2025-06-05 - PC 1424 -MARICOPA-COUNTY-BENTLEY-AMENDMENT-NO-4-COMBINED-V2-0602422-SIGNED-MARK-UP.PDF

Maricopa County — Formal (2025-12-31)

View PDF Item 78 Meeting page

Extracted text (via ocr_local) 88083 characters
Maricopa COUNTY FX ‘Be ntle y’

AMENDMENT NO. 4 TO
Sustaining \ntrastructuca
CONTRACT 14079-CI

Amendment No. 4 to
Contract Pursuant to Competition Impracticable (MCI-351) 14079-CI

This Amendment No. 4 (the “Amendment”) is hereby made and entered into by and between Bentley Systems,
Incorporated, a Delaware corporation with principal offices at 685 Stockton Drive, Exton, PA 19341 (“Bentley”), and
Maricopa County, located at 160 S. 4" Ave., Phoenix, AZ 85003-2494 (“Subscriber”), as of the date signed by all parties
(the “Amendment Effective Date”),

The purpose of this Amendment No. 4 is to incorporate Subscriber’s subscription to Bentley’s Enterprise 365 - Public Sector
Subscription (EPS-365)

WHEREAS, Bentley and Subscriber are parties to Contract 14079-CI (Bentley CLA Nuinber 10369318) entered as of the
November 5, 2014 (the “Original Agreement”), amended by Amendment No. | to Contract Pursuant to Competition
Impracticable (MCI-351) 14079-CI, executed on January 30, 2018 (“Amendment 1”) and by Amendment No. 2 to Contract
Pursuant to Competition Impracticable (MCI-351) 14079-CI (“Amendment 2”); and Amendment No. 3 to Contract Pursuant
to Competition Impracticable (MCI-351) 14079-CI (“Amendment 3”);

WHEREAS, Bentley and Subscriber desire to amend the Original Agreement, as amended by Amendment 1, Amendment 2,
and Amendment 3, as further described below (the Original Agreement, Amendment 1, Amendment 2, Amendment 3, and
this Amendment together are the “Agreement”);

NOW THEREFORE, the parties hereby mutually agree as follows:

1. Definitions. The definitions of certain terms used in the Amendment with initial capitalized letters, if not defined
herein, shall have the definitions set forth in the Original Agreement, as amended.

2. Term. Pursuant to Section 1.1 of the Original Agreement, as amended, the Agreement is renewed to add a new
term from July 1, 2022 — June 30, 2025. Pursuant to Section 1.2 of the Original Agreement, as amended, the
Agreement may be renewed by the parties for additional terms up to a maximum of seven (7) years and seven (7)
months.

3. Prices. Section 6.24 of the Agreement is hereby deleted in its entirety and replaced with “RESERVED.”

4. Order of Precedence. Section 6.26 of the Agreement is hereby modified by deleting the first sentence, “With
respect to SELECT Professional Services—In the event of a conflict in the provisions of this Contract and the
SELECT Agreement, the terms of this Contract shall prevail.”

5. Exhibit 1. Effective as of July 1, 2022, Exhibit 1 of the Agreement, which includes Appendix A, is hereby deleted
in its entirety, and replaced with Exhibit 1 attached to this Amendment.

6. Exhibit 2. Exhibit 2 of the Agreement is hereby amended to add Exhibit EPS, attached to this Amendment as
Attachment 1.

7. Legal Effect. The modifications set forth in this Amendment are effective as of the Amendment Effective Date.
Except as expressly amended or modified by the terms of this Amendment, all other terms of the Agreement shall
remain unchanged and in full force and effect. In the event of a conflict between the terms of the Agreement and
the terms of this Amendment, the terms of this Amendment shall control.

8. Headings. The headings used in this Amendment are for convenience of reference only shall not be used to define
the meaning of any provision.
[Signature page to follow]

Maricopa County Page | of 4
Amendment No. 4

CUNO Ol

MARICOPA COUNTY FA ‘Be ntley

AMENDMENT NO. 4 TO Sustaining Infrastructuco
CONTRACT 14079-CI

IN WITNESS WHEREOF, the parties represent and warrant that this Amendment is executed by duly authorized
representatives of each party as set forth below on the date first stated above.

meres Bentley Systems, Incorporated
By: (et By: LEYS
BILL GATES Print Name: James Kaiser

‘nt Title. WP, Operations
Print Title: __ CHAIRMAN BOARD OF SUPERVIsors Print Title: “72 =P
ate: 05/16/2022

Date: JUN 22 2022

Print Name:

Attested:

Print Name: Juanita Garza

Print Title: CLERK, BOARD OF SUPERVISORS

Date: JUN 2 2 2022

oveer

Approved as to Form

Print Name: Nikolaus G. Decker

Print Title;_Deputy County Attorney
Date: 06/21/2022

Maricopa County Page 2 of 4
Amendment No. 4

MARICOPA COUNTY FA | Bentle y

AMENDMENT NO. 4 TO | Sustaining Infrastructure
CONTRACT 14079-CI

EXHIBIT 1
Bentley Enterprise 365 - Public Sector

PRICING

Maricopa County Page 3 of 4

Amendment No. 4

APPENDIX A

Bentley Enterprise 365 - Public Sector

Welcome to

: Bentley's Commercial
Program for Digital
Advancement

Enterprise 365 . Order Form
Public Sector : Se

ORDER FORM

Enterprise 365 — Public Sector Program

Welcome to the Enterprise 365 — Public Sector (EPS-365) Program. By signing below, the Subscriber is
confirming their intent to participate in the EPS-365 Program pursuant to this Order Form and the terms
and conditions set forth in the Exhibit EPS-365 of the SELECT Program Agreement. The words, terms, or
phrases in the section below shall have the meaning set forth in the SELECT Program Agreement.

SUBSCRIBER: Maricopa County DOT
STATEMENT CONTACT NAME: Eduardo Mendoza
STATEMENT CONTACT EMAIL: Eduardo.Mendoza@ Maricopa.Gov

SELECT PRoGRAM AGREEMENT CLA#: 10369318

SUBSCRIPTION START DATE: July 1, 2022
YEAR 1 FEE: $151,385 USD (0 Blueprint Credits)
YEAR 1 ESTIMATED Tax (RATE 8.6%): $13,019.11 USD

YEAR 1 FEE AND ESTIMATED TAX TOTAL: $164,404.11 USD

YEAR 2 FEE*: $166,524 USD (0 Blueprint Credits)

YEAR 3 Fee*: $183,176 USD (0 Blueprint Credits)

*Tax rates for Years 2 and 3 to be determined.

ESCALATION
BENTLEY SUBSCRIBER
DESIGNEE
Name: | Mark Nicholson Roberto Murrieta
LEVEL 1
TITLE: | Senior Account Manager, Enterprise CADD Analyst
Name: | Lara Lamparski Eduardo Mendoza
LEVEL 2
TitLeE: | Regional Sales Manager, DOT CADD Manager
Name: | Katherine Flesh David Fritz
LeveL 3 TitLeE: | Senior Regional Director, Engineering Branch Manager
Transportation
Page 2 The information contained in this document is proprietary to Bentley and is not to be disclosed

to any third party without Bentley’s express prior written consent.

Bentley’

www.bentley.com

Enterprise 365 . Order Form
Public Sector “23525385

By signing this Order Form, the Subscriber acknowledges and agrees to the terms and conditions set

forth herein or by reference.

SIGNATURE: DATE:

PRINT NAME: TITLE:

The information contained in this document is proprietary to Bentley and is not to be disclosed

Pa
ge 3 to any third party without Bentley’s express prior written consent.

Bentley’

www.bentley.com

Affiliate and Baseline Asset List

Enterprise 365
Public Sector
Affiliates:

None

Baseline Products:

YS 208. ___.._ Bentley Descartes forMS 2

US 2920, | _CulvertMaster 4

US 1003 _____MicroStation 45

US 13295 OpenBridge Designer 6

US 10312 ___OpenCities Map Advanced S'alone 1

___US 2923 OpenFlows FlowMaster 4
____US 12662 OpenRoads Designer oe _ 20
US 13777 _ OpenRoads SignCAD 2

US 13553 OpenSite Designer 10

US 2964 StormCAD Standalone Unlim Inlets kL 1

The information contained in this document is proprietary to Bentley and is not to be disclosed
to any third party without Bentley’s express prior written consent.

Bentley

www.bentley.c

Bentley Systems
Enterpdse 365 Price Ust Globsl USD - CONFIDENTIAL
Updated 2362021
eration 3 (2021 Priceboot)

es ey ee ee

Dasktap and Desk Codes: Feu

nn dally uiage par unique machine name,

tans ‘iduct Une,
TT AeGoim Energy Smaator Bold bain Day Daitop TORR Pereas/DaTappicaion — Apei37021 Escalon
1052 Autobe Pipe Suess andVewelAnatsh Daly Destop 20.7 Penona/Dsy/Appteaion —A-252021.Eseallon
1054 AuloPPE Advanced Pipe sires andVessel Anant Oy Dettiop 1256 Penom/DaviApptenion —Ape2)-2021.Exealtlon
1839 AULOPIFE Horse Pipe swessandVextel Anata Oty Dertop G02 Penona/Dey/Appteation Ape-23-2021 Escalation
2280 AutePE Vest Pipe sires andVeste Anais ay Derttop 3427 Penona/Day/Appcatton —-Ape-732021. Escalon
2058 AUtoPiE Vexset ent Exhengar PipesivessandVestelAnaials ny Desttop 3197 Penona/DaviApplealon Ape-232021. Escalon
2ISL_—_AutoPPe VasrelUtinate Pipe Suess sndVextel Ahals ay oastop 5895 Personn/Dayipplcaon Ape-232021. Escalon
1055 AvtoPLANT20 Piping Flint Design oity ertop 727 Persona/Day/Apateaton ABC-23-2021.fcalation
1060 —_-AULePLANT Equlpmnent Fant Devan oaty Dexttop 15:14 Perena/Dav/Appcatlon Ap0-23-021 Escalation
1054 Avie PLANTHromatiea Btant Deen oaFr Desktop 1813 Perona/DayiAppkcatlon Ape-732001 Escalation
2293 AUGPUNT Moder Fant Desion oaty Dentop (141 Persons/Dayfapptcatian—Ape-232021. Escalon
1066 AutePLANT PID Plant Design Daty Desktop 10.36 Persons/Day/Appication —Apr-23-2021 Escalation
1072 —_AutePLANT cevays Punt besten oaty Desktop 15.14 Pemena/Day/apptestion Ape-24-2021. Escalon
1696 Bantey30-Conttucton for rpetdton uci Deen oaty Bestop 173 Persena/Day/Apptcatlen —ApC2-2021 Escalation
1363 BenUeyAXSYS Server plant Desten Day Desktop 6240 PenonefDayApplenion 50232021. Escalation
1839 Benthy Cadattre Realhy and Spatial Modeling Day Desktop 9.76 Pertona/Day/Appicaton — Ape-23-2021 Escalatton
1620 Bentley CADLCHpA edly snd SpillsIModelleg Day Desitop 9.76 PessenafDavApptemion — AGC-23-2021.Escaafon
ss ‘Benthey Conn Enecgy Dalty Deittop: ‘13.34 Persona/Day/Application —Apr-23-2021 Escalation
1868 Bentley Communkatlons PowerView Energy Daty Desktop 2.57 Persona/Day/Application —Ape-23-2021 Escalation
ass Bentley Copper Enerny Oaty Desktop 1.22 Persona/Day/Apptcation — Apr-23-2021 Escalation
ri Bentley Darwin Cs Hydraulics and Hydrology Daty Desktop: 23.03 Pervons/Day/Application —Apr-23-2021 Escalatlon
1212 alley Darin Dasyoer Mystavkesandtlysctopy ay Deitop 2303 Penena/Oay/Apphealon — AGC-222001 Escalation
1078 Benvey Data Manager Plant Design baty Desktop £49 Persona/Day/apptcaion Ape232021 Escalon
1079 eantheyDatuheats Pint Osten Daty Deron 649 PenenafOnfApption —Apr-23-2021. Escalon
2169 entey Oevearus Realty andSptll Moasieg Os Desktop 5220 Penons/DivAppcatlon —Ape-23-2021.Eseatlon
1082 Bentley Osscartes for MiccoStatlon Reality and Spatial Modeling Daty Berttop 17.87 Perons/Day/Appiication —Ape-23-2021 Escalation
1689 Banthey Electric Enecey Daty Desktop 32.A9 Persona/Day/Application —Apr-23-2021 Escalation
1518 Banthey Expert Designer Energy Day Desktop 6845 Persona/Day/Applicalon —Apy-23-2021 Escalation
1788 ‘Bentley Expert Designer Communicathens Eneegy Daky Oesttop: 9.12 Persona/Day/Appication — Apr-23-2021 Escalation
1781 ane Eger Dagar Elect eneey baty oesttop S165 Penens/Day/apptcation Apr-232021. Escalon
1182 Benthey Expect Dain at foweey Daty oestiop SLES Penona/On/appfaion —ApC-232021.seaation
1524 any Expat DagnerSurvar Enwey ary Deitop M439 Penona/Ony/Appteaion —Ape232021 Escalon
1783 tanthy Expert Onsignr Water ney sty ettop BLES Penons/On/Applcaion Apr-23-2021. Escalation
1265 Gantey Fede Rapors Buia Dern oaty 39.13 Penom/OnrfApplcnion —Ape-23-2021 Excaation
3264 Bentley Facthias Space Planner Building Design Daily 22.73 Persons/Day/Application —_Apy-23-2021 Escalation
wat Bentley Fiber Energy Oally 26.64 Pervona/Day/Applicalon —Ape-23-2021 Escalation
1760 Bently Ons ene oat 3249 Penane/Day/Applcaion —Apr23-2021. Escalation
1213 —_enthy Geo Web Sohrtons Realy and Spalal Modsliog Day S611 PentonafOay/Apptexion —Ape-23-2021_fscatlon
3150 Bentley GEOPAK Bridge Bridge Anshysis Daly 6.56 Persona/Day/Appicaton —Apt-23-2021 Escalation
$223 Remtey isConnect ygtevtesandiyditory Oy S42 PerenafOay/applemion —-ApC3-2021 Escalon
9224 Bentley HEC Pack: Hydraulics and Hydrology ‘Daly 5.73 Persona/Day/Applicetion —Apt-23-2021 Escalation
1063 Benthy Hookups Enerey ‘Daly $90 Persona/Day/Appiication —Apt-23-2021 Escalation
W272 Bentley I/RAS B Realky and Spatlal Modeling Daily 13.48 Pemsona/Day/Appiication —Apr-23-2021 Escalation
1014 GantoylnRords Bette frisge Arahat any 2453 PervonofDay/AppBeation Ap-22-2021 Escattlon
1280 Banthy inva Plant fneiey aay 1604 Pemens/On/applcaton Ape-23-2021 Escalon
1081 Bantiey Instrumentation end Wiring Plant Design Daty 39.71 Perona/Oay/Appication —Apr-23-2021 Escalation
2517 eney Lumen EnpneeringCaluboralon ty Desktop 2328 Penena/On/appfeaion —ApC-23-2021. Escalation
1538 enthy Map Pra VUSELECTUAses 2} healny and patil Modding Daly desktop 024 Pemena/Oay/applcition Ag1-23-2021 Escalation
162s enloy MAPseit eahy andSpathl Modeliog——DaRy esttop 3426 PenonafOn/Applcation ApC-252001. Escalon
1712 enthey Mode Mapplog Tool Prot fowsey Oaty Derttop Lis Persona/Dey/Appteaton Apr23-2021.Escaltion
1712 Bentley Mabie Mapping Too! Std Energy Daly Desktop 9.33 Persona/Day/Application = Apr-23-2021 Escalation
LSI antey MEORAW ceaiDestn aty Dero 9463 Penone/DnfApptcnion —Apc23-2001.Exeabition
5342 ‘Bentley MXPROFESSIONAL Cet Design Daly Desktop: 68.94 Persona/Day/Application —Apr-23-2021 Escalation
1343, ‘Bartley MX-Q-ROAD Chal estoy Day Desktop: 45.96 Persona/Day/Appiication —Apt-23-2021_Excalation
1162 Bentley HERENEW Ada craivesin aay oestiop 363 Perona/Day/Appication —Apr-23:2021 Escalation
1164 Bentley MXROAD-Addin Chal Destgn ‘Daly Desktop: 10.09 Perona/Day/Application —Apr-23-2021 Excalatton
168 ‘Bentley MXURBAN Chil Design Daly Desktop 33.60 Pemona/Day/Appication —Apr-23-2021 Escalation
1169 ‘Sentley MXURBAN Addin Chel Design Daity Desktop: 10.09 Persena/Day/Applicatlon —Apr-23-2021 Escalation
1170 ‘Sentley MKURBANCOMPACT Ont Desipn Dany Desktop: 33.98 Persona/Day/Application —Apx-23-2021 Escalation
2164 Banthey OpenUtlities Designer, ‘Enevey Dally Desttop AB.6O Persona/Day/Appiation —Api-23-2021 Escalation
2418 santey Open EiesBap fowey aty Destop 4092 PersonafOn/bgptation Aee-232024. Escalation
2439 antey OpenUtHnsPowesView eneegy aay Desktop 1638 Penens/Onr/Apptialon —Apr-232021. Escalation
4523 Bentiny OpenUtEtles Workflow Manat ‘Energy Daily Desitop ‘11.92 Persona/Day/Appiicaion —Apr-23-2021 Escalation
2400 ‘Bante Punt space Dasl Sites Piping (2018) Flin Desten any Deshtap 2136 Persene/Ory/AppBcatlon APC-232021 Escalon
tra try PlantSpace Equipment Plant Design Datty Desktop 9,19 Persona/Day/Applcation —Ape-23-2021 Escalation
a3 Bantiny PlantSpace HVAC Plant Design ‘Day Desktop: 6.25 Persona/Day/Appcation —Apr-23-2021 Escalation
29 Benthey PlantSpace troEstractor Plat Design Oaky Desktop: ‘21.36 Persona/Day/Appication —Apr-23-2021 Escalation
Mat they PlantSpace lsomatrics Plant Design Daky Desktop: 11.47 Persons/Oay/Appleation —Apr-23-2021 Escalation
33, whey PlantSpace PID Plant Design Daily Derktop 13.54 Persona/Day/Appiication —Apr-23-2021 Escalation
337 Bentiey PlantSprce Racaways Plant Design Datty Dasktop 9.19 Persona/Day/Appication — Apy-23-2021 Escalation
1140, Banthey PiantSpace SupportModeler Plant Design Dalty Desttop: 10.28 Pervona/Day/Appiation —Apy-23-2021 Excalatton
173 Bentley Pinmt WAVE for POMs: Plant Design Daity Desttop: 9583 Persona/Day/Appication —Apr-23-2021 Escalatton
im ‘Bentiny Plant WAVE for POS: Plant Design Daly ‘Desitop: ‘76.95 Persona/Day/Apptcation —Apr-23-2021 Escalatfon
1700 Bentley MentWise Plant Design Daly Desttop 41357 Persona/Oay/Applcation — Apr-23-2021 Excalation
2175 Bentley Pointools Realty end Spatlal Modeling Datty Desttop 4553 Persona/Day/Apptication —Ape-23-2021 Escalation
1810 Bentley PowerDraft Field for Communkations Energy Day Desktop: BAG Persona/Day/Apptcation —Apr-23-2021 Excalition
08 Banthy PowerDrat for Manse Realy ndSpaietNodeing sy Desktop 1948 PenenafOay/Applaxion —Ape23-2021 Escalon
mag inty Power Map: Realky and Spatial Modeling Day Desktop 17.74 Persona/Day/Apptcation —Ape-23-2021 Escalation
145 ‘Banthey PowerMap Flald Realky and Spatial Modeling Oaty Desktop 5.08 Pessona/Day/App¥cation —_Apy-23-2021 Escatutton
1555, ‘Sentley PowerRabay Structural Detailing aly Desttop 23.36 Persona/Day/Applcation —Apr-23-2021 Escalation
1687 eatley Raceway and Cable Management lntoeten Doty Desttop 5296 Perens/Oay/Apelctlon —Ape-232021 Escalon
2072 Banthy RallSUynal Elected cra Design oy Desktop 45.36 Pemone/Day/Apptcalon —Ape-23-2021 Escalon
1239 inthy SCADACanntct 300 Signals Rydeaulics and Hydrology: Daty Desktop 126.07 Persona/Day/Application —_Api-23-2021 Escalition
1239 Benthy SCADACOnaect 25 Signals Hydeaullcs and Hydrolony. Datty Desktop: 63.03 Persona/Oay/Application —_Apy-23-2021 Escalation
1259 Bunty ScADAConnect United Spas Hyotautesandtyerotony RY Deitop 189.10 Pesena/Day/AppFcation —Ape2h2021 Escalation
1663 Bentley FLOW ney oaty Desktop 1756 Pemonn/Diy/Applcation —Ape23-2021. Escalon
1668 ania HAVO 0411000 Plpas Eney oaty Desktop {348 PenonofDry/Appéction — Ape-232021 Escalation
1658 ‘eneey Daily Desktop 79.6? Persona/Day/Apptcation —Apr-23-2021 Escalation
1668 ‘Bantiay shsHYO Gas Uniim Pipes Energy ‘Dally Desktop 94.15 Pervona/Ory/Appicmion —Ape-23-2021 Escalation
‘1666 imtiay sisH¥O Heat 1000 Pipes ‘Energy ‘Daily Desktop 43.48 Persona/Dzy/Application —Ape-23-2021 Excalation
1656 Banthey slbHYO Hest 10000 Pipes: Enecy ‘Dally Destop: 79.67 Persona/Day/Appteation —Ape-23-2021 Escalation
1666 Banthy slsH¥O Heat Unim Pipes Enerry Daty Desktop 94.15 Persona/Oay/Apptcalon — Apr-23-2021 Escalation
1669 Bentisy sl:V¥D MU 1000 Pips Enecny Daty Desktop: 79.67 Persona/Day/Appicaton — Apr-23-2021 Escalation
1669 yntley s1tH¥D MU 10000 Pipes: Eneny Day Desktop 139.06 Persona/Oay/Appiication —Apr-23-2021 Escalation
1669 Bentley slsHYD MU Unt Pipes Enessy, Oaty Desttop ATTAS Persona/Oay/Application —Ape-23-2024 Escalation
1670 Eneray Daly Desttop 122.54 Persona/Day/Apptcation —Apt-23-2021 Excalition
1680 Energy Day Desktop: 117.64 Persona/Osy/Applcation —Apr-23-2024 Escalation
673 ney amy esttop 1550 PenonofOovibppecation  Ape-232021. Escalation
1656 Bentley stNET Electie Enevny Daly Desktop: 43.21 Persona/Day/Appiation —Apy-23-2021 Excalatton
1658 Bantey SuNET Ges Energy Oaiy Desttop 21 Persona/Day/Appecaton —Apr-23-2021 Escalation
1678 Rent AANET Green Enerey oaty Desktop 5109 pemona/Dm/Apptealon —Ap-242021 Escalon
1676 —_-Renthy HANET Grundébenstbakak trey osty Deitiop 4504 Pesion/Day/Apptealon — Ape-2B-2021 Escalation
1657 antay AMET Heat ney oaty Deitiop 4821 Pesonn/Day/Apotcatlon — Ape-23-2021 Escalation
1683 Bentley sbNET HAM Energy Oaity Desktop: 63.24 Persona/Day/Apptcation —Apr-23-2021 Escalation
168) BentayALNET HAY ine amy Desktop 13504 Penena/Dry/Appterten Ape-23-2021 Escalon
16735, Bentley slLNET Vegenschaften Eneay Daily Desktop. 51.09 Persona/Day/Application —Apr-23-2021 Escalation
1661 Bany HLNET Mul Uity eowey ety Desktop 12048 Perone/Dry/Apptenion —Ape23-2021 Escalation
1660 Bently ALNET Wertewatar eney Day bastion 3444 Pemona/DayApptcnlon —Ape-23-2021. Escalon
1689 ‘Bentey shNET Water Energy, ‘Daby Desktop: 3444 Persona/Day/Apptcation — Apr-23-2021 Escalation

Pages ofS

1792
m9
2ae
2813
2016
202
245
206
2107
2143
1000
04
600

1038
1323
1374
2074
2084
2087
2764
2379
2380
1344
2342
2381
2388
279
2075
24s
1226
m7
ae
1535
iat
raz
1536
seat
ae
2730
1935
1934

isan
asa
1940
1942
2st
1305
ams
1207
107
1707
1207
1207
1207
8207
1207
1207
1207

Benthy shVEW Basle

Banihy speediion Arebitecturt

Banuey speedtian AttibuteFtter for OWG, DGH and ATL

Henthy speedikon Industetat

Benthy speedcon Projectedttor

‘entlay speadicon QuentttyTakzol™
nay Water

875 -Projectase Asset Tausing

Brkdgentaster Boxdieder

Brhdgettarter DoxGieder Pratestlonal

Beldgentarter Professional

Bilégettarter Profasstonald

Brldga taster Standard

CHCCRM Openkesds

Compare

Conecete Structural Systm for STAAD

ContextCapture

Convert

CobrertMaster

Expect Duslpner Connactor for ESAL

FlawMaster

we

UT tog

WAT Profession

BAT Professional Plus

Hevacomp Oynuove Stmutztion

Hevacomp Deetrieal Contractor

Hevacomp Electrical Deslgner

Hevacomp Hectrcal Syrtem Bude

Heracomp Mand€ System Bolder

Heracamp Mechualeal and Electeteal Designer

Havacamp Muchraleal Contractor

Hovacamp Muchaaleal Desients

Havacomp Marhanlea Systeen Buréer

Hol BASE Ch 30

HolBASE Oats Entry

HoWBASE Mleroroh Excal

HoleBASE Professional

HolsBASE Standard

HolBASE Template Studio

Iavel

101K2 Code for AutoPiPE
Keys

Uns Bilge

LEAR Bridge Concrate

LEAP Bridge Console

EAR Bridge Precatt

UAP erhige Ste

teA® CONBOX

LEAP CONSPAN

LEAP CONSPLICE

teas consys

LEAP GEOMATH

UEA9 PRESTO

AAP RCPIER

MEAP VERTEX

AEGION Model Bubder

LEGION simulator

MAXSURE

MANSURE Advanced

MAXGUAE Modsler Advanced
[MAXSURE Stabltty Advanced
MAXSURE Sabtity Ukimate
(MAXSURE Uldnate
MicroStation

MicroStation GroOuttook
MicroStation

MiczoStation Powesbeatt
MicroStation Pawerseope
MicroStation Repro@raphks
nay Designer for Mlcrostatlon
Mlouysle Matarlat Handling
Macys Suevey

OHIO Studio.

Moses

OSES Advanced

MOSES lacket Launch
MOSES Pipa and Rod alameat e
OSES Uttinete

Mstower

MsTower Menopote
‘Nahitrame

Mbttrame Advanced
HENGHL Convertor
NENSDF Convertor

Ome

‘Omega Unk tite

omens Pre

mera Pra Unk

‘Omera Pro Unk ine
‘Omega Pro UTE VS
‘Opentitdge Devine
Opantitdge Dasignes COX
Opentuidge Modeter
OpantuiidingsDestgner
Openttidings Staton Daslgner
Openchies Map Advancad for Mirostaton
‘Opencnies Mtp Advanend Standatoae

‘Openchies Map Ultimate
‘Opencomnms Designer

Opencornm Werkpetnt Engineer

Opanfiaws HAMMER Untindted

Opentiowa ChilStorm AutoCAD Unlimited Unks
(Opansiows ChitStarm for AulaCAD 10 Unts
‘OpanFlows Chilstorm for AutoCAD 1000 Links
‘Opanflows Chvitstorm for AutoCAD 250 Unks
‘OpenFlaws ChilStorm for AutoCAD 30 Links
OpanFlows CheliStarm Standalone 10 Unks
OpenFlews ChilStorm Stundatone 1000 Links
OpanFiows Chilsterm Standalone 250 inks
OpenFlows Chilsiorm Standalone $0 Ls
Openttows Chistarm Standatone Uatm Unks

Bentley Syiterns
Eatecpdse 365 Price Ust Global USD - CONADENTIAL
Updated 1306C2021
eration 3 (2022 Pricedook)

fnesey oaty Desktop
Bultding estan Oaiy Desktop
Bulldog Design Dany Desktop
Burtsiog Design Daty Desttop
Butlatog Design uty Desttop
Building Desten any Desttop
freny oaty Desttop
Busing Design any Desktop
Rddge Analysis oaty Desttop
Bildge Anata, oaty Desttop
Reldge Anatysis outy Desttop
Beldre Anahsts outy Desttop
Betdge Anatyss oaty Desttop
chat Destgn uty Desitop
Realny and Spatlat Modeling Daly Oesitop
Steuetural Anabysts ay Besitop
Reaky andSpatlal Modeling Day Desktop
Realty and Spatlal Modeling Dally Desktop
Mydeauites and Hydeotory uty desttop
Faerey ony oesttop
Rydrautes and tydrotony oaty oesitop
Realky and Spatial Modeling Dally Desktop
Geotechaleat information Maneger Dally Desitop
Geotechnical information Manager Daly Desktop
Geotechatcal information Manager Dally Desktop
Buttding Destan oaty Desktop
Busing Oesiyn oaty Desktop
Buding Design ouny Desitop
Building Design oaty Desktop
Burtding Design uty Desktop
Butaing Design oaty Desttop
‘utting Desten oy Desktop
Bunding Design oaty Desktop
utding Design oat desktop
Geotechnical fnformaticn Manager Daly Desitep
Geotechaial information Manager Datty Desktop
Geotechaleatlaformation Manager Day Desktop
Geotechnical lnformation Mansger O4Py Desitop
Geotechnical formation Manager O2%y Destop
Geotechnical information Manager Daly Desitop
Oia ony Desitep
Pipe Steest andVessel Anatysls—DaIy Design Code
Geotechaicaltoformation Manager Daly Desktop
Bildge Anabyss Daly Desktop
Beldge Anabysts Duy Desktop
Beldge Anatysls Oaty Desitop
Bildge Amabsts Duty Oestep
Beldge Ansty oaty Desktop
Oy Desktop
oaty Desktop
Bridge Anatsis ary Desktop
Bridge Anahsts bay Desktop
Bildge Anatysls oaty Desktop
suuctural Anahsis Duty desktop
Bridge Anahi. Duty Desktop
Strocueal Anahals ony Desktop
‘Motiity Simulation Daty Dertop
Mobitty Slmlstton Day Oesitep
Oilfshere Suuctural Anahsts ——DaTy Desttep
Oiltshore Structural Anaysts Daly Desitop
Olishore Structural Anaisis ay Desitep
Offshore Structural Anatyls——OaFY Desttep
Offshore Structural Anahais (Day Desttep
Otfshore Structural Anahss ay
Modettog Daty
Renny snd Spatial Modeling Daily
Modeling Oaty
Modeling Daly
Modeling Daty
Realky andSpatlat Modeling Day
Mine Design Daty
Mine Design oaty
Mine Design oaty
Hydrautes and Hyérotony oaty
Oifshore Structural Anatsts ay
Offshore Strvctural Anahss Day
Offshore SuuxturatAnshsls Daly
Offshore StroctucatAnthyss Daly
Offshore Structural Anahsts Dally
Steuctural Analysts Daly
Structural Anahysis Oaty
Otfshore Suucturat Anatsis Daly
Ofshore Structural Anadis ay

Realty and Spatial Modeliog Oat
Reainy andSpital Modeling Oat
Realty and Sprtiat Modeling O1ty
Realky and Spatial Modeling Day
Aealky sodSpital Modeling Day
Aeatky andSpatlal Modeling Day
Realy andSpatial Modding Oaly
Aeaky andSpatial Modeling aly

bridge Anata
Bridge Anatole
Bridge Anat
Building Desten
Buttatng Destan

Realky and Spatial Modeling Oaly
Reainy and Spattat Modeling Oay
‘Realny and putiat Modelleg O28
Realky and Spats! Modding Day

fnecey aay
Energy Daly
‘Mydrauiies and Hydrology Day
‘Hydraulles and Hydrology Daly
‘Hydraulics and Hydrology Day
Hydiaules and Hydrology oaty
Hydeauter and Hydrotony oaty
Hydraulics and Hydrology Oaby
lydrautes and Hydrotory ay
Hydraulics and Hydrology Oaty
Nydrauies and tyerology Day
Hydraulics and Hydrology ‘Oaty
Kydrauites and Hydrology Daity

ay
Daty
bay
oaty
Day

Page 2of5

2.94 Persona/Day/Apetication
35.16 Persena/Oay/Apptction
6.11 Persona/Day/Appteation
68.9 Persona/Day/Appttcatlon
18.72 Persena/Day/Apptication
8.73 Persona/Oay/Application
2542 Persena/Day/Appkcation
1420 Pervona/Day/Apptication
51.01 Persana/Day/Applicxion
85.02 Perona/Oay/Apptcation
2858 Persena/Day/Apptexion
51.34 Persona/Day/App¥eation
11.72 Persona/Day/Apptcation
4285 Persana/Day/Appteation
1331 Pemona/Oay/Appteation
2897 Perona/Oay/Appteation
4325 Persona/DayiApption
8.92 Pemona/Day/Apprcation
681 Persona/Day/Apptcation
191.97 Persona/Day/Appteation
GAL Perrons/Oay/Apptextion
4.21 Persona/Day/Appteation
3.35 Penons/Day/Appteation
1331 Pemoos/Day/App¥eation
18.48 Pecrona/Day/Aporeation
30.28 Pertans/Day/Apptcation
11.77 Persona/Oay/Apptcation
19.20 Persona/Day/Appteation
1428 Persona/Day/Apptcation
3049 Persona/Day/Apptcation
4037 Penana/DaylAappteation
19.27 Penona/Dey/Appteation
28.78 Persona/Day/Appteation
23.24 Persana/Day/Apptcation
7.24 Parsana/Day/Apptcation
242 Persona/Day/Apptcatton
242 Persana/Oay/Apptcation
15.06 Persona/Day/Apptcation
783 Persona/Day/apptcation
2.42 Persona/Oay/Appcation
4.50 Persons/Day/Applctton
1446 Pervona/DayiAppfcation
1145 Perona/Day/Appication
319.50 Pessona/Day/Appeation
5432 Persona/Day/Appteation
50.04 Perrona/Oay/Apptcatton
39.38 Persona/Oay/Apptctton
38.32 Persona/Day/Apoteatton
1475 Periona/0ay/Apotcation
19.68 Perona/Day/Appcation
23551 Persona/Day/Appitcatton
4.68 Persona/Day/Appliction
12.29 Persona/Day/Apptication
20.16 Persona/Oay/Appiieation
19,68 Persona/Day/Apptcation
20.16 Persona /Oay/Appteatton
22.36 Persona/Oay/Appieation
99.10 Persona/Day/Appllcaton
28.30 Persona/Oay/Appication
10036 Persona/Day/Appicion
27.63 Persona /Day/Application
36.35 Pemona/Day/Apptcatton
5050 Persona/Day/Apptication
168.23 Pecrons/Day/Apptcatton
11.25 Pecsons/Day/Applicstlon
240 Persona/Day/Appiiation
11.25 Perrons/Day/Appiication
11.25 Periona/Day/Apptication
0.50 Pertona/Day/Application
11.10 Persona/Day/Apoteation
63.46 Persona/Day/Apptcation
63.46 Persone/Day/Apptcatlon
27.30 Persons/Day/Appieatton
358.93 Pecsons/Day/Appticatlon
269.02 Persona/Dav/Appiation
222.61 Persona/Day/Applictton
90.14 Persona/Day/Apgttcatton
90.14 Persona/Oay/Appltcaton
426.68 Persona/Oay/Appheatlon
21.01 Persons/Day/Apetcation
6.77 Percona/Day/Apeteation
2357 Personn/Day/Apptication
37.02 Persona/ay/Appticatton
1005 Persona/Dar/Apptication
5.02 Persona/Dar/Appication
3.09 Periona/Day/Application
2.65 Periona/Day/Application
12.32 Persona/Day/Apptieion
12.32 Persona/Day/Appltcatlon
349 Persona/Day/Appicatlon
349 Persona/Day/Appteation
9987 Perens/Day/Apptcatlon
321.49 Persona/Day/Appteation
37.48 Pervona/Oay/Appikation
24.27 Persona/Day/Appiction
31.37 Persons/Oay/Apptcition
1044 Persona/Oay/Appiication
17.06 Persons/Day/Apphextton
646 Persons/Day/Applicstion
31.92 Persona/Day/Apptcation
60.05 Persons/Day/Appiication
19.18 Pervena/Day/Appicatton
50.84 Persona/Day/Apptcatlon
95.36 Pervons/oay/Appicatlon
31.77 Persons/ony/Apptcation
57.24 Pervona/Day/Appteation
4450 Persont/Day/Apptcation
38.15 Femons/Day/Aptcation
19.96 Periona/Day/Appleation
44:50 Peniona/Day/Appscation
31.77 Persona/Day/Apptication
25.40 Persona/Day/Application
4265 Perrona/Day/Aoptextion

Apt-23-2021,
‘Ape-23-2024

‘hpe-23-2021,

AApe-23-2021

Ap-23-2021

49623-2021

‘Ape-23-2021

(Ap0-23-2021

Ape-23-2021

Ape23-2021
Ape-23-2021

‘Ape-23-2021

‘Ape-23-2021

Ape-28-200

Apt- 23-202

‘Ape-23-2024

Ape-23-2021
‘Ape-23-2021

AApr-23-2021
Ape-28-2021

‘Ape 23-2021
Ape-23-2021
‘Apt-23-2021
‘Ape-23-2021
(hpe-23-2021
9-22-2021
Apr 23-2021
90-23-2021
Ape-23-2021
Ape-28-202
Ape-23-2021
Ape-23-2021
‘Ape-23-2021
‘Ape-23-2021
‘Ape-23-2021
Ape-23-2021
‘Ape 23-2021
Ape23-2021
‘Ape-23-2021
Ape23-2021
Ape 23-2021
‘Ape-23-2021
Ape-28-2021
‘Ape 28-2028
Ape28-2021
‘Apr-24-2021
‘Ape-24-2021
‘Ape-23-2021
Ape-23-2021
‘Ape-28-2024
‘Ape-23-2024
‘Ape-23-2023
(Ape 23-2024
‘Ape-23-2021
‘Ape-28-2024
Apee23-2001
May27-2021
Ape-23-2021
Ape23-2021
AApr-23-2021
Ap 23-2001
‘Ape-23-2021
‘Ape-23-2021
Ape-23-2021
‘Apr-04-2020
AApe-23-2021
Ape-04-2020
Ape2-2021
‘Apr-04-2020
Ape-23-2021
(Ape-23-2021
‘Ape-23-2021
Ape-23-2021
Ape-23-2021
|Apt-23-2021
AAph2-2021
Ape-23-2021
pe-23-2021
‘Ape-23-2021
Apt-23-2021
apr-23-2021
‘Apt-23-2021
AApr-23-2021
Ap-23-2021
Ape 23-2021
Ape-28-2021
Ape 24-2021
Ape-23-2021
Ape-23-2021
Ape23-2001
(Aoe-23-2021
Ape-23-2021
Ape-23-2021
Ape 23-2021
‘Ape-23-2021
(ApH-23-2024
Ape23-202
pe-28-2001
‘Ape-23-2001
‘hp6-23-2021
p0-23-2021
Ape-23-2021
‘Ape-23-2021
9-23-2021
Ap0-23-2021
(Ape-23-2021
pe-23-2021
(4pe-23-2021
(Apr-23-2021
Ape-23-2021
Ape-23-2021
Ape-22-2001
Ape23-2001

Escalation
Escalation
Escalation,
Escalation,
Escalation
Escalation
Excafation
Esealtion
Escalation
Escalation
Escalation
Escalation,
Escalation
fxeatation
Eseahtion
Escalatlon
Escalation,
Escalation
Escalation
Esealatten
Esealaten
Esealiten
Esealitlon
Escalation
Escalation
Escalstica
Escalation
Escalation
Escalation,
Excalation
Escalation
Escalation
Escalation,
Esealatlon,
Escatatton
Escalation
Escalation
Escalation
Escalation,
Escalation
Eseatatton,
Escalation
Escalation
Escalation
Escalation.
Escalation,
Escalation
Escalation
Escalation
Escatation
Escalation
Escalation
Escalation
Escalation
Escalation
Escalation
Pekechange
Escalation
Escalation
Escatation
Escalation
Escalation
Escalation
Escalation
Escalttion
Escalation
Escalation
Escalation
Escalation
Escalation
Escalation
Escalation
Escalation
Escalation
Escalation
Escalation
Escalation
Escaltion
Escalation,
Estalation
Escalition
Escahtion
Escalation
Escalation
Eseafation
Escalation
Escalation
Escalation
Escalation,
Escalation
Escalation
Escalation
Escalitton
Escalation
Escalation
Escalation
Excalation
Escalition
Escalation
Escalition
Escalation
Escalation
Escalation
Escalation
Escalation
Esealtioa
Escalation
Escalation
Escalation
Escalation.
Escalation
Exealatlon,
Escatatlon

Opentlove FUD0D

Opentlows PondPack 1 Pond

OpanFlows PendPack 3 Pend

OpanFlows PondPack AutoCAD Untiited Ponds
Opentlows PondPacs for AutoCAD 1 Pond

‘OpenFlows SewerCAD for AULOCAD 10 Pipes
‘OpenFlows SaweICAD for AutoCAD 100 Pipes
Opentlows SawerCAO for AutoCAD 1000 Pipa
‘Opantlowa Sewa1CAO for AUtOCAD 15000 Pipes
OpenFlows SewarCAD for AutoCAD 2000 Pipa t
(OpenFlows SayearCAD for AUtOCAD 25 Pipes
‘OpenFlows SewerCAD for AULOCAD 250 Piper
OpenFlows SaveetCAD tor AutoCAD 500 Pip
‘Opentlows SewesCAD for AutoCAD $000 Pipes
OpenFlows Sews1CAD for AVLOCAD Untamed Pipes
Opentlows SewarCAO Standstons 10 Pipes
OpenFlowa SewerCAO Standalone 100 Piper
Openflows SewerCAD Standalone 1000 Pipes
OpenFlows SawatCAD Standalone 10000 Pipes
‘OpenFlova SewerCAD Standalone 2000 Pipes
‘OpenFlows Sawe!CAD Standalone 25 Pips
Opantlowa SewarCAD Standalona 250 Pipes
COpantlows SewarCAD Standalone 500 Pipes
(Opuntirwa SewarCAO Standalone 5000 Pipes
OpeaTiowa SeweiCAD Standalone Untmbed Pipa
(OpenFlova SevenrGEM$ 3009 Pipes

‘OpenFlovas SewerGEM$ 10000 Pipes

COpanflowa SewerGEMS 2000 Pipa

COpanfiows SewerGEMS 250 Pipe

Opantlows SewerGEMs $09 Pips

‘Opentlows SewerGEMs 5000 Pipes

Opentowa SewerGEMs Untied Pipes
‘Opentlows StormCAD for AutoCAD 10 nets
‘OpenFlows StormCAO for AUtOCAD 25 inate
‘OpenFiows StormnCAD for AutoCAD 5 Infats
‘OpenFlows StormCAD for AutoCAD Unite Ine ts
Opantlowa StormCAD Standatone 10 tabets
‘Opantlows StormCAD Standitone 25 lalats
Opentlowa StormCAD Standalone SInlets
Openflews StormCAO Standalone Uniim Inketx
OpaaFlaws WeterCAD for AutoCAD 10 Pip
Opantlows WaterCAD for AutoCAD 100 Pipes
COpentiows WaterCAD for AutoCAD 1000 Pipas
Opentiowa WatarCAD for AutoCAD 10000 Pipes
Opantiows WaterCA0 for AURDCAD 2000 Pips
COpentlows WaturCAD for AutoCAD 25 Pipes
‘Opentlows WaterCAD for AvtoCAO 250 Pipes
‘Opentlows WaterCAD for AutoCAD S00 Pipes
Opanflows WaterCAD for AutoCAD $000 Pipes
(Opanflews WaterCAD for AutoCAD Unlimited Pipes
Opantlows WaterCAD Standalone 10 Pipes

CAD Standalone 100 Pipes

FCAD Standaons 1000 Pipes

FCAD Standalone 10000 Pipes
ICAO Standabone 2000 P
Opanflows WeterCAD Standalone 25 Pipes
Opantlowa WaterCAD Standalone 250 Piper
Opentlows WaterCAD Standalone 500 Pipes
Opentlows WaterCAD Standalene S000 Pipas
Opentlows WaterCAD Standalone Uniimtted Pipes
Opentlows WaterGEMS 1000 Pipes
Opentlows WaterGEMS 10000 Pipes
‘Opentlows WaterGEMS 2000 Pipes

‘Opentows WatarGEMS 250 Pipes

‘OpenFlows WaterGEMS 500 Piper

OpenFiows WaterGEMS $000 Pipes

Opentlows WaterGEMS Unlimited Pipes
OpenGround Colaborster

Opanctound Osta Cobcter

OpanGround Integrator

OpenGtound Manager

OpenPunt Electrical

OpenPanttiometrics Manager

Openiant Modeler
OpenPlint Modelserver
OpenPlant Orthographics Mai
OpenPlant PID

OpenPlant Support Engineering
‘Openked Conceptstation

Opentel Designer

Opantal Overhead tine Designer
OpanReads Concaptstation

OpanReads Designer

OpenRosds SignCAD

Opensite Designer

‘Opentower Europe

‘Opentower Mount Anshnis
‘OpenlJUtes Substation
OpentindPawar + Fluad Foundation
OpsnWindPawar - Floating Foundation
(Orbit 30M Content Manager
(Orbit 30M Feature Extraction Basle
Orbit 30M Feature Extraction Pi
(Orbit 30M Feature Extraction Standard
Pranthlow

‘antstow Plus

‘Hunt WAVE for PlantSpace

maxis 20

AXES 20 Advanced

MANS 20 UE

ANS 20 URImate

PLANS 30,

PLANIS 30 Advanced

PLAKIS 30 LE

PUAXIS 80 Unioate

PLAXIS Designer

Proconerete

ProConcrata for AutoCAD

ProjectWie POx Dynamic Review Service
promlste Prof Standa

Promise

Bentley Systems
Enterpuise 365 Price st Global USD ~ CONFIDENTIAL
Updated 13062021
eration 3 (2021 Pukeboo})

Hydrauiles and Hydrolony bay Desttop
Mysrauiles and Hydeolory baty Oesitop
Hydraules and Hydvotony Daly Desktop
Kydrautics and Hydrotony Dany Desktop
Hydravtes and Hydrology uty Desktop
Hydrautes and Hydrology bay Desitop
Hydeauttes and Hydrotoy oy DeiHop
Hydraules and Hydrotony uty Desitop
Hydrautes and iydeetony. oaty Desktop
Hydraulics and Nydrotony Dany Oesitop
Hydraulics and Hydtetony ow Desitop
Hydraulics and Hydrology Day Desitop
Hydravtcs and Hystotony Daty Desktop
Hyraulls and Hydrology bay Desitop
Hydrauiles and Hydrolory Dany Desitop
Hydrauiles and HystolOry Day Desktop
Hydrautee and Hyérotony amy Desktop
Hydrautes and Rydrelogy Day Desttop
Nydrautes and Hyérotony Day Desktop
Hydeautes and ydrotony Day Desktop,
Hydrauiis and Hydrotory bay Detktep
Hydravics and tydeatory ouy Oetop
Hysaules and Hydtolony oaey desttop
Hydraulics and Hydrotory Daty Desitop
Wydeautes and Hydtolory Daty Desitop
Hydrautes and Hydrolory Day Desitop
Hydraulics andiydrotony baty Desktop
Hydraulics and Hydrolosy bay Desktop
Hydraulics andHydrolory bay Desitop
Hydraules and Hydrology Daty Desttop
Hydrautes and Hydrology Day Desktop.
Hydrautes and Hydrolory Daly Desitop
Hydeautes and Hydrology Daty Desitop
Hydraufes and Hydrology bay Oesttep
Hydrautes and iydrelory Doty desitop,
Nysrauies and Hydrelory Daty Desttop,
Hydrautcs and Hydrolory Daty Desttop
Hydiautes and Hydrology Oaty Desktop
Hydraulics and Hydrotory Day vesktop
Nydraulis and Hydrolony Daty DesKtop
Kydrautes and Hydrolory bay Desktop
Hydrautes and tiydrolony Daty Desitop
Hydrautes anditydeotony Daly Desitep
Hydraules and Hydrology Daty Desttep
Hydrautes and ydrotony Daly Destiop
Hydravtes andtlydrolosy Daty Desktop
Hydiautes and Hydrolony oaty desktop
Hydraukes and Hydrology Oaky Oesitop
Hydiautes and Hydrology Oaiy Desitop
Hydrautes and Hydrolony Diy Desttep
Hydeaules and Hysrolory Daly Desktop
Hydraulics and Kydrotony Duty Desttop
Hydrautes and Hydrolony Day Desitop
Hyoraulis and Hydrology baty

Hyviauiics and Hydrology bay

Mydrautes and Hydrology oaty

Hydiaules and Hydrology oaty

Hydraulics and Hydrology Oaty

Hyraules and Hydrology Oaty

Hydrauties and Hydrology Daly

Hydteutes and Hydrology Daly

Hydrautes and Hydrotony Daty

Hydraufes and Hydrolony Daly

Hiydraules and Hydrotory oaiy

Hydrautes and ydeolosy Day

Hydrautes and Hydtology ony

Rydrautcs and tydrotogy Oaty

Hydraulics and Hydiotony Oaty

Hydrauiles and Hydrotory Daty Desttop
Geotechnical Information Manages Daly Cloud Service
Geotechnical information Manages Oaty loud Service
Geotechafeal information Manager Day loud Service
Geotechalcal Information Manager Duty loud Sereice
eneeey Daty Desttop
Plant Design Daly Destop
Phat Design Day Denton
Plant Deslan oaty Desitap
Plant Design Daty Desitop
Plant Design Day Desitop
Plant Design oaty Desttop
CoAT Dest Day Desttop
cet Design Daly Desitop
Cnt Destin Daly Detttop
vn Design Day Desitap
An Destan oay Desitap
Chel Dest baty Desttop
el Desten Daty Desktop
structural Anahats Duty desitop
Structural Anshats Day Desktop
Every Day Desitop
Otishore Structural Ansty Dat Desktop
Otfchore Structural Anthyits ay Desitop:
Realky andSpitit Modeling Daily Desitop
Realky andSpital Modeling Dally Desitop
Reaky andSpitial Modeling Day Desktop
Realky and Spatial Modeling Day Desktop
Pipe Suess and Vessel Anahysls Daly Desktop
Pipe Stress end Vessel Anthsts Oxy Desitop
Plant Design Day Desktop
Grotechateal Anstystt Daly Desitop
Geotechnical Anatystt Daly Desttop
Grotechnleal Anat Duty Destop
Geotechnical Anatyis, Dany Desktop
Geotechnical Anatysls Duty Desktop
Geotechntcal Ansiysit Day Desttop
Geotechalcal Anahsts Dany Desktop.
Geotechaleal Anabysls aly Desttop
Geotechnical Anahats oaty Desttop
stevtvaal Detating ony Desttop
Steuctural Detatiog Daty desHtop
Plant Desian Daly Desttop
Enevey bay Desttop
Enewsy Day Oesttop

Page 3of S

158.93 Pessons/Oay/Appiiatlon
1269 PersonafDay/Apptcation
13.05 Persana/Day/Apptexion
4450 Pernona/Ouy/Apptcation
1$A8 Persona/Day/AppRcation
2540 Permona/Day/Appteation
31.72 Pesona/Day/Apptcation

203 Persons/Day/Apptcation

9.69 Persons/Day/Apptcation
5084 Pervons/Oxy/Apptcatlon
95.36 Penonn/Day/Appkcation
6257 Persona/Dny{Apptation

650 Persona/Day/Appication
19:20 Parsons/Oay/Apptcation
31.77 FersonafDay/Appication
12555 Persons/Ony/Appication
127.15 Pecsonn/oayfApptaation

133 Pemooa/Day/Apotcation

650 Fenvona/Day/Applcation
3177 Penone/Day/Appation
8265 Persona/DayfApptcation
S084 Persona/Day/Apptcation

235 Persona/Day/Apptation
1245 Persona/Day/Apptextion
1920 Persons/Day/Apptcation
6357 Pessona/Day/Apptcation
95.36 Perons/Day/Appication
6357 Persona/DayiApplcaton

127.15 Pervona/Day/Appictlon
12665 Pertona/Day/Appteation
31.7 Personn/Day/Appteation
50.84 Persone/Day/Appteation
95.36 Persona/Day/Apptcation

158.93 Peona/Day/Appllction
1245 Persons /Oay/Appestion
31.7 Pessona/OnyfApphcation

199 Persona/Oay/Apicatton
$084 Persona/On/Appication
650 Persona/Day/Appication
19.06 Persons/Day/Appitction
133 Persons/Day/Applicatton
31.77 Persons Day/Apptication
1.99 Perrons/Day/Appication
9.69 Penona/Diy/Applcation
S044 Persona/Dry/Apptction
95.36 Persons/Day/Appliestion
63.57 Perrona/Day/Apetiation
650 Permone/Day/Apptcaion
19.20 PersonayDay/Apptcation
31.77 Pecsons/Day/Apptcation
82.65 Persona/Day/Apptcation
127.15 Penone/Day/Applcetion
1.33 Personn/Day/Appcation
650 Penona/Day/Applcaton
31.77 Persona/Day/Apolietion
22.65 Persons/Day/Appliation
5084 Person/Day/Appication
3:33 Persona/Day/Appilcation
1245 Persons/Dar/Apgiteation
18.20 Pansona/Oay/Appication
63.57 Pertona/Oay/App¥eatlon
95.36 Pervons/Day/Apptestlon
63.57 Persons/Day/Application

27.15 Persona/Day/Apptication
#255 Persona/Day/Appteation
31.77 Persono/Day/Apptication
$044 Persona/DayiApptiation
95.36 Persona/Day/Application

158.93 Persona/Oay/Apptication

1.71 Persona/Day/Apptcation
447 Persona/Day/Applcation
£856 Persona/Day/Appikation
1531 Persona/Oay/Applcation
9846 Persons/Dey/Application
32.14 Pentona/Day/appliction
3605 Persona/Day/Appliation

12009 Persona/Day/Appiication
432.14 Person/Day/Applieation
22.26 Persona/Osy/Apgieation
2228 Persons/Day/Aopication
3499 Persona/Day/Appiction
5382 Persone/O2y/Applicavion

110.91 Perona/Day{Applcatton
12.37 Persana/Dar/Application
25.98 Persana/Day/AppHextton
12.08 Pemona/Day/Apptcation
2052 Persons/Day/Appiiextion
2087 Persona/Day/Appuexion
2700 Persona/Day/Appricxtion
7826 Persona/Day/Appteatlon

29745 Persons/Day/Apptcation

421.20 Persons/DayiApptcation

7020 Persons/Day/Apptcation
A446 Persona/Day/Appteation

7.62 Persana{Day/Appkeation
10.32 Persona/Day/Apptcation
7852 Persona/Day/AppScation
2496 Pertona/DayiAppiication
31.20 Persona/Day/Appteation
1950 Persona/Day/Apptictton
4446 Persona/Day/Appteation
{6552 Persona/Day/Apphication
18757 Persona/Day/Appication
5850 Percona/Day/Apptication
307.48 Persone/Day/Appteation
27.30 Persona/Day/Apptcation
34.43 Pecsona/Dayi/Appscation
3443 Persona/Day/Apptication
12009 Persona/Day/Applcetion
243 Persona/Oay/Appteation
35.08 Persona/Day/Appication

Ap-23-2021. Excatation
Ape2S-2021 Escalon
Ape232021. Excalation
Ape D201 Eccalation
Ape-22-2021 Exealation
Ape20U1 Escalation
‘Ape-23-2021. Escalation
‘Ape-2-2021 Escalation
ApeT3-2021 Excabtion
‘Apr-23-2021. Escalation
Ape2i-2021. Escalatton
‘Ape24-2021 Esealatton
Apr23-2021. Escalttion
Ape2%-2021. Escalation
Ape-23-2021 Escalition
Ape23-2021 Escalation
‘Ape-23-2021 Exealation
‘Ape-23-2021 Escalation
‘Ape-23-2021 Escalation
Apr-23-2021 Excalation
Ape23-2021. Escalation
‘Apr-23-2021. Esealatton
‘Ape24-2021 Excalatton
Ape-23-2021. Escalation
Ape-23-2021 Ercalation
Ape-23-2021 Escalation
Ape22-2021 Escalation
Ape2s-2024 Excalatfon
Ape-23

‘Ape 23-2021 Escalatlon
Ape-23-2021 Erealation
‘Apr-2}-2021 Esealatton
Ape23-2021 Exeahatlon
‘Ape-23-2021 Escalation
‘Ape-23-2021 Escalation
‘Ape-23-2021 Escalation
Ape-28-2021 Escalation
‘Ap-23-2021 Escalation
‘Ape-23-2021. Escalation
‘Ape-23-2021. Escalation
‘Ape-23-2021 Escalation
‘Ape23-2021 Escalation
‘Ape-2-2001 Escattion
Ape-23-2021. Escalation
‘Apr-23-2021 Escalation
Ape-23-2021 Escalation
‘Ape-22-2021 Escalation
‘Ape-23-2021 Escalatton
Ape2¥-2021 Escalation
‘Apr-23-2021 Escalatton
‘Ape-23-2021 Escalation
51-23-2021 Escaltion
‘Ape-28-2021. Escalation
‘Ape-23-2021 Escalatlon
Ape-23-2021 Escalation
‘Ape-23-2021 Escalation
‘Ape-23-2021 Escalation
‘Ape-23-2021 Escalation
‘Ap-23-2021 Ercalation
‘Ape23-2021 Escalation
‘Ape23-2021 Escalation
‘Ape 23-2021 Escalation
Ape22-2021 Escalation
Ap6-23-2021, Escalation
Ape-2B-2021 Escalation
‘Ape-24-2021 Escalation
‘Ape-23-2021 Escalation
‘Apr-23-2021 Escalatlon
‘Ape-23-2021 Escalation
Ape 23-2021 Escatation
Ape23-2021 Escalation
‘Ape23-2021 Escalation.
Ape Escalon
Ape-23-2021. Esealatton
Ape23-2021 Etealation
‘Ape-23-2021 Escalation
‘Ape28-2021 Escalation
‘hpr-23-2021 Escalation
‘Ape-23-2021 Escalation
Ape2¥-2021 Escalation
‘Ape23-2024 Escalation
‘Aug-17-2020 ProdvctAdded
‘Ape-23-2021Escalitlon
‘Apr-23-2021 Escalation.
Ape2¥-2021 Escalation
Ape-28-2021 Escalation
‘Ape-28-2021 Etcaltion
‘Ape-23-2021. Escalation
Ap-2-2021 Escalation
Ap-23-2021 Escalation
‘Apt-23-2021 Escalation
Nan-13-2021 ProductAdded
Ianel3-2021 Productadded
Jam13-2021 Productadded
Jan-12-2024 ProductAdées
Apr-23-2021 Excalition,
‘Apr23-2024 Escalitlon.
Ape-232021 Escaltion
Jan08-2021 ProductAdded
Jan08-2021 ProductAdded
Ya08-2021 Productadded
Inw08-2021 Productadded
Inn08-2021 Productadded
Iao-08-2021 ProductAdées
Jan-13-2021 ProductAdéed
Tan-8-2021 Productadded
Han13-2021 Productadded
‘Ape-23-2021 Escalation
‘Ape-23-2021Escatatlon
‘Ape-23-2021 Escalatton
‘Ape-23-2021 Excalatton
‘Ape-23-2021. Escalatfon

Bentley Systems

Enteeprise 365 Price Ltt Globsl USD - CONFIDENTIAL

Updated 13062021,

Netatton 3 (2021 Peiceboot)

265 momlte for Ra lenetag foerey baby aston 3684 Pervna/ory/Appleation Apr-242021.Exctation
2269 Prete structural Detalrag oaty Deiten 3443 PersonafDaviapplicatlon —AGE-232021_ Escalon
1743 ‘ProStaet 2500 Parts Sttuctural Detalting Oaky Desktop ALL Persona/Day/Applicetion —Apr-23-2021 Escalation
ins ProStaat 3D Englveariog ‘Structural Detaliog Oaty Desktop: ASL Persona/Day/Apptcation —Apr-23-2021 Escalation
1710 Profteel 30 Modeler Structural Oetalbog uty oesitop 1131 Fersona/DaylAppteation — Ape-23-2021 Excalillon
YT estael or AutoCAD Structural Detling oaty Cesttep 3443 PerionsDay/hopKewion —-Ape-242001_ Escalon
2270 Prastructuces Stiocturaletatog bay ousttop $470 PertnOay/AppReaion —Kpr22-2001.Fscaition
2455 ProStructures for AutoCAD ‘Structural Detalfing: Daty Desktop: 54.70 Pecsona/Day/Appiication —Apr-23-2021 Excalation
1036 PULS Option 2 Pipe Stress and Vessel Anahysis. = Daty Desktop: 15.26 Persona/Oay/Application —Apr-23-2021 Escalation
1007 Puls option Pipe stescandVesselAnahsly—O2RY devttop 45a1 Penena/Oayfappteaion —Apr232021. Escalon
1098 PUlsOptiona PipestiessandVestelAnatats ay oesttop E110 PersnfDay/appteation —Ape-23-2081. Escalon
1235 pumpMarter Hyarauses andiyetoloey ty Destiop 4321 Persona/Day/Applation Ape-23-2024 Excaitlon
tss1 ase Srucurataniiat oaty Desktop 739 PersenaPDay/Applation Ape-23-2021 Ecealitlon
1476 RAM ConcaptAl Hoeuas SiructuralAnats Day Desttop Apere2004 Exelon
1574 RAMSbuum Strotrat Anat Ooty Destiop 150 Persona/Ony/Apaicalon Ape 28-7001. Producthdded
276 Ree bitéteAnahats oy Derttop 4822 Penom/Or/Apptieaion —Ape232021.Eseabtion
2177 RM ike Adranced sildte Anata oaty Desttop 8128 Penonn/Day/Appcation —A5C-23-3001 Escalon
1339 AM Bihge cnt bridge Anak oaty Detttop 6399 Penon/Osy/apptction Apr 28-2021.Excaliton
2679 RM Uh Energie Buide Anahals Daty vestiop 12453 perton/Day/appReation—Ape2S-2024.sealatlon
2013 SACS Catapre there strana Aatnts ty ettiop 66.10 Persona/Oay/appkaaion —Apr23-2024. Escalon
21 sacs ratque COfthote structural nats OsRy oasttop 3040 Penons/Oay/Appliction —Apr-22.2021. Escalation
2015 SACS Fabtve Advanced -Opnamk Responte OfthoreSoctrat Anais Oaky pesmep 245 penom/DayfApplealon —ApE-3.2001 Escalon
2016 ‘SACS Fatigue Advanced - Wave Response: Offshore Structural Anabysis Daty Desttop 49.65 Persons/Day/Application —Apr-23-2021 Escalation
2017 SACS Fatigue Ultimate Oftshove strat Anayals aly oestiop 22.1 Penenr/Dny/apptcation —Ape-232021. Escalon
220 AG FEMGY OftheretroauratAnatpis ay Destop 2078 recom fOiy/Appkealen —pr-73-2001 Escalation
2018 SACS Modine Offshere StuctcatAnnyah Oty Deitiop 2625 Penons/Dn/Appkeation —Apr-232021.fscallon
2019 SACS Marine Advanced Offshore Structural Anabysts Daky Detitop: 32.58 Persona/Day/Appication —Apt-23-2021 Escalation
2216 SACS Marine Utimate Offshore Structural Anabysis Baty Oesktop: 33.03 Persons/Day/Application —Apt-23-2021 Escalation
2003 SACS Ofshoe Sacre Oftshore Strucutat Anat ay Desttop 6785 Penons/Dayiapelealon — APC-ISOU Eseatatlon
2010 sACS Ofhoe Soucture Advanced Other Suara Annies ay esto 2285 Penona/Day/Applation —Apr-232024. Escalon
2011 ACS Ofhhoce Structure Ultimate Otthore wurst Anahals ay 3040 Persons/Day/Applction Aps-23.2021. Escalon
2012 SACS Pile Structure Daslen Offshore Structural Anabysts Oatty 53.37 Persona/Day/Applicatian —Apy-23-2021 Escalation
2025 sACSPostwe ttchore Suucurl Ansinls Oty 15.6 Perona/Day/Apptstion Ape-2.2021.Excaitlon
202 SACS Pracete OfshereSuuxtral Anat Oy 17A1 Penone/Day/Applction —Apr-23.2001.Excalition
2447 SmmarB0captue Advance fea andSpatisl Modding Ry 3913 PansonyfOn/Appteton —-Apr232001.fscatiton
mo sur fealy and Spal Modeling Oy 265 Persena/Day/Apptctlon —Ape-232021.Excaalon
G01 —_STAAD Advanced Conctete Design hb Pack Stuceat anata aay 1242 Perens/Oay/Appietion —Apr-23-2021.Excaatlon
2303 STAAO Advanced Concrete Desi nda SuueturalAnahas om 5.25 Persena/Day/apptcatlon —Ape-232021 Escalation
‘2585 STAAO Advanced Concrate Design Singapore Structural Analysh Daly 5.78 Persona/Day/Application —Apt-23-2021 Escalation
2583 STAAD Afvanced Conarte Design UK suctual Anata ay 5.14 Persona/Day/Apptcetion Apr-23-2021. Escalation
1ss4 STAAD Advanced Concrate Oasign US Structural Analysts Daly 5.51 Persona/Day/Applicatlon = Apt-23-2021 Escalation
2304 STAD Planwin ‘Structural Anais ‘Daly ‘3.84 Persona/Day/Appiication —Ape-23-2021 Escalation
yal staADRCOCTE Strcturat Arad oaty 5.02 Pencne/Day/Agptiaion —Apr23-2021. Escalon
1614 STAAD. Foundation Singha Code: Structural Anahi Oaty 8.56 Persena/Oay/Appiication —Apt-23-2021 Escalation
1453, ‘Stelta ‘Realky and Spatial Modeling ‘Daty 24.53 Persona/Day/Appcaion —Apr-23-2021 Escalation
ade Structural Modeler Bualding Oesiga Day ‘7.83 Persona/Day/Application —Apr-23-2021 Esealation
1602 Structural WorkSuite ‘Structural Anat Daky 25.31 Persona/Day/Appiication —Apr-23-7021 Exealation
2886 Substation China Energy Daly 41.10 Persona/Day/Appication —Apr-23-2021 Escalation
1532 WAS/WOARDT Object ‘Realky and Spatlai Modeling ary 15.18 Persona/Day/Appiication —_Apf-23-2021 Escalation
1103 WinNO2L APHESO. Pipe Stress and Vestel Analysis, = Daly 0.91 Persona/Day/Appiication = Apr-23-2021 Escalation
1105 ‘WisO2L KKK Pipe Stress and Vessel Analysts, = Daily ‘Design Code 5.26 Persona/Day/Application = Apr-23-2021 Escalation
1108 WiaNozL p05s00 Pipe SiessandVestelAnahas Oty oesitaa 301 PeronefOay/Appiction — Apra3-2021.Eseataton
Ho? WaNo2L wne1ay Pipe stessandVestelAnahsk Oat Onstiop Ape23-2021, Esclition
108 ‘WinNO2ZL WRC297 Pipe Stress and Vessel Analysts = Dafty Desttop: ‘LOL Persona/Day/Appiication —Ape-23-2021 Escalation.
Satexory & Visas and related Cloud Services data consumption: Fees based on unique users per eaten

TEL AdvaneadWodthaca gains Goautraon Goaneny vin 701500 FenonslQvenerNa — ApeDSTORT Caainion
6235 Anabyticalloud Vin 365 Structural Anatysts Quarterty Via 137.80 Persona/Quarter/Visa ‘Apr-23-2021 Escalation
6234 antay bad Compestin Sarvs fr Irwin Platorm uaety sever 4081.00 Persona/Quarer/Appliator Nov 04-2018. ProductAdded
2649 SManegement¥isa36s Construction Quarterty Via 876.95 Persona/Quarer/Vba Apr-23-2021 Escalation
2539 CompistloasVisa365 Construction: Quartedy Vea 486.00 Persona/Quarter/Vha Apr-23-2021 Escalition
2478 Contercaptiv Canter Engae) feamyandSpatel Modding Quarterty sever 2962.45 Pecona/Quarer/ApplatorAp1-23-2021,Ecaltion
1477 ‘ContextCaptura Canter (Master) ‘Rlealhy and Spatlal Modeling, Quarterty Server 1,063.32 Persons/Quarter/Applicatior Apt-23-2021 Escalztlon
616, Opencround Dts /awiTeetecter antes Geotechnical afovmation Macager Quarter vur 26335 Persona/QuarterVia——Ape-23-2021. Escalon
2610 OpenTowerOasignervss365 Structural Anahi Quartenty Vise 1,035.45 Persona/Quarter/Vea Apl-23-2021 Escalation
MSL ojectinneses Engineering Ceaborsvon——uartety wis 4200 PenonajQuarteyVua——-Apv23-2021.Eseattion
1016 ProjectWhel6SPro_ Engineering Callaboration ‘Quartedy Visa 175.00 Persona/QuarterVia Ape-23-2021 Escatatton
6526 ofetWietOOnagahertow3es Engineering Cotnberavon ——Quartedy Via 2000 Penons/auirieyka —Wov-202021 Productadded
2462 ‘SHTEOPSVina365 Cévil Design ‘Quarterly Visa 877.50 Perona/Quantes/Via ‘Apr-23-2021 Escatation:
1a SYNCHROAOVIS365 Construction ‘Quarterty visa 1,300.00 Persona/Quaner/Via Dec-1$-2019 ProductAdded:
6143 SYNCHROControlvina 6S Construction ‘Quarterty Vea 390.00 Persona/Quarter/Visa Dec-19-2019 ProductAdded
Gini syucHRocontaust368 Constrtion uirtedy Sueitlon Covd Service 81250 Quartet Subverition How 18-2021 Producthdded
6142 SYNCHROFIeidVisa 365 Consteuction Quarterty a 117.00 Persona/Quarte(/Via ‘Dec-19-2019 ProductAdded
6332 SYHCHROPertormVis3 365 Construction ‘Quantedty Subscription Cloud Service 650,00 Quarterly Subscription Nov-18-2021 ProductAdded
ong SYNCHROProvira36S Construction Quarterty View 1,233.27 Perona/Quarter/Visa ‘Apr-23-2021 Escalation
Eatexore ¢: Proposal or other commarcial documentation is raqulved to add coverage of thase subserptions under Enterprise 365, Please contact your Account Manager.

[eeduto | tame estas | ee ee Semieatiinsat | tatvedusa [ vetuenoe
G258 aD Analyites-Anahyis Pols Band 4 Pra-Pald Annwal ‘it Performance Manigement’ Quantedy Sabsciption Server 2075657 Guaitery HT Escalation
6238 +40 Analytics - Anabyals Points Band 2 Pre-Pald Annual Asset Performance Management Quarterty Subserfption Server ATATAAO Quarterty Subscription ‘Apr-23-2021 Escalation
6238 AO Anahes- Ansys Pont Band 3Pr-Frld Anneal AssetPerfoimance Management Quarter Subscription Server 75479004 Quartet Sutvcgtion ——Ap-23-2021.Escaltion
623840 Anahea-Anubtl Polat Bind 4 Pre-Paid Annual ‘Asset Performance Management QuartertySubsedpton Server 11320856 Quarter Subscrpton ——-Ape-23.2021_ Escalation
623840 Anabytlen-Anafyals Polat Band $ Pra-Pald Annual ‘Asset Performance Management Quacterty Subsutgtion Server 150,958.08 Quarter Subscription ——Apr-28-2021. Escalation
6235 ALM Plant Star E368 ‘Asset Performance Management Quarterly Subiaiption Server 11552100 Quarterly Sutncdption Sep 24-2021 Produdhdded
6236 ALM: Plant Band 11408 Anal AssetPerformance Management QuarterySubncigtion Server SS2SLOA Quarter Subrcftion — Ape22-021 Fecation
6236 ALUM: Plant Sand 2 Pre-Paid Annual ‘Asset Pecformance Management Quarterty Subsigtion Server 122,563.80 Quarterly Subscription ‘Apr-23-2021, Escalation
636 AIM: Plant Band 3PrePald Annual AatecFerormance Management Quartet Sutmcrgtion Server 29652480 Quarter Subwcilon —— Ape23I02Excatlon
6236 UM. Pant Band Prefab Aanutt AssetPeformance Monegement GuaretySubvcgton Server 415420800 QuartesySubnedtion —-Ape-2B2021. Eset
6236 Asset Performance Mantgement Quarter Subsulon Server 69189120 Quarter Subsedtion —Ape-23-2021. Escalon
e238 Asset Performance Management Quarter Subveipion Server 7731438 Quarterly Subsritlon ——Ape-23-2021.Eseaation
e236 ater Pedermance Management Quarter Subsiplon Server 26292:12 Quanity Sutsedion ——Ape-23-2021. Escalation
eas Aste Pertormance Management Quarter Sobciplon Servet 44070720 Quarterly Suction Age-23-2021. Excabtton
ous AstetPesformance Management. Quirery Subsciplon Server €67,18040 Quirtery Sobscgtion —_Apr-23-2021.Excatlon
one AstetPerormance Management Quarter Subuepon Server 289,574.40 Quirery Subutlon ——_Apr23-2021. Exelon
a7 Asset Performance Mangement Quire Substipon Server 3039140 Quarter Subsedption Apr23-2021. Escalon
e237 Aatet Performance Management Quartet Subvrption Sever 45287.66 Quarter Subsedtlon ——A5v-23-2021.Escaletlon
a7 Aste Performance Management. Quite Subsciption Server 6034240 Quarter Subserplon ——Apv23-2021 Escalon
«37 Asset Peformance Management Quartedy Subselptlon Server 7547906 Quarter Subncglon —Apea32O21 Escalation
6237 AsetRalutiny Fate Modes Band $Pre-PaH Aamoth Asset Perormance Manigement Quartet Subsedptlon Server 9575.28 Quarter Subscrplon ——Ape23-2021 Escalation
6237 Asset ReGabiy Inspection Felnts - Plant Bind 4 Pre-Pabi Annual Astet Performance Management Quartet Subwaigtion Server 2191.40 Quartedy Subscription ——Apr-23-2024. Escalation
6237 ——_Aset ReMabiiny Inspection Polots- Plant Band 2 Pre-Pald Anna Asset Performance Management uartery Subscription Sever 45:287.64 Quarter Subsciptlon ——_Apr-23-2021.Esealatfon
6237 Asset RaMabitny -lnspaction Points - Plant Band 3 Pre-Pald Annual Asset Performance Management Quarterty Subneription Server 638280 Quarteny Subsciption ——_Apt-23-2021. Escalation
6237 ‘Asset Reliabilty - inspection Polnts - Plant Gand 4 Pra-Pakd Annual Asset Performance Management Quarterly Subscription Server, TSA79.04 Quarterly Subscription Apr-23-2021 Escalation
6237 Asset Rallablity « Inspection Points - Plant Band 5 Pra-t Astet Performance Management Quarterty Subscription — Server 90,575.28 Quarterly Subscription Apr-23-2021 Escalation
6086 Astetwdse Enterprise Interoperabiltty + Infor Asset Performance Management Quarterty Subscription Connexter 10,782.72 Quarterly Sudseription Apt-23-2021 Escalation
6087 Assets Entrpte lateropere by - nbn [Astet Performance Management Guarterty Subscription Connector 458560 Quartet Subncrition —Ape-22.2021.Exalaton
otk Asst EntarpeeInteropecebey- Manin ‘ivetPerformance Manstement Quarter Subseiton Connector 1437698 Quarteny Subsciption ——A5-25-2024 Escalon

Page dof S

jentley Systems
Enterpulve 365 Price Ust Global USD - CONFIDENTIAL
Updated 13062021
tteratian 3 2021 Pitceboot)

6038 Astetwhte Enterprise [ntaroperabity - OC Asset Performance Management Quarterly Subscription Connector S,797.12 Quarterly Subscription —ADI-23-2021 Escalation
6035 Asset Performance Management Quarterly Sutsciiption Connector 10,782.72 Quarterly Subscription ApL-23-202L_ Escalation

6093 ——_Asnitwise Enterprles fateroperabitty «OS! Asset Performance Management Quarterty Subscription Connector 2,695.68 Quarter Subscription ——Apt-23-2021, Escalation,

6082 Assetwise Enterpelte lnteroparaWtty - SAP ‘Asset Performance Management Quarterty Subscription Connector 17,971.20 Quarterly Subscription Ape-23-2024. Escalation

6302 AnsetWte Inspections Band 1 £365 mobiny Quarter Subscitption Server 8,425.00 Quarterly Subscription —_Apy-25-2021. ProductAdded
6302 AstetWise Intpectlons Gund 2 £365 Mobiny Quarterly Subscription Server 26,000.00 Cuuarterh Subscription ApY-25-2021 ProductAdded
6302 AstetWise Inspections Band 3 £565 Mobary Quartedy Subsertgtion Server 152,000.00 Quartesty Subscription -Apr-25-2021 ProdutAdded
6302 AssetWire Inspections Band 4 E365 Mabany Quartery Subsestption Sever 14,750.00 Quirterly Subscriptlon ——ApI-2S-20724 ProductAdded
6302 —_AssetWise Inspectlons Band 5 £368 Mobiity ‘Quarterly Subscription Server 91,000.00 Quarterty Subscription Apr-25-2021 ProducAdded
624 AvtoP{PE Nuclear Pipe Stress andVesselAnahsis arte Subscription Oes¥top 4,016.76 Quarterly Subscription Apr-23-2021. Escalation

6243 AutoPIPE Huclaar QA and Reporting Pipe Steess andVesselAnahsls— Guarterty Subscription Content 11,831.40 Quarter Subscription Apt-23-2021. Escalation

6269 BEDE Portfolio Band 1265 Engineering Collaboration Quinerty Subsedptlon Goud Service 11,250.00 Cuuarterly Subscription Dee-06-2021 ProductAdded
6369 BEDE Portfolla Band 2 6365 Engineering Collaboration Quarterly Subscription Cloud Service 28,125.00 Quarterly Subscription ee-06-2021 Producthdded
6369 —_-BCDE Porttollo Bend 3365 Engineering Collaboration ‘Quarterly Subscription Cloud Service 5625000 Quirterly Subscription __—Dee-06-2021 Productadded
6369 CDE Portfolio Band 4 £263 Engineering Collaboratten Quartery Subscription Cloud Service 112,500.00 Quarter Sudseriptlon ——_—Dee-06-2021 Producthdded
6369 BCDE Portfolia Enpineesiag Collaboratton Quarterly Subsertption Cloud Service 562,500.00 Quarterly Subscription Dec-05-2021 Productadded
6369 BEDE Portfello Engineertog Collaboration Quarterly Subterigtlon Cloud Service 1,125,00000 Quarterly Subscription ——_—Dex-06-2021 Preductadded
6168 BEDE Program Band LER6S Engineering Collaboration Quarterly Subsctptlon Cloud Service 9,375.00 Quarter Subscription ——Dee-05-2021 ProduaAdded
6168 —_-BEDE Program Band 26345 Engineering Collaboration Quarter SubseaiAion Cloud Service 23,437.50 Quirterly Subscription ——Dec-06-7023.ProductAdded
6168 —-BCDE Program Band 3ESS Engineering Collaboration Quaneity Subseifption Cloud Service 4617500 Quirtesty Subscription Dec-06-2071 ProdurtAdded
6368 BCDE Program Band 4365, Enginessing Collaboration Quaresty Subsatption Cloud Service 93,7500 Quartedy Subseiiption —-Dec-06-7071 ProductAdded
6368 REDE Program Band SE36S Engineesing Collzboratlon uartedy Subscription Cloud Service 468,750.00 Quarterly Subscription —_Dee-06-2021 ProduetAdded
6368 BEDE Program 81nd 6ES6S Engineeiing Collaboration Quarter Subscription Cloud Service 937,500.00 Quarterly Subscription Oee-06-2021 ProductAdded
6367 BEDE Project Band 1365, Engreertag Collaboration Quirterty Subscription Cod Service 6,405.00 Quarterly Subscription —_—Dee-06-2021 Productadded
6367 CDE Project Band 2 £565 Engineering Collaboratton uarterty Subsetption Cloud Service 16,012.50 Quarterly Subscription Dee-05-2021 Productadded
6367 BCDE Project Band 3 E365 Engineering Collaboration Quartet Subscription Cloud Secvice 32,025.00 Quarterhy Subteripion Dee D5-2021_ProductAdded
6367 BEDE Projact Band 4 E365 Engineering Collaboration Quarterty Subscription Cloud Service 54,050.00 Quarterly Subscription D&e-06-2021 ProductAdded
6367 BCDE Project Band SER6S Engineering Collaboration Quarterly Subscription Goud Secvice 320.2500 Quarterly Subscription —_Dee-06-2021 FroductAdded
6167 BEDE Project Band GEI6S Engneeiing Collaboration Quarter Subscristion Cloud Service {640,500.00 Quarterly Subscrtption _—Dec-06-2021. ProductAdded
6233 ComphyPro* Engneesing Collaboration Quarter Subsatption Cloud Service ‘S748 Quarterly Subscription APY-23-7021. Excation

6160 CUBE - E365 Indbiduat Mobany imutation Quinterty subscription Coud Service 2,500.00 Quarterly Subscription ul16-2021 Productadded
6260 CUBE- E365 Starter -Mabuny Siewutztion Quarterly Subvatption Desktop 6,250.00 Quarterly Subscription Ott-07-2020 ProductAdded
6260 CUBE E365 Bale ‘Mobiiny Simutztion Quarter Subsaition Desktop 12,50000 Quarterly Subscription 0«t-07-2020 Produaadded
6260 CUBE+ E365 Standard Mobtky Strultion Quarterty Subscription Desktop 25,0000 Quarteity Subsaiiption _O«1-07-2020ProductAdded
6260 CUBE E65 Advanced Moby Simutition Quarterly Subsesiption —Des#top '50,00000 Quarterly Subseription Oct-07-2020 ProductAdded
6260 CUBE E465 URimate Mobitcy Simulation, Quarterly Subsatption Desktop. 75,000.00 Quarterly Subscription Oct-07-7020 ProductAdded
6313 Equipment as a Service E865 twin Pattonen Quarteity Subscetption Hardware Custom Quarterly Subscription —ec-07-2021. Productadded
6313, Infrastructure loT E365 {in Platform ‘Quarterly Subscription Cloud Service Custom Quarterty Subscription Oct-27-2021 Productadded
6239 near Analyties - Survey Miles Band 1 Pre-Paid Annual Mobiny Quarterty Subsertgtion Server ATA92.68 Quarterly Subscription ——_Apr-23-2021. Escalation

6239 Linear Anatyties-Survay Mit Mobiity Quarterty Subscgxion Server 81,049.68 Quarterly Subscription ——ApE-ZS-2021_ Escalation

6239 naar Anabyties-Survay Mi Mobiiky Quarterly Subscription Seever 207,625.28 Quarterty Subscription Ape-23-2021 Escalation

6239 Unear Anatytice-Survay Mil ‘Mobility quarterty Subscrition Server 379,462.32 Quartery Subcitption ——Apr-23-2021, Escalation

6239 Unear Analytica - Survay Miles Band 5 Pre-Pabd Anaval Mobany uarterty Subscription Server 615,242.60 Quarterly Subsertption —Apr-23-2021, Escalation

GUUS Openctes Planner €265~ Starter Realky snd Spathl Modeling Quarterty Subscription Cloud Service 25,650.00 Quarterly Subseription ——Apr-23-2021. Escalation

GUS Openchies Planner £365- Advanced Reaiky andSpathl Modeling Quarterly Subscription Cloud Service {67,500.00 Quarterly Subserition —Apt-23-2021. Escalation

6245 OpenChies Planner £365 Ubimate Reniky andSpattal Meddling ——_Quarterfy Subscription Cloud Service 135,000.00 Quarterty Subscription ——Aps-23-2071. Escalation

6246 OpenGround iS E365 Geotechnical information Manager Quarterly Subsection Cloud Service Custom Quarterly Subseritton —-Mav-18-2010 ProductAdded
3194 OpenTower IQGIM E365. Structural Anabyste Quarterly SubteripAlon Cloud Service 162.50 Quarterly Subscription —_—_—Sep-17-2021 ProdutAdded
3192 OpanTower iQ Exsential E365 Stroctueal Anais Quarterly Subsciigtlon  CoudService 6250 Quarterly Subscription ——_Sep-17-2021 ProductAdéed
3193 OpenTower KQlanlghty E365 Structural Anatals Cuamesty Subscripllon Goud Service 12500 Quarterly Subvatption ——_Sep-17-2021. Productadéed
3195 OpanTowar IQ Mapping E365 Stroctural Anais Quarterly Subscription Cloud Service 250.00 Quarterly Subsailption —_Sepri7-2021 ProductAdded
3191 OpenTower IQ Viewer E365 Suroduna Anatsts ‘Quanerty Subscription Goud Service 25.00 Quarterly Subserption —_Sep-47-2021 ProductAdded
6243 OpanUden Olghal Twin Sarvices E365 Enenry Quarterty Sutscription  CoudService Custom Quarterly Subscription Mar-12-2022, ProdurtAdded
6198 Orbit 30M Clowd £265 anda Restky andSpitl Modeling §—-Quarterty Sutsuiiption Goud Service 12,500.00 Quartesly Subscription Oct O4-2021 ProductAdded
6198 Opt DM Cloud E365 Bendz ealky andSpatlal Modeling Quarterty Sutscriptlon CoudService 25,000.00 Quarterly Subscription Oct-04-2021 ProductAdded
6198 OFM SOM Cloud E365 Band 3 Realny andSpatlal Modeling ——Cuarterty Subscription CloudService $30,000.00 Quarterly Subscription Oct. 04-2071 Produetadded
6198 QIBIL SDM Cloud £385 Band ¢ Realhy andSpatial Modeling Quarterly Subscriptlan Cloud Sewvice $00,200.00 Quarterly Subscription Oct-04-2021. Productadded
3117 OrbHL SDM Publier Start Realky andSpatlal Modeling Quarterly Subscrfption Server 32,500.00 Quarterly Subscription lan-13-2021 Productadded
SHUR Qrblt 30M Pubtiuher Advancs Realky andSpatlal Modeling Quarterty Subscription Server 25,000.00 Quarterly Subscription Jan-13-2021 Productadded
3119 Q¢blt 30M Pubusher URimate Reainy andSpatlal Modeling Guarterty Subscription Server 50,000.00 Quarterly Subscription Jan-13-2021 Productadéed
2958 PlantGght - PSB Small Eneay ‘Quarterty Subscription GoudService 7,500.00 Project fan-13-2021 ProductAdded
2958 PhantSight -PS3 Mi Eneary ‘Quarterly Subscription Cloud Service 22,500.00 Project. Ian-13-2025 ProdutAdded
295k lantSght -PS3 Large Enery Quirterty Subscription Cloud Service 37,500.00 Project Janv3-2021 ProductAdded
2712 lantight- PSS Small Enesey Quartery Subscrigaion Cloud Service 11,250.00 Guarterly Subseripton ‘140-313-2021 ProductAdded
2712 Plantsight- P55 Medium Eneery urmterty Subscrigtion Cloud Service 48/000.00 Quartesty Subscription _Ja-13-2021 Productadded
2712 Plantsight- PSS targa Enenty Quarter Subsciition Cloud Service 90,000.00 Quarterly Subseription _Jan-13-2021 Productadded
A745 STAD Huclear Design Codes Structural Analysis Quarter Subscription Desttep 1,022.90 Quarterly Subscription ——-Ape-23-2021. Escalation

6242 STAAD Huclear QA and Reporting Structural Anais Quarterty Subscription Content 11,612.30 Quarterly Subscription Ape-23-2021. Escalation

6268 SUPERLOAD E365 Mobily Quirterty Subscription Server Custom QuarterlySubtcription ——-Mat-12-2021 ProductAdded
2810 SYNCHRO Workgroup Profect Constevction Quirterty Subscription Server 2434.90 Quarterly Subscription ——_-AU4-27-2020 ProductAdded
6366 Water25 Sena 265 Hydrau¥es and Hydrology Quintety Subscription CoudSenvice 19,540.00 Quarter Subscription Nov. 24-2021. ProductAdéed
6364 Water365 Medlum E365 aullcs and Hydrology Quarterly Sub«crtption Cloud Service 12,720.00 Quarterty Subsecptlon Productadded
6364 Watera6S tage E365 Hydrauties and Hydrology Quarterly Subscription Cloud Serie 16960.00 Quarterly Subscription Productadded

GatecocrD; Naaltty Modeling Cloud Service Procasting Unit. Faus are bused on the total numbee of procasalog units consumed quarter.

Tinned
[5a4  Cantericaptura Goud roctiag Serves = Proce Unit Really Modeling Proceutoqvate Gavdsence 756 FemonePbuifkecontans — hpc32011 Escalon
GatesocvE: neatny Modetieg Cloud Secs Storage, Fees are bated on th staraze mead of Une Nahant penkday quartet.
7 Tibrceniaadee,
581 Prolecivive Contexthare Geate= Management UAlt Teany Modag Saget Geudsewice OHi GigibpelPekony — ApeSTON Eseahion

Pages ol

Attachment 1

Exhibit EPS

Enterprise 365
Public Sector

BENTLEY SELECT PROGRAM AGREEMENT

EXHIBIT EPS
ENTERPRISE 365 — PUBLIC SECTOR SUBSCRIPTION

1, Applicability.

At Subscriber’s request and upon Bentley’s approval, Subscriber
may participate in the Enterprise 365 — Public Sector Program
(“EPS-365”), subject to the terms and conditions of the SELECT
Program Agreement (“Agreement”) and those stated herein, which
is an Exhibit to the Agreement. To be eligible to participate,
Subscriber must (i) be current on all outstanding invoices for
amounts owed to Bentley; (ji) have a current SELECT Program
Agreement; and (iii) utilize CONNECT Licensing or any successor
Bentley tool for license administration.

2. Overview.

Upon Bentley’s acceptance of Subscriber into the EPS-365
Program, Subscriber shall be granted rights to Use certain EPS-365
Products (as defined below) without limitation as to the number of
Employees who may Use such EPS-365 Products. Subscriber shall
execute an EPS-365 Order Form, which shall designate the Annual
EPS-365 Fees, the subscription start date (‘Start Date”) and the
length of the subscription (“Term”), If Subscriber executes multiple
EPS-365 Order Forms over time, the EPS-365 Order Form with the
most recent execution date shall supersede all previous EPS-365
Order Forms.

3, EPS-365 Products.

Bentley Products eligible under the EPS-365 Program (“EPS-365
Products”) are licensed on the following bases: i) named user or
unique machine per day (“Category A Products”); ii) named user or
unique machine per quarter (“Category B Products”); or iii) fixed
fee (“Category C Products”), License model and pricing
information for EPS-365 Category A and B Products are included
in the Enterprise 365 Price List, such prices shall be fixed for the
Term. Category C Products will be quoted separately, and the list
price in effect when Subscriber begins using the Category C
Product shall be fixed for the remainder of the Term. Bentley may
amend the list of EPS-365 Products from time to time in Bentley’s
sole discretion,

4,  EPS-365 Products License Grant,

4,1 Production Use. In consideration for full payment of the
Annual EPS-365 Fees and, provided that Subscriber is not
otherwise in breach of the Agreement, Bentley hereby grants
to Subscriber a non-exclusive, limited, revocable, non-
transferable, non-assignable license to Use the EPS-365
Products in Production Use during the EPS-365 subscription,
without limitation as to the number of Employees who may
Use the EPS-365 Products.

4.2 Evaluation Use. Subscriber may request, and Bentley may
at its sole discretion grant to Subscriber a limited, non-
transferable, revocable, non-exclusive right to use Eligible
Products for internal evaluation or testing use only (an
“Evaluation License”), provided that such Evaluation
Licenses are not used for Production Use. To the extent that
an Evaluation License is used in breach of the restrictions set
forth herein (an “Unauthorized Use”), then each such instance
of Unauthorized Use shall count as an instance of Use of EPS-
365 Products.

5, Annual EPS-365 Fees.

The EPS-365 Order Form will designate one or more Annual EPS-
365 Fees, depending on the length of the subscription (i.e., the

number of years, each defined as a “Contract Year”). Each Contract
Year shall be a twelve-month period, with the first period (“Year
One”) covering the first twelve months from the Start Date, and
subsequent periods covering twelve-month terms from the
anniversary of the Start Date. Annual EPS-365 Fees after Year One
will incorporate a fee increase as stated on the EPS-365 Order Form
to accommodate for anticipated increase in usage of EPS-365
Products. Each BPS-365 Annual Fee is based on the preceding
twelve months’ usage of Bentley Products, specifically Category A
Products, Category B Products, and Category C Products,
applicable to Subscriber's Ecosystem (as defined
below), Subscriber shall pay in advance the total of the Annual
EPS-365 Fees for each Contract Year, from which Bentley, on a
quarterly basis, shall draw down one quarter (4) the value of that
Contract Year's Annual EPS-365 Fees. In the event of early
termination pursuant to clauses 6, 7 or 10 herein, any remaining
portion of the Annual EPS-365 Fees shall be used to fund
Subscriber’s continued access to Bentley Products under the
SELECT Program.

6. Fee Adjustments,

6.1 Fee Adjustment Process. The parties acknowledge that the
Annual EPS-365 Fees are based on actual or projected usage
of certain Bentley Products by Subscriber, including any
third-party organizations accepted and authorized by Bentley
(as of the Start Date as indicated on the EPS-365 Order Form)
to use Bentley Products under Subscriber’s EPS-365
Subscription (collectively, “Subscriber Ecosystem”), The
parties further acknowledge that significant, unanticipated
changes to Usage or to Subscriber Ecosystem (as detailed in
this clause 6 below) may require an increase or decrease to
the Annual EPS-365 Fees (“Fee Adjustment”). For the sake
of clarity, the Fee Adjustment process detailed in this clause
6.1 shall govem Fee Adjustments made pursuant to clauses
6.4, 6.5 and 6.6 and shall not be applicable to Fee Adjustments
made pursuant to clause 6.3, For Fee Adjustments made
pursuant to clause 6.2, and with respect to applicable
invoicing, clause 6.1(a)(1) below shall apply and not that of
clause 6.1(a)(2).

Subject to the threshold limits for any such increase or
decrease in Usage of Category A and B Products as described
in Section 6.2 herein, Fee Adjustments may be proposed in
writing by either party at any time during a then current
Contract Year (“Fee Adjustment Notice”). Within ninety (90)
days after a receiving party’s receipt of a Fee Adjustment
Notice, and upon concurrence of the parties, a Fee Adjustment
shall be made part of the Agreement in the manner set forth
below for any such increase or decrease, respectively, as
follows:

(a) For a Fee Adjustment for an agreed upon increase,
Subscriber shall pay the annualized pro-rata amount of
such increase: (1) in the then current Contract Year for
which such increase first applies and within ninety (90)
days of Subscriber’s receipt of an applicable invoice; or
(2) at the time when payment is due for the immediately
following Contract Year's Annual EPS-365 Fees, with
such annualized pro-rata amount of such increase to be
paid in addition to said following Contract Year’s
Annual EPS-365 Fees, which shall have been revised to
include the agreed upon Fee Adjustment.

The information contained In this document Is proprietary to Bentley and is not to be disclosed to any
third party without Bentley's express prior written consent.

Bentley

www.bentley.com

Enterprise 365
Public Sector

6.2

63

64

65

6.6

(b) A Fee Adjustment for an agreed upon decrease shall be
made part of the Agreement with the annualized pro-rata
amount of such decrease for the then current Contract
Year deducted from the immediately following Contract
Year’s Annual EPS-365 Fees, which shall have been
revised to reflect the agreed upon Fee Adjustment. If
the parties are unable to agree to a Fee Adjustment
within ninety (90) days after a receiving party’s receipt
of a Fee Adjustment Notice, the EPS-365 Subscription
may be terminated by either party, to be effective at the
end of the then current Contract Year, with not less than
thirty (30) days written notice (notwithstanding the
termination notice provisions in clause 9 below) to the
other party.

Category A and B Products. Bentley will review EPS-365
Usage during each Contract Year. Should the usage value of
Category A and B Products, based on the EPS-365 Price List,
exceed or drop below 10% of the then current Contract Year’s
Annual EPS-365 Fees (as revised by any Fee Adjustment
made during that Contract Year), the Annual EPS-365 Fees
may be adjusted, subject to the process set forth in clause 6.1
herein. Fee Adjustments, positive or negative, shall be limited
to 20% of the then current Contract Year’s Annual EPS-365
Fees (as revised by any Fee Adjustment made during that
Contract Year), subject to any Cloud Offering minimum fee
requirements.

Category C Products, Annual EPS-365 Fees assume usage
of only Category A and B Products listed in the EPS-365 Price
List plus any Category C Products subscribed to as of the Start
Date. Should Subscriber add or modify a Category C Product
subscription during a given Contract Year, the value of the
added subscription will be prorated to the end of the Contract
Year and billed based on then-current pricing. Annual EPS-
365 Fees for subsequent Contract Years will be adjusted to
include the added subscription. ‘Category C Product additions
and fee adjustments will not be subject to the process set out
in clause 6.1 above.

Bentley Acquisitions. Should Bentley make available to
Subscriber new software via acquisition, the Fee Adjustment
Process described in clause 6.1 herein shall apply. This
potentially includes technology currently in use by Subscriber
that Bentley acquires,

Subscriber Reorganization, M&A and Divestiture. If
Subscriber is part of a reorganization, merger or acquisition,
or divestiture that involves Bentley software (including but
not limited to perpetual licenses or subscription rights to
Bentley Products), Subscriber shall notify Bentley within 30
days following the event or transaction. Related Fee
Adjustments, if any, shall be subject to the Fee Adjustment
Process set out in clause 6.1 herein.

Third-Party Access, Subscriber, at any time during a
Contract Year, may request to include an additional third
party organization (including, but not limited to an affiliate,
consultant, contractor or other organization outside of
Subscriber Ecosystem) under its EPS-365 entitlement, subject
to Bentley's consent, which shall not be unreasonably
withheld. Related Fee Adjustments, if any, shall be subject to
the Fee Adjustment Process set out in clause 6.1 herein.
Subscriber shall be responsible for all Users, including those
of third-party organizations, within Subscriber Ecosystem,
including compliance with the terms and conditions of the
Agreement.

The Information contained in this document Is proprietary to Bentley and is not to be disclosed to any
third party without Bentley’s express prior written consent.

7. Versions of EPS-365 Products.

Subscriber's participation in the EPS-365 Program is conditioned
on Subscriber’s use of the latest versions of the EPS-365 Products.
If Subscriber has not fully adopted the latest versions by the Start
Date, Subscriber agrees to do so within eighteen months from the
Start Date. Bentley will monitor version usage and may elect to
terminate Subscriber's EPS-365 subscription pursuant to clauses
10.1 and 10.3 below,

8. EPS-365 Success Services,

8.1 Subscriber Access. Participation in the E365 Program
affords Subscriber access to E365 Success Services, including
discrete services projects (each a “Enterprise Blueprint”),
success advisors, industry evangelists, support account
manager, leaming paths, user insights and industry
newsletters.

8.2 Credits, Each Enterprise Blueprint will have a fixed cost
expressed as a given number of Credits, Each Credit is valid
for twelve months from either the Subscription Start Date, as
set forth on the E365 Order Form, or a given anniversary of
the Subscription Start Date (each an “Anniversary Date”), as
applicable, For the sake of clarity, if one or more relevant
Credits expire after delivery of an Enterprise Blueprint has
commenced but before it is completed, delivery shall continue
to completion on the basis of the expired Credits, and
Subscriber will not be asked to expend any additional Credits
for that Enterprise Blueprint,

(a) Subscriber will be allocated a number of Credits, based
initially on Subscriber's Initial Estimated Fees as set
forth on the £365 Order Form, and in subsequent years
on the Requested Funding Amount listed on a given
Enterprise 365 Request for Funding document
(‘Allocated Credits”). For the sake of clarity, the
number of Allocated Credits may be zero.

(b) Additional Credits may be purchased by Subscriber and
will expire on the next Anniversary Date in time
regardless of the date of purchase (‘Purchased Credits”).

8.3 Delivery Timelines. Enterprise Blueprint delivery timelines
are estimates only and should not be construed as deadlines.
Actual delivery schedules for given Enterprise Blueprints
may vary according to various dependencies, including
timeliness of needed cooperation from Subscriber.

8.4 Territory. Enterprise Blueprints are subject to geographic
availability, and Bentley reserves the right to modify the list
of Enterprise Blueprints from time to time in its sole
discretion, For the sake of clarity, such modification shall not
apply to any Enterprise Blueprint ongoing at the time of the
modification.

8.5 Scope. Services not covered by Enterprise 365:

¢ Assistance with non-Bentley products, services or
technologies, including implementation, administration
or use of third-party enabling technologies such as
databases, computer networks or communications
systems;

« Assistance with installation or configuration of
hardware, including computers, hard drives, networks or
printers; and

* Creation of custom code development, data
manipulation (de-duping, merging, cleansing) or
creating deliverables using Bentley software, except
when a specific Enterprise Blueprint includes such
activities,

Bentley’

www.bentley.com

Enterprise 365
Public Sector

8.6

%
91

9.2

10.
10.1

Travel. Bentley will separately invoice for travel and
accommodation expenses incurred in the performance of
Enterprise Blueprints based on actual expenses incurred. The
following travel costs will not be charged:

e Travel costs directly related to quarterly alignment
meetings;

e Travel costs for the Success Manager, dependent on
location, for up to one (1) time per month;

© Travel costs directly related to development of the
Digital Advancement Plan; and

e Local (within city) travel.
Governance.

Quarterly Business Review Meetings. Notwithstanding and
in addition to the Success Services governance processes,
Bentley and Subscriber shall make best efforts to meet at least
once every 90 days during the term of the EPS-365
subscription to review program success and areas for
improvement. Meeting topics include but are not limited to:
a) ongoing success stream work and new areas for
engagement per Subscriber's and Bentley’s mutual goals: b)
application version use, and pricing transparency and
foreseeability; c) potential efficiency and cost saving
improvements through use of Bentley Products; and d)
organizational engagement plan.

Escalation. Either party may, by written notice to the other
party, request the escalation of any issue arising: a) at a
Success Manager progress meeting; b) at any Quarterly
Business Review or other meeting described in clause 9.1
above; orc) according to the Fee Adjustment Process set forth
in clause 6,1 above, Any such escalation shall be conducted
in the following manner. Subscriber's EPS-365 Order Form
shall list, in ascending order of seniority level (each an
“Escalation Level”), the names and titles of authorized
individuals from each party. Both parties acknowledge that
substitutions of specific individuals may occur as required;
provided that such substitutions are of the same level of
seniority, Each party agrees to use best efforts to resolve such
escalated issues at the lowest applicable Escalation Level and
shall only call for further escalation: 1) upon making a
determination that resolution of the issue requires the next
higher Escalation Level, and 2) by written notice to the other
party. For clarity, the parties agree that, notwithstanding the
escalation process as described herein, the time frames as
required by Section 6.1 Fee Adjustment Process shall remain
in effect at all times.

Term and Termination.

Term, Subscriber's BPS-365 subscription shall begin on the
Start Date, may prorate to the nearest first day of a calendar
quarter, and shall continue until the end of the Term, unless
either Bentley or Subscriber terminates the subscription for
convenience at any time with ninety (90) days prior written
notice (the “Termination Notice”) to the other party. Prior to
the start of the EPS-365 subscription, Bentley may extend
Subscriber’s then-current Bentley subscriptions on a pro-
rated basis to the end of the then-current calendar quarter.

10,2 Termination. Notwithstanding anything to the contrary

contained herein, Bentley reserves the right to terminate
Subscriber’s participation in the EPS-365 Program upon

The information contained In this document Is proprietary to Bentley and Is not to be disclosed to any
third party without Bentley's express prior written consent.

10.3

I
ML

thirty (30) days prior written notice in the event Subscriber is
in breach of the terms and conditions of the SELECT Program
Agreement unless Subscriber cures such breach within such
thirty (30) day period, Subscriber hereby acknowledges that
this right to cure shall not be extended to any breach by
Subscriber which by its nature cannot be cured within the
thirty (30) day cure period.

Event of Termination. In the event of any termination of
Subscriber’s EPS-365 subscription according to this Section
10, Subscriber’s continued access to and use of Bentley
Products shall be governed by the terms and conditions of the
SELECT Program Agreement. In the event of a termination
for convenience of Subscriber's EPS-365 subscription
according to Section 10.1 herein, all delivery of services
towards any Enterprise Blueprint shall cease immediately
following the receipt by Bentley or Subscriber of a
Termination Notice, and the amount paid for all Purchased
Credits that remain unused shall be refunded to Subscriber.

Miscellaneous.
Terms are Confidential,

(a) Subject to 11.1 (b), Subscriber hereby acknowledges
that the terms and conditions of the EPS-365 Order
Form and any EPS-365 Success Services materials are
confidential in nature, and Subscriber hereby agrees that
neither it nor any third party organization using EPS-
365 Products in Subscriber Ecosystem shall disclose the
contents of the EPS-365 Order Form or any EPS-365
Success Services materials to any other third party.

(b) Bentley hereby acknowledges that disclosure by
Subscriber of this Exhibit and the Agreement, or
portions thereof, may be subject to Subscriber’s state
statutes, such as open public records or freedom of
information acts, The nondisclosure of this Exhibit and
the Agreement, or portions thereof, may depend upon
official or judicial determinations made pursuant to such
statutes when Subscriber receives a request from a third
party for the disclosure of information designated by
Bentley as “confidential information.” In such cases,
Subscriber shall notify Bentley within a reasonable
period of the request, and Bentley shall be exclusively
responsible for defending Bentley’s position conceming
the confidentiality of the requested information. Neither
the Subscriber nor any of its agencies is or shall be
obligated to assist in Bentley’s defense. If any
disclosure is subsequently made of such information by
Subscriber, disclosure shall be made consistent with
such official or judicial final determination and only to
the extent required under applicable law,

11,2 Conflicts. he terms herein must be read in conjunction with

the Exhibits to the SELECT Program Agreement, except that
in the event of any inconsistency between the terms herein
and any other Exhibit, the terms herein shall control with
respect to Subscriber's participation in the EPS-365 Program.

11.3 Definitions. Capitalized terms used herein and in the EPS-

365 Order Form shall have the meanings set forth herein or,
if not otherwise defined herein, shall have the definitions set
forth in the Agreement.

Bentley’

www.bentley.com

Maricopa County - Bentley Amendment No. 4
(COMBINED) v2 050922

Final Audit Report 2022-05-16
Created: 2022-05-10
By: Mary Kate Bonner (MaryKate.Bonner@bentley.com)
Status: Signed
Transaction ID: CBJCHBCAABAAXGLzYA1H50020CwC91IZYt_m7rYLGll_.

"Maricopa County - Bentley Amendment No. 4 (COMBINED) v2
050922" History

©) Document created by Mary Kate Bonner (MaryKate.Bonner@bentley.com)
2022-05-10 - 6:36:31 PM GMT- IP address: 100.14.7.157

& Document emailed to James Kaiser (james.kaiser@bentley.com) for signature
2022-05-10 - 6:37:19 PM GMT

@& Document e-signed by James Kaiser (james.kaiser@bentley.com)
Signature Date: 2022-05-16 - 12:51:29 PM GMT - Time Source: server- IP address: 68.80.235.240

@ Agreement completed.
2022-05-16 - 12:51:29 PM GMT

Bentley | xc”

Advancing infrastreetbre Acrobat Sign