multifamily, and agricultural uses. 2) The applicant’s request for modification of Stipulation 1 regarding general conformance and additional standards is recommended for approval with a modification and additional stipulations. The first modification is to remove the general conformance requirement for conceptual elevations. See Finding #3 for detailed discussion regarding elevations. The second modification is to remove the requirement for specific regard to the quantity and location of open space. In the original rezoning case, this stipulation was established to require that the developer provide common open space consistent with the MUA district, which requires a minimum 25% of the net site area of a mixed-use development to be set aside as open space accessible to the public. There is no comparable standard in the C-1 zoning district. Additionally, this standard would not apply to a multifamily development in the MUA district. The applicant’s Planning Hearing Officer Summary of October 20, 2021 Application PHO-1-21--Z-69-08-8 Page 3 request is consistent with the R-3 zoning district, which requires a minimum 5% of the gross area be provided as common area. The applicant is proposing 5.3%. Therefore, this existing language is no longer relevant to the current proposal. The third modification is to relocate existing stipulation language, regarding compliance with MUA landscaping standards for quantity and type of landscape materials and parking lot landscaping standards, to a new stand-alone stipulation. These requirements are unrelated to the site plan and should be separated from the content of Stipulation 1. 3) The South Mountain Village Planning Committee recommended two additional stipulations regarding elevations that are recommended for adoption. The Committee expressed concerns regarding design continuity on all building sides and a lack of architectural detailing and features. Specifically, these concerns were centered around rear elevations, given that the proposed conceptual site plan depicts many units backing to the public right-of-way along 36th Street and Southern Avenue. These stipulations establish enhanced requirements regarding exterior finishes and four-sided architecture. They address the Committee’s concerns regarding these issues and the additional stipulations will allow the applicant and staff flexibility to modify the conceptual elevations to incorporate additional enhancements, particularly on the rear of the buildings. 4) The Street Transportation Department recommends an additional stipulation regarding required bicycle parking. This stipulation is recommended for inclusion. The subject site is in proximity to identified multi-use trails along the east side of 36th Street, west side of 32nd Street, and Vineyard Road. The development site is abutting bike lanes along Southern Avenue and along other nearby streets (i.e., 32nd Street, 40th Street, Roeser Road). In addition, the subject site is less than a mile from the Western Canal which offers regional multi-modal connections. Bicycle infrastructure supports the established and future planned multi-modal network and promotes the goals of the City Council approved Complete Streets Policy. 5) The site is identified as archaeologically sensitive and two additional stipulations are recommended to be included to address requirements for archaeological survey and testing. STIPULATIONS 1. That The development shall be in general conformance to WITH the site plan and elevations date stamped July 3, 2008 OCTOBER 18, 2021, AS MODIFIED BY THE FOLLOWING STIPULATIONS with specific regard to Planning Hearing Officer Summary of October 20, 2021 Application PHO-1-21--Z-69-08-8 Page 4 the amount and location of the common open space, however, the development shall follow the Mixed Use Agriculture (MUA) zoning district standards pertaining to quantity and type of landscape materials, and the parking lot landscaping standards, as AND approved by the PLANNING AND Development Services Department. 2. THE DEVELOPMENT SHALL COMPLY WITH MIXED-USE AGRICULTURAL (MUA) ZONING DISTRICT STANDARDS PERTAINING TO QUANTITY AND TYPE OF LANDSCAPE MATERIALS AND PARKING LOT LANDSCAPING STANDARDS, AS APPROVED OR MODIFIED BY THE PLANNING AND DEVELOPMENT DEPARTMENT. 3. BUILDING ELEVATIONS SHALL BE DEVELOPED TO THE FOLLOWING STANDARDS, AS APPROVED BY THE PLANNING AND DEVELOPMENT DEPARTMENT. A. BUILDING ELEVATIONS SHALL CONTAIN MULTIPLE COLORS, EXTERIOR ACCENT MATERIALS AND TEXTURAL CHANGES THAT EXHIBIT QUALITY AND DURABILITY SUCH AS BRICK, STONE, COLORED TEXTURED CONCRETE OR STUCCO, TO PROVIDE A DECORATIVE AND AESTHETIC TREATMENT. B. ALL BUILDING ELEVATIONS SHALL CONTAIN ARCHITECTURAL EMBELLISHMENTS AND DETAILING SUCH AS TEXTURAL CHANGES, PILASTERS, OFFSETS, RECESSES, VARIATION IN WINDOW SIZE AND LOCATION, AND/OR OVERHANG CANOPIES. 4. THE DEVELOPER SHALL PROVIDE SECURED BICYCLE PARKING FOR RESIDENTS AT A MINIMUM RATE REQUIRED BY CHAPTER 13, SECTION 1307.H FOR MULTI-FAMILY DEVELOPMENT, AS APPROVED BY THE PLANNING AND DEVELOPMENT DEPARTMENT. 5. IF DETERMINED NECESSARY BY THE PHOENIX ARCHAEOLOGY OFFICE, THE APPLICANT SHALL CONDUCT PHASE I DATA TESTING AND SUBMIT AN ARCHAEOLOGICAL SURVEY REPORT OF THE DEVELOPMENT AREA FOR REVIEW AND APPROVAL BY THE CITY ARCHAEOLOGIST PRIOR TO CLEARING AND GRUBBING, LANDSCAPE SALVAGE, AND/OR GRADING APPROVAL. 6. IF PHASE I DATA TESTING IS REQUIRED, AND IF, UPON REVIEW OF THE RESULTS FROM THE PHASE I DATA TESTING, THE CITY ARCHAEOLOGIST, IN CONSULTATION WITH A QUALIFIED ARCHAEOLOGIST, DETERMINES SUCH DATA RECOVERY EXCAVATIONS ARE NECESSARY, THE APPLICANT SHALL Planning Hearing Officer Summary of October 20, 2021 Application PHO-1-21--Z-69-08-8 Page 5 CONDUCT PHASE II ARCHAEOLOGICAL DATA RECOVERY EXCAVATIONS. 7. 2. That If any archaeological materials are encountered during construction, the contractor shall cease all ground disturbing activities within 33 feet of the discovery and notify the City of Phoenix Archaeology Office immediately to allow time to properly assess the materials. 8. 3. That The property owner shall record documents that disclose the existence and operational characteristics of Phoenix Sky Harbor International Airport to future owners or tenants of the property. The form and content of such documents shall be according to the templates and instructions provided that have been reviewed and approved by the City Attorney. 9. 4. That The following street transportation improvements shall be provided and approved by the PLANNING AND Development Services Department: a. Right-of-way totaling 60 feet shall be dedicated for the north half of Southern Avenue. b. Right-of-way totaling 30 feet shall be dedicated for the west half of 36th Street. c. A 25 foot by 25 foot right-of-way triangle shall be dedicated at the northwest corner of 36th Street and Southern Avenue 10. 5. The developer shall construct all streets within and adjacent to the development with paving, curb, gutter, sidewalk, curb ramps, streetlights, landscaping, and other incidentals as per plans approved by the PLANNING AND Development Services Department. All improvements shall comply with all ADA accessibility standards. 11. PRIOR TO PRELIMINARY SITE PLAN APPROVAL, THE LANDOWNER SHALL EXECUTE A PROPOSITION 207 WAIVER OF CLAIMS IN A FORM APPROVED BY THE CITY ATTORNEY'S OFFICE. THE WAIVER SHALL BE RECORDED WITH THE MARICOPA COUNTY RECORDER'S OFFICE AND DELIVERED TO THE CITY TO BE INCLUDED IN THE REZONING APPLICATION FILE FOR RECORD. Planning Hearing Officer Summary of October 20, 2021 Application PHO-1-21--Z-69-08-8 Page 6 Upon request, this publication will be made available within a reasonable length of time through appropriate auxiliary aids or services to accommodate an individual with a disability. This publication may be made available through the following auxiliary aids or services: large print, Braille, audiotape or computer diskette. Please contact the Planning and Development Department, Angie Holdsworth, at voice number 602-495-5622 or TTY use 7-1-1. South Mountain Village Planning Committee Minutes – October 12, 2021 Page 4 Chairwoman Daniels asked for an applicant response, further discussion, or a motion. MOTION: Mr. Brownell motioned to approve case PHO-1-21—Z-142-03-7(8) as filed. Mr. Brooks seconded the motion to approve. VOTE: 10-0, motion passed; Members Aldama, Brooks, Brownell, Busching, Marchuk, Muhammad, Shepard, Smith, Viera and Daniels in favor. None in dissent. 7) PHO-1-21--Z-69-08-8: Presentation, discussion, and possible recommendation regarding a request to modify stipulations of entitlement for the property located at the northwest corner of 36th Street and Southern Avenue. Request to modify Stipulation No. 1 regarding general conformance to the site plan and elevations date stamped July 3, 2008. Technical corrections to Stipulation Nos. 4 and 5. No members of the public registered to speak on this item. Enrique Bojórquez, staff, introduced himself and provided a presentation on this case noting the location of the site, existing zoning, and proposed use. The requested modification to the case stipulation for Z-69-08-8 were presented and the new proposed site plan plus building elevations were shown. He then invited the applicant to provide a brief presentation to the committee. Benjamin Tate, with Whitey Morris PLC, introduced himself as the applicant and discussed the location of the site, surrounding uses, and existing site conditions. A history of the site was provided, followed by the new proposed site plan and elements within that plan which were modified slightly from the site plan provided to the committee. Renderings of the proposed site were shown, and the requested stipulation modification was presented. Elements from the General Plan were discussed, and the presentation was concluded. Greg Brownell stated that the building elevations look very plain and cheap with the materials depicted. The partnership with Tiger Mountain Foundation is good, but he does not know how the relationship will continue. He discussed the landscaping and adding a new stipulation to allow flexibly with the spacing of trees. Mr. Tate responded that he would be concerned with adding a stipulation that might have unintended consequences regarding the landscaping but appreciates the suggestion. Mr. Brownell stated that the stipulation can remain, but the applicant should work with a certified arborist to determine the spacing of the trees. Mr. Tate South Mountain Village Planning Committee Minutes – October 12, 2021 Page 5 responded that he prefers to not over-regulate the standards, as it makes sense from a practical perspective. He discussed the repositioning of retail uses and critical mass in the area. Emma Viera asked if drought-tolerant trees could be used. Mr. Tate responded that tree species from the Mixed-Use Agricultural (MUA) zoning district were required per the previous stipulation on the case. Dr. Viera asked staff if drought-tolerant tree species were required, as some of the tree species proposed are not appropriate due to high-water usage. Mr. Bojórquez, responded that drought-tolerant plant species are typically required along perimeter landscaping, but in this case, the previous stipulation requires landscaping to adhere to the MUA zoning district plant list. The committee could vote to change this stipulation. Emma Viera asked if cool pavement could be used in this project. Ryan Hartman, with Avenue North, responded that this had not been considered but he can look into this. Fatima Muhammad Roque asked if there were other community gathering areas besides the pool. Mr. Tate responded that the focus was to create open space areas where someone can recreate. He discussed the sidewalk along 36th Street that will connect residents to Esteban Park, north of the site. Ms. Muhammad asked if there will be a clubhouse for residents to use and how far is Esteban Park from this site. Mr. Tate responded that a barbecue area, ramada and pool were some of the amenities provided. This for-rent community is planned to feel like a townhome community. Ms. Muhammad asked the following questions to the applicant: • Why was a clubhouse not provided? • How many parking spaces will there be on the site? • Are any balconies proposed? • Where is your surface water retention area located? Mr. Tate responded that the project is intended to feel like a townhome community where it is convenient for residents to walk back to their home. The site plan proposed exceeds the required number of parking stalls and no balconies are proposed since adjacent to the existing residential community. Mr. Hartman discussed the required parking and stated that water retention will be along open space areas. Ms. Muhammad asked if a traffic signal light will be required. Mr. Tate responded that a traffic signal warrant analysis was done for the project to the north, but not traffic light was warranted. South Mountain Village Planning Committee Minutes – October 12, 2021 Page 6 Ms. Muhammad asked for an update regarding public outreach. Mr. Tate stated that a series of conversations with the adjacent HOA had taken place, and a letter of support was issued for this project by the HOA. Ms. Muhammad asked for clarification on the location of electric charging stations. Mr. Tate responded that these will be inside the garages. Mr. Hartman added that they may install electrical wiring in other parking areas in case electric charging stations are placed there in the future. Ms. Muhammad asked what the market-rate for these units and planned project completion date is. Mr. Hartman responded that 85 units took about 24 months to build nearby, thus expects this project to take 15 to 18 months or early 2022 to break ground. Ms. Muhammad asked the following questions: • Has a community benefit agreement been considered? • What will be your application process and fees? • Have you considered setting aside several units to help members in the community? Mr. Tate responded that the operator must be careful with Fair Housing Laws. Mr. Hartman added that at their 18th Street and Baseline Road project, they refund fees to people who have previous convictions. Application fees usually cover the cost associated with processing the application. Ms. Muhammad asked how rent deposits were handled. Mr. Hartman responded that usually one-months rent is required, but there are great programs that renters can use to get further assistance. Ms. Muhammad asked if these rental assistance programs were part of the application process. Mr. Hartman discussed the management of the property and providing housing for people. Ms. Muhammad asked for clarification on the square footage of the buildings. Mr. Hartman discussed the square footage and floor plans. These will be three- bedroom units proposed on this site. Vice Chair Marchuk thanked the applicant for their work. He asked if elevation enhancements were considered. He asked staff to display stipulation language on the screen regarding building elevation enhancements. South Mountain Village Planning Committee Minutes – October 12, 2021 Page 7 Mr. Hartman is happy to incorporate the stipulation language, but also must consider the cost associated with it. He will work with his team to update the building elevations. Vice Chair Marchuk stated that he wants the building elevations to look appealing. Mr. Tate accepted the stipulation proposed. Mr. Hartman would like to keep a solid wall along Southern Avenue but can incorporate some view fencing along the 36th Street frontage. Vice Chair Marchuk agrees with this proposal. Mr. Hartman discussed fencing changes. Vice Chair Marchuk discussed the community and changes to the site plan. Ms. Muhammad is concerned with impacts to elderly or disabled persons due to the two-story design of the community. Mr. Hartman responded that his company owns other communities in the area with one-story floor plans that could be offered. Chairwoman Daniels stated that the building elevations could be improved. But that the new stipulation will help improve these elevations. She discussed the community. MOTION: Ms. Busching motioned to approve case PHO-1-21—Z-69-08-8 as filed with a modification to Stipulation No.1 and an additional stipulation. Ms. Shepard seconded the motion to approve. Modification to Stipulation No. 1: 1. That the development shall be in general conformance to the site plan and elevations date stamped August 12, 2021, with specific regard to the amount and location of the common open space, however, the development shall follow the Mixed Use Agriculture (MUA) zoning district standards pertaining to quantity and type of landscape materials, and the parking lot landscaping standards, as approved by the Planning and Development Department. South Mountain Village Planning Committee Minutes – October 12, 2021 Page 8 Additional Stipulation No. 2: 2. New building elevations shall be developed to the following standards, as approved by the Planning and Development Department: a. Building elevations shall contain multiple colors, exterior accent materials and textural changes that exhibit quality and durability such as brick, stone, colored textured concrete or stucco, to provide a decorative and aesthetic treatment, as approved by the Planning and Development Department. b. All building elevations shall contain architectural embellishments and detailing such as textural changes, pilasters, offsets, recesses, variation in window size and location, and/or overhang canopies, as approved by the Planning and Development Department. VOTE: 9-0-1, motion passed; Members Brooks, Brownell, Busching, Marchuk, Muhammad, Shepard, Smith, Viera and Daniels in favor; None in dissent; Member Aldama abstained. 8) Z-TA-3-19: Presentation, discussion, and possible recommendation regarding a request to amend Chapters 3, 5 and 13 of the Phoenix Zoning Ordinance to expand the Walkable Urban (WU) Code boundaries citywide and amend Appendix A - Zoning Fee Schedule to include fees for WU Code Transect Districts and administrative temporary use permits. Two members of the public registered to speak on this item. Enrique Bojórquez, staff, introduced himself and provided a presentation on this citywide text amendment case Z-TA-3-19. He provided a summary of the request involving the expansion of the Walkable Urban (WU) code applicability area, noting the existing boundaries where WU code is available today. He discussed the need for this text amendment given the expansion of mass-transit to other parts of the city. The various WU Code Transects were explained, providing examples of low, medium and high-intensity transects. This proposal would allow property owners to rezone to WU Code citywide and update standards regarding single-family attached standards outside of TOD areas. This proposal does not rezone any property, does not modify the current rezoning process, does not modify the applicability or standards of adopted City policy plans including TOD District plans. Addendum A of the staff report revises applicability of regulatory overlay districts and plans, plus adds Administrative Temporary Use Permit fees. An overview of existing zoning tools, rezoning evaluation process and impacts was provided. Staff recommends