REPORT OF PLANNING COMMISSION ACTION 
May 1, 2025 
 
ITEM NO: 3 
 
 
DISTRICT NO.: 2 
SUBJECT: 
 
 
 
Application #: 
Z-87-D-03-2 (Companion Case GPA-DSTV-1-24-2)  
 
(64th & Mayo PUD) 
Location: 
Northeast corner of 64th Street and Mayo Boulevard 
From: 
S-1 (Approved CP/BP PCD), S-1 (Approved R-3A PCD), and S-1 
To: 
PUD PCD 
Acreage: 
51.37 
Proposal: 
Major Amendment to the Paradise Ridge Planned Community District 
(PCD) to allow multifamily and single-family attached residential 
Applicant: 
JLB Partners, LLC 
Owner: 
64th and Mayo Bidder, LLC 
Representative: Nick Wood, Snell & Wilmer, LLP 
 
ACTIONS: 
 
Staff Recommendation: Approval, subject to stipulations. 
 
Village Planning Committee (VPC) Recommendation: 
Desert View 9/10/2024 Information only. 
Desert View 4/1/2025 Approval, per the staff recommendation, with modifications. Vote: 12-0. 
 
Planning Commission Recommendation: Approval, per the staff memo dated May 1, 2025. 
 
Motion Discussion: N/A 
 
Motion details: Vice-Chairperson Boyd made a MOTION to approve Z-87-D-03-2, per the staff 
memo dated May 1, 2025. 
 
 
Maker: Vice-Chairperson Boyd 
 
Second: Read 
 
Vote: 9-0 
 
Absent: None   
 
Opposition Present: No 
 
Findings: 
 
1. 
The proposal is consistent with the proposed General Plan Land Use Map Designation 
and the character of the surrounding area. 
2. 
The proposal will facilitate new multifamily residential development at an appropriate 
location, contributing to the land use mix in the area. 
3. 
The proposed PUD sets forth design and development standards that will enhance 
connectivity in the immediate vicinity, including enhanced shade and detached sidewalks 
and standards to buffer the proposed uses from adjacent residences. 
 
 
ATTACHMENT E

Stipulations: 
 
1. 
An updated Development Narrative for the 64th & Mayo PUD reflecting the changes 
approved through this request shall be submitted to the Planning and Development 
Department within 30 days of City Council approval of this request. The updated 
Development Narrative shall be consistent with the Development Narrative date stamped 
March 13, 2025, as modified by the following stipulations: 
a. 
Front cover: Revise the submittal date information to add the following: City Council 
adopted: [Add adoption date]. 
 
b. 
Page 22, Section F. Signs: Remove all language, except the first two sentences 
REPLACE THE FOLLOWING LANGUAGE AFTER THE FIRST PARAGRAPH AS 
LISTED BELOW:  
IN ADDITION TO BASE SIGNAGE, GIVEN (I) THE UNIQUE SITE ACCESS TO 
THE PROPERTY (WITH MAIN ACCESS TO ALL FOUR DEVELOPMENT 
QUADRANTS AT 66TH STREET), (II) THE IMPORTANCE OF CLEAR 
IDENTIFICATION FOR VISITORS AS WELL AS MODERN DELIVERY SERVICES 
(GOODS, FOOD DELIVER, CAR SHARE, ETC.), AND (III) DUE TO THE SIGNAGE 
CONTEXT ALONG THE NORTH SIDE OF MAYO BLVD, THE FOLLOWING 
PROJECT-SPECIFIC MARQUEE MAIN ENTRY SIGN IS PERMITTED. THIS 
MARQUEE SIGN WILL BE DESIGNED IN A MANNER THAT DOES NOT EXCEED 
THE STANDARDS OUTLINED BELOW.  
MARQUEE MAIN ENTRY SIGN 
• ONE (1) MARQUEE MAIN ENTRY SIGN FOR THE OVERALL PUD SHALL BE 
PERMITTED AT 66TH AND MAYO BLVD, IN GENERAL CONFORMANCE WITH 
THE LOCATION SHOWN IN ILLUSTRATION C BELOW. 
• THE MARQUEE SIGN SHALL BE NO TALLER THAN 18 FEET IN HEIGHT.  
• THE TOTAL SIGNAGE AREA SHALL BE NO GREATER THAN 100 SQUARE 
FEET PER SIDE. 
• THE SIGN SHALL BE GENERALLY CONSISTENT WITH THE DESIGN SHOWN 
IN EXHIBIT 8, INCLUSIVE OF MATERIALS AND COLORS AS LISTED THEREIN.  
THIS MARQUEE MAIN ENTRY SIGN IS AN IMPORTANT FEATURE OF THIS PUD 
AS TO ITS BRANDING DUE TO THERE BEING FOUR DEVELOPMENT UNITS, 
TWO OF WHICH ARE “HIDDEN” BY THE UNITS ALONG MAYO BLVD. TO 
ADDRESS THIS, AT THE MAIN ENTRANCE TO THE DEVELOPMENT 
(NORTHWEST CORNER OF 66TH STREET AND MAYO BOULEVARD), THE 
MARQUEE MAIN ENTRY SIGN WILL SERVE AS THE PRIMARY MONUMENT 
SIGN FOR THE ENTIRETY OF THIS MASTER-PLANNED COMMUNITY. THIS 
SIGN WILL PROVIDE SUFFICIENT SPACE TO DISPLAY THE FOUR (4) 
DISTINCT MULTIFAMILY DEVELOPMENTS PLANNED FOR THE PROJECT, 
EACH WITH ITS OWN BRANDING, LOGO AND NAME. THE SCALE AND 
PLACEMENT OF THE PROPOSED SIGN WILL ENHANCE VISIBILITY OF THE 
KEY ACCESS POINT TO THE DEVELOPMENT FROM MAYO BOULEVARD, 
IMPROVING WAYFINDING AND FOSTERING COMMUNITY RECOGNITION, 
WHILE FOCUSING TRAFFIC TO/FROM THE SITE TO THIS SIGNALIZED 
INTERSECTION. THE 18-FOOT SIGN IS PROPORTIONATE TO THE PROJECT’S 
SCALE AND IS CONSISTENT WITH THE COHESIVE DESIGN STANDARDS OF 
THIS PUD, OFFERING A HIGH-QUALITY VISUAL IDENTITY WHILE 
ACCOMMODATING INDIVIDUAL BRANDING FOR EACH OF THE FOUR 
DEVELOPMENT PARCELS. IT IS ALSO OF SIMILAR SIZE AND PLACEMENT TO

OTHER SIGNS FOUND ALONG THE NORTH SIDE OF THE MAYO BLVD 
CORRIDOR, PROVIDING A VISUAL CONNECTION TO THE LARGER 
NEIGHBORHOOD OF RESIDENTIAL AND COMMERCIAL DEVELOPMENT FROM 
THE CITY LIMITS TO 64TH STREET. 
RATHER THAN INSTALLING A NUMBER OF GROUND SIGNS, THE MARQUEE 
MAIN ENTRY SIGN ACHIEVES A VISUAL ENVIRONMENT SUPERIOR TO THAT 
WHICH CAN BE ACHIEVED VIA ADHERENCE TO THE BASE SIGN ORDINANCE 
STANDARDS THROUGH ITS CONTEMPORARY DESIGN WHICH IS 
COMPLEMENTARY AND CONSISTENT WITH THE MODERN ARCHITECTURAL 
STYLE AS PROVIDED FOR WITHIN THIS PUD. CRAFTED FROM DURABLE 
MATERIALS AND INCORPORATING COMPLEMENTARY COLORS, THE SIGN 
WILL CONVEY A SENSE OF QUALITY AND PERMANENCE. CONSOLIDATING 
INDIVIDUAL COMMUNITY SIGNS TO A SINGULAR SIGN AT THE PROJECT’S 
“FRONT DOOR” ENHANCES DESIGN CONSISTENCY AND SUPPORTS THE 
OVERALL VISION FOR THE COMMUNITY AS ONE COHESIVE WHOLE. 
STRATEGICALLY POSITIONED AT THE SOUTHEAST CORNER OF THE 
PROPERTY, THE SIGN’S HEIGHT, SIZE, AND LOCATION IN AN AREA OF 
ENHANCED LANDSCAPING WILL CREATE A DISTINCT "FRONT DOOR" TO 
THE COMMUNITY. THE OVERALL DESIGN, LOCATION AND TREATMENT OF 
THE SIGN WILL CONTRIBUTE TO A SENSE OF PLACE AND GRANDEUR, 
SERVING NOT ONLY AS AN ENTRY MARKER FOR RESIDENTS AND VISITORS, 
BUT ALSO AS A DEFINING AND ATTRACTIVE VISUAL FEATURE FOR THOSE 
TRAVELING THROUGH THE AREA. 
C. 
PAGE 22, SECTION F. SIGNS: REPLACE ILLUSTRATION C WITH THE IMAGE 
ATTACHED AS AN EXHIBIT TO THE PLANNING COMMISSION BACK UP MEMO 
DATED MAY 1, 2025.  
D. 
PAGE 54, EXHIBIT 8: REPLACE THE EXHIBIT WITH THE IMAGE ATTACHED AS 
AN EXHIBIT TO THE PLANNING COMMISSION BACKUP MEMO DATED MAY 1, 
2025. 
2. 
A minimum 70 feet of right-of-way shall be dedicated and constructed for the north half of 
Mayo Boulevard, per the approved Master Street Plan. 
3. 
A minimum 70 feet of right-of-way shall be dedicated and constructed for the east half of 
64th Street, per the approved Master Street Plan. 
4. 
A minimum 40 feet of right-of-way shall be dedicated and constructed for the west half of 
66th Street, per the approved Master Street Plan. 
5. 
Construction, funding, and phasing of all off-site mitigation improvements shall comply with 
the approved Master Street Plan and Master Phasing Plan for 64th Street and Mayo 
Boulevard. 
6. 
Replace unused driveways with sidewalk, curb, and gutter. Also, replace any broken or out-
of-grade curb, gutter, sidewalk, and curb ramps on all streets and upgrade all off-site 
improvements to be in compliance with current ADA guidelines 
7. 
All streets within and adjacent to the development shall be constructed with paving, curb, 
gutter, sidewalk, curb ramps, streetlights, median islands, landscaping and other 
incidentals, as per plans approved by the Planning and Development Department. All 
improvements shall comply with all ADA accessibility standards.

8. 
The site is located within a Special Flood Hazard Area (SFHA), called a SPECIFICALLY IN 
Zone AO, AS SHOWN on pPanel 1315L of the Flood Insurance Rate Maps (FIRM), revised 
ON February 8, 2024 OCTOBER 16, 2013. TO ENSURE COMPLIANCE WITH 
APPLICABLE REGULATIONS, The following requirements shall apply, as approved by the 
Planning and Development Department AND THE FLOODPLAIN MANAGEMENT 
SECTION OF THE OFFICE OF THE CITY ENGINEER, THE FOLLOWING 
REQUIREMENTS MUST BE MET: 
a.  
The Architect/Engineer is required to show CLEARLY DELINEATE the floodplain 
boundary limits on the Grading and Drainage pPlan. THE PLAN MUST ALSO 
DEMONSTRATE and ensure that POTENTIAL impacts to the proposed facilities 
have been PROPERLY considered, following IN ACCORDANCE WITH the National 
Flood Insurance Program (NFIP) Regulations (44 CFR Paragraph 60.3) AND THE. 
This includes, but is not limited to, provisions OUTLINED in the latest MOST 
CURRENT versions of the Floodplain Ordinance of the Phoenix City Code. 
b. 
A copy of the PRELIMINARY Grading and Drainage Plan needs to MUST be 
submitted to the Floodplain Management sSection of the Office of the City Engineer 
for review and approval of TO ENSURE COMPLIANCE WITH Ffloodplain-RELATED 
requirements BEFORE APPLYING FOR GRADING & DRAINAGE AND BUILDING 
PERMITS. FLOODPLAIN MANAGEMENT MUST APPROVE THE FINAL GRADING 
AND DRAINAGE PLANS PRIOR TO THE ISSUANCE OF GRADING & DRAINAGE 
PERMITS. 
c. 
FEMA approved CLOMR-F or CLOMR is required prior to issuance of a 
Grading and Drainage permit. PRIOR TO APPLYING FOR GRADING & 
DRAINAGE AND BUILDING PERMITS, AN ELEVATION CERTIFICATE 
(FEMA FORM 086-0-33), BASED ON THE CONSTRUCTION PLANS, MUST 
BE SUBMITTED TO AND APPROVED BY FLOODPLAIN MANAGEMENT. 
D. 
PRIOR TO THE ISSUANCE OF VERTICAL CONSTRUCTION, THE FOLLOWING 
CONDITIONS MUST BE MET: 
I. 
AN ELEVATION CERTIFICATE, BASED ON THE BUILDING UNDER 
CONSTRUCTION, MUST BE SUBMITTED TO AND APPROVED BY 
FLOODPLAIN MANAGEMENT. 
II. 
95% COMPACTION TEST RESULTS FOR THE BUILDING PADS MUST BE 
PROVIDED. 
E. 
PRIOR TO THE ISSUANCE OF A CERTIFICATE OF OCCUPANCY, AN 
ELEVATION CERTIFICATE BASED ON THE FINISHED CONSTRUCTION, 
DEMONSTRATING THE STRUCTURE’S COMPLIANCE, MUST BE SUBMITTED 
TO AND APPROVED BY FLOODPLAIN MANAGEMENT.  
9. 
The property owner shall record documents that disclose the existence, and operational 
characteristics of Scottsdale Municipal Airport (SDL) to future owners or tenants of the 
property. The form and content of such documents shall be according to the templates and 
instructions provided which have been reviewed and approved by the City Attorney.

10. 
If determined necessary by the Phoenix Archaeology Office, the applicant shall conduct 
Phase I data testing and submit an archaeological survey report of the development area 
for review and approval by the City Archaeologist prior to clearing and grubbing, landscape 
salvage, and/or grading approval 
11. 
If Phase I data testing is required, and if, upon review of the results from the Phase I data 
testing, the City Archaeologist, in consultation with a qualified archaeologist, determines 
such data recovery excavations are necessary, the applicant shall conduct Phase II 
archaeological data recovery excavations 
12. 
In the event archaeological materials are encountered during construction, the developer 
shall immediately cease all ground-disturbing activities within a 33-foot radius of the 
discovery, notify the City Archaeologist, and allow time for the Archaeology Office to 
properly assess the materials. 
13. 
Prior to final site plan approval, the landowner shall execute a Proposition 207 waiver of 
claims form. The waiver shall be recorded with the Maricopa County Recorder's Office and 
delivered to the City to be included in the rezoning application file for record. 
PCD Stipulations 
14. 
Master Plan documents shall be submitted for portions of the Planned Community District 
as development occurs, per the applicable development agreement. 
15. 
Right-of-way and improvements shall be determined by the final Traffic Impact Study and a 
Master Street Plan – Development Agreement between the city, Arizona State Land 
Department, and the City of Scottsdale. Additional right-of-way and/or easements not 
specifically identified such as bus bays, turn lanes, landscape/sidewalk easements, slope 
and construction easements, etc., may be required as determined by the Master Street 
Plan, or when individual development plans are submitted to the Planning and 
Development Department for approval. 
16. 
Detailed requirements for potable water, wastewater, and reclaimed water onsite and 
offsite infrastructure needed to service this project and infrastructure phasing schedules 
shall be determined at the time of review and approval of the PCD potable water, 
wastewater, and reclaimed water master plans. Off site infrastructure requirements shall be 
a function of the amount of major master plan water and sewer lines constructed by other 
development in the area prior to initiation of this project. 
 
This publication can be made available in alternate format upon request. Please contact 
Saneeya Mir at 602-686-6461, saneeya.mir@phoenix.gov, TTY: Use 7-1-1.