250048-CONTRACT EXHIBIT A-B.PDF

Maricopa County — Formal (2025-09-12)

View PDF Item 93 Meeting page

Extracted text (via pymupdf) 78619 characters
October 2, 2025 
October 6, 2025_R2 
 
Corry Slama 
301 W Jefferson Street 
Suite 700 
Phoenix, AZ 85003 
Sent via Email: corry.slama@maricopa.gov 
 
 
Re: MCSO Durango Office and K9 Facility, 250048-ROQ 
 
Dear Corry, 
 
                                                                              
Thank you for the opportunity to submit this fee proposal to provide architectural and 
engineering services for the MCSO Durango Office and K9 Facility.  The following is a 
description of our understanding of the requirements for the design of this new facility based 
on #250048-ROQ and the pre-proposal meeting held with FMD and OPS on September 22, 
2025.  
Project Understanding and Scope of Work: 
Dekker understands that Maricopa County intends to construct a new multi-purpose facility 
comprised of office and administrative space for multiple divisions within MCSO, as well as 
specialty space(s) for the MCSO K9 division. The exact size and location of the new facility will be 
determined as part of the overall design effort, and future phases/additions should be considered 
throughout the design process.  
 
We acknowledge that FMD Design Standards & Technical specifications have been downloaded 
from the Facilities Management website and will be applied these during our design of the 
project. This includes the following: 
• 
FMD Design Standards Instructions and Narrative 
• 
FMD Design Standards Table of Contents 
• 
FMD Technical Specifications 
• 
Appendix A - ETI Standards 
• 
Appendix B – Owner provided accessories 
• 
Maricopa County Space Standards 
 
We understand that Maricopa County will provide written approval at both the completion of 
each phase and once deliverables have been reviewed, allowing the design team to move forward 
into the phase. 
Scope of Phase 1 Services: 
Programming Phase  
Per our scope of work, we will carry out the following: 
• 
Design team will tour existing facilities to see how the departments currently function and 
assess their current spaces and adjacency requirements. 
• 
Conduct one (1) in person project kick-off meeting to define and align the strategic goals 
and desired outcomes and obtain information and/or standards regarding the current and 
desired work environment, space utilization, work processes, key adjacencies, image, and 
department identity. 
• 
Review existing programmatic information and develop baseline space needs and 
overall metrics for circulation, densities, ratios of open to closed space, personnel, 
support spaces, and services.

• 
Conduct one (1) in person programming planning workshop with our subject matter 
experts, FMD, and MCSO representatives to establish project goals and programmatic 
requirements. 
• 
The team will reconvene, in person, with FMD and MCSO to review the developed 
program document. This will include a detailed listing of all functions and spaces 
together with the square footage of each assignable space, gross square footage, and 
a description of the relationships between and among the principal programming 
elements. The programming document will be used to establish headcount and 
department specific support space for approval and use for the final design.  
Schematic Design Phase  
Dekker will establish an overall design direction, including preparation and submission of 
Schematic Design (SD) documents illustrating the scale and relationship of project 
components.  
Per our scope of work, we will carry out the following: 
• 
Comprehensive preliminary drawings in sufficient detail to illustrate the size and character 
of the project, including material selections, types of systems and construction, and any 
other features specified by the County or as determined by the programming 
requirements and test fits. 
• 
Assume one (1) major revision (more than 65%) and one (1) minor revision (less than 50%) to 
schematic space plans.  
• 
Establish major building mechanical, electrical, and plumbing systems and 
components. 
• 
Lead two (2) project review meetings with the project team for development and approval 
of the SD before proceeding with further phases. 
• 
Provide SD book for approval and use in the final design. 
Proposed Schedule: 
Phase 
Duration 
Completion Date 
Notice to Proceed 
- 
October 23, 2025 
Programming 
6 weeks 
December 4, 2025 
      County Programming Review 
   1 week 
December 11, 2025 
Schematic Design 
10 weeks 
February 19, 2026 
      County SD Review 
   1 week 
February 26, 2026 
 
Proposed Fee:  
We propose to provide these services for a lump sum fee as broken out below:   
Discipline 
Firm 
Lump Sum 
Public Safety SME 
SchraderGroup (SGA) 
$211,040.00 
Crime Lab SME 
Crime Lab Design (CLD) 
$60,570.00 
Civil Engineering 
Dibble 
$38,365.00 
Landscape Architecture  
Dekker 
$30,860.00 
Architecture & Interior Design 
Dekker 
$186,055.00 
Structural  
Caruso Turley Scott (CTS) 
$3,150.00 
Mechanical + Plumbing 
Bridgers & Paxton (B&P) 
$84,625.00 
Electrical  
Bridgers & Paxton (B&P) 
$56,360.00 
Technology + Acoustics 
Convergent Technologies (CTDG)  
$14,465.00 
 
Sub Total of Basic Services 
$685,490.00

Allowances: 
To be used as approved by FMD 
 
     General Allowance  
 
$50,000.00 
     Mechanical Energy Study 
B&P 
$11,925.00 
Reimbursables: 
 
 
      Travel from out of state 
SGA & CLD (Not to Exceed) 
$14,600.00 
 
Total Compensation 
$762,015.00 
 
Exclusions & Assumptions 
1. 
A geotechnical engineering report is not included in this proposal. 
2. Entitlements, plan review, permit fees, traffic analyses, air quality analyses, or testing 
of any kind required by the Authorities Having Jurisdiction and Maricopa County are 
excluded.  
3. Specialty consultant fees (not listed herein) 
4. Full presentation renderings 
5. Design Development, Construction Documents, and Construction Administration 
6. Material boards 
7. Special Inspection fees 
 
Thank you for the opportunity to submit this proposal. As always, feel free to contact me if 
you have questions about anything contained herein. If this proposal is acceptable, please 
sign below and return via email as an acknowledgment.  
 
Regards,  
Dekker Design, LLC                                                                       
 
 
 
 
 
 
 
 
 
 
 
Adrienne Lewis, AIA, NCARB, LEED AP 
 
Client Focus Leader / Principal, Public Safety 
 
 
 
 
      
 
 
 
 
 
 
 
 
 
Attachments:  
Dekker 2025 Billing Rates  
 
Cost Summary Worksheet 
 
Fee Summary Worksheet 
 
Fee Cash Flow Schedule 
 
SchraderGroup Proposal  
 
CLD Proposal 
 
Dibble Proposal  
 
Caruso Turley Scott Proposal  
 
Bridgers & Paxton Proposal  
 
Convergent Technologies Design Group Proposal

Standard Hourly Rates 
Valid thru 12/31/25 
 
 
Principal III: 
$290.00 per hour 
Principal II: 
$240.00 per hour 
Principal I: 
$220.00 per hour 
Architect III: 
$190.00 per hour 
Architect II: 
$160.00 per hour 
Architect I: 
$140.00 per hour 
Construction Administrator III: 
$160.00 per hour  
Construction Administrator II: 
$140.00 per hour 
Construction Administrator I: 
$120.00 per hour 
Design Associate III: 
$165.00 per hour 
Design Associate II: 
$135.00 per hour 
Design Associate I: 
$110.00 per hour 
Intern Architect II: 
$100.00 per hour 
Intern Architect I: 
$85.00 per hour 
Planner III: 
$155.00 per hour 
Planner II: 
$120.00 per hour 
Planner I: 
$85.00 per hour 
Structural Engineer III: 
$190.00 per hour 
Structural Engineer II: 
$160.00 per hour 
Structural Engineer I: 
$130.00 per hour 
Engineering Intern II: 
$120.00 per hour 
Engineering Intern I: 
$95.00 per hour 
Interior Designer III: 
$170.00 per hour 
Interior Designer II: 
$130.00 per hour 
Interior Designer I: 
$100.00 per hour 
Interior Design Intern II: 
$95.00 per hour 
Interior Design Intern I: 
$85.00 per hour 
Landscape Architect III: 
$155.00 per hour 
Landscape Architect II: 
$135.00 per hour 
Landscape Architect I: 
$115.00 per hour 
Landscape Designer II: 
$105.00 per hour 
Landscape Designer I: 
$85.00 per hour 
CAD/Revit Technician III: 
$115.00 per hour 
CAD/Revit Technician II: 
$100.00 per hour 
CAD/Revit Technician I: 
$80.00 per hour 
Administrative Assistant II: 
$95.00 per hour 
Administrative Assistant I: 
$75.00 per hour 
 
 
 
 
Notes:  
 
1. 
Rates are subject to annual adjustment

Dekker
Subtotal
SchraderGroup
CLD
Dibble
Dekker
Caruso Turley
Scott
Bridgers & Paxton
Bridgers & Paxton
Convergent 
Technologies 
Total Fee for 
Phase
Architect
Consultants
Police SME
Crime Lab & K9 
SME
Civil
Landscape
Structural
Mechanical & 
Plumbing
Electrical
Technology & 
Acoustics
$205,645.00
$54,480.00
$151,165.00
$65,840.00
$56,440.00
$7,525.00
$7,090.00
$800.00
$5,265.00
$3,540.00
$4,665.00
$479,845.00
$131,575.00 
$348,270.00
$145,200.00
$4,130.00
$30,840.00
$23,770.00
$2,350.00
$79,360.00
$52,820.00
$9,800.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$685,490.00
$186,055.00
$499,435.00
$211,040.00
$60,570.00
$38,365.00
$30,860.00
$3,150.00
$84,625.00
$56,360.00
$14,465.00
Dekker
Subtotal
SchraderGroup
CLD
Dibble
Dekker
Caruso Turley
Scott
Bridgers & Paxton
Bridgers & Paxton
Convergent 
Technologies 
Total Fee for 
Phase
Architect
Consultants
Police SME
Crime Lab & K9 
SME
Civil
Landscape
Structural
Mechanical & 
Plumbing
Electrical
Technology & 
Acoustics
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0
$0
$0
$0
$0
$0
$0
$0
$0
Dekker
Subtotal
SchraderGroup
CLD
Dibble
Dekker
Caruso Turley
Scott
Bridgers & Paxton
Bridgers & Paxton
Convergent 
Technologies 
Total Fee for 
Phase
Architect
Consultants
Police SME
Crime Lab SME
Civil
Landscape
Structural
Mechanical & 
Plumbing
Electrical
Technology & 
Acoustics
$50,000.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$11,925.00
$0.00
$11,925.00
$0.00
$0.00
$0.00
$0.00
$0.00
$11,925.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$61,925.00
$0.00
$11,925.00
$0.00
$0.00
$0.00
$0.00
$0.00
$11,925.00
$0.00
$0.00
Dekker
Subtotal
SchraderGroup
CLD
Dibble
Dekker
Caruso Turley
Scott
Bridgers & Paxton
Bridgers & Paxton
Convergent 
Technologies 
Total Fee for 
Phase
Architect
Consultants
Police SME
Crime Lab & K9 
SME
Civil
Landscape
Structural
Mechanical & 
Plumbing
Electrical
Technology & 
Acoustics
$8,900.00
$0.00
$8,900.00
$6,800.00
$2,100.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$4,700.00
$0.00
$4,700.00
$3,200.00
$1,500.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$1,000.00
$0.00
$1,000.00
$400.00
$600.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$14,600.00
$0.00
$14,600.00
$10,400.00
$4,200.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
Dekker
Subtotal
SchraderGroup
CLD
Dibble
Dekker
Caruso Turley
Scott
Bridgers & Paxton
Bridgers & Paxton
Convergent 
Technologies 
All Phases Total
Architect
Consultants
Police SME
Crime Lab & K9 
SME
Civil
Landscape
Structural
Mechanical & 
Plumbing
Electrical
Technology & 
Acoustics
$762,015.00
$186,055.00
$511,360.00
$211,040.00
$60,570.00
$38,365.00
$30,860.00
$3,150.00
$96,550.00
$56,360.00
$14,465.00
*Totals from fee summary sheets should roll to a cost summary total sheet
**Use of Additional Services and Reimbursable Expenses shall be in accordance with procedures outlined in the Professional Services Contract
Fee Service Totals
Example #3
Example #2
Example #1
Allowances
General Allowance
Mechanical Energy Study
Reimbersible Expenses
Reimbersibles 01 - Travel
Reimbersibles 02 - Hotel
Total Summary
Reimbersibles 03 - Per Diem Meal
TOTAL
MCSO Office & K9 Facility 
TOTAL
TOTAL
TOTAL
Programming
Basic Services                                   
10/2/2025
10/6/2025 R2
Cost Summary Sheet
Dekker 
Construction Administration
100% Construction Documents
50% Construction Documents
Schematic Design
Design Development
Additional Services (If Necessary)

Hourly Rate
Programming
Hours
Programming
Fee
SD 
Hours
SD Fee
DD Hours
DD Fee
50% CD 
Hours
50% CD Fee
100% CD 
Hours 
100% CD Fee
CA Hours
CA Fee
$240.00
60.00
$14,400.00
100.00
$24,000.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
$190.00
60.00
$11,400.00
120.00
$22,800.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
$190.00
60.00
$11,400.00
180.00
$34,200.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
$130.00
72.00
$9,360.00
160.00
$20,800.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
$135.00
0.00
$0.00
25.00
$3,375.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
$165.00
48.00
$7,920.00
160.00
$26,400.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
300.00
$54,480.00
745.00
$131,575.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
$186,055.00
Hourly Rate
Programming
Hours
Programming
Fee
SD 
Hours
SD Fee
DD Hours
DD Fee
50% CD 
Hours
50% CD Fee
100% CD 
Hours 
100% CD Fee
CA Hours
CA Fee
$410.00
62.00
$25,420.00
80.00
$32,800.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
$320.00
62.00
$19,840.00
100.00
$32,000.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
$195.00
28.00
$5,460.00
80.00
$15,600.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
$150.00
56.00
$8,400.00
240.00
$36,000.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
$120.00
56.00
$6,720.00
240.00
$28,800.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
264.00
$65,840.00
740.00
$145,200.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
$211,040.00
Hourly Rate
Programming
Hours
Programming
Fee
SD 
Hours
SD Fee
DD Hours
DD Fee
50% CD 
Hours
50% CD Fee
100% CD 
Hours 
100% CD Fee
CA Hours
CA Fee
$320.00
80.00
$25,600.00
12.00
$3,840.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
$290.00
16.00
$4,640.00
1.00
$290.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
$275.00
36.00
$9,900.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
$225.00
60.00
$13,500.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
$175.00
16.00
$2,800.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
$150.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
208.00
$56,440.00
13.00
$4,130.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
$60,570.00
Hourly Rate
Programming
Hours
Programming
Fee
SD 
Hours
SD Fee
DD Hours
DD Fee
50% CD 
Hours
50% CD Fee
100% CD 
Hours 
100% CD Fee
CA Hours
CA Fee
$220.00
9.00
$1,980.00
34.00
$7,480.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
$220.00
0.00
$0.00
11.00
$2,420.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
$180.00
7.00
$1,260.00
72.00
$12,960.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
$145.00
8.00
$1,160.00
8.00
$1,160.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
$155.00
0.00
$0.00
44.00
$6,820.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
$195.00
3.00
$585.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
$110.00
4.00
$440.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
$210.00
10.00
$2,100.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
$130.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
41.00
$7,525.00
169.00
$30,840.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
$38,365.00
Lab Planner / Designer / Engineer
Assistant Engineer (EIT)
Senior Designer
Land Surveyor (RLS)
Phase Totals
Phase Totals
Designer
Project Manager
Project Architect
Police SME Fee Summary
SchraderGroup (SGA)
Principal
Senior Project Manager
Architect Fee Summary 
Dekker                       
Project Manager/Architect III
Project Architect III
Spec Writer
Design Associate III
Interior Designer II
Principal II
Architect Total Fee
Police SME  Total Fee
Civil Fee Summary
Dibble
Phase Totals
Civil Total Fee
Project Manager
Project Engineer (PE)
Project Coordinator
Crime Lab & K9 SME Fee Summary
Crime Lab Design (CLD)
Senior Project Manager
Principal / Subject Matter Expert
Crime Lab & K9 SME Total Fee
Phase Totals
Sr. Lab Architect / Sr. Engineer
Project Support
Jr. Planner / Jr. Designer / Jr. Engineer
Senior Engineer
Survey Technician
Survey Crew

Hourly Rate
Programming
Hours
Programming
Fee
SD 
Hours
SD Fee
DD Hours
DD Fee
50% CD 
Hours
50% CD Fee
100% CD 
Hours 
100% CD Fee
CA Hours
CA Fee
$220.00
10.00
$2,200.00
16.00
$3,520.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
$135.00
30.00
$4,050.00
80.00
$10,800.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
$105.00
8.00
$840.00
90.00
$9,450.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
48.00
$7,090.00
186.00
$23,770.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
$30,860.00
Hourly Rate
Programming
Hours
Programming
Fee
SD 
Hours
SD Fee
DD Hours
DD Fee
50% CD 
Hours
50% CD Fee
100% CD 
Hours 
100% CD Fee
CA Hours
CA Fee
$200.00
4.00
$800.00
2.00
$400.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
$160.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
$150.00
0.00
$0.00
2.00
$300.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
$140.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
$120.00
0.00
$0.00
12.00
$1,440.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
$100.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
$105.00
0.00
$0.00
2.00
$210.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
$100.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
4.00
$800.00
18.00
$2,350.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
$3,150.00
Hourly Rate
Programming
Hours
Programming
Fee
SD 
Hours
SD Fee
DD Hours
DD Fee
50% CD 
Hours
50% CD Fee
100% CD 
Hours 
100% CD Fee
CA Hours
CA Fee
$225.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
$210.00
9.00
$1,890.00
66.00
$13,860.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
$155.00
9.00
$1,395.00
140.00
$21,700.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
$110.00
18.00
$1,980.00
180.00
$19,800.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
$100.00
0.00
$0.00
240.00
$24,000.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
$145.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
36.00
$5,265.00
626.00
$79,360.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
$84,625.00
Hourly Rate
Programming
Hours
Programming
Fee
SD 
Hours
SD Fee
DD Hours
DD Fee
50% CD 
Hours
50% CD Fee
100% CD 
Hours 
100% CD Fee
CA Hours
CA Fee
$225.00
7.00
$1,575.00
56.00
$12,600.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
$210.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
$155.00
7.00
$1,085.00
84.00
$13,020.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
$110.00
8.00
$880.00
120.00
$13,200.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
$100.00
0.00
$0.00
140.00
$14,000.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
$145.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
22.00
$3,540.00
400.00
$52,820.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
$56,360.00
Mechanical & Plumbing Total Fee
Electrical Total Fee
Project Engineer
Engineer in Training (EIT)
Designer / Drafter
Construction Inspector/Observer
Phase Totals
Phase Totals
Electrical Engineering Fee Summary
Bridgers & Paxton
Principal
Project Manager
Project Manager
Project Engineer
Engineer in Training (EIT)
Designer / Drafter
Construction Inspector/Observer
Senior Field Inspector
Phase Totals
Structural  Total Fee
Mechanical & Plumbing Fee Summary  
Bridgers & Paxton                      
Principal II
Landscape Architect Total Fee
Structural Engineering Fee Summary
CTS
Principal
AutoCAD/BIM Technician
Design Engineer
Landscape Designer III
Landscape Architect Fee Summary
Dekker
Principal I
Landscape Architect II
Phase Totals
Associate/Senior PM
Project Manager
Senior Engineer
Structural Engineer

Hourly Rate
Programming
Hours
Programming
Fee
SD 
Hours
SD Fee
DD Hours
DD Fee
50% CD 
Hours
50% CD Fee
100% CD 
Hours 
100% CD Fee
CA Hours
CA Fee
$190.00
9.00
$1,710.00
12.00
$2,280.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
$185.00
4.51
$835.00
12.00
$2,220.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
$180.00
4.00
$720.00
10.00
$1,800.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
$175.00
4.00
$700.00
10.00
$1,750.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
$175.00
4.00
$700.00
10.00
$1,750.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
25.51
$4,665.00
54.00
$9,800.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
$14,465.00
Technology & Acoustics Total Fee
Security Designer
Acoustics Designer
Phase Totals
Technology & Acoustics Fee Summary
CTDG
IT Designer
AV Designer
Design Principal

MCSO Durango Office & K9 Facility - 250048
Proposed Fee Schedule
10/6/2025_R1
Phase
Start Date
End Date
Duration 
(Weeks)
TOTAL Fee
Programming
23-Oct-25
11-Dec-25
7
$205,645
Schematic Design
12-Dec-25
27-Feb-26
11
$479,845
Design Development
tbd
tbd
$0
Construction Documents
tbd
tbd
$0
Construction Administration
tbd
tbd
$0
Fee Schedule
$685,490
$6
*Fees do not include Allowances or Reimbursables
MAR 
2026
APR 
2026
MAY 
2026
JUN 
2026
JUL
2026
NOV 
2025
DEC 
2025
JAN 
2026
FEB 
2026
18.00%
60.00%
22.00%
$0
$37,016
$123,387
$170,002
$191,938
$163,147
$0
$0
$0
$0
26.00%
40.00%
34.00%
AUG
2026

555 East North Lane, Suite 5100 | Conshohocken, PA 19428 | 215.482.7440 | www.sgarc.com 
 
01 October 2025 
Dekker 
3110 N Central Ave, Suite G140 
Phoenix, Arizona  85012 
 
Attn: 
Ms. Adrienne Lewis, AIA, NCARB, LEED AP 
 
Client Focus Leader/ Principal, Public Safety 
 
RE: 
Proposal for Law Enforcement Subject Matter Expert 
 
Programming and Schematic Design 
MCSO Durango Office and K9 Facility 
New Facility 
 
Dear Ms. Lewis: 
Pursuant to your request, SCHRADERGROUP, A Hord Coplan Macht Studio (SGA) is pleased to provide 
Dekker with this proposal for professional services. We look forward to being part of Dekker’s team. 
PROPOSED SCOPE OF WORK 
This proposal addresses the individual portions of proposed work to include; Law Enforcement 
Programming, Planning and Concept Design and Schematic Design for the above-mentioned project. 
We are prepared to support the project and summarize our proposed effort below: 
 
Programming, Planning & Concept Design Scope  
The SGA team has two visits planned for this portion of the effort.  We will conduct all of our efforts below 
in conjunction with Dekker. 
Visit #1 - SGA will conduct interviews of law enforcement users and will hold a programming and 
planning workshop.  During that workshop we will present state-of-the-art police trends, then we will 
guide the client through a live programming exercise.  We will then return to our offices and develop the 
overall program.  We will also begin to develop individual space data sheets, flow and adjacency 
diagrams to bring to a second visit. SGA will coordinate with Dekker on elements of design that they are 
responsible for during this effort. 
Visit #2 – The team will reconvene with the client to review the developed program document and will 
review the adjacency and flow diagrams.  This effort will solidify the overall programming and planning 
and will allow us to return to the office to develop conceptual drawings to fit the law enforcement facility 
into an overall concept for the site planning being developed by Dekker. SGA will coordinate with Dekker 
on elements of design that they are responsible for during this effort. 
Meeting #3 – This meeting will be a virtual meeting.  The SGA/Dekker team will meet with MCSO to 
review the concept design. During this meeting we will tweak the concept in order to have it ready for

Page 2 
 
 
555 East North Lane, Suite 5100 | Conshohocken, PA 19428 | 215.482.7440 | www.sgarc.com 
 
Dekker to move the project into Schematic Design. SGA will coordinate with Dekker on elements of design 
that they are responsible for during this effort. 
Schematic Design and Peer Review Scope 
SGA will work with Dekker to develop a cohesive schematic design.  SGA will help to massage the 
adjacencies into a design framework (interior and exterior) and will coordinate interior layout with the 
exterior design being developed by Dekker. We anticipate two (2) in-person meetings with the client to 
further develop the schematic design. We also anticipate up to six (6) additional virtual meetings to 
complete this task. 
Once the SD package is further refined, Dekker will send the Schematic Design Package to SGA who will 
review all pertinent elements.  We will conduct a virtual meeting with Dekker to review all law enforcement 
design related items.  SGA will develop a full itemized list of comments for Dekker to consider in the final 
development of the SD package.  SGA will then conduct a review in the offices of Dekker and the entire 
design team in order to coordinate the efforts of all. SGA will coordinate with Dekker on elements of 
design that they are responsible for during this effort. 
FEE PROPOSAL  
 
 
 
We provide a fee for the services as described below (Also broken out in Fee Worksheet - Attachment A).
 
 
 
Task 
 
 
 
 
 
 
Proposed Fee 
 
 
 
 
Programming, Planning & Conceptual Design 
 
$   65,840.00 
 
Schematic Design & Package Peer Review  
 
$ 145,200.00 
 
Reimbursables *  
 
 
 
 
$   11,500.00 
 
 
 
 
 
 
 
 
 
 
Grand Total 
 
$ 222,540.00 
 
*The above referenced costs include travel and expenses 
Additional services will be developed based upon the SGA Hourly rates (Attachment B). 
PROPOSED SCHEDULE 
We are prepared to proceed with this project under the schedule to be agreed on between Dekker and 
the Owner.  The current schedule anticipates six (6) weeks for Programming with one week of client review 
and ten (10) weeks for schematic design with one week for client review. 
FORM OF AGREEMENT 
Given the limited nature of our services, we would propose utilizing an AIA Architect Consultant 
Agreement for limited Scope of Services.  If Dekker requires alternate agreements or wishes to investigate 
other forms of AIA agreements, please notify us and we will work with you. 
The entire SGA team is excited to continue our partnership with Dekker.  Please feel free to contact us if 
you have any questions about the proposal.  Thank you for your consideration

Page 3 
 
 
555 East North Lane, Suite 5100 | Conshohocken, PA 19428 | 215.482.7440 | www.sgarc.com 
 
Sincerely, 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
David L. Schrader, FAIA  
 
 
 
 
 
 
 
 
 
Managing Partner 
 
 
Cc: 
Harry Pettoni, Pat McFeely, Christina Kanyavong, Regina Jean-Claude

Page 4 
 
 
555 East North Lane, Suite 5100 | Conshohocken, PA 19428 | 215.482.7440 | www.sgarc.com 
 
 
 
 
ATTACHMENT A

Hourly Rate
Programming 
Hours
Programming Fee
SD Hours
SD Fee
DD Hours
DD Fee
50% CD 
Hours
50% CD Fee
100% CD 
Hours 
100% CD Fee
CA Hours
CA Fee
$410.00
62.00
$25,420.00
80.00
$32,800.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
$320.00
62.00
$19,840.00
100.00
$32,000.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
$195.00
28.00
$5,460.00
80.00
$15,600.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
$150.00
56.00
$8,400.00
240.00
$36,000.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
$120.00
56.00
$6,720.00
240.00
$28,800.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
$0.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
264.00
$65,840.00
740.00
$145,200.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
$211,040.00
Principal
Architect Subject Matter Expert 
Fee Summary                        
Project Manager
Project Architect
Designer
-
Phase Totals
Senior Project Manager
Architect SME Total Fee

Page 8 
 
 
555 East North Lane, Suite 5100 | Conshohocken, PA 19428 | 215.482.7440 | www.sgarc.com 
 
 
 
ATTACHMENT B

2025 BILLING RATES 
Standard Billing Rate Table 
PRINCIPALS / ASSOCIATE PRINCIPALS
RATE
Principal V
410
            
Principal IV
320
            
Principal III
265
            
Principal II
235
            
Principal I
200
            
ARCHITECTURE
Architect IV
225
            
Architect III
195
            
Architect II
165
            
Architect I
135
            
Designer IV
195
            
Designer III
150
            
Designer II
120
            
Designer I
110
            
CONSTRUCTION
Construction Coordinator
235
            
Construction Manager
180
            
STRUCTURAL ENGINEERING
Structural Engineer
170
            
Structural Designer
120
            
LANDSCAPE ARCHITECTURE
Landscape Architect III
170
            
Landscape Architect II
160
            
Landscape Architect I
135
            
Landscape Designer II
115
            
Landscape Designer I
110
            
INTERIOR DESIGN
Certified Interior Designer III
205
            
Certified Interior Designer II
150
            
Certified Interior Designer I
130
            
Interior Designer III
150
            
Interior Designer II
130
            
Interior Designer I
110
            
SPECIFICATION
Specifier III
225
            
Specifier II
145
            
Specifier I
125
            
Specifier Admin 
115
            
GRAPHICS
Architectural Illustrator
230
            
Senior Graphic Designer
210
            
Visualization Manager
160
            
Graphic Designer III
160
            
Graphic Designer II
130
            
Graphic Designer I
110
          
OTHER
Public Safety Specialist
230
            
Rates are subject to change on January 1 every year.

320 N. Sangamon, Suite 1050     
Chicago  Illinois  60607 
248.262.1500 tel        
A R C H I T E C T U R E . E N G I N E E R I N G . P L A N N I N G . D E S I G N
ATLANTA 
CHICAGO         
      DETROIT               LOS ANGELES              PHILADELPHIA              SAN DIEGO       
       ST. LOUIS                                 
October 6, 2025 
 
Adrienne Lewis, AIA, NCARB, LEED AP 
Client Focus Leader / Principal, Public Safety 
Dekker 
3110 N Central Ave, Suite G-140 
Phoenix, AZ 85012 
 
Subject: 
Proposal for Programming Services for the Maricopa County Sheriff’s Office (MCSO) 
Durango Office and K9 Facility 
 
Dear Adrienne,
 
Thank you for the opportunity to submit this proposal for professional services to Dekker in 
support of the subject project.  We appreciate your confidence in our team to serve your 
planning needs. 
 
Scope of Project 
 
This proposal is based on the request for proposal by Dekker for the MCSO Durango Office and 
K9 Facility project and the scope requested of Crime Lab Design (CLD). We understand that the 
County wishes to proceed only with the Programming and Schematic Design phases and that 
CLD’s involvement will be limited to the Programming phase. 
 
The project will consist of the design of a new facility that will be programmed for MCSO 
divisions currently located in building #1920, and other recommended divisions, including Major 
Crimes (Including CISM), SWAT/K9, and Fleet Management. Secondary consideration for 
programming includes MCSO divisions currently located in building 1915/1916, which include 
the Crime Lab, Firearm Examiner, Forensic Scientist, and Health & Wellness. For the purposes of 
this proposal, these secondary considerations will be collectively referred to as the Forensic Lab. 
 
A previous programming effort from several years ago yielded a facility sized at approximately 
50,000 SF. The new facility should have the ability to expand. 
 
The delivery method for the project will be Construction Manager at Risk (CMaR), which the 
County plans to engage around Schematic Design. 
 
Scope of Services 
 
CLD will provide Programming services in support of the K9 and Forensic Laboratory portions of 
the project. We understand that the K9 portion of the project is a primary division that will be 
housed within the facility, and the forensic laboratory elements are secondary considerations 
that the County would like programmed. We anticipate that CLD’s involvement in Programming 
will occur for 6-weeks.

Adrienne Lewis, AIA, NCARB, LEED AP 
Dekker 
October 6, 2025 
Page 2 
 
 
 
Crime Lab Design 
 
 
Programming (6 Weeks) 
 
1. Participate in one (1) in-person project kick-off meeting to participate in the project 
kick-off, programming interviews/workshops, and assist in developing project goals and 
milestone objectives. 
2. Participate virtually in project meetings to be led by Dekker. 
3. Perform analysis of space utilization for the K9 Division and the forensic lab. Update the 
overall program of spaces to outline the required spaces, their area requirements, and 
commensurate support and circulation spaces. 
4. Identify critical adjacencies and conceptual blocking plans based on the outcome of user 
meetings. 
 
Schematic Design 
 
1. Attend in one (1) in-person meeting at the beginning of the SD phase to assist in 
transitioning the program and conceptual diagrams into the eventual Schematic Design 
deliverables to be created by Dekker and its other consultants.  
 
Fee Proposal 
 
Crime Lab Design's proposed fees below include the lump sum for basic services and the 
anticipated cost of reimbursable travel expenses based on the included assumed trip unit cost. 
Please see the Pricing Spreadsheet included as Exhibit A. 
 
Phase
Fee
Programming
$56,440
Schematic Design
$4,130
Design Development
TBD
Construction Documents
TBD
Bidding & Permitting
TBD
Construction Administration
TBD
Basic Services Total
$60,570
Estimated Travel Expenses
$4,200 ($2,100 per trip)

Adrienne Lewis, AIA, NCARB, LEED AP 
Dekker 
October 6, 2025 
Page 3 
 
 
 
Crime Lab Design 
 
Item
Est. Cost
Airfare
500
$       
Hotel
250
$       
Rental Car
100
$       
Transport/Parking
80
$         
Mileage
-
$        
Meals
100
$       
Total $/Trip per Person
1,030
$   
Estimated Trip Unit Cost
 
 
The estimated travel expenses assume three (3) days for planning workshops per trip based on 
the above Estimated Trip Unit Cost. 
 
Additional Services shall be provided for the project if authorized by Dekker.  Crime Lab Design's 
fee for additional services beyond the scope of basic services outlined above and which is in 
addition to the basic services fee amount will be a lump sum amount as agreed at the time 
additional services are requested. 
 
Assumptions and Clarifications 
 
1. 
If the Forensic Lab portion of the project moves forward into future phases beyond 
Programming, CLD will provide a proposal to Dekker for related design services. 
2. 
In person meetings will be attended by one (1) CLD subject matter expert. Virtual 
meetings may be attended by other CLD staff if required. 
3. 
While CLD may include nominal time from its Forensic specialist MEP engineers to 
provide input on programming and conceptual layouts, it is understood that any effort 
beyond this general consulting will not be required. 
4. 
An MEP engineer other than CLD will be the engineer for the project and will be the 
eventual Engineer of Record. 
5. 
CLD will work under the direction of Dekker. 
6. 
A BIM model will not be required as part of CLD’s scope of services, but CLD, at its own 
discretion, may elect to create one to convey conceptual layouts and programming 
diagrams. 
7. 
Electronic form deliverable documents will be provided to Dekker for reproduction and 
distribution. 
8. 
We assume that a consolidated OFOI (Owner Furnished, Owner Installed) equipment list 
will be provided by the Owner. Therefore, Equipment Planning is not included in this 
proposal. If Equipment Planning is ultimately required from CLD, we will provide a 
proposal for the additional services. 
9. 
Detailed reviews of equipment cutsheet information and/or surveying and 
documentation of existing Owner equipment is/are not included. 
10. 
CLD does not have specialized training or expertise in the specification, treatment 
and/or handling of new and/or existing asbestos-containing, asbestos-contaminated, or 
other toxic and hazardous materials, above or below surface, and our professional

Adrienne Lewis, AIA, NCARB, LEED AP 
Dekker 
October 6, 2025 
Page 4 
 
 
 
Crime Lab Design 
 
liability insurance policy does not include coverage of these services. Therefore, CLD 
cannot provide these services. It is our understanding that the Client will retain, if 
necessary, a qualified remediation consultant, industrial hygienist, and/or contractor to 
provide these services. 
11. 
FFE services are not included. 
 
Crime Lab Design will begin work on the project immediately upon receipt of your authorization 
to proceed.  If you have any questions regarding this proposal-agreement for services, or if you 
wish to discuss any aspect of the project, please contact me directly.  We look forward to this 
opportunity to provide our expertise and services to Dekker and Maricopa County. 
 
Sincerely, 
 
 
 
Jon Howard, AIA, CDT 
Principal

Hourly Rate
Programming
Hours
Programming
Fee
SD 
Hours
SD Fee
DD Hours
DD Fee
50% CD 
Hours
50% CD Fee
100% CD 
Hours 
100% CD Fee
CA Hours
CA Fee
$320.00
80.00
$25,600.00
12.00
$3,840.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
$290.00
16.00
$4,640.00
1.00
$290.00
$275.00
36.00
$9,900.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
$225.00
60.00
$13,500.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
$175.00
16.00
$2,800.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
$150.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
$0.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
208.00
$56,440.00
13.00
$4,130.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
$60,570.00
Crime Lab & K9 SME Total Fee
Senior Project Manager
Jr. Planner / Jr. Designer / Jr. Engineer
Project Support
Phase Totals
Crime Lab & K9 SME Fee Summary
Crime Lab Design (CLD)
Principal / Subject Matter Expert
Sr. Lab Architect / Sr. Engineer
Lab Planner / Designer / Engineer

p 602.957.1155 
3020 East Camelback Road, Suite 201 
dibblecorp.com 
f 602.957.2838 
Phoenix, AZ 85016 
 
September 29, 2025 
 
Adrienne Lewis, AIA, NCARB, LEED AP 
Dekker 
3110 N Central Ave Suite G-140 
Phoenix, AZ 85012 
602-842-5600 
 
 
RE: 
MCSO Durango Office and K9 Facility 
 
Maricopa County Durango Campus 
 
Survey & Civil Engineering Services Proposal 
 
 
Adrienne, 
 
Thank you for the opportunity to submit this proposal to provide survey and civil engineering services.  This proposal 
has been prepared based on our understanding of the project as described in the Project Understanding and Scope 
of Services sections.  We look forward to partnering with your team for a successful project. 
 
PROJECT UNDERSTANDING: 
Project summary 
• 
An approximately 50,000 sf office building for Maricopa County Sheriff’s Office including multiple 
departments and facilities for K9 
• 
The anticipated site location is approximately 6.5 acres as shown in the attached exhibit on the Maricopa 
County owned Durango Campus, the exact location may change based on coordination with owner.  The 
proposal assumes a maximum 6.5 acre site will be chosen within the Durango Campus. 
• 
Existing site is currently mostly cleared, being previously a jail facility demolished in 2023-2024 
• 
Adjacent developments include county use facilities including a parking garage to the north, Towers Jail 
beyond an empty lot directly adjacent to the east, vehicle parking/impound lots to the west, and Lower 
Buckeye jail beyond an irrigation channel to the south.  
 
Grading & Drainage 
• 
Retention will be provided for the 100-year, 2-hour rainfall event within above ground or underground 
retention  
• 
The MC Durango Campus is almost entirely located within a FEMA Special Flood Hazard Area (SFHA)  
designated as Zone AE with established base flood elevations with some exceptions around existing 
buildings designated as Zone X where no flooding is expected, including portions of the proposed site. 
• 
Finished floor and pads for new equipment will need to be set above the base flood elevation plus 1.2’ to 
meet City of Phoenix requirements, and any site improvements will need to maintain the floodplain without 
causing an adverse impact to adjacent buildings or property.  
• 
The City of Phoenix provides floodplain management for the Durango Campus, and permitting for 
construction within a FEMA designated flood zone is required through the City of Phoenix.  
• 
The City of Phoenix and FEMA require a Letter of Map Revision Based on Fill (LOMR-F) for new buildings in 
FEMA Special Flood Hazard Areas.  
 
Existing/proposed utilities: 
• 
Fire service will be provided with a connection to the private main within the adjacent Gibson Lane 
• 
Domestic water service will be provided with a connection to the private main within the adjacent Gibson 
Lane 
• 
Sanitary sewer service will be provided with a connection to the private main within the adjacent Gibson 
Lane 
• 
Utility relocations are not expected 
• 
Off-site utility improvements are not expected

2
 
Adjacent roadway infrastructure: 
• 
Adjacent roadway (Gibson Lane) is fully developed.  It’s not anticipated that Gibson Lane will be widened 
beyond any local improvements for access to the site. 
 
Parcel summary 
• 
Replat/Lot Combo/Easements new or abandonment are not expected 
 
CONDITIONS: 
• 
Architect will provide electronic files (AutoCAD) of the proposed site and building improvements for use as 
the basis of the civil design 
• 
The Client will provide a Geotechnical Report with recommendations for pavement sections and percolation 
rates to complete the civil design for this project.  If underground retention is proposed report will include 
underground retention corrosion protection recommendations, and bedding & backfill design. 
• 
Submittals will be made via pdf documents and printing if required will be done by others or reimbursed at 
cost to Dibble  
• 
Submittal and review fees will be paid by Owner/Architect at the time of submittal 
• 
The design team will utilize the aerial topographic survey and ALTA surveys conducted in early 2024 for the 
electrical infrastructure campus upgrades for the programming and schematic design phases. Additional 
survey will be required to capture more detailed information regarding utilities and hard tie in locations. 
• 
Site plan changes received less than two weeks prior to SD (30%) will not be incorporated until the next 
submittal in order to allow Dibble to perform our typical QA/QC process on these submittals prior to making 
our submittal. 
• 
Meetings are as noted in each section.  Should the required meeting attendance exceed the expected 
number of meetings additional compensation will be requested. 
 
DESIGN STANDARDS/PERMITTING AGENCY 
Design will conform to the following Authorities Having Jurisdiction (AHJ). 
• 
City of Phoenix (floodplain) 
• 
Maricopa County  
Design will be reviewed and permitted by the following AHJ(s) 
• 
City of Phoenix (floodplain use permit) 
• 
Maricopa County  
 
SCHEDULE: 
• 
Client is anticipating 6 weeks of programming and 10 weeks for schematic design. 
 
SCOPE OF SERVICES: 
 
1.0 
Programming Phase 
1.1 
Supplemental Survey 
• 
Additional survey shots to pick up pavement and hardscape tie in locations  
• 
Utility surface appurtenances and manhole and storm drain dips for invert elevations 
• 
Incorporate new topo information into electrical infrastructure campus upgrade survey files for use as 
the basis of civil design 
1.2 
Programming 
 
Dibble will perform programming services including: 
• 
Provide input on site locating options regarding existing utilities, easements and site circulation 
• 
Provide input on strategic building placement to minimize floodplain permitting obstacles 
• 
Collect existing utility maps and civil reports (drainage) impacting proposed site 
• 
Provide narrative summary with findings of reports and utility impacts 
1.3 
Meetings & Coordination 
• 
3 ea. - 1 hour meetings (approximately bi weekly) 
• 
1 ea. – 2 hours facility tour

3
2.0 
Schematic Design Phase 
2.1 
Schematic Design Documents 
 
Dibble will prepare Schematic Design documents including: 
• 
Develop on-site plans including site demolition plan, civil site plan, grading & drainage plan, and utility 
plan 
• 
Develop design of horizontal control of the site elements of the project including walls, hardscape, drives, 
and drainage features 
• 
Develop design of water, sewer, and fire protection services 
• 
Develop design of storm water conveyance, above ground and underground retention/detention facilities 
• 
Develop draft drainage calculations 
• 
Coordinate dry utilities by acquiring design plans from design team and illustrating dry utility alignment 
on civil plans, for reference only 
• 
Coordination with Owner, Architect, Plumbing Engineer & Landscape Architect 
2.2 
Schematic Design Drainage Analysis 
 
Dibble will provide schematic design level drainage analysis including: 
• 
Coordinate with the City of Pheonix to determine all project specific floodplain permitting 
requirements 
• 
Review existing floodplain modeling developed as part of the Maricopa County Library 
Distribution Center project to determine existing condition flood risk 
• 
Determine FEMA base flood elevation relative to the proposed building footprint based on 
the FEMA effective Flood Insurance Rate Map 
• 
Establish minimum building finished floor and pad elevation for each piece of equipment 
per FEMA and City of Phoenix requirements 
• 
Run floodplain modeling of the conceptual proposed condition to ensure no adverse impact 
to adjacent buildings or property 
• 
Run calculations for required drainage openings for site walls if necessary 
• 
Prepare a preliminary drainage report in preparation for a request for floodplain clearance  
from the City of Pheonix and a LOMR-F from FEMA in future project stages 
2.3 
Meetings & Coordination 
• 
10 ea. - 1 hour meetings (weekly meetings) 
 
 
ALLOWANCE/SUB-CONSULTANTS 
3.0 
Fire Flow Test (allowance) 
• 
Fire flow test for building fire flow calculations 
 
EXCLUSIONS: 
Unless noted otherwise within the Scope of Services the following services are excluded from this proposal 
• 
Cost of permits or fees 
• 
Design services beyond Schematic Design 
• 
Survey Services including: Replat/Lot Combinations, ALTA survey, legal descriptions & exhibits 
• 
Traffic study/Traffic impact analysis/Signal design 
• 
Roadway signing & striping design 
• 
Sub-surface exploration (utility pot-holing) 
• 
Environmental investigations 
• 
Geotechnical investigation 
• 
Pavement section design & percolation tests (To be provided by Geotechnical Engineer) 
• 
Design of off-site/public street, sidewalk, water, or sewer improvements   
• 
404 permitting 
• 
Electrical design, mechanical design, natural gas design, landscaping, and irrigation design 
• 
Site structural design including walls  
• 
Street light plan/street light design 
• 
Construction staking/Construction inspection 
• 
As-built survey / Record document preparation 
• 
Certification of finish floor elevation 
• 
NOI (Notice of Intent) application by Contractor

4
FEES: 
1.0 
Programming Phase  
$ 
7,525 
1.1 
Supplemental Survey 
$ 
3,125 
1.2 
Programming 
$ 
2,400 
1.3 
Meetings & Coordination 
$ 
2,000 
2.0 
Schematic Design Phase 
$ 
30,840 
2.1 
Schematic Design Documents 
$ 
15,800 
2.2 
Schematic Design Drainage Analysis 
$ 
11,040 
2.3 
Meetings & Coordination 
$ 
4,000 
 
Subtotal  
$ 38,365 
ALLOWANCE/SUB-CONSULTANTS 
3.0 
Fire Flow Test 
$ 
1,000 
 
Subtotal  
$ 
1,000 
 
Project Total  
$ 39,365 
 
 
STANDARD BILLING RATES (January 1, 2025) 
Project Manager 
220.00 
QA/QC Manager 
220.00 
Project Engineer (PE) 
180.00 
Assistant Project Engineer (EIT) 
145.00 
Senior Engineering Technician 
175.00 
Senior Designer 
155.00 
Land Surveyor (RLS) 
195.00 
Survey Technician 
110.00 
Survey Crew  
210.00 
Project Coordinator 
130.00 
 
ADDITIONAL SERVICES: 
If the Consultant/Engineer is required to perform services in addition to those outlined in the Scope of Services, by 
reason of substantial changes ordered by the Owner or Architect or for any reason beyond the 
Consultant’s/Engineer’s control, they are to receive compensation for such services.  Compensation for additional 
services not included in the Scope of Services for the basic services shall be based on time expended.  Additional 
services must be approved by the Owner prior to the start of such work. 
 
Invoices will be submitted monthly based on the percentage of the survey and civil engineering services that are 
complete.  These invoices will be due and payable upon receipt and will be considered past due if not paid within 
seven days after Client’s receipt of payment from the Owner. 
 
If you have any questions, please feel free to call us at (602) 957-1155.  
 
 
Sincerely, 
 
 
 
 
 
 
 
 
C. Shannon Mauck, P.E. 
 
 
 
Adrian Carvajal, P.E. 
Vice President, Land Development  
 
Senior Project Manager/Team Leader 
Dibble  
 
 
 
 
Dibble

5 
Possible Site Exhibit/Supplemental Survey Area

Hourly Rate
Programming 
Hours
Programming Fee
SD Hours
SD Fee
DD Hours
DD Fee
50% CD 
Hours
50% CD Fee
100% CD 
Hours 
100% CD Fee
CA Hours
CA Fee
$220.00
9.00
$1,980.00
34.00
$7,480.00
$0.00
$0.00
$0.00
$0.00
$220.00
$0.00
11.00
$2,420.00
$0.00
$0.00
$0.00
$0.00
$180.00
7.00
$1,260.00
72.00
$12,960.00
$0.00
$0.00
$0.00
$0.00
$145.00
8.00
$1,160.00
8.00
$1,160.00
$0.00
$0.00
$0.00
$0.00
$155.00
$0.00
44.00
$6,820.00
$0.00
$0.00
$0.00
$0.00
$195.00
3.00
$585.00
$0.00
$0.00
$0.00
$0.00
$0.00
$110.00
4.00
$440.00
$0.00
$0.00
$0.00
$0.00
$0.00
$210.00
10.00
$2,100.00
$0.00
$0.00
$0.00
$0.00
$0.00
$130.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
41.00
$7,525.00
169.00
$30,840.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
$38,365.00
Civil Total Fee
Project Engineer (PE)
Assistant Project Engineer (EIT)
Civil Fee Summary                        
Phase Totals
Project Manager
Senior Designer
Land Surveyor (RLS)
Survey Technician
Survey Crew
Project Coordinator
Senior Engineer

CARUSO 
TURLEY 
SCOTT 
structural 
engineers 
STRUCTURAL 
SOLUTIONS 
 
PARTNERS 
Sandra Herd, SE, PE, LEED AP 
Thomas Morris, SE, PE, LEED AP 
Richard Dahlmann, SE, PE 
Troy Turley, SE, PE, LEED AP 
Brady Notbohm, SE, PE 
Craig Porter, SE, PE 
Ron Kuklish, SE, PE 
PROFESSIONAL 
REGISTRATION 
 
All 50 States 
Washington D.C. 
Puerto Rico 
1215 W. Rio Salado Pkwy. 
Suite 200 
Tempe, AZ 85281 
480.774.1700 
www.ctsaz.com 
September 30, 2025 
 
Ms. Adrienne Lewis 
DEKKER  
3110 N. Central Ave. Suite G140 
Phoenix, AZ 85012 
602.842.5600 
AdrienneL@dekkerdesign.org  
 
RE: 
MCSO Durango Office and K-9 Facility – Schematic Design 
 
Near 3300 W. Gibson Ln. (final location TBD) 
 
Phoenix, AZ 
 
MC Project No: 1902-26-00594 
 
MC Contract No: 250049-ROQ 
 
CTS Job No: 25-1197-43 
 
Dear Ms. Lewis: 
 
This will confirm our fee to provide structural engineering and drafting services as required for a new MCSO Office and 
K9 facility. Services are anticipated to include: 
 
• 
Programing and Schematic design only a new multi-purpose facility comprised of office and administrative 
space for multiple divisions within MCSO as well as specialty space(s) for the MCSO K9 division.  The exact 
size and location of the new facility will be determined as part of the overall design effort.   
• 
New facility will primarily be programmed for MCSO divisions currently located in building #1920, and other 
recommended divisions.  These divisions are as follows:  
o 
Major Crimes - Including CISM, SWAT/K9, and Fleet Management 
• 
Secondary consideration for programming includes MCSO divisions, which include:  
o 
Crime Lab, Firearm Examiner, Forensic Scientist, and Health & Wellness 
• 
The facility should have area and/or the ability to expand.  
• 
K9 facilities are planned to house up to 24 animals (TBD) with inside / outside access with shade awnings or 
roof overhangs, and an exterior fenced exercise yard. 
• 
Phase 1 deliverables to include a narrative on proposed building materials. Sketch level framing plans may be 
provided if appropriate.  
• 
The construction delivery method will be Construction Manager at Risk (CMR), which FMD plans to engage 
around Schematic Design. 
• 
Services anticipate up to two (2) meetings during programing and Schematic Design 
• 
Design Development Documents, Construction Documents, Permitting, Construction Administration and 
Special Structural Inspection Services (SSI) are excluded.  
• 
Services excluded cost estimating of the structure, these services are to be provided by others on the design 
team. 
 
Our Basic Services will be billed at a Fixed Fee per the attached break down. 
 
Programming and Schematic Design        $3,150.00 
 
 
HOURLY BILLING RATES 
TEAM MEMBER 
RATE $ 
TEAM MEMBER 
RATE $ 
Partner 
200.00 
Structural Engineer I 
120.00 
Associate 
190.00 
Structural Designer II 
110.00 
Senior Principal 
180.00 
Structural Designer I 
100.00 
Principal 
170.00 
Senior Structural Inspector 
105.00 
Senior Project Manager 
160.00 
Structural Inspector 
95.00 
Project Manager 
150.00 
Senior Structural Drafter 
105.00 
Senior Structural Engineer 
140.00 
Structural Drafter 
95.00 
Structural Engineer II 
130.00 
Administrative / Billing Team 
65.00 
 
Basic Services will include a written narrative of the structural systems proposed for the new facility.  
 
Reimbursable Expenses are included in this fee. 
 
 
 
 
CLIENT INFORMATION: 
 
 
 
CLIENT PROJECT NO. 
 
 
 
PROJECT MANAGER 
 
 
 
OTHER

CARUSO 
TURLEY 
SCOTT 
STRUCTURAL SOLUTIONS SINCE 1963 
September 30, 2025 
MCSO Durango Office and K-9 Facility – Schematic Design  
Phoenix, AZ 
Page 2 
 
 
In rendering professional services Caruso Turley Scott (CTS) shall apply the skill and care ordinarily exercised by 
structural engineers at the time and place the services are rendered. Schedules and timely available information from 
the architect, owner and other design consultants contribute to the completeness of the structural drawings. As such, all 
projects should carry a contingency for potential coordination and value-added items. It is recommended that final bids 
not be taken until city review comments and coordination comments have been incorporated. If documents are bid prior 
to city and coordination comments, the owner assumes the risk for associated additional costs. Client agrees that the 
liability of CTS, its agents, and employees, in connection with services hereunder to the Client and to all persons having 
contractual relationships with them, resulting from any negligent acts, errors, and/or omissions of CTS, its agents, and/or 
employees is limited to the total fees actually paid by the Client to CTS for services rendered by CTS hereunder. CTS 
maintains a current professional liability insurance policy. As a consultant we shall neither have control over or charge 
of, nor be responsible for, the construction means, methods, techniques, sequences, or procedures, or for safety 
precautions and programs in connection with the work, since these are solely the Contractor’s rights and responsibilities. 
 
At the commencement of engineering services, a “Preliminary Notification” may be forwarded to the property owner 
and/or tenant. The “Preliminary Notification” is not a lien, but state law requires the distribution of a “Preliminary 
Notification” issued at the commencement of engineering services to maintain the option of filing a lien for nonpayment 
of engineering services at a future date. This “preliminary notification” is customary and routine in the construction 
industry and informs the recipient of their legal rights and obligations. Payments for Services as described above shall 
be made upon the presentation of the Engineer’s invoice based on time expended. Interest at 1.5% per month, 
compounded monthly, will be paid on all invoices after 30 days from billing date. In the event any portion of an account 
remains unpaid 90 days after billing, the Client shall pay the cost of collection, including reasonable attorney fees. If any 
portion of the account remains unpaid 30 days after billing, this office may, without waiving any claim or right, and without 
liability whatsoever to the Client, suspend or terminate the performance of all services. 
 
This proposal is valid for 120 days from the date of issuance. After 120 days, please contact our office for updated fees. 
If this contract meets with your approval, please sign, date and e-mail (MMcClinton@ctsaz.com) back to our 
office for authorization to proceed. 
 
Respectfully Submitted: 
 
Accepted By: 
CARUSO TURLEY SCOTT INC. 
 
DEKKER 
 
 
Troy Turley, SE, PE, LEED AP 
Partner 
480.774.1746 Direct 
tturley@ctsaz.com  
 
Name: 
 
 
Title: 
 
 
Date: 
 
 
IF ANOTHER PARTY IS RESPONSIBLE FOR PAYMENT 
Please advise our office at 480.774.1700 for separate approval to proceed.

Client: 
Date:
Project Name: 
250048-ROQ
Project No & Brief Description: 
Task
Description
Hours
$200.00
Hours
$160.00
Hours
$150.00
Hours
$140.00
Hours
$120.00
Hours
$100.00
Hours
$105.00
Hours
$105.00
Hours
$65.00
Project intitiation kick off 
/site visit
4.0
800.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
4.0
Schematic Design
2.0
400.00
0.00
2.0
300.00
0.00
12.0
1440.00
0.00
2.0
210.00
0.00
0.00
18.0
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.0
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.0
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.0
Hours & Fee:
6.0
1200.00
0.0
0.00
2.0
300.00
0.0
0.00
12.0
1440.00
0.0
0.00
2.0
210.00
0.0
0.00
0.0
0.00
Respectfully submitted,
Caruso Turley Scott Structural Engineers
Troy E. Turley, PE, SE, LEED AP
Partner
Direct: 480.774.1746
Email: TTurley@ctsaz.com
-
$                         
CTS Job No:
-
$                         
TOTAL Design Labor:
Reimbursable Expenses:
800.00
$                   
-
$                         
2,350.00
$                
Project Manager
($Hourly Rate)
($Hourly Rate)
Senior Engineer
($Hourly Rate)
Senior  Field 
Inspector
TOTAL DESIGN & REIMBURSABLES (not to Exceed):
MCSO Durango Office and K-9 Facility -Schematic Design
50,000 sf office and K9 facility  - Schematic Narative
Dekker  
($Hourly Rate)
AutoCAD | BIM 
Technician
($Hourly Rate)
Design Engineer
($Hourly Rate)
Structural 
Engineer 
($Hourly Rate)
($Hourly Rate)
($Hourly Rate)
PROJECT ITEMIZED COST SUMMARY & ESTIMATED MAN HOURS
3,150.00
$                
3,150.00
$                
-
$                         
MC Contract No:
Total
Fee
Direct Labor Hours
Total
Hours
September 30, 2025
Principal
Clerical (Admin)
Associate | Senior 
PM

October 4, 2025 
 
 
Client:  
 
Ms. Adrienne Lewis, AIA, NCARB, LEED AP 
Principal / Architect 
Dekker 
3110 North Central Ave, Suite G140 
Phoenix, AZ 85012 
602-842-5600 
adriennel@dpsdesign.org 
 
Project:  
 
Maricopa County MCSO Durango Office and K9 Facility 
MC Durango Campus 
Phoenix, AZ  
  
 
 
 
 
 
 
SUBJECT: PROPOSAL FOR MEP ENGINEERING SERVICES 
 
PHASE 1 – PROGRAMMING AND SCHEMATIC DESIGN – REV 1 
B&P Prop No. – 25P-098 
 
Dear Adrienne: 
 
Thank you for the opportunity to submit this proposal to provide consulting engineering services 
for the referenced project. This proposal includes the Project Description, as we understand it, 
B&P’s proposed Scope of Services, Compensation, and our Terms & Conditions. 
 
Project Description 
 
Maricopa County Sheriff’s Office is looking to build a new building and K9 facility that will be located 
on the Durango Campus.   The anticipated construction budget is $55 Million.  The design of the 
facility will be developed in phase 1 which includes programming and schematic design.   The general 
scope is to provide offices for the MCSO department which may include up to 30 user groups, K9 
kennel facilities, and K9 training areas.      
 
Information to be Provided by Client 
 
• 
Client shall provide the following information to B&P: 
o Criteria, constraints and definitions applicable to this project 
o Electronic REVIT files. 
o Design and construction standards. 
 
Included Services 
 
B&P proposes to provide consulting engineering services for the above referenced project.  Our 
1839 S. Alma School Rd, Suite 300 
Mesa, AZ  85210 
main 602.996.6399  www.bpce.com

10/4/2025 
Page 2 
 
 
 
services will include: 
 
• 
Programming: 
• 
Site investigation 
• 
Coordination with the Durango electrical infrastructure project to determine primary 
electrical service to the site.   
• 
Coordinate with Dekker regarding space programming to determine electrical and 
mechanical room sizes. 
• 
Attend design team coordination meetings. 
• 
Attend County review meetings.  Each discipline will be represented. 
• 
Schematic Design: 
• 
Provide recommendations regarding existing HVAC equipment and Electrical 
Distribution Equipment 
• 
Preliminary Engineering for Mechanical, Electrical, Plumbing and Fire Protection 
(performance based) systems within the building and to 5 ft outside the building 
footprint. 
Mechanical: 
1. Preliminary heat /load calculations to determine HVAC equipment  
2. Determine mechanical room space requirements 
3. Provide design narrative. 
4. Provide typical schematic design room layouts for supply & return ductwork, grilles and diffusers. 
 
Plumbing: 
1. Prepare preliminary domestic water demand calculations. 
2. Prepare preliminary waste and vent piping calculations. 
3. Coordinate fixture types and provide cutsheets. 
4. Coordinate invert location with Civil Engineer. 
 
Electrical: 
1. Coordinate primary service with the Durango Electrical Infrastructure project.  
2. Coordinate primary service with Arizona Public Service. 
3. Calculate preliminary one-line diagram and service requirements 
4. Develop site plan electrical distribution layout. 
5. Provide electrical room dimensions and equipment layouts. 
6. Provide typical schematic design layouts for lighting and receptacles. 
 
Allowance:   Energy analysis and life cycle cost studies of Mechanical HVAC systems. 
 
Excluded Services 
 
B&P proposes to provide consulting engineering services for the above referenced project.  Our 
services DO NOT include: 
 
• 
On-site civil utility design beyond 5'-0" from the building, including domestic water, fire main, 
sanitary sewer, storm sewer, natural gas and all associated meters, backflow preventers, 
vaults, structures and enclosures (to be provided by Civil Engineer to extent as may be 
necessary 
• 
Technology design will be provided by CDT.  CDT will provide Audio Visual, 
Telecommunications cabling systems, security systems, acoustics, noise & Vibration 
Controls, all pathways (including but not limited to cable tray, conduit, outlet boxes), 
division 27 and 28 specifications.   B&P will not be providing any services in reference to 
technology.

10/4/2025 
Page 3 
 
 
 
• 
Services for Design Development, Construction Documents, Bid & Award and Construction 
Administration. 
• 
Providing Opinions of Probable Construction Costs. 
• 
Design of off-site utility system improvements or expansion including connections to utilities 
beyond the property line and/or within the public right-of-way (to be provided by Civil 
Engineer to the extent as may be necessary). 
• 
Special on-site observation/inspection which may be required by the City of Phoenix, 
County or State Building Department/Officials. 
• 
LEED participation and documentation for typical MEP credits. 
• 
Preparation of any additional work typically included as "Additional Services" in the standard AIA 
Agreement between Architect and Consultants. This includes life cycle cost analyses. 
• 
Extensive revisions to our work due to changes outside B&P’s control, including redesign of 
systems after approval by the Owner or Owner’s Representative. 
 
Compensation 
We propose to provide these services for a lump sum fee as indicated in the attached task 
breakout.  We will invoice monthly during design and construction.  If you request additional 
services, we could provide them either on a lump sum fee basis or hourly per our attached 
hourly rate schedule 
 
We anticipate the following milestones:  Phase 1:  Programming and Schematic Design.  
 
Terms & Conditions 
 
This proposal is based on our understanding of the project and the Owner’s expectations. 
Please forward us a copy of your prime agreement when it becomes available. We reserve 
the right to modify this proposal if your prime agreement differs significantly from our 
expectations. 
 
By signing this proposal document, client agrees to all attached Terms and Conditions and all 
included sheets prior to this signature sheet.  
 
This proposal is considered valid for 90 days from date above. 
 
Thank you for the opportunity to submit this proposal. We look forward to working with you on 
this project. Please call me if you would like to discuss any aspects of it. 
 
 
Sincerely, 
 
BRIDGERS & PAXTON 
CONSULTING ENGINEERS, INC. 
 
 
 
John Montaño, P.E. 
Principal 
 
 
cc: 
B&P Accounting 
 
File 
 
ACCEPTED BY:   
 
 
 
 
 
DATE:

10/4/2025 
Page 4 
 
 
 
 
Accounting:  
Date:     
 
 
 
 
M:\PHX\PROPOSAL\2025\25P-086 MCF MCSO DURANGO OFFICE AND K9 FACILITY (AWARDED)\FEE PROPOSAL\BP FEE MCF MCSO OFFICE AND K9 PROGRAMMING AND 
SCHEMATIC DESIGN PHASE 1.DOCX

BRIDGERS & PAXTON CONSULTING ENGINEERS
Mechanical & Plumbing  Fee Summary - Bridgers & Paxton
programming hours
programming fee
SD Hours
SD Fee
DD Hours
DD Fee
50% CD Hours
50% CD Fee
100% CD Hours
100% CD Fee
CA Hours
CA Fee
Hourly Rate
(in contract)
(in contract)
(in contract)
(in contract)
Principal
$225.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0
Project Manager
$210.00
9.00
$1,890.00
66.00
$13,860.00
$0.00
$0.00
$0.00
$0
Project Engineer
$155.00
9.00
$1,395.00
140.00
$21,700.00
$0.00
$0.00
$0.00
$0
Engineer in Training (EIT)
$110.00
18.00
$1,980.00
180.00
$19,800.00
$0.00
$0.00
$0.00
$0
Designer / Drafter
$100.00
$0.00
240.00
$24,000.00
$0.00
$0.00
$0.00
$0
Construction Inspector/Observer
$145.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0
Phase Totals
36.00
$5,265.00
626.00
$79,360.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
Mechanical  Fee Total
$84,625
Electrical  Fee Summary - Bridgers & Paxton
programming hours
programming fee
SD Hours
SD Fee
DD Hours
DD Fee
50% CD Hours
50% CD Fee
100% CD Hours
100% CD Fee
CA Hours
CA Fee
Hourly Rate
(in contract)
(in contract)
(in contract)
(in contract)
Principal
$225.00
7.00
$1,575.00
56.00
$12,600.00
$0.00
$0.00
$0.00
$0.00
Project Manager
$210.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
Project Engineer
$155.00
7.00
$1,085.00
84.00
$13,020.00
$0.00
$0.00
$0.00
$0.00
Engineer in Training (EIT)
$110.00
8.00
$880.00
120.00
$13,200.00
$0.00
$0.00
$0.00
$0.00
Designer / Drafter
$100.00
$0.00
140.00
$14,000.00
$0.00
$0.00
$0.00
$0.00
Construction Inspector/Observer
$145.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
Phase Totals
22.00
$3,540.00
400.00
$52,820.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
Electrical  Fee Total
$56,360
BRIDGERS & PAXTON TOTAL FEE:
$140,985
Energy Study - Bridgers & Paxton
programming hours
programming fee
SD Hours
SD Fee
DD Hours
DD Fee
50% CD Hours
50% CD Fee
100% CD Hours
100% CD Fee
CA Hours
CA Fee
Hourly Rate
(in contract)
(in contract)
(in contract)
(in contract)
Principal
$225.00
1.00
$225.00
2.00
$200.00
$0.00
$0.00
$0.00
$0.00
Project Manager
$210.00
$0.00
9.00
$1,890.00
$0.00
$0.00
$0.00
$0.00
Project Engineer
$155.00
2.00
$310.00
60.00
$9,300.00
$0.00
$0.00
$0.00
$0.00
Engineer in Training (EIT)
$110.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
Designer / Drafter
$100.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
Construction Inspector/Observer
$145.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
Phase Totals
3.00
$535.00
71.00
$11,390.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
Alowance for Mechanical Energy Study
$11,925

10/4/2025 
Page 5 
 
 
 
PROFESSIONAL FEE SCHEDULE OF HOURLY RATES 
MECHANICAL/ELECTRICAL/PLUMBING/TECHNOLOGY/CONTROLS 
 
November 15, 2024 – November 14, 2026 
 
PRINCIPAL 
$225.00 
 
PROJECT MANAGER 
$210.00 
 
SENIOR ENGINEER 
$185.00 
 
PROJECT ENGINEER 
$155.00 
 
ENGINEER 
$130.00 
 
ENGINEER INTERN 
$105.00 
 
SENIOR DESIGNER 
$165.00 
 
PROJECT DESIGNER 
$120.00 
 
DESIGNER 
$100.00 
 
BIM SERVICES 
$120.00 
 
CADD TECH 
$  90.00 
 
ESTIMATING/CONSTRUCTION SERVICES 
$145.00

C O N V E R G E N T  T E C H N O L O G I E S  D E S I G N  G R O U P ,  I N C .  
6501 York Road  •  Baltimore, Maryland  •  21212  •  (410) 532-2395 voice  •  (410) 532-2396 fax 
448 W 37th St 7D • New York. New York • 10018 • (646) 475-5116 voice • (646) 475-5117 fax 
4651 South Lakeshore Dr.  •  Tempe, Arizona  •  85282  •  (480) 345-9951 voice  •  (480) 345-9952 fax 
Email: design@ctdginc.com  •  website: www.ctdginc.com 
 
September 30, 2025 
 
 
Adrienne Lewis, AIA, NCARB, LEED AP 
Dekker 
3110 N Central Ave Ste G-140 
Phoenix, AZ 85012 
 
 
Re: Maricopa County Sheriff’s Office (MCSO) 
 
 
MCSO Durango Office and K9 Facility 
 
Telecommunications Cabling Systems, Audiovisual Systems, 
Access Control/Video Surveillance & Acoustics Design Services  
 
 
Dear Adrienne, 
 
Thank you for the opportunity to work on another exciting project with yourself and Dekker. This scope of 
work is based on the by email discussions and a basic description of the building program. Included is an 
outline for deliverables as follows:  
 
 
• 
Telecommunications Cabling Systems 
• 
Audiovisual Systems  
• 
Access Control/Video Surveillance Systems 
• 
Acoustics, Noise & Vibration Control 
 
PROJECT UNDERSTANDING 
Convergent Technologies Design Group, Inc (CTDG) has been asked to provide telecommunications cabling 
systems, audiovisual system electronics, access control/video surveillance systems, room acoustics, interior 
sound isolation, HVAC noise control design services for Maricopa County Sheriff’s Office (MCSO) Durango 
Office and K9 Facility located in Maricopa County, AZ.  We have been asked to include deliverables for a 
design project commencing with the Programming & Schematic Design phase and concluding with the 
Programming & Schematic Design phase Our basic services scope addressing programmed needs exclude 
paging/public address and intercom systems, Distributed Antenna Systems (DAS) and LAN/PBX/Wi-Fi 
electronics. 
 
 
SCOPE OF WORK – BASIC SERVICES 
Under this proposal, CTDG will perform the following tasks as they pertain to the Maricopa County Sheriff’s 
Office (MCSO) Durango Office and K9 Facility:

MCSO 
 
 
 
 
 
                        9/30/2025 
Durango Office and K9 Facility 
                                                                                                                                                            
2 
TELECOMMUNICATIONS CABLING SYSTEMS w/ INFRASTRUCTURE 
Programming & Schematic Design 
• 
Review existing programmatic requirements and MCSO standards for the telecommunications 
cabling (voice, data, video) systems.  Identify and communicate to the design team the general 
locations throughout the project in which telecommunications cabling systems should be 
housed.  Examples of these areas, where tight coordination is required, include 
telecommunications rooms (Main Cross-connect (MC), Horizontal Cross-connect (HC)), duct 
spaces, equipment rooms, and raised floor areas. 
• 
The scheduled deliverable for the Schematic Design phase of the project will be a basis for 
design narrative report outlining desired: 
1. Telecommunications Cabling Systems & Associated Infrastructure  
2. Telecommunications Cable Distribution Rooms (MC/HC) 
3. Outside Plant Cabling (OSP) Connectivity for Telecommunications Utilities 
 
Inclusive of this report shall be preliminary budget estimates for the specified systems on a per 
space/system type basis. 
• 
Other deliverables in this phase shall be in the form of verbal conversations, written notes and 
email communications. 
AUDIOVISUAL SYSTEMS ELECTRONICS w/ INFRASTRUCTURE 
Programming & Schematic Design 
• 
Review existing programmatic requirements and MCSO standards for the audiovisual systems.  
Identify and communicate to the design team the general locations throughout the project in 
which audiovisual components should be housed.  Examples of these areas, where tight 
coordination is required include audiovisual equipment rooms, ceiling heights, control rooms, 
and raised floor areas. 
• 
The scheduled deliverable for the Schematic Design phase of the project will be a basis for 
design narrative report outlining desired audiovisual systems.  Inclusive of this report shall be 
preliminary budget estimates for the specified systems on a per space/system type basis.

MCSO 
 
 
 
 
 
                        9/30/2025 
Durango Office and K9 Facility 
                                                                                                                                                            
3 
ROOM ACOUSTICS 
Programming & Schematic Design 
• 
Recommended room reverberation times will be outlined in the form of a narrative report for 
the following spaces: 
1. Training Rooms 
2. Briefing Rooms 
3. Conference Rooms 
4. Office Areas 
5. Lobby Area 
6. Kennel/K9 Areas 
 
• 
Room shaping will be evaluated to determine adequate reflected sound levels and the control 
of flutter and delayed echoes from side and rear wall surfaces.  Recommendations will be given 
in the form of a narrative report. 
 
INTERIOR SOUND ISOLATION 
Programming & Schematic Design 
• 
Recommended Sound Transmission Class (STC) ratings for various partition types and floor 
slabs will be outlined in the form of a narrative report. 
• 
Partition type details will be provided and selected based on the recommended acoustical 
design criteria.  
• 
Recommended partition types will be keyed on architectural floorplans.  
• 
Acoustical requirements for floor/ceiling construction will be provided in the form of a narrative 
report and/or detail drawings. 
• 
Other deliverables during this phase shall be delivered as verbal comments, meeting notes, 
product literature, and e-mail communications. 
HVAC NOISE & VIBRATION CONTROL 
Programming & Schematic Design 
• 
Recommended Noise Criterion (NC) levels will be outlined in the form of a narrative report for 
the following spaces: 
1. Training Rooms 
2. Briefing Rooms 
3. Conference Rooms 
4. Office Areas 
5. Lobby Area 
6. Kennel/K9 Areas 
 
• 
Radiated noise generation from mechanical/electrical equipment will be reviewed and 
compared to the design criteria.  Recommendations for architectural sound isolation will be 
provided.

MCSO 
 
 
 
 
 
                        9/30/2025 
Durango Office and K9 Facility 
                                                                                                                                                            
4 
• 
Scheduled deliverable for this phase of the project will a comprehensive Acoustical analysis 
and report.

MCSO 
 
 
 
 
 
                        9/30/2025 
Durango Office and K9 Facility 
                                                                                                                                                            
5 
ACCESS CONTROL/VIDEO SURVEILLANCE SECURITY SYSTEMS 
Programming & Schematic Design 
• 
Review and establish baseline security requirements for the video surveillance and access 
control systems for the project, including areas of coverage, concentric zones of security, and 
perimeter monitoring. 
• 
The scheduled deliverable for the Schematic Design phase of the project will be a basis for 
design narrative report outlining the desired access control/video surveillance security system.  
Inclusive of this report shall be a preliminary budget estimate for the specified systems. 
 
 
MEETING SCHEDULE 
 
Based on our existing knowledge of Maricopa County Sheriff’s Office (MCSO) standards, previous 
experience with projects of similar size and scope plus the proposed project design schedule, we anticipate 
a moderate number of design and construction administration meetings will be needed.  Included in this 
scope & fee proposal is support for several virtual or on-site meetings in Maricopa County, AZ as follows: 
1. Attend Schematic Design Meeting – TBD 
 
2. Site Visits – (x2) 
 
 
 
FEE BREAKDOWN PER SPECIALTY & PHASE  
 
 
  
Telecommunications Cabling Systems, 
Audiovisual Systems, Access Control/Video 
Surveillance Systems & Room Acoustics, 
Sound Isolation & HVAC Noise Control 
Programming 
$4,665.00 
Schematic Design 
$9,800.00 
SUBTOTAL  
$14,465.00 
  
$14,465.00

MCSO 
 
 
 
 
 
                        9/30/2025 
Durango Office and K9 Facility 
                                                                                                                                                            
6 
Project Management and Schedule 
Convergent Technologies Design Group, Inc. can meet a Programming deliverable date for the first phase 
of the scope in the month of November 2025. 
Brian Whitlock, CTS-D, RCDD will serve as Design Principal.  Mr. Whitlock is a Certified Technology Specialist 
and Registered Communications Distribution Designer experienced in the design and integration of state-
of-the-art technology systems at higher education and medical institutions across the country.  
 
Nathaniel Holland will serve as primary technology designer. Mr. Holland is a multi-faceted Technology 
Consultant and Designer with a strong foundation in the principles of electronic systems and operations. With 
hands-on experience and a deep theoretical understanding, he began his career in integration and embedded 
systems programming, developing a technical rigor that continues to inform his work. 
 
 
Your signature below will indicate your acceptance of this proposal, giving us notice to proceed with our 
work.  Please feel free to call if you have any questions. 
 
 
Signed and Agreed By: 
 
 
 
Convergent Technologies Design Group, Inc.: 
 
 
 
 
________________________________________       
_________________ 
Name 
(Date) 
 
 
Dekker: 
 
 
 
________________________________________        
_________________ 
Name  
 
 
 
 
 
 
 
(Date) 
 
 
 
______________________ 
Title

Hourly Rate
Programming
Hours
Programming
Fee
SD 
Hours
SD Fee
DD Hours
DD Fee
50% CD 
Hours
50% CD Fee
100% CD 
Hours 
100% CD Fee
CA Hours
CA Fee
$190.00
9.00
$1,710.00
12.00
$2,280.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
$185.00
4.51
$835.00
12.00
$2,220.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
$180.00
4.00
$720.00
10.00
$1,800.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
$175.00
4.00
$700.00
10.00
$1,750.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
$175.00
4.00
$700.00
10.00
$1,750.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
$0.00
$0.00
$0.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
25.51
$4,665.00
54.00
$9,800.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
$14,465.00
Technology & Acoustics Total Fee
Security Designer
Acoustics Designer
Phase Totals
Technology & Acoustics Fee Summary - 
CTDG
Design Principal
IT Designer
AV Designer