Summary Sheet- RFCA SUMMARY
Extracted text (via pymupdf)
2966 characters
CITY OF TEMPE Meeting Date: 1/4/2024 REQUEST FOR COUNCIL ACTION Agenda Item: 8A2 ACTION: Award the construction contract to Haydon Building Corporation for the Tempe Municipal Operations Center - GMP #6 - Phase 2 project. FISCAL IMPACT: The total construction contract amount is $38,273,373.00 and the total contingency amount is $3,827,337.30. Funds to cover this contract and related costs are appropriated in Fiscal Year 2023/24 from Capital Improvement Project No. 6711269 - TMOC - Phase 2. RECOMMENDATION: Award construction contract to Haydon Building Corporation for Project No. 6700130. BACKGROUND INFORMATION: Project History: The Tempe Municipal Operations Center (TMOC) will feature the development of an open, city-owned 24-acre site located along the south levee of the Salt River, between the East Valley Bus Operations and Maintenance (EVBOM) facility and the State Route 143 freeway. As summarized below, Guaranteed Maximum Price (GMP) proposal #6 includes the remainder of construction efforts that are necessary for the full completion of the TMOC project. Scope of Work: GMP #6’s scope of work includes the construction of 4 additional buildings, as well as other supporting infrastructure: • Building 2 - a wash bay building • Building 3 – a 2-story, 64,000 square foot maintenance building for Fleet and Solid Waste • Building 4 - IT Tech Center and Solid Waste Container Shop building • Building 5 - a container paint shop building. • Associated parking lots, lay down areas, site utilities, electrical work, and sitework to provide the City of Tempe with a complete and functioning facility. Contract Type: Construction Manager at Risk (CMAR) Construction Services Procurement Method: Request for Qualifications: Haydon Building Corp. was selected by a review committee as the most qualified firm for these services using a process pursuant to Arizona Revised Statutes § 34-603. The qualifications-based selection process includes evaluation of each firm's statement of qualifications in response to the City's request for qualifications (RFQ); evaluating each firm based on the relative weight of the selection criteria as outlined in the RFQ, including evaluation of the contractor's expertise, qualifications of key personnel and project experience; and selecting the final list of contractors in order of preference. Staff has negotiated the construction services fee with Haydon Building Corp. and considers it reasonable for the scope of services ATTACHMENTS: 1. 6700130 CMAR HAYDON BC TMOC GMP 6 - PHASE 2.PDF 2 STAFF CONTACT(S): Julian Dresang, Deputy Engineering and Transportation Director / City Engineer, (480) 350-8025; Tom Duensing, Deputy City Manager, (480) 350-8505 Department Director: Shelly Seyler, Interim Engineering and Transportation Director Legal review by: Sam Arrowsmith, Assistant City Attorney Prepared by: Julie Acedo, Engineering and Transportation Admin Supervisor