INTERGOVERNMENTAL AGREEMENT
between the
CITY OF MESA
and the
FLOOD CONTROL DISTRICT OF MARICOPA COUNTY

DESIGN, RIGHTS-OF-WAY ACQUISITION, AND UTILITY RELOCATIONS

of
Pecos Road Basins and Storm Drain Improvements

IGA FCD 2024A005

Agenda Item

This Intergovernmental Agreement (Agreement) is entered into by and between the City of Mesa, a municipal
corporation, acting by and through its City Council, hereinafter called the CITY, and the Flood Control District
of Maricopa County, a political subdivision of the State of Arizona, acting by and through its Board of
Directors, hereinafter called the DISTRICT. The DISTRICT and the CITY may hereinafter individually be
called a PROJECT PARTNER, or collectively called the PROJECT PARTNERS.

This Agreement shall become effective as of the date it has been executed by all PROJECT PARTNERS.
STATUTORY AUTHORIZATION

1. The DISTRICT is empowered by Arizona Revised Statutes (A.R.S.) Section 48-3603 to enter into this
Agreement and has authorized the undersigned to execute this Agreement on behalf of the DISTRICT.

2. The CITY is empowered by A.RS. § 48-572 and Section 103 of the Mesa City Charter to enter into this
Agreement and has by resolution authorized the undersigned to execute this Agreement on behalf of the
CITY.

BACKGROUND

3. Pecos Road Basins and Storm Drain Improvements (PROJECT) is located in the developed urban area
within the City of Mesa (CITY). The PROJECT is intended to mitigate excess stormwater runoff that
impacts existing and proposed residences and businesses by using new storm drain basins and other
drainage features to convey stormwater to the Ellsworth Channel. The PROJECT DESIGN will
encompass the Design, Rights-of-Way Acquisition, and Utility Relocations necessary for the construction
of the PROJECT.

4. The proposed improvements were studied as part of the East Mesa Area Drainage Master Plan Update
(EMADMPU) prepared in November 2013, and in 2015 with a concept design contracted by the
DISTRICT. The EMADMPU and the concept design provided solutions to mitigate the flood hazards in
the area including the drainage improvements along Pecos Road from the Meridian Road alignment to
Ellsworth Road.

IGA FCD 2024A005 PCN 442.02.30 PAGE f OF 10

10.

11.

On January 25, 2023, the Board of Directors of the DISTRICT adopted Resolution FCD 2022R002 (C
69-23-030-X-00), authorizing the DISTRICT to negotiate and prepare an Intergovernmental Agreement
for the cost sharing, rights-of-way acquisition, design, construction, construction management and future
operation and maintenance of the PROJECT.

This Agreement is for the PROJECT DESIGN of the PROJECT which will consist of storm drains and
other conveyance improvements in the vicinity of Pecos Road from the Meridian Road alignment to
Ellsworth Road in Mesa to mitigate flooding caused by at-least the 10-year event. The proposed PROJECT
elements are shown on Exhibit A, attached hereto and made a part hereof.

PURPOSE OF THE AGREEMENT

This Agreement identifies and defines the responsibilities of the DISTRICT and the CITY for PROJECT
activities related to Design, Rights-of-Way Acquisition, and Utllity Relocations for the PROJECT. An
additional IGA will need to be entered into for the roles, responsibilities and cost-share funding for
construction, construction management, and operation & maintenance of the PROJECT.

TERMS OF AGREEMENT
The PROJECT and PROJECT DESIGN, as referenced herein, is described in section 3 of this Agreement.

The PROJECT DESIGN COST, as referenced herein, solely encompasses the following costs directly
associated with the PROJECT, unless noted otherwise below:

9.1. The PROJECT DESIGN COST is estimated to be $16,000,000. This amount is an estimate based
on the best information available at the time of this Agreement. Upon recognition of anticipated
costs above this estimated PROJECT DESIGN COST, the PROJECT PARTNERS shall
communicate these anticipated increases, and address them in the context of Paragraph 11.3.

9.2. Development of the final design and preparation of construction documents.
9.3 Acquisition of fee simple rights-of-way and/or drainage easements required for the PROJECT.

9.4 Relocation of conflicting utilities with prior rights, together with associated costs. Utilities in place
without prior rights will be relocated at their owners’ expense.

9.5 Obtaining United States Army Corps of Engineers Section 404 Permits for the PROJECT, and costs
associated with the mitigation efforts required by this permit process.

9.6 Each PROJECT PARTNER shall pay for, and not seek reimbursement for, its own personnel and
internal administrative costs associated with this PROJECT. Including costs associated with the
issuance of PROJECT permits, unless specifically identified otherwise in this Agreement.

The CITY shall be solely responsible for any costs that are not needed for the flood control features of the
PROJECT, including but not limited to all costs associated with any fee simple estate rights-of-way and/or
easements acquired at the CITY’s request for non-flood control purposes. This includes the Pecos Road
roadway improvements.

Not later than January 1st of each year during the life of the Project, the CITY shall provide to the
DISTRICT a written estimate of the funds the CITY anticipates will be needed from the DISTRICT for
the next fiscal year and for each of the remaining fiscal years of the Project until said Project is completed.
The County fiscal year commences on July 1 and ends on June 30 of the following calendar year. The

IGA FCD 2024A005 PCN 442.02.30 PAGE 2 OF 10

12,

13.

14.

DISTRICT'S funding as shown in the table below is dependent on the availability of funding. The CITY
should use these DISTRICT funding figures to derive its cash flow for the PROJECT. Depending on
funding availability, the Parties may implement a payment plan by mutual agreement.

11.1. The DISTRICT's total PROJECT DESIGN funding under this IGA shall not exceed $10,400,000.
11.2 Funding from the District for the DISTRICT's cost share is contingent on funding availability for

design, rights-of-way acquisition, construction, and all related activities, with an overall funding limit
of $22,000,000 distributed for each DISTRICT fiscal year, as outlined in the table below:

Fiseal Year INot to Exceed
FY 2025 from
FY 2026 frmon
FY 2027 | ae

11.3. Funding increases may be negotiated and are subject to written approval from the DISTRICT,
contingent upon budget availability.

DISTRICT funding for this PROJECT shall be from secondary flood control tax levy revenue and is
contingent upon funding availability within the DISTRICT’s Capital Improvement Program.

CITY funding for the PROJECT will be through various means and shall include but not be limited to
the CITY’s Capital Improvement Program (CIP) budget.

The CITY shall:

14.1. Plan and design the PROJECT to meet the recurrence interval of at-least the 10-year flood as
determined by generally applied technical data and methodology in use at the time of PROJECT
design, and this level of protection is specifically approved by the Board of Directors of the Flood
Control District of Maricopa County.

14.2, Prior to the CITY beginning the contracting process for hiring a consultant for design related
activities, coordinate with the DISTRICT to understand its funding capabilities and timing for
reimbursement of these PROJECT costs.

14.3. Fund thirty-five (5%) of the PROJECT COST, making the CITY’s estimated share $5,600,000 (the
“CITY’s SHARE”) of the PROJECT DESIGN COST.

14.4 Beginning three months after the award of the design contract, invoice the DISTRICT every quarter
for its share of the earned contract costs to date as invoiced to the CITY by the consultant. For costs
incurred by the CITY for utility relocations or for 404 Permit related costs, invoice the DISTRICT
for its cost share of those costs as they are incurred or include with the quarterly invoice.

14.5 Serve as the lead agency for PROJECT design and include the DISTRICT in the consultant selection
process.

IGA FCD 2024A005 PCN 442.02.30 PAGE 3 OF 10

14.6 Provide the DISTRICT with interim project submittals and allow three (3) weeks for review and
comment. Incorporate the DISTRICT’s comments into the PROJECT as appropriate.

14.7 Serve as the lead agency for obtaining any necessary USACE Section 404 Permit, and for completing
mitigation efforts required by any such permit process.

14.8 Serve as the lead agency for rights-of-way acquisition and, in that capacity:

14.8.1. Obtain fee simple estate rights-of-way and/or easements required for the PROJECT. If it
is mutually agreed between the PROJECT PARTNERS that, the project property is no
longer needed for flood control purposes and therefore available for sale, the CITY may sell
the property under the stipulation that the DISTRICT shall be paid the DISTRICT’s cost
share percentage of the original acquisition cost, along with its pro-rata share of any
appreciation in land value from the original acquisition price of the property for the
PROJECT to the final disposition price at the time that the CITY disposes of the property.

14.8.2 Invoice the DISTRICT for the DISTRICT’s share of the PROJECT DESIGN COST for
fee simple estate right-of-way and/or easement acquisition as it is incurred and upon
availability of DISTRICT funding, no more frequently than quarterly, and no less frequently
than annually.

14.8.3 Provide all CITY owned and controlled rights-of-way necessary for the PROJECT, and not
specifically purchased for this PROJECT, at no cost to the PROJECT.

14.9 Serve as the lead agency for PROJECT public involvement activities.

14.10 Prior to offering to make or making the PROJECT property available for any non-flood control
uses, assure the safety and appropriateness of such use, and ensure such use will not interfere with
the operation and function of the PROJECT.

14.11 Obtain DISTRICT review and comments on the design and/or construction of any changes or
modifications to the PROJECT that may affect the hydraulic function of the PROJECT and resolve
and/or incorporate the DISTRICT’s comments into these PROJECT modifications.

14.12 Prior to DISTRICT?s final cost share payment for the design contract(s), provide written notification
to the DISTRICT that all contractual obligations have been met, all project contracts closed, and all
certificates of performance have been received by the CITY.

14.13 Warrant and certify that it does not currently, and agrees for the duration of the contract that it will
not, use:

The forced labor of ethnic Uyghurs in the People's Republic of China.

Any goods or services produced by the forced labor of ethnic Uyghurs in the People's Republic of
China

Any contractors, subcontractors or suppliers that use the forced labor or any goods or services
ptoduced by the forced labor of ethnic Uyghurs in the People’s Republic of China.

If the CITY becomes aware during the term of the Agreement that any Contractor is not in
compliance with this paragraph, the CITY shall notify the DISTRICT within five (5) business days
after becoming aware of the noncompliance. Failure of CITY to provide a written certification that

IGA FCD 2024A005 PCN 442.02.30 PAGE 4 OF 10

the appropriate contractor has remedied the noncompliance within one hundred eighty (180) days
after notifying the public entity of its noncompliance, this Agreement shall terminate unless the Term
of this Agreement shall end prior to said one hundred eighty (180) day period.

15. The DISTRICT shall:

15.1 Fund 65% of the PROJECT COST, making the DISTRICT’s estimated share $10,400,000 for the
PROJECT DESIGN COST.

15.2 Subject to the availability of funding, within 30 calendar days of receipt, pay invoices issued by the
CITY in accordance with the terms of this Agreement.

15.3 Participate in PROJECT public involvement activities.

15.4 Provide review comments to the CITY within three (3) weeks of receipt of the periodic PROJECT
submittals during the design process.

16. Each PROJECT PARNTER, and the PROJECT PARTNERS collectively:

16.1 Shall comply with A.R.S. Sections 41-4401 and 23-214, subsection A.

16.1.1

16.1.2

Each party to this Agreement retains the legal right to inspect the records of the other party’s
and any contractors’ or subcontractors’ employees performing work under this Agreement
to verify compliance with A.R.S. Sections 41-4401 and 23-214, subsection A.

Failure by either party to this Agreement to comply with A.R.S. Sections 41-4401 and 23
214, subsection A shall be deemed a breach of this Agreement and is subject to penalties up
to and including termination of the Agreement.

16.2 Shall require that any contractor selected for the PROJECT:

16.2.1

16.2.2

16.2.3

16.2.4

Warrant compliance with all federal immigration laws and regulations that relate to its
employees and their compliance with A.R.S. section 23-214(A);

Agrees that a breach of the warranty shall be deemed a material breach of this Agreement
which entitles the other party to obtain appropriate relief including termination of this
Agreement.

Consent to inspection of all papers of the contractor or subcontractor employee(s) who
work(s) on the PROJECT to ensure that contractor or subcontractor is complying with the
warranty.

Who engages in for-profit activity and has 10 or more employees, certify it is not currently
engaged in, and agrees for the duration of this Agreement to not engage in, a boycott of
goods or services from Israel. This certification does not apply to a boycott prohibited by
50 U.S.C. § 4842 or a regulation issued pursuant to 50 U.S.C. § 4842.

16.3. Shall provide in-kind services and any permit(s), at no cost to the project, that a PROJECT
PARTNER has the authority to issue and that is required for the PROJECT.

IGA FCD 2024A005

PCN 442.02.30 PAGE 5 OF 10

17.

18.

16.4 Has the right, following written agreement of all PROJECT PARTNERS, to delegate its
responsibilities under this Agreement to another party. Any delegation, however, shall not relieve
the delegating PROJECT PARTNER of its original responsibilities as defined herein.

16.5 Shall, in the event of any dispute arising pursuant to this Agreement, use their best efforts and enter
into good faith negotiations to resolve the disputed matters. However, this shall not limit the rights
of the PROJECT PARTNERS to seek any remedies provided by law.

16.6 Shall take reasonable and necessary actions within its authority to ensure that only storm water is
discharged into the PROJECT, and that such discharges into the PROJECT comply at the point of
discharge with any applicable requirements of the U.S. Environmental Protection Agency Clean
Water Act, Arizona Pollutant Discharge Elimination System, or any other applicable discharge
requirements, including any permit requirements.

16.7 Shall equally share the cost of a PROJECT compliance and cost audit to be initiated within sixty (60)
days of PROJECT completion, if requested by either PROJECT PARTNER. An independent
auditing firm agreed to by the PROJECT PARTNERS will perform the audit. Any payments or
reimbursements necessary to bring the PROJECT into compliance with the audit findings shall be
made within forty-five (45) days of acceptance by the PROJECT PARTNERS. and at the agreed
upon cost share percentages set forth in Sections 14 and 15 herein.

16.8 Shall comply with applicable federal, state, and local privacy laws. A PROJECT PARTNER may
withhold CITY ot DISTRICT information from the other PROJECT PARTNER if required by
such privacy laws or by CITY or DISTRICT policy or regulation. This Agreement is subject to the
restrictions of A.R.S. Sections 44-1373 and 44-7601.

Each PROJECT PARTNER shall, as “Indemunitor,” to the extent permissible by law, indemnify, defend
and hold harmless the other PROJECT PARTNER (“Indemnitee”) from and against any and all loss or
expense incurted as a result of any claim or suit of any nature whatsoever, which arises out of any act or
omission of Indemnitor pursuant to this IGA, including but not limited to, reasonable attorneys’ fees, court
costs, and other expenses relating to the defense against claims or litigation, incurred by the
Indemnitee. Notwithstanding the above, Indemnitee shall be liable for its own negligence or wrongful acts
as provided by law. In no event shall the Indemnitor owe or be obligated to pay any amounts which the
Indemnitee has not actually paid or has no actual obligation to pay. In the event any agreement to pay to
resolve issues of liability is not enforceable, or any agreement or settlement results in an actual obligation
lower than the full amount of liability, the Indemnitor’s obligation to pay shall be limited to the
amount Indemnitee has paid or would be obligated to pay in the absence of any agreement to
indemnify. Should any PROJECT PARTNER offer to make or make the PROJECT available for any
non-flood control uses, the offering PROJECT PARTNER shall, to the extent permissible by law,
indemnify, defend, and save harmless the DISTRICT, including agents, officers, directors, governors, and
employees thereof, from any and all loss or expense incurred as a result of any claim or suit arising in whole
or in part from the sanctioned non-flood control use. Such indemnification obligation is intended to be a
specific indemnity obligation rather than the general indemnity obligations set forth in this paragraph
regarding all other types of claims or suits and shall include the obligation to provide reasonable attorneys’
fees, court costs, and other expenses relating to the defense of such claims or litigation.

All notices or demands upon any party to this Agreement shall be in writing and shall be delivered in person
or sent by mail addressed as follows:

Flood Control District of Maricopa County
Chief Engineer and General Manager
2801 West Durango Street

IGA FCD 2024A005 PCN 442.02.30 PAGE 6 OF 10

19.

20.

21.

22.

Phoenix, AZ 85009-6399

City of Mesa

City Manager

PO Box 1466

Mesa, AZ 85211-1466

This Agreement shall expire cither (a) 10 years from the effective date, or (b) upon completion of the
PROJECT and after all funding obligations and reimbursements have been satisfied in accordance with
this Agreement, whichever is the first to occur. However, by mutual written agreement of all parties, this
Agreement may be amended or terminated. The operation, maintenance, and indemnification provisions,
of this Agreement, shall survive the expiration of this Agreement.

This Agreement is subject to cancellation by any party pursuant to the provisions of A.R.S. Section 38-511.

Attached to this Agreement or contained herein are the written determinations by the appropriate attorneys
for the parties to this Agreement, that these agencies are authorized under the laws of the State of Arizona
to enter into this Agreement and that it is in proper form.

If legislation is enacted after the effective date of this Agreement that changes the relationship or structure
of one or more parties to this Agreement, the parties agree that this Agreement shall be renegotiated at the
written request of any party.

IGA FCD 2024A005 PCN 442.02.30 PAGE 7 OF 10

FLOOD CONTROL DISTRICT OF MARICOPA COUNTY
A Political Subdivision of the State of Arizona

Recommended by:

Paul Baughman, Chief Engineer /General Manager Date
Approved and Accepted:
By:
Chairman, Board of Directors Date
Attest:
By:
Clerk of the Board Date

The foregoing Intergovernmental Agreement IGA FCD 2024A005 has been reviewed pursuant to A.R.S.
Section 11952, as amended, by the undersigned General Counsel, who has determined that it is in proper form
and within the powers and authority granted to the Flood Control District of Maricopa County under the laws
of the State of Arizona.

Flood Control District General Counsel Date

IGA FCD 2024A005 PCN 442.02.30 PAGE 8 OF 10

CITY OF MESA
A Municipal Corporation

Date
Attest:
By: dt ln Viore hay _ of 14/244
Holly Mosefoy, City Clerk (4) "Date

The foregoing Intergovernmental Agreement IGA FCD 2024A005, has been reviewed pursuant to A.R.S.
Section 11-952, as amended, by the undersigned attorney who has determined that it is in proper form and
within the power and authority granted to the City of Mesa under the laws of the State of Arizona.

APPROVED AS TO FORM:

OFFICE OF THE CITY ATTORNEY

| ) hice jofeley

Jim Smith, City Attorney Date

IGA FCD 2024A005 PCN 442.02.30 PAGE 9 OF 10

IGA FCD 2024A005

EXHIBIT A

Pecos Road Basins and Storm Drain*

*Approximate Locations

IGA FCD 2024A005 PCN 442.02.30 PAGE 10 OF 10

aX.
mesa:az

OFFICE OF THE CITY CLERK

Certificate

of
CITY CLERK

|, HOLLY MOSELEY, THE DULY APPOINTED, QUALIFIED AND ACTING CITY CLERK OF
THE CITY OF MESA, MARICOPA COUNTY, ARIZONA, DO HEREBY CERTIFY THAT THE
ATTACHED COPY OF RESOLUTION NO. 12266 ENTITLED:

RESOLUTION NO. 12266

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF MESA, MARICOPA COUNTY,
ARIZONA, APPROVING AND AUTHORIZING THE CITY MANAGER TO EXECUTE AN
AGREEMENT BETWEEN FLOOD CONTROL DISTRICT OF MARICOPA COUNTY AND THE
CITY OF MESA FOR THE PECOS ROAD BASINS AND STORM DRAIN IMPROVEMENTS
PROJECT.

IS A TRUE, CORRECT AND COMPARED COPY OF THE ORIGINAL OF RECORD, AND ON
FILE IN THE OFFICE OF THE CITY CLERK OF THE CITY OF MESA, ARIZONA.

IN WITNESS WHEREOF, | HAVE HEREUNTO SET MY HAND AND SEAL OF THE CITY OF
MESA, MARICOPA COUNTY, STATE OF ARIZONA, THIS 10™ DAY OF OCTOBER 2024.

CITY CLERK

RESOLUTION NO. 12266

A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF MESA,

MARICOPA COUNTY, ARIZONA, APPROVING AND AUTHORIZING

THE CITY MANAGER TO EXECUTE AN AGREEMENT BETWEEN

FLOOD CONTROL DISTRICT OF MARICOPA COUNTY AND THE

CITY OF MESA FOR THE PECOS ROAD BASINS AND STORM

DRAIN IMPROVEMENTS PROJECT.

BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF MESA, MARICOPA
COUNTY, AS FOLLOWS:

Section 1: | That the agreement between the Flood Control District of Maricopa
County and the City of Mesa for the design, rights-of-way acquisition, and utility relocation
of the Pecos Road Basins And Storm Drain Improvements Project; is hereby approved.

Section2: That the City Manager, Christopher J. Brady, or his designated
representative, is authorized and directed to execute the agreement on behalf of the City
of Mesa, and the City Clerk is authorized and directed to attest to the signature of the City
Manager or his authorized designated representative thereon.

PASSED AND ADOPTED by the City Council of the City of Mesa, Maricopa .

County, Arizona, this 23rd day of September, 2024.

APPROVED:

hull.
Maget

ATTEST:

Afoll,Moscke,

City Clerk J