2 BUDGET RE PREP BLDG TO AUCTION & RESTORE SITE.PDF
Extracted text (via pymupdf_layout)
3706 characters
MARICOPA COUNTY FACILITIES MANAGEMENT DEPARTMENT Form Revised: Feb. 23, 2017 Design-Bid-Build Design-Build One-Step PROJECT NAME: Prep Modular Units for Removal and Restore Site Article 3 Contractor Moving cost by person/company that purchases units at auction Construction Management @ Risk Building/Site Number: 4040 W.I.C. Today's Date: November 30, 2017 Job Order Contracting Project Number: Date Budget Developed: 11.30.2017 Mechanical JOC Planner: Planned Completion Date: Electrical JOC Project Manager: Budget Contact: PSG User Department: Public Health Budget Revision # 1 Project Existing Location 1260 S. 7th Ave. Phoenix AZ Budget Revision # 2 Project New Location Budget Revision # 3 Type of Procurement Job Order Contracting PROJECT COSTS Quantities Cost Comments Land Acquisition $0 Property Purchase $0 Hard Key $$ Appraisal Costs $0 Hard Key $$ Title Report $0 Hard Key $$ Phase 1 & 2 Environmental Report $0 Hard Key $$ Legal Fees $0 Hard Key $$ ROW / Easement Costs $0 Hard Key $$ Other Closing Costs $0 Hard Key $$ Pre-Design Project Development $0 Environmental Study & Sampling $0 0.00% of Construction Costs Abatement / Remediation $0 0.00% of Construction Costs Archeological Remediation $0 Hard Key $$ Demolition $0 Hard Key $$ Survey $0 0.00% of Construction Costs Design $0 Summary of items below Civil & Utility Design for Bid Drawings @ New Location $0 0.00% of Construction Costs Additional Services $0 0.00% of Basic fees Special Inspections (if in A/E contract) $0 0.00% of Construction Costs Const. Mngt. as Related to Design $0 0.00% of Basic fees Cost Estimating (3rd Party) $0 0.00% of Construction Costs Geotechnical Services $0 0.00% of Construction Costs Permits / Taps / Connections General Bldg. Permit $0 0.00% of Construction Costs Water Permit $0 0.00% of Construction Costs Sewer Permit $0 0.00% of Construction Costs Aid-to-Construction (3 phase) $0 0.00% of Construction Costs Natural Gas $0 0.00% of Construction Costs Material Testing $0 0.00% of Construction Leed Certification $0 0.00% of Construction Costs Commissioning $0 0.00% of Construction Costs Printing & Advertising for Bidding $0 0.00% of Construction Cost Other Soft Costs $0 Hard Key $$ Project Management & Planning $1,200 Summary of Items Below In-House $ Per Hr. # of Hours FMD In-House Planning 0 Hrs $0 Hard Key Hours $0 $40.00 0 FMD Project Manager 24 Hrs $1,200 Hard Key Hours PM Time $ Per Hr. # of Hours Other County Departments Hard Key $$ $1,200 $50.00 24 Construction $94,659 Summary of Items Below Demo Skin, Disconnect Utilities, Demo 4' Out, Budget Revised Budget Prep Bldg for Removal and Restore Site $94,659 Infill Foundation Pit, Repave Area 11/20/2017 11/30/2017 Subtotal $71,590.00 $71,590.00 10% Contingency $7,159.00 $7,159.00 1% Bond $715.90 $715.90 1.5% Insurance $1,073.85 $1,073.85 8% Overhead $5,727.20 $5,727.20 5% Profit $0.00 $3,579.50 Subtotal $86,265.95 $89,845.45 5.35805% Taxes $4,622.17 $4,813.96 Equipment & Technology $0 Summary of Items Below Grand Total $90,888.12 $94,659.41 Operation equipment Telecom $0 OET & Cox Cable Reconnection of Services External (MC Network & Private Carrier) Internal Cabling Costs Network Equipment WAN / BDU / Wi-Fi / Radios / Racks Building Security $0 N/A Metal Detection A / V Systems Other Furniture & Softscape $0 Summary of Items Below Systems & Non-Systems Furniture $0 N/A Signage Exterior Interior Plants / Artwork Public Art Other Contingency $0 Summary of Items Below Design contingency $0 0% of Construction Costs Construction contingency $0 0% of Construction Costs TOTAL PROJECT COSTS $95,859 S:\Estimates by FY\FY18 Estimates\4040 7th Ave WIC\Relocate Bldg\Budget ~ Prep Bldg to Auction & Restore Site.xlsx