ATTACHMENT A 
 
THIS IS A DRAFT COPY ONLY AND IS NOT AN OFFICIAL COPY OF THE FINAL, 
ADOPTED ORDINANCE 
 
 
 
 
 
ORDINANCE G- 
 
AN ORDINANCE AMENDING THE ZONING DISTRICT MAP 
ADOPTED PURSUANT TO SECTION 601 OF THE CITY OF 
PHOENIX ZONING ORDINANCE BY CHANGING THE ZONING 
DISTRICT CLASSIFICATION FOR THE PARCEL DESCRIBED 
HEREIN (CASE Z-68-24-8) FROM C-3 (GENERAL 
COMMERCIAL) TO PUD (PLANNED UNIT DEVELOPMENT). 
 
____________ 
 
 
 
BE IT ORDAINED BY THE COUNCIL OF THE CITY OF PHOENIX, as 
follows: 
SECTION 1. The zoning of a 0.76 acre site located approximately 220 feet 
west of the northwest corner of 16th Street and Washington Street in a portion of 
Section 9, Township 1 North, Range 3 East, as described more specifically in Exhibit 
“A,” is hereby changed from “C-3” (General Commercial) to “PUD” (Planned Unit 
Development). 
SECTION 2. The Planning and Development Director is instructed to 
modify the Zoning Map of the City of Phoenix to reflect this use district classification 
change as shown in Exhibit “B.” 
SECTION 3. Due to the site’s specific physical conditions and the use 
district applied for by the applicant, this rezoning is subject to the following stipulations,

violation of which shall be treated in the same manner as a violation of the City of 
Phoenix Zoning Ordinance: 
1. 
An updated Development Narrative for the Venue on Washington PUD reflecting 
the changes approved through this request shall be submitted to the Planning 
and Development Department within 30 days of City Council approval of this 
request.  The updated Development Narrative shall be consistent with the 
Development Narrative date stamped October 10, 2025, as modified by the 
following stipulations: 
a. 
Front cover: Revise the submittal date information on the bottom to add the
following: Hearing draft submittal: October 10, 2025; City Council adopted: 
[Add adoption date]. 
b. 
Page 14, E. Design Guidelines, Complete Streets, iv. Design for Green 
Infrastructure: Move the following requirement to the end of the 
Sustainability Section (Page 14, G. Sustainability): 
“A minimum of two green infrastructure (GI) techniques for stormwater 
management shall be implemented in The Venue on Washington PUD: 
• Utilize permeable pavement to allow stormwater to drain through an 
aggregate reservoir. 
• Utilize stormwater harvesting basins to collect stormwater and clean
it prior to it percolating into the subsurface.” 
2. 
All mitigation improvements shall be constructed and/or funded as identified in the
accepted Traffic Impact Analysis dated August 8, 2025. 
3. 
All streets within and adjacent to the development shall be constructed with 
paving, curb, gutter, sidewalk, curb ramps, streetlights, median islands, 
landscaping and other incidentals, as per plans approved by the Planning and 
Development Department. All improvements shall comply with all ADA 
accessibility standards. 
4. 
The property owner shall record documents that disclose the existence, and 
operational characteristics of the Phoenix Sky Harbor Airport to future owners or 
tenants of the property. The form and content of such documents shall be 
according to the templates and instructions provided which have been reviewed 
and approved by the City Attorney. 
5. 
If determined necessary by the Phoenix Archaeology Office, the applicant shall 
conduct Phase I data testing and submit an archaeological survey report of the 
development area for review and approval by the City Archaeologist prior to 
clearing and grubbing, landscape salvage, and/or grading approval.

SECTION 4. If any section, subsection, sentence, clause, phrase or 
portion of this ordinance is for any reason held to be invalid or unconstitutional by the 
decision of any court of competent jurisdiction, such decision shall not affect the validity 
of the remaining portions hereof.  
PASSED by the Council of the City of Phoenix this 3rd day of December, 
2025.  
 
 
 
 
________________________________ 
 
 
 
       MAYOR  
 
 
ATTEST:  
 
 
_________________________  
Denise Archibald, City Clerk 
 
 
APPROVED AS TO FORM: 
Julie M. Kriegh, City Attorney 
 
 
By: 
6. 
If Phase I data testing is required, and if, upon review of the results from the 
Phase I data testing, the City Archaeologist, in consultation with a qualified 
archaeologist, determines such data recovery excavations are necessary, the 
applicant shall conduct Phase II archaeological data recovery excavations. 
7. 
In the event archaeological materials are encountered during construction, the 
developer shall immediately cease all ground-disturbing activities within a 33-foot 
radius of the discovery, notify the City Archaeologist, and allow time for the 
Archaeology Office to properly assess the materials. 
8. 
Prior to final site plan approval, the landowner shall execute a Proposition 207 
waiver of claims form. The waiver shall be recorded with the Maricopa County 
Recorder's Office and delivered to the City to be included in the rezoning 
application file for record.

_________________________  
_________________________ 
 
 
REVIEWED BY:  
 
 
_________________________  
Ed Zuercher, City Manager 
 
 
 
Exhibits: 
A – Legal Description (1 Page) 
B – Ordinance Location Map (1 Page)

EXHIBIT A 
 
LEGAL DESCRIPTION FOR Z-68-24-8 
 
Within a portion of Section 9, Township 1 North, Range 3 East of the Gila and Salt River 
Base and Meridian, Maricopa County, Arizona, being more particularly described as 
follows: 
 
Lots 17, 18, and 19, Block 9, Collins Addition to the City of Phoenix, according to  
Book 1 of Maps, page 11, records of Maricopa County, Arizona.