VAI RESORT
ZON23-03
Centerpoint PAD Amendment
SEC Cardinals Way and Loop 101 Freeway
Submittal #1:  
May 2023
Submittal #2:  
October 2023
Submittal #3:  
January 8, 2024
Submittal #4:  
August 5, 2024
Submittal #5:  
September 23, 2024
PLANNING DIVSION 
RECEIVED
[04 OCT 2024]

Table of Contents | 2 
VAI Resort
TABLE OF CONTENTS
DEVELOPMENT TEAM 
 
4
INTRODUCTION  
5
REGULATORY PROVISIONS 
 
6
GENERAL PLAN CONFORMANCE 
 
7
PLANNED AREA DEVELOPMENT PLAN  
8
 
I. Purpose and Overview  
8
 
II. Permitted Uses 
 
8
 
III. Performance Conditions 
 
9
 
 
Live Events 
 
9
 
IV. Development Standards 
 
9
 
 
TABLE A: Development Standards  
10
 
V. PAD Deviation Justifi cation 
 
11
 
 
Landscape Setbacks 
 
11
 
 
Landscape Islands in Parking Lot 
 
11
 
 
Parking  
11
 
 
TABLE B: Parking Totals 
11
DESIGN GUIDELINES 
 
12
 
ARCHITECTURAL DESIGN PARAMETERS 
 
12
 
 
Building Design  
12
 
 
TABLE C: Building/“ISLE” Identifi cation 
 
12
 
 
Roof Design 
 
13
 
 
Entrances 
 
14
 
 
Building Materials 
 
14
 
 
Paving Materials Design 
 
15
 
 
Wall/Fences Design 
 
15
 
 
Lighting Design  
15
 
 
Main Project Entry Points  
15
LANDSCAPE DESIGN 
 
16
 
 
Specifi c Perimeter Treatments 
 
16
 
 
Site Entrances 
 
16
 
 
Parking Lot Landscaping  
16
 
 
Hardscape Design 
 
16
SIGNS & WAYFINDING 
 
17
 
Allowable Signs  
17
 
A. Building or Tenant Wall Signs facing the Highway 
 
18
 
B. Electronic Digital Signs 
 
18
 
C. Building Identifi cation 
 
18
 
D. Vehicular Entry Monolith Sign  
18
 
E. Exterior Traffi  c Wayfi nding Signs 
 
19
 
 
Primary Vehicular Wayfi nding Signs 
 
19
 
 
Secondary Vehicular Wayfi nding Signs 
 
19
 
 
Tertiary Vehicular Wayfi nding Signs 
19 
 
F. Digital Billboards 
 
19

Table of Contents | 3 
VAI Resort
INFRASTRUCTURE 
 
20
 
 
Circulation 
 
20
 
 
Traffi  c 
20-22
 
 
Grading & Drainage 
 
22
 
 
Waste and Wastewater 
 
22
PHASING 
 
22
PAD FINDINGS  
23
SUMMARY 
 
25
EXHIBITS 
 
26
 
EXHIBIT 1 - AERIAL MAPS 
27
 
 
Aerial Map_Parcel 102-14-272D (11”x17”) 
28
 
 
Aerial Map_Parcel 102-14-273D (11”x17”) 
 
29
 
EXHIBIT 2 - ZONING MAPS 
30
 
 
Zoning Map_Parcel 102-14-272D (11”x17”) 
31
 
 
Zoning Map_Parcel 102-14-273D (11”x17”)  
32
 
EXHIBIT 3 - GENERAL PLAN LAND USE MAPS 
33
 
 
General Plan Land Use Map_Parcel 102-14-272D (11”x17”) 
34
 
 
General Plan Land Use Map_Parcel 102-14-273D (11”x17”) 
 
35
 
EXHIBIT 4 - CONCEPTUAL CIVIL/SITE PLAN 
36
 
 
Conceptual Site Plan - Sheet CS01 - Cover & Summary Plan (24”x36”) 
37
 
 
Conceptual Site Plan - Sheet SP01 - Partial Plan (24”x36”) 
38 
 
 
Conceptual Site Plan - Sheet SP02 - Partial Plan (24”x36”) 
39 
 
 
Conceptual Site Plan - Sheet SP03 - Partial Plan (24”x36”) 
40
 
EXHIBIT 5 - RENDERED ELEVATIONS 
42
 
 
Rendered East Elevation (11”x17”) 
43
 
 
Rendered South Elevation (11”x17”) 
44
 
 
Rendered West Elevation (11”x17”) 
45
 
 
Rendered North Elevation (11”x17”) 
46
 
EXHIBIT 6 - CONCEPTUAL RESORT SITE PLAN 
47
 
 
Conceptual Resort Site Plan - Sheet A001 (36”x48”) 
48
 
 
Area Development Streetscape Overall Plan - Cardinals Way - Sheet A001A (36”x48”) 
49
 
 
Area Development Streetscape Overall Plan - North 95th Avenue - Sheet A001B (36”x48”) 
50
 
 
Area Development Wall Elevations & Details - Sheet A001C (36”x48”) 
51
 
EXHIBIT 7 - COMPREHENSIVE SIGN PACKAGE (11”x17”) 
52
 
 
Comprehensive Sign Package Cover 
53
 
 
Table of Contents 
54
 
 
Resort Overview Map 
55
 
 
Building Exterior & Identity Signage 
56
 
 
Wayfi nding 
67
 
EXHIBIT 8 - LIGHTING 
77
 
 
Dark Sky Lighting Locations (11”x17”) 
78
 
 
Dark Sky MATTEL Adventure Park Layout - Sheet LT-GTX (36”x48”) 
79
 
 
Aerobar Cutsheets - 12 pages (8.5”x11”) 
80-91

Development Team | 4 
VAI Resort
DEVELOPER
 
 
 
 
 
VAI Resort/Fisher Industries
 
 
 
 
 
P.O. Box 1034
 
 
 
 
 
Dickinson, ND 58602-1034
 
 
 
 
 
ATTORNEYS/REPRESENTATIVE
 
 
 
 
 
Withey Morris Baugh, PLC
 
 
 
 
 
2525 E. Arizona Biltmore Circle
 
 
 
 
 
Suite A-212
 
 
 
 
 
Phoenix, AZ 85016
ARCHITECT OF RECORD
 
 
 
 
 
Baker Barrios Architects
 
 
 
 
 
189 S. Orange Avenue
 
 
 
 
 
Suite 1700
 
 
 
 
 
Orlando, FL 32801
ARCHITECT OF RECORD
 
 
 
 
 
SPARC Design Group
 
 
 
 
 
1604 S. Commerce Street
 
 
 
 
 
Suite B
 
 
 
 
 
Las Vegas, NV 89102
CIVIL ENGINEER
 
 
 
 
 
EPS Group
 
 
 
 
 
1130 N. Alma School Road
 
 
 
 
 
Suite 120
 
 
 
 
 
Mesa, AZ 85201
 
 
 
 
 
ENGINEER OF RECORD
 
 
 
 
 
Genesis Engineering Group
 
 
 
 
 
134 4th Avenue North
 
 
 
 
 
Franklin, TN 37064
DEVELOPMENT TEAM

Introduction | 5 
VAI Resort
VAI Resort proposes to develop approximately 66.31 gross acres located at the southeast corner of Cardinals 
Way and the 101 Freeway (the “Property”) as shown on the Aerial Map. This application requests an amendment 
to the Centerpoint Planned Area Development (“PAD”) to allow the development of a resort and entertainment 
venue.  The new VAI Resort is expected to be the largest in Arizona once built and comprised of a variety of 
entertainment, dining and retail attractions for both day and night-time activities.  In total, the development is 
planned to have 1,091 hotel rooms and suites, theme park, concert venue, and a semi-public swimming pool. 
The VAI Resort PAD is intended to provide a superior land plan. Developing the Project will create opportunities 
to maximize the freeway access and synergy of other entertainment venues in the area. The PAD regulations 
are tailored to the proposed development and enable the creation of Arizona’s largest resort and entertainment 
experience.
INTRODUCTION

Regulatory Provisions | 6 
VAI Resort
The VAI Resort PAD amendment has been prepared pursuant to Section 5.900-PAD-Planned Area 
Development of the Zoning Ordinance of the City of Glendale in order to establish the regulatory framework 
for this master plan development. This PAD amendment is intended to supplement the Centerpoint PAD by 
providing additional zoning regulations, permitted uses, development standards and design guidelines for the 
VAI Resort property. The PAD amendment includes background information to illustrate the intent and scope of 
the development. Future plans and documents with specifi c designs for the future development will be processed 
through the City’s process in accordance with Section 3.600-Design Review. Provisions not specifi cally regulated 
by the VAI Resort PAD are governed by the City’s zoning ordinance. 
The Applicant seeks to develop the Property in accordance with the Centerpoint PAD with modifi ed development 
standards to meet the heightened level of expectation for guests and patrons within this entertainment corridor. 
This PAD only modifi es zoning ordinance regulations as it relates to VAI Resort and the balance of regulations 
shall apply to the remainder of the Centerpoint PAD. 
Unless a use or standard for development is specifi cally revised herein, the Zoning Ordinance of the City 
of Glendale, Arizona as adopted and periodically amended, is applicable to the VAI Resort PAD amendment 
(“Zoning Ordinance”). That said, it is the intent and purpose of this PAD amendment to establish the permitted 
uses, development standards and amended provisions of the Zoning Ordinance that will govern VAI Resort.
REGULATORY PROVISIONS

General Plan Conformance | 7 
VAI Resort
Glendale’s General Plan land use designation on the entire Property is “CCC” (Corporate Commerce Center) 
and Parks and Open Space (POS). This proposed mixed-use project fi ts within this existing “CCC” designation, 
but an amendment to the Glendale General Plan is necessary for the 10-acre portion currently designated 
as POS. A separate General Plan Amendment application is pending with the City of Glendale (GPA23-02). 
The CCC designation allows for a mixed-use center with complimentary community and specialty retail, hotels, 
restaurants, major medical facilities, entertainment and destination uses serving the region, urban housing and 
employment. The fi nal identifi cation of uses is defi ned by the overall Mixed-Use project itself.
The proposed PAD amendment is also compatible with the existing and emerging development in the 
surrounding area that includes an existing Westgate City Center, Tanger Outlets Mall, Zanjero, Main Street, 
Glendale Corporate Center, Sportsman Park, State Farm Stadium, Gila River Arena, all along the Loop 101 
Freeway including the City’s municipal airport. This PAD provides an excellent opportunity for a variety of users 
with freeway frontage and good freeway and arterial roadways access, especially with the opening of 95th 
Avenue between Cardinals Way and Camelback Road. Customers and users for the site will have numerous 
access options.
This proposed PAD allows for a mix of uses with opportunities for jobs, entertainment, offi  ces, shopping, and 
hospitality. As previously mentioned, the potential mix of uses in the zoning request could include retailers who 
want to be close to VAI Resort, as well as commercial, offi  ce, and lodging opportunities to capitalize on the 
nearby shopping and entertainment area. Based upon the analysis provided above, we believe the proposed 
rezoning is consistent with the overall intent and goals of the City’s General Plan land use designation of CCC 
and will be benefi cial to the surrounding area.
GENERAL PLAN CONFORMANCE

Planned Area Development Plan | 8 
VAI Resort
The intent of the VAI Resort PAD is to allow a mix of commercial retail, restaurants, entertainment, hospitality, 
offi  ce, employment and multi-family in accordance with this PAD document. The purpose of the proposed PAD 
amendment is to create specifi c standards to guide the development of the Property. The property enjoys 
approximately 1/2 mile of the Loop 101 freeway frontage and full visibility from the Freeway. This request seeks 
to amend the PAD to allow for the development of a resort and entertainment focused, mixed-use development, 
which implements the greater intent of the City of Glendale’s vision for development along the Loop 101 Freeway 
corridor.  
This PAD amendment creates a unique mixed-use environment for a wide variety of land uses including but 
not limited to commercial retail, restaurants, entertainment, hospitality, offi  ce, employment, and/or multi-family 
residential uses within the context of circulation and common landscape themes.
PLANNED AREA DEVELOPMENT PLAN
I. Purpose and Overview
All uses (and prohibitions) outlined in the Centerpoint PAD, Sections F through H shall continue to apply.  This 
PAD amendment allows additional uses including commercial retail, restaurants, entertainment and concert 
venue, theme park, semi-public swimming pool, hospitality, and offi  ce uses as part of the overall VAI Resort/
hotel  development.
 
The Planning Administrator, or designee, shall determine if uses not expressly listed in the Centerpoint PAD or 
this amendment are signifi cantly similar or dissimilar to particular uses listed within this PAD. Any uses similar to 
and not more detrimental than the uses permitted herein shall be subject to Planning Administrator interpretive 
administrative approval. Uses that are found to be similar shall meet the same requirements as the related use 
listed in the matrix.
II. Permitted Uses

Planned Area Development Plan | 9 
VAI Resort
All Performance Conditions outlined in the Centerpoint PAD, Section G shall continue to apply. This PAD 
amendment proposes an additional performance condition as follows:  
III. Performance Conditions
As refl ected through Table A below, the development standards for the VAI Resort PAD amendment are 
similar to the Centerpoint PAD except as may be modifi ed to facilitate the development. The permitted heights 
and intensity will permit the development of a highly attractive and superior project at a scale appropriate for 
development. 
 
The requested development standards are intended to allow this Property to bring together the VAI Resort in 
a cohesively planned setting. While some residential homes exist next to the employee parking for this site, the 
applicant proposes to build a 6’ perimeter wall to screen that area. The existing perimeter streets and freeway 
act as appropriate separation between existing and proposed uses and already provides large building setbacks 
from any other adjacent development. Density and intensity in urbanized areas, near employment and retail 
centers on a major freeway, is typical, appropriate, and desirable.
IV. Development Standards
Live events, including, without limitation, shows, festivals, concerts, sales, corporate events, and other indoor/
or outdoor public gatherings (the “Live Events”) are permitted subject to an annual noise management plan 
approved by the City by December 31st. A noise management plan shall include:
  
 
1) Description and locations of noise monitoring equipment;
 
 
2) Real time noise monitoring and reporting of the average noise level in 1-hour periods;
 
3) An active trial period to identify system improvement and make adjustments as needed to 
speakers and noise monitoring systems; 
 
4) Annual calibration of noise monitoring stations and equipment; 
 
5) Procedures and policies to respond resident calls and complaints.
 Live events may be exempt from the provisions of the Glendale City Code provided that the event is operating 
in accordance with the conditions of the noise assessment and noise management plan approved by the City. If 
the City receives what it deems a signifi cant amount of citizen complaints related to Live Events (within reasonable 
discretion), the City may request the applicant modify its noise assessment and noise management plan to 
address such complaints, and the applicant will make all necessary and reasonable adjustments in response to 
such request to the City’s reasonable satisfaction and approval.
Live Events

Planned Area Development Plan | 10 
VAI Resort
DEVELOPMENT STANDARDS
Centerpoint PAD
VAI Resort PAD Amendment
Max FAR
1.00 or less
1.00 or less
Min. Open Space %
10%
10%
Min. Front Building Setback (Cardinals 
Way)
0-feet
120-feet (SRP substation may be placed 
within setback)
Min. Street Side Building Setback
• 
95th Avenue
0-feet
5-feet
• 
Missouri Avenue
0-feet
230-feet
• 
Loop 101 Freeway
0-feet
125-feet
Min. Interior Setback
Per Building Code
Per Building Code
Distance Between Structures
Building separation shall be per the 
building code
Building separation shall be per the 
building code
Max. Building Height**
220 feet (subject to FAA Clearance)
220 feet (subject to FAA Clearance)
Min. Landscape Setbacks
• 
Cardinals Way
20-feet
0-feet
• 
95th Avenue
20-feet
10-feet
• 
Missouri Avenue
10-feet
8-feet
• 
Loop 101 Freeway
0-feet
0-feet
Max. Height for Freeway Monument Sign
55-feet
55-feet
Parking Space Dimensions
Minimum 9’ x 18’
Minimum 9’ x 18’
Parking Ratio
1 space per 500 sf; up to 15% total 
parking spaces reduction subject to 
approval by the planning Administrator or 
their designee
1 space per 450 sf***
TABLE A: Development Standards
* Open Space is defi ned as: An area that is intended to provide light and air and is designed for either environmental, scenic, 
or recreational purposes. Open space includes, but is not limited to lawns, decorative planting, walkways, active and passive 
recreation areas, playgrounds, fountains, swimming pools, wooded areas, water courses, perimeter landscaping, plazas and 
rooftop amenities.
**Prior to the City’s issuance of permit(s) for vertical construction of building(s), the developer shall submit FAA form 7460-1 to 
the FAA Regional Offi  ce for the FAA’s determination of whether such building(s) height would be a hazard to aviation and what 
additional conditions (if any) are recommended by the FAA. Building heights must comply with any terms required in the “No 
Hazard Determination” such as installing and maintaining any required lighting.
***If additional parking relief is required beyond the ratios outlined in the table above, a “Shared Parking Model/Parking Study 
Justifi cation” analysis may be submitted by the owner for administrative approval by the City for an additional reduction.

Planned Area Development Plan | 11 
VAI Resort
The perimeter landscape setbacks are reduced because of an internal loop road that wraps the property and 
is necessary for site circulation and emergency access. However, additional landscaping is still provided along 
95th Avenue and Missouri Avenue setbacks, and within the excess Right-of-Way along Cardinals Way. However, 
the intent of VAI Resorts is to provide as much greenery and theming elements wherever possible.
PARKING TYPE & QUANTITIES
On-Site Surface Parking
822 spaces
On-Site Underground Parking
623 spaces
Off -Site Employee Parking
335 spaces
Off -Site Public Parking Garage
3,859 spaces
TOTAL:
5,639 spaces
V. PAD Deviation Justifi cation
Landscape Setbacks
The zoning code requires landscaping islands and plantings within the parking lot every 10 spaces. This PAD 
proposes to delete the parking lot islands for on-site parking.  This design was based off  the existing Cardinal’s 
parking lot and helps to maximize the on-site parking. As an entertainment user and theme park, there is a 
greater need for parking mass quantities of persons, and the city has typically accommodated this with other 
similar large event parking lots. The employee parking area east of 95th Avenue will have 5’-wide islands at the 
end-caps of parking rows only.
Landscape Islands in Parking Lot
The development provides approximately 5,639 spaces both on-site and off -site which exceeds the parking 
demands (4,263 spaces on average; 4,872 spaces maximum) per the Parking Analysis Report provided by EPS 
group.  
Below are the parking areas and their respective supplies to be provided. If the applicant desires additional 
spaces for its operations, the applicant will secure additional off -site parking in coordination with the City of 
Glendale. 
Parking
The proposed development will provide signifi cantly more parking spaces than both the average and maximum 
calculated typical parking demand. It should be noted that these calculations represent the estimated demand 
and do not explicitly account for the eff ects of shared parking that is likely to occur, i.e. fl uctuation in demand for 
diff erent uses resulting in less parking needed at certain times. It should also be noted, similar to the concurrent 
Traffi  c Impact Analysis, special event traffi  c was not included. The event traffi  c and parking accommodations will 
be evaluated under a separate plan, as requested by the City, on an annual basis. It should be noted this plan is 
subject to change as event traffi  c becomes more defi ned related to concerts, special events, and other nearby 
concurrent stadium events.
TABLE B: Parking Totals

Design Guidelines | 12 
VAI Resort
The provisions of this section seek to create a foundation for design that will ensure development of an 
attractive, high-quality mixture of architectural styles. Buildings will feature creative applications of materials, 
colors and textures. The design of each building within the overall development will be complementary, so as 
to create a harmonious blend of styles. This will be accomplished through the use of compatible materials 
and colors, while creating a strong individual design identity consistent with each building’s individual use and 
purpose. The design guidelines and standards proposed herein are intended to provide an overall vision for the 
character of the project. This PAD shall conform to the following design guidelines indicated below: 
BUILDING “ISLE” DESIGNATION & FUNCTION
ISLE 1:
Hotel and Mixed-Use with Retail & Restaurants
ISLE 2:
Hotel and Mixed-Use with Retail & Restaurants
ISLE 3:
Off -Site Parking Garage Structure
ISLE 4:
Mixed-Use | Theater, Restaurants & Attractions
ISLE 4.4:
Swim-up Bar Structure
ISLE 5:
MATTEL Adventure Park Family Entertainment Center & Outdoor Attraction 
Yards
ISLE 6:
Hotel and Mixed-Use with Retail & Restaurants
ISLE 7:
Convention Center and Resort Amenities
ISLE 8:
Hotel and Mixed-Use with Retail & Restaurants
ISLE 8S:
Outdoor Stage & Amphitheater
ISLE 9:
Central Outdoor Entertainment Island
ISLE 10
VAI Corporate Offi  ce Building
DESIGN GUIDELINES
ARCHITECTURAL DESIGN PARAMETERS
In its entirety, VAI Resort is comprised of a series of mixed-use buildings each with similar design materials and 
visual characteristics. The property contains four hotel buildings, attraction facilities, retail and restaurants each 
showcasing a mixture of “Rhinestone White” EIFS (Exterior Insulation & Finish System), stone veneer cladding 
along base walls and column surrounds, and all glass is a blue hue. Fenestration planned for each building is 
specifi c to its relationship with site lines and viewing angles. In this specifi c project, buildings are referred to as 
“Isles” as listed below.
Building Design
TABLE C: Building/“ISLE” Identifi cation

Design Guidelines | 13 
VAI Resort
The visual impact of a building depends not only on its size, but also on the relationship between its height, 
length, and width including such features as prominent entries, windows, color and materials. Articulation of the 
facade on all four building sides. 
 
Building wall articulation shall be required on buildings with appropriate details and elements to recognize the 
pedestrian scale environment and a sense of place. Acceptable modes of articulation may include per building 
facade: 
Any pitched roof structure shall use concrete tiles or “pre-fi nished” metal roofi ng or other acceptable material as 
approved by Planning Division. Flat roofs shall be non-refl ective material (minimum SRI of 78 for non-occupiable 
roof patios). 
 
Variation in roof lines, architectural elements, change in materials, parapets and/or other signifi cant roof or 
canopy form, or other form of architectural treatment as approved by the Planning Division is encouraged to 
reduce the scale of buildings. Roof size, shape, material, color and slope should be coordinated with the scale 
and theme of the building. Parapets will be used for concealing fl at roofs. Three-dimensional cornice treatment 
(where appropriate) or other similar detail that enhance the building architecture is encouraged. 
 
All roof mounted mechanical, elevator equipment and satellite dishes will be screened from public view on 
the adjacent public streets of Cardinals Way and 95th Avenue. It is understood that it is not possible to screen 
such roof mounted equipment from some level of public view on the adjacent 101 Freeway, however, reasonable 
eff orts will be made to minimize the level of visual impact from the Loop 101 through screening, painting, color 
or other acceptable measures.
• Changes in the horizontal wall plane. 
• Changes in the vertical wall plane. 
• Variation in the roof lines and form. 
• Introduction of signifi cant signage elements. 
• Use of balconies. 
• Use of ground level arcades and covered areas. 
• Use of protected and recessed entries. 
• Use of vertical elements on or in front of expansive blank walls. 
• Use of pronounced wall plane off sets and projects. 
• Use of vertical accents and focal points. 
• Change in use of materials or color to provide a clear distinction between roof, body and base of a 
building. 
• Variation in storefront windows and material diff erentiation.  
• Changes in predominant material use. 
• Other form of building facade articulation as approved by the Planning Division. 
Roof Design

Design Guidelines | 14 
VAI Resort
All buildings shall have a minimum of one clearly defi ned main entrance which incorporates a minimum of 2 
of the following elements: 
Entrances
• Arches 
• Overhangs 
• Canopies or porticos 
• Recesses/projections 
• Raised parapets 
• Peaked roof forms 
• Signage 
• Entrances framed by outdoor pedestrian features or enhanced landscaping 
• Architectural features such as tile work and moldings integrated into the building structure to frame the 
entryway. 
• Other acceptable architectural element as approved by the Planning Division.
There will be a mix of architectural materials throughout the project. 
 
Approved exterior wall materials include the following list, unless otherwise expanded with approved by the 
Planning Division:
• Marble, or other natural stone 
• Tile cladding 
• Direct applied EIFS 
• Concrete, pre-cast or poured in place 
• Glass 
• Metal panels and/or trim 
• Metal and composite panels 
• Metals (polished and rusted) 
• Perforated metals and meshes 
• Stucco 
• Exposed fi nished structural steel 
• Stone 
• Masonry 
• Green-Screen/Green walls including trellises to reduce excessive radiant heat in pedestrian areas. 
• Or other acceptable method as approved by the Planning Division. 
Building Materials

Design Guidelines | 15 
VAI Resort
Pedestrian crossing area shall have a diff erent color, texture or material to defi ne these areas with one of the 
following methods: 
Paving Materials Design
• Stamped concrete or asphalt  
• Interlocking concrete pavers 
• Stained concrete
• Integral colored concrete. 
• Water proofi ng stone matrix
Thematic walls and fences shall be utilized to provide a cohesive project as approved by the Planning Division. 
Up to 8-feet tall walls are permitted except a 15-feet wall may be permitted near the SRP facility on Camelback 
Road Approved wall materials include the following list, unless otherwise approved by the Planning Division:
• Metals, wrought iron, view fencing, steel tube (polished and rusted). 
• Architectural masonry products as CMU, integral color CMU, textured CMU. 
• Architectural masonry bricks and veneers. 
• Architectural metal works, stand alone or integrated into masonry walls. 
• Stucco or synthetic applied to all exposed surfaces of masonry CMU. 
• Poured in place concrete with direct applied EIFS
Lighting shall comply with Section 35.4.400 of the Glendale Unifi ed Development Code unless modifi ed by this 
PAD (including lighting types, locations, intensity and hours identifi ed on Exhibit 8) or by other city exemptions. 
All exterior lighting on the site is to be shielded from view of the light source off -site to the extent feasible. Parking 
lot fi xtures and wall lights shall not exceed 25-feet in height.
Lighting which may exceed dark sky ordinance is shown at locations atop the MATTEL attraction and Aerobar, 
generally identifi ed on Exhibit 8. Fixture counts may vary on a per show location or activation basis. The Theatrical 
Fixtures for the Aerobar are as follows:
Main project entry points shall be created to convey the identity of the development. The main project entry 
points shall be designed as part of the overall entry plan which locates driveway locations, driveway widths, 
landscaping and paving details and shall be part of the Design Review application when that portion of the overall 
property is submitted to the City for review and approval.
Wall/Fences Design
Lighting Design
Main Project Entry Points
1.) Elation Pixel Bar 120, they are 6.5’ long LED Bar with a max Lumen output of 168.
2.) Elation Proteus Brutus is a moving head spot fi xture with a 75000 Lumen Output LED Source. 
3.) Elation Proteus Rayzor 1960 is a moving wash fi xture with a 8823 Lumen Output LED Source.
• 
The Elation Proteus Brutus will be mounted to the top of the roof structure for the Aerobar and will point 
towards the sky and onto the attractions.
• 
The Elation Proteus Razor 1960 will also be mounted to the Roof Structure of the Aerobar.
• 
All theatrical lighting fi xtures will be fully controlled by the DMX protocol and can be run on various timings 
and diff erent confi gurations.
• 
A theatrical fi xtures will be used to dynamically light up the Aerobar with diff erent lighting eff ects and color 
options deemed appropriate by operations to enhance the riders experience on the Aerobar Attraction.
• 
Theatrical Fixtures do not have any type of photocell attached and will not be illuminated during daytime 
operations. 
• 
(Cutsheets Attached)

Landscape Design | 16 
VAI Resort
Landscaping shall be designed to complement the building architecture overall design theme for the site.  All 
planting materials will comply with the City’s low water use plant palette and the City’s landscaping minimum size 
requirements per Sections 35.4.103 through 35.4.105 of the Glendale Unifi ed Development Code. Enhanced 
landscaping will further defi ne potential building entries areas as indicated in this document.   
The plant palette will consist of a variety of drought-tolerant tree, shrubs and ground cover species and a 
colorful combination of shrubs and ground cover to enhance and complement the visual appearance of both 
the individual buildings and overall development.  More specifi c details regarding plantings, types, locations and 
quantities will be a part of the future design review application where they will address the actual planting size 
and specifi cations. In addition, all planting material shall be fi nished with a natural topping in accordance with 
Sections 35.4.103 through 35.4.105 of the Glendale Unifi ed Development Code. 
LANDSCAPE DESIGN
The perimeter landscaping shall incorporate the use of shrubs and ground covers that will provide a sense 
of identity and be compatible with the environmental conditions of the area. Drought tolerant trees, shrubs and 
ground covers shall be incorporated along all site edges.
Specifi c Perimeter Treatments
Entries into the site shall be clearly identifi ed as project entry points with the use of enhanced landscape 
materials. These may include increased plant massing, themed plant species as well as site walls consistent with 
the project. These may include native trees, with shrub accent and ground cover plantings, landscaped mounds, 
site walls and directional signage.
Site Entrances
On-site parking areas shall comply with the Landscape Islands in Parking Lot section of this PAD document 
and provide 5’-wide landscape islands at the end-caps of parking rows only. Each landscape island shall contain 
at least (1) tree or groupings of shrubs and ground covers with a minimum width of fi ve (5) feet measured from 
back  of curb to back of curb, except if a photo-voltaic system is used in a parking fi eld. If such photo-voltaic 
system is used in a parking fi eld, then no landscape planter or plantings shall be required underneath the photo-
voltaic covered area. Shrubs within the planter island of an on-site parking area shall be maintained to a height 
no greater than three (3) feet, and all trees within such planters shall maintain a minimum clearance of fi ve (5) feet 
from the lowest branch to the adjacent grade elevation. Wherever possible, the required number of landscape 
planters shall be distributed or located within the parking areas to enhance the proposed development project. 
The landscaped area within these planters may be used to satisfy general planting requirements. 
Parking Lot Landscaping
A mixture of diff erent hardscape and paving materials shall be integrated into the site to emphasize key focus 
areas. These areas may include major vehicular entrances, pedestrian crossings, and/or pedestrian plazas. 
Architecturally themed signage, screen walls and decorative elements will be selected to integrate with the 
overall character of the development.
Hardscape Design

Signs & Wayfi nding | 17 
VAI Resort
All sign provisions outlined in the Centerpoint PAD, Section L shall continue to apply. This PAD amendment 
proposes additional signage provisions as outlined below and in the attached Comprehensive Sign Package. All 
signs shall comply with sight visibility requirements. 
 
A general framework is provided in this PAD amendment to ensure that the designs are appropriate for the 
project as a whole. Signage should not only include text that identifi es the name of the business but may also 
incorporate the use of graphics and forms that provide identity, where appropriate, for the uses.  
 
Signage will be a vital and integral tool in creating and framing the environment for VAI Resort. A unique 
signage package is proposed that allows business identifi cation, on and off -site advertising, art, graphics and 
freestanding signs to tie into the building architectural landscape of VAI Resort. The signage necessary to provide 
identity, name recognition, corporate branding and visual advertisement. Digital Billboard Signs will also be an 
important part of this signage hierarchy to generate interest and excitement for future businesses and the master 
plan itself.
At the perimeter of the site, signs shall be designed to be easily read from both adjacent freeways and arterial 
streets. Signs along the 101 freeway may advertise on-site and off -site uses.
 
All signs shall be regulated by the Signage Design Guidelines set forth in this PAD amendment under the 
governance of the Master Developer and/or its Assignee and the City of Glendale. All signs may face the freeway. 
Specifi c signage for individual building(s) and fi nal sign locations will be part of the Design Review process
SIGNS & WAYFINDING
These provisions are also meant to ensure an overall consistency in signage that protects the properties within 
the development and the unique identities of the uses and tenants.  
 
The following signs, as well as signs otherwise permitted by the Centerpoint PAD:
Allowable Signs
• Building or Tenant Wall Signs  
• Exterior Digital Signs
• Building Identifi cation 
• Marquee Monument Signs  
• Vehicular Entry Monolith Signs 
• Vehicular Wayfi nding Signs 
 
• Primary Vehicular Wayfi nding Signs 
 
• Secondary Vehicular Wayfi nding Signs 
 
• Tertiary Vehicular Wayfi nding Signs 
• Digital Billboards

Signs & Wayfi nding | 18 
VAI Resort
• Building sign size will be determined by lineal footage criteria (2 s.f. per lineal foot of frontage not to 
exceed 300 s.f. per sign) are permitted on all applicable elevations.  
• Tenant signs may be identifi ed at each primary entrance that provides pedestrian access to the main 
lobby. 
• Tenant sign size will be determined by lineal footage criteria (2 s.f. per lineal foot of frontage not to 
exceed 300 s.f. per sign).  
• The sign should be limited to the company or corporate names and may include the company logo or 
trademark.  
• Upper stories may be used to identify the tenant or building. Signs are permitted on all applicable 
elevations with sign sizes diff ering depending on exposure and legibility.  
• The signs should not exceed 15-feet in height and total not more than 300 square foot per sign. All wall 
signs can utilize internally illuminated or non-illuminated pan channel, reverse channel or cutout 
dimension letters. Illumination can be neon or LED. Logo types can be fabricated using free-
formed cabinets that are illuminated with fl orescent or other forms of internal illumination.
A. Building or Tenant Wall Signs facing the Highway
• Building 7 Marquee Sign (north and west side) 
 
- Wall Mounted 
 
- Size: 28’x70’ (1)
• Building 8 Marquee Signs (northwest side) 
 
- Wall Mounted 
 
- Size: 30’x60’ (2), 26’x53’ (1) 
• Lighting: 
 
- Max 5000 nits daytime and 150 nits nighttime 
 
- Automatic dimmer to be installed to reduce lighting between dusk to dawn
 
- Max 1ft candle illumination 
B. Electronic Digital Signs
• Building Identifi cation signs may be identifi ed at each primary entrance that provides pedestrian access 
to the main lobby. Signs may be positioned at the building entry facade.  
• Maximum sign area shall not exceed twenty (20) square feet.  
• Maximum height, including any supporting structures, shall not exceed two (2) feet.  
• Building Identifi cation signs cannot be mounted higher than the ground fl oor (no higher than 20ft from 
the fi nished fl oor) 
• All Building identifi cation signs can utilize internally illuminated, halo-illuminated or non-illuminated pan 
channel, reverse channel or cut-out dimension letters. Illumination can be neon or LED. Logo 
types can be fabricated using free-formed cabinets that are illuminated with fl orescent or other 
forms of internal illumination.
C. Building Identifi cation
• Up to 1 shall be permitted at the intersection of Cardinals Way and North 95th Avenue.  
• Vehicular Entry monolith sign must be located within 50-feet of the property line.  
• Maximum sign area shall not exceed two hundred (200) square feet per sign face.  
• Maximum height, including any supporting structures, shall not exceed 18-feet.
D. Vehicular Entry Monolith Sign

Signs & Wayfi nding | 19 
VAI Resort
• A maximum of 10 primary vehicular wayfi nding signs permitted on each frontage.
• Maximum sign area shall not exceed fi fty (50) square feet per sign face.
• Maximum height, including any supporting structures, shall not exceed 8-feet.
E. Exterior Traffi  c Wayfi nding Signs
Primary Vehicular Wayfi nding Signs
Digital billboards will be in accordance with the City of Glendale Zoning Ordinance.
Secondary Vehicular Wayfi nding Signs
 
• A maximum of 10 secondary vehicular wayfi nding signs permitted on each frontage.  
 
• Maximum sign area shall not exceed twenty (20) square feet per sign face.  
 
• Maximum height, including any supporting structures, shall not exceed 8-feet.
Tertiary Vehicular Wayfi nding Signs
 
• A maximum of 10 tertiary vehicular wayfi nding signs permitted on each frontage.  
 
• Maximum sign area shall not exceed twelve (12) square feet per sign face.
 
• Maximum height, including any supporting structures, shall not exceed 6-feet.
F. Digital Billboards

Infrastructure | 20 
VAI Resort
VAI Resort is located at a major intersection of two signifi cant arterials: Cardinals Way and 95th Avenue. When 
combined with convenient freeway access at Cardinals Way, as well as Camelback Road, this development is 
very accessible for the general public both regionally and locally. The arterial street and freeway network already 
exist in the area. The pedestrian sidewalk framework exists on both sides of 95th Avenue adjacent to overall 
property. No sidewalk exists along the south side of Cardinals Way adjacent to the overall property. Sidewalk 
and required street improvements for the south half of Cardinals Way will be done when development adjacent 
to Cardinals Way occurs. Internal pedestrian walkway and connections to the City’s street sidewalk network 
and fi nal half-street improvements which may include streetlights, deceleration and driveway locations will be 
submitted when that portion of the property is submitted to the City for Design Review. 
INFRASTRUCTURE
Circulation
A traffi  c impact analysis was prepared in accordance with the requirements of the City of Glendale, and 
submitted separately to the City of Glendale. The project generates more than 1,000 peak hour trips. The 
opening year for the proposed development is considered as 2025 for this analysis. The analysis study years 
include existing and horizon years 2025, 2035 and 2045 (20 years after opening). The weekday PM peak hour 
and Saturday peak hour (late afternoon) were studied since they correspond to both the peak operation of the 
proposed development and the adjacent roadway peaks.  
Traffi  c
Full build-out of the proposed development is anticipated to generate 24,507 weekday daily trips 
(entering/exiting) with 2,552 trips (entering/exiting) during the Weekday PM peak hour and 3,069 trips 
(entering/exiting) during the Saturday Peak Hour. Internal trip reductions were applied to specifi c uses 
within the development.
TRIP GENERATION:
Full build-out of the proposed development is anticipated to generate 24,507 weekday daily trips 
(entering/exiting) with 2,552 trips (entering/exiting) during the Weekday PM peak hour and 3,069 trips 
(entering/exiting) during the Saturday Peak Hour. Internal trip reductions were applied to specifi c uses 
within the development.
EXISTING LEVEL-OF-SERVICE:
The movements and approaches at the study intersections will operate at level-of-service ‘E’ and 
above during the weekday PM peak hour and Saturday peak hour of the horizon years with the exception 
of the Loop 101/Cardinals Way, 95th Avenue/Cardinals Way, 91st Avenue/Cardinals Way, 91st Avenue/
Camelback Road, 95th Avenue/Camelback Road and 99th Avenue/Camelback Road intersections. 
FUTURE LEVEL-OF-SERVICE:
It is recommended to review and optimize existing corridor traffi  c signal cycle lengths and traffi  c signal 
phasing. This includes developing various plans for the weekday, weekend and event time periods. 
Cardinals Way and Camelback Road are currently programmed with coordination and 145 second cycle 
lengths during the PM peak hour and 120 second cycle lengths on the weekend. The level-of-service 
at the Loop 101/Cardinals Way and 95th Avenue/Cardinals Way intersections could be improved by 
reevaluating signal timing with future conditions. 
RECOMMENDED MITIGATION MEASURES:

Infrastructure | 21 
VAI Resort
A future connection to the Loop 101 from the west side of the development is under consideration. 
This analysis does not account for a potential Loop 101 connection, and therefore makes conservative 
recommendations with the assumption that all traffi  c will enter/exit the site from 95th Avenue.
Camelback Road: The daily traffi  c volume on Camelback Road is projected to reach 47,000 vpd 
in horizon year 2045 with background traffi  c only and will approach capacity as a four and fi ve-lane 
roadway warranting a six-lane section. To achieve acceptable levels of service at the study intersections 
on Camelback Road, three through lanes in each direction are warranted in the horizon year. VAI Resort 
– Glendale, Arizona - 2 - Traffi  c Impact Analysis –September 2024
 
The 91st Avenue/Cardinals Way, 91st Avenue/Camelback Road, 95th Avenue/Camelback Road, and 
99th Avenue/Camelback Road intersections will experience delay with the growth of traffi  c volumes. The 
site traffi  c will have an additional impact at the 95th Avenue/Camelback Road and 91st Avenue/Cardinals 
Way intersections, since they are entryways to the site driveways on 95th Avenue and the parking garage 
on Montebello Avenue. In addition to three through lanes in each direction on Camelback Road, the 
following additional turn lanes are recommended:
91st Avenue and Cardinals Way 
" 
Northbound dual left-turn 
" 
Eastbound right-turn 
" 
Westbound dual left-turn 
" 
Maintain existing turn lanes 
91st Avenue and Camelback Road 
" 
Northbound dual left-turn 
" 
Northbound right-turn 
" 
Westbound right-turn 
" 
Maintain existing turn lanes 
95th Avenue and Camelback Road 
" Dual southbound left-turn 
" Dual eastbound left-turn 
" Maintain existing turn lanes including dual southbound right-turn lanes provided with existing 
conditions 
99th Avenue and Camelback Road 
" Northbound right-turn 
" Dual westbound left-turn 
" Dual southbound left-turn 
" Southbound right-turn lane 
" Maintain existing turn lanes 
With the above improvements, the movements and approaches at the study intersections are anticipated 
to operate at level of service “E” or better.

Phasing | 22 
VAI Resort
The proposed project may be developed in a single phase or in multiple phases.  Each phase will be subject to 
the City’s normal Design Review process. At the time individual development is proposed, development shall be 
processed through the City’s Administrative Design Review process for that phase and show how the proposed 
development fi ts compatibly within the balance of the overall Property. Individual phases will build necessary site 
work, parking and infrastructure to accommodate that phase of development.
PHASING
The grading and drainage for the site will be designed to convey storm water runoff  to the A.D.O.T. canal along 
the east edge of the 101 Freeway.  On-site retention is incorporated, including a combined storm water retention 
system that retains for multiple parcels and a portion of 95th and Montebello Avenues’ Right-of-Way for the 100-
year, 2-hour storm event.  Storm water drainage will be conveyed via underground storm drains and overland 
fl ow across the surface which will outfall to a combination of surface and/or underground retention areas or to 
the A.D.O.T. canal. Any of the retention storage volume, not being conveyed to the A.D.O.T. canal, will dissipate 
within 36 hours via a combination of natural percolation, evaporation, and dry wells. Any off -site drainage impacts 
to the site will be routed through the site to maintain its historical drainage pattern.
Grading & Drainage
An extension of the City of Glendale’s water main will be located in an on-site loop around the outer perimeter 
of the VAI Resort Site. This system will provide domestic and fi re protection services to the property. The Property 
will have an on-site wastewater collection system that will discharged into the City of Glendale’s public sewer 
system.
Waste and Wastewater
Site Access Four main driveways are proposed on 95th Avenue. There is also a service-only driveway and 
employee driveway (not included in the analysis). The most northern driveway (Site Access A) is proposed 
as left-in, right-in and right-out and provides access to the hotels and a loop road that goes around the 
resort. Site Access B provides full access to a valet area. The two south driveways on 95th Avenue provide 
direct access to the Mattel Adventure Park while providing access to the loop road around the resort. The 
driveways near the Mattel Adventure Park are designed with a right-out exit only (Site Access C1) driveway 
and a right-in, left-in enter only (Site Access C2) driveway. Site Access D is a driveway to a new parking 
garage that is proposed on Montebello Avenue west of 91st Avenue. Site Access E (right-in and right-out) 
is a proposed driveway on 91st Avenue that will provide additional access to the new garage. There is also 
a shared ride drop-off /pick-up staging area with two driveways provided on Montebello Road east of 95th 
Avenue. The three existing Black Lot driveways on Montebello Road will remain open. VAI Resort – Glendale, 
Arizona - 3 - Traffi  c Impact Analysis –September 2024
 
The site driveways will be stop sign controlled. Dedicated left-turn lanes will be provided on 95th Avenue at 
the driveways that allow left turns into the site, which include Site Access A, Site Access B and Site Access 
C2.
Right-turn deceleration lanes are provided at the site driveways on 95th Avenue.
VAI traffi  c management, circulation and pedestrian accommodations during the Arizona Cardinal’s game 
day, and other major events at the adjacent football stadium, will be coordinated with the City staff  and law 
enforcement. Additionally, a separate agreement will be entered into between the VAI ownership and the 
City to develop event traffi  c management plans during special events at the VAI Resort and concert venue.
EVENT TRAFFIC MANAGEMENT:

PAD Findings | 23 
VAI Resort
PAD FINDINGS
Section 5.901 Purpose, of the City of Glendale’s Zoning Ordinance states the intent of the PAD district is to:
A. 
Encourage creative and eff ective use of land and circulation systems to accommodate changes in 
land development technologies.
 
VAI Resort PAD amendment is at its core a mixed-use development that will also attract other 
complimentary uses over time. The adjacent entertainment corridor and freeway frontage 
and nearby freeway access is attractive to resort amenities, entertainment venues, retail and 
shopping, corporate headquarters, offi  ce, regional operation centers, and a wide spectrum of 
local, community and regional retail shopping opportunities, restaurants, entertainment venues 
and high density residential. This total site is large enough to accommodate a variety of such uses 
within a master planned setting. Cardinals Way, 95th Avenue, Loop 101 Freeway and Missouri 
Avenue will provide convenient, multiple, major access to the overall site.  
B.  
Encourage residential development to provide a mixture of housing types and designs. 
 
No residential uses are proposed with this PAD amendment. 
C.  
Encourage innovative development or redevelopment concepts for all land use types to provide a 
greater variety and intensity of uses.  
 
As noted at several points in this narrative, the proposed mix of uses for VAI Resort include resort 
lodging and entertainment uses, commercial, and offi  ce uses to capitalize on the nearby shopping 
and entertainment areas. 
D. 
Provide a process which relates the urban design and scale of project to the unique characteristics 
of the site. 
 
The vision for this PAD amendment is to provide a mixed-use environment that supports the 
City’s sports/entertainment area. The City has long wanted a commercial retail, restaurants, 
entertainment, hospitality, offi  ce, employment user to locate in this corridor. The PAD amendment 
provides design criteria that helps support the City’s vision for design. All new development is 
required to follow the PAD design criteria and the City’s Design Review process. This will ensure 
City Staff  suffi  cient review of the urban design, scale and character of each development as it 
comes forth with the overall project.

PAD Findings | 24 
VAI Resort
E. 
Require the nature and intensity of development to be supported by adequate utilities, transportation, 
drainage, and common open spaces to serve the development and to minimize impact on existing 
or future adjacent development.  
 
The previously approved CBD101 and Centerpoint PAD called for a high-intensity, mixed-use 
development that included up to 4.6 million square feet of offi  ce, hotels, commercial retail space, 
and residential. This VAI Resort PAD amendment continues to seek the same spectrum of uses. 
The proposed project has been reviewed by the various City development review departments 
and it has been deemed that there are adequate utilities, transportation, drainage, and common 
open spaces to serve the development. 
F. 
Encourage development that is consistent with the policies and the guidelines established in any 
specifi c plan and the General Plan. 
 
The Property is designated as “CCC” (Corporate Commerce Center) and POS on the City’s 
General Plan Land Use map.  An amendment to the Glendale General Plan is necessary for the 
10-acre portion currently designated as POS. A separate General Plan Amendment application is 
pending with the City of Glendale (GPA23-02). The proposal is consistent with the policies and the 
guidelines in the General Plan. This request seeks the same zoning category as what is currently 
on the subject property and will continue to be consistent with the General Plan. It continues to 
seek the same spectrum of uses in a master planned setting but at a scale complimentary to the 
surrounding existing developments.

Summary | 25 
VAI Resort
This proposal embraces the City’s vision for this area adjacent to the 101 Freeway to attract a broad range of 
complimentary, vibrant uses. The proposed VAI Resort PAD will provide an exceptional opportunity for the City 
to capture Arizona’s largest resort and entertainment venue.  With a half mile of freeway frontage, along with 
signifi cant frontage along both Cardinals Way and the new 95th Avenue, VAI Resort is well positioned to achieve 
the vision set forth for this key corridor. The proposed request will positively impact the City’s economic vitality 
and the livability of the area. We believe this PAD is consistent with the overall intent and goals of the City of 
Glendale’s General Plan which sets forth objectives and expectations for this area. 
SUMMARY

EXHIBITS | 26 
VAI Resort
EXHIBITS

EXHIBIT 1
VAI Resort
EXHIBIT 1 | 27

$HULDO0DS'
0DULFRSD&RXQW\*,20DULFRSD&RXQW\$VVHVVRU
V2IILFH
6HSWHPEHU




PL




NP

0DULFRSD&RXQW\$VVHVVRU
V2IILFH
O
EXHIBIT 1 | 28 
VAI Resort

$HULDO0DS'
0DULFRSD&RXQW\*,20DULFRSD&RXQW\$VVHVVRU
V2IILFH
6HSWHPEHU




PL




NP

0DULFRSD&RXQW\$VVHVVRU
V2IILFH
O
VAI Resort
EXHIBIT 1 | 29

EXHIBIT 2
EXHIBIT 2 | 30 
VAI Resort

VAI Resort
EXHIBIT 2 | 31

EXHIBIT 2 | 32 
VAI Resort

EXHIBIT 3
VAI Resort
EXHIBIT 3 | 33

EXHIBIT 3 | 34 
VAI Resort

VAI Resort
EXHIBIT 3 | 35

EXHIBIT 4
EXHIBIT 4 | 36 
VAI Resort
EXHIBIT 4

BEGIN PAVEMENT
STOP
STOP
STOP
STOP
STOP
STOP
STOP
S03° 28' 56.39"W
1996.875
S00° 45' 37.05"W
575.268
N88° 14' 17.62"E
120.809
N00° 47' 02.40"E
647.673
N88° 14' 18.00"E
1012.794
S89° 19' 35.59"E
55.001
S00° 40' 24.40"W
310.529
N56° 22' 22.40"E
100.813
N00° 40' 24.40"E
1381.311
N18° 59' 58.74"E
51.693
N55° 11' 35.64"W
115.975
N34° 57' 24.40"E
100.851
L=277.713, R=499.633
D=031.8470
L=21.461, R=500.000
D=002.4592
L=299.330, R=500.000
D=034.3007
S33° 37' 37.60"E
120.651
S86° 43' 24.67"W
1241.570
L=48.772, R=191.918
D=014.5606
N89°06'23"W
109.71'
N0°40'24"E
712.80'
102-14-272B
ACERO GLENDALE LLC
LOT A BETHANY LAND PARTNERS MLD
BK 989, PG 24 MCR
102-13-073
FARM 101 LLC
LOT 2 MONTEBELLO 95 ADDITION
BK 1330, PG 03 MCR
102-13-063
LOT 58
PENDERGAST WEST
BK 143, PG 04 MCR
102-13-042
LOT 37
PENDERGAST WEST
BK 143, PG 04 MCR
102-13-041
LOT 36
PENDERGAST WEST
BK 143, PG 04 MCR
102-13-018
LOT 13
PENDERGAST WEST
BK 143, PG 04 MCR
102-13-017
LOT 12
PENDERGAST WEST
BK 143, PG 04 MCR
102-13-072
CITY OF GLENDALE
LOT 1 MONTEBELLO 95 ADDITION
BK 1330, PG 03 MCR
1
Cover Sheet
Vai Resort
Glendale, AZ
SITE PLAN
FOR
A PORTION OF THE NORTHWEST QUARTER OF SECTION 16, TOWNSHIP 2 NORTH,
RANGE 1 EAST OF THE GILA AND SALT RIVER MERIDIAN, MARICOPA COUNTY, ARIZONA
SHEET INDEX
DESCRIPTION
SHEET NO.
COVER SHEET
CS01
1
SITE PLAN
SP01-SP03
2-4
PARKING BREAKDOWN:
REQUIRED PARKING RATIO:
1 SPACE PER 450 SF
ON-SITE SURFACE PARKING:
822 SPACES
ON-SITE UNDERGROUND PARKING:
623 SPACES
OFF-SITE EMPLOYEE PARKING:
335 SPACES
OFF-SITE PUBLIC PARKING GARAGE * :
3,859 SPACES
TOTAL PROVIDED PARKING:
5,639 SPACES
*FUTURE PUBLIC PARKING GARAGE SPACES SUBJECT TO CITY AGREEMENT
100
scale
200
feet
0
LEGAL DESCRIPTION:
A PORTION THAT REAL PROPERTY DESRIBED IN DOCEMENT 2021-0741888 MARICOPA COUNTY RECORDS BEING A PORTION OF THE SOUTHWEST QUARTER OF SECTION
ON 16, TOWNSHIP 2 NORTH, RANGE 1 EAST, OF THE GILA AND SALT RIVER BASE AND MERIDIAN, MARICOPA COUNTY, ARIZONA MORE PARTICULARLY DESCRIBED AS
FOLLOWS:
COMMENCING AT THE WEST QUARTER CORNER OF SAID SECTION 16 WHICH BEARS SOUTH 88 DEGREES 14 MINUTES 18 SECONDS WEST FROM THE FOUND BRASS CAP
STAMPED RLS 22282 MARKING THE CENTER OF SAID SECTION 16 2655.12 FEET;
THENCE NORTH 88 DEGREES 14 MINUTES 18 SECONDS EAST 1206.76 FEET ALONG THE SOUTH LINE OF THE SOUTHWEST QUARTER OF SAID SECTION 16 TO THE POINT
OF BEGINNING;
THENCE NORTH 00 DEGREES 45 MINUTES 27 SECONDS EAST 575.27 FEET;
THENCE NORTH 03 DEGREES 26 MINUTES 37 SECONDS EAST 431.66 FEET;
THENCE NORTH 03 DEGREES 26 MINUTES 58 SECONDS EAST 987.81 FEET;
THENCE NORTH 03 DEGREES 27 MINUTES 27 SECONDS EAST 354.97 FEET;
THENCE NORTH 03 DEGREES 28 MINUTES 34 SECONDS EAST 80.41 FEET;
THENCE NORTH 03 DEGREES 53 MINUTES 34 SECONDS EAST 142.03 FEET;
THENCE NORTH 86 DEGREES 00 MINUTES 20 SECONDS EAST 230.27 FEET;
THENCE NORTH 86 DEGREES 04 MINUTES 51 SECONDS EAST 208.26 FEET;
THENCE NORTH 86 DEGREES 44 MINUTES 23 SECONDS EAST 326.14 FEET;
THENCE NORTH 87 DEGREES 20 MINUTES 23 SECONDS EAST 476.98 FEET;
THENCE SOUTH 89 DEGREES 06 MINUTES 23 SECONDS EAST 109.71 FEET;
THENCE SOUTH 00 DEGREES 40 MINUTES 24 SECONDS WEST 712.80 FEET;
TO THE BEGINNING OF A TANGENT CURVE CONCAVE WESTERLY A RADIUS OF 500.00 FEET A CENTRAL ANGLE OF 34 DEGREES 17 MINUTES 00 SECONDS A DISTANCE OF
299.18 FEET;
THENCE SOUTH 34 DEGREES 57 MINUTES 24 SECONDS WEST 100.85 FEET;
THENCE SOUTH 55 DEGREES 04 MINUTES 10 SECONDS EAST 109.17 FEET;
TO THE BEGINNING OF A TANGENT CURVE CONCAVE NORTHERLY A RADIUS OF 200.00 FEET, A CENTRAL ANGLE OF 15 DEGREES 55 MINUTES 51 SECONDS A DISTANCE OF
55.61 FEET;
THENCE SOUTH 18 DEGREES 59 MINUTES 59 SECONDS WEST 51.69 FEET;
THENCE SOUTH 00 DEGREES 40 MINUTES 24 SECONDS WEST 1,381.31 FEET;
THENCE SOUTH 56 DEGREES 22 MINUTES 22 SECONDS WEST 100.81 FEET;
THENCE NORTH 33 DEGREES 37 MINUTES 38 SECONDS WEST 120.65 FEET;
TO THE BEGINNING OF A NON-TANGENT CURVE CONCAVE EASTERLY A RADIUS OF 500.00 FEET, A RADIAL LINE TO SAID CURVE BEARS SOUTH 56 DEGREES 22 MINUTES
22 SECONDS WEST A CENTRAL ANGLE OF 34 DEGREES 18 MINUTES 03 SECONDS A DISTANCE OF 299.33 FEET A RADIAL LINE
TO SAID CURVE BEARS NORTH 89 DEGREES 19 MINUTES 35 SECONDS WEST;
THENCE NORTH 00 DEGREES 40 MINUTES 24 SECONDS EAST 310.53 FEET;
THENCE NORTH 89 DEGREES 19 MINUTES 36 SECONDS WEST 55.00 FEET;
THENCE SOUTH 88 DEGREES 14 MINUTES 18 SECONDS WEST 1,012.79 FEET;
THENCE SOUTH 00 DEGREES 47 MINUTES 02 SECONDS WEST 647.67 FEET;
THENCE SOUTH 88 DEGREES 14 MINUTES 18 SECONDS WEST 120.81 FEET;
AREA = 2,888,3440 SF OR 66.31 ACRES MORE OR LESS
Designer:
Drawn by:
Project:
Sheet No.
Job No.
Call at least two full working days
before you begin excavation.
Dial 8-1-1 or 1-800-STAKE-IT (782-5348)
In Maricopa County: (602)263-1100
w w w . e p s g r o u p i n c . c o m
T:480.503.2250
F:480.503.2258
|
1130 N Alma School Road
Suite 120
Mesa, AZ 85201
22-0292 - Vai Resort
Vai Resort
Southwest Corner of Cardinals Way & North 95th Ave.
EPS
EPS
22-0292
of 4
Or
Preliminary
Construction
Not For
Recording
Or
Preliminary
Construction
Not For
Recording
ZON23-03
N.T.S.
  VICINITY MAP  
PINNACLE PEAK
DEER VALLEY
BEARDSLEY
UNION HILLS
BELL
GREENWAY
THUNDERBIRD
CACTUS
PEORIA
OLIVE
NORTHERN
GLENDALE
BETHANY HOME
CAMELBACK
115TH
107TH
99TH
83RD
75TH
67TH
59TH
51ST
43RD
RD.
RD.
RD.
DR.
RD.
RD.
RD.
RD.
AVE.
RD.
RD.
AVE.
AVE.
AVE.
91ST
S.R. Loop 101
CIVIL ENGINEER:
EPS GROUP, INC.
1130 N. ALMA SCHOOL RD, SUITE 120
MESA, ARIZONA  85201
PHONE:  (480) 503-2250
CELL: (586) 420-8545
CONTACT:  TODD LESLIE
EMAIL:  todd.leslie@epsgroupinc.com
ARCHITECT:
BAKER BARRIOS ARCHITECTS
189 S. ORANGE AVENUE, SUITE 1700
ORLANDO, FLORIDA 32801
BASIS OF BEARING:
THE SOUTH LINE OF THE NORTHWEST QUARTER OF SECTION 16, TOWNSHIP 2 NORTH, RANGE 1 EAST, GILA AND SALT RIVER MERIDIAN MARICOPA COUNTY,
ARIZONA BEARS NORTH 88°14'18" EAST.
BENCHMARK:
BENCHMARK IS A MARICOPA HIGHWAY DEPARTMENT BRASS CAP IN POTHOLE DOWN 3" ACCEPTED AS THE WEST QUARTER CORNER OF SECTION 9, TOWNSHIP
2 SOUTH, RANGE 1 EAST, BEING THE INTERSECTION OF 99TH AVENUE AND MARYLAND.
ELEVATION 1060.657 PER GDACS BOOK 699, PAGE 26 MCR.
OWNER:
VAI RESORT, LLC
1302 W. DRIVERS WAY
TEMPE, ARIZONA  85284
CONTACT:  TOMMY FISHER
EMAIL:  tfisher@fisherind.com
GENERAL SITE PLAN NOTES:
A.
FIRE DEPARTMENT ACCESS AND WATER SUPPLY REQUIREMENTS SHALL BE IN PLACE PRIOR TO
COMBUSTIBLE MATERIALS BEING BROUGHT ON SITE
B.
PURSUANT TO CHAPTER 32.5 OF THE GLENDALE CITY CODE, ALL NEW AND EXISTING
UTILITIES WITHIN OR CONTIGUOUS TO THIS SITE SHALL BE PLACED UNDERGROUND.
C.
ALL UTILITY BOXES, VAULTS AND BACKFLOW PREVENTION DEVICES SHALL BE PAINTED TO
MATCH THE BUILDING AND SCREENED A FROM PUBLIC VIEW BY A MASONRY WALL OR A
ROUND-TOPPED WIRE MESH ENCLOSURE, PAINTED TO MATCH THE ADJACENT WALL.
D.
SIGHT DISTANCE REQUIREMENTS OF COG DETAIL G-447 (LOCAL STREET) OR G-448 (ARTERIAL
AND COLLECTOR STREETS) ARE MET FOR ALL DRIVEWAYS AND STREETS.
E.
STREETLIGHTS INSTALLED BY THE DEVELOPER MAY BE REQUIRED FOR CONSTRUCTION
PLANS APPROVAL.
F.
ON-SITE LIGHTING WILL BE PLACED SO AS TO DIRECT THE LIGHT AWAY FROM ADJACENT
RESIDENTIAL USES AN MUST NOT EXCEED ONE-FOOT CANDLE AT THE PROPERTY LINE.  THE
HEIGHT OF THE PARKING LOT LIGHTS WITHIN 150" OR RESIDENTIAL USE TO BE 15'.  HEIGHT
PRESSURE SODIUM (HPS) LIGHTING REQUIRED ADJACENT TO RESIDENCE.
G.
ON-SITE LIGHTING SHALL MEET OUTDOOR LIGHT CONTROL ORDINANCE.
H.
MAXIMUM NOISE LEVEL 55 DECIBELS (NORMAL SPEAKING VOICE) AT PROPERTY LINE.
I.
CONVENIENCE USES SHALL BE SUBJECT TO A SEPARATE CITIZEN PARTICIPATION AND
CONDITIONAL USE PERMIT PROCESS.
J.
THE PROPERTY OWNER IS RESPONSIBLE FOR MAINTAINING LANDSCAPING IN ALL PUBLIC
RIGHTS-OF-WAY ADJACENT TO THE PROJECT.
CS01
PROJECT DATA:
PROPOSED USE:
COMMERCIAL / RESORT
EXISTING ZONING:
PAD
TOTAL SITE AREA:
66.31 AC (2,888,344 SF)
TOTAL BUILDING AREA:
659,180 SF
LOT COVERAGE: 
28%
FLOOR AREA RATIO:
1.0 MAX
BUILDING TYPES:
HOTEL - TYPE IA CONSTRUCTION
HOTEL - TYPE IB CONSTRUCTION
TYPE IA CONSTRUCTION
TYPE IIB CONSTRUCTION
TYPE IB CONSTRUCTION
BUILDING OCCUPANCY TYPES:
A-1
A-2
A-3
B
M
S-1
S-2
R-1
REQUIRED LANDSCAPE
COVERAGE:
6.13 AC (10%)
SP01
SP02
SP03
KEY MAP
SHEET NAME
SITE
ARCHITECT:
SPARC DESIGN GROUP
1804 S COMMERCE STREET, SUITE B
LAS VEGAS, NV 89102

102-13-073
FARM 101 LLC
LOT 2 MONTEBELLO 95 ADDITION
BK 1330, PG 03 MCR
ZONING: PAD
FUTURE FRONTAGE ROAD
2' 36"W
5'
L=21.46
', R=500
.00'
D=00
2°27'33
"
N89° 19' 36"W
712.80'
S00° 53' 37"W
109.71'
S02° 39' 37"E
476.98'
S03° 15' 37"E
326.14'
S03° 55' 09"E
208.26'
S03° 59' 40"E
230.27'
S86° 06' 26"E
142.03'
S86° 31' 26"E
80.41'
S86° 32' 33"E
354.97'
N. 95TH AVE.
LOOP 101
CARDINALS WAY
R/W
WIDTH VARIES
132.1'
R/W
L=277
.71', R=5
00.00
'
D=031°
49'22"
EDGE OF
WATER
BUILDING #2
BUILDING #1
BUILDING #8
BUILDING #7
 PUBLIC
BEACH
BAR
BUILDING #9
STAGE
BUILDING #8S
65.0'
R/W
23.0'
9.0'
22.5'
GARAGE RAMP
LOADING AREA
GARAGE RAMP
VALET
DROP-OFF
VALET
DROP-OFF
VALET
DROP-OFF
RIDESHARE
DROP-OFF
6" CMU WALL
UNDERGROUND
STORAGE
FH
FH
FH
FH
FH
FH
FH
FH
FH
FH
FH
97.0'
FH
30.0'
18.0'
24.0'
11.0'
18.0'
24.0'
17.1'
23.2'
9.0'
18.0'
22.3'
8.2'
135.0'
147.5'
121.2'
188.0'
UNDERGROUND
PARKING GARAGE
PEDESTRIAN
BRIDGE
CARDINALS WAY
FH
28.3'
12.4'
44.4'
58.8'
SRP SUBSTATION
RETENTION
RETENTION
EDGE OF
WATER
BUILDING #2
BUILDING #2
56.0'
ACCESS
46.7'
ACCESS
LOOP 101
Designer:
Drawn by:
Project:
Sheet No.
Job No.
Call at least two full working days
before you begin excavation.
Dial 8-1-1 or 1-800-STAKE-IT (782-5348)
In Maricopa County: (602)263-1100
w w w . e p s g r o u p i n c . c o m
T:480.503.2250
F:480.503.2258
|
1130 N Alma School Road
Suite 120
Mesa, AZ 85201
22-0292 - Vai Resort
Vai Resort
Southwest Corner of Cardinals Way & North 95th Ave.
EPS
EPS
22-0292
of 4
Or
Preliminary
Construction
Not For
Recording
Or
Preliminary
Construction
Not For
Recording
ZON23-03
feet
scale: 1" = 50'
100
50
0
50
2
SP01
Site Plan
MATCH LINE
SEE PP02

STOP
STOP
STOP
STOP
STOP
102-13-063
LOT 58
PENDERGAST WEST
BK 143, PG 04 MCR
ZONING: RU-43
102-13-042
LOT 37
PENDERGAST WEST
BK 143, PG 04 MCR
ZONING: RU-43
102-13-041
LOT 36
PENDERGAST WEST
BK 143, PG 04 MCR
ZONING: RU-43
55.0'
R/W
55.0'
R/W
110.0'
R/W
33.0'
ACCESS
N01° 45' 42"W
1012.79'
N00° 40' 24"E
55.00'
N89° 19' 36"W
1381.31'
N71° 00' 01"W
51.69'
L=5
5.6
1', R
=2
00
.40'
D=
015
°5
3'59
"
S34° 55' 50"W
109.17'
N55° 02' 36"W
100.85'
S86° 33' 02"E
987.81'
S86° 33' 23"E
431.66'
MONTEBELLO AVE
N. 94TH LN.
N. 95TH AVE.
BUILDING #6
 BUILDING #5
BUILDING #4
 PUBLIC
BEACH
BAR
BUILDING #10
32.2'
164.4'
23.0'
40.7'
FUTURE FRONTAGE ROAD
58.4'
VALET
DROP-OFF
UNDERGROUND
PARKING GARAGE
GARAGE RAMP
VALET
DROP-OFF
FH
FH
FH
FH
FH
FH
FH
FH
FH
FH
FH
FH
FH
EMPLOYEE
PEDESTRIAN
TUNNEL
SVT (TYP.)
PEDESTRIAN BRIDGE
FH
FH
REFUSE
FH
134.9'
FH
EXIT ONLY
ACCESS
24.0'
9.0'
24.0'
24.0'
18.0'
24.0'
29.6'
24.0'
24.0'
9.0'
18.0'
24.0'
24.0'
9.0'
18.0'
24.0'
20.0'
8.7'
33.5'
24.0'
24.0'
21.1'
24.0'
24.0'
24.0'
9.0'
18.0'
11.0'
20.0'
23.0'
8.0'
24.0'
30.0'
135.0
FH
FH
102-14-272E
ACERO GLENDALE LLC
LOT A BETHANY LAND PARTNERS MLD
BK 989, PG 24 MCR
ZONING: PAD
 PUBLIC
BEACH
BAR
32.0'
18.1'
18.0'
24.0'
24.0'
18.0'
18.0' 18.0'
EDGE OF
WATER
BUILDING #4.4
EMPLOYEE
ONLY
PARKING
EMPLOYEE
ONLY
PARKING
44.0'
ACCESS
18.7'
ACCESS
LOOP 101
Designer:
Drawn by:
Project:
Sheet No.
Job No.
Call at least two full working days
before you begin excavation.
Dial 8-1-1 or 1-800-STAKE-IT (782-5348)
In Maricopa County: (602)263-1100
w w w . e p s g r o u p i n c . c o m
T:480.503.2250
F:480.503.2258
|
1130 N Alma School Road
Suite 120
Mesa, AZ 85201
22-0292 - Vai Resort
Vai Resort
Southwest Corner of Cardinals Way & North 95th Ave.
EPS
EPS
22-0292
of 4
Or
Preliminary
Construction
Not For
Recording
Or
Preliminary
Construction
Not For
Recording
ZON23-03
feet
scale: 1" = 50'
100
50
0
50
3
SP02
Site Plan
MATCH LINE
SEE PP01
MATCH LINE
SEE PP03

STOP
STOP
102-13-018
LOT 13
PENDERGAST WEST
BK 143, PG 04 MCR
ZONING: RU-43
102-13-017
LOT 12
PENDERGAST WEST
BK 143, PG 04 MCR
ZONING: RU-43
32.1'
18.0'
N89° 12' 58"W
647.67'
1012.79'
S89° 19' 36"E
310.53'
L=299.3
3', R=5
00.00'
D=034
°18'02"
N56° 22' 22"E
120.65'
N33° 37' 38"W
100.81'
S89° 14' 33"E
575.27'
N01° 45' 42"W
120.81'
N. 95TH AVE.
18.0'
24.0'
24.0'
36.0'
ACCESS
18.0'
18.0' 18.0'
EMPLOYEE ONLY
PARKING ACCESS
FH
102-14-272E
ACERO GLENDALE LLC
LOT A BETHANY LAND PARTNERS MLD
BK 989, PG 24 MCR
ZONING: PAD
102-14-272E
ACERO GLENDALE LLC
LOT A BETHANY LAND PARTNERS MLD
BK 989, PG 24 MCR
ZONING: PAD
RETENTION
EMPLOYEE
ONLY
PARKING
Designer:
Drawn by:
Project:
Sheet No.
Job No.
Call at least two full working days
before you begin excavation.
Dial 8-1-1 or 1-800-STAKE-IT (782-5348)
In Maricopa County: (602)263-1100
w w w . e p s g r o u p i n c . c o m
T:480.503.2250
F:480.503.2258
|
1130 N Alma School Road
Suite 120
Mesa, AZ 85201
22-0292 - Vai Resort
Vai Resort
Southwest Corner of Cardinals Way & North 95th Ave.
EPS
EPS
22-0292
of 4
Or
Preliminary
Construction
Not For
Recording
Or
Preliminary
Construction
Not For
Recording
ZON23-03
feet
scale: 1" = 50'
100
50
0
50
4
SP03
Site Plan
MATCH LINE
SEE PP02

END OF EXHIBIT 4

EXHIBIT 5
EXHIBIT 5 | 42 
VAI Resort
EXHIBIT 5 | RENDERED ELEVATIONS

VAI Resort
East Elevation | 43 
EXHIBIT 5 | RENDERED ELEVATIONS

South Elevation | 44 
VAI Resort
EXHIBIT 5 | RENDERED ELEVATIONS

VAI Resort
West Elevation | 45 
EXHIBIT 5 | RENDERED ELEVATIONS

North Elevation | 46 
VAI Resort
EXHIBIT 5 | RENDERED ELEVATIONS

EXHIBIT 6
VAI Resort
EXHIBIT 6 | 47 
EXHIBIT 6

DN
DN
DNDNDN
DN
DN
DN
DN
DN
C A R D I N A L S  W A Y
N  9 5 T H  A V E
W
E S T  M O N T E B E L L O  A V E N U E
_ __ _ _ __ _ _ __ _ _ __ _ _ _ __ _ _ __ _ _ __ _ _ __ _ _ __ _ _ __
D 1
A 0 0 1 A
_ __ _ _ __ _ _ __ _ _ __ _ _ _ __ _ _ __ _ _ __ _ _ __ _ _ __ _ _ __
A 1
A 0 0 1 B
_ __ _ _ __ _ _ __ _ _ __ _ _ _ __ _ _ __ _ _ __ _ _ __ _ _ __ _ _ __
A 2
A 0 0 1 B
_ __ _ _ __ _ _ __ _ _ __ _ _ _ __ _ _ __ _ _ __ _ _ __ _ _ __ _ _ __
A 3
A 0 0 1 B
I S L E  8  
I S L E  7  
I S L E  6  
I S L E  5  
I S L E  4  
I S L E  2  
I S L E  3  
I S L E  9  
I S L E  1 1  
I S L E  1  
I S L E  1 0  
I S L E  8 S  
I S L E  4 . 4  
N
R E S O R T  S I T E  P L A N
P R O J .  # V A I  R E S O R T
V A I  R E S O R T ,  L L C  |  V A I  R E S O R T  -
P L A N N E D  A R E A  D E V E L O P M E N T  ( P A D )
2 0 2 4 . 0 9 . 2 3
S I T E  P L A N  R E V I E W
A 0 0 1
1 "  =  1 0 0 '- 0 "
A 1
A R E A  D E V E L O P M E N T  P L A N
NOT A PART

DN
C A R D I N A L S  W A Y
P A L M  T R E E  S P E C I M E N  
W
I T H  M I N .  T H R E E  S H R U B S  A T  5 0 ' - 0 "  S P A C I N G
50'-0"
50'-0"
A
A 0 0 1 A
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
N .  9 5 T H  A V E
E X I S T I N G  U T I L I T Y  B O X E S
E X I S T I N G  T R A F F I C  L I G H T
E X I S T I N G  S T R E E T  L I G H T ,  T Y P .
S C R E E N E D  S U B S T A T I O N
S I T E  P A V E R S
CIP SITEWALL WITH DIRECT APPLIED EIFS FINISH COAT
5'-0" - 8'-0"
LANDSCAPE BUFFER
7'-0" - 8'-0"
CONCRETE WALK
7'-0"
CURB/GUTTER
2'-0"
T R E E S  A T  5 0 '  S P A C I N G  W
I T H  M I N .  
T H R E E  S H R U B S  &  S I T E  L I G H T I N G
CIP SITEWALL WITH DIRECT APPLIED EIFS FINISH COAT
5'-0" - 8'-0"
LANDSCAPE BUFFER
VARIES
PAVERS
 15'-0"
CURB/GUTTER
2'-0"
T R E E S  A T  5 0 '  S P A C I N G  W
I T H  M I N .  
T H R E E  S H R U B S  &  S I T E  L I G H T I N G
CIP SITEWALL WITH DIRECT APPLIED EIFS FINISH COAT
5'-0" - 8'-0"
LANDSCAPE BUFFER
VARIES
CONCRETE WALK
7'-0"
LANDSCAPE BUFFER
5'-0"
CURB/GUTTER
2'-0"
T R E E S  A T  5 0 '  S P A C I N G  W
I T H  M I N .  
T H R E E  S H R U B S  &  S I T E  L I G H T I N G
CIP SITEWALL WITH DIRECT APPLIED EIFS FINISH COAT
5'-0" - 8'-0"
LANDSCAPE BUFFER
VARIES
CONCRETE WALK
 10'-0"
LANDSCAPE BUFFER
VARIES
CURB/GUTTER
2'-0"
T R E E S  A T  5 0 '  S T A G G E R E D  S P A C I N G  
W
I T H  M I N .  T H R E E  S H R U B S  &  S I T E  
L I G H T I N G
CIP SITEWALL WITH DIRECT APPLIED EIFS FINISH COAT
6'-0"
LANDSCAPE BUFFER
2'-10"
CURB/GUTTER
2'-0"
CONCRETE DRIVEWAY
 15'-0"
CURB/GUTTER
2'-0"
CONCRETE WALK
VARIES
N
A R E A  D E V E L O P M E N T  S T R E E T S C A P E  O V E R A L L  P L A N  -
C A R D I N A L S  W A Y
P R O J .  # V A I  R E S O R T
V A I  R E S O R T ,  L L C  |  V A I  R E S O R T  -
P L A N N E D  A R E A  D E V E L O P M E N T  ( P A D )
2 0 2 4 . 0 9 . 2 3
S I T E  P L A N  R E V I E W
A 0 0 1 A
1 "  =  4 0 '- 0 "
D 1
C A R D I N A L S  W A Y  - S T R E E T S C A P E  O V E R A L L  P L A N
1 / 2 "  =  1 '- 0 "
A
S T R E E T S C A P E  S E C T I O N  A
1 / 2 "  =  1 '- 0 "
B
S T R E E T S C A P E  S E C T I O N  B
1 / 2 "  =  1 '- 0 "
C
S T R E E T S C A P E  S E C T I O N  C
1 / 2 "  =  1 '- 0 "
D
S T R E E T S C A P E  S E C T I O N  D
1 / 2 "  =  1 '- 0 "
E
S T R E E T S C A P E  S E C T I O N  E

2 2
2 2
2 2
2 2
2 2
2 2
2 2
2 2
2 2
2 2
2 2
2 2
2 2
2 2
2 2
2 2
2 2
2 2
2 2
2 2
2 2
2 2
2 2
2 2
2 2
2 2
2 2
2 2
2 2
2 2
2 2
2 2
2 2
2 2
2 2
2 2
2 2
2 2
2 2
DN
N  9 5 T H  A V E
B
A 0 0 1 A
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
/
A 2
A 0 0 1 B
E X I S T I N G  U T I L I T Y  B O X E S
S C R E E N E D  S U B S T A T I O N
S I T E  P A V E R S
C
A 0 0 1 A
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
B
A 0 0 1 A
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
A
A 0 0 1 A
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
/
A 1
A 0 0 1 B
R E S O R T  
M A R Q U E E
P E D E S T R I A N  
E N T R Y
/
A 3
A 0 0 1 B
F U T U R E  S E C U R I T Y   &  
V A L E T  S T R U C T U R E
E L E V A T E D  B R I D G E
1 7 ' - 6 "  C L E A R  A B O V E  
R O A D W
A Y
E M P L O Y E E  D R O P - O F F  L O O P
R A I S E D  E N T R Y  
C O U R T Y A R D
E
A 0 0 1 A
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
V E H I C L E  E N T R A N C E / E X I T  
A T  E M P L O Y E E  P A R K I N G  
S U R F A C E  L O T
C
A 0 0 1 A
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
/
A 2
A 0 0 1 B
N
A R E A  D E V E L O P M E N T  S T R E E T S C A P E  O V E R A L L  P L A N  -
N O R T H  9 5 T H  A V E N U E
P R O J .  # V A I  R E S O R T
V A I  R E S O R T ,  L L C  |  V A I  R E S O R T  -
P L A N N E D  A R E A  D E V E L O P M E N T  ( P A D )
2 0 2 4 . 0 9 . 2 3
S I T E  P L A N  R E V I E W
A 0 0 1 B
1 "  =  4 0 '- 0 "
A 1
N O R T H  9 5 T H  A V E N U E  - S T R E E T S C A P E  O V E R A L L  P L A N  A
1 "  =  4 0 '- 0 "
A 2
N O R T H  9 5 T H  A V E N U E  - S T R E E T S C A P E  O V E R A L L  P L A N  B
1 "  =  4 0 '- 0 "
A 3
N O R T H  9 5 T H  A V E N U E  - S T R E E T S C A P E  O V E R A L L  P L A N  C

DN
DN
DNDNDN
DN
DN
DN
DN
DN
C A R D I N A L S  W A Y
N  9 5 T H  A V E
I S L E  8  
I S L E  7  
I S L E  6  
I S L E  5  
I S L E  4  
I S L E  2  
I S L E  9  
I S L E  1 1  
I S L E  1  
I S L E  1 0  
I S L E  8 S  
I S L E  4 . 4  
T R E E S  A T  5 0 '  S P A C I N G  W
I T H  M I N .  
T H R E E  S H R U B S  &  S I T E  L I G H T I N G
T Y P .  R E S O R T  P E R I M E T E R  W
A L L
CIP SITEWALL WITH DIRECT APPLIED EIFS FINISH COAT
MIN. 5'-0" - MAX. 8'-0"
S I D E W
A L K
T Y P .  W
A L L  F O O T I N G
L A N D S C A P E  D E S I G N  I N T E N T  S H O W
N  O N  
S I T E  P L A N .  F I N A L  D E S I G N  P E N D I N G .
H Y B R I D  S I T E W A L L  &  R A I L I N G  S Y S T E M
HYBRID CIP SITEWALL WITH DIRECT APPLIED EIFS FINISH COAT & RAILING SYSTEM
MIN. 5'-0" - MAX. 8'-0"
S I D E W
A L K
T Y P .  W
A L L  F O O T I N G
3'-0"
T Y P .  R E S O R T  C O L U M N
T Y P .  C O L U M N  F O O T I N G
E X T E R I O R  L I G H T I N G  F I X T U R E
T Y P .  C O L U M N  P R E C A S T  C A P
CIP COLUMN WITH DIRECT APPLIED EIFS FINISH COAT
+/- 8'-0" - 12'-0"
N O T  F O R  C O N S T R U C T I O N
N
A R E A  D E V E L O P M E N T  W
A L L  E L E V A T I O N S  &  D E T A I L S
P R O J .  # V A I  R E S O R T
V A I  R E S O R T ,  L L C  |  V A I  R E S O R T  -
P L A N N E D  A R E A  D E V E L O P M E N T  ( P A D )
2 0 2 4 . 0 9 . 2 3
S I T E  P L A N  R E V I E W
A 0 0 1 C
1 "  =  1 0 0 ' - 0 "
A 1
A R E A  D E V E L O P M E N T  W A L L  E L E V  L O C A T I O N S
1 / 2 "  =  1 ' - 0 "
F
T Y P  W A L L  E L E V A T I O N  D E T A I L
1 / 2 "  =  1 ' - 0 "
G
T Y P  H Y B R I D  W
A L L  E L E V A T I O N  D E T A I L
1 / 2 "  =  1 ' - 0 "
H
T Y P  C O L U M N  E L E V A T I O N  D E T A I L
WALL DETAIL "G/A001C"
COLUMN DETAIL "H/A001C"
WALL DETAIL "F/A001C"
WALL DETAIL "F/A001C"
WALL DETAIL "F/A001C"
WALL DETAIL "F/A001C"

EXHIBIT 7
EXHIBIT 7 | 52 
VAI Resort
EXHIBIT 7 | COMPREHENSIVE SIGN PACKAGE

COMPREHENSIVE SIGN PACKAGE
VAI Resort
  | 53 
EXHIBIT 7 | COMPREHENSIVE SIGN PACKAGE

Table of Contents | 54 
VAI Resort
EXHIBIT 7 | COMPREHENSIVE SIGN PACKAGE
TABLE OF CONTENTS
PAGE #
SECTION
REVISION HISTORY
55
RESORT OVERVIEW MAP
9/23/2024
55
RESORT OVERVIEW MAP
9/23/2024
56
BUILDING EXTERIOR & IDENTITY SIGNAGE
9/23/2024
56
Exterior Digital Sign Locations: Overview
9/23/2024
57
Exterior Identity Sign Elevations: BLDG 8 (North Side)
9/23/2024
58
Exterior Identity Sign Elevations: BLDG 8 (South Side)
9/23/2024
59
Exterior Digital Sign Elevations: BLDG 8 (North Side)
9/23/2024
60
Exterior Digital Sign Elevations: BLDG 7 (West Side)
9/23/2024
61
Exterior Identity Sign Elevations: BLDG 6 (West Side)
9/23/2024
62
Exterior Identity Sign Elevations: BLDG 2 (East Side)
9/23/2024
63
Exterior Identity Sign Elevations: BLDG 1 (North Side)
9/23/2024
64
Exterior Identity Sign Elevations: BLDG 10 (North Side)
9/23/2024
65
Building Exterior & Identity Sign Matrix
9/23/2024
66
WAYFINDING
9/23/2024
67
Exterior Traffi  c Wayfi nding: 1
9/23/2024
68
Exterior Traffi  c Wayfi nding Site Key Plan
9/23/2024
69
Exterior Traffi  c Wayfi nding: A
9/23/2024
70
Exterior Traffi  c Wayfi nding: B
9/23/2024
71
Exterior Traffi  c Wayfi nding: C
9/23/2024
72
Exterior Traffi  c Wayfi nding: D
9/23/2024
73
Exterior Examples / Vehicular Wayfi nding (Primary Directional)
9/23/2024
74
Exterior Examples / Vehicular Wayfi nding (Secondary Directional)
9/23/2024
75
Exterior Examples / Vehicular Wayfi nding (Tertiary Directional)
9/23/2024
76
Wayfi nding Matrix
9/23/2024

- PAGE NOT IN USE -
VAI Resort
  | 55 
EXHIBIT 7 | COMPREHENSIVE SIGN PACKAGE

Exterior Digital Sign Locations: Overview | 56 
VAI Resort
EXHIBIT 7 | COMPREHENSIVE SIGN PACKAGE
ID # - Identity Signs (#)
SS # - Static Signage (#)
DG # - Digital Signs (#)
CE1 - Cadence Hotel Entrance (Building 1)
VE1 - VAI Villas Entrance (Building 2)
RE1 - Rhythm Hotel Entrance (Building 6)
AE1 - Amphitheater Hotel Entrance (Building 8)
ID5
ID4
ID2
ID1
ID3
ID7
ID6
RE1
DG4
SS4-8,
10-12
VE1
ID10
CE1
DG3
AE1
DG2
DG1
AE1

VAI Resort
Exterior Identity Sign Elevations: Bldg 8 (North Side) | 57 
EXHIBIT 7 | COMPREHENSIVE SIGN PACKAGE
ID1

Exterior Identity Sign Elevations: Bldg 8 (North Side) | 58 
VAI Resort
EXHIBIT 7 | COMPREHENSIVE SIGN PACKAGE
ID1

VAI Resort
Exterior Identity Sign Elevations: Bldg 8 (South Side) | 59 
EXHIBIT 7 | COMPREHENSIVE SIGN PACKAGE
ID2
ID3

Exterior Digital Sign Elevations: Bldg 8 (North Side) | 60 
VAI Resort
EXHIBIT 7 | COMPREHENSIVE SIGN PACKAGE
DG3
DG2
DG1

VAI Resort
Exterior Digital Sign Elevations: Bldg 7 (West Side) | 61 
EXHIBIT 7 | COMPREHENSIVE SIGN PACKAGE
SS1
SS2
SS3
SS4
SS5
DG4
SS6
SS7
SS8

Exterior Identity Sign Elevations: Bldg 6 (West Side) | 62 
VAI Resort
EXHIBIT 7 | COMPREHENSIVE SIGN PACKAGE
ID5

VAI Resort
Exterior Identity Sign Elevations: Bldg 2 (East Side) | 63 
EXHIBIT 7 | COMPREHENSIVE SIGN PACKAGE
ID6

Exterior Identity Sign Elevations: Bldg 1 (North Side) | 64 
VAI Resort
EXHIBIT 7 | COMPREHENSIVE SIGN PACKAGE
ID7

VAI Resort
Exterior Identity Sign Elevations: Bldg 10 (North Side) | 65 
EXHIBIT 7 | COMPREHENSIVE SIGN PACKAGE
ID10

Building Exterior & Identity Sign Matrix | 66 
VAI Resort
EXHIBIT 7 | COMPREHENSIVE SIGN PACKAGE
BUILDING EXTERIOR & IDENTITY SIGN MATRIX
SIGN IDs
SECTION
S/D
STYLE
CONTENT
SIZE
SQFT
TYPE
DESCRIPTION
ID1
Amphitheater Hotel Front Facade
Single
Wall Mounted
VAI Identity Sign
26’-10” x 10’-4”
Static
Lit Channel Letters
ID2
Amphitheater Hotel Resort-facing Facade
Single
Wall Mounted - East
VAI Identity Sign
15’-4” x 6’-0”
Static
Reverse Pan Channel Letters
ID3
Amphitheater Hotel Resort-facing Facade
Single
Wall Mounted - West
VAI Identity Sign
15’-4” x 6’-0”
Static
Reverse Pan Channel Letters
ID4
Building 7 - Convention Center
Single
Wall Mounted - West
VAI Identity Sign
60’-0” x 20’-0”
Static
Lit Channel Letters
ID5
Building 6.2 - Rhythm Hotel
Single
Architectural
VAI Identity Sign
25’-0” x 5’-0”
Static
Architectural
ID6
Building 2 - VAI Villas
Single
Architectural
VAI Identity Sign
30’-0” x 11’-6”
Static
Architectural
ID7
Building 1.2 - Cadence Hotel
Single
Architectural
VAI Identity Sign
25’-0” x 5’-0”
Static
Architectural
ID10
Building 10 - VAI Corporate Offi  ce Bldg
Single
Architectural
VAI Identity Sign
30’-0” x 11’-6”
Static
Architectural
DG1
Building 8 - Amphitheater Hotel
Single
Wall Mounted
Marketing
30’-0” x 60’-0”
Digital
Marquee
DG2
Building 8 - Amphitheater Hotel
Single
Wall Mounted
Marketing
26’-0” x 53’-0”
Digital
Marquee
DG3
Building 8 - Amphitheater Hotel
Single
Wall Mounted
Marketing
30’-0” x 60’-0”
Digital
Marquee
DG4
Building 7 - Convention Center
Single
Wall Mounted - West
Marketing
70’-0” x 28’-0”
Digital
Marquee
SS4-12
Building 7 - Convention Center
Single
Wall Mounted - West
Marketing
14’-0” x 28’-0”
Static
Marquee
CE1
Building 1 - Cadence Hotel (ID Sign)
Single
Wall Mounted
CADENCE HOTEL
13’-0” x 1’-0”
20 Sqft.
Static
Halo-Illuminated Letters
AE1
Building 8 - Amphitheater Hotel (ID Sign)
Single
Wall Mounted
AMPHITHEATER HOTEL
13’-0” x 1’-0”
20 Sqft.
Static
Halo-Illuminated Letters
RE1
Building 6 - Rhythm Hotel (ID Sign)
Single
Wall Mounted
RHYTHM HOTEL
13’-0” x 1’-0”
20 Sqft.
Static
Halo-Illuminated Letters
VE1
Building 2 - VAI Villas
Single
Wall Mounted
VAI VILLAS
13’-0” x 1’-0”
20 Sqft.
Static
Halo-Illuminated Letters
ID # - Identity Signs (#)
SS # - Static Signage (#)
DG # - Digital Signs (#)
CE1 - Cadence Hotel Entrance (Building 1)
VE1 - VAI Villas Entrance (Building 2)
RE1 - Rhythm Hotel Entrance (Building 6)
AE1 - Amphitheater Hotel Entrance (Building 8)
LEGEND:
5'-0"
6"
24'-0"
6"
5'-0"
24'-0"
6"
5'-0"
24'-0"
6"
8'-5 1/4"
3'-2 1/2"
30'-3"

VAI Resort
Exterior Traffi c Wayfi nding: 1 | 67 
EXHIBIT 7 | COMPREHENSIVE SIGN PACKAGE
E3
E4
E5
E6
E7
E8
E9
E10
E11
E12
NORTH
EAST
WEST
SOUTH

QUADRANT A
QUADRANT B
QUADRANT C
QUADRANT D
Exterior Traffi c Wayfi nding Site Key Plan | 68 
VAI Resort
EXHIBIT 7 | COMPREHENSIVE SIGN PACKAGE

VAI Resort
Exterior Traffi c Wayfi nding: Quadrant A | 69 
EXHIBIT 7 | COMPREHENSIVE SIGN PACKAGE

Exterior Traffi c Wayfi nding: Quadrant B | 70 
VAI Resort
EXHIBIT 7 | COMPREHENSIVE SIGN PACKAGE

VAI Resort
Exterior Traffi c Wayfi nding: Quadrant C | 71 
EXHIBIT 7 | COMPREHENSIVE SIGN PACKAGE

Exterior Traffi c Wayfi nding: Quadrant D | 72 
VAI Resort
EXHIBIT 7 | COMPREHENSIVE SIGN PACKAGE

VAI Resort
Vehicular Wayfi nding - Primary Directional | 73 
EXHIBIT 7 | COMPREHENSIVE SIGN PACKAGE
VEHICULAR WAYFINDING | PRIMARY DIRECTIONAL
A. POWDER-COATED 
FABRICATED 
ALUMINUM 
TOTEM WITH EVEN INTERNAL LED ILLUMINATION 
AND PUSH-THROUGH LETTERS AND SYMBOLS 
(D). ALL SIDES PAINTED TO MATCH PT-2 BASE 
MOUNTED TO GROUND WITH NO VISIBLE 
MECHANICAL FASTENERS.
B. POWDER-COATED 
FABRICATED 
ALUMINUM 
PANEL WITH EVEN INTERNAL LED ILLUMINATION 
AND PUSH-THROUGH LETTERS AND SYMBOLS 
(E). ALL SIDES PAINTED TO MATCH PT-
1; MOUNTED TO TOTEM WITH NO VISIBLE 
MECHANICAL FASTENERS (TWO PANELS TOTAL; 
ONE EACH SIDE OF TOTEM).
C. NATURAL STONE MONOLITH BASE (ST-1) 
MOUNTED TO GROUND WITH NO VISIBLE 
MECHANICAL FASTENERS; STONE TO WRAP 
ALUMINUM TOTEM.
D. 1/2” THICK PUSH THROUGH FACE ILLUMINATED 
DIMENSIONAL LOGO; ALUMINUM RETURNS 
PAINTED TO MATCH PT-1; LOGO APPLIED TO 
BOTH SIDES OF SIGN.
E. 1/2” THICK  PUSH THROUGH FACE ILLUMINATED 
DIMENSIONAL LETTERS AND ARROWS; DAY/
NIGHT ACRYLIC LETTER FACE WITH ALUMINUM 
RETURNS PAINTED TO MATCH BLACK; LETTERS 
APPLIED TO BOTH SIDES OF SIGN.
F. EXTERNAL UP-LIGHTING TO ILLUMINATE STONE 
MONOLITH; TO BE SPECIFIED BY LIGHTING 
CONSULTANT.
NOTE:
 
ALL FOUNDATIONS/FOOTING AND ELECTRICAL 
REQUIREMENTS 
TO 
BE 
PROVIDED/
COORDINATED BY VENDOR.
D
A
B
C
F
E
FOR ILLUSTRATIVE PURPOSES ONLY - 
FINAL DESIGN PENDING.

Vehicular Wayfi nding - Primary Directional | 74 
VAI Resort
EXHIBIT 7 | COMPREHENSIVE SIGN PACKAGE
VEHICULAR WAYFINDING | SECONDARY DIRECTIONAL
A. POWDER-COATED 
FABRICATED 
ALUMINUM 
TOTEM WITH EVEN INTERNAL LED ILLUMINATION 
AND PUSH-THROUGH LETTERS AND SYMBOLS 
(C). ALL SIDES PAINTED TO MATCH PT-2 BASE 
MOUNTED TO GROUND WITH NO VISIBLE 
MECHANICAL FASTENERS.
B. POWDER-COATED 
FABRICATED 
ALUMINUM 
PANEL WITH EVEN INTERNAL LED ILLUMINATION 
AND PUSH-THROUGH LETTERS AND SYMBOLS 
(D). ALL SIDES PAINTED TO MATCH PT-
1; MOUNTED TO TOTEM WITH NO VISIBLE 
MECHANICAL FASTENERS (ONE PANEL TOTAL).
C. 1/2” THICK PUSH THROUGH FACE ILLUMINATED 
DIMENSIONAL LOGO; ALUMINUM RETURNS 
PAINTED TO MATCH PT-1; LOGO APPLIED TO 
ONE SIDE OF SIGN.
D. 1/2” THICK  PUSH THROUGH FACE ILLUMINATED 
DIMENSIONAL LETTERS AND ARROWS; DAY/
NIGHT ACRYLIC LETTER FACE WITH ALUMINUM 
RETURNS PAINTED TO MATCH BLACK; LETTERS 
APPLIED TO ONE SIDE OF SIGN.
E. EXTERNAL UP-LIGHTING TO ILLUMINATE TOTEM; 
TO BE SPECIFIED BY LIGHTING CONSULTANT.
NOTE:
 
ALL FOUNDATIONS/FOOTING AND ELECTRICAL 
REQUIREMENTS 
TO 
BE 
PROVIDED/
COORDINATED BY VENDOR.
FOR ILLUSTRATIVE PURPOSES ONLY - 
FINAL DESIGN PENDING.
C
A
B
D
E

A. FABRICATED STAINLESS STEEL PANEL; ALL 
SIDES PAINTED TO MATCH PT-2; MOUNTED 
TO BASE WITH NO VISIBLE MECHANICAL 
FASTENERS; PANEL TO ACCEPT CHANGEABLE 
MAGNETIC FACE.
B. 1” THICK, 1/2” DEEP STAINLESS STEEL FRAME; 
ALL SIDES PAINTED TO MATCH PT-2; TOP OF 
FRAME OPEN TO ACCEPT CINTRA INSERT.
C. 1/8” THICK CINTRA PANEL WITH DIRECT PRINT 
GRAPHICS; CINTRA PANEL TO BE REMOVABLE; 
PANEL TO SLIDE INTO TOP OF FRAME.
D. WEIGHTED STAINLESS STEEL BASE; ALL SIDES 
PAINTED TO MATCH PT-2; MOUNTED TO BASE 
WITH NO VISIBLE MECHANICAL FASTENERS.
E. CASTERS FINISHED TO MATCH PT-2; CONCEALED 
BY SIGN BASE.
NOTE:
 
ALL FOUNDATIONS/FOOTING AND ELECTRICAL 
REQUIREMENTS 
TO 
BE 
PROVIDED/
COORDINATED BY VENDOR.
VAI Resort
Vehicular Wayfi nding - Primary Directional | 75 
EXHIBIT 7 | COMPREHENSIVE SIGN PACKAGE
VEHICULAR WAYFINDING |
TERTIARY DIRECTIONAL
FOR ILLUSTRATIVE PURPOSES ONLY - 
FINAL DESIGN PENDING.
B
D
B
C
A
E

Vehicular Wayfi nding - Primary Directional | 76 
VAI Resort
EXHIBIT 7 | COMPREHENSIVE SIGN PACKAGE
WAYFINDING MATRIX
SIGN CODE
LOCATION
S/D
FACING
CONTENT
ARROW(S)
FACING
TYPE
SIZE
SQFT
NOTES
E1
RESERVED
E2
RESERVED
E3
Cardinals Way West
Single
South
[VAI Resort -- arrow right]
Right
Static
8’-0” x 6’-0”
48 Sqft
E4
Intersection of Cardinals Way and 95th Avenue
Single
West
[VAI Resort -- arrow right]
Right
Static
8’-0” x 6’-0”
48 Sqft
E5
95th (West side of street)
Single
North
[Amphitheater Hotel, Cadence Hotel, Rhythm Hotel, 
Convention – arrow right] [Mattel Adventure Park – 
arrow straight]
Right, Up
Static
8’-0” x 6’-0”
48 Sqft
E6
95th (West side of street)
Single
North
[VAI Villas – arrow right] [Mattel Adventure Park – ar-
row straight]
Right, Up
Static
8’-0” x 6’-0”
48 Sqft
E7
95th (West side of street)
Single
North
[Loading Dock – arrow right] [Mattel Adventure Park – 
arrow straight]
Right, Up
Static
8’-0” x 6’-0”
48 Sqft
E8
95th (West side of street)
Single
North
[Loading Dock Exit – DO NOT ENTER] [Fire Lane – 
DO NOT BLOCK]
---
Static
8’-0” x 6’-0”
48 Sqft
FOLLOW CITY OF GLENDALE SIGNAGE GUIDE - 
LINES & CRITERIA FOR FIRE LANE
E9
95th (West side of street)
Double
West/East
West: [Resort Exit – arrow right] East: [Loading Dock 
Exit – DO NOT ENTER]
---
Static
8’-0” x 6’-0”
48 Sqft
E10
95th (West side of street)
Single
South
[Hotel Entrances, Valet, Self Parking, Ride Sharing, 
Deliveries – arrow left]
Left
Static
8’-0” x 6’-0”
48 Sqft
E11
95th (East side of street)
Single
South
[Employee Parking Entrance, Resort Self-Parking Ga-
rage – arrow right]
Right
Static
8’-0” x 6’-0”
48 Sqft
E12
Montebello (South side)
Single
West
[Employee Parking Entrance, Deliveries – arrow right, 
Resort Parking Garage – straight arrow]
Right, Up
Static
8’-0” x 6’-0”
48 Sqft

EXHIBIT 8
VAI Resort
EXHIBIT 8 | 77 
EXHIBIT 8 | LIGHTING

Dark Sky Lighting Locations | 78 
VAI Resort
EXHIBIT 8 | LIGHTING
LIGHT SOURCE
DARK SKY LIGHTING LOCATIONS
NOT A PART

UP
UP
UP
UP
UP
1'
1'
16'-4"
1'
BALLOON BUST
4X  AFG
OPERATOR WALKWAY
15'-2"
7'-5"
WHAC A MOLE
6 UNIT
BOWLER
ROLLER
6 UNIT
GOBLET 6 X 10
OPERATOR WALKWAY
20'-1 3/4"
9'-9"
6'
GOBLET 6 X 10
HANG TIME
(2X) SINGLE
12'-10 1/2"
9'-10 1/2"
RAMP WATER
6 UNIT
REBOUND
PLINK DROP
7X6
ROLL A BALL 6 UNIT
OPERATOR  WALK WAY
TOPGLO 6 UNIT
UP
UP
UP
UP
UP
UP
1
2
3
4
5
6
7
8
9
10
11
12
13
A
B
C
E
F
D
G
H
J
K
L
ELECTRICAL
ROOM
PARTY
ROOM
PARTY
ROOM
PARTY
ROOM
HARD
PLAY
AMPHITHEATER
HAROLD'S
LIFT OFF
SAMBA'S
TOWER
FAMILY
RR
BERTIE'S
BUS TOUR
MEN
WOMEN
STORAGE
FUTURE
TENANT
SPACE
(RETAIL
A)
FIREFIGHTING
FLYNN
MIDWAY
A
TRAIN
RIDE
THEATER
LOBBY
?
?
CORRIDOR
?
FUTURE
TENANT
SPACE
(RETAIL
B)
MIDWAY
B
GO KARTS
GEPPETTO
GEPPETTO
OFFICE
EMPLOYEE
RR
FAMILY
RR
FIRE
RISER RM
VESTIBULE
ELEV1-1
TICKET
COUNTER
SERVICE
COUNTER
A/V
EXIT
PASSAGEWAY
ST5-1
TRAIN
RIDE EXIT
TRAIN
RIDE
TUNNEL
?
51056
ROCKING
TUG
51060
MOTHER'S
ROOM
51031
KIDS
ARCADE
51032
CORRIDOR
51020
MOTHER'S
ROOM
51019
JANITOR
CLOSET
51021
FAMILY
RR
51022
WOMEN
51023
MEN
51025
WOMEN
51013
RIDE
THEATER
51030
RIDE
PNEUMATICS
51017
ELECTRICAL
51018
EXIT
PASSAGEWAY
51041
SCREEN
MAINT.
ELEV2-1
51007
FAMILY
COASTER
ELECTRICAL
ROOM
51067
ELECTRICAL
ROOM
51005
ELECTRICAL
ROOM
51048
PARTY
ROOM
51043
STORAGE
51009
PARTY
ROOM
51011
PARTY
ROOM
51010
PARTY
ROOM
51027
ELECTRICAL
ROOM
51024
MEN
51003
ATRIUM
ARCADE
51014
GLASSES
CLEANING
ROOM
51016
STORAGE
ST4-1
H.8
H.6
Xref D:\Dropbox (Lightswitch)\LSLA-2126 Mattel Glendale\03-Drawing\Working CAD\MATTEL\xref\2023.03.16 - Revit Export\210192-00_A21_ISLE 5_detached-Floor Plan - CAD Export_Leve-154823- Mattel FEC - Struct R21_20220817-rvt-1-CAD Export_Level 2.dwg
Xref C:\Users\LSNY6\ACCDocs\Baker Barrios\VAI Resorts LLC\Shared\ARCHITECTURAL - ISLE 5\Legends Bar 22.12.09.dwg
Xref ./xref/TH011.dwg
LT-L06
LDR-105-21
LCR-105-25
LT-L06
LDR-105-21
LCR-105-25
LT-L06
LDR-105-21
LCR-105-25
LT-L06
LDR-105-13
LCR-105-27
LT-L06
LDR-105-13
LCR-105-27
LT-L06
LDR-105-10
LCR-105-27
LT-L06
LDR-105-23
LCR-105-21
LT-L06
LDR-105-23
LCR-105-21
LT-L09
LDR-105-23
LCR-105-21
LT-L09
LDR-105-13
LCR-105-27
LT-L09
LDR-105-21
LCR-105-25
LT-L06
LDR-105-23
LCR-105-21
LT-L06
LDR-105-23
LCR-105-21
LT-L06
LDR-105-23
LCR-105-21
LT-D01
LDR-107-20
LT-D01
LDR-107-20
LT-D01
LDR-107-20
LT-D01
LDR-107-20
LT-S09
LDR-102-04
LCR-117-69
LT-S12
LDR-107-25
LCR-149-12
LT-S01
LDR-103-21
LT-S01
LDR-103-21
LT-S01
LDR-103-21
LT-S01
LDR-103-21
LT-S01
LDR-103-21
LT-S01
LDR-103-21
LT-S01
LDR-103-21
LT-S01
LDR-103-21
LT-S01
LDR-103-21
LT-S08
LDR-102-25
LCR-117-12
LT-W05
LDR-103-17
LCR-149-09
LT-W05
LDR-103-17
LCR-149-09
LT-W05
LDR-103-17
LCR-149-10
LT-W05
LDR-103-17
LCR-149-10
LT-W05
LDR-103-17
LCR-149-10
LT-W05
LDR-103-17
LCR-149-10
LT-W05
LDR-103-16
LCR-167-12
LT-W05
LDR-103-16
LCR-167-12
LT-W05
LDR-103-16
LCR-167-12
LT-W05
LDR-103-16
LCR-167-12
LT-W05
LDR-103-15
LCR-167-12
LT-W05
LDR-103-15
LCR-167-12
LT-W05
LDR-103-14
LCR-167-12
LT-W05
LDR-103-14
LCR-167-12
LT-W05
LDR-103-18
LCR-149-09
LT-W05
LDR-103-18
LCR-149-09
LT-S04
LDR-102-13
LT-S04
LDR-102-13
LT-S04
LDR-102-14
LT-S04
LDR-102-14
LT-S04
LDR-102-15
LT-S04
LDR-102-15
LT-S04
LDR-102-16
LT-S04
LDR-102-16
LT-L07a
LDR-106-05
LCR-107-14
LT-L06
LDR-105-12
LCR-105-24
LT-L06
LDR-105-14
LCR-105-30
LT-S06
LDR-103-12
LT-S06
LDR-103-12
LT-L06
LDR-101-01
LCR-167-04
LT-L06
LDR-101-01
LCR-167-04
LT-L06
LDR-101-01
LCR-167-04
LT-L06
LDR-101-01
LCR-167-04
LT-S08
LDR-102-04
LCR-117-69
LT-S12
LDR-107-25
LCR-149-11
LT-S08
LDR-107-25
LCR-149-11
LT-S12
LDR-107-25
LCR-149-11
LT-S12
LDR-107-26
LCR-149-37
LT-S12
LDR-107-26
LCR-149-37
LT-S12
LDR-105-24
LCR-117-02
LT-S12
LDR-105-24
LCR-117-07
LT-S12
LDR-105-25
LCR-117-09
LT-S12
LDR-107-25
LCR-149-13
LT-S12
LDR-107-26
LCR-149-38
LT-S12
LDR-107-26
LCR-117-01
LT-S12
LDR-105-24
LCR-117-05
LT-S12
LDR-105-25
LCR-117-08
LT-S08
LDR-102-25
LCR-117-12
LT-S08
LDR-102-25
LCR-117-11
LT-S08
LDR-102-25
LCR-117-11
LT-S08
LDR-102-25
LCR-117-11
LT-S08
LDR-102-25
LCR-117-10
LT-S08
LDR-102-25
LCR-117-10
LT-P01
LDR-103-23
LT-P01
LDR-103-23
LT-P01
LDR-103-23
LT-P01
LDR-103-23
LT-P01
LDR-103-23
LT-P01
LDR-103-23
LT-P01
LDR-103-23
LT-P01
LDR-103-23
LT-L07a
LDR-106-05
LCR-107-14
LT-L07a
LDR-106-01
LCR-107-33
LT-L07a
LDR-106-01
LCR-107-33
#12
#13
#9
#10
#11
#5
#4
#3
#6
#7
#2
LT-S03
LDR-103-20
LT-S03
LDR-103-20
LT-FX06
LDR-105-08
LCR-117-21
LCR-117-21
LDR-105-08
LT-FX06a
LCR-117-21
LDR-105-08
LT-FX06a
LT-FX06
LDR-105-09
LCR-117-20
LCR-117-20
LDR-105-09
LT-FX06a
LT-FX06
LDR-105-09
LCR-117-20
LT-FX06
LDR-105-09
LCR-117-20
LT-FX06
LDR-105-09
LCR-117-20
LT-FX06
LDR-105-09
LCR-117-20
LT-FX06
LDR-105-09
LCR-117-20
LT-FX06
LDR-105-09
LCR-117-20
LT-FX06
LDR-105-09
LCR-117-20
LT-FX06
LDR-105-09
LCR-117-20
LT-FX06
LDR-105-09
LCR-117-20
LT-FX06
LDR-105-09
LCR-117-20
LT-FX06
LDR-105-09
LCR-117-20
LT-FX06
LDR-105-09
LCR-117-20
LT-FX06
LDR-105-09
LCR-117-20
LT-FX06
LDR-105-09
LCR-117-20
LT-FX06
LDR-105-09
LCR-117-20
LT-FX06
LDR-105-09
LCR-117-20
LT-FX06
LDR-105-09
LCR-117-20
LT-FX06
LDR-105-09
LCR-117-20
LT-FX06
LDR-105-09
LCR-117-20
LT-FX06
LDR-105-08
LCR-117-21
LT-FX06
LDR-105-08
LCR-117-21
LT-FX06
LDR-105-08
LCR-117-21
LT-FX06
LDR-105-08
LCR-117-21
LT-FX06
LDR-105-08
LCR-117-21
LT-FX06
LDR-105-08
LCR-117-21
LT-FX06
LDR-105-08
LCR-117-21
LT-FX06
LDR-105-08
LCR-117-21
LT-FX06
LDR-105-08
LCR-117-21
LT-FX06
LDR-105-08
LCR-117-21
LT-FX06
LDR-105-08
LCR-117-21
LT-FX06
LDR-105-08
LCR-117-21
LT-FX06
LDR-105-08
LCR-117-21
LT-FX06
LDR-105-08
LCR-117-21
LT-FX06
LDR-105-08
LCR-117-21
LT-FX06
LDR-105-08
LCR-117-21
LT-FX06
LDR-105-08
LCR-117-21
LT-FX06
LDR-105-08
LCR-117-21
LT-FX06
LDR-105-08
LCR-117-21
LT-FX06
LDR-105-08
LCR-117-21
LT-FX06
LDR-105-08
LCR-117-21
LT-FX06
LDR-105-08
LCR-117-21
LT-FX06
LDR-105-08
LCR-117-21
LT-FX06
LDR-105-08
LCR-117-21
LT-FX06
LDR-105-08
LCR-117-21
LT-FX06
LDR-105-08
LCR-117-21
LT-FX06
LDR-105-08
LCR-117-21
LT-FX06
LDR-105-08
LCR-117-21
LT-FX06
LDR-105-08
LCR-117-21
LT-FX06
LDR-105-08
LCR-117-21
LT-FX06
LDR-105-08
LCR-117-21
LT-FX06
LDR-105-08
LCR-117-21
LT-FX06
LDR-105-08
LCR-117-21
LT-FX06
LDR-105-08
LCR-117-21
LT-FX06
LDR-105-08
LCR-117-21
LT-FX06
LDR-105-08
LCR-117-21
LT-FX06
LDR-105-08
LCR-117-21
LT-FX06
LDR-105-08
LCR-117-21
LT-FX06
LDR-105-08
LCR-117-21
LT-S08
LDR-102-25
LCR-117-11
UP
UP
UP
UP
F
G
H
J
K
L
ELECTRICAL
ROOM
PARTY
ROOM
PARTY
ROOM
HARD
PLAY
AMPHITHEATER
SAMBA'S
TOWER
BERTIE'S
BUS TOUR
TRAIN
RIDE EXIT
51056
ROCKING
TUG
51060
MOTHER'S
ROOM
51048
PARTY
ROOM
51043
STORAGE
H.8
H.6
LT-E01
LDR-103-01
LCR-149-07
LT-E01
LDR-103-01
LCR-149-07
LT-E01
LDR-103-01
LCR-149-07
LT-E02
LDR-103-01
LT-E02
LDR-103-01
LT-E02
LDR-103-01
LT-E02
LDR-103-02
LT-E02
LDR-103-02
LT-E02
LDR-103-02
LT-E02
LDR-103-02
LT-E02
LDR-103-02
LT-E02
LDR-103-02
LT-E02
LDR-103-02
LT-E02
LDR-103-02
CONCRETE PAD FOR
MOUNTING FIXTURES
CONCRETE PAD FOR
MOUNTING FIXTURES
CONCRETE PAD FOR
MOUNTING FIXTURES
LT-E01
LDR-103-01
LCR-149-07
LT-E01
LDR-103-01
LCR-149-07
LT-E01
LDR-103-01
LCR-149-07
LT-E01
LDR-103-01
LCR-149-07
LT-E01
LDR-103-01
LCR-149-07
LT-E01
LDR-103-01
LCR-149-07
LT-E01
LDR-103-01
LCR-149-07
LT-E01
LDR-103-01
LCR-149-07
LT-E01
LDR-103-01
LCR-149-07
LT-E01
LDR-103-01
LCR-149-07
LT-E01
LDR-103-01
LCR-149-07
LT-E02
LDR-103-02
LT-E02
LDR-103-02
LT-E02
LDR-103-03
LT-E02
LDR-103-03
LT-E02
LDR-103-03
LT-E02
LDR-103-03
LT-E02
LDR-103-03
LT-E02
LDR-103-04
LT-E02
LDR-103-04
LT-E02
LDR-103-04
LT-E02
LDR-103-04
LT-E02
LDR-103-04
LT-E02
LDR-103-04
LT-E02
LDR-103-04
LT-E02
LDR-103-04
LT-E02
LDR-103-02
LT-E02
LDR-103-02
LT-E02
LDR-103-02
LT-E02
LDR-103-02
LT-W07
LDR-103-05
LCR-167-10
LT-W07
LDR-103-05
LCR-167-10
LT-W07
LDR-103-05
LCR-167-10
LT-W07
LDR-103-05
LCR-167-10
LT-W07
LDR-103-04
LCR-149-06
LT-W07
LDR-103-04
LCR-149-06
LT-W07
LDR-103-04
LCR-149-06
LT-W07
LDR-103-04
LCR-149-06
LT-W07
LDR-103-03
LCR-149-05
LT-W07
LDR-103-03
LCR-149-05
LT-W07
LDR-103-06
LCR-167-11
LT-W07
LDR-103-06
LCR-167-11
LT-W07
LDR-103-05
LCR-167-10
LT-W07
LDR-103-05
LCR-167-10
LT-S12
LDR-107-25
LCR-149-12
LT-W05
LDR-103-17
LCR-149-09
LT-W05
LDR-103-17
LCR-149-09
LT-W05
LDR-103-17
LCR-149-10
LT-W05
LDR-103-17
LCR-149-10
LT-W05
LDR-103-17
LCR-149-10
LT-W05
LDR-103-17
LCR-149-10
LT-W05
LDR-103-16
LCR-167-12
LT-W05
LDR-103-16
LCR-167-12
LT-W05
LDR-103-16
LCR-167-12
LT-W05
LDR-103-16
LCR-167-12
LT-W05
LDR-103-15
LCR-167-12
LT-W05
LDR-103-15
LCR-167-12
LT-W05
LDR-103-14
LCR-167-12
LT-W05
LDR-103-14
LCR-167-12
LT-W05
LDR-103-18
LCR-149-09
LT-W05
LDR-103-18
LCR-149-09
L
L
LT-S04
LDR-102-14
LT-S04
LDR-102-14
LT-S04
LDR-102-15
LT-S04
LDR-102-15
LT-S04
LDR-102-16
LT-S04
LDR-102-16
LT-S06
LDR-103-12
LT-S06
LDR-103-12
LT-S12
LDR-107-25
LCR-149-11
LT-S08
LDR-107-25
LCR-149-11
LT-S12
LDR-107-25
LCR-149-11
LT-P01
LDR-103-23
LT-P01
LDR-103-23
LT-P01
LDR-103-23
LT-P01
LDR-103-23
LT-P01
LDR-103-23
LT-P01
LDR-103-23
LT-P01
LDR-103-23
LT-P01
LDR-103-23
CONCRETE PAD FOR
MOUNTING FIXTURES
CONCRETE PAD FOR
MOUNTING FIXTURES
CONCRETE PAD FOR
MOUNTING FIXTURES
LT-W07
LDR-103-03
LCR-149-05
LT-W07
LDR-103-03
LCR-149-05
CONCRETE PAD FOR
MOUNTING FIXTURES
CONCRETE PAD FOR
MOUNTING FIXTURES
CONCRETE PAD FOR
MOUNTING FIXTURES
LT-W07
LDR-103-06
LCR-167-11
LT-W07
LDR-103-06
LCR-167-11
LT-E01
LDR-103-01
LCR-149-07
LT-E01
LDR-103-01
LCR-149-07
#12
#13
#9
#10
#11
LT-E02
LDR-103-04
LT-E02
LDR-103-04
ALLOW 10' SOFT CABLE
FOR ALL LT-E02 FIXTURES
.
.
.
.
.
.
LT-E02
LDR-103-02
3
6/10/22 Update
4
13/12/22 Tunnel Update
5
20/12/22 Coaster Update
Project #:
Drawn By:
Sheet Title:
Sheet Number:
REV
DATE
ISSUES & REVISIONS
Mattel_MASTER.dwg   8/5/2024 4:23 pm
This document is a representation of design concepts.
Lightswitch Architectural takes no responsibility and herewith disclaims
liability for the erection, engineering or use of any components or
concepts in this or any other document. It is the responsibility of the
vending companies to erect this design using properly engineered and
approved materials, components & methods, including but not  limited
to  local  building, fire & safety codes, and all applicable O.S.H.A.
standards.
All concepts, ideas & design elements shown on this drawing & any
other documentation are the exclusive intellectual property of
Lightswitch Architectural & may only be used for this project. Any other
use is prohibited, unless express written permission has been granted
by Lightswitch Architectural.
Review or use of this document implies acceptance of the above terms
& conditions.
COPYRIGHT © 2013 LIGHTSWITCH ARCHITECTURAL
MATTEL ADVENTURE PARK
9601 CARDINALS WAY
GLENDALE, AZ 85305
CM, TF,  WKK
LSLA - 2126
2
5/24/22 Update
1
4/25/22 Original Issuance
6
09/01/23 Thomas Update
7
14/04/23 Facility Coordination
8
26/07/23 Elevation Update
9
08/11/23 Elevation Update
10 12/01/24 Coaster Update
11 09/02/24 Setting Out
Lighting Layout
GTX Exterior
LT-GTX
West Exterior Ride Space - Lighting Layout 
A
LT-2201 Scale: 1/8":1'

PIXEL BAR IP SERIES
The PIXEL BAR IP SERIES™ is an outdoor IP65 rated 
LED pixel bar series featuring tri-color RGB SMD LEDs 
with a 16mm pixel pitch, a refresh rate of 44,000Hz 
for flicker free operation for broadcast TV and FILM 
applications, and comes in 30 pixel (0.5 m / 1.6 ft), 60 
pixel (1m / 3.3 ft), and 120 pixel (2m / 6.6 ft) lengths.
Each pixel bar is housed in a lightweight IP65 rated 
aluminum housing featuring magnetic end caps which 
allow seamless end-to-end pixel spacing, an integrated 
adjustable mounting bracket, a safety cable loop, and 
includes square and rounded frosted lens attachments. 
Easy and versatile control options are handled by the 
Pixel Driver 4000™ (sold separately) which provides 
simple dimming and strobe control via on-board 
manual or 3 channel DMX-512, and full pixel mapping 
control of up to 4,080 max pixels via Kling-Net and 
up to 680 max pixels via Art-Net and sACN (streaming 
ACN) protocols. Power and data are supplied via 
proprietary IP rated 4pin combo cables (sold separately) 
which are available in lengths from 2 to 50 meters.
Specifications subject to change without notice ©Elation Professional 11/08/19
Elation Professional USA | 6122 S. Eastern Ave. | Los Angeles, CA. 90040
323-582-3322 | 323-832-9142 fax | www.elationlighting.com | info@elationlighting.com
Elation Professional B.V. | Junostraat 2 | 6468 EW Kerkrade, The Netherlands
+31 45 546 85 66 | +31 45 546 85 96 fax | www.elationlighting.eu | info@elationlighting.eu
ELATION I PIXEL BAR IP SERIES I Product Specification Sheet
FEATURES
Outdoor IP65 Rated
Pixel Bar 30IP - (30) 0.2W RGB SMD LEDs | 0.5m / 1.6ft
Pixel Bar 60IP - (60) 0.2W RGB SMD LEDs | 1m / 3.3 ft
Pixel Bar 120IP - (120) 0.2W RGB SMD LEDs | 2m / 6.6 ft
16mm Pixel Pitch | 44,000Hz PWM
Flicker Free Operation for Broadcast TV and FILM
Magnetic End Caps - Seamless End-to-End Spacing
Integrated Adjustable Mounting Brackets
Square and Rounded Frosted Lens Included
Proprietary IP Rated Power/Data Combo Cables
(Available in 2, 3, 5, 10, 12, 15, 20, 30, 50, meter lengths)
Magnetic End Caps - Seamless End-to-End Spacing

specifications I ELATION PIXEL BAR SERIES™ I www.elationlighting.com
Specifications subject to change without notice ©Elation Professional 11/08/19
Elation Professional USA | 6122 S. Eastern Ave. | Los Angeles, CA. 90040
323-582-3322 | 323-832-9142 fax | www.elationlighting.com | info@elationlighting.com
Elation Professional B.V. | Junostraat 2 | 6468 EW Kerkrade, The Netherlands
+31 45 546 85 66 | +31 45 546 85 96 fax | www.elationlighting.eu | info@elationlighting.eu
PRODUCT SPECIFICATIONS
ORDERING INFORMATION
SOURCE
PIXEL BAR 30IP - 30 0.2W RGB SMD LEDS
PIXEL BAR 60IP - 0.2W RGB SMD 60 LEDS
PIXEL BAR 120IP - 0.2W RGB SMD 120 LEDS
50,000 Hour Average LED Life*
*May vary depending on several factors including but not limited to:
Environmental Conditions, Power/Voltage, Usage Patterns (On-Off Cycling), Control and Dimming.
PHOTOMETRIC DATA
16mm Pixel Pitch | 44,000Hz PWM
PIXEL BAR 30IP 
133° Beam, 160° Field, 46+ Total Output Lumens
PIXEL BAR 60IP
146° Beam, 167° Field, 80+ Total Output Lumens
PIXEL BAR 120IP
150° Beam, 170° Field, 169+ Total Output Lumens
COLOR
RGB
CONTROL / CONNECTIONS
4pin Power/Data In/Out
SIZE / WEIGHT
PIXEL BAR 30IP - 1.6 foot (0.5m)
Length: 19.2” (488mm)
Width: 1.3” (34mm)
Height: 3.3” (83mm)
Weight: 1.5 lbs. (0.7kg)
PIXEL BAR 60IP - 3.37 foot (1m)
Length: 38.0” (967mm)
Width: 1.3” (34mm)
Height: 3.3” (83mm)
Weight: 2.6 lbs. (1.2kg)
PIXEL BAR 120IP - 6.6 foot (2m)
Length: 75.9” (1928mm)
Width: 1.3” (34mm)
Height: 3.3” (83mm)
Weight: 4.4 lbs. (2.0kg)
ELECTRICAL / THERMAL
AC 100-240V - 50/60Hz
5°F to 113°F (-15°C to 45°C)
Multiple Unit Power Linking
PIXEL BAR 30IP - 2W Max Power Consumption
PIXEL BAR 60IP - 12W Max Power Consumption
PIXEL BAR 120IP - 24W Max Power Consumption
INCLUDED ITEMS - PIXEL BARS
2 ft. (0.6m) 4pin 16AWG Power/Data Jumper Cable
Square Frost Lens
Rounded Frost Lens
INCLUDED ITEMS - PIXEL DRIVER 4000
19-inch (483mm) Rack Mount Kit
5.6 ft. (1.7m) 18AWG Power Cable
9.25 ft. (2.8m) 4pin 16AWG Power/Data Cable
APPROVALS / RATINGS
 
PIX200
PIXEL BAR 30IP
PIX225
PIXEL BAR 60IP
PIX253
PIXEL BAR 120IP
PIX277
PIXEL DRIVER 4000
PIX300
P BAR IP 0.6m (2ft) 16AWG Cable
PIX313
P BAR IP 1m (3ft) 16AWG Cable
PIX326
P BAR IP 1.5m (5ft) 16AWG Cable
PIX339
P BAR IP 3m (10ft) 16AWG Cable
PIX352
P BAR IP 3.5m (12ft) 16AWG Cable
PIX365
P BAR IP 4.5m (15ft) 16AWG Cable
PIX378
P BAR IP 6m (20ft) 16AWG Cable
PIX391
P BAR IP 7.5m (25ft) 16AWG Cable
PIX411
P BAR IP 9m (30ft) 16AWG Cable
PIX424
P BAR IP 15m (50ft) 16AWG Cable
PIX450
P BAR IP MALE Cable Connector
PIX452
P BAR 30IP Replacement Clear Lens
PIX462
P BAR 30IP Rounded Frost Lens
PIX463
P BAR IP FEMALE Cable Connector
PIX471
P BAR 30IP Square Frost Lens
PIX483
P BAR 60IP Replacement Clear Lens
PIX494
P BAR 60IP Rounded Frost Lens
PIX502
P BAR 60IP Square Frost Lens
PIX515
P BAR 120IP Replacement Clear Lens
PIX526
P BAR 120IP Rounded Frost Lens
PIX537
P BAR 120IP Square Frost Lens
PIX550
PIXEL BC20-12 20ft, 12Guage Cable
PIX563
PIXEL BC25-12 25ft, 12Guage Cable
PIX576
PIXEL BC30-12 30ft, 12Guage Cable
PIX589
PIXEL BC50-12 50ft, 12Guage Cable

19x 60W RGBW LED IP65 Wash Fixture with SparkLED Effect, Zoom and Continuous Pan and Tilt
Specifications are subject to change without notice ©Elation Professional 12/11/2023
Elation Professional USA | 6122 S. Eastern Ave. | Los Angeles, CA. 90040
323-582-3322 | 323-832-9142 fax | www.elationlighting.com | info@elationlighting.com
Elation Professional B.V. | Junostraat 2 | 6468 EW Kerkrade, The Netherlands
+31 45 546 85 66 | +31 45 546 85 96 fax | www.elationlighting.eu | info@elationlighting.eu
Proteus Rayzor 
1960
KEY FEATURES
IP65 Rated LED Wash Effects Fixture
19x 60W OSRAM RGBW LED with Pixel Control
76x 2W SparkLED™ Effect with Pixel Control (patented)
Extreme Zoom – 5.6° for mid-air beam to 55° for even 
washes
Fast and precise 360° continuous Pan and Tilt rotation
Beam FX and Smooth Wash fixture in a compact IP65 certi-
fied housing
FIL (Foam In Lay) Polyurethane Foam Packaging Included
The PROTEUS RAYZOR 1960™ is a compact yet extremely powerful IP65 rated Wash Effects fixture 
featuring Elation’s unique SparkLED™ system and fast continuous Pan and Tilt motion. With its 
wide zoom range from 5°  to 55°  it provides intense and well-defined mid-air beams at over 18.000 
lumens as well as an exceptionally wide and even wash coverage, making it a perfect tool for any 
application, even in adverse outdoor conditions. SparkLEDs offer a prominent and innovative LED 
pixel effect with dedicated high brightness pixels inside the large front lenses for additional layers 
of creativity.
Driven by 19, independently controlled, 60W RGBW LEDs, delivering over 18.000 lumens of output 
with a total power of 1140W, the PROTEUS RAYZOR 1960™ provides a powerful beam that stands 
out on any stage. The oversized front lenses create a large surface on the fixture that is enhanced 
by the exclusive patent pending SparkLEDs technology. SparkLEDs consists of 76 individual white 
LEDs, strategically placed inside the lens itself to create a unique additional layer, allowing 
designers access to a new and innovative way of creating interest on the stage. Proteus Rayzor 
1960 offers this never seen before style of internal lens illumination for depth and visual impact. 
SparkLEDs are controllable by the lighting console or driven by a multitude of internal FX patterns.
In addition to its powerful wash and enhanced effects, the PROTEUS RAYZOR 1960™ offers precise 
continuous pan & tilt rotation, allowing variable speed from slow to extremely fast movement 
effects. Combining the powerful LED output with the SparkLEDs while utilizing the 360° movement, 
allows the designer to create endless, unique and appealing designs from mid-air beams or wide 
stage washes to subtle effects for mood or the TV camera lens.
The PROTEUS RAYZOR 1960™ ships in a cardboard box with a custom fitted polyurethane foam FIL 
(Foam In Lay) insert. This foam insert easily fits into a custom sized flight case (not included),and 
provides enhanced impact protection during transport.
DATA SHEET

19x 60W RGBW LED IP65 Wash Fixture with SparkLED Effect, Zoom and Continuous Pan and Tilt
Specifications are subject to change without notice ©Elation Professional 12/11/2023
Elation Professional USA | 6122 S. Eastern Ave. | Los Angeles, CA. 90040
323-582-3322 | 323-832-9142 fax | www.elationlighting.com | info@elationlighting.com
Elation Professional B.V. | Junostraat 2 | 6468 EW Kerkrade, The Netherlands
+31 45 546 85 66 | +31 45 546 85 96 fax | www.elationlighting.eu | info@elationlighting.eu
Proteus Rayzor 
1960
SOURCE
(19) 60W Osram RGBW LEDs
(76) 2W White SparkLED™
50,000 Hour Average LED Life*
*Test lab conditions. May vary depending on 
several factors including but not limited to:
Environmental Conditions, Power/Voltage, 
Usage Patterns (On-Off Cycling), Control, and 
Dimming.
PHOTOMETRIC DATA
18.100 Total Lumen Output
CRI 80
Zoom Range 5° - 55°
Beam Angle 5.6° - 53.6° 
Field Angle 7.8° - 71°
EFFECTS
Motorized Zoom
Linear Color Temperature Presets (2700-
8000K)
RGBW Color Mixing and Pixel Control
White SparkLED Lens Effect
Color Presets and Macros
Electronic Strobe and Variable Dimming 
Curves
16-bit Dimming
Pan Angle: 360° (continuous rotation) / 540°
Tilt Angle: 360° (continuous rotation) / 270°
CONTROL / CONNECTIONS
3 DMX Channel Modes (25 / 100 / 176 
channels)
360° Continuous Pan and Tilt Movement
DMX Adjustable Refresh Rate (900 -25000 Hz)
(6) Button Touch Panel
Full Color 180° Reversible LCD Menu Display
RDM Support
IP65 5pin XLR DMX In/Out
IP65 RJ45 Ethernet In/Out (Art-Net, sACN)
IP65 Locking Power Cable In
SIZE / WEIGHT
Length: 14.81 in (376.26mm)
Width: 18.41 in (467.68mm)
Height: 22.80 in (579.04mm)
Weight: 73.0 lbs. (33.1kg)
ELECTRICAL / THERMAL
AC 100-240V 50/60Hz
1600W Max Power Consumption
Ambient Temperature Range: -4°F to 113°F 
(-20°C to 45°C)
APPROVALS / RATINGS
CE | cETLus | IP65 | UKCA
SPECIFICATIONS

19x 60W RGBW LED IP65 Wash Fixture with SparkLED Effect, Zoom and Continuous Pan and Tilt
Specifications are subject to change without notice ©Elation Professional 12/11/2023
Elation Professional USA | 6122 S. Eastern Ave. | Los Angeles, CA. 90040
323-582-3322 | 323-832-9142 fax | www.elationlighting.com | info@elationlighting.com
Elation Professional B.V. | Junostraat 2 | 6468 EW Kerkrade, The Netherlands
+31 45 546 85 66 | +31 45 546 85 96 fax | www.elationlighting.eu | info@elationlighting.eu
Proteus Rayzor 
1960
US SKU
EU SKU
DESCRIPTION
PRR196
1237000261
Elation Proteus Rayzor 
1960
PIXEL MAPPING
ORDERING INFORMATION

19x 60W RGBW LED IP65 Wash Fixture with SparkLED Effect, Zoom and Continuous Pan and Tilt
Specifications are subject to change without notice ©Elation Professional 12/11/2023
Elation Professional USA | 6122 S. Eastern Ave. | Los Angeles, CA. 90040
323-582-3322 | 323-832-9142 fax | www.elationlighting.com | info@elationlighting.com
Elation Professional B.V. | Junostraat 2 | 6468 EW Kerkrade, The Netherlands
+31 45 546 85 66 | +31 45 546 85 96 fax | www.elationlighting.eu | info@elationlighting.eu
Proteus Rayzor 
1960
UNIT DIMENSIONS
18.85in (478.72mm)
15.00in (381.09mm)
15.00in (381.09mm)
4.37in
(111.00mm)
18.41in (467.68mm)
19.78in (502.50m)
12.73in (323.39mm)
4.94in
(125.50mm)
13.03in
(331.00mm)
9.49in
(241.00mm)
5.31in
(134.90mm)
22.80in (579.04mm)
14.81in (376.26mm)
5.55in
(141.00mm)
9.53in (242.12mm)
7.09in
(180.00mm)
7.09in
(180.00mm)

19x 60W RGBW LED IP65 Wash Fixture with SparkLED Effect, Zoom and Continuous Pan and Tilt
Specifications are subject to change without notice ©Elation Professional 12/11/2023
Elation Professional USA | 6122 S. Eastern Ave. | Los Angeles, CA. 90040
323-582-3322 | 323-832-9142 fax | www.elationlighting.com | info@elationlighting.com
Elation Professional B.V. | Junostraat 2 | 6468 EW Kerkrade, The Netherlands
+31 45 546 85 66 | +31 45 546 85 96 fax | www.elationlighting.eu | info@elationlighting.eu
Proteus Rayzor 
1960
FOAM IN-LAY DIMENSIONS
21.1in (535.0mm)
19.1in (484.3mm)
18.5in (470.0mm)
14.2in (360.2mm)
9.1in (230.0mm)
14.6in (370.8mm)
16.3in (415.0mm)
17.1in (435.0mm)
19.9in (506.6mm)
20.9in (530.0mm)
ϴ 0.8in (20.0mm)
1.2in
(31.0mm)
4.9in
(125.0mm)

1200W Peak Field LED IP65 Wash FX Fixture
KEY FEATURES
High Efficiency 1200W 6,500K Peak Field LED Engine
Up to 75.000 Total Lumen Fixture Output 
CMY Color Mixing and Variable CTO
6 Position Color Wheel, High CRI, UV filter 
Complete FX System featuring Rotating Gobos, Animation, 
Iris, Frost 
Optional Full Blackout Framing Module 
Wide Zoom Range from 4.5° to 45° / Large 220mm (8.7”) 
Front Aperture 
FIL (Foam In Lay) Polyurethane Foam Packaging Included
Specifications are subject to change without notice ©Elation Professional 05/08/2023
Elation Professional USA | 6122 S. Eastern Ave. | Los Angeles, CA. 90040
323-582-3322 | 323-832-9142 fax | www.elationlighting.com | info@elationlighting.com
Elation Professional B.V. | Junostraat 2 | 6468 EW Kerkrade, The Netherlands
+31 45 546 85 66 | +31 45 546 85 96 fax | www.elationlighting.eu | info@elationlighting.eu
DATA SHEET
PROTEUS BRUTUS
The PROTEUS BRUTUS™ an extremely bright IP65 rated LED Wash FX fixture offering high intensity 
wash and effects qualities in any environment.
Providing up to 75.000 lumens from its custom designed 1200W Peak Field LED engine the Proteus 
Brutus is the ideal fixture for any outdoor application requiring superior output, bright and powerful 
wash, quiet operation as well as stunning colors and effects. Proteus Brutus provides the designer 
a comprehensive FX package with 6 rotating glass gobos, animation wheel, frost and a high-speed 
Iris. Its optional indexable framing system provides full blackout shutter cuts for precise beam shape 
control.
With a fast zoom range from 4.5° to 45° and an impressive 220mm front lens the Proteus Brutus has 
the power to cut through at great distances in any outdoor concert, special events and with its fully 
dust and waterproof design it is an ideal fixture for theme parks and cruise ships or any application 
that benefits from its sealed IP65 housing.
The PROTEUS BRUTUS fixture ships in a cardboard box with a custom fitted polyurethane foam FIL 
(Foam In Lay) insert. This foam insert easily fits into a custom sized flight case (not included), and 
provides enhanced impact protection during transport.

1200W Peak Field LED IP65 Wash FX Fixture
SOURCE
1200W 6,500K Bright White LED Engine
30,000 Hour Average LED Life*
*May vary depending on several factors including but not limited to: Environmental Conditions, Power/Voltage, 
Usage Patterns (On-Off Cycling), Control, and Dimming.
PHOTOMETRIC DATA
75,000 Total Lumen Output
CRI 70+ (82+ with HCRI Filter)
2:1 Peak Field
Zoom Range 4.5° - 45°
Beam Angle 4.4° - 39.4°
Field Angle 6.8° - 49.7°
EFFECTS
Motorized Zoom (220mm / 8.7 in Front Aperture)
Full 360° Bi-Directional Animation Wheel
Variable Frost Filter
Motorized Iris with Variable Pulse Effects
Variable 16-bit Dimming Curve Modes
High Speed Electronic Shutter and Strobe
DMX Controllable LED Refresh Rate
Pan Angle: 540°/630°
Tilt Angle: 266°
COLOR
CMY Color Mixing
Linear CTO Color Correction
6 Dichroic Colors including High CRI Filter and UV
GOBOS
5 Rotating / Indexing Interchangeable Beam Shaping + FX 
Gobos
OPTIONAL FRAMING MODULE
4 Rotating Full Blackout Framing Blades 
+/-45° Framing Indexing
CONTROL / CONNECTIONS
4 DMX Channel Modes (25 / 36 / 34 / 56)
16-bit Pan, Tilt and Dimming Control
Motorized Focus
DMX, RDM, Art-NET, sACN Protocol Support
(6) Button Touch Control Panel
Full Color 180° Reversible LCD Menu Display
Hibernation Mode (Power Save)
5pin XLR DMX In/Out
IP65 RJ45 ethernet In/Out
IP65 Locking Power Cable In
With Wired Digital Communication Network
SIZE / WEIGHT
Length: 25.3 in (643.6mm)
Width: 18.0 in (456.9mm)
Height: 34.2 in (869mm)
Weight: 104.1 lbs. (47.2kg)
ELECTRICAL
AC 100-240V 50/60Hz
Max Power Consumption 1,700W
-4°F to 113°F (-20°C to 45°C)
APPROVALS / RATINGS
CE | cETLus | IP65 | UKCA
Specifications are subject to change without notice ©Elation Professional 05/08/2023
Elation Professional USA | 6122 S. Eastern Ave. | Los Angeles, CA. 90040
323-582-3322 | 323-832-9142 fax | www.elationlighting.com | info@elationlighting.com
Elation Professional B.V. | Junostraat 2 | 6468 EW Kerkrade, The Netherlands
+31 45 546 85 66 | +31 45 546 85 96 fax | www.elationlighting.eu | info@elationlighting.eu
SPECIFICATIONS
PROTEUS BRUTUS

1200W Peak Field LED IP65 Wash FX Fixture
GOBOS | COLORS | ANIMATION WHEEL
ORDERING INFORMATION
COLOR WHEEL
RED
BLUE
AMBER
HCRI
UV
GREEN
ANIMATION WHEEL
ROTATING GOBO WHEEL
PRB201
Proteus Brutus (US Sku)
1237000259
Proteus Brutus (EU Sku)
Specifications are subject to change without notice ©Elation Professional 05/08/2023
Elation Professional USA | 6122 S. Eastern Ave. | Los Angeles, CA. 90040
323-582-3322 | 323-832-9142 fax | www.elationlighting.com | info@elationlighting.com
Elation Professional B.V. | Junostraat 2 | 6468 EW Kerkrade, The Netherlands
+31 45 546 85 66 | +31 45 546 85 96 fax | www.elationlighting.eu | info@elationlighting.eu
PROTEUS BRUTUS

1200W Peak Field LED IP65 Wash FX Fixture
UNIT DIMENSIONS
Elation Professional USA | 6122 S. Eastern Ave. | Los Angeles, CA. 90040
323-582-3322 | 323-832-9142 fax | www.elationlighting.com | info@elationlighting.com
Elation Professional B.V. | Junostraat 2 | 6468 EW Kerkrade, The Netherlands
+31 45 546 85 66 | +31 45 546 85 96 fax | www.elationlighting.eu | info@elationlighting.eu
Specifications are subject to change without notice ©Elation Professional 05/08/2023
13.5in.
[343.7mm]
18.0in. [456.9mm]
15.7in. [400.0mm]
11.5in. [292.9mm]
21.9in. [555.5mm]
5.6in. [143.0mm]
17.6in. [446.1mm]
25.2in. [640.9mm]
5.1in. [129.5mm]
25.1in. [638.2mm]
Ø30.7in. [Ø780.0mm]
2.0in. [50.8mm]
32.7in. [830.8mm]
7.1in. [180.0mm]
9.7in. [246.0mm]
13.1in. [331.9mm]
7.1in. [180.0mm]
11.1in. [283.0mm]
13.8in. [349.4mm]
34.0in. [863.6mm]
27.9in. [708.1mm]
PROTEUS BRUTUS

1200W Peak Field LED IP65 Wash FX Fixture
FOAM IN-LAY DIMENSIONS
Elation Professional USA | 6122 S. Eastern Ave. | Los Angeles, CA. 90040
323-582-3322 | 323-832-9142 fax | www.elationlighting.com | info@elationlighting.com
Elation Professional B.V. | Junostraat 2 | 6468 EW Kerkrade, The Netherlands
+31 45 546 85 66 | +31 45 546 85 96 fax | www.elationlighting.eu | info@elationlighting.eu
Specifications are subject to change without notice ©Elation Professional 05/08/2023
PROTEUS BRUTUS