073024 Hazen and Sawyer Phase 2
Extracted text (via pymupdf)
21582 characters
Department Name Account ID Description FY24 Budget Sub-lines Fy24 Final Budget FY25 Final Sub-lines FY25 Final Budget Water Operations 511-5-7115-385 BUILDING WATER/SEWER SERVICES $3,000 $3,000 Water Operations 511-5-7115-385 Sewer $600 $600 Water Operations 511-5-7115-385 Water $2,400 $2,400 Water Operations 511-5-7115-386 LANDSCAPING/IRRIGATION $12,000 $12,000 Water Operations 511-5-7115-386 At wells $12,000 $12,000 Water Operations 511-5-7115-387 UTILITY ELECTRICITY $934,000 $934,000 Water Operations 511-5-7115-418 SPECIAL PROJECTS $283,000 $233,000 Water Operations 511-5-7115-418 Consultant for Lead and Copper Pipes $50,000 $0 Water Operations 511-5-7115-418 Dietz Crane Arsenic Media Replacment $100,000 $0 Water Operations 511-5-7115-418 City Water Use Audit/Evaluation/Action Plan $0 $50,000 Water Operations 511-5-7115-418 Multi-Zone Water System Study $0 $50,000 Water Operations 511-5-7115-418 GIS Mapping $133,000 $133,000 Water Operations 511-5-7115-482 ASSURED WATER SUPPLY $1,763,000 $1,788,000 Water Operations 511-5-7115-650 VEHICLES $50,000 $60,000 Water Operations 511-5-7115-650 Vehicle Replacement Program - Water $50,000 $60,000 Water Operations 511-5-7115-656 BUILDING/DATA INFRAS. IMPROV. $2,228,500 $2,291,000 Water Operations 511-5-7115-656 62343 Public Works Facility Carryforward $55,000 $1,366,000 Water Operations 511-5-7115-656 WRF Equipment and Materials Building $0 $125,000 Water Operations 511-5-7115-656 Water Production Facility Rehabilitation Program $140,000 $0 Water Operations 511-5-7115-656 62065 - Water Production Facility Rehabilitation Program $400,000 $800,000 Water Operations 511-5-7115-656 Customer Service Facility $300,000 $0 Water Operations 511-5-7115-656 Public Works Facility $1,333,500 $0 Water Operations 511-5-7115-658 LAND IMPROVEMENTS $0 $183,000 Water Operations 511-5-7115-658 Site Aesthetic Enhancements $0 $133,000 Water Operations 511-5-7115-658 Well Site Security Improvement Project $0 $50,000 Water Operations 511-5-7115-673 PRE-CONSTRUCTION DESIGN $1,675,000 $2,489,000 Water Operations 511-5-7115-673 Booster Pump Replacement for 127th Lane Well Site $100,000 $0 Water Operations 511-5-7115-673 Sunnyvale Well Site Discharge Pipe Replacement and Flow Meter $65,000 $65,000 Water Operations 511-5-7115-673 Water Main Replacement $1,250,000 $1,232,000 Water Operations 511-5-7115-673 Residential and Commercial Meter Replacement Project $0 $825,000 Water Operations 511-5-7115-673 Critical Valve Replacement Program $200,000 $367,000 Water Operations 511-5-7115-673 62059- Drainage Improvements $60,000 $0 Water Operations 511-5-7115-960 DEPRECIATION $1,650,000 $1,660,000 Water Operations 511-5-7115-717 WIFA - PRINCIPAL $1,549,000 $1,476,000 Water Operations 511-5-7115-750 WIFA - INTEREST $278,500 $236,000 Water Operations 511-5-7115-773 TRUST/AGENCY FEES $10,000 $10,000 Water Operations 511-5-7115-950 TRANSFER OUT $3,116,000 $3,361,000 Water Operations 511-5-7115-950 General Fund $1,722,000 $1,967,000 Water Operations 511-5-7115-950 Sewer Fund $1,394,000 $1,394,000 Water Customer Service 511-5-7116-110 SALARIES AND WAGES $354,000 $380,000 Water Customer Service 511-5-7116-111 OVERTIME $3,000 $3,000 Water Customer Service 511-5-7116-120 HEALTH-LIFE-DENTAL INSURANCE $71,000 $74,000 Water Customer Service 511-5-7116-130 SOCIAL SECURITY CONTRIBUTION $23,000 $24,000 Water Customer Service 511-5-7116-131 MEDICARE CONTRIBUTION $6,000 $6,000 Water Customer Service 511-5-7116-132 ASRS CONTRIBUTION $40,000 $43,000 Water Customer Service 511-5-7116-140 WORKERS COMPENSATION $1,000 $1,000 Water Customer Service 511-5-7116-141 UNEMPLOYMENT INSURANCE $2,000 $1,000 Water Customer Service 511-5-7116-230 OFFICE SUPPLIES $3,000 $3,000 Water Customer Service 511-5-7116-232 COMPUTER/PRINTER SUPPLIES $3,000 $3,000 Water Customer Service 511-5-7116-233 UNIFORMS $500 $1,000 Water Customer Service 511-5-7116-237 EQUIPMENT/FURNITURE PURCHASE $1,000 $1,000 Water Customer Service 511-5-7116-248 SOFTWARE PURCHASE $500 $0 Water Customer Service 511-5-7116-249 OPERATING MATERIAL & SUPPLIES $1,000 $1,000 Water Customer Service 511-5-7116-269 OTHER MAINTENANCE/REPAIRS $3,000 $3,000 Water Customer Service 511-5-7116-313 CONTRACTED SERVICES $97,000 $97,000 Water Customer Service 511-5-7116-325 TECH/SOFTWARE SUPPORT $40,000 $40,000 Water Customer Service 511-5-7116-338 ARMORED CAR SERVICES $7,500 $8,000 Water Customer Service 511-5-7116-350 TRAVEL AND PER DIEM $3,000 $3,000 Water Customer Service 511-5-7116-351 CONFERENCE,SEMINARS & TRAINING $3,500 $4,000 Water Customer Service 511-5-7116-360 PRINTING COST $3,000 $3,000 Water Customer Service 511-5-7116-362 MAILING COST $2,000 $2,000 38 Water Operations 511-5-7115-482 ASSURED WATER SUPPLY $1,763,000 $1,788,000 LCRR Phase 2 Draft Scope of Services City of El Mirage 1 Lead and Copper Rule Revisions Phase 2: Program Implementation City of El Mirage Scope of Work DRAFT June 14, 2024 LCRR Phase 2 Draft Scope of Services City of El Mirage 2 Introduction This approach outlines how the Hazen team will work with El Mirage (City) to support the LCRR compliance program. The LCRR was promulgated by the United States Environmental Protection Agency (USEPA) on January 15, 2021 and became effective on December 16, 2021. The LCRR included a 3-year timeframe for utilities to meet the new regulatory requirements with a compliance deadline of October 16, 2024. As of May 2024, approximately 5 months remain for compliance. The compliance deliverables in the state of Arizona include: • Lead Service Line (LSL) Inventory • Lead Service Line Replacement Plan (if any lead, galvanized requiring replacement (GRR), or lead status unknown service lines are present in the LSL Inventory)* • Tap Sampling Plan* • List of Schools and Childcare Facilities Requiring Testing* *As described within the Draft Lead and Copper Rule Improvements (LCRI), the LSL Replacement Plans and list of schools and childcare facilities will not be required on October 16, 2024 if the LCRI is finalized by the compliance deadline. ADEQ currently advises systems to prepare these compliance deliverables for the deadline, however, in the event that the LCRI is not finalized in time or requirements change. Project Understanding and Approach The LSL Inventory must include the utility and customer-owned portions of each service line and indicate whether the service line material is lead, galvanized requiring replacement (GRR), non-lead, or lead status unknown. During Phase 1 efforts, it was determined there are 11,979 service lines in the service area with 1,974 unknowns on the utility-side and the customer-side. The City’s selected compliance pathway is aimed to fulfill the goal to have zero lead status unknown service lines. In order to reach this goal, field work must be completed for a prescribed quantity of lead status unknown service lines based upon the selected indirect method. Additionally, site review of field verified service lines and an updated LSL Inventory will be needed to integrate field work findings. All field verified service lines will need to be categorized as non-lead, and the City will need to conduct additional investigation of any customer-side galvanized service lines through record review or ADEQ coordination, if customer-side galvanized service lines are identified downstream of a service line that was or is lead status unknown. Beyond the LSL Inventory, compliance sample sites and sampling protocol will be required to fulfill two additional compliance requirements. Finally, customer education and outreach is a critical component of LCRR requirements in the future after the compliance deadline including for systems with a “No Lead Service Line Verification”. Notably, indirect method requirement stringency has greatly increased following the initial February 2024 release by ADEQ. At this time, 95% of the service line materials in homogeneous communities are required to be the same material, e.g., copper, plastic, galvanized, etc. Due to this, many homogeneous communities do not meet this requirement and require 100% field verification by ADEQ. This alone is shifting many Arizona utilities’ compliance strategies to have lead status unknown service lines LCRR Phase 2 Draft Scope of Services City of El Mirage 3 remaining after the deadline. With this in mind, the potential for this strategy is incorporated into this proposal with the exception of an LSL Replacement Plan. Scope of Services The Scope of Services includes the necessary tasks to complete Phase 2. The following tasks will be performed as part of this project: • Task 1: Project Management and Meetings • Task 2: Field Work Preparation • Task 3: Field Work Review and Inventory Updates • Task 4: Sampling, Monitoring, and Protocol • Task 5: Customer Outreach and Education • Task 6: Regulatory Coordination LCRR Phase 2 Draft Scope of Services City of El Mirage 4 Task 1: Project Management and Meetings Hazen will provide project management services throughout the project, including preparation of billing statements, document control, record keeping, and project budget and schedule tracking. Hazen will also track project performance including budget and schedule, identify any outstanding issues, and hold progress meetings/conference calls with City staff as necessary. Our management approach includes well-defined roles and responsibilities of each resource and the lines of communication among team members and the City, as well as plans for maintaining QA/QC. Project Kick-Off Meeting and Review: Hazen will conduct a 1-hour virtual kickoff meeting with the City to introduce our project team, establish lines of communication, review LCRR and LCRI requirements, and review the scope of services and project schedule. During the kickoff meeting, Hazen will verify the City’s team participants, needs, and schedule. Project Progress Meetings: Hazen will coordinate with City throughout the duration of the project. Coordination meetings will be held between the Hazen and the City, as needed (up to 8 meetings total). Progress Reports: Project progress will be summarized each month in invoice progress reports. Deliverables: • Kickoff Meeting – agenda, slides, action items, and key takeaways • Project schedule • Meeting minutes for monthly project progress meetings, which will be billed monthly Assumption: • Conduct a kickoff meeting and virtual monthly progress calls, as needed, during a project duration (estimated at 8 months). Task 2: Field Work Preparation Service Line Identification Plan: Hazen will prepare and lead a workshop with the City to provide an overview of all direct and indirect service line identification methods. A combined direct and indirect identification method will be recommended. Hazen will develop a Service Line Identification Action Plan with methods to verify service line materials based on findings in Phase 1 and the pilot effort. This Plan will inform any future work that could be performed to identify “Lead Status Unknown” service lines in the system. Mobile App and Dashboards: Hazen will develop a Field Maps app to directly integrate field verification findings into the Lead Service Line Inventory Database. The Field Maps app will cover the required service line verification points as required by ADEQ. Service line sites may be assigned to separate Contractor(s) or City personnel, as desired, within the app platform. Instructions for utilization of LCRR Phase 2 Draft Scope of Services City of El Mirage 5 the Field Maps app will be included in Task 2’s Training Materials. Additionally, a Field Verification QC Dashboard will be developed for the review of service line field verification submissions from the Field Maps app. Training and Piloting: Hazen will host one three-hour training session for Contractor(s) and/or City staff to meet the ADEQ field work training requirements. Hazen will coordinate with ADEQ on training materials to ensure they meet ADEQ requirements. Deliverables: • Contractor and/or City Staff Training. • Field Verification Mobile App. • Field Verification QC Dashboard. Assumptions: • The Field Verification Mobile App will be developed through ArcGIS Field Maps app available in the Apple and Google Play app stores. • The field verification of sites will be completed by the City or a City contractor. Task 3: Field Work Review and Inventory Updates Identification Review: Hazen will coordinate with Contractor(s) and/or City staff to review Field Maps mobile app field verification submissions in the El Mirage ArcGIS Online Field Maps QC platform. Hazen will track Field Maps fields and high-level Contractor or City staff progress in the Field Maps Dashboard. LCRR Initial Inventory Updates: Throughout the field identification effort, Hazen will update the LSL Inventory to provide an estimated quantity of remaining unknowns. At the completion of field identification, the LSL Inventory Template will be populated with the final LSL Inventory results for future detailed inventory submission requirements by ADEQ. Deliverables: • Updated LSL Inventory • LCRR Initial Inventory Template Assumptions: • Updates to the LCRR Initial Inventory will be required to follow the requirements and formatting of the LCRI Baseline Inventory. The LCRI Baseline Inventory template is not currently available, however, and is due October 16, 2027. Additional LCRR to LCRI changes for the inventory may be included in a future scope of work. • The City will be responsible for conducting field survey efforts using City staff or a contractor. LCRR Phase 2 Draft Scope of Services City of El Mirage 6 • During Phase 1, Hazen estimated approximately 2,000 lead status unknown service lines. For planning purposes, 500 sites are estimated for field verification and field work review. • Based on efforts for other communities in Maricopa County, contractors are completing approximately 1,500 sites per month using the methods that the City will likely apply for field verification. At this rate, it is estimated to take approximately 1 month to complete field verification. • Field verification contractor submissions will not exceed 500 sites. The estimated time to review each site, coordinate with contractors, and provide alternates, as needed, is 8 mins, which equates to 67 hours. • The City will backup all collected data weekly with snapshot data backup. The City will provide the Contractor access to the El Mirage AGO, as needed. • The field verification crews will maintain a viable mobile device and upload all service line data into the Field Maps mobile app without need for manual entry by Hazen staff. • Leaded solder testing is not currently included in this effort. • Identification of disadvantaged communities is not included in this effort. Task 4: Sampling, Monitoring, and Protocol LCRR Sampling Plan: Following the April 2024 EPA Fact Sheet, ADEQ is pending the LCRI finalization to reduce the compliance deliverables for October 16, 2024. If the LCRI is finalized prior, then the Tap Sampling Plan would be required October 16, 2027. Furthermore, the Lead Service Line Replacement Plan would be deferred until October 16, 2027 for systems with LSLs, GRR, or unknowns. Pending this change, Hazen will develop an LCRR Compliant Sampling Site Selection including recommendations for revising the standard monitoring sample site pool based upon LSL Inventory results and existing sample sites to reflect the new tiered structure. Additionally, Hazen will update sampling protocols to account for 1st and 5th Liter sample requirements in the LCRR, as applicable. Finally, an inventory of schools and childcare facilities will be prepared for the initial October 16, 2024 deadline. LCRI Sampling Plan: In the event that the LCRI is finalized prior to the October 16, 2024 deadline, Hazen will modify the prior Sampling Plan, SOPs, and sample site selection to meet LCRI requirements. Deliverables: • LCRR Tap Sampling Plan • Inventory of Schools and Childcare Facilities Assumptions: • Information on leaded solder will be provided by the City, if available. Hazen will not evaluate leaded solder. LCRR Phase 2 Draft Scope of Services City of El Mirage 7 Task 5: Customer Outreach and Education Hazen will prepare Customer Outreach materials including topics for educational material, sampling instructions, sampling results, and additional customer notifications. Many of these deliverables are required for all water systems to provide to customers under certain compliance scenarios. Additionally, find-and fix materials are only required if an individual compliance sample exceeds 10 µg/Lor 15 µg/L pursuant to the LCRR or LCRI requirements. Hazen will coordinate with ADEQ, as needed, during the project timeline to ensure materials meet ADEQ requirements. Customer service and outreach materials will focus on LCRR compliance requirements with documents which may be required by October 16, 2024 in bold. Deliverables: • Educational Material o Lead in Drinking Water Educational Material (1 Page – Front & Back) o Annual Educational Information for Schools and Childcare Facilities (1 Page – Front and Back) • Sampling Instructions o Find-and-Fix with POU Instructions (1 Page – Front & Back) • Sampling Results o Tier 1 Action Level Exceedance Notification • Service Line Material Notification o Notification of Service Line Material Field Verification (1 Page – Front) o Service Line Material Field Verification Flyer (1 Page – Front) o Annual Notification of Possible Lead Service Line (Letter)* o Information for Customers for Accessing and Understanding LSL Inventory Map (1 page – Front & Back)* o Notification of Service Line Disturbance Assumptions: • Two revisions to the draft customer communication materials will be included. • The first round of revisions will be completed in Microsoft Word, and the second round of revisions will be completed in Microsoft Word with inserted graphics. • Up to nine (9) separate one-page documents with graphics will be prepared. Other documents will only include text within Microsoft Word. • Documents prepared will not exceed two pages of final material. Task 6: Regulatory Coordination ADEQ Coordination: ADEQ is providing case-by-case approval to inventory narratives and methods for service line material verification. Thus, coordination between ADEQ and the City to ensure regulatory compliance is a top priority for this project. Hazen will attend up to two calls with ADEQ to communicate the approach and findings. LCRR Phase 2 Draft Scope of Services City of El Mirage 8 Application for “No LSL Verification”: Once all required field verification sites are completed and confirmed as non-lead service line material coordination with ADEQ will begin to assist the City in reaching a non-lead designation, if the field verification work and inventory results align with ADEQ’s requirements. Deliverables: • Material verification findings summary • Request for a “No Lead Service Lines Verification” designation Assumptions: • Hazen will conduct regulatory coordination meetings with ADEQ on the material verification methods up to two times during the duration of the project. • Written verification from ADEQ on service lince material identification methods will be received prior to commencing field work in Task 2. Project Schedule The anticipated Notice to Proceed (NTP) date is tentatively prior to July. We are proposing a timeline of completing the project within 8 months. Project Fee The total fee associated with this project is shown on the below table using contract rates. The work would be billed time and materials up to the not-to-exceed amount shown in the table. LCRR Phase 2 Draft Scope of Services City of El Mirage 9 Task Project Manager - VP Deputh Project Manager - PE Technical Advisor - PE QA/QC - SA Assistant Engineer II - AE II Assistant Engineer I - AE I Courter Robles Cook Rosenfeldt Varies Varies Hourly Rate $285 $210 $210 $260 $145 $130 Labor Fee - $ Task 1: Project Management and Meetings 12 8 20 5,100 $ 54 $ 5,154 $ Task 2: Field Work Preparation 20 40 40 12 80 80 272 47,620 $ 47,620 $ Task 3: Field Work Review and Inventory Updates 4 16 16 2 80 80 198 30,380 $ 30,380 $ Task 4: Sampling, Monitoring, and Protocol 8 8 20 12 60 60 168 27,780 $ 27,780 $ Task 5: Customer Outreach and Education 2 8 16 2 60 40 128 20,030 $ 20,030 $ Task 6: Regulatory Coordination 16 16 40 8 40 120 24,200 $ 24,200 $ TOTALS - BASIC SERVICES 62 88 140 36 320 260 906 155,110 $ 54 $ 155,164 $ Hazen and Sawyer Labor Classifications Additional Direct Expenses - detail Units Unit Cost Total $ AVP - Associate VP / Technical Director / QA-QC Mileage 100 Miles 0.540 $ 54 $ SA - Senior Associate / Project Manager / Technical Manager PE - Principal AE - Assistant Engineer Subtotal - Other Direct Costs 54 $ Total Hours Direct Expenses (detail below) Total Fee Budget Lead and Copper Rule Revisions Phase 2 City of El Mirage (Owner) Hazen and Sawyer (Consultant) June 14, 2024