EXHIBIT_B_TT0548_BWCDD_CANAL_AND_IRRIGATION_STRUCTURES_INVOICE_7-24-2018.DOCX
Extracted text (via pymupdf_layout)
6102 characters
Cost Estimate Number: BWCDD18008 July 24, 2018 Mr. Robert Prater Maricopa County Department of Transportation 2901 W. Durango Street Phoenix, AZ 85009 Project TT0548 MC-85 Laterals 1-S & 3-M Extensions, Bridge Widening & Box Culvert Extensions – MWCDD Dry Up Buckeye, Arizona BWCDD has contracted DBA Construction, Inc. and Desert Pool Services (Shotcrete contractor), to complete these items as listed. Contractors will furnish all labor, equipment and materials (unless otherwise noted) for the completion of the project. BWCDD will be handling construction management and oversite for scope of the project that pertains to the 100% sealed plans and this Cost Estimate. ITEM # QTY. UNIT DESCRIPTION UNIT PRICE EXTENSION LATERAL NUMBER 1-S COST ESTIMATE 1 1 LS Mobilization $600.00 $ 600.00 2 4 HR Pot Hole $130.00 $ 520.00 4 15 LF Remove/Reset Fence $22.00 $ 330.00 5 6 LF Saw Cut Concrete $38.50 $ 231.00 6 2 EA Remove Irrigation Structure $705.00 $ 1,410.00 7 144 SF Remove Concrete Ditch Lining $7.50 $ 1,080.00 8 13 LF 36" RGRCP Class V Irrigation Pipe $480.00 $ 6,240.00 9 1 EA 36" Concrete Pipe Collar $2,500.00 $ 2,500.00 10 12 CY Structural Excavation Headwall $60.00 $ 720.00 11 10 SY Excavate/Grade Hand Placed Ditch Lining $89.00 $ 890.00 12 25 SF 6" ABC @ Headwall $18.80 $ 470.00 13 1 EA Concrete Headwall No. 4 $7,105.00 $ 7,105.00 14 82 SF 4" Concrete Hand Placed Ditch Lining $42.05 $ 3,448.10 15 9 CY Backfill Headwall $91.50 $ 823.50 15 100 SY Parkway Grading $2.95 $ 295.00 18 8 DAY Traffic Control $305.00 $ 2,440.00 19 1 LS Construction Quality Control $1,250.00 $ 1,250.00 20 1 EA BWCDD Construction management/Admin $4,552.89 $ 4,552.89 LATERAL 1-S TOTAL: $ 34,905.49 P.O Box 1726 Buckeye AZ. 85326 Ph: 623-386-2196 Fax:623-386-7789 www.bwcdd.com 1 | P a g e ITEM # QTY. UNIT DESCRIPTION UNIT PRICE EXTENSION LATERAL NUMBER 3-M COST ESTIMATE 1 1 LS Mobilization $600.00 $ 600.00 2 4 HR Pot Hole $130.00 $ 520.00 3 6 LF Saw Cut Concrete $38.50 $ 231.00 4 1 EA Remove Irrigation Structure $815.00 $ 815.00 5 336 SF Remove Concrete Ditch Lining $7.50 $ 2,520.00 6 25 LF 36" RGRCP Class V Irrigation Pipe $350.00 $ 8,750.00 7 1 EA 36" Concrete Pipe Collar $2,500.00 $ 2,500.00 8 8 CY Structural Excavation Headwall $60.00 $ 480.00 9 10 SY Excavate/Grade Hand Placed Ditch Lining $89.00 $ 890.00 10 25 SF 6" ABC @ Headwall $18.80 $ 470.00 11 1 EA Concrete Headwall No. 4 $7,105.00 $ 7,105.00 12 105 SF 4" Concrete Hand Placed Ditch Lining $42.05 $ 4,415.25 13 9 CY Backfill Headwall $91.50 $ 823.50 14 100 SY Parkway Grading $2.95 $ 295.00 15 8 DAY Traffic Control $305.00 $ 2,440.00 16 1 LS Construction Quality Control $1,250.00 $ 1,250.00 17 1 EA BWCDD Constuction Management/Admin $5,115.71 $ 5,115.71 LATERAL 3-M TOTAL: $ 39,220.46 P.O Box 1726 Buckeye AZ. 85326 Ph: 623-386-2196 Fax:623-386-7789 www.bwcdd.com 2 | P a g e ITEM # QTY. UNIT DESCRIPTION UNIT PRICE EXTENSION BRIDGE WIDENING & BOX CULVERT EXTENSIONS COST ESTIMATE 1 1 LS Mobilization $17,850.00 $ 17,850.00 2 1 LS SWPP PLAN & BMPs $6,600.00 $ 6,600.00 4 65 CY STRUCTURAL EXCAVATION $79.00 $ 5,135.00 5 475 CY CHANNEL EXCAVATION $33.50 $ 15,912.50 6 156 CY STRUCTURAL BACKFILL $71.00 $ 11,076.00 7 340 CY FILL CONSTRUCTION $91.50 $ 31,110.00 8 877 SY GEOGRID $5.08 $ 4,455.16 9 800 TON MAG ABC $37.85 $ 30,280.00 10 170 SY REMOVE CONCRETE CHANNEL LINING $18.00 $ 3,060.00 11 2 EA REMOVE CANTILEVER CONCRETE $1,840.00 $ 3,680.00 12 8 EA REMOVE WINGWALL $849.00 $ 6,792.00 13 1 EA REMOVE CONCRETE GIRDERS $11,713.00 $ 11,713.00 14 120 LF REMOVE CHAIN LINK FENCE & CURB $12.50 $ 1,500.00 15 1 LS TRAFFIC CONTROL $9,915.00 $ 9,915.00 15 28 DAY VARIABLE MESSAGE BOARD $100.00 $ 2,800.00 18 280 HR OFF DUTY OFFICER $64.00 $ 17,920.00 19 104 LF CONCRETE DRILLED SHAFTS 2' DIA $550.00 $ 57,200.00 20 10 CY MAG AA CONCRETE $1,174.00 $ 11,740.00 21 208 CY MAG A CONCRETE $717.00 $ 149,136.00 22 36008 LB REINFORCING STEEL $3.67 $ 132,149.36 23 114 LF F SHAPE BARRIER 32" $165.00 $ 18,810.00 23 280 LF PRECAST VOIDED SLAB GIRDERS $613.00 $ 171,640.00 24 110 LF SAFETY RAIL MAG DET 145 MOD $84.00 $ 9,240.00 25 515 LF INSTALL WATER STOP JOINTS $16.47 $ 8,480.00 26 1 EA BWCDD issuance of ROW to MCDOT $4,000.00 $ 4,000.00 27 185 SY Shotcrete Canal Lining $180.00 $ 33,300.00 28 1 EA BWCDD Construction Management/Admin $38,950.05 $ 38,950.05 29 1205 LF CCS 1500 sealant $7.00 $ 8,435.00 30 1 EA Contengency Funds $45,000.00 $ 45,000.00 BRIDGE WIDENING & BOX CULVERT EXTENSIONS TOTAL $ 867,879.07 Grand Total $942,005.02 P.O Box 1726 Buckeye AZ. 85326 Ph: 623-386-2196 Fax:623-386-7789 www.bwcdd.com 3 | P a g e MCDOT Responsibilities: 1. Payment to BWCDD shall be made in full within 10 days of execution of agreement by MCDOT’s Board of Supervisors or no later than 60 days prior to commencement of project. Project commencement date is November 2, 2018. 2. QA & QC for the duration of this project (survey and testing) 3. Issue NESHAP, Construction, Right of Way permits and 404 Permits (if applicable) at no cost to BWCDD or its contractors. Assumptions Our proposal is based on assuming that the following conditions exist at the project site: 1. No utility conflicts. Clarifications Our cost estimates includes: 1. Pricing based on the mobilizations shown. 2. Pricing includes taxes and bond. 3. VMBs are included for 7 days prior to each dry up and include 2 message boards. 4. Off duty officers are included. 5. Night shifts are included along with light plants. 6. Contingency Funds. These funds will be paid back to MCDOT upon completion of Project barring any additional work, utility conflicts or force majeure not included in this cost estimate. Exclusions Our proposal excludes the following items and were not considered during the preparation of this cost estimate: 1. NESHAP, Construction, right of way and 404 permits, 2. The adjustment and relocation of conflicting utilities, 3. Survey, 4. And testing. BWCDD. Noel Carter P.O Box 1726 Buckeye AZ. 85326 Ph: 623-386-2196 Fax:623-386-7789 www.bwcdd.com 4 | P a g e P.O Box 1726 Buckeye AZ. 85326 Ph: 623-386-2196 Fax:623-386-7789 www.bwcdd.com 5 | P a g e