REPORT OF PLANNING COMMISSION ACTION 
October 1, 2020 
ITEM NO: 11 
DISTRICT NO.: 7
SUBJECT: 
Application #: 
Z-12-20-7 (Laveen Spectrum PUD)
Location: 
Northwest corner of 59th Avenue and Baseline Road 
From: 
R1-8, R-2, R-3A, C-1, C-2 HGT/WVR
To: 
PUD 
Acreage: 
71.75 
Proposal: 
Planned Unit Development to allow commercial, multifamily and 
single-family residential development
Applicant: 
Barclay Group
Owner: 
Lines Brothers Farms, LLC
Representative: Gammage and Burnham, Susan E. Demmitt
ACTIONS: 
Staff Recommendation: Approval, subject to stipulations. 
Village Planning Committee (VPC) Recommendation: 
Laveen 7/13/2020 Information Only. 
Laveen 9/14/2020 Approval, per the staff recommendation with additional stipulations. 
Vote: 4-3. 
Planning Commission Recommendation: Approval, per the staff memo dated October 1, 
2020, with additional and modified stipulations. 
Motion Discussion: N/A 
Motion details: Commissioner Gaynor made a MOTION to approve Z-12-20-7, per the 
staff memo dated October 1, 2020, with the additional stipulation as read into the record 
and modification to Stipulation No. 1.c. and the additional Stipulation No. 1.f. as 
requested by the applicant. 
Maker: Gaynor 
Second: Johnson 
Vote: 7-0 
Absent: Montalvo, Shank 
Opposition Present: Yes 
Findings: 
1.
The proposed land use intensity is appropriate at this location in close proximity
to the Loop 202 freeway corridor.
Attachment F

2. 
The proposal includes several development standards and design guidelines 
that exceed conventional Zoning Ordinance standards.
 
 
3. 
The proposal includes enhanced landscaping standards as well as an enhanced 
pedestrian and bicycle environment along Baseline Road and 59th Avenue. 
 
Stipulations: 
 
1. 
An updated Development Narrative for the Laveen Spectrum PUD reflecting the 
changes approved through this request shall be submitted to the Planning and 
Development Department within 30 days of City Council approval of this request. 
The updated Development Narrative shall be consistent with the Development 
Narrative date stamped August 21, 2020, as modified by the following 
stipulations: 
 
 
 
a. 
Front cover: Revise the submittal date information on the bottom to add 
the following: Third FOURTH submittal: August 21, 2020; City Council 
adopted: [Add adoption date].
 
 
b. 
Page 25, Table 3, Trees: Trees in streetscape landscape areas along 
Baseline Road shall be minimum 50 percent 2-inch caliper, 25 percent 
3-inch caliper, and 25 percent 4-inch caliper.
 
 
c. 
PAGE 17, TABLE 2: DEVELOPMENT STANDARDS, MINIMUM OPEN 
SPACE: REVISE TO REFLECT THAT RESIDENTIAL USES IN 
DEVELOPMENT SUB-AREAS 2 AND 3 WITH DENSITIES NOT 
EXCEEDING 14 UNITS PER GROSS ACRE SHALL HAVE A 
MINIMUM OF 15 PERCENT OPEN SPACE BASED ON NET SITE 
AREA. 
 
 
D. 
PAGE 14, DEVELOPMENT SUB-AREA 2 LAND USES: REVISE 
FORMATTING TO REFLECT COMMUNITY GARDEN BEING A 
STANDALONE PERMITTED USE.
 
 
E. 
PAGES 72 THROUGH 78: APPENDIX K, PERIMETER DESIGN 
CORRIDOR SUPPLEMENT TO THE PUD NARRATIVE: THIS 
EXHIBIT SHALL BE REPLACED WITH THE PERIMETER DESIGN 
CORRIDOR SUPPLEMENT DATED SEPTEMBER 2020. 
 
 
F. 
Page 58, APPENDIX F, COMPARATIVE ZONING TABLE FOR 
RESIDENTIAL USES, PROPOSED COLUMN, MINIMUM OPEN 
SPACE: REVISE TO REFLECT THAT RESIDENTIAL USES WITH 
DENSITIES NOT EXCEEDING 14 UNITS PER 
GROSS ACRE SHALL HAVE A MINIMUM OF 15 PERCENT OPEN 
SPACE BASED ON NET SITE AREA.
 
 
 
2. 
The developer shall dedicate right-of-way and construct one bus stop pad along 
westbound Baseline Road west of the 59th Avenue alignment. The bus stop pad 
shall be constructed according to City of Phoenix Standard Detail P1262 with a 
minimum depth of 10 feet. The bus stop pad shall be spaced from the

intersection of 59th Avenue and Baseline Road according to City of Phoenix 
Standard Detail P1258. 
 
 
3. 
The developer shall dedicate right-of-way and construct one bus stop pad along 
southbound 59th Avenue south of the Carson Road alignment. The bus stop pad 
shall be constructed according to City of Phoenix Standard Detail P1262 with a 
minimum depth of 10 feet. The final bus stop pad placement to be approved by 
the Public Transit Department.
 
 
4. 
The developer shall dedicate right-of-way and construct one bus stop pad along 
southbound 59th Avenue south of the Vineyard Road alignment. The bus stop 
pad shall be constructed according to City of Phoenix Standard Detail P1262 
with a minimum depth of 10 feet. The final bus stop pad placement to be 
approved by the Public Transit Department.
 
 
5. 
The developer shall dedicate minimum 80-foot right-of-way for the west half of 
59th Avenue tapering to the north, as approved by the Street Transportation 
Department. 
 
 
6. 
The developer is fully responsible for any relocation or modification of the traffic 
signal at 59th Avenue and Baseline Road.
 
 
7. 
Existing irrigation facilities along any exiting or proposed right-of-way are to be 
undergrounded and/or relocated outside of City right-of-way. Contact SRP to 
identify existing land rights and establish appropriate process to relocate facility. 
Relocations that require additional dedications or land transfer require 
completion prior to obtaining plat and/or civil plan review approval. 
 
 
8. 
The applicant shall submit a Traffic Impact Study/Statement to the City for this 
development. No preliminary approval of plans shall be granted until the study is 
reviewed and approved by the City.
 
 
9. 
The developer shall construct all streets within and adjacent to the development 
with paving, curb, gutter, sidewalk, curb ramps, streetlights, median islands, 
landscaping and other incidentals, as per plans approved by the Planning and 
Development Department. All improvements shall comply with all ADA 
accessibility standards. 
 
 
10. If determined necessary by the Phoenix Archaeology Office, the applicant shall 
conduct Phase I data testing and submit an archaeological survey report of the 
development area for review and approval by the City Archaeologist prior to 
clearing and grubbing, landscape salvage, and/or grading approval. 
 
 
11. If Phase I data testing is required, and if, upon review of the results from the 
Phase I data testing, the City Archaeologist, in consultation with a qualified 
archaeologist, determines such data recovery excavations are necessary, the 
applicant shall conduct Phase II archaeological data recovery excavations. 
 
 
12. In the event archaeological materials are encountered during construction, the 
developer shall immediately cease all ground-disturbing activities within a 33-foot

radius of the discovery, notify the City Archaeologist, and allow time for the 
Archaeology Office to properly assess the materials.
 
 
13. DEVELOPER SHALL PROVIDE NOTICE TO THE CHAIR OF THE LAVEEN 
VILLAGE PLANNING COMMITTEE UPON SUBMITTAL OF A PRELIMINARY 
SITE PLAN APPLICATION TO THE PLANNING AND DEVELOPMENT 
DEPARTMENT FOR EACH INDIVIDUAL DEVELOPMENT PROJECT. THE 
NOTICE SHALL INCLUDE A COPY OF THE PRELIMINARY SITE PLAN 
SUBMITTAL AND THE DATE AND TIME OF THE PRELIMINARY SITE PLAN 
PUBLIC REVIEW MEETING WITH PLANNING AND DEVELOPMENT 
DEPARTMENT STAFF. 
 
 
14. CONCURRENT WITH THE DEVELOPMENT OF THE FIRST INDIVIDUAL 
DEVELOPMENT PROJECT WITHIN A DEVELOPMENT SUB-AREA, ALL 
REQUIRED STREETSCAPE ZONE PERIMETER SETBACK LANDSCAPING 
FOR THE ENTIRE DEVELOPMENT-SUB-AREA MUST BE INSTALLED. 
 
 
15. PRIOR TO PRELIMINARY SITE PLAN APPROVAL, THE LANDOWNER SHALL 
EXECUTE A PROPOSITION 207 WAIVER OF CLAIMS FORM. THE WAIVER 
SHALL BE RECORDED WITH THE MARICOPA COUNTY RECORDER'S 
OFFICE AND DELIVERED TO THE CITY TO BE INCLUDED IN THE 
REZONING APPLICATION FILE FOR RECORD.
 