Staff Report: Z-60-23-2
November 22, 2023
Paradise Valley Village Planning
Committee Meeting Date:
December 4, 2023
Planning Commission Hearing Date:
January 4, 2024
Request From:
PUD (Planned Unit Development) (5.02 acres)
Request To:
A-1 (Light Industrial District) (5.02 acres)
Proposal:
Warehousing and office building
Location:
Approximately 375 feet east of the southeast
corner of 25th Place and Rose Garden Lane
Owner:
Horses Help Inc.
Applicant:
Carlos Elias, LGE Design / Build
Representative:
Stephen Anderson, Gammage and Burnham,
PLC
Staff Recommendation:
Approval, subject to stipulations
General Plan Conformity
General Plan Land Use Designation
Industrial
Street Map Classification
Rose Garden Lane
Collector 40-foot south half street
CONNECT PEOPLE & PLACES CORE VALUE; OPPORTUNITY SITES; LAND USE
PRINCIPLE: Encourage development of the taller and larger buildings in Areas
of Change away from single-family and low-rise, multifamily housing.
The proposal is located in an established commerce park and industrial area which is
separated from nearby residential areas by Cave Creek Road to the west, the canal to
the north and east, and the Loop 101 freeway to the south.
STRENGTHEN OUR LOCAL ECONOMY CORE VALUE; MANUFACTURING /
INDUSTRIAL DEVELOPMENT; LAND USE PRINCIPLE: Support the expansion of
industrial zoning in targeted industrial areas.
The proposal for industrial zoning is located within a targeted industrial and commerce
park area consistent with the General Plan Land Use Map of Industrial.
ATTACHMENT B
Staff Report: Z-60-23-2
November 22, 2023
Page 2 of 12
BUILD THE SUSTAINABLE DESERT CITY; TREES AND SHADE; DESIGN
PRINCIPLE: Integrate trees and shade into the design of new development and
redevelopment projects throughout Phoenix.
The proposal, as stipulated, will be required to provide a minimum of 75 percent shade
along pedestrian pathways, including sidewalks. Additionally, the proposal will be
required to provide shade trees dispersed throughout the surface parking lot areas to
achieve a minimum of 25 percent shade at maturity, as well as shade trees along the
north, west and south sides of the building.
Applicable Plan, Overlays, and Initiatives
101/Cave Creek Major Employment Center: See Background Item No. 2.
Outer Loop Freeway Specific Plan: See Background Item No. 7.
Tree and Shade Master Plan: See Background Item No. 8.
Complete Streets Guidelines: See Background Item No. 9.
Comprehensive Bicycle Master Plan: See Background Item No. 10.
Zero Waste PHX: See Background Item No. 11.
Transportation Electrification Action Plan: See Background Item No. 12.
Phoenix Climate Action Plan: See Background Item No. 13.
Surrounding Land Uses/Zoning
Land Use
Zoning
On Site
Equestrian facility
PUD
North (across Rose
Garden Lane)
Office and warehouse
CP/BP
South
Warehouse and manufacturing
CP/GCP
East
Office and athletic facility
CP/GCP
West
Office and warehouse
CP/GCP
Staff Report: Z-60-23-2
November 22, 2023
Page 3 of 12
A-1 – Light Industrial District
Standards
Requirements
Provisions on the
Proposed Site Plan
Gross Acreage
-
5.02 acres
Maximum Building Height
56 feet; up to 80 feet with use
permit
42 feet (Met)
Maximum Lot Coverage
No maximum
31.9% (Met)
Minimum Building Setback
Adjacent to Street
25 feet
North: 96 feet, 1
inch (Met)
Minimum Building Setback
Adjacent to Property Line
0 feet
East: 77 feet, 8
inches (Met)
South: 58 feet (Met)
West: 57 feet (Met)
Minimum Landscape Setback
Adjacent to Street
5 feet and no less than 8 feet
times the lot frontage,
measured in square feet
North: 21 feet (Met)
Minimum Landscape Setback
Adjacent to Property Line
0 feet
East: 0 feet (Met)
South: 0 feet (Met)
West: 0 feet (Met)
Minimum Parking
83 spaces
Office: 1 space per 300 sq. ft.
Warehouse: 1 space per
1,000 sq. ft.
Proposed office: 6,000 sq. ft.
Proposed warehouse: 62,496
sq. ft.
96 spaces (Met)
Background/Issues/Analysis
SUBJECT SITE
1.
This request is to rezone 5.02 acres located approximately 375 feet east of the
southeast corner of 25th Place and Rose Garden Lane from PUD (Planned Unit
Development) to A-1 (Light Industrial District) for a warehousing and office
building.
2.
101/Cave Creek Major Employment Center
The subject site is located within the boundaries of the Maricopa Association of
Governments (MAG) designated 101/Cave Creek major employment. The
101/Cave Creek employment center includes the area between Cave Creek
Road to the west, the Loop 101 freeway to the south, and the Central Arizona
Project (CAP) canal to the north and east.
Staff Report: Z-60-23-2
November 22, 2023
Page 4 of 12
The 101/Cave Creek
employment center
consists of an
established commerce
park and industrial area
consisting of
warehouses and
offices. The proposal
for a warehouse and
office would remain in
character with the
established
employment center.
GENERAL PLAN LAND USE MAP DESIGNATION
3.
The General Plan Land Use Map designation for the subject site is Industrial.
The proposal for A-1 (Light Industrial District) is consistent with this designation.
The General Plan Land Use Map designations surrounding the site to the north,
east, south and west are also Industrial.
General Plan Land Use Map
Source: Planning and Development Department
Major Employment Centers Map
Source: Planning and Development Department
Staff Report: Z-60-23-2
November 22, 2023
Page 5 of 12
SURROUNDING LAND USES AND ZONING
4.
The subject site is used for an equestrian facility and is currently zoned PUD
(Planned Unit Development).
To the north of the subject site, across Rose Garden Lane, are office and
warehouse uses, zoned CP/BP (Commerce Park District, Business Park Option).
To the south of the subject site are warehouse and manufacturing uses, zoned
CP/GCP (Commerce Park District, General Commerce Park Option).
To the east of the subject site are office uses and an athletic facility, zoned
CP/GCP (Commerce Park District, General Commerce Park Option).
To the west of the subject site are office and warehouse uses, zoned CP/GCP
(Commerce Park District, General Commerce Park Option).
PROPOSAL
5.
Site Plan
The conceptual site plan, attached as an exhibit, proposes a 65,496-square-foot
warehouse building with a 6,000-square-foot office. Loading docks are proposed
Zoning Sketch Map
Source: Planning and Development Department
Staff Report: Z-60-23-2
November 22, 2023
Page 6 of 12
on the east side of the building which will be screened by the office building and
landscaping to the north of the loading dock area. The site plan proposes 96
parking spaces provided along the east and west sides of the site and on the
north side of the building. Vehicular access is proposed from Rose Garden Lane
with two driveways located on the east and west sides of the site for ingress and
egress. Refuse is proposed on the southeast corner of the site and on the east
side of the site near the rolling gate by the loading dock area. Since the site plan
meets or exceeds the development standards of the A-1 zoning district, staff
recommends general conformance with the site plan date stamped September 8,
2023. This is addressed in Stipulation No. 1.
In order to enhance employee health and wellness, staff is recommending that
one outdoor employee resting area of no less than 400 square feet, or two 200-
square foot areas, be provided on the site, and include a minimum of two
pedestrian seating benches, constructed of quality and durable materials, and
shaded to a minimum of 75 percent using shade trees and/or architectural shade.
This is addressed in Stipulation No. 12.
6.
Elevations
The building elevations provided propose a 42-foot-tall building with glazing
provided on all sides, a grey color palette with four varying colors, and three
varying materials including ground face CMU block wall and concrete tilt panels
with vertical deep reveals with and without score lines. To ensure the proposal
develops as shown, staff recommends general conformance with the elevations
date stamped November 15, 2023. This is addressed in Stipulation No. 2.
PLANS, OVERLAYS, AND INITATIVES
7.
Outer Loop Freeway Specific Plan
In May 1996, the Phoenix City Council adopted the Outer Loop Freeway Specific
Plan, which aims to retain the value of the immediate surrounding properties
along the Loop 101 freeway by mitigating the compatibility between the freeway
and the residential neighborhoods through which it passes. Its primary focus is
stabilizing the neighborhood through community involvement. The subject site is
within Segment 5, subsection 5.1, which includes properties between Cave
Creek Road to Squaw Peak Freeway. Since the site is not adjacent to the
freeway or located in a residential area, no specific mitigation recommendations
were proposed for the subject property.
8.
Tree and Shade Master Plan
The Tree and Shade Master Plan has a goal of treating the urban forest as
infrastructure to ensure that trees are an integral part of the city’s planning and
development process. By investing in trees and the urban forest, the city can
reduce its carbon footprint, decrease energy costs, reduce storm water runoff,
increase biodiversity, address the urban heat island effect, clean the air, and
increase property values. In addition, trees can help to create walkable streets
Staff Report: Z-60-23-2
November 22, 2023
Page 7 of 12
and vibrant pedestrian places. Staff is recommending robust tree planting and
shade standards, including:
• Larger canopy shade trees planted within the north landscape setback.
• Shade trees planted along the north, west, and south sides of the building.
• Shade trees dispersed throughout the surface parking lot areas to achieve
a minimum of 25 percent shade at maturity.
• Pedestrian pathways and sidewalks shaded to a minimum of 75 percent.
These are addressed in Stipulation Nos. 3 through 6.
9.
Complete Streets Guidelines
In 2014, the City of Phoenix City Council adopted the Complete Streets Guiding
Principles. The principles are intended to promote improvements that provide an
accessible, safe, connected transportation system to include all modes, such as
bicycles, pedestrians, transit, and vehicles. Staff is recommending pedestrian
walkways to be constructed of a visually contrasting material or other pavement
treatment where they cross a vehicular path. Additionally, staff is recommending
a detached sidewalk along Rose Garden Lane with a landscape strip between
the back of curb and sidewalk planted with enhanced streetscape landscaping to
provide shade along the sidewalk. These are addressed in Stipulation Nos. 7 and
13.
10.
Comprehensive Bicycle Master Plan
The City of Phoenix adopted the Comprehensive Bicycle Master Plan in 2014 to
guide the development of its bikeway system and supportive infrastructure. The
Comprehensive Bicycle Master Plan supports options for both short- and long-
term bicycle parking as a means of promoting bicyclist traffic to a variety of
destinations. As stipulated, the development will provide bicycle parking per the
requirements of Section 1307.H of the Phoenix Zoning Ordinance, which would
require all nonresidential uses to provide a minimum of one bicycle parking
space per 25 vehicle parking spaces, with a maximum of 25 spaces. This is
addressed in Stipulation No. 8.
11.
Zero Waste PHX
The City of Phoenix is committed to its waste diversion efforts and has set a goal
to become a zero-waste city, as part of the City’s overall 2050 Environmental
Sustainability Goals. One of the ways Phoenix can achieve this is to improve and
expand its recycling and other waste diversion programs. Section 716 of the
Phoenix Zoning Ordinance establishes standards to encourage the provision of
recycling containers for multifamily, commercial, and mixed-use developments
meeting certain criteria. The applicant indicated in their submittal materials that
the tenant plans to establish a recycling program for the proposed development
in order to help the City achieve this goal.
Staff Report: Z-60-23-2
November 22, 2023
Page 8 of 12
12.
Transportation Electrification Action Plan
In June 2022, the Phoenix City Council approved the Transportation
Electrification Action Plan. The current market desire for the electrification of
transportation is both a national and global phenomenon, fueled by a desire for
better air quality, a reduction in carbon emissions, and a reduction in vehicle
operating and maintenance costs. Businesses, governments and the public are
signaling strong future demand for electric vehicles (EVs), and many automobile
manufacturers have declared plans for a transition to fully electric offerings within
the coming decade. This Plan contains policy initiatives to prepare the City for a
future filled with more EVs, charging infrastructure and e-mobility equity, and
outlines a roadmap for a five-step plan to prepare for the EV infrastructure needs
of 280,000 EVs in Phoenix by 2030. One goal of the Plan to accelerate public
adoption of electric vehicles through workplace, business, and multifamily
charging infrastructure recommends a standard stipulation for rezoning cases to
provide EV charging infrastructure. Staff recommends a minimum of five percent
of the required parking spaces include EV Installed infrastructure. Additionally,
staff recommends a minimum of 10 percent of the required bicycle parking
spaces include standard electrical receptacles for electric bicycle charging
capabilities. These are addressed in Stipulation Nos. 9 and 10.
13.
Phoenix Climate Action Plan
In October 2021, the Phoenix City Council approved the Climate Action Plan.
The Climate Action Plan will serve as a long-term plan to achieve greenhouse
gas emissions reductions and resiliency goals from local operations and
community activities as well as prepare for the impacts of climate change. This
plan contains policy and initiatives regarding stationary energy, transportation,
waste management, air quality, local food systems, heat, and water. Goal W2
(Water), Action W2.4, pertains to the implementation of the Greater Phoenix
Metro Green Infrastructure (GI) and Low Impact Development Details for
Alternative Stormwater Management to benefit the environment, promote water
conservation, reduce urban heat, improve the public health, and create additional
green spaces. This goal is addressed in Stipulation No. 11, which requires a
minimum of two GI techniques for stormwater management to be implemented in
this development.
COMMUNITY INPUT SUMMARY
14.
At the time this staff report was written, staff had not received any letters in
support or in opposition to this request.
INTERDEPARTMENTAL COMMENTS
15.
Street Transportation Department
The Street Transportation Department commented that Rose Garden Lane is
part of a significant bicycle bikeway called the Phoenix Sonoran Bikeway, a 40-
mile bikeway connecting South Mountain to the Phoenix Sonoran Desert
Preserve and requested that bicycle facilities be incorporated on the site to
Staff Report: Z-60-23-2
November 22, 2023
Page 9 of 12
Findings
1.
The proposal is consistent with the General Plan Land Use Map designation.
2.
The proposal is compatible with the surrounding land uses and zoning.
3.
As stipulated, the landscaping and planting standards are above the minimum
required standards and will lessen the proposal’s impact.
4.
As stipulated, the proposal supports efforts from various plans and initiatives,
including the Tree and Shade Master Plan, the Complete Streets Guiding
encourage utilization of a bicycle for recreation and transportation. The Street
Transportation Department also commented that Rose Garden Lane is identified
as a Collector E roadway which has an existing 40-foot half street dedication and
requested the following:
• That a minimum five-foot-wide detached sidewalk separated by a
minimum eight-foot-wide landscape strip be constructed on the south side
of Rose Garden Lane, adjacent to the development.
• That the developer underground existing electrical utilities within the public
right-of-way that are impacted or require relocation as part of this project.
• That all streets be constructed with all required elements and comply with
all ADA accessibility standards.
These are addressed in Stipulation Nos. 13 through 15.
OTHER
16.
The site has not been identified as being archeologically sensitive. However, in
the event archaeological materials are encountered during construction, all
ground disturbing activities must cease within a 33-foot radius of the discovery
and the City of Phoenix Archaeology Office must be notified immediately and
allowed time to properly assess the materials. This is addressed in Stipulation
No. 16.
17.
Staff has not received a completed form for the Waiver of Claims for Diminution
in Value of Property under Proposition 207 (A.R.S. 12-1131 et seq.), as required
by the rezoning application process. Therefore, a stipulation has been added to
require the form be completed and submitted prior to preliminary site plan
approval. This is addressed in Stipulation No. 17.
18.
Development and use of the site is subject to all applicable codes and
ordinances. Zoning approval does not negate other ordinance requirements.
Other formal actions such as, but not limited to, zoning adjustments and
abandonments, may be required.
Staff Report: Z-60-23-2
November 22, 2023
Page 10 of 12
Principles, the Comprehensive Bicycle Master Plan, the Transportation
Electrification Action Plan, and the Phoenix Climate Action Plan.
Stipulations
1.
The development shall be in general conformance with the site plan date
stamped September 8, 2023, as modified by the following stipulations, and as
approved by the Planning and Development Department.
2.
The development shall be in general conformance with the elevations date
stamped November 15, 2023, as approved by the Planning and Development
Department.
3.
The landscape setback along the north side of the property, adjacent to Rose
Garden Lane, shall be planted with minimum 2-inch caliper, large canopy,
drought-tolerant, shade trees, planted 20 feet on center or in equivalent
groupings, and drought-tolerant shrubs, accents, and vegetative groundcovers
to achieve a minimum of 75% live coverage, as approved by the Planning and
Development Department.
4.
A minimum 5-foot-wide landscape strip shall be provided along the north, west,
and south sides of the building, and shall be planted with minimum 2-inch
caliper, large canopy, drought-tolerant, shade trees, planted 20 feet on center or
in equivalent groupings, and drought-tolerant shrubs, accents, and vegetative
groundcovers to achieve a minimum of 75% live coverage, as approved by the
Planning and Development Department.
5.
All uncovered surface parking lot areas shall be landscaped with minimum 2-
inch caliper, large canopy, drought-tolerant, shade trees. Landscaping shall be
dispersed throughout the parking area and achieve 25% shade, as approved by
Planning and Development Department.
6.
All pedestrian pathways, including sidewalks, shall be shaded by a structure,
landscaping, or a combination of the two to provide a minimum of 75% shade,
as approved by the Planning and Development Department.
7.
Where pedestrian walkways cross a vehicular path, the pathway shall be
constructed of decorative pavers, stamped or colored concrete, or other
pavement treatments that visually contrasts parking and drive aisle surfaces, as
approved by the Planning and Development Department.
8.
Bicycle parking spaces shall be provided per the requirements of Section
1307.H of the Phoenix Zoning Ordinance through Inverted U and/or artistic
racks located near the office and installed per the requirements of Section
1307.H. of the Phoenix Zoning Ordinance. Artistic racks shall adhere to the City
Staff Report: Z-60-23-2
November 22, 2023
Page 11 of 12
of Phoenix Preferred Designs in Appendix K of the Comprehensive Bicycle
Master Plan.
9.
A minimum of 10% of the required bicycle parking spaces shall include standard
electrical receptacles for electric bicycle charging capabilities, as approved by
the Planning and Development Department.
10.
A minimum of 5% of the required parking spaces shall include Electric Vehicle
(EV) Installed Infrastructure, as approved by the Planning and Development
Department.
11.
A minimum of two green infrastructure (GI) techniques for stormwater
management shall be implemented per the Greater Phoenix Metro Green
Infrastructure and Low Impact Development Details for Alternative Stormwater
Management, as approved or modified by the Planning and Development
Department.
12.
One outdoor employee resting area of no less than 400 square feet, or two 200-
square foot areas shall be provided on site. Each required pedestrian area shall
include a minimum of two pedestrian seating benches, constructed of quality
and durable materials, and shaded to a minimum of 75% using minimum 2-inch
caliper large canopy drought-tolerant shade trees and/or architectural shade, as
approved by the Planning and Development Department.
13.
A minimum 5-foot-wide detached sidewalk separated by a minimum 8-foot-wide
landscape strip located between the back of curb and sidewalk shall be
constructed on the south side of Rose Garden Lane, adjacent to the
development, planted to the following standards and as approved by the
Planning and Development Department.
a. Minimum 2-inch caliper, single-trunk, large canopy, drought-tolerant,
shade trees, planted 20 feet on center or in equivalent groupings.
b. Drought-tolerant shrubs, accents, and vegetative groundcovers with a
maximum mature height of two feet to achieve a minimum of 75% live
coverage.
Where utility conflicts exist, the developer shall work with the Planning and
Development Department on an alternative design solution consistent with a
pedestrian environment.
14.
All existing overhead utilities within the public right-of-way shall be
undergrounded, adjacent to the development. The developer shall coordinate
with all affected utility companies for their review and permitting.
Staff Report: Z-60-23-2
November 22, 2023
Page 12 of 12
15.
All streets within and adjacent to the development shall be constructed with
paving, curb, gutter, sidewalk, curb ramps, streetlights, median islands,
landscaping and other incidentals, as per plans approved by the Planning and
Development Department. All improvements shall comply with all ADA
accessibility standards.
16.
In the event archaeological materials are encountered during construction, the
developer shall immediately cease all ground-disturbing activities within a 33-
foot radius of the discovery, notify the City Archaeologist, and allow time for the
Archaeology Office to properly assess the materials.
17.
Prior to preliminary site plan approval, the landowner shall execute a
Proposition 207 waiver of claims form. The waiver shall be recorded with the
Maricopa County Recorder’s Office and delivered to the City to be included in
the rezoning application file for record.
Writer
Adrian Zambrano
November 22, 2023
Team Leader
Racelle Escolar
Exhibits
Zoning Sketch Map
Aerial Sketch Map
Conceptual Site Plan date stamped September 8, 2023
Conceptual Landscape Plan date stamped September 8, 2023
Elevations date stamped November 15, 2023
ANX 135-8C
Z-52-01
Z-141-00
Z-22-16
Z-SP-15-01
Z-56-00
Z-SP-10-97
ANX 135-8D
Z-93-02
Z-12-05
Z-88-01
Z-13-17
Z-19-96
Z-156-04
Z-113-95
Z-101-03
Z-15-10
135-8A
135-7D
SP-8-B
*
*
*
*
*
*
*
*
*
*
*
*
*
*
CP/BP
C-2
CP/GCP
C-2
CP/GCP
CP/GCP
RE-35
CP/
RE-35
PUD
C-2
CP/GCP
CP/GCP SP
CP/GCP
CP/BP
CP/GCP
C-2
C-2
CP/GCP
C-2
S-1
MOHAWK LN
ROSE GARDEN LN
25TH PL
28TH ST
DEER VALLEY DR
SR 101
UNION HILLS DR
BELL RD
GREENWAY RD
THUNDERBIRD RD
CACTUS RD
SHEA BLVD
S
Q
U
A
W PEAK PKWY (SR 51)
16TH ST
24TH ST
32ND ST
40TH ST
TATUM BLVD
56TH ST
64TH ST
SCOTTSDALE RD
PARADISE VALLEY VILLAGE
CITY COUNCIL DISTRICT: 2
I
APPLICANT'S NAME:
APPLICATION NO.
Z-60-23
GROSS AREA INCLUDING 1/2 STREET
AND ALLEY DEDICATION IS APPROX.
5.02 Acres
MULTIPLES PERMITTED
* Maximum Units Allowed with P.R.D. Bonus
PUD
A-1
CONVENTIONAL OPTION
8
N/A
* UNITS P.R.D. OPTION
N/A
N/A
LGE Desgin / Build c/o Carlos Elias
DATE:
9/29/2023
REVISION DATES:
AERIAL PHOTO &
QUARTER SEC. NO.
QS 41-33
ZONING MAP
N-9
REQUESTED CHANGE:
FROM: PUD ( 5.02 a.c.)
TO:
A-1 ( 5.02 a.c.)
Document Path: S:\Department Share\Information Systems\PL GIS\IS_Team\Core_Functions\Zoning\sketch_maps\2023\Z-60-23.mxd
Z-60-23
0.06
0
0.06
0.03
Miles
10/23/2023
ANX 135-8C
Z-52-01
Z-141-00
Z-22-16
Z-SP-15-01
Z-56-00
Z-SP-10-97
ANX 135-8D
Z-93-02
Z-12-05
Z-88-01
Z-13-17
Z-19-96
Z-156-04
Z-113-95
Z-101-03
Z-15-10
135-8A
135-7D
SP-8-B
*
*
*
*
*
*
*
*
*
*
*
*
*
*
CP/BP
C-2
CP/GCP
C-2
CP/GCP
CP/GCP
RE-35
CP/
RE-35
PUD
C-2
CP/GCP
CP/GCP SP
CP/GCP
CP/BP
CP/GCP
C-2
C-2
CP/GCP
C-2
S-1
MOHAWK LN
ROSE GARDEN LN
25TH PL
28TH ST
Maricopa County Assessor's Office
DEER VALLEY DR
SR 101
UNION HILLS DR
BELL RD
GREENWAY RD
THUNDERBIRD RD
CACTUS RD
SHEA BLVD
S
Q
U
A
W PEAK PKWY (SR 51)
16TH ST
24TH ST
32ND ST
40TH ST
TATUM BLVD
56TH ST
64TH ST
SCOTTSDALE RD
PARADISE VALLEY VILLAGE
CITY COUNCIL DISTRICT: 2
I
APPLICANT'S NAME:
APPLICATION NO.
Z-60-23
GROSS AREA INCLUDING 1/2 STREET
AND ALLEY DEDICATION IS APPROX.
5.02 Acres
MULTIPLES PERMITTED
* Maximum Units Allowed with P.R.D. Bonus
PUD
A-1
CONVENTIONAL OPTION
8
N/A
* UNITS P.R.D. OPTION
N/A
N/A
LGE Desgin / Build c/o Carlos Elias
DATE:
9/29/2023
REVISION DATES:
AERIAL PHOTO &
QUARTER SEC. NO.
QS 41-33
ZONING MAP
N-9
REQUESTED CHANGE:
FROM: PUD ( 5.02 a.c.)
TO:
A-1 ( 5.02 a.c.)
Document Path: S:\Department Share\Information Systems\PL GIS\IS_Team\Core_Functions\Zoning\sketch_maps\2023\Z-60-23.mxd
Z-60-23
0.06
0
0.06
0.03
Miles
10/23/2023
$&
%&
GcOZ\NTKxCGRQx
hx
fx qUQrNTKxK@\G
gx
,x
.x
GcMZ\NTKxGQGC[XMC@QxVUQHZ&x
XGQUC@_Gx@ZxXGW`MXGF%x
9< xSNT*xZ\XGG\x B`NQFMTKx
FXMaGXx
BXH@PxX'X)x
bAXGLU`ZGx
GSVQUdGGx
GT[X@TCG
=<;?=xZ(I)xJUU]VXOT\x
:444xZ*I+xSGe@TNTGx
>4 4x
>4
4x
VH7tB
B`M QFOTK
ux
CUTZ\X`C^MUTx
/0xp85;
k6= xKX@FHx
RGaGRxFUUXx
:
x? k64 xFUCP
FUUXZx
\X`CPxbHRQ
invx
5:\X`CP2x
\X@MRGXx
ZV@CGZxNTx
d@XFx
w o!!!!"5;
k6= xKY@FG
RGaGRxFUUXx
FGGVxJUU^MTK
IUXxI`\`XHx
5;4 4x
PTUCPx
`^x
V@TGQZ1$x
\X`CPxbGRRZx
9
x ? k64 x
FUCPx
6944x
5;mk6jlxKsFGx
-x
QGaGQx
UXx#x
<4
4x
>4
4x
\X`CPxbHRQx
FUUXZx
/$'%("3, 33 - !
3
-$. 3, 3-
!
3
3
3
').3)0 ," 33!,33
/,, (.32)(%("3*/3
*,)*)- 32)(%("33
, +/$, 3*,&%("3
)!!% 33-!333-* -3
1, #)/- 33- !
333-* -3
3.).'3*,&$("3-* -3, +/$, 3
*,)0$ 3*,&$("3
3-* -3
3,-
CONCEPTUAL
&& &&
& & &#&"& &"&
&
&&! #&&&& &
&&&&& &
*&
***
" **%** *!(* *
*
*
#**
*
*#
***
*
* )*!*#* *!
*&
***!
!*!*!*
*
!* *&
*
!*&***$
*! *
*')* * *$*
x
3x
Ex
Dx
T.J. McQUEEN & ASSOCIATES,
.
INC. a
LANDSCAPE ARCHITECTURE
URBAN DESIGN
SITE PLANNING
10450N.74thstr&e1,Sulle120
Scottsdalo,Arlzona85258
P.(602)265-0320
EMAIL: timmc;qu&en@ijmla.net
: ::
I
BUILDING AREA
68,496 S.F.
65,496 S.F. FOOTPRINT
3,000 S.F. MEZZANINE
32' CLEAR
I
:: :: :
$-.=r)AL=*+, D,-./0f. .. 1:=23P=LA
4N5eo---
■■ ■ ■ ■
SCALE:
1• = 30'
CERCIDIUM HYBRID
DESERT MUSEUM
2' ' CALIPER 7'T,S'W
ACACIA SAUCINA
WILLOW ACACIA
2' CALIPER 8.5 'T.4'W
QUERCUS VIRGINIANA
LIVEOAK
l" CALIPER 6.51, 3.S'W
ACACIA ANEURA
MULGA (SRP/APS APPROVED)
2" CALIP., 5.S'T ,4'W
0
SALVAGED TREE
RELOCATED FROM SITE
0
S
bcRde;fg:hi
SEE INV /SAL V COMBO (C-1 J
*
AGAVE WEBBERII
WEBBER'S AGAVE
SGALLON
(§)
TECOMA 'ORANGE JUBILEE '
ORANGE JUBILEE
SGALLON
HESPERALOE PARVIFLORA
$
RED YUCCA
SGALLON
ACACIA REDOLENS
'DESERT CARPET ' tm
1 GALLON
ENCHINOCACTUS GRUSONII
"'
GOLDEN BARREL
SGALLON
DASYLIRION WHEELERII
DESERT SPOON
SGALLON
RUELLIA PENINSULARIS
BAJA RUELUA
SGALLON
LANTANA MONTEVIDENSIS
0
'GOLD MOUND'
1 GALLON
ALOE 'BLUE ELF '
BLUE ELF ALOE
I GALLON
I /'l' MINUS MADISON GOLD
DECOMPOSED GRANITE
'Z ' DEPTH IN ALL LANDSCAPE AREAS
CITY OF PHOENIX
SEP08 2023
Planning & Development
Department
__
=
_
·.:;.
_
...,
_
=-
_
.::;;;;
_
...
_
.... ¾
_
.,.
_
....
_
;:,
•
_
,.
_
-·
_
.......
_
.....
_
,..
_
,. ______________ LGE I DESIGNBUILD-----------------------
Phoenix, Arizona
CR E A 'TI Q N iREl
Muscular Moving Men
2023. 07. ,a
I"\
l!..!.]
CONCEPTUAL LANDSCAPE PLAN
z
w
0 ""
<(
w
V) ""
z
w
:E
c.,
z
5
0
:E ""
::::,
V)
::::,
:E
T.O. PARAPET MFR
+42'-0"
CLR SPACE MFR
+32'-0"
T.O. STOREFRONT MFR
+10'-0"
F.F.
+0'-0"
T.O. PARAPET MFR
+42'-0"
CLR SPACE MFR
+32'-0"
T.O. STOREFRONT MFR
+10'-0"
F.F.
+0'-0"
T.O. PARAPET MFR
+42'-0"
CLR SPACE MFR
+32'-0"
F.F.
+0'-0"
T.O. WALL
+8'-0"
T.O. STOREFRONT MFR
+10'-0"
T.O. STOREFRONT MFR
+10'-0"
T.O. PARAPET MFR
+42'-0"
CLR SPACE MFR
+32'-0"
F.F.
+0'-0"
T.O. STOREFRONT MFR
+10'-0"
T.O. PARAPET MFR
+42'-0"
CLR SPACE MFR
+32'-0"
F.F.
+0'-0"
T.O. STOREFRONT MFR
+10'-0"
T.O. PARAPET MFR
+42'-0"
CLR SPACE MFR
+32'-0"
F.F.
+0'-0"
T.O. PARAPET MFR
+42'-0"
CLR SPACE MFR
+32'-0"
F.F.
+0'-0"
T.O. STOREFRONT MFR
+10'-0"
T.O. PARAPET MFR
+42'-0"
CLR SPACE MFR
+32'-0"
F.F.
+0'-0"
G1
C1
C1
C1
CT P1
CTP2
CTP4
CRP4
G2
G1
CT P1
CT P1
CT P1
CT P1
CTP2
CTP2
CTP2
CTP2
CTP4
CTP4
CT P1
CTP2
CTP4
CT P1
CT P1
CT P1
CTP2
CTP2
CTP4
CTP4
G1
G1
G1
G1
G1
CTP4
G1
CTP4
CTP4
CTP4
CTP3
CTP3
CTP3
CTP3
CTP3
G1
G1
G1
G1
G2
CT P1
CT P1
CT P1
CTP2
C1
CTP4
CT P1
CTP2
G1
G1
CTP4
CT P1
CT P1
CT P1
CT P1
CT P1
CT P1
CTP2
CTP2
CTP2
CTP2
CTP4
CTP4
G1
CTP4
CTP2
G1
CTP2
CTP2
G1
G1
SCALE: 1" = 20'-0"
EXTERIOR ELEVATIONS
THESE DRAWINGS ARE AN INSTRUMENT OF SERVICE AND THE PROPERTY OF LGE DESIGN GROUP AND LGE DESIGN BUILD AND SHALL REMAIN THEIR PROPERTY. THE USE OF THIS DRAWING SHALL BE RESTRICTED TO THE ORIGINAL SITE FOR WHICH IT WAS PREPARED AND PUBLICATION THEREOF IS EXPRESSLY LIMITED TO SUCH
1200 N. 52nd Street Phoenix, AZ 85008
P: 480.966.4001
BJM
01/10/23
PRE-APP SUBMITTAL - 01/10/2023
SCALE: 1" = 20'-0"
SCALE: 1" = 20'-0"
DUNN EDWARDS (LIGHT GRAY I)
'COLD MORNING' # DE6365
(LRV 73)
DUNN EDWARDS (LIGHT GRAY II)
'COVERED IN PLATINUM' # DE6367
(LRV 46)
DUNN EDWARDS (DARK GRAY I)
'WALRUS' # DE6368
(LRV 31)
P2
P1
P3
SCALE: 1" = 20'-0"
DUNN EDWARDS (DARK GRAY I)
'BOAT ANCHOR' # DE6377
(LRV 14)
P4
KEY:
DESCRIPTION:
MATERIAL:
DESCRIPTION:
FRAMES
ALUMINUM STOREFRONT -
4 1/2" (SEALANT JOINT VERTS)
BLACK ANODIZED (AB-8)
EXTERIOR GLAZING
SOLARBAN 60
1" INSULATED GLAZING
LOW-E
SOLARGRAY
KEY:
DESCRIPTION:
CONCRETE TILT PANEL W/ VERTCIAL
1/2" X 1/2" DEEP REVEALS & 1/2" "V"
SCORE LINES - PAINTED.
EXTERIOR WALLS:
CT
G1
CR
CONCRETE TILT PANEL W/ 1' O.C.
VERTCIAL 1/2" X 1/2" DEEP REVEALS -
PAINTED.
GARAGE DOOR GLAZING
G2
C1
TRENDSTONE
GROUND FACE CMU WALL
INTEGRAL COLOR: RUTHERFORD
GRAY