AMENDMENT NO. ONE 
CHOLLA WATER TREATMENT PLANT 
PROCESS AND BOOSTER PUMP STATION IMPROVEMENTS - GMP3  
(Construction Manager at Risk Agreement, Contract No. C20-0896) 
 
This Amendment No. One (“Amendment”) to the Construction Manager at Risk 
Agreement (“Agreement”) is made this ______ day of ________, 2023, (“Effective Date”), 
by and between the City of Glendale, an Arizona municipal corporation (“City”) and PCL 
Construction, Inc.,, a Colorado corporation authorized to do business in Arizona 
(“Contractor”). 
 
RECITALS 
 
A. 
City and PCL Construction, Inc. (“Contractor”) previously entered into 
Construction Manager at Risk Agreement GMP3, Contract No. C20-0896, dated 
October 13, 2020 (“Agreement”); and 
 
B. 
City and PCL Construction, Inc. (“Contractor”) entered into a contract extension, 
Contract No. C20-0896-1, dated March 3, 2022, increasing the length of term of 
contract; and 
 
C. 
City is seeking to increase the Guaranteed Maximum Price for Construction Manager 
at Risk GMP3 due to contractor assistance and unforeseen conditions and increase 
the compensation to be paid under this agreement by an additional $219,752.99 and 
extend the term thru August 15, 2023; 
 
D. 
City and Contractor wish to modify and amend the Agreement subject to and strictly 
in accordance with the terms of this Amendment. 
 
AGREEMENT 
 
In consideration of the mutual promises set forth herein and other good and valuable 
consideration, the receipt and sufficiency of which are hereby acknowledged, the City and 
Contractor hereby agree as follows: 
 
1. 
Recitals.  The recitals set forth above are not merely recitals but form an integral 
part of this Amendment. 
 
2. 
Term.  The term of the Agreement is extended for a ten (10) month period from 
October 22, 2022 through August 15, 2023, unless otherwise terminated or canceled 
as provided by the Agreement.  All other provisions of the Agreement except as set 
forth in this Amendment shall remain in their entirety. 
 
3. 
Scope of Work. The scope of work is expanded to include PCL assist with 
unrelated underground feeder wire repair and west wing underground plumbing 
replacement at the administration building.

4/29/2021 
4.  
Compensation. The compensation shall be increased by an additional $219,752.99 
 
5. 
Insurance Certificate.  Current certificate will expire on May 1, 2023 and a new 
certificate applying to the extended term must be provided prior to this date to 
Materials Management and the Contract Administrator. 
 
6. 
Non-discrimination.   Contractor must not discriminate against any employee or 
applicant for employment on the basis of race, color, religion, sex, national origin, 
age, marital status, sexual orientation, gender identity or expression, genetic 
characteristics, familial status, U.S. military veteran status or any disability. 
Contractor will require any Sub-contractor to be bound to the same requirements as 
stated within this section. Contractor, and on behalf of any subcontractors, warrants 
compliance with this section.  
 
7.  
No Boycott of Israel.  To the extent A.R.S § 35-393 through § 35-393.03 are 
applicable, the parties hereby certify that they are not currently engaged in, and agree 
for the duration of the Agreement to not engage in, a boycott of goods or services 
from Israel, as that term is defined in A.R.S § 35-393. 
 
8. 
Attestation of PCI Compliance.  When applicable, the Contractor will provide the 
City annually with a Payment Card Industry Data Security Standard (PCI DSS) 
attestation of compliance certificate signed by an officer of Contractor with oversight 
responsibility. 
 
9. 
Ratification of Agreement.  City and Contractor hereby agree that except as 
expressly provided herein, the provisions of the Agreement shall be, and remain in 
full force and effect and that if any provision of this Amendment conflicts with the 
Agreement, then the provisions of this Amendment shall prevail. 
 
[Signatures on the following page.]

4/29/2021 
CITY OF GLENDALE, an Arizona 
municipal corporation 
___________________________________ 
Kevin R. Phelps, City Manager 
ATTEST: 
____________________________________ 
Julie K. Bower, City Clerk                 (SEAL) 
APPROVED AS TO FORM: 
____________________________________ 
Michael D. Bailey, City Attorney
PCL Construction, Inc. 
a Colorado corporation 
By: 
Mike McKinney 
Its: 
District Manager

4/29/2021 
 
CHOLLA WATER TREATMENT PLANT 
ADMINISTRATION BUILDING 
IMPROVEMENTS 
April 17, 2023 
Description 
Authorized 
Expenditure 
Construction – Cholla WTP Improvements 
GMP#3 
PCL Construction - GMP #3 
$4,046,768.00 
Project Allowance 
$1,462.000.00 
Owners Contingency 
$550,877.00 
(GMP3 Total = $6,059,645.00) 
Amendment #1 – Time Extension ONLY 
$0.00 
Amendment #2 - Final Compensation Adjustment 
PCL assist with unrelated underground feeder wire
repair -   $126,101.59
 
 
$219,752.99 
West Wing Underground Plumbing replacement at
administration building – $93,651.40
Construction Sub-Total
$6,279,397.99

November 22, 2021 
Tom K.aczmarowski 
City of Glendale 
Engineering Department 
5850 West Glendale Avenue 
Glendale A Z 85301 
TK.aczmarowski@glendaleaz.com 
Subject: Cholla WTPimprovements Project#l61751 & 161752-GMP 3 
Re: RFP # P-060 - Repulling Feeders 
Mr. K.aczmarowski, 
CONSTRUCTION LEADERS 
PCL Construction, Inc. hereby submits Request for GMP 3 Allowance release in the amount of 
$126,101.59 for the above referenced project. 
This proposal includes the labor and materials to: 
•
Removal of damaged feeder cables 
•
Loading out of scrap recycling for COG. 
•
Reinstallation of new feeders. 
This proposal does not include: 
•
Anything not listed above. 
•
Caustic removal or remediation 
•
Generator rentals 
This proposal includes normal markups per the contract documents. 
Pricing for this proposal is based upon labor, material and normal markup cost elements. This 
proposal does not include costs associated with sequence changes, disruptions or delays, extended 
overhead and acceleration. This scope of work must be done concurrently with annual plant 
shutdown. 
Sincerely, 
PCL Construction 
PaulLaVanne 
Project Engineer 
Phone 805-551-9836 
E-mail: paullavannc@pcl.com 
PCL CONSTRUCTION, INC. 
1711 West Greentree Drive, Suite 201- Tempe, Arizona 85284 
District Phone ( 480) 829-6333 District Fax { 480) 829-8252 
www.pcl.com