PHOENIX OFFICE OF ARTS AND CULTURE
FY 2020-25 PUBLIC ART PLAN
Artist: James Carpenter Design Associates
Attachment B
2
Table of Contents
Projects in Italics are new projects
Introduction and Background ............................................................................................................ 4
The FY 2020-25 Public Art Plan Types of Projects ........................................................................... 5
2019-20 Substantially Completed Public Art Projects ....................................................................... 6
2020-25 Public Art Plan .................................................................................................................... 9
Project Title: 7th Avenue at Melrose Curve ............................................................................ 9
Project Title: North 32nd Street Improvement ......................................................................... 9
Project Title: 107th Avenue Streetscape ................................................................................ 9
Project Title: Arizona Falls .................................................................................................. 10
Project Title: Arterial Canal Crossings and Trail Connections (Grand Canalscape) ............. 10
Project Title: Artists’ Initiative ............................................................................................. 10
Project Title: Buckeye Road ................................................................................................ 10
Project Title: Community Well Site 157 ............................................................................... 11
Project Title: Community Water Site - BS-2B ..................................................................... 11
Project Title: Community Well Site 84/88 ........................................................................... 11
Project Title: Community Well Site 94/234 .......................................................................... 11
Project Title: Community Well Site 156 .............................................................................. 12
Project Title: Community Well Site Security Gates and Fences .......................................... 12
Project Title: Cortez Park Well Site and Arizona Canal ...................................................... 12
Project Title: Happy Valley Road at I-17 Interchange ......................................................... 12
Project Title: Lift Stations and Neighborhood Facilities ........................................................ 13
Project Title: Light Rail Corridor Phase II ............................................................................ 13
Project Title: PSHIA Portable Works Collection ................................................................... 13
Project Title: PSHIA Sky Train Stage II - 24th Street Station Terrazzo ................................. 13
3
Project Title: PSHIA Sky Train Stage II - RCC Station Weather Fence ............................... 14
Project Title: PSHIA Sky Train Stage II - RCC Station Terrazzo ........................................ 14
Project Title: PSHIA Terminal 3 Modernization West Atrium .............................................. 14
Project Title: PSHIA Terminal 3 Modernization North Concourse Bridge ............................ 14
Project Title: PSHIA Terminal 4 S1 Concourse ................................................................... 15
Project Title: Public Works – 27th Avenue Solid Waste Management Facility ..................... 15
Project Title: Shade ............................................................................................................ 15
Project Title: South Mountain Loop 202 Pedestrian Bridge at Elwood Street ..................... 16
Project Title: SR51 Artwork Retrofit ................................................................................... 16
Project Title: Thomas Road Overpass Retrofit .................................................................... 16
Project Title: Tres Rios Wetlands ....................................................................................... 17
Project Title: Van Buren Street Improvement ..................................................................... 17
Project Title: Water Public Art Master Plan ........................................................................ 17
Project Title: Water Services West Yard ............................................................................ 18
FY 2020-25 Major Multi-Year Projects ........................................................................................... 19
2019-20 Public Art Projects Substantially Completed .................................................................... 20
2020-25 Public Art Plan Summary ................................................................................................. 21
Projects by Council Districts ........................................................................................................... 22
Interactive Map ............................................................................................................................... 23
FY2020-25 Public Art Plan Budget ................................................................................................. 24
4
Introduction and Background
The Phoenix City Council established the Phoenix Office of Arts and Culture Public Art Program in 1986 to help create a
more beautiful and vibrant city. The program is funded through an ordinance that allocates one percent of the Phoenix
Capital Improvement Program to enhance the design of public buildings, infrastructure and spaces. In the past 34 years, it
has created more than 200 major projects and become a national leader in developing unique collaborations with artists
and other design professionals to build a better Phoenix. The projects range from new airport facilities, parks, community
centers and canal trails, to bridges, streetscapes, overpasses, transit centers, recycling centers, and other key infrastructure.
Phoenix public art has garnered numerous awards for design excellence, including two Design for Transportation Awards
from the U.S. Department of Transportation and the National Endowment for the Arts, numerous Arizona Forward
Environmental Excellence Awards, including the 2001 President's Award, and other local and national recognition. The
Public Art Program has brought positive national and international media attention to the City of Phoenix through articles
in The New York Times, Newsweek, The Wall Street Journal, Art in America, The Atlantic Monthly, and Landscape
Architecture, among others.
Each year, the Phoenix Office of Arts and Culture works with funding City departments and the Mayor and City Council
to develop the annual Public Art Plan that identifies capital improvement projects in all areas of Phoenix that offer the
greatest opportunity for artist involvement and public accessibility. The plan is presented to the Mayor and City Council
for review and approval. The total budget for each project includes funds to contract for design, fabrication, installation
and project administration. Art projects, like other public works, are funded in part through City-issued bonds and other
capital improvement funds. The projects are scheduled to be in step with priorities in the City’s CIP program.
Artists are recommended for projects through a competitive procurement process that involves selection panels of arts
professionals, staff from the funding City departments and representatives of the community where public art projects will
be located. Project architects and City staff may serve as non-voting advisors to the panel. The panels review applications
usually submitted in response to a Call to Artists. The selection panels base their recommendations on the quality of the
artists’ works, their suitability for the project, and their ability to work well with the community and other design
professionals. The panel’s recommendation must be reviewed by the Phoenix Arts and Culture Commission, a volunteer
citizen advisory board, and approved by the Mayor and City Council before artists can be contracted to begin work.
F o r mo r e i n f o r ma t io n r eg a rd in g th e P h o en ix Of f i c e o f Ar t s a n d Cu l tu r e,
p l ea s e v i si t p h o e n ix .g o v/a r t s o r c a ll (6 0 2 ) 2 6 2 -4 6 3 7 .
5
The Phoenix Office of Arts and Culture has developed the FY 2020-25 Public Art Plan with input and assistance from the
Mayor and City Council, City residents, artists, funding City departments, and the Phoenix Arts and Culture Commission.
1. Design Team Projects
Artists on design teams collaborate with architects, landscape architects, engineers and community members to
plan major capital construction projects. Design team projects often create significant enhancements for new
infrastructure, stand-alone structures fabricated by the artist, or both.
2. Site-Specific Commissions
These projects often respond to the opportunities and history of a community or place. Site-specific commissions
may be incorporated into new construction or existing public facilities.
3. Purchase of Existing Artwork
The City maintains an extensive portable works collection of more than 1,000 works of art displayed in more than
20 public buildings and at The Gallery @ City Hall.
4. Temporary Commissions
Temporary commissions include a range of short-term projects that provide professional development for artists
and that respond to selected locations or opportunities. Temporary projects may include new media, art
installations, sculptures and other changing displays.
5. Artwork Refurbishment
The City must periodically refurbish public art in the City’s collection. Sometimes major modifications or retrofits
are needed to accommodate changing site conditions or to renew the appearance of works that have been damaged
by the elements. Major modifications funded through the City’s Capital Improvement Program go beyond routine
maintenance.
6. Master Planning
The City periodically develops master plans to determine the best opportunities for incorporating art into public
projects. Master plans often recommend where specific projects or series of projects should be sited to achieve the
greatest public benefit.
The FY 2020-25 Public Art Project Plan includes the following types of public art projects:
6
Community Well Site 94/234
Artist Barbara Grygutis (AZ) worked with landscape architect Dig Studios to enhance the security and appearance of this
Community Well Site in Sunnyslope. The improvements included landscaping, fencing, pathways and a sculptural
landmark.
PSHIA T-3 Modernization North Concourse Bridge
Artist James Carpenter (NY) created a major artwork along the west windows of the passenger bridge to Phoenix Sky
Harbor Airport’s Terminal 3 North Concourse. The sculptural work spans approximately 200 feet and includes more than
750 gold and blue reflective aluminum cells.
2 0 1 9–20 Completed Public Art Projects
7
Light Rail Corridor Phase II
Matthew and Maria Salenger (AZ) of the artist team coLab worked with City departments and the community to create a
bus shelter at 19th Ave. and Maryland Ave. The shelter’s expanded platform and shade panels provide greater ADA access
and comfort for transit riders.
Arterial Canal Crossings and Trail Connections (Grand Canal)
Artist Michael Singer (FL) worked with T.Y. Lin International (AZ) to improve the safety, appearance and connectivity of
the Grand Canal trail through central Phoenix. The improvements included paths, lighting, seating and shade features.
2 0 1 9 –20 Substantially Completed Public Art Projects
8
Artists Initiative (Influx Cycle VIII)
Arizona artists Daniel Funkhouser and Christy Puetz installed temporary works at the Burton Barr Central Library. Their
separate installations were part of the In Flux Cycle VIII series, featuring temporary installations by 10 artists in six
Valley cities.
2 0 1 9–20 Completed Public Art Projects
9
(Listed alphabetically – the budget summary in the appendix provides detailed information. New projects are italicized.)
Project Title
7th Avenue at Melrose Curve
Project #
AR63000025
Location
7th Ave. and West Glenrosa St.
Type of Project
Temporary Commission
Funding Source
Public Works Capital Program
2020-25 Budget
$37,588
Council District
4
Description:
This continuing project features works about recycling and the environment by Arizona artists, bolstering City efforts to
increase household recycling. The art is displayed in the three double-sided, back-lighted canopied shelters at 7th Ave. at
West Glenrosa St. The project has featured more than 30 Arizona artists and more than 25 poets since it was initiated in
FY 2004-05.
Project Title
North 32nd Street Improvements
Project Number
AR63000030
Location
N 32nd St. – from Shea Blvd. to Bell Rd.
Type of Project
Design Team Commission
Funding Sources
Streets and Water Capital Funds
2020-25 Budget
$215,000
Council District
3, 2
Description
An artist will be contracted to work with the community, Streets and Water Services Departments to enhance
the design of N. 32nd Street as part of planned water pipeline and streetscape improvements between Shea Blvd.
and Bell Rd. This project is in the design phase.
Project Title
107th Avenue Streetscape
Project Number
AR63000031
Location
107th Ave. between Indian School and Camelback Rds.
Type of Project
Site-Specific Commission
Funding Source
Street Transportation Capital Program
2020-25 Budget
$65,777
Council District
5
Description:
Artists Laura Haddad and Tom Drugan (WA) have been contracted to create integrated public art to enhance pedestrian
safety and comfort as part of the 107th Avenue Street Improvement between Indian School Rd. and Camelback Rd. The
project is in construction.
2020-25 Public Art Project Plan
10
Project Title
Arizona Falls
Project #
AR84850019
Location
Arizona Canal at 56th St.
Type of Project
Artwork Refurbishment
Funding Source
Water Capital Program
2020-25 Budget
$24,825
Council District
6
Description:
Major safety features, such as fencing, shade structures, drainage and security lighting, will be upgraded as part of site
renovations to improve the durability and safety of the site. The project is in construction.
Project Title
Arterial Canal Crossings and Trail Connections (Grand Canalscape)
Project Number AR63000013
Location
Various Sites on Grand Canal
Type of Project Site-Specific Commission
Funding Sources Water Capital Program
2020-25 Budget $8,007
Council Districts 4, 8
Description:
Artist Michael Singer (FL) was been contracted to work with T.Y. Lin International (AZ) to improve safety and
connectivity of the Grand Canal trail through Central Phoenix. The improvements include paths, lighting, seating and
shade features. The project is in warranty closeout phase.
Project Title
Artists' Initiative
Project Number
AR74000014
Location
Various Sites
Type of Project
Temporary Commission
Funding Sources
Water Capital Program
2020-25 Budget
$25,160
Council District
Citywide
Description:
This continues a successful series of temporary projects for Arizona artists new to public art. It has activated public
buildings and spaces through a wide range of artistic installations, performances and media. The artists will present
temporary projects online or at community facilities citywide, as public health interests allow.
Project Title
Buckeye Road
Project Number
AR67000012
Location
Buckeye Rd., 16th St. to 7th St.
Type of Project
Site Specific Commission
Funding Sources
Water and Transit Capital Funds
2020-25 Budget
$143,950
Council District
8
Description
An artist will be contracted to work with City departments and the community to create works that improve pedestrian and
transit shade and comfort at bus stops along the corridor. This will be coordinated with the PHX Land Reuse Strategy to
create a cultural corridor, and with ongoing City efforts to reduce the impact of urban heat and improve pedestrian and
transit mobility. This project is in the planning phase, and is partly funded with an “Our Town” grant from the National
Endowment for the Arts.
11
Project Title
Community Well Site 157
Project Number
AR84850027
Location
55th Ave. and W. Edgemont Ave.
Type of Project
Design Team Commission
Funding Sources
Water Capital Program
2020-25 Budget
$18,939
Council District
4
Description:
Arizona artist Kevin Berry was contracted to work with landscape architect Janet Waibel to enhance the security and
appearance of Community Well Site #157. The improvements include fencing, shade trees, walking paths and a sculptural
landmark. This project is in the warranty closeout phase.
Project Title
Community Water Site - BS-2B
Project Number
AR84850034
Location
1439 East Alta Vista Rd.
Type of Project
Design Team Commission
Funding Sources
Water Capital Funds
2020-25 Budget
$3,598
Council District
8
Description
An artist will be selected to improve the security and appearance of this Water Services Department Community Site (BS-
2B). This project is in the planning phase.
Project Title
Community Well Site 84/88
Project Number
AR84850029
Location
73rd Ave. and W. Crittenden Ln.
Type of Project
Design Team Commission
Funding Sources
Water Capital Program
2020-25 Budget
$20,196
Council District
5
Description:
Artist Bobby Zokaites (AZ) has been contracted to work with landscape architect Dig Studios to reduce the urban heat
island impact and enhance the security and appearance of this Community Well Site in Maryvale. This project is in the
construction phase.
Project Title
Community Well Site 94/234
Project Number
AR84850030
Location
6th St. and Butler Dr.
Type of Project
Design Team Commission
Funding Sources
Water Capital Program
2020-25 Budget
$12,736
Council District
6
Description:
Artist Barbara Grygutis (AZ) was contracted to work with landscape architect Dig Studios to enhance the security and
appearance of this Community Well Site, in Sunnyslope. This project is in the closeout phase.
12
Project Title
Community Well Site 156
Project Number
AR84850031
Location
63rd Ave. and W. Osborn Rd.
Type of Project
Design Team Commission
Funding Sources
Water Capital Program
2020-25 Budget
$17,174
Council District
7
Description:
Artist Jeff Zischke (AZ) has been contracted to work with engineers Wood Patel and landscape architect Janet Waibel to
enhance the security and appearance, and reduce the urban heat island impact of this Community Well Site in west
Phoenix. This project is in the design phase.
Project Title
Community Well Site Security Gates and Fences
Project Number
AR84850035
Location
Various
Type of Project
Design Team Commission
Funding Sources
Water Capital Funds
2020-25 Budget
$312
Council District
Citywide
Description
Artists will be commissioned to work with the Water Services Department to enhance the design of security gates and
fences at Water facilities. This project is in the planning phase.
Project Title
Cortez Park Well Site and Arizona Canal
Project Number
AR84850036
Location
35th Ave. and Arizona Canal
Type of Project
Design Team Commission
Funding Sources
Water Capital Program
2020-25 Budget
$8,950
Council District
1
Description
Artist John Randall Nelson (AZ) was selected to work with the Water, Parks and Neighborhood Services Departments to
design site enhancements to improve the safety and security of this Aquifer Storage and Recovery well site and
surrounding public spaces along the Arizona Canal and Cortez Park. This project is in the design phase.
Project Title
Happy Valley Road at I-17 Interchange
Project Number
AR63850018
Location
Happy Valley Rd. at I-17
Type of Project
Design Team Commission
Funding Source
Street Transportation Capital Program
2020-25 Budget
$165,466
Council District
1
Description:
Artist Daniel Mayer (AZ) has been contracted to work with City departments, the community, HDR engineering and the
Arizona Department of Transportation to enhance the design of a planned retrofit of the interchange. The public art
improvements will include upgraded designs for overpass fencing, support columns and concrete work. The project will
improve traffic flow and safety, and serve as the North Phoenix gateway. This project is in the construction phase.
13
Project Title
Lift Stations and Neighborhood Facilities
Project Number
AR84900011
Location
Citywide
Type of Project
Site-Specific Commission
Funding Source
Wastewater Capital Program
2020-25 Budget
$311,818
Council District
Citywide
Description:
Artists will be contracted to work with City consultants to enhance or upgrade the design of new or existing lift stations
and other neighborhood facilities essential to the City's wastewater collection system. In addition to wall enhancements,
the projects may include upgraded landscaping, security fencing and other features. This project is in the planning phase.
Project Title
Light Rail Corridor Phase II
Project Number
AR63000014
Location
19th Ave., from Bethany Rd. to Dunlap Ave.
Type of Project
Site-Specific Commission
Funding Source
Wastewater Capital Programs
2020-25 Budget
$20,534
Council District
5
Description:
Artists Matthew and Maria Salenger (AZ), of the artist team coLab Studio, were contracted to work with City departments
and the community to create a bus shelter at 19th Ave. and Maryland Ave. This project is in the closeout phase.
Project Title
PSHIA Portable Works Collection
Project Number
AR66000021
Location
Phoenix Sky Harbor International Airport
Type of Project
Purchase and Commission of Existing Artworks
Funding Source
Aviation Capital Program
2020-25 Budget
$157,073
Council District
8
Description:
Artworks will be commissioned or purchased to expand Phoenix Airport Museum programming in new public exhibition
areas created by the Terminal Modernizations. This will include purchasing recommended works from temporary museum
exhibitions and POAC projects for the museum's permanent collection, and 2) purchasing collections of works by
contemporary artists. POAC staff will work closely with the Aviation Department to identify the Portable Works projects.
This project is in the planning phase.
Project Title
PSHIA Sky Train Stage II - 24th Street Station Terrazzo
Project Number
AR66000043
Location
Phoenix Sky Harbor International Airport
Type of Project
Design Team Commission
Funding Source
Aviation Capital Program
2020-25 Budget
$7,647
Council District
8
Description:
Artist Frank Gonzales (AZ) has been contracted to work with the Aviation Department and its Gannett Fleming/Hensel
Phelps project team to design a terrazzo floor for this PHX Sky Train station. This project is in the construction phase.
14
Project Title
PSHIA Sky Train Stage II Rental Car Center Station Weather Fence
Project Number
AR66000041
Location
Phoenix Sky Harbor International Airport Rental Car Center
Type of Project
Design Team Commission
Funding Source
Aviation Capital Program
2020-25 Budget
$245,700
Council District
8
Description:
The artist team of Roberto Behar and Rosario Marquardt (FL) has been contracted to work with the Aviation Department
and its Gannett Fleming/Hensel Phelps project team to design two protective weather fences for this PHX Sky Train
station platform. Each fence will run approximately 260 feet along the north and south sides of the station. This project is
in the construction phase.
Project Title
PSHIA Sky Train Stage II Rental Car Center Station Terrazzo
Project Number
AR66000042
Location
Phoenix Sky Harbor International Airport
Type of Project
Design Team Commission
Funding Source
Aviation Capital Program
2020-25 Budget
$7,076
Council District
8
Description:
Artist Bill Dambrova (AZ) has been contracted to work with the Aviation Department and its Gannett Fleming/Hensel
Phelps project team to design a terrazzo floor for this PHX Sky Train station. This project is in the construction phase.
Project Title
PSHIA Terminal 3 Modernization West Atrium
Project Number
AR66000036
Location
Phoenix Sky Harbor International Airport
Type of Project
Design Team and Site-Specific Commission
Funding Source
Aviation Capital Program
2020-25 Budget
$78,317
Council District
8
Description:
Artists Michael Anderson (AZ), Mitch Fry (AZ), Patricia Sannit (AZ) and Matt Wedel (OH) have been contracted to
create sculptures for the west side of the Terminal 3 Atrium. The works will be combined with other large-scale sculptures
already in the Phoenix Airport Museum Collection to enhance the terminal and create an outdoor sculpture and botanical
garden in the Terminal 3 West Plaza. This project is in the closeout phase.
Project Title
PSHIA Terminal 3 Modernization North Concourse Bridge
Project Number
AR66000037
Location
Phoenix Sky Harbor International Airport
Type of Project
Design Team Commission
Funding Source
Aviation Capital Program
2020-25 Budget
$304,193
Council District
8
Description:
Artist James Carpenter (NY) was contracted to integrate a major artwork into the modernization of the Terminal 3 North
Concourse bridge. The project is in the warranty closeout phase.
15
Project Title
PSHIA Terminal 4 S1
Project Number
AR66000040
Location
Phoenix Sky Harbor International Airport
Type of Project
Design Team Commission
Funding Source
Aviation Capital Program
2020-25 Budget
$1,637,575
Council District
8
Description:
The Fortoul Brothers (AZ) artist team was contracted to work with the Aviation Department and its project team to
enhance the design of the Connector Bridge to the new South Concourse. (S1) at Terminal 4. Artist Marc Fornes (NY)
has been contracted to enhance the design of the concourse Atrium. This project is in the design phase.
Project Title Public Works – 27th Avenue Solid Waste Management Facility
Project Number
AR70160001
Location
3060 South 27th Ave. (at Lower Buckeye Rd.)
Type of Project
Site-Specific Commission
Funding Source
Solid Waste Capital Program
2020-25 Budget
$206,041
Council District
7
Description:
Artists will be contracted to create artworks from materials commonly found in the City’s recycling stream. This
successful series of projects has bolstered City efforts to increase awareness about recycling and resource management by
introducing new ways to re-use materials. Phoenix has adopted the goal of achieving a 40 percent waste diversion rate by
2020. This project is in the design phase.
Project Title
Shade
Project Number
AR67000011
Location
Citywide
Type of Project
Site Specific Commission
Funding Sources
Street Transportation, Transit & Water Capital Funds
2020-25 Budget
$240,947
Council District
Citywide
Description
Artists will be contracted to create designs for shade and weather screens for new city bus shelters and other streetscape
structures, to improve pedestrian and transit comfort citywide. This project is in the planning phase, and will be
coordinated with efforts to raise awareness about and reduce the impact of urban heat. This project has received funds
from the National Endowment for the Arts. It is in the design phase.
16
Project Title
South Mountain Loop 202 Pedestrian Bridge at Elwood Street
Project Number
AR63850017
Location
Loop 202 Freeway at Elwood St. Alignment
Type of Project
Design Team Commission
Funding Source
Street Transportation Capital Program
2020-25 Budget
$1,811,904
Council District
7
Description:
Artist Jody Pinto (NY) has been contracted to work with City departments, the Arizona Department of Transportation and
the Connect 202 development team to enhance the design of a planned pedestrian bridge across the future Loop 202
Freeway at Elwood St. The bridge will provide a critical pedestrian link between residential neighborhoods and a nearby
school. This project is in the construction phase.
Project Title
SR51 Artwork Retrofit
Project Number
AR39000003
Location
Sites along SR51, between McDowell Rd. and Bethany Home Rd.
Type of Project
Artwork Refurbishment
Funding Sources
Streets Capital Program
2020-25 Budget
$135,811
Council District
4, 6, 8
Description:
Arizona artists and contractors will complete major retrofits of the Wall Cycle to Ocotillo Public Art Project integrated
into the design of SR 51 in the early 1990s. The works require major renovations due to exposure to the elements and
damage by vandals. This project is in the fabrication phase.
Project Title
Thomas Road Overpass Retrofit
Project Number
AR63850020
Location
SR 51 and Thomas Rd.
Type of Project
Major Retrofit
Funding Source
Streets Capital Program
2020-25 Budget
$149,809
Council District
4
Description:
This project will contract Arizona fabricators to assess and restore sections of the adobe wall panels integrated into the SR
51 overpass at Thomas Rd. Portions of the panels, which were produced through a collaboration between artist Marilyn
Zwak (AZ) and community residents in 1990, have been damaged by vandals and exposure to the elements. The Thomas
Rd. Overpass was the first of the City’s many award-winning public art projects created by design teams.
17
Project Title
Tres Rios Wetlands
Project Number
AR84900010
Location
91st Ave. and Baseline Rd.
Type of Project
Design Team Commission
Funding Source
Wastewater Capital Program
2020-25 Budget
$1,680,315
Council District
7
Description:
Artist Adam Kuby (OR) was contracted to work with a design team, City departments, consultants and the community to
create significant recreation and environmental education experiences as part of this multi-year effort to improve the
seven-mile, 1,500-acre wetland at the confluence of the Salt and Gila Rivers in southwestern Phoenix. Kuby and the team
have designed raptor towers, viewing areas, paths and demonstration gardens in the wetlands. This project is in the design
phase.
Project Title
Van Buren Street Improvement
Project Number
AR63850019
Location
Van Buren St. - 7th St. to 24th St.
Type of Project
Design Team/Site-Specific Commission
Funding Source
Street Transportation and Transit Capital Programs
Budget
$69,633
Council District
8
Description:
An artist will be contracted to work with the community and City departments to create works to improve pedestrian and
transit shade and connectivity. The enhancements will be coordinated with City efforts to upgrade ADA, pedestrian and
transit connections and comfort in the Choice Neighborhoods project area. This project is in the planning phase, and is
partially funded by an “Our Town” grant from the National Endowment for the Arts.
Project Title
Water Public Art Master Plan
Project Number
AR84850013
Location
Citywide
Type of Project
Master Planning
Funding Source
Wastewater Capital Program
2020-25 Budget
$43,711
Council District
Citywide
Description:
Develop a comprehensive computerized mapping system (GIS mapping) to determine the best public art sites and
opportunities citywide for using Water and Wastewater Percent-for-Art funds. The project will enable City staff to refine
the ongoing mapping of City projects and more efficiently integrate art into City’s Capital Improvement Program. This
project is ongoing.
18
Project Title
Water Services West Yard
Project Number
AR84850033
Location
North 47th Ave. and West Camelback Rd.
Type of Project
Design Team Commission
Funding Sources
Wastewater Capital Funds
2020-25 Budget
$1,162,417
Council District
5
Description
The Fortoul Brothers (AZ) artist team has been contracted to work with the Water Services Department and its project
team to develop enhancements for publicly accessible areas of the planned West Yard Facility and Customer Service
Center. This project is in the design phase.
19
Completion of the following projects will require significant funding resources over the next five fiscal years. Funding for
the planning and implementation of these projects is included in the FY 2017-22 Public Art Plan. Funding of all projects
is subject to City Council approval through future Public Art Plans.
Community Water Facilities
Artists Kevin Berry (AZ), Barbara Grygutis (AZ), Bobby Zokaites (AZ), Jeff Ziscke (AZ), Mary Shindell (AZ, and the
Fortoul Brothers (AZ) have been contracted to work with the community and the Water Services Department to improve
the security and appearances of community water facilities citywide. Other artists will be contracted for future well site
projects.
Streetscape Shade and Mobility Improvements
Artists will be contracted to work with the community and City departments to enhance pedestrian and transit shade and
connectivity. The enhancements will be coordinated with City efforts to reduce the impact of urban heat and improve
mobility citywide.
Public Works Recycling and Sustainability Initiative
The Public Art Program has worked with the Public Works Department since 1990 to involve artists in the design of
innovative recycling centers, and in building awareness of the need for recycling and sustainable resource
management. Artists will be contracted to create artworks that expand educational outreach about recycling and bolster
City efforts to increase recycling citywide. The Reimagine Phoenix initiative has set a goal of increasing the household
diversion of trash to recycling from the current rate of 15 percent to 40 percent by 2020.
PSHIA Terminal Modernization, Sky Train Phase 2 Public Art, and Terminal 4 New Concourse Projects
Phoenix Sky Harbor International Airport future terminal modernizations represent the City's most significant opportunity
to reach the widest public with great public art and integrated design. PSHIA handles more than 40 million passengers
annually. Public Art staff is working with Aviation staff and its design teams to carry out a comprehensive plan to
integrate significant art and design to enhance the experience of travelers. Projects will be implemented in step with the
airport modernization phases.
Tres Rios Wetlands
Artist Adam Kuby has been contracted to work with City departments, consultants and the community to create
significant environmental recreation and education opportunities at Tres Rios. This project is part of this multi-year effort
to improve the seven-mile, 1,500-acre wetland at the confluence of the Salt and Gila Rivers in southwestern Phoenix.
FY 2020-25 Public Art Project Plan Major Multi-Year Projects
20
The following projects were substantially completed in FY 2019-20:
Well Site 94/234
PSHIA T-3 Modernization North Concourse
19th Ave. Light Rail Corridor Phase II
Arterial Canal Crossings and Trail Connections (Grand Canal)
Artists Initiative (Influx Cycle VIII)
FY 2019-20 Public Art Project Substantially Completed
21
Number of New Projects
2
$ 364,809
Number of Continuing Projects
31
$8,673,390
Total Funded Projects
33
$9,038,199
Arizona Artists
Of the 31 projects in the 2020-25 Public Art Plan that are expected to result in contracts with artists and contractors in
2020-21, at least 21 (68%) are expected to involve artists or teams with an Arizona member. Two projects address long-
range planning, and are not expected to involve contracting artists or design professionals. Artists who live in Arizona are
eligible and encouraged to apply for all projects.
FY 2020-25 Public Art Project Plan Summary
22
Project Description
DISTRICT 1
Happy Valley/I-17 Interchange Improvement
Cortez Park Well and Canal Project
DISTRICT 2, 3
North 32nd Street Improvement
DISTRICT 3, 6
Community Well Site 94/234
DISTRICT 4
7th Avenue at Melrose Curve
Community Well Site 157
Thomas Road Overpass Retrofit
DISTRICT 4, 6, 8
SR 51 Wall Cycle to Ocotillo Refurbishment
DISTRICT 4, 8
Arterial Canal Crossings - Canalscape
DISTRICT 5
107th Avenue Streetscape
Community Well Site 84/88
Light Rail Corridor Phase II
Water Services West Yard
DISTRICT 6
Arizona Falls
DISTRICT 7
Public Works 27th Avenue Solid Waste Management Facility
South Mountain Freeway Loop 202 Pedestrian Bridge at Elwood Street
Tres Rios Wetlands
Community Well Site 156
DISTRICT 8
Community Well Site BS-2B
Buckeye Road
PSHIA Portable Works Collection
PSHIA Terminal 3 Modernization West Atrium
PSHIA Terminal 3 Modernization North Concourse Bridge
PSHIA Terminal 4 South (S1) Concourse
PSHIA Sky Train Stage 2 Rental Car Center Weather Fence
PSHIA Sky Train Stage 2 Rental Car Center Station Terrazzo
PSHIA Sky Train Stage 2 24th Street Station Terrazzo
Van Buren Street Improvement
CITYWIDE
Lift Station Projects
Water Public Art Plan
Community Well Site Security Gates & Fences
Artists’ Initiative
Shade
Council Districts
23
To see the location and details of each project you can use the interactive Map Tool through Google Maps. Use the link
or click on the map below to go to the Google map then click on the yellow stars to learn more about each project. For
context you can also view layers City Council Districts and locations of previously completed public art projects.
https://drive.google.com/open?id=1eLngbpXXMC0NOqaNduWoJgoXYsuknbKg&usp=sharing
Interactive Map
24
2020-25 Public Art Program Budget
Project Name
Project
Fund
Fund Name
FY
20-21
FY
21-22
FY
22-23
FY
23-24
FY
24-25
Total
20-25
7th Avenue at Melrose
Curve
AR63000025
65909
Solid Waste - Mega IV
37,588
0
0
0
0
37,588
Total
37,588
0
0
0
0
37,588
107th Avenue
Streescape
AR63000031
0007
AZ Highway Users 30%
- Street Improvements
65,777
0
0
0
0
65,777
Total
65,777
0
0
0
0
65,777
Arizona Falls
AR84850019
1700
Water CIC Bond
24,825
0
0
0
0
24,825
24,825
0
0
0
0
24,825
Arterial Canal Crossings
and Trail Connections
AR63000013
1700
Water CIC Bond
8,007
0
0
0
0
8,007
Total
8,007
0
0
0
0
8,007
Artists' Initiative
AR74000014
1700
Water CIC Bond
21,396
21,396
1365
2007 CIC Water Bonds
1,098
1,098
1421
2008 CIC Water Bonds
2,448
2,448
1366
2006 CIC Water Bonds
218
218
Total
25,160
0
0
0
0
25,160
Buckeye Road
AR67000012
2050
Tax Transit
31,484
0
0
0
0
31,484
2051
Streets
75,000
0
0
0
0
75,000
1700
Water CIC Bond
37,466
37,466
Total
143,950
0
0
0
0
143,950
Community Water Site –
BS-2B
AR84850034
1700
Water CIC Bond
3,598
0
0
0
0
3,598
Total
3,598
0
0
0
0
3,598
Community Well Site 157
AR84850027
1700
Water CIC Bond
18,939
0
0
0
0
18 ,939
Total
18,939
0
0
18,939
Community Well Site
84/88
AR84850029
1700
Water CIC Bond
20,196
0
0
0
0
20,196
Total
20,196
0
0
0
0
20,196
Community Well Site
94/234
AR84850030
1700
Water CIC Bond
12,736
0
0
0
0
12,736
Total
12,736
0
0
0
0
12,736
Community Well Site 156
AR84850031
1700
Water CIC Bond
17,174
0
0
0
0
17,174
Total
17,174
0
0
0
0
17,174
Community Well Site
Security Gates and
Fences
AR84850035
1700
Water CIC Bond
312
0
0
0
0
312
Total
312
0
0
0
0
312
Cortez Park Well
Site/Arizona Canal
Project
AR84850036
1700
Water CIC Bond
8,950
0
0
0
8,950
Total
8,950
0
0
0
0
8,950
Happy Valley/I-17
Interchange
AR63850018
0007
AZ Highway Users
165,466
0
0
0
0
165,466
Total
165,466
0
0
0
0
165,466
Lift Stations and
Neighborhood Facilities
AR84900011
1701
Wastewater Bond 2019
311,818
0
0
0
0
311,818
Total
311,818
0
0
0
0
311,818
Light Rail Corridor Pha II
AR63000014
0090
Wastewater Bond 2019
20,534
0
0
0
0
20,534
Total
20,534
0
0
0
0
20,534
North 32nd Street Improv
AR63000030
0007
AHUR 30% Street Imp
200,000
0
0
0
0
200,000
1700
CIC Water Bond
15,000
0
0
0
0
15,000
Total
215,000
0
0
0
0
215,000
25
2020-25 Public Art Program Budget
Project Name
Project
Fund
Fund Name
FY
20-21
FY
21-22
FY
22-23
FY
23-24
FY
24-25
Total
20-25
PSHIA Portable Works
Collection
AR66000021
0042
Airport Improvement -
Sky Harbor
1,549
0
0
0
0
1,549
1732
2020 Airport Rev Bond
155,524
155,524
Total
157,073
0
0
0
0
157,073
PSHIA Sky Train Stage II
AR66000041
1731
CFC 2020 Bond
245,700
0
0
0
0
245,700
Total
245,700
0
245,700
RCC Sky Train Terrazzo
AR66000042
1731
CFC 2020 Bond
7,076
0
0
0
0
7,076
Total
7,076
0
0
0
0
7,076
24th Street Sky Train
Terrazzo
AR66000043
1430
PFC Non-Bond
7,647
0
0
0
0
7,647
Total
7,647
0
0
0
0
7,647
PSHIA T4 S1 Concourse
AR66000040
1732
2020 Airport Rev Bond
1,637,575
0
0
0
0
1,637,575
Total
1,637,575
0
0
0
0
1,637,575
PSHIA T-3 Mod. North
Concourse Bridge
AR66000037
1732
2020 Airport Rev. Bond
304,193
0
0
0
0
304,193
Total
304,193
0
0
0
0
304,193
PSHIA Terminal 3 Mod.
West Atrium
AR66000036
1732
2020 Airport Rev. Bond
78,317
0
0
0
0
78,317
Total
78,317
0
0
0
0
78,317
Public Works – 27th
Avenue Solid Waste
Management Facility
AR70160001
65909
Solid Waste - Mega IV
206,041
0
0
0
0
206,041
Total
206,041
0
0
0
0
206,041
Shade Project
AR67000011
2050
Transport Tax Transit
81,755
0
0
0
0
81,755
2051
Transport Tax Streets
159,192
0
0
0
0
159,192
Total
240,947
0
0
0
0
240,947
South Mountain Loop
202 Pedestrian Bridge
AR63850017
0007
AHUR 30% Streets Imp
1,811,904
0
0
0
0
1,811,904
Total
1,811,904
0
0
0
0
1,811,904
SR51 Artwork Retrofit
AR39000003
2051
Transport Tax Streets
135,811
0
0
0
0
135,811
Total
135,811
0
0
0
0
135,811
Thomas Rd Overpass
AR63850020
0007
AHUR 30% Street Imp
50,000
0
0
0
0
50,000
2051
T2050 Streets
99,809
0
0
0
0
99,809
Total
149,809
0
0
0
0
149,809
Tres Rios Wetlands
AR84900010
1701
Wastewater Bond 2019
1,680,315
0
0
0
0
1,680,315
Total
1,680,315
0
0
0
0
1,680,315
Van Buren Streetscape
AR63850019
0007
AHUR 30% Street Imp
69,633
0
0
0
0
69,633
Total
69,633
69,633
Water Public Art Master
Plan
AR84850013
1701
Wastewater Bond 2019
43,711
0
0
0
0
43,711
Total
43,711
0
0
0
0
43,711
Water Services West
Yard
AR84850033
1701
Wastewater Bond 2019
959,247
0
0
0
0
959,247
0007
AHUR 30% Streets Imp
200,000
0
0
0
0
200,000
1700
CIC Water Bond
3,170
0
0
0
0
3,170
Total
1,162,417
0
0
0
0
1,162,417
TOTAL
9,038,199
0
0
0
0
9,038,199