Construction Agreement with Paveco Inc

City of Glendale — Regular Meeting (2024-11-26)

View PDF Item 10 Meeting page

Extracted text (via pymupdf) 27007 characters
1 
 
05/10/2023 
C 
 
 
CONSTRUCTION AGREEMENT 
 
This Construction Agreement ("Agreement") is entered into this _____ day of _________________, 2024, and is 
effective between the City of Glendale, an Arizona municipal corporation ("City"), and Paveco, Inc., an Arizona 
Corporation authorized to do business in the State of Arizona (“Contractor"). 
RECITALS 
A. 
City intends to undertake a project for the benefit of the public, with public funds, that is more fully set forth 
in Exhibit A attached ("Project"); 
B. 
City desires to retain the services of Contractor to perform those specific duties and produce the specific 
work as set forth in the Project; 
C. 
City and Contractor desire to memorialize their agreement with this document. 
AGREEMENT 
The parties hereby agree as follows: 
1. 
Project. 
1.1 
Scope.  Contractor will provide all services and material necessary to assure the Project is completed 
timely and efficiently consistent with Project requirements, including, but not limited to, working in 
close interaction and interfacing with City and its designated employees, and working closely with 
others, including other contractors, providers or consultants retained by City. 
1.2 
Project Team. 
a. 
Project Manager.  Contractor will designate an employee as Project Manager with sufficient 
training, knowledge, and experience to, in the City's opinion, to complete the Project and 
handle all aspects of the Project such that the work produced by Contractor is consistent 
with applicable standards as detailed in this Agreement. 
b. 
Project Team. 
(1) 
The Project Manager and all other employees assigned to the Project by Contractor 
will comprise the "Project Team." 
(2) 
Project Manager will have responsibility for and will supervise all other employees 
assigned to the Project by Contractor. 
c. 
Sub-contractors. 
(1) 
Contractor may engage specific technical contractor (each a "Sub-contractor") to 
furnish certain service functions. 
(2) 
Contractor will remain fully responsible for Sub-contractor's services. 
(3) 
Sub-contractors must be approved by the City, unless the Sub-contractor was 
previously mentioned in the response to the solicitation. 
(4) 
Contractor shall certify by letter that contracts with Sub-contractors have been 
executed incorporating requirements and standards as set forth in this Agreement. 
2. 
Schedule.  The Project will be undertaken in a manner that ensures it is completed in a timely and efficient 
manner. If not otherwise stated in Exhibit A, the Project shall be completed no later than one hundred 
twenty (120) consecutive calendar days from and including the date of receipt of the Notice to Proceed.

2 
 
05/10/2023 
3. 
Contractor’s Work. 
3.1 
Standard.  Contractor must perform services in accordance with the standards of due diligence, care, 
and quality prevailing among contractors having substantial experience with the successful furnishing 
of services and materials for projects that are equivalent in size, scope, quality, and other criteria 
under the Project and identified in this Agreement. 
3.2 
Licensing.  Contractor warrants that: 
a. 
Contractor and Sub-contractors will hold all appropriate and required licenses, registrations 
and other approvals necessary for the lawful furnishing of services ("Approvals"); and 
b. 
Neither Contractor nor any Sub-contractor has been debarred or otherwise legally excluded 
from contracting with any federal, state, or local governmental entity ("Debarment"). 
(1) 
City is under no obligation to ascertain or confirm the existence or issuance of any 
Approvals or Debarments or to examine Contractor's contracting ability. 
(2) 
Contractor must notify City immediately if any Approval or Debarment changes 
during the Agreement’s duration and the failure of the Contractor to notify City as 
required will constitute a material default of this Agreement. 
3.3 
Compliance.  Services and materials will be furnished in compliance with applicable federal, state, 
county and local statutes, rules, regulations, ordinances, building codes, life safety codes, or other 
standards and criteria designated by City. 
Contractor must not discriminate against any employee or applicant for employment on the basis of 
race, color, religion, sex, national origin, age, marital status, sexual orientation, gender identity or 
expression, genetic characteristics, familial status, U.S. military veteran status or any 
disability.  Contractor will require any Sub-contractor to be bound to the same requirements as stated 
within this section.  Contractor, and on behalf of any subcontractors, warrants compliance with this 
section. 
3.4 
Coordination; Interaction. 
a. 
If the City determines that the Project requires the coordination of professional services or 
other providers, Contractor will work in close consultation with City to proactively interact 
with any other contractors retained by City on the Project ("Coordinating Entities"). 
b. 
Subject to any limitations expressly stated in the budget, Contractor will meet to review the 
Project, schedules, budget, and in-progress work with Coordinating Entities and the City as 
often and for durations as City reasonably considers necessary in order to ensure the timely 
work delivery and Project completion. 
c. 
If the Project does not involve Coordinating Entities, Contractor will proactively interact 
with any other contractors when directed by City to obtain or disseminate timely information 
for the proper execution of the Project. 
3.5 
Hazardous Substances.  Contractor is responsible for the appropriate handling, disposal of, and if 
necessary, any remediation and all losses and damages to the City, associated with the use or release 
of hazardous substances by Contractor in connection with completion of the Project. 
3.6 
Warranties.  At any time within two years after completion of the Project, Contractor must, at 
Contractor’s sole expense and within 20 days of written notice from the City, uncover, correct and 
remedy all defects in Contractor’s work. City will accept a manufacturer’s warranty on approved 
equipment. 
3.7. 
Bonds.  Upon execution of this Agreement, and if applicable, Contractor must furnish Payment and 
Performance Bonds as required under A.R.S. § 34-608.

3 
 
05/10/2023 
4. 
Compensation for the Project. 
4.1 
Compensation.  Contractor's compensation for the Project, including those furnished by its Sub-
contractors will not exceed $2,423,779.10, as specifically detailed in Exhibit B ("Compensation"). 
4.2 
Change in Scope of Project.  The Compensation may be equitably adjusted if the originally 
contemplated scope of services as outlined in the Project is significantly modified by the City. 
a. 
Adjustments to the Scope or Compensation require a written amendment to this Agreement 
and may require City Council approval. 
b. 
Additional services which are outside the scope of the Project and not contained in this 
Agreement may not be performed by the Contractor without prior written authorization 
from the City. 
c. 
Notwithstanding the incorporation of the Exhibits to this Agreement by reference, should 
any conflict arise between the provisions of this Agreement and the provisions found in the 
Exhibits and accompanying attachments, the provisions of this Agreement shall take priority 
and govern the conduct of the parties. 
5. 
Billings and Payment. 
5.1 
Applications. 
a. 
Unless Exhibit B (Compensation) dictates otherwise, the Contractor will submit monthly 
invoices (each, a "Payment Application") to City's Project Manager and City will remit 
payments based upon the Payment Application as stated below. 
b. 
The period covered by each Payment Application will be one calendar month ending on the 
last day of the month. 
5.2 
Payment. 
a. 
After a full and complete Payment Application is received, City will process and remit 
payment within 30 days. 
b. 
Payment may be subject to or conditioned upon City's receipt of: 
(1) 
Completed work generated by Contractor and its Sub-contractors; and 
(2) 
Unconditional waivers and releases on final payment from Sub-contractors as City 
may reasonably request to assure the Project will be free of claims arising from 
required performances under this Agreement. 
5.3 
Review and Withholding.  City's Project Manager will timely review and certify Payment Applications. 
a. 
If the Payment Application is rejected, the Project Manager will issue a written listing of the 
items not approved for payment. 
b. 
City may withhold an amount sufficient to pay expenses that City reasonably expects to incur 
in correcting the deficiency or deficiencies rejected for payment. 
c. 
Contractor will provide, by separate cover, and concurrent with the execution of this 
Agreement, all required financial information to the City, including City of Glendale 
Transaction Privilege License and Federal Taxpayer identification numbers. 
d. 
City will temporarily withhold Compensation amounts as required by A.R.S. § 34-221(C).  
6. 
Termination. 
6.1 
For Convenience.  City may terminate this Agreement for convenience, without cause, by delivering 
a written termination notice stating the effective termination date, which may not be less than 15 
days following the date of delivery. 
a. 
Contractor will be equitably compensated any services and materials furnished prior to 
receipt of the termination notice and for reasonable costs incurred.

4 
 
05/10/2023 
b. 
Contractor will also be similarly compensated for any approved effort expended and 
approved costs incurred that are directly associated with Project closeout and delivery of the 
required items to the City. 
6.2 
For Cause.  City may terminate this Agreement for cause if Contractor fails to cure any breach of this 
Agreement within seven days after receipt of written notice specifying the breach. 
a. 
Contractor will not be entitled to further payment until after City has determined its damages. 
If City's damages resulting from the breach, as determined by City, are less than the equitable 
amount due but not paid Contractor for Service and Repair furnished, City will pay the 
amount due to Contractor, less City's damages. 
b. 
If City's direct damages exceed amounts otherwise due to Contractor, Contractor must pay 
the difference to City immediately upon demand; however, Contractor will not be subject to 
consequential damages more than $1,000,000 or the amount of this Agreement, whichever 
is greater. 
7. 
Insurance. 
7.1 
Requirements.  Contractor must obtain and maintain the following insurance ("Required Insurance"): 
a. 
Contractor and Sub-contractors.  Contractor, and each Sub-contractor performing work or 
providing materials related to this Agreement must procure and maintain the insurance 
coverages described below (collectively “Contractor's Policies"), until each Parties' 
obligations under this Agreement are completed. 
b. 
General Liability. 
(1) 
Contractor must at all times relevant hereto carry a commercial general liability 
policy with a combined single limit of at least $1,000,000 per occurrence and 
$2,000,000 annual aggregate. 
(2) 
Sub-contactors must at all times relevant hereto carry a general commercial liability 
policy with a combined single limit of at least $1,000,000 per occurrence. 
(3) 
This commercial general liability insurance must include independent contractors' 
liability, contractual liability, broad form property coverage, products and completed 
operations, XCU hazards if requested by the City, and a separation of insurance 
provision. 
(4) 
These limits may be met through a combination of primary and excess liability 
coverage. 
c. 
Auto.  A business auto policy providing a liability limit of at least $1,000,000 per accident for 
Contractor and $1,000,000 per accident for Sub-contractors and covering owned, non-
owned and hired automobiles. 
d. 
Workers' Compensation and Employer's Liability.  A workers' compensation and employer's 
liability policy providing at least the minimum benefits required by Arizona law. 
e. 
Equipment Insurance.  Contractor must secure, pay for, and maintain all-risk insurance as 
necessary to protect the City against loss of owned, non-owned, rented or leased capital 
equipment and tools, equipment and scaffolding, staging, towers and forms owned or rented 
by Contractor or its Sub-contractors. 
f. 
Notice of Changes.  Contractor's Policies must provide for not less than 30 days' advance 
written notice to City Representative of: 
(1) 
Cancellation or termination of Contractor or Sub-contractor's Policies; 
(2) 
Reduction of the coverage limits of any of Contractor or and Sub-contractor's 
Policies; and

5 
 
05/10/2023 
(3) 
Any other material modification of Contractor or Sub-contractor's Policies related 
to this Agreement. 
g. 
Certificates of Insurance. 
(1) 
Within 10 business days after the execution of the Agreement, Contractor must 
deliver to City Representative certificates of insurance for each of Contractor and 
Sub-contractor's Policies, which will confirm the existence or issuance of Contractor 
and Sub-contractor's Policies in accordance with the provisions of this section, and 
copies of the endorsements of Contractor and Sub-contractor's Policies in 
accordance with the provisions of this section. 
(2) 
City is and will be under no obligation either to ascertain or confirm the existence 
or issuance of Contractor and Sub-contractor's Policies, or to examine Contractor 
and Sub-contractor's Policies, or to inform Contractor or Sub-contractor in the 
event that any coverage does not comply with the requirements of this section. 
(3) 
Contractor's failure to secure and maintain Contractor Policies and to assure Sub-
contractor policies as required will constitute a material default under this 
Agreement. 
h. 
Other Contractors or Vendors. 
(1) 
Other contractors or vendors that may be contracted by Contractor with in 
connection with the Project must procure and maintain insurance coverage as is 
appropriate to their particular agreement. 
(2) 
This insurance coverage must comply with the requirements set forth above for 
Contractor's Policies (e.g., the requirements pertaining to endorsements to name the 
parties as additional insured parties and certificates of insurance). 
i. 
Policies.  Except with respect to workers' compensation and employer's liability coverages, 
the City must be named and properly endorsed as additional insureds on all liability policies 
required by this section. 
(1) 
The coverage extended to additional insureds must be primary and must not 
contribute with any insurance or self insurance policies or programs maintained by 
the additional insureds. 
(2) 
All insurance policies obtained pursuant to this section must be with companies 
legally authorized to do business in the State of Arizona and acceptable to all parties. 
7.2 
Sub-contractors. 
a. 
Contractor must also cause its Sub-contractors to obtain and maintain the Required 
Insurance. 
b. 
City may consider waiving these insurance requirements for a specific Sub-contractor if City 
is satisfied the amounts required are not commercially available to the Sub-contractor and 
the insurance the Sub-contractor does have is appropriate for the Sub-contractor's work 
under this Agreement. 
c. 
Contractor and Sub-contractors must provide to the City proof of Required Insurance 
whenever requested. 
7.3 
Indemnification. 
a. 
To the fullest extent permitted by law, Contractor must defend, indemnify, and hold 
harmless City and its elected officials, officers, employees and agents (each, an "Indemnified 
Party," collectively, the "Indemnified Parties"), for, from, and against any and all claims, 
demands, actions, damages, judgments, settlements, personal injury (including sickness, 
disease, death, and bodily harm), property damage (including loss of use), infringement,

6 
 
05/10/2023 
governmental action and all other losses and expenses, including attorneys' fees and litigation 
expenses (each, a "Demand or Expense," collectively, "Demands or Expenses") asserted by 
a third-party (i.e. a person or entity other than City or Contractor) and that arises out of or 
results from the breach of this Agreement by the Contractor or the Contractor’s negligent 
actions, errors or omissions (including any Sub-contractor or other person or firm employed 
by Contractor), whether sustained before or after completion of the Project. 
b. 
This indemnity and hold harmless provision applies even if a Demand or Expense is in part 
due to the Indemnified Party's negligence or breach of a responsibility under this Agreement, 
but in that event, Contractor shall be liable only to the extent the Demand or Expense results 
from the negligence or breach of a responsibility of Contractor or of any person or entity 
for whom Contractor is responsible. 
c. 
Contractor is not required to indemnify any Indemnified Parties for, from, or against any 
Demand or Expense resulting from the Indemnified Party's sole negligence or other fault 
solely attributable to the Indemnified Party. 
7.4 
Waiver of Subrogation.  Contractor waives, and will require any Subcontractor to waive, all rights of 
subrogation against the City to the extent of all losses or damages covered by any policy of insurance. 
8. 
E-verify, Records and Audits. To the extent applicable under A.R.S. § 41-4401, the Contractor warrants 
their compliance and that of its subcontractor with all federal immigration laws and regulations that relate to 
their employees and compliance with the E-verify requirements under A.R.S. § 23-214(A). The Contractor or 
subcontractor’s breach of this warranty shall be deemed a material breach of the Agreement and may result 
in the termination of the Agreement by the City under the terms of this Agreement. The City retains the legal 
right to randomly inspect the papers and records of the other party to ensure that the other party is complying 
with the above-mentioned warranty. The Contractor and subcontractor warrant to keep their respective 
papers and records open for random inspection during normal business hours by the other party. The parties 
shall cooperate with the City’s random inspections, including granting the inspecting party entry rights onto 
their respective properties to perform the random inspections and waiving their respective rights to keep such 
papers and records confidential. 
9.  
No Boycott of Israel.  To the extent A.R.S § 35-393 through § 35-393.03 are applicable, the parties hereby 
certify that they are not currently engaged in, and agree for the duration of the Agreement to not engage in, a 
boycott of goods or services from Israel, as that term is defined in A.R.S § 35-393. 
 
10.         Uyghur Forced Labor Prevention Act (UFLPA). Contractor certifies that it does not currently, and during 
the term of this Agreement, will not use: 
 
a. 
the forced labor of ethnic Uyghurs in the People’s Republic of China;  
 
b. 
any goods or services produced by the forced labor of ethnic Uyghurs in the People’s 
Republic of China; and  
 
c. 
any contractors, subcontractors or suppliers that use the forced labor or any goods or 
services produced by the forced labor of ethnic Uyghurs in the People’s Republic of China. 
 
11.  
Attestation of PCI Compliance.  When applicable, the Contractor will provide the City annually with a 
Payment Card Industry Data Security Standard (PCI DSS) attestation of compliance certificate signed by an 
officer of Contractor with oversight responsibility. 
12. 
Conflict.  Contractor acknowledges this Agreement is subject to A.R.S. § 38-511, which allows for 
cancellation of this Agreement in the event any person who is significantly involved in initiating, negotiating, 
securing, drafting, or creating the Agreement on City's behalf is also an employee, agent, or consultant of any 
other party to this Agreement. 
13. 
Notices. 
13.1 
A notice, request or other communication that is required or permitted under this Agreement (each 
a "Notice") will be effective only if:

7 
 
05/10/2023 
a. 
The Notice is in writing, and 
b. 
Delivered in person or by private express overnight delivery service (delivery charges 
prepaid), certified or registered mail (return receipt requested). 
c. 
Notice will be deemed to have been delivered to the person to whom it is addressed as of 
the date of receipt, if: 
(1) 
Received on a business day, or before 5:00 p.m., at the address for Notices identified 
for the Party in this Agreement by U.S. Mail, hand delivery, or overnight courier on 
or before 5:00 p.m.; or 
(2) 
As of the next business day after receipt, if received after 5:00 p.m. 
d. 
The burden of proof of the place and time of delivery is upon the Party giving the Notice. 
e. 
Digitalized signatures and copies of signatures will have the same effect as original signatures. 
13.2 
Representatives. 
a. 
Contractor.  Contractor's representative ("Contractor's Representative") authorized to act 
on Contractor's behalf with respect to the Project, and his or her address for Notice delivery 
is: 
Paveco, Inc. 
Attn:  Steven A. Combs 
P.O. Box 1067 
Sun City, AZ 85372 
 
b. 
City.  City's representative ("City's Representative") authorized to act on City's behalf, and 
his or her address for Notice delivery is: 
City of Glendale 
Attn:  Hugh Alter 
5850 W. Glendale Avenue 
Glendale, Arizona 85301 
With required copies to: 
City of Glendale  
 
 
City of Glendale 
City Manager 
 
 
 
City Attorney 
5850 West Glendale Avenue 
 
5850 West Glendale Avenue 
Glendale, Arizona 85301  
             Glendale, Arizona 85301 
c. 
Concurrent Notices. 
(1) 
All notices to City's representative must be given concurrently to City Manager and 
City Attorney. 
(2) 
A notice will not be considered to have been received by City's representative until 
the time that it has also been received by City Manager and City Attorney. 
(3) 
City may appoint one or more designees for the purpose of receiving notice by 
delivery of a written notice to Contractor identifying the designee(s) and their 
respective addresses for notices. 
d. 
Changes.  Contractor or City may change its representative or information on Notice, by 
giving Notice of the change in accordance with this section at least ten days prior to the 
change. 
14. 
Financing Assignment.  City may assign this Agreement to any City-affiliated entity, including a non-profit 
corporation or other entity whose primary purpose is to own or manage the Project.

8 
 
05/10/2023 
15. 
Entire Agreement; Survival; Counterparts; Signatures. 
15.1 
Integration.  This Agreement contains, except as stated below, the entire agreement between City 
and Contractor and supersedes all prior conversations and negotiations between the parties regarding 
the Project or this Agreement. 
a. 
Neither Party has made any representations, warranties or agreements as to any matters 
concerning the Agreement's subject matter. 
b. 
Representations, statements, conditions, or warranties not contained in this Agreement will 
not be binding on the parties. 
c. 
Any solicitation, addendums and responses submitted by the Contractor are incorporated 
fully into this Agreement as Exhibit A. Any inconsistency between Exhibit A and this 
Agreement will be resolved by the terms and conditions stated in this Agreement. 
15.2 
Interpretation. 
a. 
The parties fairly negotiated the Agreement's provisions to the extent they believed necessary 
and with the legal representation they deemed appropriate. 
b. 
The parties are of equal bargaining position and this Agreement must be construed equally 
between the parties without consideration of which of the parties may have drafted this 
Agreement. 
c. 
The Agreement will be interpreted in accordance with the laws of the State of Arizona. 
15.3 
Survival.  Except as specifically provided otherwise in this Agreement each warranty, representation, 
indemnification and hold harmless provision, insurance requirement, and every other right, remedy 
and responsibility of a Party, will survive completion of the Project, or the earlier termination of this 
Agreement. 
15.4 
Amendment.  No amendment to this Agreement will be binding unless in writing and executed by 
the parties. Any amendment may be subject to City Council approval. 
15.5 
Remedies.  All rights and remedies provided in this Agreement are cumulative and the exercise of 
any one or more right or remedy will not affect any other rights or remedies under this Agreement 
or applicable law. 
15.6 
Severability.  If any provision of this Agreement is voided or found unenforceable, that determination 
will not affect the validity of the other provisions, and the voided or unenforceable provision will be 
reformed to conform to applicable law. 
15.7 
Counterparts.  This Agreement may be executed in counterparts, and all counterparts will together 
comprise one instrument. 
16. 
Dispute Resolution.  Any controversy or claim arising out of or relating to this contract, or the breach 
thereof, shall be settled by arbitration administered according to the American Arbitration Association’s 
Commercial Arbitration Rules, and judgment on the award rendered by the arbitrator may be entered in any 
court having jurisdiction thereof. 
17. 
Exhibits.  The following exhibits, with reference to the term in which they are first referenced, are 
incorporated by this reference. 
Exhibit A 
Project 
Exhibit B 
Compensation 
 
 
 (The remainder of this page left blank intentionally. Signatures appear on the following page.)

9 
 
05/10/2023 
The parties enter into this Agreement as of the date shown above. 
City of Glendale, 
an Arizona municipal corporation 
_____________________________________ 
By:  Kevin R. Phelps 
Its:  City Manager 
ATTEST: 
 
 
 
 
 
 
Julie K. Bower 
City Clerk 
 
 
(SEAL) 
APPROVED AS TO FORM: 
 
 
 
 
 
 
Michael D. Bailey 
City Attorney 
Paveco, Inc., 
an Arizona Corporation 
_____________________________________ 
By:  Steven A. Combs 
Its:  President 
WOMEN-OWNED/MINORITY BUSINESS ☐ YES   ☐ NO

EXHIBIT A 
CONSTRUCTION AGREEMENT 
 
PROJECT 
 
 
This project consists of an asphalt mill and overlay of 67th Avenue from Greenway Road to Bell Road, including the 
Bell Road intersection. The existing median islands will be narrowed, and some hardscape sections will be replaced. 
This project also includes new signing, striping and a Wavetronix detection signal system at Greenway Road and 
Paradise Lane intersections.

EXHIBIT B 
CONSTRUCTION AGREEMENT 
COMPENSATION 
 
 
METHOD AND AMOUNT OF COMPENSATION 
By bid, including all services materials and costs. 
NOT-TO-EXCEED AMOUNT 
The total amount of compensation paid to Contractor for full completion of all work required by the Project during 
the entire term of the Project must not exceed $2,423,779.10. 
DETAILED PROJECT COMPENSATION 
As shown in detail on the Bid Schedule.