February 25, 2026 
Z250031 
Page 1 of 3 
 
 
 
 
Report to the Board of Supervisors 
Prepared by the Maricopa County Planning and Development Department 
 
Board Hearing Date: 
February 25, 2026 
 
Case #/Title:   
 
 
Z250031 – Sun Basin VII 
 
Supervisor District: 
4 
 
Applicant/Owner:  
Alyssa Menzel, Sun Basin Solar, LLC 
 
Request: 
Zone Change with Overlay from Rural-190 to IND-2 IUPD   
 
Site Location: 
Generally located Approx 5,881 ft. southwest of the southwest 
corner of Elliott Rd. & 363rd Ave. in the Arlington area 
 
Site Size: 
Approximately 65 acres 
 
County Island Status: 
N/A 
Additional Comments: 
The zone change request is to allow for a battery energy storage 
system (BESS) to complement many power generation uses in the 
immediate area. At the Commission hearing, staff with applicant 
concurrence introduced an additional condition ‘c.10’ that loading 
/unloading zones would not be required for BESS use. There are 
no outstanding concerns from reviewing agencies. There is no 
known opposition.

February 25, 2026 
Z250031 
Page 2 of 3 
Commission  
 
Recommendation: 
On 1/22/26, the Commission voted 6-0 (motion by Commissioner 
Rochwalik, D3, seconded by Commissioner Lindblom, D1) to adopt 
a motion recommending the Board of Supervisors approve 
Z250031 subject to conditions ‘a’ - ‘g’: 
 
a. 
A Plan of Development is approved subject to site plan entitled “Sun Basin VII Solar Project 
Site Plan” consisting of 8 full-size sheets, dated November 12, 2025. The Plan of 
Development may be amended administratively under separate application as long as the 
amendment complies with the established IUPD development standards as approved by 
the Board of Supervisors. Staff may determine slight refinements to remain in substantial 
conformance with the approved site plan.  Minor and major amendments to the site plan 
will be determined in accordance with Chapter 3 of the Maricopa County Zoning 
Ordinance. 
 
b. 
Development of the site shall be in substantial conformance with the Narrative Report 
entitled “Sun Basin VII Project”, consisting of 17 pages, dated November 2025, except as 
modified by the following conditions. 
 
c. 
The following IND-2 IUPD standards shall apply:  
1. 
Minimum Front Yard – 100’ 
2. 
Minimum Side Yard -100’ 
3. 
Minimum Rear Yard – 100’ 
4. 
Minimum Parking: No Parking required 
5. 
Minimum Screening: Minimum 6’ tall chain-link fences adjacent to rural/residential 
zoning boundaries, including attached barbed wire or concertina wire under 8’ in 
height, and allow all gates to have no attached screening. No screen wall, berm or 
hedges required along front property lines.  
6. 
Minimum Paving: Alternative surfacing materials or methods approved by 
Maricopa County Air Quality to minimize dust pollution, such as but not limited to, 
native compacted soil or aggregate base course, may be used in driveways and 
parking areas. 
7. 
Minimum Landscaping/Buffering: No landscaping or irrigation required. No 
screening required adjacent to rural and residential zoning districts. 
8. 
Minimum Sight Visibility Triangles: Within sight visibility triangles at any 
intersection, on-site chain-link fences without screening materials can exceed a 
height of 2’. 
9. 
The IUPD overlay shall limit entitled uses to power generation and distribution, 
BESS facilities and ancillary uses. 
10. 
Loading and Unloading: none required. 
 
d. 
The following Planning Engineering conditions shall apply:  
1. 
Engineering review of planning and/or zoning cases is for conceptual design only. 
All development and engineering design shall be in conformance with Section 
1205 of the Maricopa County Zoning Ordinance; Drainage Policies and Standards; 
Floodplain Regulations for Maricopa County; MCDOT Roadway Design Manual; 
and current engineering policies, standards and best practices at the time of 
application for construction. 
2. 
Based on the conceptual design nature of the information submitted, changes to 
the site layout may be necessitated by the final engineering design of the drainage 
infrastructure.

February 25, 2026 
Z250031 
Page 3 of 3 
3.
Detailed Grading and Drainage (Infrastructure) Plans must be submitted with the
application for Building Permits.
e.
Prior to issuance of the initial building permit, all parcels shall be combined to create a
single parcel matching the zone change area.
f.
Prior to issuance of a building permit, written confirmation will be required from the
emergency fire protection jurisdiction having authority that the facility has been designed
in accordance with their regulations and requirements, and that emergency fire protection
service will be provided to the facility. Prior to issuance of the certificate of occupancy,
local fire protection jurisdiction review and approval will be required.
g.
The  granting of this change in use of the property has been at the request of the applicant,
with the consent of the landowner.  The granting of this approval allows the property to
enjoy uses in excess of those permitted by the zoning existing on the date of application,
subject to conditions.  In the event of the failure to comply with any condition, the property
may be considered by the Board after recommendation by the Commission at a public
hearing for reversion to the zoning that existed on the date of application.  It is, therefore,
stipulated and agreed that either revocation due to the failure to comply with any
conditions, does not reduce any rights that existed on the date of application to use, divide,
sell or possess the property and that there would be no diminution in value of the property
from the value it held on the date of application due to such revocation of the Zone
Change. The Zone Change enhances the value of the property above its value as of the
date the Zone Change is granted and reverting to the prior zoning results in the same value
of the property as if the Zone Change had never been granted.
Presented by: 
Reviewed by: 
Attachment: 
Andrew Lorentzen, Planner 
Darren Gérard, AICP, Planning Manager  
1/22/26 P&Z Packet (38 pages)  
1/22/26 Handout Memo (2 pages) 
Note: 
1/22/26 Draft P&Z Minutes are not available as of the writing of this report, but can be 
provided upon request later when available.

Z250031 
Page 1 of 9 
 
 
Report to the Planning and Zoning Commission 
Prepared by the Maricopa County Planning and Development Department 
 
 
Case: 
Z250031 – Sun Basin VII 
 
 
 
 
 
Hearing Date: 
January 22, 2026 
 
Supervisor District: 
4 
 
 
  
 
Applicant/ Owner 
Alyssa Menzel, Sun Basin Solar, LLC 
   
Request: 
Zone Change with Overlay from Rural-190 to IND-2 IUPD   
 
  
 
Site Location: 
Generally located Approx 5,881 ft. southwest of the southwest corner of 
Elliott Rd. & 363rd Ave. in the Arlington area 
 
  
Site Size: 
Approximately 65 acres 
 
Density: 
N/A 
 
County Island:  
No 
 
 
County Plan: 
Old US Hwy 80 Area Plan –Industrial / Utilities 
 
Municipal Plan: 
N/A 
 
Municipal Comments: 
None received to date  
 
Support/Opposition: 
None known 
 
Recommendation: 
Approve with conditions

Z250031 
Page 2 of 9 
Project Summary: 
 
1. 
The application intends to rezone 32 properties from Rural-190 to IND-2 IUPD with a Plan of 
Development (POD) for battery energy storage system (BESS). This project is part 7 of a multi-
site regional energy project known as The Sun Basin Project. The BESS  facility will include 
approximately 65 acres of development with 15 of those acres being directly reserved for power 
transfer substation use.  
 
2. 
The project will be comprised of battery storage pods with a single operational building proposed. 
The operational goal is to create a  800-MW storage system at this single location. The site has 
been engineered for drainage requirements with provided onsite retention throughout. It is 
directly adjacent to other power generation facilities including additional BESS facilities to the 
east and is in the direct vicinity of the Palo Verde Nuclear Generating Station. 
 
3. 
The site is located in the Old US Hwy 80 area plan which has a designation of Industrial / Utilities. 
It has been designated as Industrial / Utilities with the original dedication of the plan in 2007 and 
has not been part of a land use designation change. 
 
4. 
The applicant is requesting to amend specific development standards to ease construction 
related issues, adapt for industry standards and to address additional safety and security 
standards. Alternative parking,  loading, SVT and paving standards, as referenced in the table 
below, demonstrate a reduced presence on the site as compared to traditional industrial uses. 
The applicant is requesting to amend the screening standards from a required CMU wall to a 6’ 
chain-link fence with 2’ barbed wire. The site has been designed with 100’ setbacks and will be 
codified in the IUPD to protect any future adjacent parcels or users.  
 
 
REGULATION 
BASE ZONING DISTRICT 
REGULATIONS (IND-2) 
PROPOSED ZONING DISTRICT 
REGULATIONS (IND-2 IUPD) 
Maximum Height  
60’ 
60’ 
Minimum Front Yard 
10’-25’ 
100’ 
Minimum Side Yard 
3’-10' 
100’ 
Minimum Street-side Yard 
10' 
100 
 
Minimum Rear Yard 
0’-25' 
100’ 
Minimum Lot Area 
6,000 sq. ft. 
6,000 sq. ft. 
Minimum Lot Width * 
60' 
60’ 
Maximum Lot Coverage 
60% 
60% 
Minimum Parking Spaces 
See parking regulations 
No required parking 
Minimum Screening 
Minimum 6’ concrete 
masonry unit wall 
adjacent to rural and 
residential zoning 
boundaries and for 
outdoor use of an 
industrial nature. The 
front property line shall be 
screened with a 3’ screen 
wall, berm or hedge to 
minimize headlight glare. 
 
Minimum 6’ tall chain-link 
fences adjacent to 
rural/residential zoning 
boundaries, including attached 
barbed wire or concertina wire 
under 8’ in height, and allow all 
gates to have no attached 
screening. No screen wall, berm 
or hedges required along front 
property lines.

Z250031 
Page 3 of 9 
Minimum Paving  
Article 1102.7.1. For other 
than one single-family 
dwelling unit or one 
mobile home on a lot of 
record, any parking area 
must be paved or in the 
alternative surfaced with 
aggregate base course 
material. 
Alternative surfacing materials 
or methods approved by 
Maricopa County Air Quality to 
minimize dust pollution, such as 
but not limited to, native 
compacted soil or aggregate 
base course, may be used in 
driveways and parking areas. 
 
Minimum 
Landscaping/Buffering 
There shall be a solid 
fence, wall and suitable 
planting six feet in height 
where the side or rear lot 
lines or boundaries of the 
lot are adjacent to a rural or 
residential zoning district. 
All street frontage of the lot 
shall be landscaped with 
drought-tolerant plants 
including trees, shrubs or 
natural vegetation. There 
shall be a minimum of one 
tree and three shrubs every 
20 feet. Trees shall be a 
minimum 2-inch caliper at 
the time of installation. The 
required side yards shall be 
landscaped with drought-
tolerant plants including 
trees, shrubs or natural 
vegetation. 4% of the gross 
parking area shall be 
landscaped with trees, 
shrubs, or natural 
vegetation. Any part of the 
lot not used for buildings, 
other structures, parking 
and vehicular and 
pedestrian access shall be 
landscaped with grass, 
trees, shrubs, xeriscaping 
or natural vegetation. All 
landscaped areas shall be 
provided with water bibs or 
an automatic sprinkler 
No landscaping or irrigation 
required. No screening required 
adjacent to rural and residential 
zoning districts. 
Minimum Sight Visibility 
Triangles (SVTs) 
No obstructions over 2’ in 
height within 25’ x 25’ SVTs.  
Within sight visibility triangles 
at any intersection, on-site 
chain-link fences without 
screening materials can exceed 
a height of 2’.

Z250031 
Page 4 of 9 
 2025 Aerial-photo 
 
 
Aerial image & surrounding environs

Z250031 
Page 5 of 9 
 
Eagle view of subject site looking north into subject parcel (aerial image dated September 30, 2021)  
 
 
Site Plan

Z250031 
Page 6 of 9 
 
 
5. 
It should be noted that since the applicant is proposing a site plan (required plan of development, 
POD) and although the zone change is a legislative approval, the POD is administratively 
approved. Therefore, POD approval is contingent upon prior rezoning approval. 
 
Existing On-Site and Adjacent Zoning / Land Use: 
 
6. 
On-site: 
 
Rural-190 / Vacant Undeveloped 
North: 
Rural-190 / Undeveloped – Power transfer substation  
South: 
IND-2 IUPD / Redhawk Power Generation Facility - Solar Power Generation 
East: 
IND-2 IUPD / Redhawk Power Generation Facility - BESS unit 
West: 
Rural-190 / Undeveloped – Power transfer substation  
 
 
Current Zoning

Z250031 
Page 7 of 9 
Proposed Zoning  
 
 
Utilities and Services: 
 
7. 
Water: 
 
Well 
Wastewater: 
Septic 
Fire: 
Arizona Fire and Medical Authority 
Police:  
Maricopa County Sherriff 
 
Right-of-Way: 
 
8. 
The following table includes existing and proposed half-width right-of-way and the future 
classification based upon the Maricopa County Department of Transportation (MCDOT) Major 
Streets and Routes Plan.   
 
Street Name 
Half-width Existing R/W 
Half-width Proposed R/W 
Future Classification 
Elliot Rd. 
28’ 
28’ 
Minor Arterial 
 
Adopted Plan: 
 
9. 
Old US Hwy 80 Area Plan (adopted May 2007): Industrial / Utilities – Industrial is listed under the 
plan as an appropriate designation for “warehousing, storage, distribution activities, and general 
manufacturing. Compatibility with adjacent current and future land use is an important 
consideration”. Industrial zoning for power generation and associated uses is consistent with the 
plan.  
 
Public Participation Summary:

Z250031 
Page 8 of 9 
10. 
The applicant has notified local landowners of the proposed zone change utilizing signs  being 
posted onsite and along the adjacent ROW along Elliot Rd. Letters of intent were sent out to all 
local landowners within 300’ of the subject parcel. Staff has not received any public or municipal 
comments to the application. The applicant has met all notification requirements set forth by 
county staff. 
 
Outstanding Concerns from Reviewing Agencies: 
 
11. 
N/A 
 
Staff Analysis: 
 
12. 
Staff supports the further development of the Sun Basin project and Sun Basin VII BESS proposal. 
The BESS facility will add to the regional power infrastructure and regional energy availability. The 
site is ideally located next to established power infrastructure sites, existing industrial uses and 
is not located near established residential uses. Staff does note that there are five adjacent vacant 
parcels that are not part of the BESS facility. While a future BESS facility may affect future 
residential development uses, staff notes that only one of these parcels currently meets minimum 
190,000 square feet minimum lot area requirement of the Rural-190 zoning district.  
 
Recommendation: 
 
13. 
Staff recommends the Commission adopt a motion recommending that the Board of Supervisors 
approve Z250031 subject to the following conditions ‘a’ – ‘g’: 
 
a. 
A Plan of Development is approved subject to site plan entitled “Sun Basin VII Solar Project 
Site Plan” consisting of 8 full-size sheets, dated November 12, 2025. The Plan of 
Development may be amended administratively under separate application as long as the 
amendment complies with the established IUPD development standards as approved by 
the Board of Supervisors. Staff may determine slight refinements to remain in substantial 
conformance with the approved site plan.  Minor and major amendments to the site plan 
will be determined in accordance with Chapter 3 of the Maricopa County Zoning 
Ordinance. 
 
b. 
Development of the site shall be in substantial conformance with the Narrative Report 
entitled “Sun Basin VII Project”, consisting of 17 pages, dated November 2025, except as 
modified by the following conditions. 
 
c. 
The following IND-2 IUPD standards shall apply:  
1. 
Minimum Front Yard – 100’ 
2. 
Minimum Side Yard -100’ 
3. 
Minimum Rear Yard – 100’ 
4. 
Minimum Parking: No Parking required 
5. 
Minimum Screening: Minimum 6’ tall chain-link fences adjacent to rural/residential 
zoning boundaries, including attached barbed wire or concertina wire under 8’ in 
height, and allow all gates to have no attached screening. No screen wall, berm or 
hedges required along front property lines.  
6. 
Minimum Paving: Alternative surfacing materials or methods approved by 
Maricopa County Air Quality to minimize dust pollution, such as but not limited to, 
native compacted soil or aggregate base course, may be used in driveways and 
parking areas.

Z250031 
Page 9 of 9 
7. 
Minimum Landscaping/Buffering: No landscaping or irrigation required. No 
screening required adjacent to rural and residential zoning districts. 
8. 
Minimum Sight Visibility Triangles: Within sight visibility triangles at any 
intersection, on-site chain-link fences without screening materials can exceed a 
height of 2’. 
9. 
The IUPD overlay shall limit entitled uses to power generation and distribution, 
BESS facilities and ancillary uses. 
 
d. 
The following Planning Engineering conditions shall apply:  
1. 
Engineering review of planning and/or zoning cases is for conceptual design only. 
All development and engineering design shall be in conformance with Section 
1205 of the Maricopa County Zoning Ordinance; Drainage Policies and Standards; 
Floodplain Regulations for Maricopa County; MCDOT Roadway Design Manual; 
and current engineering policies, standards and best practices at the time of 
application for construction. 
2. 
Based on the conceptual design nature of the information submitted, changes to 
the site layout may be necessitated by the final engineering design of the drainage 
infrastructure. 
3. 
Detailed Grading and Drainage (Infrastructure) Plans must be submitted with the 
application for Building Permits. 
 
e. 
Prior to issuance of the initial building permit, all parcels shall be combined to create a 
single parcel matching the zone change area.  
 
f. 
Prior to issuance of a building permit, written confirmation will be required from the 
emergency fire protection jurisdiction having authority that the facility has been designed 
in accordance with their regulations and requirements, and that emergency fire protection 
service will be provided to the facility. Prior to issuance of the certificate of occupancy, 
local fire protection jurisdiction review and approval will be required. 
 
g. 
The  granting of this change in use of the property has been at the request of the applicant, 
with the consent of the landowner.  The granting of this approval allows the property to 
enjoy uses in excess of those permitted by the zoning existing on the date of application, 
subject to conditions.  In the event of the failure to comply with any condition, the property 
may be considered by the Board after recommendation by the Commission at a public 
hearing for reversion to the zoning that existed on the date of application.  It is, therefore, 
stipulated and agreed that either revocation due to the failure to comply with any 
conditions, does not reduce any rights that existed on the date of application to use, divide, 
sell or possess the property and that there would be no diminution in value of the property 
from the value it held on the date of application due to such revocation of the Zone 
Change. The Zone Change enhances the value of the property above its value as of the 
date the Zone Change is granted and reverting to the prior zoning results in the same value 
of the property as if the Zone Change had never been granted. 
 
Presented by: 
Andrew Lorentzen, Planner 
Reviewed by: 
Rachel Applegate, Planning Supervisor 
 
Attachments: 
Case Map (1 page) 
 
Site Plan (8 pages) 
 
Narrative Report (17 pages) 
 
Engineering Comments (2 pages) 
 
MCESD comments (1 page)

/
Maricopa County Planning & Development - Phoenix, AZ
4
Gross Acres: 65 approx.
Generated January 6, 2026 4:40 PM
Z250031
Application Name:
Legal Description
Sun Basin VII Project
Applicant
Case Address
Courtney Van Winkle
37157 W CARVER RD
Applicant Phone/Email
Parcel Primary:401-43-034G
(760) 685-0269
ARLINGTON, AZ 85322
Map scale 1:6,538
Supervisor District No.
Sun Basin VII Project - Zone Change with Overlay for Solar. Sun Basin VII Project is a battery energy
storage system (BESS) project with ancillary facilities to support solar energy generation. In April of this

P: 602.490.0535 / F: 602.368.2436
www.hilgartwilson.com
4742 N 24th Street, Suite 270
PHOENIX, AZ 85016
HAS JOINED COLLIERS ENGINEERING & DESIGN
15
Regulation
Base IND-2 Zoning District Standards
Proposed IND-2 IUPD Zoning District
Standards
Height
60’
60’
Front Yard
10’-15’**-
20’***-25’*.
100’
Side Yard
3’-10’*
100’
Rear Yard
0’-25’*
100’
Parking
Article 1102.1.4: 1 space per 250 sq. ft. of floor area
(Office)
No required parking.
Loading and Unloading
Article 1103.2 one loading and unloading space for each
10,000 square feet of floor area, or fraction thereof,
devoted to such use in the building.
None.
Sight Visibility Triangles (SVTs)No obstructions over 2’ in height within 25’ x 25’ SVTs.
Within sight visibility triangles at any
intersection, on-site chain-link fences
without screening materials can exceed a
height of 2’.
Paving
Article 1102.7.1. For other than one single-family dwelling
unit or one mobile home on a lot of record, any parking
area must be paved or in the alternative surfaced with
aggregate base course material.
Alternative surfacing materials or methods
approved by Maricopa County Air Quality
to minimize dust pollution, such as but not
limited to, native compacted soil or
aggregate base course, may be used in
driveways and parking areas.
Site Enclosure and Screening Minimum 6’ concrete masonry unit wall adjacent to rural
and residential zoning boundaries and for outdoor use of
an industrial nature. The front property line shall be
screened with a 3’ screen wall, berm or hedge to minimize
headlight glare.
Minimum 6’ tall chain-link fences adjacent to
rural/residential zoning boundaries, including
attached barbed wire or concertina wire
under 8’ in height, and allow all gates to have
no attached screening. No screen wall, berm
or hedges required along front property line.
Landscaping/Buffering
There shall be a solid fence, wall and suitable planting six
feet in height where the side or rear lot lines or
boundaries of the lot are adjacent to a rural or residential
zoning district. All street frontage of the lot shall be
landscaped with drought-tolerant plants including trees,
shrubs or natural vegetation. There shall be a minimum of
one tree and three shrubs every 20 feet. Trees shall be a
minimum 2-inch caliper at the time of installation. The
required side yards shall be landscaped with
drought-tolerant plants including trees, shrubs or natural
vegetation. 4% of the gross parking area shall be
landscaped with trees, shrubs, or natural vegetation. Any
part of the lot not used for buildings, other structures,
parking and vehicular and pedestrian access shall be
landscaped with grass, trees, shrubs, xeriscaping or
natural vegetation. All landscaped areas shall be provided
with water bibs or an automatic sprinkler system.
No landscaping or irrigation required. No
screening required adjacent to rural and
residential zoning districts.
Residential Unit Separation
n/a
Minimum 500’ separation from BESS unit to
any existing residential unit.
* Adjacent to Rural/Residential zoned properties
** Along Collector/Mid-Section Line roadways
***Along Arterials/Section Line roadways

Contact Arizona 811 at least two full
working days before you begin excavation
CALL 811 or click Arizona811.COM

Contact Arizona 811 at least two full
working days before you begin excavation
CALL 811 or click Arizona811.COM

Contact Arizona 811 at least two full
working days before you begin excavation
CALL 811 or click Arizona811.COM

Contact Arizona 811 at least two full
working days before you begin excavation
CALL 811 or click Arizona811.COM

SUN BASIN
 SOLAR PROJECT
Contact Arizona 811 at least two full
working days before you begin excavation
CALL 811 or click Arizona811.COM

The MaxWell
TM Plus Drainage System Detail And Specifications
Manufactured and Installed by
TORRENT RESOURCES
An evolution of McGuckin Drilling
www.torrentresources.com
ARIZONA  602/268-0785
NEVADA  702/366-1234
CALIFORNIA  661/947-9836
AZ  Lic.  ROC070465  A,  ROC047067  B-4,  ADWR 363
CA  Lic.  528080,  C-42,  HAZ.
NV  Lic.  0035350  A  -  NM  Lic.  90504  GF04
U.S.  Patent  No.  4,923,330  - TM Trademark  1974,  1990,  2004
The MaxWell
TM IV Drainage System Detail And Specifications
Manufactured and Installed by
TORRENT RESOURCES
An evolution of McGuckin Drilling
www.torrentresources.com
ARIZONA  602/268-0785
NEVADA  702/366-1234
CALIFORNIA  661/947-9836
AZ  Lic.  ROC070465  A,  ROC047067  B-4,  ADWR 363
CA  Lic.  528080,  C-42,  HAZ.
NV  Lic.  0035350  A  -  NM  Lic.  90504  GF04
U.S.  Patent  No.  4,923,330  - TM Trademark  1974,  1990,  2004
Contact Arizona 811 at least two full
working days before you begin excavation
CALL 811 or click Arizona811.COM

Contact Arizona 811 at least two full
working days before you begin excavation
CALL 811 or click Arizona811.COM

Sun Basin VII Project 
IND-2 (Industrial) Zone Change and Industrial Unit Plan 
of Development (IND-2 IUPD) 
 
Narrative Report 
SE of Elliot Road and Dobbins Road in the Arlington Area 
Z250031 
 
Submitted to: 
 
Maricopa County  
Planning and Development Department 
 
November 2025

TABLE OF CONTENTS 
 
 
1.0 
Introduction ................................................................................................................................................... 3 
1.1 
Project Name .................................................................................................................................................... 3 
1.2 
Applicant ........................................................................................................................................................... 3 
2.0 
Purpose of Request ....................................................................................................................................... 3 
2.1 
Industrial Unit Plan of Development ................................................................................................................ 4 
2.1.1 Justifications for Proposed Zoning District Standards ....................................................................................... 6 
3.0 
Description of Proposal ................................................................................................................................. 7 
3.1 
Overview ........................................................................................................................................................... 7 
3.2 
Battery Energy Storage System ........................................................................................................................ 8 
3.3 
Interconnection Facilities ................................................................................................................................... 8 
3.4 
Landscaping ...................................................................................................................................................... 9 
3.5 
Operation and Maintenance ............................................................................................................................ 9 
3.5.1 
Site Security and Lighting ............................................................................................................................. 9 
3.5.2 
Weed Management .................................................................................................................................... 10 
4.0 
Relationship to Surrounding Properties ...................................................................................................... 10 
5.0 
Location and Accessibility............................................................................................................................ 11 
6.0 
Circulation System ....................................................................................................................................... 12 
7.0 
Development Schedule ............................................................................................................................... 13 
7.1 
Phasing Schedule ............................................................................................................................................ 13 
8.0 
Community Facilities and Services ............................................................................................................... 13 
8.1 
Emergency Response Plan ............................................................................................................................. 13 
9.0 
Public Utilities and Services ......................................................................................................................... 14 
9.1 
Fire Protection ................................................................................................................................................ 14 
9.2 
Police Protection ............................................................................................................................................ 14 
9.3 
Water and Wastewater Resources................................................................................................................. 14 
9.4 
Electric ............................................................................................................................................................ 15 
10.0 
Drainage and Grading .................................................................................................................................. 15 
10.1 
Drainage Design ............................................................................................................................................. 15 
10.2 
Grading Design ................................................................................................................................................ 15 
11.0 
Environmental Impacts ................................................................................................................................ 16 
11.1 
Noise ............................................................................................................................................................... 16 
11.2 
Air Quality ...................................................................................................................................................... 16 
11.3 
Visual Resources ............................................................................................................................................. 16 
11.4 
Biological Resources ....................................................................................................................................... 16

3 
 
1.0 
Introduction 
1.1 
Project Name 
The name of the project is the Sun Basin VII Project, hereafter referred to as Sun Basin VII or 
the Project in this narrative report. 
 
1.2 
Applicant 
The Applicant is Sun Basin Solar, LLC, a wholly owned subsidiary of Longroad Energy 
Holdings, LLC (Longroad). Longroad is a U.S.-based developer, owner, and operator of 
renewable energy projects and is led by a team of industry veterans with a demonstrated track 
record of success on numerous projects in Arizona. In 2021, Longroad successfully completed 
construction and started commercial operations of the 150-megawatt (MW) Sun Streams 2 
Solar Project in Maricopa County. In 2024, Longroad began commercial operations on the 
215-MW solar and storage Sun Streams 3 Project. This was followed by the 300-MW solar 
and storage Sun Streams 4 Project which began commercial operations in 2025. Longroad 
has a fifth Arizona solar project currently under construction in Maricopa County, and earlier 
in 2025, completed the permitting for Sun Basin 1-6 which, along with Sun Basin 7, complete 
the Sun Basin Solar and Storage project. Longroad has a development pipeline in excess of 
5,500 MW and, through a subsidiary, is contracted to operate and manage a wind and solar 
operating portfolio of over 6,000 MW. During its time together, the Longroad team has 
successfully developed over 20 utility-scale wind and solar projects. Longroad is owned and 
funded by the New Zealand Superannuation Fund (“NZSF”), Infratil Limited, Longroad’s 
Management Team, and MUNICH ERGO Asset Management, and currently has over $35 
billion in assets under management. 
 
2.0 
Purpose of Request 
The Project is located in unincorporated, western Maricopa County in the vicinity of the Palo 
Verde Nuclear Generating Station (PVNGS). The Project is located in the more immediate 
vicinity of the Mesquite Generating Station, Hassayampa Switchyard, Chukar Substation, and 
Red Hawk Generating Station. The Project site is located on approximately 65 acres of private 
land south of Elliot Road, east of Dobbins Road, north of Narramore Road (alignment), 
approximately 3.5 miles west of the community of Arlington. This site is near significant 
existing power generation projects and energy infrastructure in the vicinity of the PVNGS, 
including several approved and existing solar projects. 
 
The Applicant requests to rezone approximately 65 acres of private land from Rural (RU-190) 
to Industrial (IND-2), with an Industrial Unit Plan of Development (IUPD), to allow the 
development of an 800-MW battery energy storage system (BESS) and ancillary facilities to 
support photovoltaic (PV) solar energy generation. 
 
The current Comprehensive Plan land use designation for the Project site is Industrial under 
the Old US Highway 80 Area Plan, which is compatible with the rezone application and the 
planned use for the site.

4 
 
 
The Project will consist of a BESS, electrical collection systems (including project substation), 
operations and maintenance (O&M) building, water tank, storage warehouse, and other 
ancillary facilities. The battery energy storage facilities will provide storage of electricity 
generated by the previously approved projects Sun Basin 1 through 6.  
 
The Applicant’s plan for timing of the Project is to construct immediately once the requisite 
permits and approvals have been received from Maricopa County. This rezoning application 
is the first step in preparing this Project site for development. Once the permits and approvals 
have been received, it is anticipated that the Project will take approximately 18-24 months to 
construct. It is anticipated that the Project could start construction as soon as 2026 and the 
commercial operation date (COD) would be in 2028 or later. The Applicant will develop this 
Project in response to market demand. 
 
2.1 
Industrial Unit Plan of Development 
To develop the Project as planned, the Applicant will be seeking modifications from County 
development standards using the overlay zoning district IUPD mechanism. According to the 
Maricopa County Zoning Ordinance, the purpose of the IUPD is to allow variations to 
development standards for industrial projects that require special design techniques or 
flexibility due to topography, innovative or sustainable project design, or other considerations.  
 
The majority of these modifications are related to the remote nature of this site. As a result, 
the Applicant is seeking to confirm that none of the mile or half-mile street alignments will be 
developed through the site, and therefore, typical street development standards including 
setbacks, improved landscaping, fencing and site visibility triangles (SVTs) are not necessary 
at the site. The specific modifications of County development standards are set forth in Table 
1 below with deviations in bold. Justifications for the modifications are discussed in Section 
2.1.1. 
 
Table 1 – Sun Basin VII Solar Project IUPD Modifications to 
Development Standards 
Regulation 
Base IND-2 Zoning District 
Standards 
Proposed IND-2 IUPD 
Zoning District Standards 
Height 
60’ 
60’ 
Front Yard 
10’-15’**- 
20’***-25’*. 
100’ 
Side Yard 
3’-10’* 
100’ 
Rear Yard 
0’-25’* 
100’ 
Parking 
Article 1102.1.4: 1 space per 250 
sq. ft. of floor area (Office) 
No required parking. 
Loading and Unloading 
Article 1103.2 one loading and 
unloading space for each 10,000 
square feet of floor area, or 
fraction thereof, devoted to such 
use in the building. 
None.

5 
 
Sight Visibility 
Triangles (SVTs) 
No obstructions over 2’ in height 
within 25’ x 25’ SVTs. 
Within sight visibility triangles 
at any intersection, on-site 
chain-link fences without 
screening materials can 
exceed a height of 2’. 
Paving 
Article 1102.7.1. For other than 
one single-family dwelling unit or 
one mobile home on a lot of 
record, any parking area must be 
paved or in the alternative 
surfaced with aggregate base 
course material.  
Alternative surfacing 
materials or methods 
approved by Maricopa County 
Air Quality to minimize dust 
pollution, such as but not 
limited to, native compacted 
soil or aggregate base course, 
may be used in driveways and 
parking areas. 
Site Enclosure and 
Screening 
Minimum 6’ concrete masonry unit 
wall adjacent to rural and 
residential zoning boundaries and 
for outdoor use of an industrial 
nature. The front property line 
shall be screened with a 3’ screen 
wall, berm or hedge to minimize 
headlight glare. 
Minimum 6’ tall chain-link 
fences adjacent to 
rural/residential zoning 
boundaries, including 
attached barbed wire or 
concertina wire under 8’ in 
height, and allow all gates to 
have no attached screening. 
No screen wall, berm or 
hedges required along front 
property line. 
Landscaping/Buffering 
There shall be a solid fence, wall 
and suitable planting six feet in 
height where the side or rear lot 
lines or boundaries of the lot are 
adjacent to a rural or residential 
zoning district. All street  
frontage of the lot shall be 
landscaped with drought-tolerant 
plants including trees, shrubs or 
natural vegetation. There shall be 
a minimum of one tree and three 
shrubs every 20 feet.  
Trees shall be a minimum 2-inch 
caliper at the time of installation.  
The required side yards shall be 
landscaped with drought-tolerant 
plants including trees, shrubs or 
natural vegetation. 4% of the 
gross parking area shall be 
landscaped with trees, shrubs,  
or natural vegetation. Any part of 
the lot not used for buildings, other 
structures, parking and vehicular 
and pedestrian access shall be 
landscaped with grass, trees, 
shrubs, xeriscaping or  
natural vegetation. All landscaped 
areas shall be provided with water 
bibs or an automatic sprinkler 
No landscaping or irrigation 
required. No screening 
required adjacent to rural and 
residential zoning districts.

6 
 
system. 
Residential Unit 
Separation 
n/a 
Minimum 500’ separation from 
BESS unit to any existing 
residential unit. 
* Adjacent to Rural/Residential zoned properties 
** Along Collector/Mid-Section Line roadways 
***Along Arterials/Section Line roadways 
 
2.1.1 Justifications for Proposed Zoning District Standards 
 
The following standards for interior lot lines are requested to provide for the transition of uses 
within the Project area, and in lieu of typical setbacks, a setback of 100 feet is provided. In 
addition, future right-of-way reservations proposed by the Maricopa County Department of 
Transportation (MCDOT) will serve as a setback. This perimeter setback and right-of-way 
reservations will ensure compatibility and sufficient distance from adjacent uses, outside of 
the Project area. 
 
Front Yard 
 
The Applicant requests a modification for all front yard setbacks to be 100 feet. The increased 
setback distance will apply to all structures including BESS which will be a primary use for this 
project and will be in conformance with the recommendations from the Arizona Fire and 
Medical Authority (AFMA).  
 
Side Yard 
 
The Applicant requests a modification for all side yard setbacks to be 100 feet. The increased 
setback distance will apply to all structures including BESS which will be a primary use for this 
project and will be in conformance with the recommendations from the AFMA. 
 
Rear Yard 
 
The Applicant requests a modification for all rear yard setbacks to be 100 feet. The increased 
setback distance will apply to all structures including BESS which will be a primary use for this 
project and will be in conformance with the recommendations from the AFMA. 
 
Parking Regulations 
 
The Applicant requests that no parking spaces be required for this site. No occupied structures 
are anticipated at the facility, and the Project will require minimal regular vehicle trips once 
constructed. The Project may include unmanned structures to house components of the BESS. 
Routine parking of vehicles on-site is not anticipated, and no permanent parking spaces are 
planned for this site. If parking areas are constructed, alternative surfacing materials may be used 
as an alternative to paving. 
 
Loading and Unloading 
 
The Applicant requests that no loading and unloading spaces be required for the site as no 
occupied structures are anticipated at the facility, no manned Project buildings will be located

7 
 
on-site or on public roads, and there will be no routine deliveries or shipments. 
 
Sight Visibility Triangles 
 
The Applicant is requesting to allow chain-link fences over two feet in height inside a sight 
visibility triangle because these types of fences do not obstruct vehicular visibility. Additionally, 
allowing this will maximize the amount of usable space for BESS structures. 
 
Paving 
 
The Applicant requests that alternative surfacing materials or methods approved by Maricopa 
County Air Quality Department, such as but not limited to, native compacted soil or aggregate 
base coarse, may be used in driveways and parking areas. The adjacent roadways providing 
access to the Project site are unpaved dirt roads. Unpaved roads on the Project will be 
maintained to reduce fugitive dust in accordance with County air quality regulations. 
 
Site Enclosure and Screening 
 
The Applicant requests to install chain-link fencing (at least six feet in height), including 
concertina or barbed wire topping (up to two feet) above the fence, and gates along the 
perimeter of the Project. This fencing will not include any screening material such as slats or 
privacy fabric. The proposed fencing will allow unimpeded surface flows, be consistent with 
other industrial developments in the area, and provide site security. Screening material will 
only make the site more visible and should, therefore, be waived as a requirement. The 
Applicant also proposes to use chain-link for the gates which will be consistent with other 
adjacent and nearby energy generation projects. Perimeter fencing will include small gaps at 
the bottom (six to eight inches) to allow for the movement of small wildlife. These gaps will be 
located in areas where drainage features intersect with the Project perimeter to compensate 
for large amounts of perimeter fencing on the site. No walls, berms, or hedges will be required 
for screening for the Project. 
 
3.0 
Description of Proposal 
3.1 
Overview 
 
To allow the development of the Project, this zone change application includes the following: 
 
• 
A BESS made up of battery enclosures; 
• 
Electrical collection systems, including project substation, PV combining switchgear, 
power conversion stations, inverters, transformers, collection lines, and emergency 
generators; 
• 
An O&M building; 
• 
Associated civil infrastructure including fencing, access driveways and gates, driveways, 
on-site parking, drainage channels, retention basins, signage, water tanks if required by 
the Fire District, storage warehouse, and possibly a septic tank and leach field. 
 
See the attached set of site plan drawings for details regarding the Project components.

8 
 
3.2 
Battery Energy Storage System 
 
As solar energy becomes a more important part of the nation's energy supply system, the need 
to store solar energy for delivery into evening hours has become a growing part of the solar 
energy production system. The BESS location is anticipated to occupy approximately 20-40 
acres of land within the 65-acre Project site. The BESS would be located at least 100’ from 
the Project boundary and any buildings, and shall be separated a minimum of 500’ from 
existing residential dwellings. The BESS will be permitted as a primary use within this IUPD. 
 
The BESS would be located on the eastern and south western portions of the Project site, and 
would be adjacent to the project substation and will consist of self-contained battery storage 
modules placed in racks, switchboards, integrated heating, ventilation, and air conditioning 
(HVAC) units, inverters, transformers, and controls in prefabricated metal or concrete 
containers. The enclosures would have appropriate safety systems built to code. The BESS 
equipment will undergo UL9540A testing to understand the impact of an equipment failure on 
its surrounding environment. This empirical test data will be utilized to establish adequate 
equipment setbacks and final design spacing.  
 
The BESS may be connected using either an alternating current (AC)-coupled or direct current 
(DC)-coupled configuration. When an AC-coupled configuration is used, a central BESS 
system is typically connected to the PV plant at the medium-voltage level. Bidirectional battery 
inverters convert the power between AC and DC electricity. When charging the batteries, the 
BESS bidirectional inverters convert the AC electricity to the DC electricity stored by the 
batteries. When discharging, the bidirectional inverters convert the DC electricity to the AC 
electricity output by the plant. Transformers are typically used to match the low-level AC 
voltage at the AC side of the inverters to the medium-level voltage necessary to connect to 
the substation.  
 
3.3 
Interconnection Facilities 
Once the power is stored, it will need to interconnect into the regional power grid. The Project 
is located in an area with extensive electrical infrastructure and expects to interconnect into 
the Hassayampa Switchyard, directly to the north of the Project site. The Project will route 
electricity via either overhead or underground medium-voltage (34.5 kilovolt [kV]) lines to the 
Project substation, where the voltage will be stepped up again to match the regional power 
grid. A short high voltage generation tie (gen-tie) line may be required to connect into the final 
point of interconnection.  
 
The medium-voltage lines will be outside the jurisdiction of the Arizona Corporation 
Commission (ACC) as they regulate lines of 115 kV or more. Lines of lesser voltage may be 
constructed up to a height of 120 feet per Maricopa County Zoning Ordinance Article 1111.7. 
Off-site transmission lines, unless constructed by an Arizona utility holding a Certificate of 
Convenience and Necessity issued by the ACC, are not exempt from local jurisdiction 
construction code authority.

9 
 
3.4 
Landscaping 
Where practical, the Project will retain the existing natural desert vegetation along the site 
perimeter. The Project is remote and, therefore, mostly not visible to passersby on public 
roads. No irrigation or landscaping will be required along the perimeter of the Project. 
 
The BESS components will be spaced a minimum of 100 feet from the property lines along 
the Project perimeter. The fences will be chain-link topped with barbed wire making them as 
visually porous as possible.  
 
Therefore, any passersby will see natural desert and the BESS facilities. The drainage basins 
on-site may be partially bermed on their downstream side to a height as much as two feet 
above existing grade, further screening visual impact. 
 
3.5 
Operation and Maintenance 
When operational, the Project will be remotely monitored and controlled by the Applicant. 
There will be a small administrative/O&M facility on-site as well as associated equipment 
storage facilities. There will be up to five full-time employees employed during the operational 
phase of the Project. These employees will work normal shift hours (generally 8 a.m. to 5 
p.m.). 
 
Battery energy storage facilities require a limited amount of maintenance. Maintenance 
activities include, but are not limited to, the following: 
 
• 
Periodic inspections; 
• 
Dust control; 
• 
Weed control; 
• 
Maintaining electrical collection system components (inverters, switchgear, 
transformers, and BESS); and, 
• 
Maintaining on-site infrastructure (driveways, drainage channels, and retention 
basins), as well as responding to issues detected by remote monitoring of the facility. 
 
No major equipment is anticipated to be required for maintenance of the facility except as 
necessary for periodic equipment replacement. Interior roadways providing access to the 
Project will not be paved. The majority of interior driveways will be native compacted soil and 
may require grading. Interior roads will be maintained to reduce fugitive dust.  
 
3.5.1 Site Security and Lighting 
 
To provide a secure and safe environment, the Project will be enclosed by an open, chain-link 
fence topped with barbed wire and all access points will be gated with swinging or rolling chain-
link gates topped with barbed wire. The fence and gates will include a minimum of six feet of 
chain-link topped with up to two feet of barbed wire, for a total of eight feet after the barbed 
wire. The Applicant plans to use open chain-link fencing to maintain a secure but visually open 
appearance. Substations will be separately fenced with the same type of fencing. Where

10 
 
necessary, portions of the fencing may increase in height to allow for gaps at the base to 
enable wildlife movement and drainage. 
 
For nighttime security, the Project may use motion-activated lights or infrared (IR) illumination 
with cameras mounted on 18-foot-tall poles. Because these security lights will be motion-
activated or IR illuminated only, the Applicant expects the site to be dark at night. The motion 
detectors on the security lighting system will not react to animal movement. Furthermore, to 
ensure that lighting will not be cast onto neighboring properties, all security lighting installed 
will be directed downward and into the site. All on-site lighting will also comply with Maricopa 
County Zoning Ordinance Article 1112. 
 
Additional security measures that may be implemented include cameras to remotely monitor 
the site and periodic patrols of the site's perimeter. 
 
3.5.2 Weed Management 
 
Following initial mowing of the site, vegetation will be allowed to reestablish to the extent it 
does not interfere with equipment or facility O&M. The Applicant may need to use weed control 
to ensure the equipment and retention areas continue to function and to prevent the spread 
of non-native, invasive plant species. Herbicides will be used as needed on a periodic basis 
and applied by licensed or certified applicators. Hand removal or mechanical methods (i.e., 
small drivable weed mowers) of weed control could also be used where necessary and 
practical. 
 
Because weeds can create a fire safety hazard, the presence of weeds (especially 
tumbleweed) on the site will be regularly monitored and managed throughout the life of the 
Project. 
 
4.0 
Relationship to Surrounding Properties 
The development of BESS facility at this location is an appropriate and compatible land use 
with the surrounding area. The area is very rural with minimal nearby population in pockets of 
single-family low-density land use. The surrounding existing and approved developed uses 
are primarily industrial, with an emphasis on electrical infrastructure. The predominant land 
use in the area is energy production and electrical transmission. As previously noted, the 
PVNGS, the largest nuclear power plant in the United States, as well as several existing gas-
fired and solar energy facilities are located nearby. The Project site is surrounded by RU-190 
zoned parcels to the north and west, and IND-2 zoned parcels to the east and south. While 
adjacent RU-190 does allow for residential development at low density among other rural 
uses, these parcels are currently vacant or are being used for energy infrastructure. The 
closest RU-43 zoning is located approximately 2 miles to the east of the Project. No current 
residential use exists within 2 miles of the site.  
 
The Hassayampa Switchyard is a major energy transfer facility located approximately 0.2 mile 
north of the Project site. The Applicant has existing connection agreements into the

11 
 
Hassayampa Switchyard through the existing Applicant-owned Sun Streams complex. 
 
Indicative of the appropriateness for the proposed use in this area, several rezonings, Special 
Use Permits, and Comprehensive Plan Amendment applications have been previously 
approved by the Maricopa County Board of Supervisors for solar energy generating facilities 
nearby. These solar energy facilities include Sun Streams I, Sun Streams II, Sun Streams III, 
Sun Streams IV, Agave Solar, Mesquite Solar, Arlington Valley Solar Energy (AVSE) II and 
III, Sun Pond I, II, and III, AV Solar Project, and Sun Basin I, II, III, IV, V, and VI. The addition 
of a battery energy storage facility, like this Project, complements those existing land uses. 
The proposed Project, when developed, will have a relatively low profile, will be odorless, and 
will have very little nighttime lighting or activity. Additionally, the BESS would not create 
discernable off-site noise. 
 
Arizona is the natural solar center of the United States. Factors critical to the siting of PV solar 
energy storage facilities include proximity to energy generating sites (especially solar energy), 
proximity to existing electrical substations and transmission infrastructure; and compatibility 
with nearby land uses. Battery energy storage facilities complement solar projects, and their 
integration can enhance the overall effectiveness and reliability of renewable energy systems. 
The Project site is located in close proximity to approved and existing solar projects, existing 
electrical substations and transmission infrastructure, making it a compatible use with nearby 
land uses. The Project site has immediate access to the Hassayampa Switchyard, limiting the 
need for extensive off-site overhead transmission facilities to connect to the regional power 
grid. 
 
Solar energy diversifies the energy supply, reduces the country's dependence on foreign oil, 
improves air quality, offsets greenhouse gas emissions, and helps avoid the construction of 
additional fossil-fuel-powered plants. In warm climates like Arizona, solar energy is also 
beneficial for satisfying peak energy demands as solar energy is generated when the demand 
for electricity is at its peak (during daylight hours). BESS facilities provide reliability benefits to 
the power grid, as it allows excess solar energy generated during the day to be dispatched at 
a later time. Large-scale BESS facilities help balance supply and demand across the grid, thus 
improving stability and resiliency and reducing the likelihood of outages and enhancing energy 
security. In addition to the environmental benefits, construction of a BESS facility of this 
magnitude stimulates the local economy by creating construction jobs during installation and 
by generating fee and tax revenue for Maricopa County. 
 
5.0 
Location and Accessibility 
The Project is located on approximately 65 acres of private land; approximately 0.5 miles south 
of Elliot Road, 0.25 miles east of Dobbins Road, 0.75 miles north of Narramore Road 
(alignment), 1 mile west of 363rd Avenue, and 3.5 miles west of the community of Arlington.  
 
Access to the Project will be via existing roads and private easements. Primary access is 
anticipated to be provided via Wintersburg Road to Elliot Road from the north, with a potential 
alternative secondary access point located at the southwestern boundary of the Project, east

12 
 
of 366th Avenue. Regional access to the Project will mainly be via Interstate 10 (I-10). The 
Project is expected to require minor extension and improvements of access roads on private 
land adjacent to the Project area. The on-site parking and staging facilities for construction 
traffic will be located in the vicinity of the primary site access, a significant distance away from 
any residences. 
 
As would be expected with any development, the Project is expected to generate construction 
and material delivery truck trips during the construction phase. Construction is anticipated to 
start in 2026 or later and continue for approximately 18 to 24 months. The peak of construction 
will require approximately 20 semi-trucks per day delivering materials to the site from I-10. A 
limited number of additional localized truck trips may be needed to meet construction water 
demands and will come from the west and/or north, avoiding Arlington Elementary School.  
 
At its peak, Project construction is anticipated to require a workforce of approximately 300, 
adding approximately 300 vehicles per day to Wintersburg Road. These workers will be 
staying off-site and will be encouraged to carpool. The mobilization and demobilization of 
equipment used for earthwork, including scrapers, graders, water trucks, compactors, truck-
mounted post drivers, skid loaders, and forklifts, is anticipated to generate a minimal amount 
of traffic. Due to the remote location of the site and low traffic volumes, traffic impacts to the 
adjacent road system will be minimal. 
 
Traffic generated by the normal operation of the Project will be minimal. It is anticipated that 
up to five persons will be working periodically to maintain the facility. 
 
The Applicant will maintain its commitment to minimizing the impact of construction traffic 
impacts on traffic in and around Arlington Elementary School and the majority of residences 
on the east side of 355th Avenue. All construction traffic, both workforce and construction 
material deliveries, will access the site from the Wintersburg exit off I-10 to the north to funnel 
traffic away from both Arlington Elementary School and the residences located east of 355th 
Avenue and north of Southern Avenue. The Applicant will meet with Arlington Elementary 
School District officials in advance of construction to discuss traffic safety.  
 
6.0 
Circulation System 
Because of the nature of the proposed solar project development, no formal traffic circulation 
or coordinated street system will be needed to support the Project. As stated above, access 
to the site will be via existing roads and private easements. The proposed locations of these 
access points will be shown on the Plan of Development site plan. 
 
Inside the Project site, access to Project facilities will be provided via perimeter roads and 
access ways to the BESS facilities and O&M building. These will be shown on the Plan of 
Development site plan. These Project roads will be unpaved and maintained to reduce fugitive 
dust.

13 
 
7.0 
Development Schedule 
7.1 
Phasing Schedule 
The Applicant will construct the Project in response to market demand. The timing of 
construction of the Project or phases (if applicable) will ultimately depend on market conditions 
and the timeline of Project approvals. Regardless of timing and phasing, all construction will 
be subject to County oversight. 
 
The Applicant is aware that County drainage regulations require that the drainage of the 
overall site or any interim phase functions in an acceptable manner regardless of phasing. 
The Applicant acknowledges that this may require the development of interim drainage 
facilities in earlier construction phases. Each phase of development will be constructed with 
the requisite drainage controls to manage the respective on-site and off-site stormwater runoff 
in accordance with County design guidelines. 
 
Temporary facilities, such as office trailers, laydown yards, containers, construction 
warehousing buildings up to 40 feet in height, parking areas, and equipment storage areas 
will be required from move-on to completion of construction. Temporary facilities will be 
removed upon the completion of construction. 
 
Up to 300 construction workers will be employed during construction, and this workforce will 
vary with phases of construction. As previously indicated, the Applicant will coordinate 
construction traffic management with the Arlington Elementary School District. 
 
8.0 
Community Facilities and Services 
During operations, the Project will have no impact on community facilities and services such 
as schools and parks, as the Project is anticipated to only require a minimal number of full-
time employees. 
 
8.1 
Emergency Response Plan 
The Project will incorporate safety systems for the solar project and the battery storage system 
that are required by code and the agencies having jurisdiction as appropriate. In addition to 
code compliant safety systems, it is important that key stakeholders, particularly the first 
responders, have a deep understanding of these safety systems and the associated 
technologies. As part of the Project, the Applicant will be engaging with local first responders 
to offer formal and informal training opportunities and to solicit feedback on the site design to 
ensure it is meeting their expectations i.e. site access points, emergency road designs, alarm 
equipment designs, etc.  
 
The Applicant has prepared an Emergency Response Plan for the existing Sun Streams 
projects in the immediate vicinity and will update that plan to cover this Project prior to 
construction. The plan specifies notification, assembly, accountability, and evacuation 
planning in the event of an emergency at the PVNGS, as the site is located within the 10-mile

14 
 
Plume Exposure Pathway Emergency Planning Zone (EPZ) for PVNGS. The agencies having 
jurisdiction on the Project have approved three BESS projects in the immediate vicinity to the 
Project site (Sun Streams 3, Sun Streams 4, and Sun Basin 1) based on design review, 
Hazard Mitigation Analysis, Emergency Response plans, and first responder training 
completed for these projects. The Sun Basin VII Project will follow this precedent and offer the 
same materials and trainings prior to construction. 
 
9.0 
Public Utilities and Services 
9.1 
Fire Protection 
Fire response services for the area are provided by the Arizona Fire and Medical Authority 
(AFMA). The AFMA has three districts: North County Fire & Medical District, South County 
Fire & Medical District, and Buckeye Valley Fire District. The Project site is located between 
the South County Fire and Medical and Buckeye Valley Fire Districts. The nearest fire station 
is AFMA Fire Station 322, located approximately 4.7 miles northeast of the Project site. On-
site driveways will provide egress for emergency and fire department access. Longroad has 
experience coordinating with AFMA on its neighboring Sun Streams projects, and would 
continue that coordination for the Sun Basin 7 Project. This includes design consultation, site 
visits, and trainings prior to construction and throughout the Project life. 
 
All materials used on the site will be managed according to applicable federal, state, and local 
regulations.  
 
9.2 
Police Protection 
The Maricopa County Sheriff’s Office, operating out of one main station in Avondale and a 
satellite station in Buckeye, provides protective services for the area. The Project site is 
located within the District II patrol area, and the nearest police substation is located at 920 E. 
Van Buren Street in Avondale. 
 
9.3 
Water and Wastewater Resources 
The Project will not impose any new water or wastewater requirements on the area. The site 
is located within an Arizona Department of Water Resources (ADWR) regulated Active 
Management Area (AMA). The need for water on the site during operations will be minimal, 
necessary only for the needs of employees. Water for construction purposes will be delivered 
to the site. Portable toilets will be used during construction. 
 
As indicated above, during operations there could be up to five full-time employees on the 
site. The potable water needs of five employees will be provided via bottled water or from 
ADWR-exempt wells. This insignificant amount of water use does not require a Public Water 
System. 
 
The wastewater generated at the facility during operations is anticipated to be treated with on-
site wastewater treatment facilities, such as a conventional septic tank system or similar

15 
 
alternative system as regulated by Arizona Department of Environmental Quality and 
administered by Maricopa County Environmental Services Department.  
 
9.4 
Electric 
Arizona Public Service (APS) is the electrical service provider for this area. The Applicant will 
coordinate with electrical service providers in the area as needed throughout the construction 
and operation of the Project. 
 
10.0 Drainage and Grading 
10.1 Drainage Design 
A Preliminary Drainage Report was prepared to provide hydrologic analysis for the Project 
and identify potential constraints as well as preliminary conveyance and retention design on 
the Project site (Exhibit A). Stormwater runoff generally flows from the northwest to southeast 
across the site. The existing flows are generally a maximum of about 12-inches deep and do 
not extend across the entirety of the effective floodplain limits. The Project site is located within 
Federal Emergency Management Agency (FEMA) Zone A Flood Hazard Area, Zone A 
includes areas with a one percent annual chance of flooding and a 26 percent chance of 
flooding over the life of a 30-year period. However, recent upstream development has 
effectively cut off flows historically impacting the Project site. The FEMA floodplain is not 
representative of existing site conditions for this Project. Offsite runoff will continue to be 
accepted and conveyed through the site via engineered channels and spreader basins, 
consistent with the existing drainage patterns. All onsite runoff generated from the Project will 
be retained onsite. 
 
The Project will acquire necessary permits and permissions before developing within any 
floodplains. A floodplain use permit is being pursued in support of development within the 
Zone A floodplain limits within the Project. The battery units within the floodplain limits and all 
permanent habitable structures shall be set above the regulatory flood elevation. The 
Applicant will also coordinate with the U.S. Army Corps of Engineers in the unlikely case that 
there is limited construction within any jurisdictional waterways determined to be located on-
site.  
 
Developed areas within Maricopa County are required to regulate stormwater discharge such 
that net flow rates and flow volume exiting from the site are equal to or less than the 
predevelopment rate. This is often controlled through the construction of retention basins. The 
proposed drainage infrastructure to manage stormwater for the Project consists of engineered 
channels, retention basins, and spreader basins to manage stormwater such that flows are 
not increased as a result of development while also maintaining historical drainage patterns. 
Peak flow rates discharged from the Project boundaries will not exceed pre-development 
conditions due to the onsite retention being provided. 
 
10.2 Grading Design 
The Applicant plans to minimize the amount of earthwork required for this Project where

16 
 
feasible. Retention basins and wash corridors for stormwater conveyance are proposed in 
locations with existing lower grade and along existing flow paths. The Project will grade areas 
alongside the BESS facilities to act as a fire break. Otherwise, grading activities will not involve 
significant dredging or filling within major washes or any potential jurisdictional waterways 
determined to be located on-site. As detailed above, the Applicant is prepared to address 
appropriate permitting requirements of both the Maricopa County Flood Control District and 
U.S. Army Corps of Engineers, as necessary. 
 
11.0 Environmental Impacts 
11.1 Noise 
When the Project is fully operational, it is not anticipated that there will be any regular activities 
on the site that will result in discernable off-site noise. The equipment used for performing 
earthwork and installation of facilities could temporarily produce noise that is noticeable off-
site during construction. Due to the remote location of the Project and presence of existing 
energy infrastructure in the area, the Project will have minimal impacts related to noise. 
 
11.2 Air Quality 
The Applicant will use construction dust control measures as required by Maricopa County to 
limit fugitive dust emissions from the site. Details of the construction dust control plan will be 
submitted and approved under a separate permit through the Maricopa County Environmental 
Services Department. Dust control measures will be supported in part by minimizing the areas 
requiring ground disturbance and applying water, as necessary. The Project will not produce 
any noticeable odors. 
 
11.3 Visual Resources 
The Project is not expected to significantly affect the visual quality of the area because it is 
located in an area with considerable existing energy generation facilities present, is on 
relatively flat desert land, will have a relatively low profile on the landscape, is several miles 
from the nearest population center, and is located in an area that does not provide recreational 
opportunities or attract public attention. The visually dominant features of the area are the 
existing PVNGS, the natural-gas-fired power plants, solar projects, and transmission lines.  
 
11.4 Biological Resources 
Information was obtained from both the U.S. Fish and Wildlife Service and the Arizona Game 
and Fish Department (AZGFD) regarding the potential occurrence of special-status species 
within the Project area. The Project is sited outside of areas designated for environmental 
resource conservation, such as Areas of Critical Environmental Concern, Important Bird 
Areas, National Wildlife Refuges, Wilderness Areas, important migratory pathways or stopover 
sites, or other specially designated areas. The Project is co-located with existing energy 
infrastructure in an industrial location and does not contain designated critical habitats for 
protected species or wetlands. There are sensitive species with the potential to occur in the 
Project area; however, potential impacts to sensitive species will be avoided or minimized by

17 
 
implementation of prevention, minimization, and mitigation measures.

Zachary Kobza, P.E.
Planning & Development 
301 W. Jefferson St., Suite 170 
Phoenix, Arizona 85003 
Phone: (602) 723-5248 
Fax: (602) 506-8762 
www.maricopa.gov/planning 
Email address: 
Zachary.Kobza@maricopa.gov 
  
Planning & Development
 
Engineering Plan Review 
 
 
Date:    
October 30, 2025 
 
Memo To: Darren Gerard, AICP, Planning Manager, Department of Planning & 
Development 
 
Attn: 
Andrew Lorentzen, Planner, Planning & Development Services 
 
cc: 
Bob Fedorka, PE, Engineering Manager, Planning & Development 
 
From: 
Zachary Kobza, PE, Senior Plans Examiner Engineer, Planning & 
Development 
 
Subject:   
Z250031 – Sun Basin VII 
APN(s): 
401-430-34G 
Engineering Review has reviewed the first plan and report routed for review on 
10/14/2025, for the subject application and has the following objections: 
 
DRAINAGE PLAN REVIEW  
 
1. OFFSITE HYDROLOGY 
 
a. The “Existing Drainage Conditions” Figure is labelled as Figure 4, but 
should be Figure 3. 
 
b. On the “Existing Drainage Conditions” Figure, Drainage Area DA-1 at the 
southern end of the Project should be labelled “ON-1”. 
 
2. ONSITE RETENTION 
 
a. Retention Volume Provided shown on the “Retention Basin Calculations 
Table” (Page 67) does not match the volume provided shown on the 
Preliminary Drainage Plan. The Table shows that RB-2 is not retaining the 
100-Yr, 2-Hr volume required and Note 1 mentions retaining the greater of 
the First Flush or Modified Rational Method volume. Please show that RB-
2 is retaining the 100-Yr, 2-Hr volume required. 
 
3. RETENTION DISPOSAL 
 
a. Also provide notes on the plans requiring retention basins to drain within 
36 hours. 
 
FLOOD CONTROL DISTRICT REVIEW 
 
1. The work proposed in the floodplain will require a Floodplain Use Permit issued 
concurrent with building permit(s) for site development.

Page 2 of 2 
 
 
 
STORM WATER QUALITY REVIEW/INFORMATION 
 
1. The subject site is not located within the County’s Urbanized Area; and thus 
will not require a Storm Water Pollution Prevention Permit (SWPPP) from the 
County. This does NOT preclude the requirement to obtain a Notice of Intent 
to Discharge (NOID) from the State (ADEQ), as may be required. 
 
The following stipulations will apply: 
 
1. Engineering review of planning and/or zoning cases is for conceptual design 
only. All development and engineering design shall be in conformance with 
Section 1205 of the Maricopa County Zoning Ordinance; Drainage Policies and 
Standards; Floodplain Regulations for Maricopa County; MCDOT Roadway 
Design Manual; and current engineering policies, standards and best practices 
at the time of application for construction. 
 
2. Based on the conceptual design nature of the information submitted, changes 
to the site layout may be necessitated by the final engineering design of the n 
drainage infrastructure. 
 
3. Detailed Grading and Drainage (Infrastructure) Plans must be submitted with 
the application for Building Permits. 
 
Please contact me with any questions.

Page | 1  
 
 
Subdivision 
Infrastructure  
& Planning Program 
301 W. Jefferson St. 
Phoenix, AZ 85003 
 
S u b d i vi s io n @ m a ri co p a .go v 
e s d .m a r i c o pa .g o v 
 
 
 
 
 
The Maricopa County Environmental Services Department (MCESD) has completed review 
for the  Sun Basin VII Project  planning case(s). Please note the following MCESD 
requirements for site development: 
 
Onsite Wastewater (Septic) –  
A Notice of Intent to Discharge application for a septic system is required for any 
construction. Application must be submitted to the MCESD Onsite Wastewater Program. 
• 
Wastewater is not permitted to discharge to an adjacent parcel’s septic system. 
• 
If conducting food service in unincorporated Maricopa, a grease trap will be 
required by Onsite Wastewater program. 
• 
Setback requirements must be maintained per Arizona Administrative Code, Title 
18, Chapter 9, Article 312, C (Features Requiring Setbacks). 
 
For Onsite Wastewater related questions, please contact the Onsite Program at (602) 506-
6666 or by email at septicquestions@maricopa.gov. 
 
Additional Notes –  
*It should be noted that this document does not approve the referenced project. Comments are provided 
for the benefit of the applicant for MCESD permit requirements and as an advisory to Maricopa County 
Planning and Development Department. Other Maricopa County agencies may have additional 
requirements. Final review and approval will be made through Planning and Development Department 
procedures. Applicant may need to submit separate applications to the Maricopa County Environmental 
Services Department for approval of proposed facilities regulated by the Department. Review of any such 
application will be based on current regulations at the time of application. 
 
 
 
 
Project Name:  Sun Basin VII Project  
Primary Contact Name:  Courtney Van 
Winkle 
Planning Application Type: Zone Change 
with Overlay 
APN(s): 401-43-034  
Reviewer: Joseph Churby, P.E. 
Email: Joseph.Churby@maricopa.gov 
Phone: 602-372-2754 
Planner Name:  Andrew Lorentzen 
Planning Case #: Z250031 
Date: October 30, 2025 
 
Water and Waste Management Division

DATE:  
January 22, 2026 
 
TO: 
 Planning & Zoning Commission   
 
From: 
 Andrew Lorentzen, Planner  
 
SUBJECT: 
 Z250031 – Sun Basin VII    
 
 Agenda Item: 3 
 
 
 
After printing of the staff report, the applicant requested an additional IUPD deviation (C.10)  
removing loading zone requirements from the proposed IND-2 IUPD zoning district. Staff has no 
objection to this request as parking requirements are already requested to be eliminated from the 
proposed BESS facility.  
 
c. The following IND-2 IUPD standards shall apply:  
1. 
Minimum Front Yard – 100’ 
2. 
Minimum Side Yard -100’ 
3. 
Minimum Rear Yard – 100’ 
4. 
Minimum Parking: No Parking required 
5. 
Minimum Screening: Minimum 6’ tall chain-link fences adjacent to 
rural/residential zoning boundaries, including attached barbed wire or 
concertina wire under 8’ in height, and allow all gates to have no attached 
screening. No screen wall, berm or hedges required along front property 
lines.  
6. 
Minimum Paving: Alternative surfacing materials or methods approved by 
Maricopa County Air Quality to minimize dust pollution, such as but not 
limited to, native compacted soil or aggregate base course, may be used in 
driveways and parking areas. 
7. 
Minimum Landscaping/Buffering: No landscaping or irrigation required. No 
screening required adjacent to rural and residential zoning districts. 
8. 
Minimum Sight Visibility Triangles: Within sight visibility triangles at any 
intersection, on-site chain-link fences without screening materials can 
exceed a height of 2’. 
9. 
The IUPD overlay shall limit entitled uses to power generation and 
distribution, BESS facilities and ancillary uses. 
10. 
Loading and Unloading: none required. 
 
 
 
Attachments: 
 
Applicant correspondence (1 page)

Andrew Lorentzen (PND)
From:
Courtney Van Winkle <cvanwinkle@kpenvironmental.com>
Sent:
Monday, January 12, 2026 5:39 PM
To:
Andrew Lorentzen (PND)
Cc:
Alyssa Menzel; Caleb Weeks
Subject:
Re: Z250031 - Sun Basin VII - Draft conditions of approval. 
This Message Is From an External Sender  
This message came from outside your organization. Please use caution when corresponding outside the county.  
Hi Andrew, 
Hope you had a good weekend. Our only comment on the draft conditions would be to add one item to the 
development standard stipulations: c.10. Loading and Unloading: none required. Otherwise, we do not have any 
revisions to the conditions. 
Thank you very much, 
Courtney Van Winkle, Project Manager 
760.685.0269 