Attachment A - Draft Ordinance - Z-21-24-1.pdf

City of Phoenix — Formal (2024-07-01)

View PDF Meeting page

Extracted text (via pymupdf) 8328 characters
ATTACHMENT A 
 
THIS IS A DRAFT COPY ONLY AND IS NOT AN OFFICIAL COPY OF THE FINAL, 
ADOPTED ORDINANCE 
 
 
 
 
 
ORDINANCE G- 
 
AN ORDINANCE AMENDING THE ZONING DISTRICT MAP 
ADOPTED PURSUANT TO SECTION 601 OF THE CITY OF 
PHOENIX ZONING ORDINANCE BY CHANGING THE ZONING 
DISTRICT CLASSIFICATION FOR THE PARCEL DESCRIBED 
HEREIN (CASE Z-21-24-1) FROM R-5 DVAO (MULTIFAMILY 
RESIDENCE DISTRICT, DEER VALLEY AIRPORT OVERLAY 
DISTRICT) TO A-1 DVAO (LIGHT INDUSTRIAL DISTRICT, DEER 
VALLEY AIRPORT OVERLAY DISTRICT). 
 
____________ 
 
 
 
BE IT ORDAINED BY THE COUNCIL OF THE CITY OF PHOENIX, as 
follows: 
SECTION 1. The zoning of a 1.85-acre property located at the northeast 
corner of 24th Avenue and Lone Cactus Drive in a portion of Section 24, Township 4 
North, Range 2 East, as described more specifically in Exhibit “A,” is hereby changed 
from “R-5 DVAO” (Multifamily Residence District, Deer Valley Airport Overlay District) to 
“A-1 DVAO” (Light Industrial District, Deer Valley Airport Overlay District). 
SECTION 2. The Planning and Development Director is instructed to 
modify the Zoning Map of the City of Phoenix to reflect this use district classification 
change as shown in Exhibit “B.”

SECTION 3. Due to the site’s specific physical conditions and the use 
district applied for by the applicant, this rezoning is subject to the following stipulations, 
violation of which shall be treated in the same manner as a violation of the City of 
Phoenix Zoning Ordinance: 
1. 
The development shall be in general conformance with the site plan date 
stamped January 31, 2024, and as approved by the Planning and Development 
Department.  
 
 
2. 
The maximum building height shall be 30 feet.  
 
 
3. 
Required landscape setbacks shall be planted with minimum 2-inch caliper 
large canopy drought-tolerant trees, 20 feet on center or in equivalent 
groupings, with five 5-gallon shrubs per tree, as approved by the Planning and 
Development Department. 
 
 
4. 
All uncovered surface parking lot areas shall be landscaped with minimum 2-
inch caliper, large canopy, drought-tolerant, shade trees. Landscaping shall be 
dispersed throughout the parking area and achieve 25% shade at maturity, as 
approved by Planning and Development Department.    
 
 
5. 
Where pedestrian walkways cross a vehicular path, the pathway shall be 
constructed of decorative pavers, stamped or colored concrete, or other 
pavement treatments that visually contrasts parking and drive aisle surfaces, 
as approved by the Planning and Development Department. 
 
 
6. 
An outdoor employee resting area of no less than 120-square feet shall be 
provided on site. The required pedestrian area shall include a pedestrian 
seating bench, constructed of quality and durable materials, and shaded to a 
minimum of 75% using minimum 2-inch caliper large canopy drought-tolerant 
shade trees and/or architectural shade, as approved by the Planning and 
Development Department. 
 
 
7. 
A minimum of 10% of the required parking spaces shall include Electric Vehicle 
(EV) Capable infrastructure, as approved by the Planning and Development 
Department. 
 
 
8. 
A minimum of four bicycle parking spaces shall be provided through Inverted U 
and/or artistic racks located near the front office and installed per the 
requirements of Section 1307.H. of the Phoenix Zoning Ordinance, as 
approved by the Planning and Development Department. Artistic racks shall 
adhere to the City of Phoenix Preferred Designs in Appendix K of the 
Comprehensive Bicycle Master Plan.

9. 
A minimum of one of the required bicycle parking spaces shall include standard 
electrical receptacles for electric bicycle charging capabilities, as approved by 
the Planning and Development Department. 
 
 
10. 
A minimum 5-foot-wide sidewalk shall be constructed on the east side of 24th 
Avenue, adjacent to the development. 
 
 
11. 
A minimum 6-foot-wide detached sidewalk separated by a minimum 8-foot-wide 
landscape strip located between the back of curb and sidewalk shall be 
constructed on the north side of Lone Cactus Drive, adjacent to the 
development, planted to the following standards and maintained with a watering 
system, as approved by the Planning and Development Department. 
 
 
 
a. 
Minimum 2-inch caliper, single-trunk, large canopy, drought-tolerant, 
shade trees, planted 20 feet on center or in equivalent groupings. 
 
 
 
 
b. 
Drought-tolerant shrubs, accents, and vegetative groundcovers with a 
maximum mature height of two feet to achieve a minimum of 75% live 
coverage at maturity. 
 
 
 
 
Where utility conflicts exist, the developer shall work with the Planning and 
Development Department on an alternative design solution consistent with a 
pedestrian environment. 
 
 
12. 
Replace unused driveways with sidewalk, curb and gutter. Also, replace any 
broken or out-of-grade curb, gutter, sidewalk, curb ramps on all streets and 
upgrade all off-site improvements to be in compliance with current ADA 
guidelines. 
 
 
13. 
All streets within and adjacent to the development shall be constructed with 
paving, curb, gutter, sidewalk, curb ramps, streetlights, median islands, 
landscaping and other incidentals, as per plans approved by the Planning and 
Development Department. All improvements shall comply with all ADA 
accessibility standards. 
 
 
14. 
Only landscape materials listed in the Phoenix Active Management Area Low 
Water-Use/Drought-Tolerant Plant List shall be utilized internal to the site, as 
approved or modified by the Planning and Development Department. 
 
 
15. 
Landscaping shall be maintained by permanent and automatic/water efficient 
WaterSense labeled irrigation controllers (or similar smart controller) to 
minimize maintenance and irrigation water consumption for all on and offsite 
landscape irrigation. 
 
 
16. 
Pressure regulating sprinkler heads and drip lines shall be utilized in any turf

areas to reduce water waste. 
 
 
17. 
A minimum of one green infrastructure (GI) technique for stormwater 
management shall be implemented per the Greater Phoenix Metro Green 
Infrastructure and Low-Impact Development Details for Alternative Stormwater 
Management, as approved or modified by the Planning and Development 
Department. 
 
 
18. 
Prior to final site plan approval, documentation shall be provided that 
demonstrates a commitment to participate in the City of Phoenix Business 
Water Efficiency Program for a minimum of 10 years, or as approved by the 
Planning and Development Department. 
 
 
19. 
In the event archaeological materials are encountered during construction, the 
developer shall immediately cease all ground-disturbing activities within a 33- 
foot radius of the discovery, notify the City Archaeologist, and allow time for the 
Archaeology Office to properly assess the materials. 
 
 
20. 
Prior to final site plan approval, the landowner shall execute a Proposition 207 
waiver of claims form. The waiver shall be recorded with the Maricopa County 
Recorder's Office and delivered to the City to be included in the rezoning 
application file for record. 
 
SECTION 4. If any section, subsection, sentence, clause, phrase or 
portion of this ordinance is for any reason held to be invalid or unconstitutional by the 
decision of any court of competent jurisdiction, such decision shall not affect the validity 
of the remaining portions hereof.  
PASSED by the Council of the City of Phoenix this 1st day of July, 2024.  
 
 
 
 
________________________________ 
 
 
 
       MAYOR  
 
 
ATTEST:  
 
 
_________________________  
Denise Archibald, City Clerk

APPROVED AS TO FORM: 
Julie M. Kriegh, City Attorney 
 
 
By: 
_________________________  
_________________________ 
 
 
REVIEWED BY:  
 
 
_________________________  
Jeffrey Barton, City Manager 
 
 
 
Exhibits: 
A – Legal Description (1 Page) 
B – Ordinance Location Map (1 Page)

EXHIBIT A 
 
LEGAL DESCRIPTION FOR Z-21-24-1 
 
Within a portion of Section 24, Township 4 North, Range 2 East of the Gila and Salt 
River Base and Meridian, Maricopa County, Arizona, being more particularly described 
as follows: 
 
Lots 20 and 23, BLACK CANYON HEIGHTS, according to Book 56 of Maps, Page 14, 
records of Maricopa County, Arizona; 
 
EXCEPT the East 73 feet of Lot 23 thereof. 
 
APN: 209-07-020-E