City of El Mirage — Regular Meeting (2025-05-06)

View PDF Item 9 Meeting page

Extracted text (via pymupdf) 1660 characters
Project Number:
EM24-ITS01
Department:
Development Services
Total Capital Cost:
$89,000.00
Type:
Capital Improvement
Request Groups:
New
Timeline:
07/01/2024
to
12/31/2024
Request description:
Capital Costs
FY2025
Total
Planning
$0.00
Design
$0.00
Engineering
$0.00
Land/Right-of-way
$0.00
Construction/Maintenance
$89,000.00
$89,000.00
Other
$0.00
Total
$89,000.00
$89,000.00
Funding Source
FY2025
Total
111 - General
$89,000.00
$89,000.00
114 - Court
$0.00
121 - Court Enhancement
$0.00
128 - Towing
$0.00
131 - HURF
$0.00
141 - LTAF
$0.00
148 - CDBG
$0.00
149 - Special Projects
$0.00
156 - Capital Streets
$0.00
511 - Water
$0.00
516 - Ranchettes
$0.00
541 - Sewer
$0.00
591 - Sanitation
$0.00
Total
$89,000.00
$89,000.00
Benefit to Community
Type of Project
Strategic Priority
Division
Grant Funding
Bond Eligible
Project Status
ITS Tracer Wire Improvements
The City has installed fiberoptic lines along existing conduit runs on El Mirage and Thunderbird roads. This project would install approximately 4.3 miles of tracer wire within these 
conduits which would help to locate or detect the lines before digging. Tracer wire is a low-cost insurance policy that prevents costly mistakes from occurring while performing necessary 
repairs or new installations.
Additional Information
The tracer wire would alert both City staff and utility locators that the fiber conduits were present so they could be marked prior to construction. 
The cost associated with the cutting of an unmarked conduit would be the responsibility of the City. This would also free up staff from having to 
locate the conduits.
Other
Superior Infrastructure
Engineering
No
No
New
51