Staff Report: PHO-1-25--Z-20-17-2
November 5, 2025
*Revised
APPLICATION #:
PHO-1-25—Z-20-17-2
LOCATION:
Approximately 1,420 feet west of the northwest corner of
North Valley Parkway and Bronco Butte Trail
EXISTING ZONING:
C-2 M-R NBCOD
ACREAGE:
0.04
REQUEST:
1) Request to delete Stipulation 1 regarding detached
sidewalks.
2) Request to delete Stipulation 2 regarding street
improvements.
3) Request to delete Stipulation 4 regarding east and west
pedestrian connections along Paseo del Prado.
4) Request to delete Stipulation 5 regarding pedestrian
pathways.
5) Request to delete Stipulation 6 regarding the use of
artificial turf.
6) Request to delete Stipulation 7 regarding turf being used
in active retention basins.
7) Request to delete Stipulation 9 regarding the hotel
development.
8) Request to delete Stipulation 10 regarding color and
material palette for the buildings.
9) Request to delete Stipulation 11 regarding the glazing on
all building windows.
10) Request to delete Stipulation 12 regarding screening of
service areas.
11) Request to delete Stipulation 13 regarding a minimum
landscape setback along property lines adjacent to public
right-of-way.
12) Request to delete Stipulation 14 regarding the Bronco
Butte Water Tank preservation.
13) Request to delete Stipulation 15 regarding view corridors
of Bronco Butte, Pyramid Peak, Union Hills, and No Name
Mountain.
ATTACHMENT B
Staff Report-PHO-1-25--Z-20-17-2
November 6, 2025 Planning Commission
Page 2 of 11
14) Request to delete Stipulation 16 regarding maximum
building height.
15) Request to delete Stipulation 17 regarding sufficient
right-of-way for a collector street.
16) Request to delete Stipulation 18 regarding sewer force
main construction.
17) Request to delete Stipulation 19 regarding approval of
offsite paving plans.
18) Request to delete Stipulation 20 regarding updating the
Sonoran Foothills PCD Street Master Plan.
APPLICANT:
Declan Murphy on behalf of TWC
OWNER:
Robert Jr. and Sabrina Eaton
REPRESENTATIVE:
Declan Murphy on behalf of TWC
STAFF RECOMMENDATION
Denial as filed, approval with modifications, per the Planning Hearing Officer (PHO)
recommendation.
PLANNING HEARING OFFICER RECOMMENDATION
On August 20, 2025, the Planning Hearing Officer took the case under advisement. On
September 16, 2025, the Planning Hearing Officer took the case out from under
advisement and recommended denial as filed, approval with modifications.
VILLAGE PLANNING COMMITTEE RECOMMENDATION
The North Gateway Village Planning Committee heard this request on August 14, 2025
and recommended approval, with a modification by a vote of 8-0.
BACKGROUND/ANALYSIS
The subject site consists of 0.04-gross acres located approximately 1,420 feet west of
the northwest corner of North Valley Parkway and Bronco Butte Trail and is zoned C-2
M-R NBCOD (Intermediate Commercial, Mid-Rise District, North Black Canyon Overlay
District). The subject property is only a portion of the 19.22 gross acres included in
original Rezoning Case No. Z-20-17-2. The applicant requested the following deletion
requests (Exhibit B):
• Request to delete Stipulation 1 regarding detached sidewalks.
• Request to delete Stipulation 2 regarding street improvements.
Staff Report-PHO-1-25--Z-20-17-2
November 6, 2025 Planning Commission
Page 3 of 11
• Request to delete Stipulation 4 regarding east and west pedestrian connections
along Paseo del Prado.
• Request to delete Stipulation 5 regarding pedestrian pathways.
• Request to delete Stipulation 6 regarding the use of artificial turf.
• Request to delete Stipulation 7 regarding turf being used in active retention
basins.
• Request to delete Stipulation 9 regarding the hotel development.
• Request to delete Stipulation 10 regarding color and material palette for the
buildings.
• Request to delete Stipulation 11 regarding the glazing on all building windows.
• Request to delete Stipulation 12 regarding screening of service areas.
• Request to delete Stipulation 13 regarding a minimum landscape setback along
property lines adjacent to public right-of-way.
• Request to delete Stipulation 14 regarding the Bronco Butte Water Tank
preservation.
• Request to delete Stipulation 15 regarding view corridors of Bronco Butte,
Pyramid Peak, Union Hills, and No Name Mountain.
• Request to delete Stipulation 16 regarding maximum building height.
• Request to delete Stipulation 17 regarding sufficient right-of-way for a collector
street.
• Request to delete Stipulation 18 regarding sewer force main construction.
• Request to delete Stipulation 19 regarding approval of offsite paving plans.
• Request to delete Stipulation 20 regarding updating the Sonoran Foothills PCD
Street Master Plan.
The conceptual site plan date stamped June 2, 2025 depicts a proposed Wireless
Communication Facility (WCF) (600 square feet) to address a gap in coverage for T-
Mobile (Exhibit I). The conceptual elevations date stamped June 2, 2025 depict an
85-foot tall WCF with proposed 30-foot X 20-foot, eight-foot-tall block wall and a
metal entry gate (Exhibit J).
The appellant argues the PHO the stipulations requested to be deleted are pertinent to
a conventional commercial development rather than the proposed utility infrastructure.
However, despite the PHO's concurrence, the decision is holding up the WCF
development process significantly for an essential utility for the area.
PREVIOUS HISTORY
On July 5, 2018, the Phoenix City Council heard Rezoning Case No. Z-20-17-2, a
request to rezone approximately 19.22 acres located approximately 220 feet north of
the northwest corner of the 27th Avenue alignment and Northern Foothills Drive
alignment from PCD NBCOD (Planned Community District, North Black Canyon
Overlay District), approved C-2/CP M-R PCD NBCOD (Intermediate Commercial or
Commerce Park, Mid-Rise, Planned Community Development, North Black Canyon
Overlay District) to C-2 M-R NBCOD (Intermediate Commercial, Mid-Rise District, North
Black Canyon Overlay District) (Exhibit E). The proposed development was intended for
a sports arena and hotel. On June 7, 2018, The Planning Commission recommended
Staff Report-PHO-1-25--Z-20-17-2
November 6, 2025 Planning Commission
Page 4 of 11
approval per the Addendum A Staff Report by a 6-0 vote. The City Council
recommended approval of the request per the Planning Commission’s recommendation
and approved C-2 M-R NBCOD (Intermediate Commercial, Mid-Rise District, North
Black Canyon Overlay District).
NEIGHBORHOOD CONCERNS
Public Correspondence
No public correspondence was received for this case.
GENERAL PLAN LAND USE MAP DESIGNATION
Mixed Use (Commercial / Commerce/Business Park)
CHARACTER OF SURROUNDING LAND USE
Zoning
Land Use
On-site
(overall development site):
C-2 M-R NBCOD
Vacant land
North:
CP/GCP M-R NBCOD
Vacant land
East:
CP/GCP M-R PCD NBCOD
Research, development,
manufacturing, production,
and shipping
South:
C-2 M-R NBCOD
Proposed Sports Arena and
Hotel
West:
C-2 M-R NBCOD
Proposed Sports Arena
PLANNING HEARING OFFICER FINDINGS
1) The request to delete Stipulation 1 regarding detached sidewalks is recommended to
be denied as filed with a modification to add language to specify the area of the
required off-site improvements. Stipulation 1 establishes the design requirements for
the construction of the sidewalk within the adjacent Bronco Butte right-of-way. As the
half street right-of-way, adjacent to the subject site, has not been improved as
required by City Code Section 31-91, the Street Transportation Department does not
support the applicant’s requested removal. The stipulation’s conditions are
applicable to the site and have not been met. If the developer to the south is first to
develop the site and completes the required improvements, the stipulation will be
met.
Staff Report-PHO-1-25--Z-20-17-2
November 6, 2025 Planning Commission
Page 5 of 11
City Code Section 31-91: “No building permit shall be issued for new
construction…which abuts any existing or future street right-of-way unless the
one-half of such abutting right-of-way which is located on the same side of the
center of the street as such lot or parcel of land has been dedicated and
improved, or installation of improvements has been assured, for the full width of
the lot or parcel where it abuts so as to meet the standards for each right-of-
way…”
2) The request to delete Stipulation 2 regarding street improvements is recommended
to be denied as filed with a modification to add language to specify the area of the
required off-site improvements.
Stipulation 2 establishes the obligations pertaining to the required construction of
the adjacent Bronco Butte right-of-way. As the half street right-of-way, adjacent
to the subject site, has not been improved as required by City Code Section 31-
91, the Street Transportation Department does not support the applicant’s
requested removal. As the subject site is directly adjacent to the Bronco Butte
right-of-way, the stipulation’s conditions are applicable to the site and have not
been met.
3) The request to delete Stipulation 4 regarding east and west pedestrian connections
along Paseo del Pardo is recommended to be denied. The Paseo is not planned to
be constructed on this portion of the original rezoning case boundary and will
therefore not affect this proposal.
4) The request to delete Stipulation 5 regarding pedestrian pathways is recommended
to be denied. There will not be pedestrian pathways on this parcel so this stipulation
will not affect this proposal.
5) The request to delete Stipulation 6 regarding the use of artificial turf is recommended
to be denied. There is no need to delete the stipulation especially if the applicant
does not intend to install artificial turf.
6) The request to delete Stipulation 7 regarding turf being used in active retention
basins is recommended to be denied. There is no need to delete the
stipulation especially if the applicant does not intend to install artificial turf.
7) The request to delete Stipulation 9 regarding the hotel development is not applicable
to this corner of the original rezoning boundary and is not recommended to be
deleted.
8) The request to delete Stipulation 10 regarding color and material palette for the
buildings is recommended to be denied. Any building that is planned to support
the WCF shall meet this stipulation.
9) The request to delete Stipulation 11 regarding the glazing on all building windows
shall also remain. There is no reason to delete this requirement for window
glazing.
Staff Report-PHO-1-25--Z-20-17-2
November 6, 2025 Planning Commission
Page 6 of 11
10) The request to delete Stipulation 12 regarding screening of service areas is
recommended to be denied. If any service areas are planned for the WCF
and associated support building, the requirement for screening shall
remain.
11) The request to delete Stipulation 13 regarding a minimum landscape setback along
property lines adjacent to public right-of-way is recommended to be denied. This
stipulation is standard for all developments in the C-2 zoning district.
12) The request to delete Stipulation 14 regarding the Bronco Butte Water Tank
preservation is recommended to be denied. The Bronco Butte Water Tank is not on
this site, and this proposal is not affected by the stipulation.
13) The request to delete Stipulation 15 regarding view corridors of Bronco Butte,
Pyramid Peak, Union Hills, and No Name Mountain is recommended to be denied.
The WCF and support building shall not block these view corridors as stipulated.
14) The request to delete Stipulation 16 regarding maximum building height is
recommended to be denied. The proposal is not asking for additional building height
so there the deletion of this stipulation is not required.
15) The request to delete Stipulation 17 regarding sufficient right-of-way for a collector
street is recommended to be denied. There are preliminary indications that all
necessary dedications have been provided for the Bronco Butte Trail collector
roadway, however, the Street Transportation Department does not support the
removal of the stipulation and requests it remain with the addition of the parcel
number clarifying the area of the required off-site improvements.
The right-of-way adjacent to the subject site is a key part of Bronco Butte’s transition
into the planned roundabout and while the Street Transportation Department doesn’t
anticipate additional right-of-way dedications, it is necessary to keep the stipulation
until the final construction designs have been reviewed and approved by the City of
Phoenix.
16) The request to delete Stipulation 18 regarding sewer force main construction is
recommended to be denied. This stipulation does not seem applicable to this
development and there is no reason to delete it.
17) The request to delete Stipulation 19 regarding approval of offsite paving plans is
recommended to be denied. The applicant has not provided any documentation
detailing how the stipulation has been met in the context of the required half-street
improvements. The stipulation pertains to the paving plans of the offsite
improvements to Bronco Butte Trail and as the subject site is required to construct
the necessary half-street improvements in the right-of-way, the stipulation applies to
the site and should not be removed until documentation has been received that the
stipulation has been met.
18) The request to delete Stipulation 20 regarding updating the Sonoran Foothills PCD
Street Master Plan is recommended to be approved. The obligation outlined in
Staff Report-PHO-1-25--Z-20-17-2
November 6, 2025 Planning Commission
Page 7 of 11
Stipulation 20 is required of the larger developer of the rezoned site, south of Bronco Butte.
PLANNING HEARING OFFICER RECOMMENDED STIPULATIONS
1.
All sidewalks shall be detached with a minimum five-foot wide landscaped
strip located between the sidewalk and back of curb and shall include
minimum two-inch caliper shade trees planted a minimum of 20 feet on
center or equivalent groupings along both sides of the sidewalk, ADJACENT
TO APN 204-12-980, as approved by the Planning and Development
Department. The landscape strip shall be installed by the developer and
maintained by property owner.
2.
The developer shall construct all streets within and adjacent to APN 204-12-
980 the development with paving, curb, gutter, sidewalk, curb ramps,
streetlights, median islands, landscaping and other incidentals, as per plans
approved by the Planning and Development Department. All improvements
shall comply with all ADA accessibility standards.
3.
In the event archaeological materials are encountered during construction,
the developer shall immediately cease all ground disturbing activities within a
33-foot radius of the discovery, notify the City Archaeologist, and allow time
for the Archaeology Office to properly assess the materials.
4.
The east and west pedestrian connection (Paseo del Prado) shall be
provided in accordance with the North Gateway Core Plan, as modified by
the following stipulations and approved by the Planning and Development
Department:
a.
The Paseo del Prado shall align with the Bronco Butte Tank and
continue through the site to the west.
b.
A pedestrian access easement of 20 feet shall be dedicated for the
pedestrian connection (Paseo del Prado). of the 20 feet, 12 feet shall
remain completely free of any pedestrian impediments, including
benches. The remaining 8 feet may be used for pedestrian friendly
uses such as restaurant seating, vendor stalls, artist displays, etc.
c.
A minimum of 50% of the 20-foot pedestrian access easement for the
Paseo del Prado shall be shaded by a structure, landscaping or a
combination of the two.
d.
The site shall be designed in such a manner that the building
placement creates an alignment and synergy for the Paseo del Prado.
This can be achieved by placing active uses such as outdoor seating,
restaurants and retail along the pedestrian path.
Staff Report-PHO-1-25--Z-20-17-2
November 6, 2025 Planning Commission
Page 8 of 11
5.
All pedestrian pathways, including those that intersect vehicular traffic lanes,
shall be constructed with decorative pavers, stamped or colored concrete, or
another material other than those used to pave the parking surfaces and
drive aisles, as approved by the Planning and Development Department.
6.
The use of artificial turf is prohibited in areas visible from public right-of-way
or parking lots, as approved by the Planning and Development Department.
7.
Turf shall only be used in active retention basins, as approved by the
Planning and Development Department.
8.
All retention areas shall be natural and organic in shape, as approved by the
Planning and Development Department.
9.
The hotel development shall be in general conformance with the elevations
date stamped April18, 2018, with specific regard to the massing, articulation,
window placement and building entry, as approved by the Planning and
Development Department.
10.
The color and material palette for the buildings shall be determined at site
plan review and shall comply with the North Black Canyon Overlay District,
with specific regard to colors being muted and blend with, rather than
contrast strongly, with the surrounding desert environment, as approved by
the Planning and Development Department.
11.
The glazing on all building windows shall have a maximum reflectivity of 20%,
as approved by the Planning and Development Department.
12.
All service areas must be screened to conceal trash containers, recycling
containers, loading docks, transformers, backflow preventers and other
mechanical and or electrical equipment from eye level adjacent to all public
streets and private drives, as approved by the Planning and Development
Department.
13.
A minimum landscape setback of 10 feet shall be required along property
lines that are not adjacent to public right-of-way and planted in accordance
with C-2 planting size and spacing standards, as approved by the Planning
and Development Department.
14.
The Bronco Butte Water Tank shall be fully preserved, in place, as it naturally
occurs and shall be identified on all site plan documents through permitting to
ensure preservation.
Staff Report-PHO-1-25--Z-20-17-2
November 6, 2025 Planning Commission
Page 9 of 11
15.
View corridors of Bronco Butte, Pyramid Peak, Union Hills and No Name
Mountain, as shown on Exhibit B in the North Gateway Core Plan, shall be
retained through building placement and step backs, as approved by the
Planning and Development Department.
16.
Maximum building height shall be limited to 60 feet. The maximum square
footage of the sports arena shall be 180,000 square feet and the maximum
square footage of the hotel shall be 60,000 square feet. Any request to
increase building height or building square footage beyond the stipulated
height and square footages shall not be approved unless all of the following
occur:
a.
A water report is submitted to and approved by the Water Services
Department which demonstrates that sufficient water capacity exists or
is being provided by the developer of this parcel;
b.
A wastewater report is submitted to and approved by the Water
Services Department which demonstrates that sufficient wastewater
capacity exists or is being provided by the developer of this parcel; and
c.
A traffic study is submitted to and approved by the Street
Transportation Department which demonstrates that street
improvements (existing and/or proposed) are sufficient to serve the
site.
17.
Sufficient right-of-way for a collector shall be dedicated ADJACENT TO APN
204-12-980 for the extension of Bronco Butte Trail as necessary to establish
an alignment to tie into the current terminus at the Bronco Tank and transition
to a half-street where the alignment is able to assume an alignment at the
north property line for the extension of Bronco Butte Trail west to the 29th
Avenue alignment, unless an alternative route is approved or modified by the
Street Transportation Department and the Planning and Development
Department.
18.
Any construction of a sewer force main, intended as a temporary sewer
solution for the subject property, must be designed and constructed in a
manner that minimizes the impacts to truck circulation (as necessary to
maintain traffic flow to and from the W.L. Gore campus at the Bronco Butte
driveway for a WB-67 vehicle).
19.
Prior to the approval of the offsite paving plans for the project, the developer
shall update the restriping plan for the intersection of North Valley Parkway
and Bronco Butte Trail. The restriping plan shall be in general conformance
to the restriping plan date stamped June 28, 2018, as approved by the Street
Transportation Department and the Planning and Development Department.
The developer shall be responsible for all improvements. The developer shall
provide documentation that the restriping plan was submitted to W.L. Gore
prior to submittal of off-site paving plan.
Staff Report-PHO-1-25--Z-20-17-2
November 6, 2025 Planning Commission
Page 10 of 11
20.
Prior to final site plan approval, the developer shall work with the adjacent
property owners to update the Sonoran Foothills PCD Street Master Plan to
address the following for the intersection of North Valley Parkway and Bronco
Butte Trail, as approved or modified by the Street Transportation Director and
the Planning and Development Director as outlined in a forthcoming letter
addressing the following:
a.
Planned roadway and striping improvements
b.
Identify existing contributions to the traffic signal infrastructure
c., Clarify responsibilities for future traffic infrastructure
20.
21.
The developer shall notify the following individuals by mail 15 days prior to
any preapplication or preliminary site plan review meetings with the
Planning and Development Department. The notice shall include the date,
time and location of the meeting.
a.
Brent Roberts
W.L. Gore
32470 N. North Valley Parkway
Phoenix, AZ 85085
b.
Heidi Kimball
Sunbelt Holdings
6720 N. Scottsdale Road, Suite 250
Scottsdale, AZ. 85253
21.
22.
The developer shall notify the following individuals by mail 10 days prior to
the submittal of the final site plan for approval by the Planning and
Development Department.
a.
Brent Roberts
W.L. Gore
32470 N. North Valley Parkway
Phoenix, AZ 85085
b.
Heidi Kimball
Sunbelt Holdings
6720 N. Scottsdale Road, Suite 250
Scottsdale, AZ 85253
Exhibits:
A- Appeal Documents (5 pages)
B- Applicant’s Narrative for PHO-1-25--Z-20-17-2 (10 pages)
Staff Report-PHO-1-25--Z-20-17-2
November 6, 2025 Planning Commission
Page 11 of 11
C- Aerial Map*
D- Zoning Map*
E- Ordinance G-6484 for Z-20-17-2 (8 pages)
F- Sketch Map for Z-20-17-2
G- PHO Summary for PHO-1-25--Z-20-17-2 from August 20, 2025 (10 pages)
H- VPC Summary for PHO-1-25--Z-20-17-2 from August 14, 2025 (7 pages)
I- Conceptual Site Plan, date stamped June 2, 2025 (2 pages)
J- Conceptual Elevations, date stamped June 2, 2025
K- Stipulated Site Plan for Z-20-17-2
L- Stipulated Elevations for Z-20-17-2 (2 pages)
M-Renderings (3 pages)
EXHIBIT A
(;+,%,7%
Page
1
Planning Hearing Officer Request
Project: AMND: 18-1196A2A
Parcel: 204-12-980
RE: Zoning Case: Z–20–17
Date: 7/15/2025
Justification Narrative for Relief/Modification of the Z–20–17
Stipulations as it pertains to the Proposed Wireless Communication
Facility (WCF) to be located on Parcel 204-12-980
TowerCom, on behalf of T-Mobile respectfully requests full relief/modification of
19 of the 22 stipulations outlined under Zoning Case Z–20–17 as it pertains
to the proposed Wireless Communication Facility (WCF) to be located on vacant
parcel 204-12-980. This request is grounded in the urgent and well-documented
need for improved wireless coverage in this rapidly growing North Phoenix
Neighborhood, and the unique circumstances associated with the subject parcel.
Background and Site Context
The proposed WCF site is strategically located adjacent to the parcel formerly
known as the Legacy Sports Complex (parcel 204-12-979), which is now under
new ownership. TowerCom/T-Mobile have actively pursued this project for over
three years, navigating a series of delays primarily due to the parcel’s prior
linkage to the Legacy Sport Complex development. That connection no longer
exists. Furthermore, drainage comments and infrastructure concerns tied to the
Legacy Sport Complex project are no longer applicable to the subject parcel,
which now stands independently.
Although the future of the Legacy Sport Complex site remains uncertain, whether
it will be developed, repurposed, or sold, it’s clear that any future development
will trigger the full scope of stipulations and infrastructure requirements
associated with Z–20–17. However, the WCF in question is a standalone utility
installation, not a large-scale commercial development, and should not be
subject to the same stipulations intended for a significantly more complex and
impactful project.
Page
2
Requested Stipulation Modifications
Stipulation 1
1. All sidewalks shall be detached with a minimum five-foot wide landscaped
strip located between the sidewalk and back of curb, and shall include
minimum two-inch caliper shade trees planted a minimum of 20 feet on
center or equivalent groupings along both sides of the sidewalk, as approved
by the Planning and Development Department. The landscape strip shall be
installed by the developer and maintained by property owner.
This Stipulation is not pertinent to utility infrastructure such as the
proposed WCF on Parcel: 204-12-980, with ample precedent
throughout the City of Phoenix as it relates to the placement of
comparable WCF’s since the adoption of Section 715. Satellite Earth
Stations And Wireless Communication Facilities.
Stipulation 2
2. The developer shall construct all streets within and adjacent to the
development with paving, curb, gutter, sidewalk, curb ramps, streetlights,
median islands, landscaping and other incidentals, as per plans approved by
the Planning and Development Department. Al improvements shall comply
with all ADA accessibility standards.
This Stipulation is not pertinent to utility infrastructure such as the
proposed WCF on Parcel: 204-12-980, with ample precedent
throughout the City of Phoenix as it relates to the placement of
comparable WCF’s since the adoption of Section 715. Satellite Earth
Stations And Wireless Communication Facilities.
Stipulation 3
3. In the event archaeological materials are encountered during construction,
the developer shall immediately cease all ground disturbing activities within a
33-foot radius of the discovery, notify the City Archaeologist, and allow time
for the Archaeology Office to properly assess the materials.
Stipulation 4
4. The east west pedestrian connection (Pase0 del Prado) shall be provided in
accordance with the North Gateway Core Plan, as modified by the following
stipulations and approved by the Planning and Development Department:
a. The Paseo del Prado shall align with the Bronco Butte Tank and
continue through the site to the west.
Page
3
b. A pedestrian access easement of 20 feet shall be dedicated for the
pedestrian connection (Paseo del Prado). Of the 20 feet, 12 feet shall
remain completely free of any pedestrian impediments, including
benches. The remaining 8 feet may be used for pedestrian friendly
uses such as restaurant seating, vendor stalls, artist displays, etc.
c. A minimum of 50% of the 20-foot pedestrian access easement for the
Paseo del Prado shall be shaded by a structure, landscaping or a
combination of the two.
d. The site shall be designed in such a manner that the building
placement creates an alignment and synergy for the Paseo del Prado.
This can be achieved by placing active uses such as outdoor seating,
restaurants and retail along the pedestrian path.
This Stipulation is not pertinent to utility infrastructure such as the
proposed WCF on Parcel: 204-12-980, with ample precedent
throughout the City of Phoenix as it relates to the placement of
comparable WCF’s since the adoption of Section 715. Satellite Earth
Stations And Wireless Communication Facilities.
Stipulation 5
5. All pedestrian pathways, including those that intersect vehicular traffic lanes,
shall be constructed with decorative pavers, stamped or colored concrete, or
another material other than those used to pave the parking surfaces and drive
aisles, as approved by the Planning and Development Department.
This Stipulation is not pertinent to utility infrastructure such as the
proposed WCF on Parcel: 204-12-980, with ample precedent
throughout the City of Phoenix as it relates to the placement of
comparable WCF’s since the adoption of Section 715. Satellite Earth
Stations And Wireless Communication Facilities.
Stipulation 6
6. The use of artificial turf is prohibited in areas visible from public right-of-way
or parking lots, as approved by the Planning and Development Department.
This Stipulation is not pertinent to utility infrastructure such as the
proposed WCF on Parcel: 204-12-980, with ample precedent
throughout the City of Phoenix as it relates to the placement of
comparable WCF’s since the adoption of Section 715. Satellite Earth
Stations And Wireless Communication Facilities.
Stipulation 7
7. Turf shall only be used in active retention basins, as approved by the Planning
and Development Department.
Page
4
This Stipulation is not pertinent to utility infrastructure such as the
proposed WCF on Parcel: 204-12-980, with ample precedent
throughout the City of Phoenix as it relates to the placement of
comparable WCF’s since the adoption of Section 715. Satellite Earth
Stations And Wireless Communication Facilities.
Stipulation 8
8. All retention areas shall be natural and organic in shape, as approved by the
Planning and Development Department.
This Stipulation is not pertinent to utility infrastructure such as the
proposed WCF on Parcel: 204-12-980, with ample precedent
throughout the City of Phoenix as it relates to the placement of
comparable WCF’s since the adoption of Section 715. Satellite Earth
Stations And Wireless Communication Facilities.
Stipulation 9
9. The hotel development shall be in general conformance with the elevations
date stamped April 18, 2018, with specific regard to the massing, articulation,
window placement and building entry, as approved by the Planning and
Development Department.
This Stipulation is not pertinent to utility infrastructure such as the
proposed WCF on Parcel: 204-12-980, with ample precedent
throughout the City of Phoenix as it relates to the placement of
comparable WCF’s since the adoption of Section 715. Satellite Earth
Stations And Wireless Communication Facilities.
Stipulation 10
10. The color and material palette for the buildings shall be determined at site
plan review and shall comply with the North Black Canyon Overlay District, With
specific regard to colors being muted and blend with, rather than contrast
strongly, with the surrounding desert environment, as approved by the Planning
and Development Department.
This Stipulation is not pertinent to utility infrastructure such as the
proposed WCF on Parcel: 204-12-980, with ample precedent
throughout the City of Phoenix as it relates to the placement of
comparable WCF’s since the adoption of Section 715. Satellite Earth
Stations And Wireless Communication Facilities.
Stipulation 11
11. The glazing on all building windows shall have a maximum reflectivity of
20%, as approved by the Planning and Development Department.
Page
5
This Stipulation is not pertinent to utility infrastructure such as the
proposed WCF on Parcel: 204-12-980, with ample precedent
throughout the City of Phoenix as it relates to the placement of
comparable WCF’s since the adoption of Section 715. Satellite Earth
Stations And Wireless Communication Facilities.
Stipulation 12
12. All service areas must be screened to conceal trash containers, recycling
containers, loading docks, transformers, backflow preventers and other
mechanical and or electrical equipment from eye level adjacent to all public
streets and private drives, as approved by the Planning and Development
Department.
This Stipulation is not pertinent to utility infrastructure such as the
proposed WCF on Parcel: 204-12-980, with ample precedent
throughout the City of Phoenix as it relates to the placement of
comparable WCF’s since the adoption of Section 715. Satellite Earth
Stations And Wireless Communication Facilities.
Stipulation 13
13. A minimum landscape setback of 10 feet shall be required along property
lines that are not adjacent to public right-of-way and planted in accordance with
C-2 planting size and spacing standards, as approved by the Planning and
Development Department.
This Stipulation is not pertinent to utility infrastructure such as the
proposed WCF on Parcel: 204-12-980, with ample precedent
throughout the City of Phoenix as it relates to the placement of
comparable WCF’s since the adoption of Section 715. Satellite Earth
Stations And Wireless Communication Facilities.
Stipulation 14
14. The Bronco Butte Water Tank shall be fully preserved, in place, as it
naturally occurs and shall be identified on al site plan documents through
permitting to ensure preservation.
This Stipulation is not pertinent to utility infrastructure such as the
proposed WCF on Parcel: 204-12-980, with ample precedent
throughout the City of Phoenix as it relates to the placement of
comparable WCF’s since the adoption of Section 715. Satellite Earth
Stations And Wireless Communication Facilities.
Stipulation 15
Page
6
15. View corridors of Bronco Butte, Pyramid Peak, Union Hills and No Name
Mountain, as shown on Exhibit B in the North Gateway Core Plan, shall be
retained through building placement and step backs, as approved by the
Planning and Development Department.
This Stipulation is not pertinent to utility infrastructure such as the
proposed WCF on Parcel: 204-12-980, with ample precedent
throughout the City of Phoenix as it relates to the placement of
comparable WCF’s since the adoption of Section 715. Satellite Earth
Stations And Wireless Communication Facilities.
Stipulation 16
16. Maximum building height shall be limited to 60 feet. The maximum square
footage of the sports arena shall be 180,000 square feet and the maximum
square footage of the hotel shall be 60,000 square feet. Any request to increase
building height or building square footage beyond the stipulated height and
square footages shall not be approved unless all of the following occur:
a. A water report is submitted to and approved by the Water Services
Department which demonstrates that sufficient water capacity exists
or is being provided by the developer of this parcel;
b. A wastewater report is submitted to and approved by the Water
Services Department which demonstrates that sufficient wastewater
capacity exists or is being provided by the developer of this parcel;
and
c. A traffic study is submitted to and approved by the Street
Transportation Department which demonstrates that street
improvements (existing and/or proposed) are sufficient to serve the
This Stipulation is not pertinent to utility infrastructure such as the
proposed WCF on Parcel: 204-12-980, with ample precedent
throughout the City of Phoenix as it relates to the placement of
comparable WCF’s since the adoption of Section 715. Satellite Earth
Stations And Wireless Communication Facilities.
Stipulation 17
17. Sufficient right-of-way for a collector shall be dedicated for the extension of
Bronco Butte Trail as necessary to establish an alignment to tie into the current
terminus at the Bronco Tank and transition to a half-street where the alignment
is able to assume an alignment at the north property line for the extension of
Bronco Butte Trail west to the 29th Avenue alignment, unless an alternative
route is approved or modified by the Street Transportation Department and the
Planning and Development Department.
Page
7
This Stipulation is not pertinent to utility infrastructure such as the
proposed WCF on Parcel: 204-12-980, with ample precedent
throughout the City of Phoenix as it relates to the placement of
comparable WCF’s since the adoption of Section 715. Satellite Earth
Stations And Wireless Communication Facilities.
Stipulation 18
18. Any construction of a sewer force main, intended as a temporary sewer
solution for the subject property, must be designed and constructed in a manner
that minimizes the impacts to truck circulation (as necessary to maintain traffic
flow to and from the W.L. Gore campus at the Bronco Butte driveway for a WB-
67 vehicle).
This Stipulation is not pertinent to utility infrastructure such as the
proposed WCF on Parcel: 204-12-980, with ample precedent
throughout the City of Phoenix as it relates to the placement of
comparable WCF’s since the adoption of Section 715. Satellite Earth
Stations And Wireless Communication Facilities.
Stipulation 19
19. Prior to the approval of the offsite paving plans for the project, the
developer shall update the restriping plan for the intersection of North Valley
Parkway and Bronco Butte Trail. The restriping plan shall be in general
conformance to the restriping plan date stamped June 28, 2018, as approved by
the Street Transportation Department and the Planning and Development
Department. The developer shall be responsible for all improvements. The
developer shall provide documentation that the restriping plan was submitted to
W.L. Gore prior to submittal of off-site paving plan.
This Stipulation is not pertinent to utility infrastructure such as the
proposed WCF on Parcel: 204-12-980, with ample precedent
throughout the City of Phoenix as it relates to the placement of
comparable WCF’s since the adoption of Section 715. Satellite Earth
Stations And Wireless Communication Facilities.
Stipulation 20
20. Prior to final site plan approval, the developer shall work with the adjacent
property owners to update the Sonoran Foothills PCD Street Master Plan to
address the following for the intersection of North Valley Parkway and Bronco
Butte Trail, as approved or modified by the Street Transportation Director and
the Planning and Development Director as outlined in a forthcoming letter
addressing the following:
a. Planned roadway and striping improvements
b. Identify existing contributions to the traffic signal infrastructure
Page
8
c. Clarify responsibilities for future traffic infrastructure
This Stipulation is not pertinent to utility infrastructure such as the
proposed WCF on Parcel: 204-12-980, with ample precedent
throughout the City of Phoenix as it relates to the placement of
comparable WCF’s since the adoption of Section 715. Satellite Earth
Stations And Wireless Communication Facilities.
Stipulation 21
21. The developer shall notify the following individuals by mail 15 days prior to
any preapplication or preliminary site plan review meetings with the Planning and
Development Department. The notice shall include the date, time and location of
the meeting.
a. Brent Roberts
W.L. Gore
32470 N. North Valley Parkway
Phoenix, AZ 85085
b. Heidi Kimball
Sunbelt Holdings
6720 N. Scottsdale Road, Suite 250
Scottsdale, AZ 85253
Stipulation 22
22. The developer shall notify the following individuals by mail 10 days prior to
the submittal of the final site plan for approval by the Planning and
Development Department.
a. Brent Roberts
W.L. Gore
32470 N. North Valley Parkway
Phoenix, AZ 85085
b. Heidi Kimball
Sunbelt Holdings
6720 N. Scottsdale Road, Suite 250
Scottsdale, AZ 85253
Page
9
Essential Utility Status of Wireless Service
Wireless communication is no longer a luxury or convenience, it is an essential
utility on par with water and electricity. The proposed WCF will directly address a
significant coverage GAP that has impacted residents, businesses, and
emergency response operations in this fast-growing area. The growth in
residential and commercial activity throughout this part of the North Phoenix
necessitates immediate and reliable access to wireless services. As such, delaying
or obstructing this WCF due to unrelated development stipulations imposes a
direct and avoidable burden on public welfare.
Importantly, this WCF has already attracted interest from two carriers, with
expectations that all three major wireless carriers operating in this market will
co-locate at this site once operational. The proposed WCF location removed from
the nearest residential and multi-carrier capacity makes this site nearly ideal from
both a technical and planning perspective.
Consistency with Citywide Standards
It is important to note that typical WCFs located within the City of Phoenix,
particularly those in commercial zones are generally only required to meet basic
dustproof access standards. They are not subject to extensive Street
infrastructure, grading/drainage review unless warranted by unique site-specific
concerns. Applying the full breadth of Z–20–17 stipulations to this WCF
installation would represent a departure from standard City of Phoenix practices,
creating inconsistency in the treatment of essential utility infrastructure, and
departure from precedent.
Public Safety and Community Benefit
Beyond its utility value, the proposed WCF is vital to enhancing public safety.
Reliable wireless communication underpins emergency services, disaster
response, 911 accessibility, and medical outreach. This is a rapidly growing area
where development is ongoing and populations are expanding, so ensuring
immediate access to wireless coverage is not just a convenience, it is a public
safety obligation.
Conclusion
In light of the above, TowerCom/T-Mobile respectfully urges the City of Phoenix
to grant full relief from the 22 stipulations outlined in Z–20–17. The proposed
WCF is a critical piece of utility infrastructure, not a conventional commercial
development, and should be treated as such. The site is uniquely positioned to
provide maximum benefit to the community with minimal impact, and serves the
broader public interest in ensuring equitable, reliable access to wireless
communication services.
Page 10
Please let me know if you need any additional information.
Sincerely,
Declan Murphy
TowerCom/T-Mobile
8283 N Hayden Road, Suite 258, Scottsdale AZ 85258
Tel: (602) 326-0111
Email: dmurphy@coal-creek.com
EXHIBIT C
W BRONCO BUTTE TRL
mapservices@phoenix.gov
Planning & Development Department
PHO-1-25--Z-20-17-2
Property Location: Approximately 1,420 feet west of the northwest corner of
North Valley Parkway and Bronco Butte Trail
0
60
120
30
Feet ´
EXHIBIT D
W BRONCO BUTTE TRL
C-2 M-R*
CP/GCP
M-R PCD*
CP/GCP M-R
NBCOD*
PCD*
Planning & Development Department
PHO-1-25--Z-20-17-2
Property Location: Approximately 1,420 feet west of the northwest corner of
North Valley Parkway and Bronco Butte Trail
0
60
120
30
Feet ´
EXHIBIT E
EXHIBIT F
* Maximum Units Allowed with P.R.D. Bonus
APPLICANT'S NAME:
DATE:
REVISION DATES:
REQUESTED CHANGE:
GROSS AREA INCLUDING 1/2 STREET
AND ALLEY DEDICATION IS APPROX.
AERIAL PHOTO &
QUARTER SEC. NO.
ZONING MAP
MULTIPLES PERMITTED
CONVENTIONAL OPTION
* UNITS P.R.D. OPTION
FROM:
TO:
PY
R
AM
ID PEAK PKWY
51ST AVE
19TH AVE
CAREFREE HWY
DOVE VALLEY RD
DYNAMITE RD
I-17
APPLICATION NO.
City of Phoenix Planning Commission
Z-20-17
19.22 Acres
08/10/2017
QS 55-22
Q-7
NORTH GATEWAY VILLAGE
Z-20-17
INTER
*
*
*
*
*
*
*
*
*
*
*
*
Z-29-02
Z-125-06
Z-43-99
Z-34-01
Z-43-99
Z-57-05
Z-43-99
Z-43-99
Z-43-99
Z-43-99
Z-43-99
Z-34-01
Z-
Z-12-11
Z-6-12
Z-6-12
Z-29-02
PCD
FH
PCD
R-2
C-2
M-R
PCD
CP/GCP
PCD
R-3A PCD
R1-6 PCD
PCD
R-2
R1-6 PCD
PCD
PCD
PCD
PCD
Z-34-01
C-2 HGT/WVR
R-2
R-3A
C-2 M-R
S-1
North Black Canyon
Corridor Plan
and Overlay District
W SONORAN DESERT DR
W JAKE HVN
W
N
ORTH
F
OO
T
HI
LLS DR
N
24TH
DR
W BRON
C
O
BUTT
E T
R
L
N
23RD
A
VE
W
DUSTY WREN DR
N N
ORT
H
VALLE
Y PKW
Y
R1-6 PCD *
C-2/CP
M-R PCD *
S-1
PCD
C-2/CP
M-R PCD *
R-2
PCD
R-4 PCD *
C-2/CP
M-R PCD *
S-1 PCD *
R1-8 PCD
C-2 PCD
S-1 PCD *
S-1 PCD *
S-1
PCD *
S-1 PCD *
S-1 PCD *
S-1
PCD *
C-2 PCD *
(C-2,C-P,
M-R) PCD
R-4 PCD *
R-2 PCD *
R1-6
PCD
900
0
900
450
Feet
\\one\pdd\Shared\Department Share\Information Systems\PL GIS\IS_Team\Core_Functions\Zoning\sketch_maps\2017\Z-20-17.mxd
PCD NBCOD (Approved C-2 / CP M-R PCD NBCOD)
C-2 M-R NBCOD
278
N/A, (334, N/A)
N/A, (278, N/A)
334
CITY COUNCIL DISTRICT: 2
I
PCD NBCOD
(Approved C-2 / CP M-R PCD NBCOD) (19.22 a.c.)
C-2 M-R NBCOD (19.22 a.c.)
04/18/2018
04/26/2018
EXHIBIT G
REPORT OF PLANNING HEARING OFFICER ACTION
Byron Easton, Planner III, Hearing Officer
Teresa Garcia, Planner I, Assisting
August 20, 2025
ITEM NO: 1
DISTRICT NO. 2
SUBJECT:
Application #:
PHO-1-25--Z-20-17-2
Location:
Approximately 1,420 feet west of the northwest corner of
North Valley Parkway and Bronco Butte Trail
Zoning:
C-2 M-R NBCOD
Acreage:
0.56
Request:
1)
Request to delete Stipulation 1 regarding detached
sidewalks.
2)
Request to delete Stipulation 2 regarding street
improvements.
3)
Request to delete Stipulation 4 regarding east and west
pedestiran connections along Paseo del Pardo.
4)
Request to delete Stipulation 5 regarding pedestrian
pathways.
5)
Request to delete Stipulation 6 regarding the use of
artificial turf.
6)
Request to delete Stipulation 7 regarding turf being used
in active retention basins.
7)
Request to delete Stipulation 9 regarding the hotel
development.
8)
Request to delete Stipulation 10 regarding color and
material palette for the buildings.
9)
Request to delete Stipulation 11 regarding the glazing
on all building windows.
10) Request to delete Stipulation 12 regarding screening of
service areas.
11) Request to delete Stipulation 13 regarding a minimum
landscape setback along property lines adjacent to
public right-of-way.
12) Request to delete Stipulation 14 regarding the Bronco
Butte Water Tank preservation.
13) Request to delete Stipulation 15 regarding view
corridors of Bronco Butte, Pyramid Peak, Union Hills,
and No Name Mountain.
14) Request to delete Stipulation 16 regarding maximum
building height.
Planning Hearing Officer Summary of August 20, 2025
Application PHO-1-25--Z-20-17-2
Page 2
15) Request to delete Stipulation 17 regarding sufficient
right-of-way for a collector street.
16) Request to delete Stipulation 18 regarding sewer force
main construction.
17) Request to delete Stipulation 19 regarding approval of
offsite paving plans.
18) Request to delete Stipulation 20 regarding updating the
Sonoran Foothills PCD Street Master Plan.
Applicant:
Declan Murphy on behalf of TWC
Owner:
Robert Jr. and Sabrina Eaton
Representative: Declan Murphy on behalf of TWC
ACTIONS:
Planning Hearing Officer Recommendation: The Planning Hearing Officer took
the case under advisement. On September 16, 2025, the Planning Hearing
Officer took the case out from under advisement and recommended denial as
filed, approval with modifications.
Village Planning Committee (VPC) Recommendation: The North Gateway Village
Planning Committee heard this request on August 14, 2025 and recommended
approval with a modification by a vote of 8-0.
DISCUSSION:
Declan Murphy, representative on behalf of TWC, introduced the subject site and
gave a background of the request. He stated the business is attempting to find a
location for Wireless Communication Facility (WCF) to address a gap in
coverage for T-Mobile. Mr. Murphy stated he submitted a minor site plan
amendment to include the proposed (WCF) and received comments pertaining to
the adjacent Legacy Sport Complex project. He noted a previous site plan
amendment was completed for this site. Mr. Murphy added that all stipulations
included in the PHO are regarding the sports complex project rather than the
implementation of the WCF. He noted this site plan amendment to include the
WCF has been approved and stipulated to seek relief of the stipulations through
the PHO process.
Byron Easton, Planning Hearing Officer, asked Mr. Murphy to clarify if he was
referring to the modification requests for the PHO case or the stipulations from
the initial rezoning case from 2017. Mr. Murphy confirmed he was referring to the
22 Stipulations from the original rezoning case. Mr. Easton also asked if Mr.
Murphy received approval of site plan amendment but was told he must do
stipulation modification. Mr. Murphy noted that was correct. He also added that
the original site plan amendment for the previous request was approved without
reference to any of the rezoning stipulations.
Planning Hearing Officer Summary of August 20, 2025
Application PHO-1-25--Z-20-17-2
Page 3
Mr. Easton asked who told Mr. Murphy the stipulation modification was
necessary.
Mr. Murphy responded that City Staff told him. He reiterated this review is for
relief for the square footage of the utility and there are minimal options for
wireless communication facilities to remediate the gap in coverage in this area.
He also noted that this facility is not only viable for T-Mobile but also Verizon and
AT&T waiting to be located on this site. He then gave background on wireless
communication facilities, public benefit and public safety due to most emergency
calls coming from wireless services. Mr. Murphy reiterated the stipulations to be
deleted for this wireless facility. He also drew reference to the Village Planning
Committee (VPC) Hearing where the Committee felt it was necessary for this
facility to meet Stipulation 10 as it is pertinent to this project, he stated he was
willing to comply.
Mr. Easton asked if the approved site plan for the WCF is included in the
presentation. Mr. Murphy said it was.
Mr. Murphy described the site plan amendment for the 600 sq ft utility. He noted
that it is fair to assume that once the larger portion of the site is developed all
stipulations of the rezoning case will be met, however for the WCF to be
responsible to meet all the stipulations is unreasonable.
Mr. Easton explained it is odd for the PHO to hear the case when the minor site
plan amendment has already been approved. He stated typically applicants
would process the PHO stipulation modification before a site plan is approved.
Mr. Murphy stated to his understanding he has site planning approval, however
in order to apply for the building permits, he must satisfy or gain relief from the
rezoning stipulations.
Mr. Easton stated that the request has gone through the North Gateway VPC
and was recommended approval 8-0. Mr. Easton stated he has no issues with
this request either, however he needs clarification interdepartmentally to rule on
this case. Mr. Easton took the case under advisement.
Mr. Murphy stated he should still be held to Stipulation 10.
Mr. Easton responded that he believes none of these stipulations should be
deleted as they pertain to the larger development of the site.
FINDINGS:
1) The request to delete Stipulation 1 regarding detached sidewalks is
recommended to be denied as filed with a modification to add language to
specify the area of the required off-site improvements.
Planning Hearing Officer Summary of August 20, 2025
Application PHO-1-25--Z-20-17-2
Page 4
Stipulation #1 establishes the design requirements for the construction of
the sidewalk within the adjacent Bronco Butte right-of-way. As the half
street right-of-way, adjacent to the subject site, has not been improved as
required by City Code Section 31-91, the Street Transportation
Department does not support the applicant’s requested removal. The
stipulation’s conditions are applicable to the site and have not been met.
If the developer to the south is first to develop the site and completes the
required improvements, the stipulation will be met.
City Code Section 31-91: “No building permit shall be issued for
new construction…which abuts any existing or future street right-of-
way unless the one-half of such abutting right-of-way which is
located on the same side of the center of the street as such lot or
parcel of land has been dedicated and improved, or installation of
improvements has been assured, for the full width of the lot or
parcel where it abuts so as to meet the standards for each right-of-
way…”
2) The request to delete Stipulation 2 regarding street improvements is
recommended to be denied as filed with a modification to add language to
specify the area of the required off-site improvements.
Stipulation #2 establishes the obligations pertaining to the required
construction of the adjacent Bronco Butte right-of-way. As the half street
right-of-way, adjacent to the subject site, has not been improved as
required by City Code Section 31-91, the Street Transportation
Department does not support the applicant’s requested removal. As the
subject site is directly adjacent to the Bronco Butte right-of-way, the
stipulation’s conditions are applicable to the site and have not been met.
3) The request to delete Stipulation 4 regarding east and west pedestiran
connections along Paseo del Pardo is recommended to be denied. The
Paseo is not planned to be constructed on this portion of the original
rezoning case boundary and will therefore not affect this proposal.
4) The request to delete Stipulation 5 regarding pedestrian pathways is
recommended to be denied. There will not be pedestrian pathways on
this parcel so this stipulation will not affect this proposal.
5) The request to delete Stipulation 6 regarding the use of artificial turf is
recommended to be denied. There is no need to delete the stipulation
especially if the applicant does not intend to install artificial turf.
6) The request to delete Stipulation 7 regarding turf being used in active
retention basins is recommended to be denied. There is no need to delete
Planning Hearing Officer Summary of August 20, 2025
Application PHO-1-25--Z-20-17-2
Page 5
the stipulation especially if the applicant does not intend to install artificial
turf.
7) The request to delete Stipulation 9 regarding the hotel development is not
applicable to this corner of the original rezoning boundary and is not
recommended to be deleted.
8) The request to delete Stipulation 10 regarding color and material palette
for the buildings is recommended to be denied. Any building that is
planned to support the WCF shall meet this stipulation.
9) The request to delete Stipulation 11 regarding the glazing on all building
windows shall also remain. There is no reason to delete this requirement
for window glazing.
10) The request to delete Stipulation 12 regarding screening of service areas
is recommended to be denied. If any service areas are planned for the
WCF and associated support building, the requirement for screening shall
remain.
11) The request to delete Stipulation 13 regarding a minimum landscape
setback along property lines adjacent to public right-of-way is
recommended to be denied. This stipulation is standard for all
developments in the C-2 zoning district.
12) The request to delete Stipulation 14 regarding the Bronco Butte Water
Tank preservation is recommended to be denied. The Bronco Butte
Water Tank is not on this site, and this proposal is not affected by the
stipulation.
13) The request to delete Stipulation 15 regarding view corridors of Bronco
Butte, Pyramid Peak, Union Hills, and No Name Mountain is
recommended to be denied. The WCF and support building shall not
block these view corridors as stipulated.
14) The request to delete Stipulation 16 regarding maximum building height is
recommended to be denied. The proposal is not asking for additional
building height so there the deletion of this stipulation is not required.
15) The request to delete Stipulation 17 regarding sufficient right-of-way for a
collector street is recommended to be denied. There are preliminary
indications that all necessary dedications have been provided for the
Bronco Butte Trail collector roadway, however, the Street Transportation
Department does not support the removal of the stipulation and requests it
remain with the addition of the parcel number clarifying the area of the
required off-site improvements.
Planning Hearing Officer Summary of August 20, 2025
Application PHO-1-25--Z-20-17-2
Page 6
The right-of-way adjacent to the subject site is a key part of Bronco Butte’s
transition into the planned roundabout and while the Street Transportation
Department doesn’t anticipate additional right-of-way dedications, it is
necessary to keep the stipulation until the final construction designs have
been reviewed and approved by the City of Phoenix.
16) The request to delete Stipulation 18 regarding sewer force main
construction is recommended to be denied. This stipulation does not
seem applicable to this development and there is no reason to delete it.
17) The request to delete Stipulation 19 regarding approval of offsite paving
plans is recommended to be denied. The applicant has not provided any
documentation detailing how the stipulation has been met in the context of
the required half-street improvements. The stipulation pertains to the
paving plans of the offsite improvements to Bronco Butte Trail and as the
subject site is required to construct the necessary half-street
improvements in the right-of-way, the stipulation applies to the site and
should not be removed until documentation has been received that the
stipulation has been met.
18) The request to delete Stipulation 20 regarding updating the Sonoran
Foothills PCD Street Master Plan is recommended to be approved. The
obligation outlined in Stipulation 20 is required of the larger developer of
the rezoned site, south of Bronco Butte.
STIPULATIONS:
1.
All sidewalks shall be detached with a minimum five-foot wide landscaped
strip located between the sidewalk and back of curb and shall include
minimum two-inch caliper shade trees planted a minimum of 20 feet on
center or equivalent groupings along both sides of the sidewalk,
ADJACENT TO APN 204-12-980, as approved by the Planning and
Development Department. The landscape strip shall be installed by the
developer and maintained by property owner.
2.
The developer shall construct all streets within and adjacent to APN 204-
12-980 the development with paving, curb, gutter, sidewalk, curb ramps,
streetlights, median islands, landscaping and other incidentals, as per
plans approved by the Planning and Development Department. All
improvements shall comply with all ADA accessibility standards.
3.
In the event archaeological materials are encountered during construction,
the developer shall immediately cease all ground disturbing activities
within a 33-foot radius of the discovery, notify the City Archaeologist, and
allow time for the Archaeology Office to properly assess the materials.
Planning Hearing Officer Summary of August 20, 2025
Application PHO-1-25--Z-20-17-2
Page 7
4.
The east and west pedestrian connection (Paseo del Prado) shall be
provided in accordance with the North Gateway Core Plan, as modified by
the following stipulations and approved by the Planning and Development
Department:
a.
The Paseo del Prado shall align with the Bronco Butte Tank and
continue through the site to the west.
b.
A pedestrian access easement of 20 feet shall be dedicated for the
pedestrian connection (Paseo del Prado). of the 20 feet, 12 feet shall
remain completely free of any pedestrian impediments, including
benches. The remaining 8 feet may be used for pedestrian friendly
uses such as restaurant seating, vendor stalls, artist displays, etc.
c.
A minimum of 50% of the 20-foot pedestrian access easement for the
Paseo del Prado shall be shaded by a structure, landscaping or a
combination of the two.
d.
The site shall be designed in such a manner that the building
placement creates an alignment and synergy for the Paseo del
Prado. This can be achieved by placing active uses such as outdoor
seating, restaurants and retail along the pedestrian path.
5.
All pedestrian pathways, including those that intersect vehicular traffic
lanes, shall be constructed with decorative pavers, stamped or colored
concrete, or another material other than those used to pave the parking
surfaces and drive aisles, as approved by the Planning and Development
Department.
6.
The use of artificial turf is prohibited in areas visible from public right-of-
way or parking lots, as approved by the Planning and Development
Department.
7.
Turf shall only be used in active retention basins, as approved by the
Planning and Development Department.
8.
All retention areas shall be natural and organic in shape, as approved by
the Planning and Development Department.
9.
The hotel development shall be in general conformance with the
elevations date stamped April18, 2018, with specific regard to the
massing, articulation, window placement and building entry, as approved
by the Planning and Development Department.
Planning Hearing Officer Summary of August 20, 2025
Application PHO-1-25--Z-20-17-2
Page 8
10.
The color and material palette for the buildings shall be determined at site
plan review and shall comply with the North Black Canyon Overlay District,
with specific regard to colors being muted and blend with, rather than
contrast strongly, with the surrounding desert environment, as approved
by the Planning and Development Department.
11.
The glazing on all building windows shall have a maximum reflectivity of
20%, as approved by the Planning and Development Department.
12.
All service areas must be screened to conceal trash containers, recycling
containers, loading docks, transformers, backflow preventers and other
mechanical and or electrical equipment from eye level adjacent to all
public streets and private drives, as approved by the Planning and
Development Department.
13.
A minimum landscape setback of 10 feet shall be required along property
lines that are not adjacent to public right-of-way and planted in accordance
with C-2 planting size and spacing standards, as approved by the
Planning and Development Department.
14.
The Bronco Butte Water Tank shall be fully preserved, in place, as it
naturally occurs and shall be identified on all site plan documents through
permitting to ensure preservation.
15.
View corridors of Bronco Butte, Pyramid Peak, Union Hills and No Name
Mountain, as shown on Exhibit B in the North Gateway Core Plan, shall be
retained through building placement and step backs, as approved by the
Planning and Development Department.
16
Maximum building height shall be limited to 60 feet. The maximum square
footage of the sports arena shall be 180,000 square feet and the
maximum square footage of the hotel shall be 60,000 square feet. Any
request to increase building height or building square footage beyond the
stipulated height and square footages shall not be approved unless all of
the following occur:
a.
A water report is submitted to and approved by the Water Services
Department which demonstrates that sufficient water capacity exists
or is being provided by the developer of this parcel;
b.
A wastewater report is submitted to and approved by the Water
Services Department which demonstrates that sufficient wastewater
capacity exists or is being provided by the developer of this parcel;
and
Planning Hearing Officer Summary of August 20, 2025
Application PHO-1-25--Z-20-17-2
Page 9
c.
A traffic study is submitted to and approved by the Street
Transportation Department which demonstrates that street
improvements (existing and/or proposed) are sufficient to serve the
site.
17.
Sufficient right-of-way for a collector shall be dedicated ADJACENT TO
APN 204-12-980 for the extension of Bronco Butte Trail as necessary to
establish an alignment to tie into the current terminus at the Bronco Tank
and transition to a half-street where the alignment is able to assume an
alignment at the north property line for the extension of Bronco Butte Trail
west to the 29th Avenue alignment, unless an alternative route is
approved or modified by the Street Transportation Department and the
Planning and Development Department.
18.
Any construction of a sewer force main, intended as a temporary sewer
solution for the subject property, must be designed and constructed in a
manner that minimizes the impacts to truck circulation (as necessary to
maintain traffic flow to and from the W.L. Gore campus at the Bronco Butte
driveway for a WB-67 vehicle).
19.
Prior to the approval of the offsite paving plans for the project, the
developer shall update the restriping plan for the intersection of North
Valley Parkway and Bronco Butte Trail. The restriping plan shall be in
general conformance to the restriping plan date stamped June 28, 2018,
as approved by the Street Transportation Department and the Planning
and Development Department. The developer shall be responsible for all
improvements. The developer shall provide documentation that the
restriping plan was submitted to W.L. Gore prior to submittal of off-site
paving plan.
20.
Prior to final site plan approval, the developer shall work with the adjacent
property owners to update the Sonoran Foothills PCD Street Master Plan
to address the following for the intersection of North Valley Parkway and
Bronco Butte Trail, as approved or modified by the Street Transportation
Director and the Planning and Development Director as outlined in a
forthcoming letter addressing the following:
a.
Planned roadway and striping improvements
b.
Identify existing contributions to the traffic signal infrastructure
c.
Clarify responsibilities for future traffic infrastructure
20.
21.
The developer shall notify the following individuals by mail 15 days prior to
any preapplication or preliminary site plan review meetings with the
Planning Hearing Officer Summary of August 20, 2025
Application PHO-1-25--Z-20-17-2
Page 10
Planning and Development Department. The notice shall include the date,
time and location of the meeting.
a.
Brent Roberts
W.L. Gore
32470 N. North Valley Parkway
Phoenix, AZ 85085
b.
Heidi Kimball
Sunbelt Holdings
6720 N. Scottsdale Road, Suite 250
Scottsdale, AZ. 85253
21.
22.
The developer shall notify the following individuals by mail 10 days prior to
the submittal of the final site plan for approval by the Planning and
Development Department.
a.
Brent Roberts
W.L. Gore
32470 N. North Valley Parkway
Phoenix, AZ 85085
b.
Heidi Kimball
Sunbelt Holdings
6720 N. Scottsdale Road, Suite 250
Scottsdale, AZ 85253
Upon request, this publication will be made available within a reasonable length
of time through appropriate auxiliary aids or services to accommodate an
individual with a disability. This publication may be made available through the
following auxiliary aids or services: large print, Braille, audiotape or computer
diskette. To request a reasonable accommodation, please contact Saneeya Mir
at saneeya.mir@phoenix.gov or (602) 686-6461 or TTY: 7-1-1.
EXHIBIT H
City of Phoenix • Planning & Development Department
200 West Washington Street, 3rd Floor • Phoenix, Arizona 85003-1611 • (602) 262-6882
Village Planning Committee Meeting Summary
PHO-1-25--Z-20-17-2
Date of VPC Meeting
August 14, 2025
Date of Planning Hearing
Officer Hearing
August 20, 2025
Request
Deletion of Stipulations 1, 2, 4 through 7, and 9
through 20
Location
Approximately 1,420 feet west of the northwest corner
of North Valley Parkway and Bronco Butte Trail
VPC Recommendation
Approval, with a modification
VPC Vote
8-0
VPC DISCUSSION:
No members of the public registered to speak on this item.
Staff Background Presentation:
Adrian Zambrano, staff, provided information regarding the location of the site, the
entitled zoning, and the request. Mr. Zambrano stated the zoning of the site is C-2 M-R
NBCOD (Intermediate Commercial, Mid-Rise District, North Black Canyon Overlay
District) which was established by rezoning case Z-20-17-2, which was subject to 22
stipulations. Mr. Zambrano provided background on area plans and overlays, indicating
that the subject site is in the North Black Canyon Corridor Plan and Overlay District
(NBCOD) and within both the Infrastructure Limit Line of the North Black Canyon
Corridor Plan and within the North Gateway Village Core Plan area. Mr. Zambrano
shared the approved stipulations of the entitled zoning and the stipulations that are
requested to be deleted. Mr. Zambrano shared that the proposal is for a wireless
communication facility and shared the proposed site plan and elevations.
Applicant Presentation:
Declan Murphy, on behalf of TWC, introduced himself and provided background on the
request. Mr. Murphy shared that other sites were looked at around the area. Mr. Murphy
stated that the subject site originally had a site plan approved for a greenhouse. Mr.
Murphy stated that other sites were not suitable for a wireless communication facility,
and they are trying to stay away from residential as much as possible. Mr. Murphy
stated that wireless communication facilities are typically a quick review with the City.
Mr. Murphy stated that the footprint is minimal and there is minimal ground disturbance.
North Gateway Village Planning Committee
Meeting Summary
PHO-1-25--Z-20-17-2
Page 2 of 7
City of Phoenix • Planning & Development Department
200 West Washington Street, 3rd Floor • Phoenix, Arizona 85003-1611 • (602) 262-6882
Mr. Murphy stated that the stipulations for infrastructure improvements would be fulfilled
by the developer of the sports arena. Mr. Murphy shared the approved site plan of the
greenhouse proposal and the proposed site plan of the wireless communication facility.
Questions from Committee:
Committee Member Scott McGill stated that he knows this area very well. Committee
Member McGill stated that the site is located within a commercial area. Committee
Member McGill stated that the stipulations were associated with the larger parcel for
the sports arena and he understands the applicant’s stance for a utility that would
benefit the area.
Chair Julie Read stated that the Committee was very careful with stipulating desert-
tone colors for this area. Chair Read asked if the color of the screen walls will be
desert-tone colors. Mr. Murphy responded that the colors have not been decided on
yet, but they would be happy to choose whichever colors the Committee thinks is
appropriate. Mr. Murphy added that future wireless carriers that co-locate on this site
would be required to match the colors.
Committee Member Andrea Crouch asked if the wireless communication facility
would look like a tree. Mr. Murphy responded that it would not, noting that there is
nothing else around the area and it would stand out. Committee Member Crouch asked
if future wireless carriers would have their own pole. Mr. Murphy responded that they
would not, and they would co-locate on one pole.
Committee Member Paul Li asked for clarification if the request is to delete the
stipulations only for the cell tower site or for the entire rezoning boundary. Mr. Murphy
responded that it would only be for the cell tower site. Committee Member Li asked for
clarification that the stipulations would still be applicable for the remaining rezoning
boundary.
Mr. Zambrano responded affirmatively.
Committee Member Li asked if there is a specific issue with complying with
Stipulation No. 10 regarding the color palette to be consistent with the North Black
Canyon Overlay District. Mr. Murphy responded that there was not. Committee
Member Li asked if the applicant would agree to not deleting Stipulation No. 10. Mr.
Murphy responded affirmatively.
Chair Read asked if Stipulation No. 10 were to remain, if it would cover the wall color,
even though it is not a building. Mr. Zambrano responded that he believes it would.
Public Comments:
None.
Applicant Response:
None.
North Gateway Village Planning Committee
Meeting Summary
PHO-1-25--Z-20-17-2
Page 3 of 7
City of Phoenix • Planning & Development Department
200 West Washington Street, 3rd Floor • Phoenix, Arizona 85003-1611 • (602) 262-6882
MOTION – PHO-1-25--Z-20-17-2:
Committee Member Li motioned to recommend approval of PHO-1-25--Z-20-17-2, with
a modification to not delete Stipulation No. 10. Committee Member Crouch seconded
the motion.
VOTE – PHO-1-25--Z-20-17-2:
8-0; the motion to recommend approval of PHO-1-25--Z-20-17-2 with a modification
passed with Committee members Crouch, Kennelly, Li, McCarty, McGill, Salow, Stein,
and Read in favor.
STAFF COMMENTS REGARDING VPC RECOMMENDATION:
None.
VPC RECOMMENDED STIPULATIONS:
1.
All sidewalks shall be detached with a minimum five-foot wide landscaped
strip located between the sidewalk and back of curb, and shall include
minimum two-inch caliper shade trees planted a minimum of 20 feet on
center or equivalent groupings along both sides of the sidewalk, as approved
by the Planning and Development Department. The landscape strip shall be
installed by the developer and maintained by property owner.
2.
The developer shall construct all streets within and adjacent to the
development with paving, curb, gutter, sidewalk, curb ramps, streetlights,
median islands, landscaping and other incidentals, as per plans approved by
the Planning and Development Department. All improvements shall comply
with all ADA accessibility standards.
3.1.
In the event archaeological materials are encountered during construction,
the developer shall immediately cease all ground disturbing activities within a
33-foot radius of the discovery, notify the City Archaeologist, and allow time
for the Archaeology Office to properly assess the materials.
4.
The east and west pedestrian connection (Paseo del Prado) shall be
provided in accordance with the North Gateway Core Plan, as modified by
the following stipulations and approved by the Planning and Development
Department:
a.
The Paseo del Prado shall align with the Bronco Butte Tank and
continue through the site to the west.
b.
A pedestrian access easement of 20 feet shall be dedicated for the
pedestrian connection (Paseo del Prado). Of the 20 feet, 12 feet shall
remain completely free of any pedestrian impediments, including
benches. The remaining 8 feet may be used for pedestrian friendly
uses such as restaurant seating, vendor stalls, artist displays, etc.
North Gateway Village Planning Committee
Meeting Summary
PHO-1-25--Z-20-17-2
Page 4 of 7
City of Phoenix • Planning & Development Department
200 West Washington Street, 3rd Floor • Phoenix, Arizona 85003-1611 • (602) 262-6882
c.
A minimum of 50% of the 20-foot pedestrian access easement for the
Paseo del Prado shall be shaded by a structure, landscaping or a
combination of the two.
d.
The site shall be designed in such a manner that the building
placement creates an alignment and synergy for the Paseo del Prado.
This can be achieved by placing active uses such as outdoor seating,
restaurants and retail along the pedestrian path.
5.
All pedestrian pathways, including those that intersect vehicular traffic lanes,
shall be constructed with decorative pavers, stamped or colored concrete, or
another material other than those used to pave the parking surfaces and
drive aisles, as approved by the Planning and Development Department.
6.
The use of artificial turf is prohibited in areas visible from public right-of-way
or parking lots, as approved by the Planning and Development Department.
7.
Turf shall only be used in active retention basins, as approved by the
Planning and Development Department.
8.
All retention areas shall be natural and organic in shape, as approved by the
Planning and Development Department.
9.
The hotel development shall be in general conformance with the elevations
date stamped April 18, 2018, with specific regard to the massing, articulation,
window placement and building entry, as approved by the Planning and
Development Department.
10.2.
The color and material palette for the buildings shall be determined at
site plan review and shall comply with the North Black Canyon Overlay
District, with specific regard to colors being muted and blend with,
rather than contrast strongly, with the surrounding desert environment,
as approved by the Planning and Development Department.
11.
The glazing on all building windows shall have a maximum reflectivity of 20%,
as approved by the Planning and Development Department.
12.
All service areas must be screened to conceal trash containers, recycling
containers, loading docks, transformers, backflow preventers and other
mechanical and or electrical equipment from eye level adjacent to all public
streets and private drives, as approved by the Planning and Development
Department.
13.
A minimum landscape setback of 10 feet shall be required along property
lines that are not adjacent to public right-of-way and planted in accordance
North Gateway Village Planning Committee
Meeting Summary
PHO-1-25--Z-20-17-2
Page 5 of 7
City of Phoenix • Planning & Development Department
200 West Washington Street, 3rd Floor • Phoenix, Arizona 85003-1611 • (602) 262-6882
with C-2 planting size and spacing standards, as approved by the Planning
and Development Department.
14.
The Bronco Butte Water Tank shall be fully preserved, in place, as it naturally
occurs and shall be identified on all site plan documents through permitting to
ensure preservation.
15.
View corridors of Bronco Butte, Pyramid Peak, Union Hills and No Name
Mountain, as shown on Exhibit B in the North Gateway Core Plan, shall be
retained through building placement and step backs, as approved by the
Planning and Development Department.
16.
Maximum building height shall be limited to 60 feet. The maximum square
footage of the sports arena shall be 180,000 square feet and the maximum
square footage of the hotel shall be 60,000 square feet. Any request to
increase building height or building square footage beyond the stipulated
height and square footages shall not be approved unless all of the following
occur:
a.
A water report is submitted to and approved by the Water Services
Department which demonstrates that sufficient water capacity exists
or is being provided by the developer of this parcel;
b.
A wastewater report is submitted to and approved by the Water
Services Department which demonstrates that sufficient wastewater
capacity exists or is being provided by the developer of this parcel;
and
c.
A traffic study is submitted to and approved by the Street
Transportation Department which demonstrates that street
improvements (existing and/or proposed) are sufficient to serve the
site.
17.
Sufficient right-of-way for a collector shall be dedicated for the extension of
Bronco Butte Trail as necessary to establish an alignment to tie into the
current terminus at the Bronco Tank and transition to a half-street where the
alignment is able to assume an alignment at the north property line for the
extension of Bronco Butte Trail west to the 29th Avenue alignment, unless an
alternative route is approved or modified by the Street Transportation
Department and the Planning and Development Department.
18.
Any construction of a sewer force main, intended as a temporary sewer
solution for the subject property, must be designed and constructed in a
manner that minimizes the impacts to truck circulation (as necessary to
North Gateway Village Planning Committee
Meeting Summary
PHO-1-25--Z-20-17-2
Page 6 of 7
City of Phoenix • Planning & Development Department
200 West Washington Street, 3rd Floor • Phoenix, Arizona 85003-1611 • (602) 262-6882
maintain traffic flow to and from the W.L. Gore campus at the Bronco Butte
driveway for a WB-67 vehicle).
19.
Prior to the approval of the offsite paving plans for the project, the developer
shall update the restriping plan for the intersection of North Valley Parkway
and Bronco Butte Trail. The restriping plan shall be in general conformance
to the restriping plan date stamped June 28, 2018, as approved by the Street
Transportation Department and the Planning and Development Department.
The developer shall be responsible for all improvements. The developer shall
provide documentation that the restriping plan was submitted to W.L. Gore
prior to submittal of off-site paving plan.
20.
Prior to final site plan approval, the developer shall work with the adjacent
property owners to update the Sonoran Foothills PCD Street Master Plan to
address the following for the intersection of North Valley Parkway and Bronco
Butte Trail, as approved or modified by the Street Transportation Director and
the Planning and Development Director as outlined in a forthcoming letter
addressing the following:
a.
Planned roadway and striping improvements
b.
Identify existing contributions to the traffic signal infrastructure
c.
Clarify responsibilities for future traffic infrastructure
21.3.
The developer shall notify the following individuals by mail 15 days prior to
any preapplication or preliminary site plan review meetings with the Planning
and Development Department. The notice shall include the date, time and
location of the meeting.
a.
Brent Roberts
W.L. Gore
32470 N. North Valley Parkway
Phoenix, AZ 85085
b.
Heidi Kimball
Sunbelt Holdings
6720 N. Scottsdale Road, Suite 250
Scottsdale, AZ 85253
22.4.
The developer shall notify the following individuals by mail 10 days prior to
the submittal of the final site plan for approval by the Planning and
Development Department.
North Gateway Village Planning Committee
Meeting Summary
PHO-1-25--Z-20-17-2
Page 7 of 7
City of Phoenix • Planning & Development Department
200 West Washington Street, 3rd Floor • Phoenix, Arizona 85003-1611 • (602) 262-6882
a.
Brent Roberts
W.L. Gore
32470 N. North Valley Parkway
Phoenix, AZ 85085
b.
Heidi Kimball
Sunbelt Holdings
6720 N. Scottsdale Road, Suite 250
Scottsdale, AZ 85253
EXHIBIT I
PHO-1-25--Z-20-17-2
Proposed Conceptual Site Plan
Hearing Date: August 20, 2025
PHO-1-25--Z-20-17-2
Proposed Conceptual Site Plan
Hearing Date: August 20, 2025
EXHIBIT J
We Connect Carriers.
PH68058A
LEGACY SPORTS
ARENA
AMND: 18-1196A2 KIVA: 18-1196 QS: Q55-22 RFDS VER 1 DATED 4/22/2022 AT 7:5:56 PM
ELEVATIONS
Z-4
EAST ELEVATION
1
SCALE:
3/16" = 1'-0"
SOUTH ELEVATION
2
SCALE:
3/16" = 1'-0"
NOTE:
ALL EQUIPMENT AND ANTENNAS TO
BE PAINTED TO MATCH THE POLE
PHO-1-25--Z-20-17-2
Proposed Conceptual Elevations
Hearing Date: August 20, 2025
EXHIBIT K
PHO-1-25--Z-20-17-2
Stipulated Site Plan
Hearing Date: August 20, 2025
EXHIBIT L
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
T.O.ROOF
54' - 8"
T.O.ROOF
13' - 6"
E-3
1
E-3
1
WP-1
5
E-2
1
S-1
3
E-2
2
W-1
15
W-1
5
E-3
2
E-1
2
S-1
3
E-3
2
E-3
1
E-2
1
E-1
1
E-3
1
WP-1
5
E-2
1
P-4
17
R-1
11
E-1
2
T.O.PARAPET
47' - 3"
T.O.PARAPET
47' - 3"
T.O. ROOF
53' - 6"
W-1
15
E-2
2
WP-1
5
W-1
15
B.O.WINDOW
48' - 0"
LEVEL 05
42' - 6"
LEVEL 04
33' - 2"
LEVEL 03
22' - 7"
LEVEL 02
12' - 0"
LEVEL 01
0"
T.O.ROOF
53' - 6"
T.O.ROOF
54' - 8"
E-3
1
E-1
1
E-2
1
TYP.
W-1
14
TYP.
W-1
18
TYP.
-
8
TYP.
TYP.
TYP.
W-1
6
TYP.
P-1
9
W-1
6
W-1
14
-
8
TYP.
W-1
14
R-1
11
W-1
14
TYP.
R-1
11
B.O.WINDOW
48' - 0"
W-1
14
W-1
14
-
8
TYP.
W-1
14
E-3
1
T.O. WINDOW
7' - 0"
T.O. WINDOW
19' - 0"
T.O. WINDOW
29' - 7"
T.O. WINDOW
40' - 2"
R-1
11
P-4
17
TYP.
TYP.
--
8
TYP.
R-1
4
R-1
4
E-3
2
E-3
2
A
B
C
D
E
F
G
H
I
J
K
L
M
N
O
P
T.O.ROOF
54' - 8"
T.O.PARAPET
47' - 3"
T.O.PARAPET
47' - 3"
T.O.CANOPY
15' - 7"
T.O.ROOF
56' - 2"
T.O.WALL
8' - 2"
E-3
1
WP-1
5
E-3
1
E-1
1
W-1
15
R-1
10
C-1
18
C-1
18
R-1
11
P-2
17
WP-1
5
WP-1
5
E-2
1
S-1
3
T-1
12
LEVEL 05
42' - 6"
LEVEL 04
33' - 2"
LEVEL 03
22' - 7"
LEVEL 02
12' - 0"
LEVEL 01
0"
T.O.ROOF
10' - 4"
T.O.ROOF
12' - 4"
TYP.
E-3
1
E-1
2
E-2
1
E-1
1
S-1
13
C-1
18
R-1
11
E-3
1
E-3
1
E-3
1
E-3
1
P-4
19
P-1
9
E-3
1
E-2
1
W-1
15
TYP.
W-1
6
TYP.
S-1
3
-
8
TYP.
W-1
14
P-4
19
W-1
6
W-1
14
T.O.WINDOW
7' - 0"
T.O.WINDOW
19' - 0"
T.O.WINDOW
29' - 7"
T.O.WINDOW
40' - 2"
R-1
4
TYP.
C
E
O
N
E
H
C
D
E
I
F
I
R
A
T
A
C
T
I
.
T
G
E
R
T
R
E
C
S
I
R
E
T
,#;4
,1..';
,
A
N
O
Z
n
i
S
e
I
.
.
d
e
U
A
.
S
.
.
D
t
a
A
R
g
...........
Expires 06/30/2019
SHEET NUMBER:
ISSUE DATE:
CHECKED BY:
DRAWN BY:
JOB NUMBER:
SHEET TITLE:
DRAWINGS AND SPECIFICATIONS AS
INSTRUMENTS OF SERVICE ARE AND
SHALL REMAIN THE PROPERTY OF THE
ARCHITECT WHETHER THE PROJECT FOR
WHICH THEY WERE PREPARED IS
EXECUTED OR NOT. THEY ARE NOT TO BE
USED ON OTHER PROJECTS OR
EXTENSIONS TO THIS PROJECT EXCEPT BY
AGREEMENT IN WRITING AND WITH
APPROPRIATE COMPENSATION TO K & I
ARCHITECTS AND INTERIORS.
OWNERSHIP OF DOCUMENTS
1850 N. CENTRAL AVE.
SUITE 200
PHOENIX, AZ 85004
PH: 602.262.3838
FAX: 602.262.3938
K & I
$
5
&
+
,
7
(
&
7
6
,
1
7
(
5
,
2
5
6
04/16/18
4/16/2018 1:31:06 PM
C:\Users\SkylarV\Documents\18901_ Central Model_ Hotel_Skylar_V.rvt
181901
S. VALLEE
J. JOLLEY
04/16/18
eLEGACY HOTEL
3200 NORTH 28TH AVENUE,
PHOENIX, ARIZONA
#
EXTERIOR
ELEVATIONS
DESIGN
DEVELOPMENT
1/8" = 1'-0"
1
SOUTH ELEVATION
1/8" = 1'-0"
2
EAST ELEVATION
KEYNOTES
COLOR SCHEDULE
#
#
EIFS SYSTEM: PAREX USA
E-1
DE 5354 HONEY GLOW
E-2
DE 6376 LOOKING GLASS
E-3
DE 5732 TEAL ME NO LIES
WALL PANEL: AEP SPAN
WP -1: KYNAR 500 - CHARCOAL GREY
ROOF PANEL
R-1: KYNAR 500 - CHARCOAL GREY
PAINT: DUNN EDWARDS
P-1
DE 5354 HONEY GLOW
P-2
DE 6376 LOOKING GLASS
P-3
DE 5732 TEAL ME NO LIES
P-4
DE 6372 LACE VEIL
STUCCO
S-1
DAVIS COLORS GREEN SLATE 3685
WINDOW MULLIONS
W-1
KYNAR 500 SHASTA WHITE
DECKING TREX
T-1
HAVANA GOLD
CEILING
C-1
MAPLE EXTERIOR
1.
4" EIFS WALL SYSTEM
2.
1 1/2" EIFS WALL SYSTEM
3.
3 COAT STUCCO SYSTEM OVER 4" RIGID INSULATION, STAMP FINAL COAT TO MATCH
BOARD FORM CONCRETE - INTEGRAL COLOR
4.
FACTORY FINISH FASCIA
5.
METAL WALL PANEL, AEP SPAN, FLEX SERIES 1.2FX10-12 OVER 1 1/2" RIGID INSULATION
6.
FACTORY FINISH ALUMINUM STOREFRONT SYSTEM WITH 1" INSULATED GLASS
7.
FACTORY FINISH AUTOMATIC SLIDING DOOR SYSTEM WITH 1" INSULATED GLASS.
8.
EIFS SCORE JOINTS
9.
EXTERIOR STOREFRONT DOOR, FRAME AND HARDWARE WITH 1" INSULATED GLASS
10.
FACTORY FINISH STANDING SEAM ROOFING SYSTEM, CURVED SPAN LOCK, AEP SPAN WITH PC
SNAP ON SYSTEM, 2" BATTEN
11.
FACTORY FINISH STANDING SEAM ROOFING SYSTEM, FLAT STANDING SEAM, AEP SPAN
WITH PC SNAP ON SYSTEM, 2" BATTEN
12.
1X6 TREX WALL CAP
13.
BOARD FORM CONCRETE WALL / COLUMN
14.
FACTORY FINISH METAL COPING
15.
FACTORY FINISH ALUMINUM STORE FRONT SYSTEM WITH SINGLE PANE FROSTED GLAZING
16.
WALL MOUNTED AC UNIT (TYPICAL) - MATCH WINDOW MULLION FINISH
17.
TUBE STEEL - PAINTED
18.
FAUX WOOD PLANK
19.
STEEL BEAM
Revisions
#
Description
Date
PHO-1-25--Z-20-17-2
Stipulated Elevations
Hearing Date: August 20, 2025
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
R-1
11
WP-1
5
--
8
S-1
3
E-2
1
E-3
1
E-3
1
P-2
17
WP-1
5
R-1
10
E-2
2
C-1
18
E-3
1
E-2
1
E-1
2
E-3
1
E-1
1
S-1
3
T.O.ROOF
54' - 8"
T.O.ROOF
56' - 2"
T.O.PARAPET
47' - 3"
T.O.PARAPET
47' - 3"
T.O.CANOPY
15' - 7"
T.O.ROOF
54' - 8"
T.O.TRELLIS
10' - 10"
E-3
1
E-1
1
E-3
1
E-1
1
E-3
1
WP-1
5
E-2
1
E-2
2
R-1
4
R-1
11
B.O.WINDOW
48' - 0"
LEVEL 05
42' - 6"
LEVEL 04
33' - 2"
LEVEL 03
22' - 7"
LEVEL 02
12' - 0"
LEVEL 01
0"
T.O. ROOF
53' - 6"
T.O.ROOF
53' - 6"
B.O.WINDOW
48' - 0"
E-2
1
W-1
14
TYP.
W-1
15
TYP.
W-1
14
TYP.
E-1
1
W-1
15
TYP.
E-3
1
TYP.
W-1
15
TYP.
E-3
2
E-1
1
P-4
13
W-1
7
W-1
7
P-2
17
W-1
7
E-2
19
R-1
11
S-1
13
R-1
19
W-1
14
R-1
11
R-1
11
B.O.WINDOW
48' - 0"
W-1
14
W-1
14
W-1
14
-
8
TYP.
-
8
TYP.
P-4
13
P-4
13
W-1
6
TYP.
W-1
15
TYP.
E-3
1
-
8
TYP.
W-1
6
TYP.
P-4
17
TYP.
R-1
4
P-4
17
TYP.
P-4
19
W-1
16
TYP.
P-4
17
TYP.
R-1
4
T.O. WINDOW
40' - 2"
T.O. WINDOW
29' - 7"
T.O. WINDOW
19' - 0"
T.O. WINDOW
7' - 0"
A
B C
D
E
F
G
H
I
J
K
L
M
N
O
P
T.O. ROOF
56' - 2"
T.O.PARAPET
47' - 3"
T.O.PARAPET
47' - 3"
T.O.CANOPY
15' - 7"
T.O.PANEL
54' - 8"
E-3
1
E-3
1
WP-1
5
W-1
15
S-1
13
WP-1
5
R-1
10
C-1
18
W-1
15
S-1
13
LEVEL 05
42' - 6"
LEVEL 04
33' - 2"
LEVEL 03
22' - 7"
LEVEL 02
12' - 0"
T.O.WALL
8' - 2"
T.O.ROOF
10' - 4"
T.O.ROOF
12' - 4"
S-1
3
W-1
9
TYP.
E-2
1
T-1
12
TYP.
P-2
17
TYP.
W-1
14
TYP.
R-1
11
C-1
18
C-1
18
E-1
1
W-1
4
R-1
11
C-1
18
E-2
19
W-1
15
E-1
2
E-3
2
E-3
2
WP-1
5
E-2
1
P-2
17
W-1
6
TYP.
LEVEL 01
0"
-
8
TYP.
W-1
6
W-1
14
P-3
17
P-3
17
TYP.
E-1
1
R-1
4
T.O. WINDOW
7' - 0"
T.O. WINDOW
19' - 0"
T.O. WINDOW
29' - 7"
T.O. WINDOW
40' - 2"
T.O. PARAPET
13' - 9"
C
E
O
N
E
H
C
D
E
I
F
I
R
A
T
A
C
T
I
.
T
G
E
R
T
R
E
C
S
I
R
E
T
,#;4
,1..';
,
A
N
O
Z
n
i
S
e
I
.
.
d
e
U
A
.
S
.
.
D
t
a
A
R
g
...........
Expires 06/30/2019
SHEET NUMBER:
ISSUE DATE:
CHECKED BY:
DRAWN BY:
JOB NUMBER:
SHEET TITLE:
DRAWINGS AND SPECIFICATIONS AS
INSTRUMENTS OF SERVICE ARE AND
SHALL REMAIN THE PROPERTY OF THE
ARCHITECT WHETHER THE PROJECT FOR
WHICH THEY WERE PREPARED IS
EXECUTED OR NOT. THEY ARE NOT TO BE
USED ON OTHER PROJECTS OR
EXTENSIONS TO THIS PROJECT EXCEPT BY
AGREEMENT IN WRITING AND WITH
APPROPRIATE COMPENSATION TO K & I
ARCHITECTS AND INTERIORS.
OWNERSHIP OF DOCUMENTS
1850 N. CENTRAL AVE.
SUITE 200
PHOENIX, AZ 85004
PH: 602.262.3838
FAX: 602.262.3938
K & I
$
5
&
+
,
7
(
&
7
6
,
1
7
(
5
,
2
5
6
04/16/18
4/16/2018 1:30:41 PM
C:\Users\SkylarV\Documents\18901_ Central Model_ Hotel_Skylar_V.rvt
181901
S. VALLEE
J. JOLLEY
04/16/18
eLEGACY HOTEL
3200 NORTH 28TH AVENUE,
PHOENIX, ARIZONA
#
EXTERIOR
ELEVATIONS
DESIGN
DEVELOPMENT
1/8" = 1'-0"
1
NORTH ELEVATION
1/8" = 1'-0"
2
WEST ELEVATION
KEYNOTES
COLOR SCHEDULE
#
#
EIFS SYSTEM: PAREX USA
E-1
DE 5354 HONEY GLOW
E-2
DE 6376 LOOKING GLASS
E-3
DE 5732 TEAL ME NO LIES
WALL PANEL: AEP SPAN
WP -1: KYNAR 500 - CHARCOAL GREY
ROOF PANEL
R-1: KYNAR 500 - CHARCOAL GREY
PAINT: DUNN EDWARDS
P-1
DE 5354 HONEY GLOW
P-2
DE 6376 LOOKING GLASS
P-3
DE 5732 TEAL ME NO LIES
P-4
DE 6372 LACE VEIL
STUCCO
S-1
DAVIS COLORS GREEN SLATE 3685
WINDOW MULLIONS
W-1
KYNAR 500 SHASTA WHITE
DECKING TREX
T-1
HAVANA GOLD
CEILING
C-1
MAPLE EXTERIOR
1.
4" EIFS WALL SYSTEM
2.
1 1/2" EIFS WALL SYSTEM
3.
3 COAT STUCCO SYSTEM OVER 4" RIGID INSULATION, STAMP FINAL COAT TO MATCH
BOARD FORM CONCRETE - INTEGRAL COLOR
4.
FACTORY FINISH FASCIA
5.
METAL WALL PANEL, AEP SPAN, FLEX SERIES 1.2FX10-12 OVER 1 1/2" RIGID INSULATION
6.
FACTORY FINISH ALUMINUM STOREFRONT SYSTEM WITH 1" INSULATED GLASS
7.
FACTORY FINISH AUTOMATIC SLIDING DOOR SYSTEM WITH 1" INSULATED GLASS.
8.
EIFS SCORE JOINTS
9.
EXTERIOR STOREFRONT DOOR, FRAME AND HARDWARE WITH 1" INSULATED GLASS
10.
FACTORY FINISH STANDING SEAM ROOFING SYSTEM, CURVED SPAN LOCK, AEP SPAN WITH PC
SNAP ON SYSTEM, 2" BATTEN
11.
FACTORY FINISH STANDING SEAM ROOFING SYSTEM, FLAT STANDING SEAM, AEP SPAN
WITH PC SNAP ON SYSTEM, 2" BATTEN
12.
1X6 TREX WALL CAP
13.
BOARD FORM CONCRETE WALL / COLUMN
14.
FACTORY FINISH METAL COPING
15.
FACTORY FINISH ALUMINUM STORE FRONT SYSTEM WITH SINGLE PANE FROSTED GLAZING
16.
WALL MOUNTED AC UNIT (TYPICAL) - MATCH WINDOW MULLION FINISH
17.
TUBE STEEL - PAINTED
18.
FAUX WOOD PLANK
19.
STEEL BEAM
Revisions
#
Description
Date
PHO-1-25--Z-20-17-2
Stipulated Elevations
Hearing Date: August 20, 2025
PHO-1-25--Z-20-17-2
Stipulated Elevations
Hearing Date: August 20, 2025
EXHIBIT M
C
E
O
N
E
H
C
D
E
I
F
I
R
A
T
A
C
T
I
.
T
G
E
R
T
R
E
C
S
I
R
E
T
,#;4
,1..';
,
A
N
O
Z
n
i
S
e
I
.
.
d
e
U
A
.
S
.
.
D
t
a
A
R
g
...........
Expires 06/30/2019
SHEET NUMBER:
ISSUE DATE:
CHECKED BY:
DRAWN BY:
JOB NUMBER:
SHEET TITLE:
DRAWINGS AND SPECIFICATIONS AS
INSTRUMENTS OF SERVICE ARE AND
SHALL REMAIN THE PROPERTY OF THE
ARCHITECT WHETHER THE PROJECT FOR
WHICH THEY WERE PREPARED IS
EXECUTED OR NOT. THEY ARE NOT TO BE
USED ON OTHER PROJECTS OR
EXTENSIONS TO THIS PROJECT EXCEPT BY
AGREEMENT IN WRITING AND WITH
APPROPRIATE COMPENSATION TO K & I
ARCHITECTS AND INTERIORS.
OWNERSHIP OF DOCUMENTS
1850 N. CENTRAL AVE.
SUITE 200
PHOENIX, AZ 85004
PH: 602.262.3838
FAX: 602.262.3938
K & I
$
5
&
+
,
7
(
&
7
6
,
1
7
(
5
,
2
5
6
04/16/18
4/16/2018 1:41:27 PM
C:\Users\SkylarV\Documents\18901_ Central Model_ Hotel_Skylar_V.rvt
181901
S. VALLEE
J. JOLLEY
04/16/18
eLEGACY HOTEL
3200 NORTH 28TH AVENUE,
PHOENIX, ARIZONA
4
RENDERINGS
DESIGN
DEVELOPMENT
1
PERSPECTIVE VIEW
Revisions
#
Description
Date
PHO-1-25--Z-20-17-2
Stipulated Elevations
Hearing Date: August 20, 2025
C
E
O
N
E
H
C
D
E
I
F
I
R
A
T
A
C
T
I
.
T
G
E
R
T
R
E
C
S
I
R
E
T
,#;4
,1..';
,
A
N
O
Z
n
i
S
e
I
.
.
d
e
U
A
.
S
.
.
D
t
a
A
R
g
...........
Expires 06/30/2019
SHEET NUMBER:
ISSUE DATE:
CHECKED BY:
DRAWN BY:
JOB NUMBER:
SHEET TITLE:
DRAWINGS AND SPECIFICATIONS AS
INSTRUMENTS OF SERVICE ARE AND
SHALL REMAIN THE PROPERTY OF THE
ARCHITECT WHETHER THE PROJECT FOR
WHICH THEY WERE PREPARED IS
EXECUTED OR NOT. THEY ARE NOT TO BE
USED ON OTHER PROJECTS OR
EXTENSIONS TO THIS PROJECT EXCEPT BY
AGREEMENT IN WRITING AND WITH
APPROPRIATE COMPENSATION TO K & I
ARCHITECTS AND INTERIORS.
OWNERSHIP OF DOCUMENTS
1850 N. CENTRAL AVE.
SUITE 200
PHOENIX, AZ 85004
PH: 602.262.3838
FAX: 602.262.3938
K & I
$
5
&
+
,
7
(
&
7
6
,
1
7
(
5
,
2
5
6
04/16/18
4/16/2018 1:41:45 PM
C:\Users\SkylarV\Documents\18901_ Central Model_ Hotel_Skylar_V.rvt
181901
S. VALLEE
J. JOLLEY
04/13/18
eLEGACY HOTEL
3200 NORTH 28TH AVENUE,
PHOENIX, ARIZONA
4
RENDERINGS
DESIGN
DEVELOPMENT
1
PERSPECTIVE VIEW
Revisions
#
Description
Date
PHO-1-25--Z-20-17-2
Stipulated Elevations
Hearing Date: August 20, 2025