Project Name: Tracer Wire Installation Project Number: TBD Project location: El Mirage - Thunderbird Rd 1 Install #12 Tracer Wire in Existing ITS Conduit LSU 1 $ 58,673.91 58,673.91 $ Includes Rolling Truck Mounted Attenuator Tax - 6.0450% LSU 1 $ 873.50 873.50 $ Bond - 0.99% LSU 1 $ 364.37 364.37 $ CONSTRUCTION TOTAL 59,911.78 $ SEE PAGE 2: INCLUSIONS, QUALIFICATIONS, EXCLUSIONS AND ACCEPTANCE: Description Item No. UM Quantity Unit Price Total Price 4640 E COTTON GIN LOOP Phoenix, Arizona 85040 Office: 623-242-0246 / Fax: 602-296-1457 Project Name: Tracer Wire Installation NICHOLAS VAN DOREN ESTIMATOR OMNI ELECTRIC, LLC Nicholas Van Doren Digitally signed by Nicholas Van Doren DN: C=US, E=nvandoren@omnielectric.io, O=Omni Electric LLC, CN=Nicholas Van Doren Date: 2025.04.01 14:45:51-07'00' INCLUSIONS, QUALIFICATIONS, EXCLUSIONS AND ACCEPTANCE: Clarifications: 1. Proposal Based off of "Combined ITS plans sent on 2.24.25" 2. Concrete foundation removal by others. 3. No Utility drawings provided Reserve the right to requote new drawings. Qualifications: Qualifications: 1. 2. The Prices quoted include material, equipment, reasonably anticipated labor. 4. Delivery of electrical equipment is typically 8 - 12 weeks after return of approved submittals. 5. Delivery of traffic signal equipment is typically 10 - 14 weeks after return of approved submittals. 6. Delivery of signal poles is typically 24 - 32 weeks after return of approved submittals. 7. 8. 9. 11. Liquidated damages shall only apply to the portion of work contracted and caused by OMNI Electric. 12. Due to the volatility in the market all material pricing is valid for 30 days and will be subject to rate increases. Exclusions: 1. Overtime 2. Temporary traffic signal installation, resetting of temp signal equipment & removal of temp signal equipment. 3. Temporary utilities 4. Railroad Insurance and railroad flagging. Acceptance: 1. This proposal price is valid for 30 calendar days from the date of this proposal. Our proposal is conditioned on entering into a contract with mutually agreeable terms and conditions Prior to our commencement of our Work, you will notify us in writing of any existing hazardous materials known or suspected by you or the Owner, on or about the Project. We will not be required to perform work that involves exposure to hazardous materials or substances. If we encounter hazardous materials or substances not placed on the Scope Letter Tracer Wire Installation Thank you for the opportunity to present you a proposal for work on the above referenced project. Our proposal includes the electrical work itemized above, with the following inclusions, qualifications and exclusions. If the scope of work you would like us to quote on differs from the work described above, please let us know so that our proposal can be modified accordingly. This is a Unit Price bid consistence with 8 hrs x 5 days normal business days. No nights and weekends. The schedule for our work shall take into account the above identified delivery times, or the actual delivery times for specified materials and equipment, and shall include a reasonable amount of time for us to complete our work after