TT0548_AGREEMENT_BWCDD_CANAL_AND_IRRIGATION_STRUCTURES_7-24-2018.DOCX
Extracted text (via pymupdf_layout)
7368 characters
Buckeye Water Conservation and Drainage District 205 E. Roosevelt Ave. Buckeye, AZ 85326 623.386-2196 & The Maricopa County Department of Transportation MCDOT PROJECT TT0548 MC85 – LIBERTY SCHOOL ROAD TO COTTON LN BWCDD CONSTUCTION – CANAL & IRRIGATION STRUCTURES An AGREEMENT between Buckeye Water Conservation and Drainage District (BWCDD) and the Maricopa County Department of Transportation (MCDOT) for the extending and relocating irrigation facilities and structures, channel excavation, fill construction, lining existing irrigation channels, removal of structures and obstructions, and other miscellaneous work, operated by BWCDD, is entered into this 24TH day of July, 2018. I. Scope of Work: BWCDD will secure a contractor to provide labor, supervision, equipment, materials and supplies to complete the following Work Items based on the design provided by Jacobs (Exhibit A): a. The widening of three (3) existing structures crossing MC85 over the BWCDD canal system, b. Demo/Removal of existing irrigation structure & concrete lining, c. Extension of 36” RGRCP Class V Irrigation pipe for Laterals 3-M & 1-S, d. Installation of two (2) new #4 concrete headwalls, e. And placement of concrete lining within the existing irrigation channel. II. Contract Price: Maricopa County will make a one-time payment to purchase necessary materials, supplies, labor and secure necessary permits to allow for construction activities to take place based on the estimate dry-up date of November 2, 2018. III. The amount to be paid will be subject to any additions and/or deductions made pursuant to authorized change orders, not to exceed 10% of the estimated amount. Final invoices shall include cost of materials and labor associated with any work performed as part of this AGREEMENT. EXHIBIT A EXHIBIT B IV. BWCDD is responsible for their Contractor’s work performance, compliance with federal, state and local laws, blue staking, insurance requirements and BWCDD final approval and acceptance of the work performed. V. BWCDD’s contractor and sub-contractors must have a current Arizona Contractor License and insurance coverage. VI. MCDOT shall provide adequate horizontal and vertical survey control. The grade and alignment of the relocation/installation shall be staked by MCDOT for those portions of the project within the scope of the roadway right-of way project limits. VII. MCDOT shall provide any necessary Right-of-Way permits at no cost to BWCDD or its subcontractors. VIII. Maintenance and operations associated costs for the BWCDD facilities covered by this AGREEMENT will be the responsibility of BWCDD. IX. Ownership of the removed, relocated and/or new irrigation equipment, supplies and material shall remain with the current owner. X. Schedules and Payments: a. MCDOT will be responsible for the cost of the irrigation relocations and cost of any work performed by BWCDD for prior rights facilities. MCDOT shall pay BWCDD the total sum of Nine hundred forty-two thousand five dollars and two cents ($942,005.02). MCDOT shall pay BWCDD the full amount of the costs estimated for the construction/relocations of BWCDD’s Canal and Irrigation Structure, as set forth in (Exhibit B). This payment shall serve as a draw fund to reimburse BWCDD for those costs that are related to the construction (“Construction Draw”) for said materials, supplies, labor and to secure necessary permits to allow for construction activities to take place during this year’s dry-up beginning November 2, 2018. b. Upon receipt of MCDOT’s Construction Draw, BWCDD will authorize its contractor to begin preparation for the construction to the New BWCDD Facilities. c. The estimate costs includes a Construction Contingency for any possible unknown/unforeseen work that may be required to complete the relocation work. Any remaining amount, not spent on the completion of this project will be reimbursed to MCDOT as non-used funds. XI. Liability: a. MCDOT and BWCDD each agree to be liable to the other party for its own acts of negligence and the negligence of its own employees. XII. General Terms and Conditions: a. By entering into this AGREEMENT, the Parties agree that to the extent permitted by law, each Party will defend, indemnify and hold the other Parties harmless, including any of the Parties’ departments, agencies, officers, employees, elected officials or agent, from and against all loss, expense, damage or claim of any nature whatsoever which is caused by an activity, condition or event arising out of the negligent performance or nonperformance by the indemnifying Party of any of the provisions of this AGREEMENT. By entering into this AGREEMENT, each Party indemnifies the other against all liability, loses and damages of any nature for or on account of any injuries or death of persons or damage to or destruction of nonperformance of this AGREEMENT, except such injury or damage as shall have been caused or contributed to by the negligence of that other Party. The damages which are the subject of this indemnity shall include but not be limited to the damages incurred by any Party, its departments, agencies, officers, employees, elected officials and/or agents. In the event of an action, the damages which are subject of this indemnity shall include costs, expenses of litigation and reasonable attorney’s fees. XIII. This AGREEMENT shall be subjected to the provisions of A.R.S. § 38-511. XIV. The Parties warrant that they are in compliance with A.R.S. § 41-4401 and further acknowledge that: a. Any contractor or subcontractor who is contracted by a Party to perform work on the Project shall warrant their compliance with all federal immigration laws and regulations that relate to their employees and their compliance with A.R.S. § 23- 214(A), and shall keep a record of the verification for the duration of the employee’s employment or at least three years, whichever is longer. XV. Communication required to be given pursuant to this AGREEMENT shall be: Maricopa County Department of Transportation Attention: Utility Coordinator 2901 West Durango Street Phoenix, AZ 85009 Fax No.: (602)506-3939 Buckeye Water Conservation and Drainage District Attention: Noel Carter 205 E. Roosevelt Ave. Buckeye, AZ 85326 a. This AGREEMENT, including any schedules, exhibits or attachments hereto, constitutes the entire AGREEMENT between parties, and no understanding or obligation not expressly set forth herein shall be binding upon them. No modification, amendment or alteration of this AGREEMENT shall be valid unless it is in writing and signed by both parties. b. This AGREEMENT shall be governed by the laws of the State of Arizona. c. The waiver by either party of any breach or failure to provide full performance under any of the terms or conditions of this AGREEMENT shall not be construed as a waiver of any other term or condition, or of any subsequent breach of the same or any other term or condition. IN WITNESS WHEREOF, the parties hereto have executed this AGREEMENT on the 24TH day of July, 2018. Signatures Dated this __________ day of ______________, 2018 MARICOPA COUNTY, A political subdivision of the State of Arizona Steve Churcri, Board of Supervisors Chairman _________________________________ ATTEST: _____________________________ Clerk of the Board APPROVED AS TO FORM: _____________________________ County Attorney