2018C012 CO #10 - AWC.PDF

Maricopa County — Formal (2024-11-06)

View PDF Item 117 Meeting page

Extracted text (via pymupdf) 3418 characters
10
Date:
10/18/2024
Amount:
$1,395,409.36
PCN No:
202.02.31
AWARD 
Amount:
Contract 
NTP Date:
9/30/2021
($560,699.11)
0
days extension of time will be allowed.
1/10/2025
.
22,379,929.00
$     
21,819,229.89
$     
1,395,409.36
$       
23,214,639.25
$     
Principal 
(Signature)  
Printed Name:
Title:
Date:
Date
Date
Date
Date
Date
Date
Date
Date
ATTEST:
Date
Date
$22,379,929.00
I certify that this change has received Engineering Review.
Project Manager
Amended Contract Amount w/ Previous Change Orders:
I certify that this change is required for this contract
Amended Contract Amount w/ Current Change Order:
With this Change Order, Cumulatively, the total amount of this contract has increased -2.51%.
 
Initial Contract Amount:
We, the undersigned Contractor, having given careful consideration to the change(s) proposed, hereby agree that upon execution of this change order that we will provide all
equipment, furnish all material (except as noted in the bid line item sheet), perform all work specified in the bid line item sheet; and we will accept as full payment therefore the
prices shown in the bid line item sheet.
N/A
Contracts Branch 
Contractor Name:
CONTRACT Project Title:
Total Previous Change Orders:
4710 E. Elwood Street - Suite 6
The following financial information is submitted:
Current Change Order Request:
By reason of this proposed change,
The contract completion date is: 
Division Manager
I certify that this change is within the limits authorized by the Maricopa County 
Procurement Code.
Contractor Name:
Archer Western Construction, LLC
CONSTRUCTION CHANGE ORDER - BOD APPROVAL
FCD 2018C012
Archer Western Construction, LLC
McMicken Dam Rehabilitation - Phase 1
Change Order No. 10 (CO 10) will increase the contract amount by $1,395,409.36. The revised contract amount will be $23,214,639.25. Additional funds are required to 
compensate AWC for time delays associated with filter sand, drain rock, and concrete features of the project. Both District and AWC settled on $1,395,409.36 as a fair 
and reasonable amount to cover all outstanding change orders to date. 
Flood Control District of Maricopa County
Change Order Number:
The Contractor, by mutual agreement of the parties, shall make the herein described changes to the plans and specifications or do the following described work not included 
in the plans and specifications on the above-identified contract.  All other contract terms and conditions remain unchanged.
Approval of this change order establishes a new contract amount of  $23,214,639.25.
Contract No:
Jay Titus
I certify that this change is required to accomplish the overall task for which this contract is 
initiated.
Program Manager
Phoenix, Arizona 85040
Construction Manager
Engineering Manager Review
Contractor Address:
Controller
FLOOD CONTROL DISTRICT APPROVAL
Division Concurrence
I certify that funds are available to accomplish this Change Order
FLOOD CONTROL DISTRICT OF MARICOPA COUNTY
RECOMMENDED BY:
ACCEPTED AND APPROVED:
General Counsel, District
Approved as to form and within the powers and authority granted under the
laws of the State of Arizona to the Flood Control Dist. of Maricopa Cnty.
Clerk of the Board
LEGAL REVIEW
Chief Engineer and General Manager
 Chairman, Board of Directors
Docusign Envelope ID: C46426D0-CF74-481E-A812-A7E6DF947AD5
10/21/2024
10/21/2024
10/21/2024
10/21/2024
10/21/2024
10/21/2024
10/21/2024
10/21/2024