REQUEST FOR QUALIFICATIONS 
 
CITY OF GLENDALE MUNICIPAL LANDFILL  
GENERAL ENGINEERING SERVICES 
 
 
PROJECT NUMBER 
242501 (Bid No. 42500003) 
 
 
 
City of Glendale 
Engineering Department 
July 2024

2 
Glendale Landfill 
General Engineering Services 
2024-2028 
 
TABLE OF CONTENTS 
 
 
Page # 
 
REQUEST FOR QUALIFICATIONS (RFQ) 
 
INTRODUCTION .......…………………………………………………………………………………………………… 
3 
SECTION I       - 
PROJECT DESCRIPTION……………………………………………………….……………..…… 
3 
SECTION II      - 
SCOPE OF WORK…………………………..…...………………………………………………….. 
3 
SECTION III     - 
REQUEST FOR QUALIFICATIONS SELECTION CRITERIA..…………………………………. 
7 
SECTION IV    - 
PRE-SUBMITTAL CONFERENCE……………………………...……………………...………….. 
7 
SECTION V      - 
SUBMITTAL REQUIREMENTS.….…………………………………………………..…………… 
9 
SECTION VI    - 
SELECTION PROCESS AND SCHEDULE.….…………………………………………..………... 
11 
SECTION VII   - 
GENERAL INFORMATION.……………..………………………………………………..……….. 
11 
SECTION VIII  - 
PROTEST OF SOLICTATIONS AND CONTRACT AWARDS.…………………………..………. 12

3 
Glendale Landfill 
General Engineering Services 
2024-2028 
REQUEST FOR QUALIFICATIONS 
City of Glendale Municipal Landfill 
General Engineering Services 
Project No. 242501 (Bid No. 42500003) 
 
INTRODUCTION 
 
The City of Glendale is seeking a qualified Engineering Consulting firm (Consultant) to provide general engineering 
services, including design and construction administration services, engineering support, and environmental 
compliance support. Activities under this contract are specific to the City of Glendale Municipal Landfill and will be 
identified in separate task orders of varying size and complexity. The contract shall be for an initial period of three 
(3) years, with the option for the city to extend the term an additional two (2) years, renewable on an annual basis. 
 
All qualified firms interested in providing the required services are invited to submit their qualifications to this Request 
for Qualifications (RFQ). All qualifications must comply with the requirements specified in this RFQ. 
  
SECTION I – PROJECT DESCRIPTION: 
 
The City of Glendale Municipal Landfill (GML), located at 11480 West Glendale Avenue, is owned, and operated 
by the City of Glendale. The permitted footprint consists of two areas: the south area (approximately 140 acres) and 
the north expansion area (approximately 120 acres). The Arizona Department of Environmental Quality (ADEQ) 
approved the entire footprint as a landfill under the 1986 Environmental Quality Act. Based on an annual landfill 
financial assurance report, the GML has approximately another 40 years disposal capacity. Landfill operations are 
nearly complete in the south area, with operations already started in the north area. 
  
The following is a list of general landfill engineering task categories typically needed by the City Landfill. This list 
is not comprehensive, and the city reserves the right to modify or add related engineering services as necessary. 
 
1. 
Planning and evaluating related master plan development, cost analysis, waste modeling and statistical 
evaluations, landfill operations, closure / post-closure and financial assurance, facility management, 
equipment optimization and utilization techniques, and environmental regulatory compliance. 
2. 
Standard calculations for landfill operation and optimization such as waste quantity estimates (e.g., 
tonnage, volume, air space), soil to waste ratios, waste densities, and environmental/air quality emissions. 
3. 
Routine activities including geotechnical and hydrological studies, construction cost projections and 
management oversight on design projects such as waste cell sequencing, leachate collection and 
pumping, stormwater management and landfill gas. 
4. 
Document preparation including permit applications and modifications; design reports and feasibility 
studies; cost estimates; construction plans, specifications and bid documents, and facility and 
environmental plans. 
5. 
Meetings and presentations, including attendance and/or representation of the City at various public and 
governmental agency meetings. 
6. 
Regulatory agency interaction and liaison requiring robust knowledge of federal, state, and local agency 
policies, guidelines, and regulations. 
 
SECTION II - SCOPE OF WORK 
 
The selected Consultant will work closely with the Glendale Municipal Landfill and others, as needed, during all 
phases of the project. The City will utilize the services of the Consultant for programming, design, probable costs, 
and construction administration. The Consultant may also attend and represent the City at various public and 
governmental agency meetings. 
 
The following information is a general description of the scope of work that the Consultant will be required to 
perform. The services listed in this scope of work may include, but are not limited to, the following:

4 
Glendale Landfill 
General Engineering Services 
2024-2028 
A.  General Project Administration: 
1. 
Conduct project meetings to discuss the progress, direction, and technical aspects of the project.  Project 
documentation will consist of preparing and distributing meeting agendas and minutes, and monthly reports.  
Meeting minutes will summarize key discussions, comments, decisions, and any action items required.  The 
monthly project reports will summarize the monthly work progress, project issues, and project schedule status. 
2. 
The Consultant will assist in the overall coordination of the project with City staff, including the Landfill and 
Field Operations, Engineering, Building Maintenance, Building Safety, and other departments as necessary to 
facilitate the project. 
3. Coordinating with private, public and City utilities (i.e., Information Technology Department, Water 
Services Department) regarding standard technology and utility issues and incorporating pertinent 
information in the plans. 
4. Submitting and retrieving all required design documents to the various required reviewing agencies. 
5. Preparing and maintaining a project schedule after meeting with the designated City project team to 
determine appropriate submittal deadlines and to coordinate project submissions. 
6. Assisting the City in obtaining all federal, state, county, local and utility permits, and approvals required for 
the Project. As the Project progresses, the Consultant shall timely furnish to the City copies of all 
communications between the Consultant and the respective agencies or departments, and all approvals and 
permits for the Project. 
7. Provide a detailed construction phasing plan and associated cost estimates for the landfill projects. 
8. Submit a written monthly progress report to the Landfill Project Team during the entire period of the 
project, through all phases, including all studies, evaluations, and design and construction. Also, the 
Consultant will be required to submit a monthly project schedule update and quarterly project cash flow 
schedule. This information will be submitted to the City for the entire period of the project, through all 
phases. 
 
 
a. 
Project Schedule: The Consultant shall prepare a significant event calendar. The initial schedule should 
show the original start date with initial completion date as references. A copy of the original overall 
schedule shall be submitted at the project kick-off meeting. The Consultant shall update the schedule 
monthly to keep it current showing comparison with the Baseline/Target schedule. The construction 
schedule will be the responsibility of the Contractor after the Contractor is issued the construction 
notice to proceed by the City. 
b. Invoices and Progress Reports: The City will approve the format for invoices and progress reports. 
Invoices will be submitted using the City’s online SmartSheet application no later than the 25th day of 
the month. The invoices will be consistent with the project tasks, project schedule, fee proposal, and 
cash flow schedule. The invoice will identify the contract number and include the amount for each 
work task and man-hour level of effort identified in the approved fee proposal. The total invoice 
submitted shall be less than or equal to the task percent complete with the associated cost. The invoice 
will show the amounts previously billed, the amount due for the current period and the task remaining 
balance. The monthly progress report will be submitted to the City’s Project Manager the same time 
the monthly invoice is submitted. Non-response to this requirement could delay payments to the 
Consultant. 
c. 
Cash Flow Schedule: The cash flow schedule will provide information to the City regarding future 
funds needed to complete the project. It is the responsibility of the Consultant to submit the project life 
cycle cash flow spreadsheet monthly.  Non-response to this requirement could delay payments to the 
Consultant. The Consultant will be responsible for the cash flow schedule through all phases of the 
project, including design and construction administration phases. 
 
The Consultant will collect or estimate the cash flow information from all the parties involved in the 
project (e.g., design consultants, engineers, construction contractors) and will combine this information 
using the Excel four (4) page workbook provided to the Consultant by the city. The Consultant will 
need to obtain the cash flow information from the Contractor and coordinate this information into the 
overall cash flow information. The Consultant will complete the applicable four (4)-page worksheet 
and send it electronically to the Project Manager.

5 
Glendale Landfill 
General Engineering Services 
2024-2028 
 
B.  Planning, study, GIS/mapping/survey services: 
 
  
1. Prepare Design Concept Reports or Project Studies. 
2. Perform field work as necessary to support reports, studies, designs or regulated environmental compliance 
programs. 
3. Advise the City regarding use of construction materials. 
 
C. Design Services:  
1. 
The Consultant may be required to prepare a preliminary design report, which incorporates the findings, 
conclusions, and recommendations from studies and evaluations.  This report will include planning 
recommendations, preliminary design criteria, preliminary construction costs, and code requirements. 
2. 
The Consultant will prepare drawings and specifications.  The Consultant will submit the drawings and 
specifications for review and comment at the 30, 60, 90 and 100 percent complete phases.  The contract 
drawings will include all drawings as needed to provide a complete project design.  The drawings will be 
prepared on 24 by 36-inch sheets using computer generated drafting AutoCAD (CAD) techniques.  The 
contract documents will include the following: 
 
a. 
City of Glendale’s “boiler plate” front-end specifications 
b. 
Consultant standard technical specifications 
c. 
Contract drawings in standard City format 
 
3. 
Agency design reviews will include submittal of 90 percent drawings to Glendale Landfill, City of Glendale 
Development Services and Building Safety Departments, Maricopa County Environmental Services 
Department (if required), and other interested agencies requiring approval and/or permits for construction. 
4. 
Final 100% drawings and specifications will be prepared based upon review comments received from the 90% 
drawings.  The Consultant will coordinate obtaining all permits required for construction, including assistance 
in preparing permit applications and providing additional information in support of the project. One 
reproducible set of the approved, bid ready, final drawings and specifications will be delivered to the City. The 
Consultant shall also provide the final drawings and specifications in electronic format approved by the City. 
5. 
The Consultant shall prepare construction cost estimates at 30, 60, and 90 percent drawings. The estimates will 
include estimates of quantities and prices appropriate for the various phases and completeness of the work 
covered by the drawings and specifications. 
6. 
Prepare facility information to incorporate into the City’s Asset Management program including drawings, 
asset lists, asset attributes, PM requirements, warranty information, assign asset numbering for entire 
facility per current City asset management standards. The asset management spreadsheet is due at the 90% 
drawings (minus the equipment serial numbers). All asset ID’s must show on the 90% plans. 
 
D. Bid Phase: 
1. Attending and preparing meeting minutes for the pre-bid conference and any other related meetings, and 
preparing all necessary addenda related to documents originated by the Consultant. 
2. Responding to questions regarding the plans and specifications. Consultant shall receive, review, and make 
recommendations regarding requests for substitutions, and incorporate these substitution requests into the 
addenda as required. 
3. If requested by the City, the Consultant will review the submitted bid documents and prepare a 
recommendation for bid approval. 
4. If a CMAR is selected the CMAR will be responsible for bidding the project, but the Consultant will 
review all GMPs and provided the City with their recommendations. 
 
E.  Construction Administration Services: 
The construction administration services to be performed by Consultant are as follows: 
1. Conduct a preconstruction conference with the Contractor, the City, and other interested parties. In addition to 
conducting the meeting, the Consultant will prepare an agenda, take minutes, and issue them to all 
attendees. The preconstruction conference shall include a discussion of the Contractor's tentative schedules, 
procedures for transmittal and review of the Contractor's submittals, processing payment applications,

6 
Glendale Landfill 
General Engineering Services 
2024-2028 
critical work sequencing, change orders, record documents, and the Contractor's responsibilities for safety 
and first aid. 
2. The Consultant shall provide quality acceptance services to perform inspection and acceptance testing of all 
items of work required by the drawings and specifications. The Consultant shall monitor construction for 
compliance with the project plans and specifications. 
3. The Consultant shall provide an on-site representative for observation and reporting of daily contractor 
activities. The on-site representative will be approved by the City. 
4. The Consultant shall review the construction schedule with particular emphasis on assuring that reasonable 
time allowances have been made for the work required. 
5. The Consultant shall review the Contractor’s schedule with particular emphasis on ensuring that reasonable 
time allowances have been made for work required by the various utility companies, prior to approval. 
6. 
The Consultant shall prepare a list of all required submittals. 
7. The Consultant shall review warranties, guarantees, certificates of inspection, and tests and approvals. 
8. The Consultant shall review and approve all shop drawings submitted by the Contractor. 
9. 
The Consultant shall conduct weekly construction project meetings, prepare an agenda and minutes of the 
meeting, and distribute to all attendees. 
10. Provide value engineering proposals that may accelerate the construction schedule or reduce construction 
costs. 
11. The Consultant shall review the Contractor's estimated monthly payments and advise the City as to its 
acceptability.  The Consultant's review shall be for the purpose of making an independent opinion of work 
completed and mathematical check of the Contractor's payment request.  Consultant is responsible for 
verifying the quantities of work which are the basis of the payment requests. The final monthly pay 
requests will be approved and processed by the City. 
12. The Consultant will review and respond to all requests for information by the City and/or Contractor. 
13. The Consultant shall review and make recommendations on all change order requests from the Contractor. 
Evaluate the cost and scheduling aspects of all change orders and, where necessary, negotiate with the 
Contractor to obtain a fair price for the work. No change order shall be implemented without the prior 
approval of the City. 
14. Materials testing will be the responsibility of the contractor. However, the Consultant shall evaluate and 
report on tests and test analyses for materials, including concrete, pipe, soil, soil compaction, asphalt, and 
any other subjects that may be required by the specifications and accepted construction practices. 
15. The Consultant will maintain a running deficiency list during the course of the project and keep the Contractor 
informed as to its current status. The Consultant will conduct, with the assistance of the City, a final inspection 
and prepare a final punch list, including all items remaining on the deficiency list, as well as any additional 
items discovered during the final inspection. 
16. The City will not grant substantial completion for any portion of the project until the asset management 
spreadsheet is 100% complete, correctly populated, and accepted by the City. The contractor will be 
responsible for maintaining new assets until the asset management spreadsheet is accepted by the City. 
17. The Consultant will compile a list of required final submittals, including, but not necessarily limited to record 
drawings, warranty and guarantee documents, lien waivers, product manuals, maintenance and operation 
manuals, and any spare parts and training required by the contract documents and the Contractor’s 
responsibility to provided. The Consultant shall review the project closeout documents for final approval. 
 
a. 
As-Built Drawings: The Consultant shall prepare record as-built drawings of the completed work 
based upon markups from the Contractor’s record drawings and deliver the drawings to the City upon 
completion of the work. The Consultant will provide one set of record drawings on bond paper and on 
a thumb drive in the appropriate format of ACAD approved by the City. The Consultant will provide a 
second set of record drawings in PDF format on a thumb drive. Each drawing sheet shall be presented 
as a separate PDF file and shall include the seal and signature of the architect/engineer of record. The 
seal and signature of the architect/engineer of record is not required on the thumb drive with the 
ACAD file. The RECORD DRAWING signature block on the cover sheet must be filled out and 
signed by the appropriate responsible party. 
 
18. If requested by the City the Consultant will conduct a one-year and two-year warranty inspection and 
prepare a punch list of deficient items discovered during the inspections.

7 
Glendale Landfill 
General Engineering Services 
2024-2028 
 
F. Other Engineering Services that may be required: 
• 
Roadway design 
• 
Site grading and drainage 
• 
Area drainage master studies and flood plain mapping 
• 
Storm drain design, hydrology, and hydraulic analysis. 
• 
Landfill area GIS/Mapping 
• 
Storm Water Pollution Prevention Plans (SWPPPs) 
• 
Water and wastewater systems 
• 
General survey services: boundary surveys, construction staking, legal descriptions, as-built surveying, and 
topographic surveys. 
• 
General geotechnical services: reports, construction, and materials testing/sampling (field & laboratory), 
QA/QC, subsurface investigations and reports, subsidence investigations and reports, geotechnical designs, 
geotechnical investigations/inspections, and forensics 
• 
General environmental services: Phase I & II assessments; asbestos, lead, paint, and mold testing; 
environmental permits and compliance. 
• 
Laboratory providing services should be AMRL certified, with ATTI certified field technicians. 
 
SECTION III – PRE-SUBMITTAL CONFERENCE 
 
A pre-submittal conference will be held on Wednesday, July 24, 2024, at 9:00 a.m., at the Glendale Municipal 
Landfill, 11480 West Glendale Avenue, Glendale, AZ, in the Landfill Administration Building conference room. At 
this meeting, staff will discuss the scope of work, general contract issues and respond to questions from the 
attendees. The City will also conduct a walk-through of the landfill and the north cell area. Attendance will be 
limited to a maximum of 2 attendees per firm. Because City staff may not have time to respond to individual 
inquiries regarding the scope outside of the pre-submittal conference and walk-through, it is recommended 
that interested firms have a representative attend. 
 
SECTION IV – REQUEST FOR QUALIFICATIONS SELECTION CRITERIA 
 
NOTE: For the convenience of the review committee, limit your RFQ submittal to ten (10) single sided (8.5" x 11" 
– 1” margins) pages using Times New Roman 10-point font, plus a one-page cover letter (11 pages).  Respond to 
Items A through E in alphabetical order. 
 
If desired, additional materials, such as detailed resumes, detailed descriptions of previous projects, and/or other 
information relevant to the assessment of the Engineering Consulting firm’s qualifications may be included AT 
THE END of the RFQ submittal in CLEARLY LABELED APPENDICES, but responses to Items A through E 
MUST be limited to 10 pages or less. Please be aware that the review committee members may limit their review 
activities only to Items A through E. 
 
The City reserves the right to accept or reject any or all submittals and re-solicit or cancel this procurement 
if deemed by the City to be in its best interest. All firms or persons interested in submitting on this RFQ will 
refrain from direct or indirect contact with any person who may play a part in the selection process, or any 
person employed by the City, other than authorized representatives as identified by the Engineering 
Department. 
 
Submittals will be worth 500 points, broken down as listed below. Parties interested in providing consulting services 
must address the following criteria: 
 
A. General Information (25 points) 
 
1. Provide a general description of the firm and/or team that is proposing to provide the required services. 
Explain the legal organization of the firm and/or team. Provide an organization chart showing all key

8 
Glendale Landfill 
General Engineering Services 
2024-2028 
personnel, specifically identifying those proposed for assignment to any or all categories explained in 
Sections I and II. 
 
2. Provide the following information: 
a. 
List the Arizona business license(s) held by the firm authorizing the firm to transact business in 
Arizona by the Arizona Corporation Commission. 
b. Identify the location of the firm’s office that will manage this project and the percent of work that will 
be performed from this office. If the principal office is not located in the Phoenix Metro area, state 
what percent of the work will be performed from the principal office. 
c. 
Identify any contracts or subcontracts, held by the firm or officers of the firm, terminated within the last 
three years, and briefly describe the circumstances. Also, identify any claims filed on a contract that 
resulted in litigation or arbitration within the last three years and briefly describe the circumstances and 
the outcomes.  This information applies only to contracts or subcontracts issued in the state of Arizona 
or the state where the office is located that will be managing this project if not in Arizona. If there are 
no issues in these areas, please respond that there are no issues, pending or threatened suits or defaults. 
 
B. Experience and qualification of the firm/team.  (100 points) 
 
1. Identify at least five (5) comparable local or regional (Southwestern United States arid desert) projects, 
studies or landfill engineering engagements awarded to your firm during the last five (5) years, in which the 
firm served as the Prime Consultant, Project Manager, and/or Construction Manager. 
 
 
For each comparable project identified, provide: 
- 
Project name and brief description of project. 
- 
Highlight how the services provided for this project are similar to the services required by the City. 
- 
Role of the firm.  Specify whether the firm was the Prime Consultant, Project Manager, and/or 
Construction Manager.  Identify the non-design services provided during each phase of the project 
(i.e., cost estimating, scheduling, value engineering, construction phasing schedule and construction 
plan, etc.). 
- 
Project’s professional services contract amount, if applicable. 
- 
Project’s initial construction cost and final construction cost, including change order amounts. 
- 
Scheduled and actual dates of completion. If there was a design element include scheduled and actual 
dates of design completion. 
- 
Scheduled and actual dates of construction completion, if applicable. 
- 
Project Owner and representative with current telephone numbers and/or email addresses. 
- 
Reference information (two names per project, organization name, current telephone number and/or 
email address).  References must be germane to the projects and clearly identify the nature of their 
participation in the referenced project. 
 
2. Discuss the Team organizational structure and how it can contribute to meeting the City’s goals. 
 
3. List all projects performed in the City of Glendale (COG), public or private, completed, or ongoing. List no 
more than five projects.  Include the project name, start date and date of completion. Present a brief history 
of your firm’s work in COG.  Provide one city staff reference and the nature of their participation in the 
referenced project. 
 
4. Identify which services will be performed in-house and those services that will be performed by any sub-
consultant(s). Provide the estimated percent of work that will be performed by the firm and by each sub-
consultant during the duration of the project. For services performed by a sub-consultant(s), describe their 
specific areas of responsibility and experience. 
 
C. Experience of key personnel to be assigned to this project.  (100 points) 
 
1. For each key person identified in the firm’s organization chart, list at least three similar projects in which 
they have played a primary role. If a project selected for a key person is the same as one selected for the

9 
Glendale Landfill 
General Engineering Services 
2024-2028 
firm, provide just the project name and the role of the key person.  For projects other than one selected for 
the firm provide the same information as requested in B.1. above. 
 
2. For each key person identified, provide a brief resume of their overall experience and knowledge and their 
number of years of overall experience. List any applicable professional registrations and/or certifications 
held by the key personnel. Identify the home office location of each key person proposed for this project, 
their length of time with the firm, and the percent of their time planned for their anticipated involvement in 
this project. 
 
4. List the key staff of any proposed sub-consultants. Include their home office location, brief description of 
their experience and qualifications, their length of time with the firm, and the percent of their time planned 
for their anticipated involvement in this project. 
 
D. Understanding of the services required and approach to performing the required services.  (200 points) 
 
1. Discuss the major issues your team has identified from similar projects in the Southwestern arid desert 
region and how you intend to address those issues. 
 
2. Describe your firm’s project management approach and team organization for the various services needed 
as described in Section II – Scope of Work. 
 
3. Describe systems used for planning, scheduling, estimating, and managing design, pre-construction, and 
construction phase services.  Describe the firm’s experience on quality control, dispute resolution and 
project safety management. 
 
E. Current/recent workload.  (25 points) 
1. List all landfill and solid waste projects awarded to your firm during the last two years. If your firm has 
more than one office location or specific division that will be responsible for this program list the projects 
awarded to the office or division that will be providing the majority of the services required. For each 
project provide a brief project description, status of the project and (estimated) completion date. List no 
more than 10 projects. 
 
2. Provide a brief description of your firms understanding of the current regional market conditions affecting 
your workload versus upcoming planned and projected landfill engineering work.  Include information 
relevant to your local office and/or key personnel only. 
 
Note: To earn the total 25 points for this criteria category all of the information, as requested above, must 
be provided. If not, points will be awarded at the discretion of the selection committee member reviewing 
the submittal. 
 
F. Ability of the firm/team to provide the required services. (50 points) 
 
The selection committee will review your RFQ submittal for completeness of each criteria item as it relates to 
the information requested. The selection committee member reviewing the RFQ submittal shall determine the 
points awarded for this item. The firm submitting the RFQ submittal will not address or respond to this item. 
 
SECTION V - SUBMITTAL REQUIREMENTS 
 
Firms interested in submitting on this project must be registered as a vendor in order to submit an RFQ 
submittal. RFQ submittals must also be submitted through the Vendor Self Service site. To register please visit 
the Vendor Self Service site at: 
https://glendaleazvendors.munisselfservice.com/Vendors/Default.aspx. 
 
Please note this program works best with the Chrome web browser.

10 
Glendale Landfill 
General Engineering Services 
2024-2028 
 
 
 
On the submittal to this RFQ, please display the firm information, bid number and title as shown: 
 
BID NUMBER: 42500003 
TITLE: 242501 – CITY OF GLENDALE MUNICIPAL LANDFILL GENERAL ENGINEERING 
SERVICES 
 
Please provide your response to this RFQ no later than: 
Thursday, August 1, 2024, before 2:00 p.m. (local time) 
Any proposal received after this time will not be considered. 
 
All questions regarding this Request for Qualifications must be submitted in writing prior to 4:00 p.m., July 29, 
2024, to: 
 
By E-Mail to (preferred): 
EngineeringDept@glendaleaz.com 
 
Or by mail to: 
City of Glendale 
Engineering Department, 3rd Floor 
5850 W. Glendale Avenue 
Glendale, AZ  85301-2599 
 
City of Glendale Representatives: 
John Murphey 
Bill Passmore 
 
Firms interested in the above project should submit a response addressing the specified Request for 
Qualifications (RFQ) criteria. Please be advised that failure to comply with the following criteria could be 
grounds for disqualification: 
 
• 
Receipt of submittal by the specified date and time. 
• 
Adherence to maximum page requirement and font size. 
• 
The firm must acknowledge in their cover letter to this RFQ they have reviewed the City’s 
Professional Services Agreement (PSA) and are willing to execute the agreement without revisions or 
modifications. An example of the City’s Professional Service Agreement (PSA) is available for 
downloading and reviewing on the City’s website at www.glendaleaz.com on the Engineering 
Department’s page under Design and Construction Documents and Forms. 
 
Adherence to the maximum page criterion is critical. Each page (maximum 8 ½ x 11 with 1” margins) with criteria 
information will be counted. Pages that have photos, charts and graphs will be counted towards the maximum 
number of pages. Submittals may include front and back design covers (not to be confused with the “cover letter”). 
The front and back design covers can include the project title, firm logo, photos, graphics, etc. The front and back 
design covers will not be counted toward the maximum page limit. Also, 1” margins may include decorative 
headers/footers that include information such as page number; project title; date; firm name, address, phones 
numbers, website information; etc. Design covers and margins must not include any information relative to the 
selection criteria. 
 
The 1-page Cover Letter should include the following: 
• 
Project name and number. 
• 
Project bid number. 
• 
Name of the firm, address, and phone number. 
• 
Name of the primary contact, including email and direct phone number.

11 
Glendale Landfill 
General Engineering Services 
2024-2028 
• 
Acknowledge the firm has reviewed the City’s Professional Services Agreement (PSA) and is willing to 
execute the agreement without revisions or modifications. 
• 
Any other information desired by the submitting firm other than any information relative to the selection 
criteria. 
SECTION VI - SELECTION PROCESS AND SCHEDULE 
 
Your RFQ submittal will be evaluated based on the qualifications of your firm, project team’s experience, firm’s 
approach to the project, and other information as outlined in the RFQ Selection Criteria. 
 
A Selection Committee organized for this specific project will review and evaluate the submittals. Following a 
review of the submittals, the Selection Committee will “short-list” three to five firms for further participation in 
Phase II of the selection process.  
 
PHASE II – PRESENTATION/INTERVIEWS 
 
The “short-listed” firms will be notified and invited to participate in a presentation/interview to the Selection 
Committee. The “short-listed” firms will be provided additional information regarding the presentation/interview 
and will have one week to prepare.   
 
After the presentation/interviews, the “short-listed” firms will form the final list and one firm will be selected as the 
most qualified by the Selection Committee. Final selection will be based on the scores/rankings from the 
Presentation/Interviews only and will not be combined with the RFQ submittal scores/rankings. The selected firm 
will be notified within a few days of the presentation/interviews and invited to a scoping meeting to start fee 
negotiations and final contract documents. 
 
SECTION VII – GENERAL INFORMATION 
 
No reimbursement will be made by the City for any costs incurred prior to the execution of a written contract and a 
formal notice to proceed. The City reserves the right to reject any and all submittals and re-solicit or cancel this 
procurement if deemed by the City to be in its best interest. The City also reserves the right to waive any informality 
or irregularity in any submittal to this RFQ and to be the sole judge of the merits of the respective submittals 
received. 
 
A firm, business or individual, may be disqualified for any of the following: 
• 
Litigation pending against the City. 
• 
Failure to perform faithfully any previous contract with the City after said previous contract was terminated 
for cause. 
• 
Failure to disclose any pending violations, lawsuits, etc., and any actions that may be a conflict of interest. 
• 
Previously defaulting or terminating a contract with the City. 
• 
Current or pending litigation which is likely to have a negative impact on a firm’s ability to execute this 
contract. 
• 
These are a continuing disclosure requirement. Any such matter commencing after the execution of a 
contract, must be disclosed in a timely manner in a written statement to the City. 
 
All firms or persons interested in submitting a response to this RFQ or this project will refrain from direct or indirect 
contact with any person who may play a part in the selection process, or any person employed by the City, other 
than the authorized representative identified above. This policy is intended to create a level playing field for all 
potential firms and to protect the integrity of the selection process. Any changes to this RFQ will be in the form of 
an addendum. 
 
Submittals to this RFQ are not returnable and will become the property of the City of Glendale.

12 
Glendale Landfill 
General Engineering Services 
2024-2028 
SELECTION PROCESS – SCHEDULE 
The following tentative schedule has been prepared for this project. Firms interested in this project must be 
available on the tentative week scheduled for interviews. This schedule is subject to change. 
 
Pre-Submittal Conference Meeting (9:00 a.m.) 
July 24, 2024 
RFQ submittals Due to Engineering Department by 2:00 p.m. 
August 1, 2024 
ESTIMATED DATES 
 
Firms Short-listed for Presentation/Interview Process 
Week of August 26, 2024 
Presentation/Interviews  
Week of September 9, 2024 
Selection Process Complete  
September 20, 2024 
Completion of Professional Services Agreement  
October 18, 2024 
City Council Award 
November 12, 2024 
   
SECTION VIII – PROTEST OF SOLICTATIONS AND CONTRACT AWARDS 
 
If a protest is lodged in connection with the subject procurement, the City will follow the City of Glendale 
Procurement Policy and Procedures, Section 800 Protests and Hearings, with the Director of Engineering serving as 
Materials Manger. If a protest cannot be resolved at the Director of Engineering level the protestant may request a 
hearing (Hearing Request). The City Manager will appoint a Hearing Officer in the appeal process.