- 1 -
4/29/2021 
C 
AGREEMENT FOR 
GAS CHROMATOGRAPH MASS SPECTROMETER 
City of Glendale/Solicitation No. RFP 23-29 
This Agreement for Gas Chromatograph Mass Spec ("Agreement") is effective and entered into between CITY OF 
GLENDALE, an Arizona municipal corporation ("City"), and Agilent Technologies, Inc., a Deleware corporation`, 
authorized to do business in Arizona, (the "Contractor"), as of the _____ day of ____________, 2023. 
RECITALS 
A.
City intends to undertake a project for the benefit of the public and with public funds that is more fully set
forth in Exhibit A, pursuant to Solicitation No. RFP 23-29 (the "Project");
B.
City desires to retain the services of Contractor to perform those specific duties and produce the specific
work as set forth in the Project attached hereto;
C.
City and Contractor desire to memorialize their agreement with this document.
AGREEMENT 
In consideration of the Recitals, which are confirmed as true and correct and incorporated by this reference, the 
mutual promises and covenants contained in this Agreement, and other good and valuable consideration, City and 
Contractor agree as follows: 
1.
Key Personnel; Sub-contractors.
1.1 
Services.  Contractor will provide all services necessary to assure the Project is completed timely 
and efficiently consistent with Project requirements, including, but not limited to, working in close 
interaction and interfacing with City and its designated employees, and working closely with others, 
including other contractors or consultants, retained by City. 
1.2 
Project Team. 
a.
Project Manager.
(1)
Contractor will designate an employee as Project Manager with sufficient training,
knowledge, and experience to, in the City's option, complete the Project and
handle all aspects of the Project such that the work produced by Contractor is
consistent with applicable standards as detailed in this Agreement;
(2)
The City must approve the designated Project Manager; and
(3)
To assure the Project schedule is met, Project Manager may be required to devote
no less than a specific amount of time as set out in Exhibit A.
b.
Project Team.
(1)
The Project Manager and all other employees assigned to the project by
Contractor will comprise the "Project Team."
(2)
Project Manager will have responsibility for and will supervise all other employees
assigned to the Project by Contractor.
c.
Discharge, Reassign, Replacement.
(1)
Contractor acknowledges the Project Team is comprised of the same persons and
roles for each as may have been identified in the response to the Project's
solicitation.

- 2 - 
4/29/2021 
(2) 
Contractor will not discharge, reassign or replace or diminish the responsibilities 
of any of the employees assigned to the Project who have been approved by City 
without City's prior written consent unless that person leaves the employment of 
Contractor, in which event the substitute must first be approved in writing by City. 
(3) 
Contractor will change any of the members of the Project Team at the City's 
request if an employee's performance does not equal or exceed the level of 
competence that the City may reasonably expect of a person performing those 
duties or if the acts or omissions of that person are detrimental to the 
development of the Project. 
d. 
Sub-contractors. 
(1) 
Contractor may engage specific technical contractor (each a "Sub-contractor") to 
furnish certain service functions. 
(2) 
Contractor will remain fully responsible for Sub-contractor's services. 
(3) 
Sub-contractors must be approved by the City, unless the Sub-contractor was 
previously mentioned in the response to the solicitation. 
(4) 
Contractor shall certify by letter that contracts with Sub-contractors have been 
executed incorporating requirements and standards as set forth in this Agreement. 
2. 
Schedule.  The services will be undertaken in a manner that ensures the Project is completed timely and 
efficiently in accordance with the Project. 
3. 
Contractor’s Work. 
3.1 
Standard.  Contractor must perform services in accordance with the standards of due diligence, 
care, and quality prevailing among contractors having substantial experience with the successful 
furnishing of services for projects that are equivalent in size, scope, quality, and other criteria under 
the Project and identified in this Agreement. 
3.2 
Licensing.  Contractor warrants that: 
a. 
Contractor and Sub-contractors will hold all appropriate and required licenses, registrations 
and other approvals necessary for the lawful furnishing of services ("Approvals"); and 
b. 
Neither Contractor nor any Sub-contractor has been debarred or otherwise legally 
excluded from contracting with any federal, state, or local governmental entity 
("Debarment"). 
(1) 
City is under no obligation to ascertain or confirm the existence or issuance of any 
Approvals or Debarments or to examine Contractor's contracting ability. 
(2) 
Contractor must notify City immediately if any Approvals or Debarment changes 
during the Agreement's duration and the failure of the Contractor to notify City as 
required will constitute a material default under the Agreement. 
3.3 
Compliance.  Services will be furnished in compliance with applicable federal, state, county and 
local statutes, rules, regulations, ordinances, building codes, life safety codes, and other standards 
and criteria designated by City. 
Contractor must not discriminate against any employee or applicant for employment on the basis 
of race, color, religion, sex, national origin, age, marital status, sexual orientation, gender identity or 
expression, genetic characteristics, familial status, U.S. military veteran status or any disability.  
Contractor will require any Sub-contractor to be bound to the same requirements as stated within 
this section.  Contractor, and on behalf of any subcontractors, warrants compliance with this 
section.

- 3 - 
4/29/2021 
3.4 
Coordination; Interaction. 
a. 
For projects that the City believes requires the coordination of various professional 
services, Contractor will work in close consultation with City to proactively interact with 
any other professionals retained by City on the Project ("Coordinating Project 
Professionals"). 
b. 
Subject to any limitations expressly stated in the Project Budget, Contractor will meet to 
review the Project, Schedule, Project Budget, and in-progress work with Coordinating 
Project Professionals and City as often and for durations as City reasonably considers 
necessary in order to ensure the timely work delivery and Project completion. 
c. 
For projects not involving Coordinating Project Professionals, Contractor will proactively 
interact with any other contractors when directed by City to obtain or disseminate timely 
information for the proper execution of the Project. 
3.5 
Work Product. 
a. 
Ownership.  Upon receipt of payment for services furnished, Contractor grants to City, 
and will cause its Sub-contractors to grant to the City, the exclusive ownership of and all 
copyrights, if any, to evaluations, reports, drawings, specifications, project manuals, 
surveys, estimates, reviews, minutes, all "architectural work" as defined in the United States 
Copyright Act, 17 U.S.C § 101, et seq., and other intellectual work product as may be 
applicable ("Work Product"). 
(1) 
This grant is effective whether the Work Product is on paper (e.g., a "hard copy"), 
in electronic format, or in some other form. 
(2) 
Contractor warrants, and agrees to indemnify, hold harmless and defend City for, 
from and against any claim that any Work Product infringes on third-party 
proprietary interests. 
b. 
Delivery.  Contractor will deliver to City copies of the preliminary and completed Work 
Product promptly as they are prepared. 
c. 
City Use. 
(1) 
City may reuse the Work Product at its sole discretion. 
(2) 
In the event the Work Product is used for another project without further 
consultations with Contractor, the City agrees to indemnify and hold Contractor 
harmless from any claim arising out of the Work Product. 
(3) 
In such case, City shall also remove any seal and title block from the Work 
Product. 
4. 
Compensation for the Project. 
4.1 
Compensation.  Contractor's compensation for the Project, including those furnished by its Sub-
contractors will not exceed $197,871.00, as specifically detailed in Exhibit B (the "Compensation"). 
4.2 
Change in Scope of Project.  The Compensation may be equitably adjusted if the originally 
contemplated scope of services as outlined in the Project is significantly modified. 
a. 
Adjustments to the Compensation require a written amendment to this Agreement and 
may require City Council approval. 
b. 
Additional services which are outside the scope of the Project contained in this Agreement 
may not be performed by the Contractor without prior written authorization from the City. 
c. 
Notwithstanding the incorporation of the Exhibits to this Agreement by reference, should 
any conflict arise between the provisions of this Agreement and the provisions found in

- 4 - 
4/29/2021 
the Exhibits and accompanying attachments, the provisions of this Agreement shall take 
priority and govern the conduct of the parties. 
5. 
Billings and Payment. 
5.1 
Applications. 
a. 
Contractor will submit monthly invoices (each, a "Payment Application") to City's Project 
Manager and City will remit payments based upon the Payment Application as stated 
below. 
b. 
The period covered by each Payment Application will be one calendar month ending on 
the last day of the month or as specified in the solicitation. 
5.2 
Payment. 
a. 
After a full and complete Payment Application is received, City will process and remit 
payment within 30 days. 
b. 
Payment may be subject to or conditioned upon City's receipt of: 
(1) 
Completed work generated by Contractor and its Sub-contractors; and 
(2) 
Unconditional waivers and releases on final payment from Sub-contractors as City 
may reasonably request to assure the Project will be free of claims arising from 
required performances under this Agreement. 
5.3 
Review and Withholding.  City's Project Manager will timely review and certify Payment 
Applications. 
a. 
If the Payment Application is rejected, the Project Manager will issue a written listing of 
the items not approved for payment. 
b. 
City may withhold an amount sufficient to pay expenses that City reasonably expects to 
incur in correcting the deficiency or deficiencies rejected for payment. 
6. 
Termination. 
6.1 
For Convenience.  City may terminate this Agreement for convenience, without cause, by 
delivering a written termination notice stating the Effective Termination date, which may not be 
less than 30 days following the date of delivery. 
a. 
Contractor will be equitably compensated for Goods or Services furnished prior to receipt 
of the termination notice and for reasonable costs incurred. 
b. 
Contractor will also be similarly compensated for any approved effort expended and 
approved costs incurred that are directly associated with project closeout and delivery of 
the required items to the City. 
6.2 
For Cause.  City may terminate this Agreement for cause if Contractor fails to cure any breach of 
this Agreement within seven days after receipt of written notice specifying the breach. 
a. 
Contractor will not be entitled to further payment until after City has determined its 
damages.  If City's damages resulting from the breach, as determined by City, are less than 
the equitable amount due but not paid Contractor for Service and Repair furnished, City 
will pay the amount due to Contractor, less City's damages, in accordance with the 
provision of § 5. 
b. 
If City's direct damages exceed amounts otherwise due to Contractor, Contractor must pay 
the difference to City immediately upon demand; however, Contractor will not be subject 
to consequential damages of more than $1,000,000 or the amount of this Agreement, 
whichever is greater.

- 5 - 
4/29/2021 
7. 
Conflict.  Contractor acknowledges this Agreement is subject to A.R.S. § 38-511, which allows for 
cancellation of this Agreement in the event any person who is significantly involved in initiating, 
negotiating, securing, drafting, or creating the Agreement on City's behalf is also an employee, agent, or 
consultant of any other party to this Agreement. 
8. 
Insurance. 
8.1 
Requirements.  Contractor must obtain and maintain the following insurance ("Required 
Insurance"): 
a. 
Contractor and Sub-contractors.  Contractor, and each Sub-contractor performing work or 
providing materials related to this Agreement must procure and maintain the insurance 
coverages described below (collectively referred to herein as the "Contractor's Policies"), 
until each Party's obligations under this Agreement are completed. 
b. 
General Liability. 
(1) 
Contractor must at all times relevant hereto carry a commercial general liability 
policy with a combined single limit of at least $1,000,000 per occurrence and 
$2,000,000 annual aggregate for each property damage and contractual property 
damage. 
(2) 
Sub-contactors must at all times relevant hereto carry a general commercial liability 
policy with a combined single limit of at least $1,000,000 per occurrence. 
(3) 
This commercial general liability insurance must include independent contractors' 
liability, contractual liability, broad form property coverage, XCU hazards if 
requested by the City, and a separation of insurance provision. 
(4) 
These limits may be met through a combination of primary and excess liability 
coverage. 
c. 
Auto.  A business auto policy providing a liability limit of at least $1,000,000 per accident 
for Contractor and $1,000,000 per accident for Sub-contractors and covering owned, non-
owned and hired automobiles. 
d. 
Workers' Compensation and Employer's Liability.  A workers' compensation and 
employer's liability policy providing at least the minimum benefits required by Arizona law. 
e. 
Notice of Changes.  Contractor's Policies must provide for not less than 30 days' advance 
written notice to City Representative of: 
(1) 
Cancellation or termination of Contractor or Sub-contractor's Policies; 
(2) 
Reduction of the coverage limits of any of Contractor or and Sub-contractor's 
Policies; and 
(3) 
Any other material modification of Contractor or Sub-contractor's Policies related 
to this Agreement. 
f. 
Certificates of Insurance. 
(1) 
Within 10 business days after the execution of the Agreement, Contractor must 
deliver to City Representative certificates of insurance for each of Contractor and 
Sub-contractor's Policies, which will confirm the existence or issuance of 
Contractor and Sub-contractor's Policies in accordance with the provisions of this 
section, and copies of the endorsements of Contractor and Sub-contractor's 
Policies in accordance with the provisions of this section. 
(2) 
City is and will be under no obligation either to ascertain or confirm the existence 
or issuance of Contractor and Sub-contractor's Policies, or to examine Contractor 
and Sub-contractor’s Policies, or to inform Contractor or Sub-contractor in the 
event that any coverage does not comply with the requirements of this section.

- 6 - 
4/29/2021 
(3) 
Contractor's failure to secure and maintain Contractor Policies and to assure Sub-
contractor policies as required will constitute a material default under the 
Agreement. 
g. 
Other Contractors or Vendors. 
(1) 
Other contractors or vendors that may be contracted with in connection with the 
Project must procure and maintain insurance coverage as is appropriate to their 
particular contract. 
(2) 
This insurance coverage must comply with the requirements set forth above for 
Contractor's Policies (e.g., the requirements pertaining to endorsements to name 
the parties as additional insured parties and certificates of insurance). 
h. 
Policies.  Except with respect to workers' compensation and employer's liability coverages, 
City must be named and properly endorsed as additional insureds on all liability policies 
required by this section. 
(1) 
The coverage extended to additional insureds must be primary and must not 
contribute with any insurance or self insurance policies or programs maintained by 
the additional insureds. 
(2) 
All insurance policies obtained pursuant to this section must be with companies 
legally authorized to do business in the State of Arizona and reasonably acceptable 
to all parties. 
8.2 
Sub-contractors. 
a. 
Contractor must also cause its Sub-contractors to obtain and maintain the Required 
Insurance. 
b. 
City may consider waiving these insurance requirements for a specific Sub-contractor if 
City is satisfied the amounts required are not commercially available to the Sub-contractor 
and the insurance the Sub-contractor does have is appropriate for the Sub-contractor's 
work under this Agreement. 
c. 
Contractor and Sub-contractors must provide to the City proof of the Required Insurance 
whenever requested. 
8.3 
Indemnification. 
a. 
To the fullest extent permitted by law, Contractor must defend, indemnify, and hold 
harmless City and its elected officials, officers, employees and agents (each, an 
"Indemnified Party," collectively, the "Indemnified Parties"), for, from, and against any and 
all claims, demands, actions, damages, judgments, settlements, personal injury (including 
sickness, disease, death, and bodily harm), property damage (including loss of use), 
infringement, governmental action and all other losses and expenses, including attorneys' 
fees and litigation expenses (each, a "Demand or Expense"; collectively, "Demands or 
Expenses") asserted by a third-party (i.e. a person or entity other than City or Contractor) 
and that arises out of or results from the breach of this Agreement by the Contractor or 
the Contractor’s negligent actions, errors or omissions (including any Sub-contractor or 
other person or firm employed by Contractor), whether sustained before or after 
completion of the Project. 
b. 
This indemnity and hold harmless provision applies even if a Demand or Expense is in 
part due to the Indemnified Party's negligence or breach of a responsibility under this 
Agreement, but in that event, Contractor shall be liable only to the extent the Demand or 
Expense results from the negligence or breach of a responsibility of Contractor or of any 
person or entity for whom Contractor is responsible.

- 7 - 
4/29/2021 
c. 
Contractor is not required to indemnify any Indemnified Parties for, from, or against any 
Demand or Expense resulting from the Indemnified Party's sole negligence or other fault 
solely attributable to the Indemnified Party. 
9. 
E-verify, Records and Audits. To the extent applicable under A.R.S. § 41-4401, the Contractor warrant 
their compliance and that of its subcontractors with all federal immigration laws and regulations that relate 
to their employees and compliance with the E-verify requirements under A.R.S. § 23-214(A). The 
Contractor or subcontractor’s breach of this warranty shall be deemed a material breach of the Agreement 
and may result in the termination of the Agreement by the City under the terms of this Agreement. The City 
retains the legal right to randomly inspect the papers and records of the other party to ensure that the other 
party is complying with the above-mentioned warranty. The Contractor and subcontractor warrant to keep 
their respective papers and records open for random inspection during normal business hours by the other 
party. The parties shall cooperate with the City’s random inspections, including granting the inspecting party 
entry rights onto their respective properties to perform the random inspections and waiving their respective 
rights to keep such papers and records confidential. 
10.  
No Boycott of Israel.  To the extent A.R.S § 35-393 through § 35-393.03 are applicable, the parties hereby 
certify that they are not currently engaged in, and agree for the duration of the Agreement to not engage in, 
a boycott of goods or services from Israel, as that term is defined in A.R.S § 35-393. 
11. 
Attestation of PCI Compliance.  When applicable, the Contractor will provide the City annually with a 
Payment Card Industry Data Security Standard (PCI DSS) attestation of compliance certificate signed by an 
officer of Contractor with oversight responsibility. 
12. 
Notices. 
12.1 
A notice, request or other communication that is required or permitted under this Agreement (each 
a "Notice") will be effective only if: 
a. 
The Notice is in writing; and 
b. 
Delivered in person or by overnight courier service (delivery charges prepaid), certified or 
registered mail (return receipt requested); and 
c. 
Notice will be deemed to have been delivered to the person to whom it is addressed as of 
the date of receipt, if: 
(1) 
Received on a business day, or before 5:00 p.m., at the address for Notices 
identified for the Party in this Agreement by U.S. Mail, hand delivery, or overnight 
courier service on or before 5:00 p.m.; or 
(2) 
As of the next business day after receipt, if received after 5:00 p.m. 
d. 
The burden of proof of the place and time of delivery is upon the Party giving the Notice; 
and 
e. 
Digitalized signatures and copies of signatures will have the same effect as original 
signatures. 
12.2 
Representatives. 
a. 
Contractor.  Contractor's representative (the "Contractor's Representative") authorized to 
act on Contractor's behalf with respect to the Project, and his or her address for Notice 
delivery is: 
Agilent Technologies, Inc. 
c/o  Elaine Jones 
2850 Centervill Road 
Wilmington, DE 19808 
b. 
City.  City's representative ("City's Representative") authorized to act on City's behalf, and 
his or her address for Notice delivery is:

- 8 - 
4/29/2021 
City of Glendale 
c/o  Anne Shadle 
5850 W Glendale Ave. 
Glendale, Arizona 85301 
623-930-2864 
 
With required copy to: 
 
City Manager 
 
 
 
City Attorney 
City of Glendale  
 
 
City of Glendale 
5850 West Glendale Avenue 
 
5850 West Glendale Avenue 
Glendale, Arizona 85301  
             Glendale, Arizona 85301 
c. 
Concurrent Notices. 
(1) 
All notices to City's representative must be given concurrently to City Manager 
and City Attorney. 
(2) 
A notice will not be deemed to have been received by City's representative until 
the time that it has also been received by City Manager and City Attorney. 
(3) 
City may appoint one or more designees for the purpose of receiving notice by 
delivery of a written notice to Contractor identifying the designee(s) and their 
respective addresses for notices. 
d. 
Changes.  Contractor or City may change its representative or information on Notice, by 
giving Notice of the change in accordance with this section at least ten days prior to the 
change. 
13. 
Financing Assignment.  City may assign this Agreement to any City-affiliated entity, including a non-
profit corporation or other entity whose primary purpose is to own or manage the Project. 
14. 
Entire Agreement; Survival; Counterparts; Signatures. 
14.1 
Integration.  This Agreement contains, except as stated below, the entire agreement between City 
and Contractor and supersedes all prior conversations and negotiations between the parties 
regarding the Project or this Agreement. 
a. 
Neither Party has made any representations, warranties or agreements as to any matters 
concerning the Agreement's subject matter. 
b. 
Representations, statements, conditions, or warranties not contained in this Agreement will 
not be binding on the parties. 
c. 
The solicitation, any addendums and the response submitted by the Contractor are 
incorporated into this Agreement as if attached hereto.  Any Contractor response modifies 
the original solicitation as stated.  Inconsistencies between the solicitation, any addendums 
and the response or any excerpts attached as Exhibit A and this Agreement will be 
resolved by the terms and conditions stated in this Agreement. 
14.2 
Interpretation. 
a. 
The parties fairly negotiated the Agreement's provisions to the extent they believed 
necessary and with the legal representation they deemed appropriate. 
b. 
The parties are of equal bargaining position and this Agreement must be construed equally 
between the parties without consideration of which of the parties may have drafted this 
Agreement. 
c. 
The Agreement will be interpreted in accordance with the laws of the State of Arizona.

- 9 - 
4/29/2021 
14.3 
Survival.  Except as specifically provided otherwise in this Agreement, each warranty, 
representation, indemnification and hold harmless provision, insurance requirement, and every 
other right, remedy and responsibility of a Party, will survive completion of the Project, or the 
earlier termination of this Agreement. 
14.4 
Amendment.  No amendment to this Agreement will be binding unless in writing and executed by 
the parties.  Any amendment may be subject to City Council approval.  Electronic signature blocks 
do not constitute execution. 
14.5 
Remedies.  All rights and remedies provided in this Agreement are cumulative and the exercise of 
any one or more right or remedy will not affect any other rights or remedies under this Agreement 
or applicable law. 
14.6 
Severability.  If any provision of this Agreement is voided or found unenforceable, that 
determination will not affect the validity of the other provisions, and the voided or unenforceable 
provision will be deemed reformed to conform to applicable law. 
14.7 
Counterparts.  This Agreement may be executed in counterparts, and all counterparts will together 
comprise one instrument. 
15. 
Term.   
 
15.1  
Renewals. The term of this Agreement commences upon the effective date and continues for a one 
 
(1)-year initial period.  The City may, at its option and with the approval of the Contractor, extend 
 
the term of this Agreement an additional four (4) years, renewable on an annual basis.  Contractor 
 
will be notified in writing by the City of its intent to extend the Agreement period at least thirty 
 
(30) calendar days prior to the expiration of the original or any renewal Agreement period.  Price 
 
adjustments will only be reviewed during the Agreement renewal period and any such price 
 
adjustment will be a determining factor for any renewal.  There are no automatic renewals of this 
 
Agreement. 
 
15.2 
Extension for Procurement Process. Upon the expiration of the Term of this Agreement, including 
 
the initial term and any renewals, at the City’s sole discretion, this Agreement may be extended on a 
 
month-to-month basis for a maximum of six (6) months to allow for the City to complete its 
 
procurement process to select a vendor to provide the services/materials similar to those provided 
 
under this Agreement.  The City will notify the Contractor in writing of its intent to extend the 
 
Agreement at least thirty (30) calendar days prior to the expiration of the Term.  Any extension 
 
provided under this subsection will continue under the same terms and conditions as in effect 
 
immediately prior to the expiration of the then-current term.  
16. 
Dispute Resolution.  Any controversy or claim arising out of or relating to this contract, or the breach 
thereof, shall be settled by arbitration administered according to the American Arbitration Association’s 
Commercial Arbitration Rules, and judgment on the award rendered by the arbitrator may be entered in any 
court having jurisdiction thereof. 
17. 
Cooperative Use of Contract.  This agreement may be extended for use by other governmental agencies 
and political subdivisions of the State.  Any such usage by other entities must be in accord with the 
ordinances, charter, rules and regulations of the respective entity and the approval of the Contractor and 
City.  For a list of SAVE members, click on the following link: 
http://www.mesaaz.gov/business/purchasing/save 
18. 
Exhibits.  The following exhibits, with reference to the term in which they are first referenced, are 
incorporated by this reference. 
Exhibit A 
Project 
Exhibit B 
Compensation

EXHIBIT A 
GAS CHROMATOGRAPH MASS SPECTROMETER 
PROJECT 
Contractor to provide the City's Water Quality Laboratory with a Gas Chromatograph/Mass Spectrometer with a 
fully integrated Autosampler which performs Solid Phase Micro-Extraction (SPME) in both liquid and headspace. 
This equipment will be integrated with the current Laboratory Information Management System and current in-
house instrument systems.

City of Glendale 
Solicitation Number: RFP 23-29 / 42300039 
GAS CHROMATOGRAPH MASS SPECTROMETER  
 
CITY OF GLENDALE 
Procurement Division 
5850 West Glendale Avenue, 
Suite 317 
Glendale, Arizona 85301 
 
 
 
3   
rev. 12.11.2020 
 
1. 
INTRODUCTION  
The City of Glendale (City) is soliciting Requests for Proposal from a qualified firms 
(Contractor) to provide the City’s Water Quality Laboratory with a Gas 
Chromatograph/Mass Spectrometer (GC/MS) with a fully integrated Autosampler 
which performs SPME (Solid Phase Micro-Extraction) in both liquid and headspace.  
This equipment will be integrated with the current Laboratory Information 
Management System and current in-house instrument systems.   
 
2. 
OBJECTIVES 
The primary purpose of this proposal is to acquire a new system that will be for the 
analysis of organic taste and odor compounds in finished water. Any instrument 
package proposed must meet the performance requirements dictated in this 
method. 
 
3. 
SCOPE OF WORK 
The system addressed by this Request for Proposal will consist of a Gas 
Chromatograph/Mass Spectrometer with a fully integrated Autosampler which 
performs SPME (Solid Phase Micro-Extraction) in both liquid and headspace. 
 
i. 
Performance:  The new system will preferably be compatible with the current 
in-house Laboratory Information Management System performing this 
analysis. As our facility moves towards reducing our environmental impact, 
reduction of power consumption has become more critical. We would like to 
see lower lab power consumption, system expandability, and a reduction in 
the demand on the air conditioning system in the lab. For the new 
instrumentation, see the specific requirements in subsequent sections of this 
bid. 
 
ii. 
Currency:  As of the date of issuance of this proposal, all items or 
components shall be of current manufacture and all components shall be 
currently offered and supported by the original equipment manufacturer. 
 
iii. 
Support: The Contractor shall guarantee support including technical 
consultation, maintenance, replacement parts, and maintenance for all 
system components for a minimum of ten (10) years following the expiration 
of the original manufacturer’s warranty. The Contractor shall guarantee the 
instrument will be fully operational* within three (3) months from the receipt 
of the equipment. The Contractor must also supply a minimum of four (4) 
days of in-house training on the new instrument.   
 
*Operational is defined as the instrument is running, able to meet specified 
parameters and the instrument operator trained and operating the 
instrument. Failure to comply with this requirement will result in contract 
invalidation and rejection of the equipment.

City of Glendale 
Solicitation Number: RFP 23-29 / 42300039 
GAS CHROMATOGRAPH MASS SPECTROMETER  
 
CITY OF GLENDALE 
Procurement Division 
5850 West Glendale Avenue, 
Suite 317 
Glendale, Arizona 85301 
 
 
 
4   
rev. 12.11.2020 
 
iv. 
Support Response Time: The Contractor shall provide same day phone 
support and on-site technical support within 48 hours of receipt of notice for 
service. Contractor is encouraged to demonstrate the steps to initiate service 
in their response.  
 
v. 
Separate Prices Required:  Responses to this Request for Proposal must 
include separately priced options for each component. 
 
vi. 
Separate Responses Required:  Contractors must respond to each of these 
specifications on a point-by-point basis. 
 
4. 
INSTRUMENT REQUIREMENTS 
The following requirements for the Operating System, Autosampler and GC/MS are 
understood to accept equivalency.  
 
i. 
Operating System 
Components: A Computer System designed to handle all the instrumentation 
required to acquire, perform, and report an analysis with the system offered. 
Contractor must provide the computer, printer and a large screen for the 
ease of the user. 
 
ii. 
Software: Designed to provide the following: 
A. 
Acquisition software designed with integration of the Autosampler and 
GC/MS. A system which delivers fast and accurate results. Intuitive 
software that supports multiple applications. Can be customizable.  
Full control of the GC/MS tuning and calibration. Provide extracted 
chromatograms from a total ion chromatogram. 
 
B. 
Autonomous diagnostics that check GC system health and alert the 
user to potential issues and how to solve them. Step-by-step 
instructions for common gas chromatograph maintenance and 
diagnostic procedures presented on the touch screen or remotely 
through the GC browser interface. 
 
C. 
Quantitation Analysis Software designed to be used by any level of 
user.  It must have a Spectral Library. Workflow templates for data 
review. Integrators which allow for minimization of manual 
integrations. Reporting templates. Data translation compatible with 
the current in-house Laboratory Information Management System 
 
iii. 
A single rail autosampler which enables multiple techniques for flexibility 
and automation. This autosampler must meet or be equivalent to the 
following requirements: 
A. 
A fully integrated (with the GC/MS) sample preparation and 
introduction system that automates heating, chilling, mixing, 
preconcentration, 
derivatization, 
dilution, 
and 
other 
sample

City of Glendale 
Solicitation Number: RFP 23-29 / 42300039 
GAS CHROMATOGRAPH MASS SPECTROMETER  
 
CITY OF GLENDALE 
Procurement Division 
5850 West Glendale Avenue, 
Suite 317 
Glendale, Arizona 85301 
 
 
 
5   
rev. 12.11.2020 
 
preparation steps. It must be able to change tools automatically 
within the same method and sequence. It also must perform Solid 
Phase Micro-Extraction (SPME) in both Liquid and Headspace without 
pausing GC operation. It must have an operating temperature range 
from 5 to 40 oC. 
 
B. 
Requirements:  Please address each of the following with the 
capabilities of the autosampler offered. 
 
1. 
X-Axis rail: Able to perform multiple techniques for maximum 
versatility. 
2. 
Vortex Mixer: Allows efficient mixing (up to 2000 rpm) for 
dilution/extraction 
sample 
preparation. 
Accommodates 
standard vial sizes (2 mL, 10 mL, and 20 mL). 
3. 
Agitator: Incubates samples from 20 °C to 200 °C and agitates 
samples from 250 rpm to 750 rpm. Accommodates six 20 mL 
vials with optional adapters for 2 mL or 10 mL vials. 
4. 
Peltier chiller: User configurable for storing 2 to 6 racks or 
plates under defined temperature conditions (4 °C to 40 °C). 
Accommodates any combination of multi-titer and deep well 
plates. 
5. 
Tool change capabilities: Safely automates most sample 
preparation steps. Holds up to three tools with automated tool 
changing during operation.  
6. 
Fully integrated intuitive software: Must fully integrate the 
GCMS system and software. 
 
a. Parameters are saved within the normal analysis method. 
b. Parameters are reported in Reports.  
c. All sequencing modes of the platform are supported. The 
user can create sequences by sequence table or more 
efficient method.  
d. Client server environment is fully supported.  
e. Status User Interface (UI) which shows needed information. 
Set points of temperature zones are provided along with 
the actual. These let the user know how the system is 
performing. Simplifies the user’s ability to change the 
standby temperature and tools on the system easily. 
7. 
Able to perform Solid Phase Micro Extraction (SPME) 
injections, Liquid injections, and Headspace injections. In 
addition, detail the Accuracy and Precision of each type of 
injection. 
 
a. 
Liquid injection: Fast liquid injection minimizes 
discrimination and supports syringe volumes from 1.2 
µL up to 10,000 µL.

City of Glendale 
Solicitation Number: RFP 23-29 / 42300039 
GAS CHROMATOGRAPH MASS SPECTROMETER  
 
CITY OF GLENDALE 
Procurement Division 
5850 West Glendale Avenue, 
Suite 317 
Glendale, Arizona 85301 
 
 
 
6   
rev. 12.11.2020 
 
b. 
Headspace injection: Capabilities include temperature 
control from 40 °C to 150 °C with magnetic vial 
transport for 2 mL, 10 mL, and 20 mL vials. Available 
in 1 mL, 2.5 mL, and 5 mL syringes flushed with inert 
gas.  
c. 
Solid Phase Micro-Extraction (SPME) injection: Reduces 
sample preparation time and eliminates the need for 
large volumes of extraction solvents, with a Fiber 
Conditioning Module. 
iv. 
A Gas Chromatograph/Mass Spectrometer (GC/MS) system which can fully 
integrate with the above addressed Autosampler. This GC/MS system must 
meet or exceed the following requirements: 
 
A. 
Chromatographic Performance:  
1. 
Retention Time Performance: GC must have a specification 
published for retention time repeatability of<0.0081 % or 
<0.00081 minutes (2 ng Tetradecane, using GC, Splitless inlet, 
injector). 
2. 
Peak Area Performance: GC must have a specification 
published for area repeatability. Preferred; <0.51% Relative 
Standard Deviation (2 ng Tetradecane, using GC, Splitless 
inlet, injector). 
 
3. 
Ambient temperature and pressure compensation: The Gas 
Chromatograph must have ambient temperature and pressure 
compensation for all pneumatics for all inlets, detectors, and 
auxiliary pneumatics. 
 
B. 
GC System Capabilities: 
1. 
EPC microchannel design: All GC pneumatics for inlets, 
detectors and auxiliary modules must have a pneumatics 
design based on microchannels that serve as restrictors for 
pneumatic control instead of using a frit.  
 
2. 
Browser User Interface: A Browser Interface must provide 
access to all the following: 
a. 
Connectivity to check status or run diagnostics from 
anywhere within the network  
b. 
Built-in self-guided diagnostics and maintenance 
capabilities 
c. 
Method and Sequence editing without the need for a 
data system 
d- 
Easy access to logs and complete user documentation

City of Glendale 
Solicitation Number: RFP 23-29 / 42300039 
GAS CHROMATOGRAPH MASS SPECTROMETER  
 
CITY OF GLENDALE 
Procurement Division 
5850 West Glendale Avenue, 
Suite 317 
Glendale, Arizona 85301 
 
 
 
7   
rev. 12.11.2020 
 
3. 
Remote Access: Remote access must be available directly into 
GC, independent of any computer being used and must be 
available as Standard with the GC. 
 
4. 
Diagnostics: GC must be able to perform no less than 5 inlet 
diagnostic procedures without a need to cap-off septum purge 
or split vent lines: 
a. 
Leak and Restriction Test  
b. 
Pressure Decay Test 
c. 
Split Vent Restriction Test  
d. 
Gas Supply Pressure Check 
e. 
Septum Purge Flow Test  
 
5. 
Automated Self-Testing: GC must perform, automated self-
monitoring of over 20 GC and autosampler parameters.  
 
6. 
Early Maintenance Feedback (EMF) Counters: For EMF 
counters, the system must be able to differentiate between 
injections on front and back inlets, and only increment 
counters associated with the configured injection flow path. 
 
7. 
Inlet Modules Pressure Sensors: 
a. 
Accuracy: <±2.25 % full scale 
b. 
Repeatability: <±0.052 psi 
c. 
Temperature coefficient: <±0.012 psi/°C 
d. 
Drift: <±0.12 psi/6 months 
` 
8. 
Inlet temperature setpoint increments: Must be able to set 
inlet temperature setpoints to 0.1oC increments. 
 
9. 
SSL/EPC 
Pressure 
Programming 
Rate: 
Split 
Splitless 
Electronic Pressure Control inlet capable to program either up 
or down at a rate of up to 1034 kpa/min or 150 psig/min and 
no additional accessory is needed. 
 
10. 
Inlet maintenance SSL: Inlet sealing system is built in standard 
with each SSL inlet for quick, easy, injector liner changes in 
under 30 seconds.       
 
11. 
Retention Time-Locking software: The GC/MS data system 
must have an integrated retention time-locking software 
module with the ability to eliminate retention time differences 
due to maintenance, detection system or physical location.  
 
Helium Conservation:  The GC system must provide Helium 
Conservation to provide cost savings in gas usage.

City of Glendale 
Solicitation Number: RFP 23-29 / 42300039 
GAS CHROMATOGRAPH MASS SPECTROMETER  
 
CITY OF GLENDALE 
Procurement Division 
5850 West Glendale Avenue, 
Suite 317 
Glendale, Arizona 85301 
 
 
 
8   
rev. 12.11.2020 
 
 
C. 
GC/MS System Capabilities 
1. 
Helium (He) Electron Impact Sensitivity: SCAN mode must 
deliver sensitivity of >4900:1 S/N ratio using a 1 pg/µL 
octafluoronaphthalene (OFN), scanning from 50-300 u at 
nominal m/z 272 ion. 
 
2. 
Detector Type: The Mass Spectrometer’s detector shall be a 
Triple-Axis high energy dynode, electron multiplier design, 
which places the detector doubly off-axis from the axis of the 
transmission quadrupole. 
 
3. 
Gain Normalization Autotune: The Mass Spectrometer must 
have a Gain Normalized Autotune which optimizes the EM’s 
gain to ensures the optimal balance between ion count, 
linearity, and EM life expectancy. 
 
4. 
Inert ion source: The mass spectrometer must use an ion 
source where the metallic parts are constructed from inert 
material. Ion Source temp controllable from 105 – 345˚ C.  
 
5. 
Ion Source Cleaning: An ability to make ion source cleaning 
easier or reduce the need to do so. 
 
6. 
Monolithic quartz structure, hyperbolic form quadrupole: Mass 
Spectrometer must utilize a Quadrupole Mass Filter consisting 
of a monolithic quartz structure. The rods must have a true 
hyperbolic shape in keeping with quadrupole theory. The 
Quadrupole is to be independently heated, and its temperature 
is to be user-selectable from 105 – 195˚C. 
 
 
7. 
Gold and titanium multilayer metalized hyperbolic electrode 
surfaces: The quadrupole is to have its electrode surfaces 
covered by titanium composite and gold thin and thick films. 
 
8. 
SIM Capacity and Speed: The mass spectrometer shall have 
the capability to create 100 SIM ion groups with up to 60 ions 
per group and speed down to 0.1 msec. 
 
9. 
High 
Performance 
Synchronous 
SIM/Scan: 
The 
mass 
spectrometer’s electronics must have the efficiency to support 
synchronous SIM/Scan.  Synchronous SIM/Scan is a mode of 
operation that enables collection of both SIM data and full scan 
data in the same acquisition cycle. SIM dwell times can be set 
in 1 msec increments from higher than 100 msec to as low as

City of Glendale 
Solicitation Number: RFP 23-29 / 42300039 
GAS CHROMATOGRAPH MASS SPECTROMETER  
 
CITY OF GLENDALE 
Procurement Division 
5850 West Glendale Avenue, 
Suite 317 
Glendale, Arizona 85301 
 
 
 
9   
rev. 12.11.2020 
 
1 msec dwell, allowing rapid analysis with more compounds 
and more samples. 
 
10. 
Automated SIM setup: The mass spectrometer must have an 
automated SIM setup that can convert a full scan method to a 
SIM or SIM/Scan method. The software must automatically 
configure the number of SIM groups, SIM cycles across the 
peak, and the ions added to each group. 
 
11. 
Fast venting: When an MS vent cycle is started, GC recognizes 
and optimizes the column flow to cool down the MSD faster. 
An oil-free dry scroll pump is preferred. 
 
5. 
WARRANTY, TRAINING AND SET-UP 
A warranty period of at least one year must be provided on all hardware, labor, and 
software. The warranty must include free telephone support for the system. 
 
The manufacturer’s technical representative must complete unpacking, set-up, 
component installation, and satisfactory standardization of the instrument on-site. 
Any travel and necessary housing must be included in the total price of system. 
 
Following completion of the initial setup and installation, the Contractor's technical 
representative must provide 32 hours of on-site, hands-on training and method 
development using the purchased system. Training must be performed in 
Glendale’s laboratory and must be completed prior to final acceptance. 
 
6. 
HOW WE CHOOSE 
 
6.1 
SCORING RESPONSES:  
The evaluation criteria are weighted in accordance with the Submission 
Requirements.  Your response will be rated as follows: 
• 
40% Adherence to the Technical Requirements 
• 
25% Experience, Proven Performance, and Qualifications 
• 
25% Technical Support  
• 
  5% Cost 
• 
  5% References 
 
6.2 
TYPE OF AWARD: The City reserves the right to make multiple awards or to 
award by group of line items, or to make an aggregate award, whichever is 
deemed most advantageous to the City. If the City determines that an 
aggregate award to one Offeror is not in the City's best interest, "all or 
none" Bids shall be rejected.  
 
6.3 
LENGTH OF CONTRACT: The City will award for an initial one (1) year with 
four (4) additional one-year renewal options.

EXHIBIT B 
GAS CHROMATOGRAPH MASS SPEC 
COMPENSATION 
NOT-TO-EXCEED AMOUNT 
The total amount of compensation paid to Contractor for full completion of all work required by the Project during 
the entire term of the Project must not exceed $197,871.00. 
DETAILED PROJECT COMPENSATION 
See below.

test
Page 1 of 6
Agilent 8890-5977C with PAL3 RTC Sampler and SPME Accessory
Learn more about Agilent's Special Offers, Products, Services and our full
range of laboratory productivity solutions optimized for your applications
and workflows. Visit us at www.agilent.com/chem
4274798
Quotation Number:
4 Weeks
Estimated Delivery Time:
April 02 2023
Quotation Expiry Date:
Delivered duty paid (DDP)
Incoterms:
USD
Currency:
Net 30 Days
Payment Terms:
Agilent Contact Name:
Agilent Contact Email:
Agilent Contact Telephone:
Nick MacKenzie
Direct Inquiries to:
nick.mackenzie@kprime.net
480-848-5032
Quotation Date:
February 01 2023
QUOTATION
623-930-2864
Anne Shadle
ashadle@glendaleaz.com
City of Glendale
28101 N 63rd Ave
GLENDALE AZ  85083-7676
USA
Customer Contact:

Page 2 of 6
Quotation Number:
4274798
February 01 2023
Quotation Date:
Product Details
ID Product
Description
Qty
Unit List Price
(USD)
Unit Net Price
(USD)
Extended Net
Price (USD)
 1 G3540A
Agilent 8890 GC System
Custom
1
39,079.00
21,493.45
21,493.45
With the following configuration:
Ship-to Country : USA
Qty He Cons Mod (303) : 1
Country of Origin : United States
Exhaust Deflector Assy
1 
Factory plumbing For quick installation
1 
Installation (44K)
1 
8890 with USA Country of Origin
1 
MSD Interface
1 
Helium Conservation Module
1 
INERT Cap S/Sl inlet with EPC - 100psi
1 
 2 G7370B
PAL3 Series II RTC 120
1
98,183.00
54,000.65
54,000.65
PAL3 Series II RTC 120
With the following configuration:
Mounting Hardware (201-207) : 8890/8860 Deck
Mount (206)
PAL3 SPME Arrow(323-325) : PAL3 SPME Arrow
for 8890/8860
Ship-to Country : USA
Introduction (44L)
Installation (44K)
8890/8860 PAL3 Deck Mounting Hardware
1 
PAL3 Agitator
1 
PAL3 SPME Arrow for 8890/8860
1 
 3 5183-4703
Liner, direct, 2mm I.D.,
deactivated 5PK
1
156.00
85.80
85.80
Liner, direct, 2mm I.D., deactivated 5PK
 4 5183-4759
Septa Non-Stick Adv Green
11mm 50pk
1
104.00
57.20
57.20
|Non-Stick Adv Green Inlt Septa 11mm 50pk Non-Stick Advanced

Page 3 of 6
Quotation Number:
4274798
February 01 2023
Quotation Date:
Green Inlet Septa 11mm inlet septa; max temp 350c
 5 5191-5861
SPME Arrow
1.1mm:DVB/Carbon WR/PDMS
1
2,043.00
1,123.65
1,123.65
SPME Arrow 1.10mm: DVB/Carbon WR/PDMS (Divinylbenzene),
 6 122-5532UI
DB-5MS Ultra Inert 30m,
0.25mm, 0.25um
1
807.00
443.85
443.85
DB-5MS Ultra Inert 30m, 0,25mm, 0,25um
 7 G7077CA
5977C Inert Plus MSD Turbo EI
Bundle
1
103,848.00
57,116.40
57,116.40
5977C Inert Plus MSD Turbo EI Bundle
With the following configuration:
Ship-to Country : USA
GC/MSD INERTPLUS EI FOR 8890 GC
1 
Installation (44K)
Introduction (44L)
1 Year SW Update/Phone Assist (44W)
ADD LASER PRINTER
1 
SUBSTITUTE IDP3 OIL FREE SCROLL PUMP
1 
 8 G1033C
NIST MS Library Bundle
1
7,380.00
4,059.00
4,059.00
Latest NIST MS Library Bundle includes over 350K EI spectra for
over 300K compounds (40K increase) and GC Methods/Retention
indices library (nist_ri) with 139K compounds
 9 H2149A
Method and Application
Consulting
1
15,716.00
11,158.36
11,158.36
Method and Application Consulting On-site consulting for a
maximum of 4 participants. Certificates and manuals not
included.
With the following configuration:

Page 4 of 6
Quotation Number:
4274798
February 01 2023
Quotation Date:
Ship-to Country : USA
Four Day On-site (Includes Travel)
1 
10 19199M
Install Kit for GCs w/out Gas
Purifiers
1
1,038.00
570.90
570.90
Installation Kit for GCs w/out gas purifiers. Includes leak
detection fluid, swage-type fittings, copper tubing, syringes,
screw-drivers and wrenches.
11 CP17974
Gas Clean Filter Kit for Carrier
Gas
1
445.00
244.75
244.75
Gas Clean Filter Kit  for Carrier Gas 1/8inch.
12 RMSN-2
Big Universal Trap, 1/8i fttgs,
Nitrogen
1
449.00
246.95
246.95
13 G7380-60001
PAL3 SPME + SPME ARROW
Condition Station
1
9,508.00
9,508.00
9,508.00
175,557.43
Total List Price (USD)
Total Discount (USD)
Subtotal (USD)
Shipping (USD)
Total Tax (7,63%)
278,756.00
Quotation Total (USD)
118,647.04-
160,108.96
3,000.00
12,448.47
Additional Information
Amount excludes any applicable taxes.  Applicable taxes will be separately stated on the invoice at time of billing.
Ordering Information

Page 5 of 6
Quotation Number:
4274798
February 01 2023
Quotation Date:
Ask about our attractive payment options and how we can help you acquire the latest innovations while minimizing the upfront costs. Contact
your Agilent sales representative today or visit us online at
www.agilent.com/en/technology/agilent-financial-solutions to learn why more and more labs are choosing these flexible payment plans and
identify which works best for you.
To place an order: Visit http://www.agilent.com/store to place
online orders using a purchase order or credit card and
track your order status.
Product
Email
FAX
Consumables
cag_sales-NA@agilent.com
302-633-8901
Genomics
orders@agilent.com
512-321-3128
Pathology
customer.service@agilent.com
800-566-3256
Instruments
Lscainstrumentsales@agilent.com
302-633-8953
1-800-227-9770 Option 1
To place an order, we require:
Purchase order number or credit card, delivery date, ship to, invoice to, end user, and quote number.
GSA customers please provide GSA contract #.
EXCLUSIVE OFFERS FOR NEW INSTRUMENT CUSTOMERS, go to www.agilent.com/chem/exclusiveoffers
TO CHECK THE STATUS OF AN ORDER:
1) Visit http://www.agilent.com/chem/supplies to check the status of your order.
2) Call 1-800-227-9770 (option 1) any weekday between 8 am and 8 pm Eastern time, in the U.S., Canada &
   Puerto Rico. You will need to know the purchase order or credit card number the order was placed on.
Legal Disclaimer
The sale of standard Products and Services referenced in this quotation is subject to the then current version of Agilent's Terms of Sale, and
any LSCA Supplemental Terms or other applicable terms referenced herein.  If any Products or Services are manufactured, configured or adapted
to meet Customer's requirements, the sale of all Products and Services referenced in this quotation is subject to the then current version of
Agilent's Terms of Sale for Custom Products and any LSCA Supplemental Terms or other applicable terms referenced herein.  A copy of
Agilent's Terms of Sale, Agilent's Terms of Sale for Custom Products and the LSCA Supplemental Terms is either attached or has been
previously provided to you.  Please contact us if you require a copy of the terms. If you have a separate agreement in effect with Agilent
covering the sale of Products and Services referenced in this quotation, the terms of that agreement will take precedence for those Products
and Services. Agilent expressly objects to any different or additional terms in your purchase/sales order documentation, unless agreed to in
writing by Agilent. Product and Service availability dates are estimated at the time of the quotation. Actual delivery dates will be specified at the
time Agilent acknowledges and accepts your purchase order. The above conditions shall apply to the fullest extent permitted by the law. You
may have other statutory or legal rights available. Commodities, technology or software exported from the United States of America ("U.S.") or
from other exporting countries will be subject to the U.S. Export Administration Regulations and all exporting countries' export laws and
regulations. Diversion contrary to U.S. law and the applicable export laws and regulations is prohibited.
Warranty
Warranty for accessory and spare parts is 3 months, and for hardware products is 12 months.

City of Glendale 
Solicitation Number: RFP 23-29  / 42300039 
Gas Ghromatograph Mass Spectrometer 
PRICING WORKBOOK 
CITY OF GLENDALE 
Procurement Department 
5850 West Glendale 
Avenue, Suite 317 
Glendale, Arizona 85301 
 
1. 
PRICING 
 
Contractor must complete the information below. 
 
 
 
 
  
 
A. 
PRICE SCHEDULE 
The following items will be used to determine the vendor who will earn full 
points on the cost section of the solicitation. 
 
The city will pay any taxes due; do not include taxes in your pricing. 
 
Item No. Description 
Price, tax excluded 
1. 
Operating System  
$ 4,059.00 
2. 
Autosampler  
$ 64,632.30 
3. 
Gas Chromatograph 
$ 23,115.90 
4. 
Mass Spectrometer 
$ 57,116.40 
 
 Grand Total (items 1-4) $ 148,923.6 
 
B. 
OPTIONS 
 
Please list all options available along with the price of each. You may attach 
a price list instead of listing each item below, if you prefer. Please list your 
company name and the RFP number on the price list if submitted separately 
from this document. 
Description 
Price, tax excluded 
Service Plan – 1 year, paid 
annually 
$       
Service Plan – 3 years, paid 
annually 
$       
Service Plan – 5 years, paid 
annually                                    $       
Agilent CrossLab Silver 
Agreement (includes parts, 
labor, travel for unlimited 
repair visits, as well as annual 
Preventative Maintenance 
service visit) - 1 Year Coverage 
after Warranty Expiration  
$ 16,746.30 
Agilent CrossLab 
Government/Academic 
Bronze Agreement  (includes 
parts, labor and travel for 
unlimited repair visits) - 1 
Year Coverage after Warranty 
Expiration 
$ 10,994.00 
Agilent CrossLab Silver 
Agreement (includes parts, 
$ 29,771.20

City of Glendale 
Solicitation Number: RFP 23-29  / 42300039 
Gas Ghromatograph Mass Spectrometer 
PRICING WORKBOOK 
CITY OF GLENDALE 
Procurement Department 
5850 West Glendale 
Avenue, Suite 317 
Glendale, Arizona 85301 
 
labor, travel for unlimited 
repair visits, as well as annual 
Preventative Maintenance 
service visit) - 3 Years 
Coverage after Warranty 
Expiration 
Agilent CrossLab 
Government/Academic 
Bronze Agreement  (includes 
parts, labor and travel for 
unlimited repair visits) - 3 
Year Coverage after Warranty 
Expiration 
$ 19,544.00 
Agilent CrossLab Silver 
Agreement (includes parts, 
labor, travel for unlimited 
repair visits, as well as annual 
Preventative Maintenance 
service visit) - 5 Years 
Coverage after Warranty 
Expiration 
$ 66,985.20 
Agilent CrossLab 
Government/Academic 
Bronze Agreement  (includes 
parts, labor and travel for 
unlimited repair visits) - 5 
Year Coverage after Warranty 
Expiration 
$ 43,974.00 
Per Incident Preventative 
Maintenance Visit 
$ 4,539.60 
      
$       
      
$       
      
$       
      
$       
      
$

City of Glendale 
Solicitation Number: RFP 23-29  / 42300039 
Gas Ghromatograph Mass Spectrometer 
PRICING WORKBOOK 
CITY OF GLENDALE 
Procurement Department 
5850 West Glendale 
Avenue, Suite 317 
Glendale, Arizona 85301 
 
2. 
DISCOUNT/PAYMENT TERMS:  
 
The City standard is 2% 20 days 
 
Comply: 
YES         NO X 
 
If your answer is NO, please state terms offered: (NET 30 DAYS 0% Enter discount 
rate if payment in 20 days) % 
 
3. 
PAYMENT Contractor shall provide monthly statements of itemized services.  
Payment will be reviewed and approved by the Contract Administrator or designee. 
The itemized statement shall not exceed the proposal fee in this Section.    
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 