Attachment B - Staff Report - Z-164-24-3.pdf

City of Phoenix — Formal (2025-05-07)

View PDF Meeting page

Extracted text (via pymupdf) 27093 characters
Staff Report: Z-164-24-3 
February 12, 2025 
 
North Mountain Village Planning 
Committee Meeting Date: 
February 19, 2025 
Planning Commission Hearing Date: 
March 6, 2025 
 
Request From: 
C-2 (Intermediate Commercial) 
(2.18 acres) 
Request To: 
R-5 (Multifamily Residence District – 
Restricted Commercial) (2.18 acres) 
Proposal: 
Multifamily residential 
Location: 
Southwest corner of Cave Creek Road 
and Peoria Avenue 
Owner: 
Valle Point, LLC 
Applicant: 
Allante Properties 
Representative: 
Alan Beaudoin, Norris Design 
Staff Recommendation: 
Approval, subject to stipulations 
 
General Plan Conformity 
General Plan Land Use Designation 
Commercial  
Street Map Classification 
 
 
Cave Creek 
Road 
Major Arterial  
 
42-foot west half 
street 
Peoria Avenue 
Minor Collector 
0 to 22-foot south 
half street 
CELEBRATE OUR DIVERSE COMMUNITIES AND NEIGHBORHOODS CORE 
VALUE; DIVERSE NEIGHBORHOOD; LAND USE PRINCIPLE: Include a mix of 
housing types and densities where appropriate within each village that support 
a broad range of lifestyles.  
 
The proposal is compatible with surrounding land uses and zoning designations, and 
will add to the mix of housing types within the area.  
 
BUILD THE SUSTAINABLE DESERT CITY CORE VALUE; TREE AND SHADE; 
DESIGN PRINCIPLE: Integrate trees and shade into the design of new 
development and redevelopment projects throughout Phoenix.  
 
ATTACHMENT B

Staff Report: Z-164-24-3 
February 12, 2025 
Page 2 of 16 
 
 
The proposal, as stipulated, provides enhanced shading and planting standards for 
pedestrian pathways, bicycle parking areas and bus stops. 
 
CONNECT PEOPLE AND PLACES CORE VALUE; PUBLIC TRANSIT; LAND USE 
PRINCIPLE: Continue to require installation of bus bays at appropriate 
locations, continue to reserve and require easements or right of ways for bus 
shelters.   
 
As stipulated, the proposal will include the installation of a new bus bay and bus pad 
adjacent to the site. 
 
 
Applicable Plan, Overlays, and Initiatives 
 
Target Area F Redevelopment Plan: Background Item No. 7. 
 
Housing Phoenix Plan: Background Item No. 8. 
 
Complete Streets Guiding Principles: Background Item No. 9. 
 
Comprehensive Bicycle Master Plan: Background Item No. 10. 
 
Tree and Shade Master Plan: Background Item No. 11. 
 
Transportation Electrification Action Plan: Background Item No. 12. 
 
Conservation Measures for New Development: Background Item No. 13. 
 
Phoenix Climate Action Plan: Background Item No. 14. 
 
 
Surrounding Land Uses/Zoning 
 
Land Use 
Zoning 
On Site 
Vacant 
C-2 
North (across 
Peoria Avenue) 
Single-family residential and restaurant 
R-5, C-2 
South 
Multifamily residential 
R-3A PCD 
East (across Cave 
Creek Road) 
Commercial uses 
C-2 
West 
Vacant (proposed multifamily residential) 
R-5

Staff Report: Z-164-24-3 
February 12, 2025 
Page 3 of 16 
 
 
R-5 Multifamily Residence District 
(Planned Residential Development Option) 
Standards 
Requirements 
Site Plan Provisions 
Gross Acres 
- 
2.18 acres - Rezone Area 
5.20 acres - Project Area 
Maximum Dwelling 
Units 
Rezone area - 99, 114 with 
bonus 
Project area - 237, 271 
with bonus 
Rezone area - Unspecified 
Project Area - 240 (Met) 
Maximum Density 
(dwelling units/acre) 
45.68, 52.20 with bonus 
Rezone Area - Unspecified 
Project Area - 46.15 (Met) 
Maximum Building 
Height 
4 stories or 48 feet; 15 feet 
within 10 feet of a single-
family zoning district,1-foot 
increase in height for every 
additional 1-foot of building 
setback to the maximum 
permitted height 
4 stories and 48 feet (Met) 
Minimum Perimeter Building Setbacks 
Adjacent to a Street 
20 feet 
Peoria Avenue: 20 feet (Met) 
 
Cave Creek Road: 20 feet (Met) 
Adjacent to a 
Property Line 
15 feet 
South: Not depicted, 
approximately 45 feet (Met) 
 
West: Not depicted, 
approximately 30 feet (Met) 
Minimum Landscape Setbacks 
Adjacent to a Street 
20 feet 
Peoria Avenue: 20 feet (Met) 
(*Parking spaces not permitted 
in landscape setback) 
 
Cave Creek Road: 20 feet (Met) 
Adjacent to a 
Property Line 
5 feet 
South: 7 feet (Met) 
 
West: Not depicted, 
approximately 5 feet (Met) 
Lot Standards 
Minimum Common 
Area / Open Space 
5 percent 
10 percent (Met) 
Maximum Lot 
Coverage 
50 percent 
49 percent (Met)

Staff Report: Z-164-24-3 
February 12, 2025 
Page 4 of 16 
 
 
Minimum Parking 
360 spaces, 1.5 spaces 
per dwelling unit 
373 spaces (Met) 
 
Background/Issues/Analysis 
 
SUBJECT SITE 
1. 
This request is to rezone 2.18 acres located at the southwest corner of Cave 
Creek Road and Peoria Avenue from C-2 (Intermediate Commercial) to R-5 
(Multifamily Residence District - Restricted Commercial) for multifamily 
residential. The subject site is proposed to be developed in combination with the 
area to the west for one multifamily residential building and associated parking 
structure. 
GENERAL PLAN LAND USE MAP DESIGNATION 
2. 
The subject site, as well as areas to the north, east and south are designated as 
Commercial on the General Plan Land Use Map. To west is designated as 
Residential 10 to 15 dwelling units per acre. To the north is designated 
Residential 3.5 to 5 dwelling units per acre and Commercial. The proposal for R-
5 zoning is not consistent with the General Plan Land Use; however, a General 
Plan Amendment is not required as the site is less than 10 acres.  
 
General Plan Land Use Map; Source: City of Phoenix GIS with annotations by staff

Staff Report: Z-164-24-3 
February 12, 2025 
Page 5 of 16 
 
 
SURROUNDING LAND USES AND ZONING 
3. 
To the east, across Cave Creek Road, are commercial uses zoned C-2. To the 
north, across Peoria Avenue, is a restaurant zoned C-2 and single-family 
residences zoned R-5. To the south is multifamily residential zoned R-3 PCD 
(Multifamily Residential District, Planned Community District). To the west is 
vacant land that is part of the project area, and zoned R-5.  
4. 
The following image illustrates the subject site and its proximity to the adjacent 
properties and zoning. 
 
PROPOSAL 
5. 
Site Plan 
The site plan, attached as an exhibit, depicts a 240-unit apartment building. The 
building and its appurtenances will span the larger approximately five-acre site as 
outlined in white below; however, the area included in the subject rezone request 
is outlined in red and is only approximately two acres of the larger 5-acre site. 
Source: City of Phoenix GIS

Staff Report: Z-164-24-3 
February 12, 2025 
Page 6 of 16 
 
 
 
 
Parking will consist of 360 vehicular spaces, mostly located within the 
internalized parking structure, with 22 spaces and one loading zone located on 
the surface lot. 
Primary access to the larger site will be from Peoria Avenue, which will lead to a 
small parking area and ultimately an access gate that leads to additional surface 
parking, loading zone, and second gate with ultimate access to Cave Creek 
Road. Access to the parking garage will occur at a dedicated entrance from 
Peoria Avenue and along the south side of the building via the aforementioned 
private drive. 
Amenities will include an internalized courtyard with pool, cabanas, BBQ area 
and landscape areas. Located in the southwest corner of the larger site within the 
gated area will be a dog park. 
6. 
Elevations 
The elevations, attached as an exhibit, depict a four-story building with a 
maximum height of 48 feet. The exterior materials are shown as stucco, masonry 
tile, and block but are otherwise undefined, while the parking spaces within the 
integrated parking garage are shown to be screened but are also otherwise 
undefined. 
Source: Norris Design with annotations by staff

Staff Report: Z-164-24-3 
February 12, 2025 
Page 7 of 16 
 
 
Source: Kephart 
ADOPTED AREA PLANS, STUDIES, AND POLICIES 
7. 
Target Area F Redevelopment Plan: 
Adopted January 1980 and amended February 1981 (Resolution No. 15576), the 
Target Area F Redevelopment Plan encompasses approximately 800 acres of 
the Sunnyslope area. The following map, taken from the Plan, includes what was 
then a forward-looking Land Use Plan, which shows the subject site as being 
designated as Community Commercial and adjacent to an area designated as 
High-Density Multi-Family.

Staff Report: Z-164-24-3 
February 12, 2025 
Page 8 of 16 
 
 
 
 
While the Target Area F’s Land Use Plan designates the site as Community 
Commercial, which would suggest the proposed rezone does not advance the 
goals and policies of the Plan, Section III of the Target Area F Redevelopment 
Plan also includes several Objectives, which include but are not limited to the 
following: 
1. Ensure the stability of existing viable residential areas and stabilize declining 
residential neighborhoods by removing structurally substandard buildings and 
blighting influences which act as a disincentive for private reinvestment. 
3. Removal of impediments to land disposition and development through 
assembly of land into reasonably sized and shaped parcels served by 
improved public utilities. 
5. Ensure the establishment of appropriate population densities and 
concentrations that will contribute to the well-being of persons, neighborhoods 
and preservation of the environment. 
Source: Target Area F Redevelopment Plan with annotations by staff

Staff Report: Z-164-24-3 
February 12, 2025 
Page 9 of 16 
 
 
9. Create a sense of community and neighborhood throughout the Target Area in 
order to enhance its attractiveness as a place to live, work, and play. 
The larger five-acre multifamily development that is associated with the proposed 
rezone acts to redevelop the site in a manner that advances these objectives. 
8. 
Housing Phoenix Plan:  
In June 2020, the Phoenix City Council approved the Housing Phoenix Plan. This 
Plan contains policy initiatives for the development and preservation of housing 
with a vision of creating a stronger and more vibrant Phoenix through increased 
housing options for residents at all income levels and family sizes.  Phoenix’s 
rapid population growth and housing underproduction has led to a need for over 
163,000 new housing units.  Current shortages of housing supply relative to 
demand are a primary reason why housing costs are increasing. The proposed 
development supports the Plan’s goal of preserving or creating 50,000 housing 
units by 2030 by contributing to a variety of housing types that will address the 
supply shortage at a more rapid pace while using vacant land in a more 
sustainable fashion. 
9. 
Complete Streets Guiding Principles: 
The City of Phoenix City Council adopted the Complete Streets Guiding 
Principles. The principles are intended to promote improvements that provide an  
accessible, safe, connected transportation system to include all modes, such as 
bicycles, pedestrians, transit, and vehicles. The proposed development, as 
stipulated, will support walking, bicycling, and transit use by including the 
following: 
• Contrasting pavement for pedestrian crossings; 
• Shaded, detached sidewalks along Peoria Avenue and Cave Creek Road; 
• Bus bay and bus pad adjacent to the site; 
• Bicycle infrastructure including guest bicycle parking, electrical charging 
stations, and fix-it station; 
• Shaded bicycle, pedestrian, and transit infrastructure.  
These are addressed in Stipulation Nos. 3, 5, 7, 11, 13, and 14. 
10. 
Comprehensive Bicycle Master Plan 
The City of Phoenix adopted the Comprehensive Bicycle Master Plan in 2014 to 
guide the development of its Bikeway System and supportive infrastructure. The 
Comprehensive Bicycle Master Plan supports options for both short- and long-
term bicycle parking as a means of promoting bicyclist traffic to a variety of 
destinations. Stipulation No.13 requires bicycle parking with supporting

Staff Report: Z-164-24-3 
February 12, 2025 
Page 10 of 16 
 
 
equipment, all to be installed per the requirements in the city’s Walkable Urban 
(WU) Code. 
11. 
Tree and Shade Master Plan 
The Tree and Shade Master Plan has a goal of treating the urban forest as 
infrastructure to ensure that trees are an integral part of the city’s planning and 
development process. By investing in trees and the urban forest, the city can 
reduce its carbon footprint, decrease energy costs, reduce storm water runoff, 
increase biodiversity, address the urban heat island effect, clean the air, and 
increase property values. In addition, trees can help to create walkable streets 
and vibrant pedestrian places. Staff recommends robust tree planting standards 
including: 
• Landscape setbacks to be planted with 2-inch caliper shade trees at 20-feet 
on center; 
• The use of 2-inch caliper trees to achieve 75% shade for all detached 
sidewalks; 
• The use of shade structure, trees, or landscaping to achieve 75% shade at 
bicycle, pedestrian, and transit infrastructure; 
• Vegetating the surface parking lot with minimum 2-inch caliper trees to 
achieve a minimum of 25 percent shade.  
These are addressed in Stipulation Nos. 2, 5, 7, 14, and 19. 
12. 
Transportation Electrification Action Plan 
In June 2022, the Phoenix City Council approved the Transportation 
Electrification Action Plan. The current market desire for the electrification of 
transportation is both a national and global phenomenon, fueled by a desire for 
better air quality, a reduction in carbon emissions, and a reduction in vehicle 
operating and maintenance costs. Businesses, governments and the public are 
signaling strong future demand for electric vehicles (EVs), and many automobile 
manufacturers have declared plans for a transition to fully electric offerings within 
the coming decade. This Plan contains policy initiatives to prepare the City for a 
future filled with more EVs, charging infrastructure and e-mobility equity, and 
outlines a roadmap for a five-step plan to prepare for the EV infrastructure needs 
of 280,000 EVs in Phoenix by 2030. One goal of the Plan, to accelerate public 
adoption of electric vehicles through workplace, business, and multifamily 
charging infrastructure, is to recommend a standard stipulation for rezoning 
cases to provide EV charging infrastructure. This is addressed in Stipulation No. 
12. Additionally, electric receptacles are required for electric bicycle charging per 
Stipulation No. 13.c.

Staff Report: Z-164-24-3 
February 12, 2025 
Page 11 of 16 
 
 
13. 
Conservation Measures for New Development: 
In June 2023, the Phoenix City Council adopted the Conservation Measures for 
New Development policy as part of a resolution addressing the future water 
consumption of new development (Resolution 22129). This resolution addresses 
the future water consumption of new development to support one of the City’s 
Five Core Values in the General Plan which calls for Phoenix to - Build the 
Sustainable Desert City. The Conservation Measures for New Development 
policy includes direction to develop standards for consideration as stipulations for 
all rezoning cases that will address best practices related to water usage in nine 
specific categories. This is addressed in Stipulation Nos. 15 through 19. 
14. 
Phoenix Climate Action Plan: 
In October 2021, the Phoenix City Council approved the Climate Action Plan. 
The Climate Action Plan will serve as a long-term plan to achieve greenhouse 
gas emission reductions and resiliency goals from local operations 
and community activities as well as prepare for the impacts of climate change. 
This plan contains policy and initiatives regarding stationary energy, 
transportation, waste management, air quality, local food systems, heat, and 
water. Goal W2 (Water), Action W2.4, pertains to the implementation of the 
Greater Phoenix Green Infrastructure (GI) and Low Impact Development Details 
for Alternative Stormwater Management to benefit the environment, promote 
water conservation, reduce urban heat, improve the public health, and create 
additional green spaces. This goal is addressed in Stipulation No. 18, which 
requires a minimum of two GI techniques for stormwater management to be 
implemented. 
COMMUNITY INPUT SUMMARY 
15. 
As of the writing of this report, no community correspondence has been received. 
INTERDEPARTMENTAL COMMENTS 
16. 
The Street Transportation Department requires sufficient right-of-way dedication 
to bring the half-width for Peoria Avenue to 30 feet adjacent to the site, and a 
right-of-way dedication along Cave Creek Road to bring the half-width to 50 feet 
adjacent to the site. Improvements will include curb, gutter, detached sidewalk, 
and landscaping as outlined in Stipulations No. 4 through No. 10. 
17. 
The Public Transit Department requested a bus bay, bus stop pad and if 
necessary, additional dedication of right-of-way along Cave Creek Road.  
This is addressed in Stipulation No. 11. 
OTHER 
18. 
The site has not been identified as being archaeologically sensitive. However, in 
the event archaeological materials are encountered during construction, all 
ground disturbing activities must cease within 33-feet of the discovery and the

Staff Report: Z-164-24-3 
February 12, 2025 
Page 12 of 16 
 
 
 
Findings 
 
1. 
The proposal will create additional housing options in line with the Housing 
Phoenix Plan's goal of preserving or creating 50,000 housing units by 2030.  
2. 
As stipulated, the proposal advances the goals and policies of adopted plans and 
policies. 
3. 
The proposal is appropriate at this location and is compatible with surrounding 
land uses. 
 
Stipulations 
 
1. 
All building elevations shall contain architectural embellishments and detailing 
such as textural changes, pilasters, offsets, recesses, variation in window size 
and location, and/or overhang canopies, as approved by the Planning and 
Development Department. 
 
 
2. 
All landscape setbacks shall be planted with minimum 2-inch caliper, large 
canopy, shade trees planted 20 feet on center, or equivalent groupings, as 
approved by the Planning and Development Department. 
 
 
3. 
Where pedestrian pathways cross a vehicular path, the pathway shall be 
constructed of decorative pavers, stamped or colored concrete, or other 
pavement treatments that visually contrasts parking and drive aisle surfaces, as 
approved by the Planning and Development Department. 
 
 
4. 
A minimum 30 feet of right-of-way shall be dedicated and constructed for the 
south half of Peoria Avenue, as approved by the Planning and Development 
Department. 
City of Phoenix Archaeology Office must be notified immediately and allowed 
time to properly assess the materials. This is addressed in Stipulation No. 20. 
19. 
Staff has not received a completed form for the Waiver of Claims for Diminution 
in Value of Property under Proposition 207 (A.R.S. 12-1131 et seq.), as required 
by the rezoning application process. Therefore, a stipulation has been added to 
require the form be completed and submitted prior to final site plan approval. This 
is addressed in Stipulation No. 21. 
20. 
Development and use of the site are subject to all applicable codes and 
ordinances. Zoning approval does not negate other ordinance requirements. 
Other formal actions such as, but not limited to, zoning adjustments and 
abandonments may be required.

Staff Report: Z-164-24-3 
February 12, 2025 
Page 13 of 16 
 
 
 
 
5. 
A minimum 6-foot-wide detached sidewalk separated by a minimum 5-foot-wide 
landscape area shall be constructed on the south side of Peoria Avenue and 
planted to the following standards, as approved or modified by the Planning and 
Development Department: 
 
 
 
a. 
Minimum 2-inch caliper, single-trunk, large canopy, shade trees planted 
20 feet on center, or in equivalent groupings. 
 
 
 
b. 
Drought tolerant vegetation to achieve a minimum of 75% live coverage. 
 
 
 
Where utility conflicts exist, the developer shall work with the Planning and 
Development Department on alternative design solutions consistent with a 
pedestrian environment for installing the required plants. 
 
 
6. 
A minimum of 50 feet of right-of-way shall be dedicated and constructed for the 
west half of Cave Creek Road, as approved by the Planning and Development 
Department. 
 
 
7. 
A minimum 6-foot-wide detached sidewalk separated by a minimum 10-foot-
wide landscape area shall be constructed on the west side of Cave Creek Road 
and planted to the following standards, as approved or modified by the Planning 
and Development Department: 
 
 
 
a. 
Minimum 2-inch caliper, single-trunk, large canopy, shade trees planted 
20 feet on center, or in equivalent groupings. 
 
 
 
b. 
Drought tolerant vegetation to achieve a minimum of 75% live coverage. 
 
 
 
Where utility conflicts exist, the developer shall work with the Planning and 
Development Department on alternative design solutions consistent with a 
pedestrian environment for installing the required plants. 
 
 
8. 
All mitigation improvements shall be constructed and/or funded as identified in 
the accepted Traffic Impact Analysis dated January 29, 2025. 
 
 
9. 
Replace unused driveways with sidewalk, curb, and gutter. Also, replace any 
broken or out-of-grade curb, gutter, sidewalk, and curb ramps on all streets and 
upgrade all off-site improvements to be in compliance with current ADA 
guidelines. 
 
 
10. 
All streets within and adjacent to the development shall be constructed with 
paving, curb, gutter, sidewalk, curb ramps, streetlights, median islands, 
landscaping and other incidentals, as per plans approved by the Planning and

Staff Report: Z-164-24-3 
February 12, 2025 
Page 14 of 16 
 
 
Development Department. All improvements shall comply with all ADA 
accessibility standards. 
 
 
11. 
A bus bay and pad along Cave Creek Road shall be constructed per the 
requirements of City of Phoenix Standard Details P1256, P1258, and P1262, as 
approved by the Planning and Development Department. The entirety of the 
facility shall be placed within the public right-of-way or an easement. Additional 
right-of-way dedication may be necessary as required by the Planning and 
Development Department. 
 
 
12. 
A minimum of 2% of the required parking spaces shall include Electric Vehicle 
(EV) Installed infrastructure. A minimum of 8% of the required parking spaces 
shall include EV Capable infrastructure. 
 
 
13. 
The development shall incorporate bicycle infrastructure as described below 
and as approved by the Planning and Development Department. 
 
 
 
a. 
The developer shall provide secure bicycle parking per Section 1307 of 
the Zoning Ordinance. 
 
 
 
b. 
Guest bicycle parking shall be provided at a minimum rate of 0.05 space 
per dwelling unit, up to a maximum of 50 spaces. 
 
 
 
c. 
A minimum of 10 percent of the provided bicycle parking spaces shall 
include standard electrical receptacles for electric bicycle charging 
capabilities. 
 
 
 
d. 
A bicycle repair station (“fix it station”) shall be provided and maintained 
on site within an amenity area or near a primary site entrance. The bicycle 
repair station (“fix it station”) shall be provided in an area of high visibility 
and separated from vehicular maneuvering areas, where applicable. The 
repair station shall include, but not be limited to: 
 
 
 
 
i. 
Standard repair tools affixed to the station; 
 
 
 
 
ii. 
A tire gauge and pump affixed to the base of the station or the 
ground; 
 
 
 
 
iii. A bicycle repair stand which allows pedals and wheels to spin freely 
while making adjustments to the bike. 
 
 
14. 
All bicycle infrastructure, pedestrian pathways (including sidewalks), and transit 
stops shall be shaded by a structure, landscaping, or a combination of the two

Staff Report: Z-164-24-3 
February 12, 2025 
Page 15 of 16 
 
 
to provide a minimum of 75% shade, as approved by the Planning and 
Development Department. 
 
 
15. 
Natural turf shall only be utilized for required retention areas (bottom of basin, 
and only allowed on slopes if required for slope stabilization) and functional turf 
areas, as approved by the Planning and Development Department. 
 
 
16. 
Pressure regulating sprinkler heads and/or drip lines shall be utilized in any turf 
areas to reduce water waste. 
 
 
17. 
Prior to final site plan approval, documentation shall be provided that 
demonstrates a commitment to participate in the Water Efficiency Program for a 
minimum of ten years, or as approved by the Planning and Development 
Department. 
 
 
18. 
A minimum of two green stormwater infrastructure (GSI) elements for 
stormwater management shall be implemented, as approved or modified by the 
Planning and Development and/or Street Transportation departments. This 
includes but is not limited to stormwater harvesting basins, bioswales, 
permeable pavement, etc., per the Greater Phoenix Metro Green Infrastructure 
and Low Impact Development Details for Alternative Stormwater Management. 
 
 
19. 
A minimum of 25% of the surface parking areas shall be shaded, as approved 
by the Planning and Development Department. Shade may be achieved by 
structures or by minimum 2-inch caliper, drought tolerant, shade trees, or a 
combination thereof. 
 
 
20. 
In the event archaeological materials are encountered during construction, the 
developer shall immediately cease all ground-disturbing activities within a 33- 
foot radius of the discovery, notify the City Archaeologist, and allow time for the 
Archaeology Office to properly assess the materials. 
 
 
21. 
Prior to final site plan approval, the landowner shall execute a Proposition 207 
waiver of claims form. The waiver shall be recorded with the Maricopa County 
Recorder's Office and delivered to the City to be included in the rezoning 
application file for record. 
 
 
Writer 
Robert Kuhfuss 
February 12, 2025 
 
Team Leader 
Racelle Escolar

Staff Report: Z-164-24-3 
February 12, 2025 
Page 16 of 16 
 
 
Exhibits 
Sketch Map 
Aerial Sketch Map 
Conceptual Site Plan date stamped January 17, 2025 
Conceptual Elevations date stamped January 17, 2025

VALLE VIEW | 
NORTH
01/17/2025
SCALE  1” = 30’
0’
15’
30’
60’
CONCEPTUAL SITE PLAN
GARAGE
ENTRY
E A S T P E O R I A AV E N U E
N O R T H C AV E C R E E K R O A D
GARAGE
ENTRY
DOG
PARK
AMENITY &
LEASING
10’ X 30’
LOADING
PROPERTY LINE
PROPERTY LINE
PROPERTY LINE
PROPERTY LINE
MOTOR
COURT
NEW
BUS BAY
20’
S/B
5’
LS STRIP
10’
LS STRIP
10
6’
SIDEWALK
20’
S/B
VEHICULAR GATE
7’
LS STRIP
5’
SIDEWALK
8’-6”
16’-6”
VEHICULAR 
GATE
PARKING
GARAGE
AMENITY
COURTYARD
8’-6”
15’
S/B
15’
S/B
6’
SIDEWALK
30’
30’
30’
30’
ROW
NEW BUS 
PAD
50’
ROW
20’
ENTRY
0’
REFUSE
STAGING
23’
20’
PLAN IS CONCEPTUAL AND SUBJECT TO CHANGE.
UNIT COUNT:
240 UNITS
PROJECT DATA:
REQUIRED
PROVIDED
PARKING
360 (1.5 SPACE / UNIT)
373 SPACES
EXISTING:
PROPOSED:
ZONING
R-5 & C-2
R-5 (PRD OPTION)
GROSS:
NET:
ACREAGE
5.2 AC (227,339 SF)
4.3 AC (185,460 SF)
ALLOWED:
PROPOSED:
BUILDING HEIGHT
4 STORIES /48 FEET
4 STORIES /48 FEET
ALLOWED:
PROPOSED:
LOT COVERAGE
50% (92,730 SF)
49% (91,117 SF)
ALLOWED:
PROPOSED:
DENSITY
52.20 DU / AC
46.15 DU / AC
REQUIRED:
PROPOSED:
COMMON AREA
5% (11,367 SF)
10% (22,734 SF)