Project Number: EM24-ITS01 Department: Development Services Total Capital Cost: $89,000.00 Type: Capital Improvement Request Groups: New Timeline: 07/01/2024 to 12/31/2024 Request description: Capital Costs FY2025 Total Planning $0.00 Design $0.00 Engineering $0.00 Land/Right-of-way $0.00 Construction/Maintenance $89,000.00 $89,000.00 Other $0.00 Total $89,000.00 $89,000.00 Funding Source FY2025 Total 111 - General $89,000.00 $89,000.00 114 - Court $0.00 121 - Court Enhancement $0.00 128 - Towing $0.00 131 - HURF $0.00 141 - LTAF $0.00 148 - CDBG $0.00 149 - Special Projects $0.00 156 - Capital Streets $0.00 511 - Water $0.00 516 - Ranchettes $0.00 541 - Sewer $0.00 591 - Sanitation $0.00 Total $89,000.00 $89,000.00 Benefit to Community Type of Project Strategic Priority Division Grant Funding Bond Eligible Project Status ITS Tracer Wire Improvements The City has installed fiberoptic lines along existing conduit runs on El Mirage and Thunderbird roads. This project would install approximately 4.3 miles of tracer wire within these conduits which would help to locate or detect the lines before digging. Tracer wire is a low-cost insurance policy that prevents costly mistakes from occurring while performing necessary repairs or new installations. Additional Information The tracer wire would alert both City staff and utility locators that the fiber conduits were present so they could be marked prior to construction. The cost associated with the cutting of an unmarked conduit would be the responsibility of the City. This would also free up staff from having to locate the conduits. Other Superior Infrastructure Engineering No No New 51