CONSTRUCTION MANAGEMENT AT RISK (CMR) 
 
 
PROFESSIONAL SERVICES CONTRACT 
 
 
 
 
Dunlap Office Space Tenant Improvements 
 
 
 
 
Office of Procurement Services 
 
 
 
 
Serial # 240062-ROQ 
Contract # 240062-ROQ 
C-_______________________________ 
Project # 4188-25-0372 
 
 
 
 
Facilities Management, Maricopa County Arizona

Dunlap Office Space Tenant Improvements 
Page | 2 
CMR Professional Services Contract 
Serial # 240062-ROQ 
 
 
AGREEMENT BETWEEN THE COUNTY OF MARICOPA, ARIZONA 
AND DESIGN PROFESSIONAL 
-For- 
CONSTRUCTION MANAGER AT RISK (CMR) PROJECT 
PROJECT DELIVERY METHOD 
 
 
 
 
 
THIS AGREEMENT made this 25 day of September in the year 2024. 
BY AND BETWEEN THE COUNTY OF MARICOPA, ARIZONA, hereinafter called the "Owner,” 
and Dekker Design, LLC hereinafter called the "Design Professional" or “DP.” 
 
NOW, THEREFORE, for and in consideration of the mutual covenants and agreements set forth 
herein, and other good and valuable consideration, the receipt and sufficiency of which is hereby 
acknowledged, the parties hereto, intending to be legally bound hereby, do covenant and agree 
as follows:  
 
 
 
PROJECT NAME: Dunlap Office Space Tenant Improvements 
 
PROJECT NUMBER: 240062-ROQ 
 
CONTRACT NUMBER: 240062-ROQ

Dunlap Office Space Tenant Improvements 
Page | 3 
CMR Professional Services Contract 
Serial # 240062-ROQ 
TABLE OF CONTENTS 
PAGE # 
SCOPE OF WORK ...................................................................................................................... 4 
ARTICLE 1:  DEFINITIONS ....................................................................................................... 5 
ARTICLE 2:  DP SERVICES AND RESPONSIBILITIES ....................................................... 8 
ARTICLE 3:  SUBCONSULTANTS ......................................................................................... 18 
ARTICLE 4:  OWNER’S RESPONSIBILITIES ...................................................................... 19 
ARTICLE 5:  PROJECT MANAGEMENT AND REVIEW PROCEDURES ....................... 19 
ARTICLE 6:  BASIS OF COMPENSATION ........................................................................... 20 
ARTICLE 7:  PAYMENTS TO DP ............................................................................................ 22 
ARTICLE 8:  INDEMNIFICATION AND INSURANCE ......................................................... 22 
ARTICLE 9:  PERFORMANCE ................................................................................................ 25 
ARTICLE 10:  OWNERSHIP OF DOCUMENTS .................................................................. 25 
ARTICLE 11:  ALTERNATIVE DISPUTE RESOLUTION .................................................... 26 
ARTICLE 12:  SUSPENSION AND TERMINATION ............................................................ 29 
ARTICLE 13:  MISCELLANEOUS ........................................................................................... 30 
EXHIBIT “A”:  HOURLY RATES AND HOURS ................................................................... 40 
EXHIBIT “B”:  LUMP SUM AMOUNT ...................................................................................... 41 
EXHIBIT ‘C’:  Record Drawing Procedures ........................................................................... 42

Dunlap Office Space Tenant Improvements 
Page | 4 
CMR Professional Services Contract 
Serial # 240062-ROQ 
SCOPE OF WORK 
Design Professionals (“DP”) shall furnish Architectural and Engineering Services (“A/E Services”) for the 
Project and Contract described above, upon issuance by the Director of Maricopa County Facilities 
Management Department (“MCFMD”) (“Director”) or Director’s designee of DP’s Authorization(s) to 
Proceed. 
DP shall furnish: planning, programming, feasibility studies, Construction Estimates, partial or complete 
design services, including preparation drawings and documents necessary for Subcontractor bidding and 
development of a GMP, construction contract administration and observation, review of recommendations 
and other deliverables of the Construction Manager At Risk (“CMR”), review of Contractor Change Order 
Requests, review of Baseline and updated Construction Schedules, review work prepared by other 
professional consultants and the Contractor, building commissioning, and other miscellaneous A/E 
Services that may be required and are authorized by Owner.  
DP acknowledges and warrants to Owner that in connection with Entering into this Agreement DP has 
received and reviewed a copy of Owner’s Standard Form of Agreement for Services by a CMR for Pre-
Construction Services and for Construction Phase Services to be used for the Project and has familiarized 
itself with the contents of both of those Agreements and all attachments or exhibits thereto and will develop 
all design documents hereunder to be fully compatible to and consistent with those Agreements. The terms 
of that Standard Form of Agreement for Services by a CMR are incorporated herein by reference (as 
outlining DP duties) and are made a part hereof.  
DP also agrees that at time of execution of any agreement between Owner and CMR, DP will have the 
responsibility to obtain from Owner an executed or conformed copy of all contracts constituting the CMR 
contract for reference and use in DP’s A/E Services at all times after the CMR Agreement is executed and 
in force. 
The Director or Director’s designee may issue an Authorization to Proceed to encompass the entire Basic 
Services as described in Section 2.2 herein for the Project or a portion of Basic Services, or for discretionary 
tasks as specified in Section 2.3 herein for Additional Services or 2.4 herein for Reimbursable Costs.  
The fees to be paid by Owner for DP Services shall be: 
A lump sum, not to exceed (See Section 6.1 herein). (Exhibit ‘B’). However, DP shall provide Hourly 
Rates and hours (by phase and service). (See Section 6.2 herein Exhibit ‘A’) for reference in the event of 
added services or change orders.  
The Director or Director’s designee will confer with DP before any Authorization to Proceed is issued. DP 
will discuss the scope of the DP Services covered by the Authorization, the time to complete those DP 
Services and the fee for those DP Services provided that when no agreement is reached as to the fee for 
a particular Authorization to Proceed, payment for those DP Services will be made in accordance with 
Section 6.1.

Dunlap Office Space Tenant Improvements 
Page | 5 
CMR Professional Services Contract 
Serial # 240062-ROQ 
 
ARTICLE 1:  DEFINITIONS 
 
1.1   
ADDITIONAL SERVICES: Those DP Services specified in Section 2.3. 
 
1.2   
AS-BUILT DRAWINGS: The As-Built Drawings (provided by the Contractor) shall consist of a set 
of drawings which clearly indicate all field changes (modifications, additions and deletions) that 
were made to the Contract Documents to adapt to field conditions and field changes. Such 
drawings shall include but not be limited to all new and existing buried and concealed installation 
of piping, conduit and utility services identified and/or field-surveyed in the course of design through 
construction. All buried and concealed items both inside and outside the facility shall be accurately 
located on the As-Built Drawings as to depth, size and material and in relationship to not less than 
two permanent features such as interior or exterior wall faces. The As-Built Drawings shall be clean 
and all changes, corrections, and dimensions shall be indicated in a neat and legible manner and 
fully comply with the format guidelines prescribed in attached Exhibit ‘C. One (1) hard-copy set of 
the As-Built Drawings shall be submitted to the Owner with submittal of the Record Drawings. See 
Section 1.28 below for “Record Drawings.”.  
 
1.3   
AUTHORITY HAVING JURISDICTION: The Maricopa County Planning and Development 
Department, the State Fire Marshal, the State Elevator Inspector and any Arizona municipal 
corporation within which the Project is situated.  
 
1.4   
AUTHORIZATION TO PROCEED: A document issued by the Director or Director’s designee to DP 
authorizing the performance of specific professional services, and stating the time for completion 
and the amount of fee authorized for such services. 
 
1.5   
BASIC SERVICES: Those DP Services defined in Section 2.2. 
 
1.6   
CHECK SET: A set of drawings that have been checked for errors and discrepancies between the 
design disciplines. 
 
1.7   
CONSTRUCTION DOCUMENTS: The documents prepared by DP and their Sub-consultants and 
referred to in Section 2.2 of this Agreement to be used for permitting and construction of the Project. 
 
1.8   
CONSTRUCTION ESTIMATE: A detailed estimate of all construction cost, including but not limited 
to all on-site and off-site construction activities, all utility designs, equipment and construction fees, 
Contractor general conditions, general requirements, mark-ups and contingencies and escalation. 
 
 
1.9   
CONSTRUCTION MANAGER AT RISK (“CMR”): A consultant selected pursuant to a Request for 
Qualifications that shall contract with Owner in two (2) phases: initially as a consultant to Owner 
during the design phase, and then serving the function of the Contract Manager during construction 
if a Contract is executed.   
 
1.10   
CONSTRUCTION MANAGEMENT AT RISK: A process that allows an Owner to select a CMR 
based on qualifications; makes the CMR a member of a collaborative project team; centralize 
responsibility for construction under a single contract; obtain a bonded, guaranteed maximum price; 
produce a more manageable, predictable project; saves time and money; and reduces risk for the 
client, Owner, DP and the CMR. 
 
1.11   
CONSTRUCTION PROJECT MANAGER: An employee of Owner or agent of the Owner assigned 
by the Director to monitor the construction and design services to be performed under this 
Agreement and the construction of the Project as a direct representative of Owner.  The Director 
reserves the right, not to assign a Construction Project Manager to the project.  In such case the 
Owner’s Project Manager will assume all Owner responsibilities for the project.

Dunlap Office Space Tenant Improvements 
Page | 6 
CMR Professional Services Contract 
Serial # 240062-ROQ 
 
1.12   
CONTRACT DOCUMENTS: This Agreement, the CMR Proposal, the Design Proposal by CMR, 
the Construction Contract for this Project (with its attachments), the Drawings and Project 
Specifications and Construction Documents and exhibits and documents related thereto or 
contemplated thereby, as well as all Addenda, Amendments and Change Orders related to each 
with respect to the Project and all changes to said documents issued by Owner after execution of 
this Agreement.  
 
1.13   
CONTRACT TIME: The time between the date when the Notice to Proceed is issued to the CMR 
and Final Completion of the Work.  
 
1.14   
COUNTY MANAGER: The chief executive officer of Owner. 
 
1.15   
DAY: Shall mean a calendar day. 
 
1.16   
DEFERRED SUBMITTALS:  Design deferred to the Contractor by the DP for completion of the 
design due to the complexity and associated Code impacts.  Typical Deferred Submittals may 
include Curtain Wall Systems, Stairs, Precast, Fire Alarm, and Fire Protection System.  DP shall 
provide a list of recommended Deferred Submittals to the Owner for approval. 
 
1.17   
DESIGN DEVELOPMENT DOCUMENTS: The drawings, outline specifications and other 
documents to delineate and describe the size and character of the entire Project as to architectural, 
civil, structural, mechanical, plumbing, fire alarm, and electrical systems, landscaping, construction 
and finish materials and other items incidental thereto, and as required by the Project Manager.  
 
1.18   
DESIGN PROFESSIONAL (“DP”): The individual, partnership, LLC, professional association, 
corporation, association, joint venture, or any combination thereof, of properly registered 
professional architects and/or engineers, that has entered into the Agreement to provide 
professional services to Owner. DP is the prime Project professional as defined in the Rules issued 
by the Arizona Board of Technical Registration.  
 
1.19   
DIRECTOR OF THE FACILITIES MANAGEMENT DEPARTMENT OR DIRECTOR: The Director 
of Facilities Management Department of the County of Maricopa, Arizona, having the authority and 
responsibility for management of the specific project(s) to be carried out under this Agreement. 
From time to time the Director may act through a Director’s designee. 
 
1.20   
FINAL CONSTRUCTION DOCUMENTS: A complete and accurate set of drawings and 
specifications advancing the content of Design Development documents so as to allow the 
permitting and construction of the Project. 
 
1.21   
INSPECTOR: An employee or consultant assigned by the Project Manager or Construction Project 
Manager to make observations of Work performed by the CMR. 
 
1.22   
MAXIMUM COST LIMIT: The maximum amount budgeted by Maricopa for the total cost of the 
construction of the Work on the Project.  
 
1.23   
OWNER: The Owner is Maricopa County Facilities Management Department (FMD), the public 
body which is a party hereto and the entity for which this contract is to be performed. In all respects 
hereunder, Owner’s performance is pursuant to Owner’s position as Owner of the Project. In the 
event Owner exercises its regulatory authority as a governmental body, the exercise of such 
regulatory authority and the enforcement of any rules, regulations, codes, laws and ordinances 
shall be deemed to have occurred pursuant to Owner’s authority as a governmental body and shall 
not be attributable in any manner to Owner as a party to this contract.  
 
1.24   
PAYMENT APPLICATION: The certified form submitted by the CMR requesting payment for 
construction work to be reviewed by DP and approved by the Construction Project Manager and/or 
Project Manager.

Dunlap Office Space Tenant Improvements 
Page | 7 
CMR Professional Services Contract 
Serial # 240062-ROQ 
 
 
1.25   
PROJECT: The scope of construction, alteration, or repair and all services and incidents thereto of 
a County of Maricopa, Arizona facility as approved by Owner.  
 
1.26   
PROJECT DEVELOPMENT SCHEDULE: A written document providing the proposed completion 
date of each Phase of the Project through design, selection of CMR, construction and proposed 
date of occupancy by Owner. 
 
1.27   
PROJECT MANAGER: An employee of Owner or agent of the Owner assigned by the Director to 
monitor the services to be performed under this Agreement and the construction of the Project as 
a direct representative of Owner. 
 
1.28   
RECORD DRAWINGS: Record Drawings are the official record drawings that document what was 
constructed. The DP shall prepare Record Drawings from the As-Built documents for the Project. 
The DP shall provide to Owner one (1) set of Record Drawings as a printed, hard-copy full-sized 
set with one (1) corresponding set of digital media containing the complete Construction Drawings 
for the Project in AutoCAD, complying with the guidelines prescribed in attached Exhibit ‘C’. The 
resulting image produced on the viewing screen shall include all of the kinds of information that is 
visible on full-sized originals approved for permit and issued for construction. These provisions 
apply to all projects conducted at Maricopa County. All electronic media with As-Built or Record 
Drawings MUST be in AutoCAD or BIM format (consistent with guidelines in attached Exhibit C) 
with a matching PDF.  
 
1.29   
SCHEMATIC DESIGN DOCUMENTS: The drawings and other documents illustrating the scale 
and relationship of the Project components including the selection of materials, systems, and 
equipment, as well as initial program drawings and documents that establish and describe the size 
and character of the Project as to architectural, structural, mechanical, electrical, plumbing, fire 
alarm, and fire protection systems, materials and additional engineering services as deemed 
necessary by the Owner and DP to produce a complete and accurate set of drawings and 
specifications for the permitting and construction of the Project.  
 
1.30   
SCHEMATIC DESIGN STUDIES: Site and floor plans, elevations, sections, and other items as 
required by the Project Manager and shall show the scale and relationship of the parts and the 
design concept of the whole.  
 
 
1.31   
SUBSTANTIAL COMPLETION: That date on which, as certified in writing by DP, the Work, or a 
portion thereof designated by the Construction Project Manager or Project Manager is at a level of 
completion in substantial compliance with the Contract Documents and has satisfied all 
requirements in the Project Specifications and other Contract Documents such that all conditions 
of permits and authorized authorities having jurisdiction have been satisfied and Owner or Owner’s 
designee can enjoy beneficial use and occupy and can use or operate in all respects for its intended 
purposes.  
 
1.32   
SUB-CONSULTANT: A person or organization of properly registered professional architects and/or 
engineers, who has entered into an agreement with DP to furnish professional services for a project 
or task, described under Basic Services or a task described under Additional Services or 
Reimbursable Costs. 
 
1.33   
WORK: The entire construction or various separately identifiable parts thereof required to be 
furnished under the Contract Documents. Work is the result of performing services, furnishing labor 
and furnishing incorporating materials and equipment into the construction, all as required by the 
Contract Documents.

Dunlap Office Space Tenant Improvements 
Page | 8 
CMR Professional Services Contract 
Serial # 240062-ROQ 
 
ARTICLE 2:  DP SERVICES AND RESPONSIBILITIES 
 
2.1   
SUSTAINABILITY:  
 
2.1.1 
The Project shall comply with designated Maricopa County goals for sustainability.  The 
project shall incorporate “green” building practices to achieve the highest efficiency 
standards reasonable to reduce operating costs via energy savings; improve worker 
productivity; and reduce potential liability resulting from indoor air quality problems.   
 
2.2 
BASIC SERVICES: 
 
DP agrees to provide complete professional A/E Services set forth below, including code-compliant 
architectural, civil, structural, mechanical, electrical engineering, plumbing, fire protection systems, 
landscape design and other engineering services normally required for a project of this specific 
type, hereinafter collectively called “Basic Services.” 
 
2.2.1 
Programming and Schematic Design: 
  
2.2.1.1 
DP shall confer with the Director or Director’s designee to establish the Program 
or program verification, consisting of a detailed listing of all functions and spaces 
together with the square footage of each assignable space, gross square footage, 
and a description of the relationships between and among the principal 
programmatic elements. Based upon Owner’s input, DP shall establish a design 
concept which shall incorporate environmental and visual elements. Design of the 
Project is to include wastewater, storm water, drainage, parking, lighting and any 
other design element necessary to complete the facility.  
 
2.2.1.2 
DP shall prepare and present, for approval by Owner, a Design Concept and 
Schematics Report, comprising the Schematic Design Studies, including 
identification of any special requirements affecting the Project.  All presentations 
shall be made to FMD and approved prior to proceeding with further design.  
Written approval from FMD is required prior to the release of any information to 
the end user or stakeholders.  
 
2.2.1.2.1 Schematic Design Documents shall consist of but not be limited to site 
and floor elevation plans, elevations, sections, etc. as required by the 
Project Manager and the scale of the relationship of the parts and 
design concept of the Project and shall also include a review of all 
Building Codes and applicable laws to determine compliance, 
scheduling and construction budget information.  
 
2.2.1.2.2 Schematic Design Studies shall consist of but not be limited to site 
and floor plans, elevations, sections, etc. as required by the Project 
Manager and shall show the scale and relationship of the parts and 
the design concept of the whole.  
 
2.2.1.2.3 DP shall submit hard copies and one (1) electronic media set (in PDF 
format, but generated from AutoCAD files complying with guidelines 
prescribed in Exhibit ‘C’) on disk of all documents required, without 
additional charge, for approval by Owner. DP shall not proceed with 
the Design Development Phase until the documents have been 
approved by Owner and a written Authorization to Proceed with the 
next phase of the design has been issued by the Director or Director’s 
designee.

Dunlap Office Space Tenant Improvements 
Page | 9 
CMR Professional Services Contract 
Serial # 240062-ROQ 
 
2.2.1.2.4 DP shall prepare an energy efficiency study necessary to comply with 
all applicable mechanical and electrical codes, requirements and 
standards for Owner. 
 
2.2.2 
Selection and Award of Construction Management at Risk Contractor: 
 
2.2.2.1 
Solicitation of CMR: At such other time as Owner may elect, DP shall participate 
in the evaluation and selection of a qualified construction management firm to 
serve as the CMR. 
 
2.2.2.2 
Issuance of Addenda and Selection: 
 
2.2.2.2.1 At the request of the Project Manager, DP shall participate in any 
selection committee meetings and meet with Owner’s staff and Project 
Manager to assist in evaluating Responses to the RFQ and 
qualifications. 
 
2.2.2.2.2 At the direction of the Project Manager, DP shall attend all 
presentations or interviews with CMR candidates. 
 
2.2.3 
Design Development: 
 
2.2.3.1 
Working from the previously approved Schematic Design Documents, DP, with 
requisite input and assistance from the CMR, shall prepare and present, for 
review and approval by Owner, the Design Development Documents, comprising 
the drawings, outline specifications and other documents necessary to delineate 
and describe the size and character of the entire Project including architectural, 
civil, structural, mechanical, plumbing, fire alarm and fire protection, and electric 
systems, landscaping, construction materials and finish materials.  DP shall fully 
involve the CMR during this phase to allow the CMR to prepare and deliver 
ongoing constructability and bidding reviews, value engineering proposals, and 
construction cost estimates. DP shall be required to make at least one (1) 
presentation of the Design Development Documents to Owner.  As and if 
requested by the Project Manager, Sub-consultants engaged by DP shall attend 
this presentation to explain the design concept of their respective systems. All 
presentations shall be made to FMD and approved prior proceeding with further 
design.  Written approval from FMD is required prior to the release of any 
information to the end user or stakeholders. 
 
2.2.3.2 
If the CMR’s Design Development Construction Estimate exceeds the Owner’s 
Construction Budget the DP shall provide a list of appropriate cost or scope 
reduction recommendations at no cost to Owner. 
 
2.2.3.3 
DP shall submit hard copies and, one (1) electronic media set (in PDF format, but 
generated from AutoCAD files complying with guidelines prescribed in Exhibit ‘C’) 
on disk of all documents required under this Phase, without additional charge, for 
approval by Owner, and DP shall not proceed with the next Phase of the design 
until Owner has approved the documents and a written authorization for the next 
Phase has been issued.  
 
2.2.3.4 
If requested by the Project Manager, DP shall prepare Finish Material Sample 
boards as necessary to review the color selections of all finish materials with the 
Project Manager and DP will furnish the approved colors to the CMR within a

Dunlap Office Space Tenant Improvements 
Page | 10 
CMR Professional Services Contract 
Serial # 240062-ROQ 
 
timeframe acceptable to the Project Manager. This shall be done in a timely 
manner so as to not delay Project progress. 
 
2.2.4 
Construction Documents Development: 
 
Working from the approved Design Development Documents, DP with assistance from the 
CMR shall prepare for approval by Owner 50% Construction Documents, setting forth in 
detail all requirements necessary for the permitting, bidding and construction of the Project. 
DP shall fully involve the CMR during this design phase to perform as needed or 
authorized, ongoing bidding and constructability reviews, value engineering proposals, 
estimate of final construction cost and a, preliminary baseline construction schedule.  DP 
is responsible for full compliance of the design and the Construction Documents with all 
applicable codes of building officials or entities having jurisdiction and shall opine to Owner 
that the Project can be constructed within the construction budget established by Owner. 
 
2.2.4.1 
50% Construction Documents Submittal: 
 
DP shall complete and submit a 50% Construction Document set and 
Specifications to the CMR for review. Upon review and acceptance of the CMR 
that the drawings and specifications represent a 50% Construction Document set, 
the DP shall submit the 50% Construction Documents and Specifications, with 
the CMR comments incorporated to the Owner for approval.  The submission 
shall include: 
 
2.2.4.1.1 Hard copies and one (1) electronic media set of all drawings (AutoCAD 
complying with guidelines prescribed in Exhibit ‘C’ with matching PDF) 
and 
specifications 
(complying 
with 
designated 
products/materials/systems prescribed by the Owner). 
 
2.2.4.1.2 A complete index of every drawing sheet, to become part of the 
Construction Documents. 
 
2.2.4.1.3 DP shall, in the preparation of the Project Specifications, use the most 
recent edition of CSI Standards promulgated by the Construction 
Specifications Institute and these technical specifications shall not be 
merely outline specifications as were submitted during the Design 
Development Phase. Specification content shall be coordinated in 
conjunction with prescribed products/materials/systems of the Owner, 
as identified during Design Development.  The specifications content 
shall be coordinated and comply with the Owner provided preferred 
equipment product and system specifications. 
 
2.2.4.1.4 An Authorization to Proceed with the completion of 100% Construction 
Documents will not be issued by the Director or Director’s designee if 
CMR latest Construction Estimate exceeds the Construction Budget, 
unless Owner increases the Construction Budget or the CMR, DP and 
Owner mutually agree on methods of cost reduction sufficient to 
enable construction of the Project within the Construction Budget.  
 
2.2.4.2 
DP shall not proceed with further design until approval from the Director or 
Director’s designee is received.  DP, with input from the CMR, shall make all 
required changes to the documents and resolve all questions prior to proceeding 
with the design.

Dunlap Office Space Tenant Improvements 
Page | 11 
CMR Professional Services Contract 
Serial # 240062-ROQ 
 
2.2.4.3 
100% Construction Documents Submittal: 
 
2.2.4.3.1 Upon completion of the 100% Construction Documents, DP shall submit 
the 100% Construction Document set to the CMR for review. Upon review 
and acceptance of the CMR that the drawings and specifications represent 
a complete 100% Construction Document set, the DP shall submit the 
100% Construction Documents and Specifications, with the CMR 
comments incorporated to the Owner for approval.    Submission shall 
include: 
 
2.2.4.3.1.1 Hard copies and one (1) electronic media set (AutoCAD 
complying with guidelines prescribed in Exhibit ‘C’ with matching PDF) on 
disk.  Include all drawings, specifications, reports, programs, etc.  All 
recommendations of Owner and CMR from this review shall be 
incorporated by DP into the Construction Documents prior to submission 
of the 100% Construction Documents for permit. Once approved by 
Owner, the 100% Construction Documents shall become the Approved 
100% Construction Documents and shall not be altered, modified, or 
revised without Owner’s prior written consent.  Construction Documents 
must be reviewed by the CMR and confirmed by its written that the entire 
Project can be constructed within the construction budget set by Owner. 
 
2.2.4.3.2 Following approval by the Owner the DP shall be responsible for preparing 
and submitting the completed construction documents for approval by 
governmental authorities having jurisdiction over the Project and in 
obtaining certifications of “permit approval” by such reviewing authorities. 
Any revisions required by permitting agencies comments shall be 
incorporated into the Construction Documents.  Upon receiving permitted 
construction documents the DP shall make the permit and approved 
documents available to Owner for reproduction of additional copies as may 
be required for bid solicitation and/or construction purposes. 
 
2.2.4.3.3 DP expressly warrants that the Drawings and Project Specifications and 
Construction Documents for the Project have been prepared by DP and 
the Sub-consultants by exercising their professional skills with care and 
diligence and in a reasonable non-negligent manner consistent with the 
standard of care of like professionals in Maricopa                           County, 
Arizona.  
 
2.2.4.3.4 DP shall be responsible for the cost of any additional design necessary to 
correct errors or omissions caused by or attributable to DP  that fall outside 
the applicable standard of care. 
 
2.2.4.4 
CMR Contract: 
 
2.2.4.4.1 During the timeframe of Owner’s Agreement with the CMR for Pre-
Construction Services, DP shall, as requested by the Project Manager 
or Construction Project Manager, provide assistance to Owner in 
connection with Owner’s acceptance of CMR’s Guaranteed Maximum 
Price (“GMP”) proposal, including but not limited to determining and 
memorializing the criteria and factors on which the GMP proposal is 
based; 
 
2.2.4.4.2 In the event Owner does not accept the CMR’s last proposal of a GMP, 
after value engineering and other steps to arrive at a GMP have been

Dunlap Office Space Tenant Improvements 
Page | 12 
CMR Professional Services Contract 
Serial # 240062-ROQ 
 
taken, Owner may, in accordance with A.R.S. § 34-104(E), direct DP at 
no added cost to Owner to revise the Project scope or quality or both as 
approved by Owner, and then assist Owner in soliciting bids from 
qualified, licensed general contractors in accordance with A.R.S. § 34-
201 in its then existing statutory form.  
 
2.2.4.4.3 During the timeframe of Owner’s agreement with CMR for Construction 
Phase Services, DP acknowledges its responsibility and duties called 
out and set forth in Owner’s agreement with CMR (incorporated herein 
by this reference) in addition to the responsibilities set forth herein.  
 
2.2.5 
Phase V - Observation and Administration of the Construction Contract: 
 
2.2.5.1 
The Construction Phase of the Project will commence with the award of the 
Construction Contract and will end when final payment is made by Owner. During 
this period, DP shall observe and provide administration of the Construction 
Contract as set forth in the Construction Contract entered and other Contract 
Documents and as provided herein. 
 
2.2.5.2 
During the Construction Phase, DP shall advise and consult with Owner and shall 
have authority to act on behalf of Owner only as set forth herein and to the extent 
provided in the Construction Contract between Owner and CMR, incorporated by 
this reference.   
 
2.2.5.3 DP shall be responsible for and provide all special inspections required for the 
project. 
 
2.2.5.4 
DP shall visit the site at least weekly and at such times as requested by the Project 
Manager, and at all key construction events.  DP’s Sub-consultants shall visit the 
site weekly, to ascertain the progress of the Project and to determine in general if 
the Work is proceeding in accordance with the Contract Documents. On the basis 
of on-site observations, DP shall endeavor to guard Owner against defects and 
deficiencies in the Work. DP shall notify Owner of any non-compliant work 
discovered during the site visits. DP will not be required to make extensive 
inspections or provide continuous daily on-site inspections to check the quality or 
quantity of the Work unless otherwise set forth in this Agreement.  
 
DP is not responsible for the CMR’s construction means, methods, techniques, 
sequences or procedures, or for safety precautions and programs in connection 
with the performance of the Work, nor will DP be held responsible for the CMR's or 
Subcontractors', or any of their agents’ or employees’, failure to perform the Work 
in compliance with the Contract Documents. 
 
2.2.5.5 
DP shall furnish Owner with a written report of all observations of the Work made 
by DP during each visit made to the Project. DP shall keep a log of all non-
compliant work and shall keep track of all such issues to resolution. DP shall also 
state in the log the final resolution action and the date correction was made. DP 
shall also note the general status and progress of the Work, and submit same in 
a timely manner or more often if requested by the Construction Project Manager 
or Project Manager. DP shall ascertain that the CMR is making timely, accurate, 
and complete notations on its As-Built Drawings as the Work proceeds by 
reviewing the CMR As-Built Drawings on a monthly basis and providing written 
confirmation to the Owner, prior to the CMR application for payment.

Dunlap Office Space Tenant Improvements 
Page | 13 
CMR Professional Services Contract 
Serial # 240062-ROQ 
 
2.2.5.6 
Based on observations at the site and consultation with the Construction Project 
Manager, DP shall assist in determining the amount due the CMR in progress 
payments and shall recommend approval or disapproval of amounts applied for 
by executing AIA Form G702. This recommendation shall constitute a 
representation by DP to Owner that, to the best of DP’s knowledge, information 
and belief, the Work has progressed to the point indicated in the pay application 
and the quality and quantity of the Work is in compliance with the Contract 
Documents subject to: 
 
2.2.5.6.1 an evaluation of the Work for compliance with the Contract Documents 
upon Substantial Completion, 
 
2.2.5.6.2 the results of any subsequent tests required by the Contract 
Documents, 
 
2.2.5.6.3 minor deviations from the Contract Documents correctable prior to 
Project completion, and 
 
2.2.5.6.4 any specific qualifications stated in the Payment Application.  
 
2.2.5.7 
If Owner elects to withhold, in whole or in part, any progress payment to CMR, 
DP may be required to assist Owner in preparation of specific written findings 
about the deficiency in the Work and in calculating the reasonable cost necessary 
to correct the deficient work and complete same. 
 
2.2.5.8 
DP shall be the initial interpreter of the requirements of the Contract Documents 
and the initial judge of performance thereunder. DP shall render written 
interpretations necessary for the proper execution or progress of the Work with 
reasonable promptness on written request of either Owner or the CMR. If 
revisions to the Drawings and/or Project Specifications become necessary, DP 
shall make a written proposal as to the cost unless the need for revision is 
attributable to DP.  
 
2.2.5.9 
DP shall render written recommendations, within a reasonable time, on all claims, 
disputes or other matters in question between Owner and the CMR relating to the 
execution or progress of the Work or the interpretation of the Contract 
Documents. The Director or Director’s designee shall make final decisions 
regarding interpretations or disputes related to or arising therefrom. 
 
2.2.5.10 Such interpretations and recommendations of DP shall be consistent with the 
intent of and reasonably inferable from, the Contract Documents and shall be in 
written form with graphic supplementation if helpful. In the capacity of interpreter, 
DP shall endeavor to secure faithful performance of the Contract by both Owner 
and the CMR, and shall not show partiality to either. 
 
2.2.5.11 DP shall have authority to recommend rejection of Work which does not conform 
to the Contract Documents. Whenever, in DP’s reasonable opinion, it is 
necessary or advisable to insure compliance of the work with the Contract 
Documents, DP will recommend special inspection or testing of any Work deemed 
to be not in compliance with the Contract Documents, whether or not such Work 
has been fabricated and delivered to the Project, or installed and completed but 
such inspection or testing may only be authorized by Owner. DP shall provide 
such normal mechanical, plumbing, electrical, structural, landscape or other 
related inspection expertise and services as is necessary from time to time to 
determine compliance with the Construction Contract.

Dunlap Office Space Tenant Improvements 
Page | 14 
CMR Professional Services Contract 
Serial # 240062-ROQ 
 
2.2.5.12 DP shall review and return all submittals, shop drawings, samples, deferred 
submittals and other submissions of the CMR for conformance with the design 
concept of the Project and for compliance with the Contract Documents within 
fourteen (14) days from receipt.  
 
2.2.5.13 DP shall respond to all Requests for Information or Clarification from the CMR or 
Owner within seven (7) days from receipt and shall do so with graphic 
supplementation when requested. All reviews are to be conducted in a timely 
manner so as to not delay progress of the construction. Changes to or substitution 
of Construction Documents shall not be authorized without the written 
concurrence of Owner. 
 
2.2.5.14 DP shall issue a Proposal Request (PR) to the Owner for each revision to the 
contract but only after consulting with and with the agreement of the Owner.  The 
DP shall review and make recommendations to the Owner on all Change Order 
Requests submitted by the CMR.  DP shall assist the Owner in review of all 
Contractor requests for time extensions and make recommendations to the 
Owner.  DP may issue supplemental instruction or interpretation of the Contract 
Documents or order minor changes in the Work so long as they involve no change 
in Contract Time or Contract Price. 
 
2.2.5.15 Upon receipt of CMR’s request for Substantial Completion with CMR’s Punch List 
attached, DP shall, prior to occupancy by Owner, confirm and recommend to the 
Owner that the project is substantially complete in accordance with the Contract 
requirements. Upon Owner written concurrence, DP shall develop a complete, 
final punch list of any remaining defects and discrepancies in the Work.  The 
punch list shall be created with the Owner’s involvement and include Owner’s 
comments.  The complete punch list shall be attached to the DP Certificate of 
Substantial Completion.  DP shall be responsible for all punch list back-checks 
and confirmation of full and satisfactory performance before DP recommends to 
the Owner that a Final Acceptance Final Payment be made to the CMR.  
 
2.2.5.16 For Substantial Completion, DP shall obtain from the CMR all guarantees, 
Operation and Maintenance manuals for equipment, and such other documents 
and certificates as may be required by applicable codes, laws, Project 
Specifications and the Owner, review them for compliance with Contract 
requirements, and deliver them to Owner if in compliance. 
 
2.2.5.17 DP shall provide assistance in obtaining the CMR's compliance with the Contract 
Documents relative to 1) initial instruction of Owner's personnel in the operation 
and maintenance of any equipment or system, 2) initial start-up and testing, 
adjusting and balancing of equipment and systems, and 4) final clean-up of the 
Project. 
 
2.2.5.18 During all Phases of the Project, DP shall notify Owner in writing of all conflicts 
between the Plans and Specifications and/or Contract Documents and any laws, 
codes, ordinances, rules, regulations and restrictions that come to the attention 
of DP or should have reasonably come to DP’s attention with the exercise of due 
care.  
 
2.2.5.19 DP shall prepare and submit to Owner weekly and/or monthly reports, as required 
by the Owner, throughout the Construction Phase of the Project. The reports shall 
provide the current status of activities of DP, CMR, subcontractors, Consultants, 
Sub-consultants, and others whose activities affect the Project. The reports shall

Dunlap Office Space Tenant Improvements 
Page | 15 
CMR Professional Services Contract 
Serial # 240062-ROQ 
 
also include a copy of the log on all non-compliant work and all resolution 
information.   
 
2.2.5.20 For both Basic and Additional Services, DP shall prepare Record Drawings 
(reference Exhibit C) based on the CMR’s As-Builts Drawings and provide to 
Owner one (1) printed hard-copy full-size set of Record Drawings and one (1) 
corresponding set of digital media containing the complete drawings for the 
Project in AutoCAD and in matching PDF. The image on screen shall include all 
title blocks, borders, details, and all notes that are visible on the full-sized 
originals. Each sheet provided shall indicate it is a Record Drawing. DP shall also 
prepare a simplified version of all approved Egress Plans in the Drawings used in 
the permit approval process and provide such to Owner upon request for 
purposes of installation of evacuation / exiting diagrams in the completed Project. 
DP acknowledges that the quantity thereof and extent of depicted information may 
be determined by the Authority Having Jurisdiction over the Project. 
 
2.2.5.21 In connection with Final Acceptance and final payment, DP shall inspect the Work 
and determine: 
 
2.2.5.21.1 Whether the CMR has satisfactorily completed or corrected all items 
on the punch list attached to the Request for Substantial Completion; 
 
2.2.5.21.2 Whether the work complies with i) the Contract Documents, and ii) all 
applicable laws, building codes or authorities having jurisdiction;  
 
2.2.5.21.3 Whether required inspections by building officials have been 
completed; and  
 
2.2.5.21.4 In consultation with Owner, whether the Work is finally complete. 
 
If the Work is not finally complete, the process as set forth above shall be 
repeated until such time as the Work is finally completed in compliance 
with the Contract Documents. DP shall also incorporate As-Built Drawings 
as defined in Article 1, above, into the Record Drawings prior to Final 
Acceptance. 
 
2.2.5.22 DP shall assist Owner in conducting a post-construction inspection at least thirty 
(30) days prior to the expiration of the one-year post-construction warranty period 
to identify deficiencies and warranty-related problems. DP shall note, prepare and 
submit to Owner a written report on all faults, deficiencies or warranty problems 
observed. 
 
2.2.6 
Maximum Cost Limit: 
 
If at any time during the design phase the latest Construction Estimate submitted by CMR 
exceeds Owner’s Maximum Cost Limit, DP shall, with the CMR’s assistance, at no 
additional cost to Owner, revise the Design Documents to bring the Project costs within the 
Maximum Cost Limit. Such revised Design Documents must be completed by DP within 
the time period designated in writing by the Owner. The Maximum Cost Limit for the Work 
is not to be changed unless amended by Maricopa County.  
 
2.3 
ADDITIONAL SERVICES:

Dunlap Office Space Tenant Improvements 
Page | 16 
CMR Professional Services Contract 
Serial # 240062-ROQ 
 
2.3.1 
The Additional Services listed below are beyond the scope of the Basic Services as same 
are defined in this Agreement, and if authorized in advance by an appropriate written 
directive from the Director or Director’s designee, will be compensated for by lump sum, 
not-to-exceed agreed to by Owner under Section 6.2. 
 
2.3.1.1 
Special analyses of Owner’s needs, and special detailed programming 
requirements for the Project authorized by Director or Director’s designee. 
 
2.3.1.2 
Financial feasibility, life cycle costing or other special studies. 
 
2.3.1.3 
If not provided for in Basic Services or Owner’s own program, planning surveys, 
site evaluations, geo-technical surveys or comparative studies of prospective 
sites as authorized by Director or Director’s designee. 
 
2.3.1.4 
Design services relative to future facilities, systems and equipment which are not 
intended to be constructed as part of the Project. 
 
2.3.1.5 
Providing services to investigate existing conditions of facilities or to make 
measured drawings thereof, after DP has expended an amount of time deemed 
to be the normal requirement for renovation and alteration projects.  
 
2.3.1.6 
Detailed Estimates of Construction Cost consisting of quantity surveys itemizing 
all material, equipment and labor required for the Project.  
 
2.3.1.7 
Excluding all equipment, materials, supplies and related items included in the 
Construction Contract, design services required for or in connection with the 
selection of furniture or furnishings or fixtures. 
 
2.3.1.8 
Investigation and making detailed appraisals and valuations of existing facilities, 
and surveys or inventories in connection with construction performed by Owner. 
 
2.3.1.9 
Any additional special professional services (other than the customary 
architectural, civil, structural, geo-technical, mechanical, plumbing, fire alarm, fire 
protection, security and electrical engineering and landscape design services) as 
may be required for the Project, including but not limited to: acoustical, food 
service, theatrical, electronic, telephone/data, artists, and sculptors. 
 
2.3.1.10 The services of one or more full-time Project Field Representatives during 
construction as deemed appropriate and as approved and authorized, in advance 
by the Owner. 
 
2.3.1.11 Extended assistance beyond that provided under Basic Services for the initial 
start-up, testing, adjusting and balancing of any equipment or system; extended 
training of Owner's personnel in operation and maintenance of equipment and 
systems, and consultation during such training; and preparation of operating and 
maintenance manuals, other than those provided by the CMR, subcontractor, or 
equipment manufacturer. 
 
2.3.1.12 A/E Services concerning replacement of any Work damaged or built in non-
compliance with the Contract Documents, providing the cause for such non-
compliance is determined by Owner to be other than by fault of DP or beyond 
control of DP. 
 
2.3.1.13 Making major revisions changing the scope of the Project, to Drawings and 
Project Specifications, when such revisions are inconsistent with written

Dunlap Office Space Tenant Improvements 
Page | 17 
CMR Professional Services Contract 
Serial # 240062-ROQ 
 
approvals or instructions previously given by Owner and are due to causes 
beyond the control of DP. (Major revisions are defined as those changing the 
scope and arrangement of spaces and/or scheme and/or any significant portion 
thereof.) 
 
2.3.1.14 Preparing to serve or serving as an expert witness in connection with any public 
hearing, arbitration or legal proceeding, providing, however, that DP cannot testify 
or give evidence against Owner in any matters during the course of providing 
services under this Agreement. 
 
2.3.1.15 Providing services after Final Completion and final payment has been made to 
the CMR, other than those called for in this Agreement. 
 
2.3.1.16 Additional Observation and Administration, in the event the time period of 
Observation of DP under Basic Services exceeds the Contract Time for the Work 
by more than 15%, and only if the delay in completion of the Work is in the opinion 
of Owner beyond the control of DP and the Additional Observations and 
Administration is approved by the Owner. 
  
2.3.1.17 Renderings, sketches, models or photographs to further convey the proposed 
design concept to the Owner. 
 
2.3.1.18 Any other services not otherwise included in this Agreement.  
 
2.3.2 
Failure to timely perform any part of requested Additional Services identified in this 
Agreement shall be a breach of the Agreement and Owner may, in its sole discretion, 
without liability, contract with others to perform those services and the cost for these 
services and others incurred by Owner shall be borne by DP.  
 
2.3.3 
DP shall not perform any services not covered by this Agreement and any such services 
performed by DP without prior written authorization shall be at DP’s own risk and cost. DP 
hereby agrees that in the absence of prior written authorization, DP’s work will be at its 
own risk, cost, and expense and DP agrees that without such prior written authorization, 
DP will make no claim for compensation for unauthorized services.   
 
2.4 
REIMBURSABLE COSTS: 
 
Reimbursable Costs are those items that are authorized by Owner in writing for payment in addition to 
the Basic and Additional Services and consist of actual expenditures (as verified by invoices) made by 
DP and its Sub-consultants in the interest of the progress of Work and in accordance with the County’s 
Contractor Travel Policy for the following purposes: 
 
2.4.1 
Identifiable transportation expenses in connection with the Project to locations outside the 
Maricopa County area or from locations outside the Maricopa County area will not be 
reimbursed unless specifically pre-authorized in writing by the Owner.  
 
2.4.2 
Meals and lodging expenses will not be reimbursed for temporarily relocating DP’s 
employees from one of DP’s offices to another office if the employee is relocated for more 
than ten (10) consecutive working days. 
 
2.4.3 
Identifiable communication expenses approved by the Owner, long distance telephone, 
courier and express mail between DP’s various permanent offices. DP’s field office at the 
Project is not considered a permanent office.

Dunlap Office Space Tenant Improvements 
Page | 18 
CMR Professional Services Contract 
Serial # 240062-ROQ 
 
2.4.4 
Cost of printing, reproduction or photography which is required by or of DP to deliver 
services set forth in this Agreement. 
 
2.4.5 
Identifiable testing costs approved by Owner.  
 
2.4.6 
All Permit fees paid to regulatory agencies for approvals directly attributable to the Project.  
 
2.4.7 
Reimbursable Sub-consultant expenses are limited to the items described above and on 
the same basis.  
 
2.4.8 
All Reimbursable Costs will be approved by Owner only if prior written approval was 
received and pursuant to verified invoices, receipts or other acceptable proof of 
expenditure provided by DP. 
 
 
ARTICLE 3:  SUBCONSULTANTS 
 
3.1 
REGISTRATION OF SUBCONSULTANTS: 
 
 
All contracts entered into by DP with Sub-consultants or Special Sub-consultants engaged to 
provide professional services on the Project must be with registrants with the Arizona Board of 
Technical Registration. All such contracts with Sub-consultants must incorporate all terms and 
provisions of this Agreement (including those re: Alternative Dispute Resolution) as they relate to 
the duties and responsibilities of DP on the Project.  
 
3.2 
SUB-CONSULTANTS' RELATIONSHIP: 
 
3.2.1 
All services provided by the Sub-consultants shall be pursuant to appropriate written 
agreements between DP and the Sub-consultants, which shall contain provisions that 
preserve and protect the rights of Owner and DP under this Agreement.  
3.2.2 
Nothing contained in this Agreement shall create any contractual or business relationship 
between Owner and the Sub-consultants. DP acknowledges the Sub-consultants are to 
perform those professional services under the direction, control and supervision of DP as 
the prime Project professional.  
 
3.2.3 
DP proposes to utilize the following Sub-consultants: 
 
 
      FIRM NAME  
 
   CONSULTING SERVICE 
 
Associated Construction Econ.__ 
 
Costs Estimator 
 
  
 
Dibble_______________ ___     
 
Civil Engineering 
 
 
Advanced Structural Engineers_ 
 
Structural 
 
 
Bridgers & Paxton                      
 
Mechanical, Electrical, Technology 
   
 
____________________ ____ 
 
_______________________ 
 
 
3.2.4 
DP shall not change or replace any Sub-consultant without first obtaining prior written 
approval from the Director or Director’s designee in response to a written request stating 
the reasons for any proposed substitution. Such approval shall not be unreasonably

Dunlap Office Space Tenant Improvements 
Page | 19 
CMR Professional Services Contract 
Serial # 240062-ROQ 
 
delayed by the Director or Director’s designee and, if the request is denied, an explanation 
will be provided. 
 
 
ARTICLE 4:  OWNER’S RESPONSIBILITIES 
 
4.1 
INFORMATION FURNISHED: 
 
If available, the Owner, at its expense shall furnish DP with the following information: 
 
4.1.1 
Surveys of building sites, giving boundary dimensions, locations of existing structures 
and/or trees, the grades and lines of street, pavement, and adjoining properties; the rights, 
restrictions, easements, boundaries, and topographic data of a building site, and such 
information as it has relative to sewer, water, gas and electrical services. Information 
contained in such provided documents will be provided by Owner with no express 
guarantee for their accuracy or completeness or lack thereof. DP agrees to field-verify the 
accuracy or completeness of any information provided by the Owner as deemed necessary 
by the DP to provide Contract Documents meeting expectations set forth under Articles 2 
and 3 herein.  
 
4.1.2 
If available, soil borings or test pits information, mechanical, structural, or other tests when 
deemed necessary by Owner. 
 
4.1.3 
If available, drawings representing as-built conditions at the time of original construction 
will be furnished to DP; however, they are not warranted to represent conditions as of the 
date of this Agreement. DP must perform field investigations as deemed necessary by the 
DP and Sub-consultants in order to obtain sufficient information to perform services 
complying with Articles 2 and 3 herein.  
 
 
ARTICLE 5:  PROJECT MANAGEMENT AND REVIEW PROCEDURES 
 
5.1 
PROJECT MANAGEMENT: 
 
5.1.1 
The Director or Director’s designee shall act on behalf of Owner in all matters pertaining to 
this Agreement, and with the approval of the County Manager, the Director or Director’s 
designee shall issue all Authorizations to Proceed to DP. The Director or Director’s 
designee shall approve all invoices for payment to DP upon recommendation of the Project 
Manager or Construction Project Manager. 
 
5.1.2 
Maricopa County Facilities Management Department is the Owner. The Director shall 
designate a Project Manager and/or a Construction Project Manager to have general 
responsibility for management of the Project through all Phases of this Agreement. The 
Project Manager and Construction Project Manager shall have authority to issue 
Authorizations to Proceed to DP and meet with DP at periodic intervals throughout the 
preparation of the Contract Documents to assess the progress of the design and 
professional services and the Work in accordance with approved schedules. The Project 
Manager and Construction Project Manager shall also examine documents submitted by 
DP, including invoices, and shall promptly render decisions and/or recommendations 
pertaining thereto, to avoid unreasonable delay in the progress of DP's work. 
 
5.1.3 
If Owner observes or otherwise becomes aware of any faulty or defective work in the 
Project, or other nonconformance with the Contract Documents during the Construction 
Phase, Owner shall give prompt notice thereof to DP.

Dunlap Office Space Tenant Improvements 
Page | 20 
CMR Professional Services Contract 
Serial # 240062-ROQ 
 
5.2 
REVIEW PROCEDURES: 
 
The following procedures shall be followed for review of all submittals required by Article 2 of this 
Agreement:  
 
5.2.1 
DP shall submit programming when called for herein, Schematic Studies and Schematic 
Documents, Design Development Documents and Construction Documents for review by 
Owner and CMR in accordance with the Project Design Schedule. 
 
5.2.2 
Owner and CMR will be required to provide all review comments to DP within thirty (30) 
calendar days from receipt of the submittal.  
 
5.2.3 
DP shall respond to and incorporate review comments transmitted by Owner and CMR. 
Any budgetary overruns or discrepancies shall be resolved by design and engineering 
modifications to match or get below the Construction Budget established by the Owner. 
 
5.2.4 
Unless otherwise agreed to in writing, DP shall respond in writing within seven (7) calendar 
days of receipt of the review comments. Owner Project Manager or Construction Project 
Manager will log, transmit and facilitate the exchange of review comments. DP shall also 
maintain a similar log and make it available to Owner at all times. 
 
 
5.2.5 
Replies to DP Responses: Owner, Project Manager, Construction Project Manager or CMR 
will reply within fourteen (14) calendar days to any responses requiring confirmation and 
will advise DP if any further reconciliation is required. 
 
5.2.6 
Resolution of Differences: Owner, Project Manager or Construction Project will schedule a 
meeting between DP, CMR and Owner, to take place within fourteen (14) calendar days 
after review comments are issued to DP, in order to resolve all issues between teams. The 
Owner will arrange additional meetings or conference calls as necessary, in order to 
expedite resolution and avoid impact to the Project Schedule or the Contract Documents. 
 
5.2.7 
Punch List and Back-Check Review: Upon notice from the Contractor that the project is 
substantially complete, the DP shall develop a punch list with assistance from the Owner, 
incorporating all comments into one punch list for issuance with the Certificate of 
Substantial Completion.  The DP will be responsible for all back-checks to the punch list.  
If any comments remain unsatisfied, additional back-checks shall be required from DP until 
all comments have been satisfied.  Any costs associated with DP’s preparation of the back-
checks shall be DP’s responsibility 
 
5.2.8 
Resolution of all review comments is requisite for completion of any phase of the Design 
Services. 
 
5.2.9 
Any failure of Owner to make a decision within the time limits set forth herein shall not be 
construed as acquiescence in all or any part of a subsequent DP claim for relief or remedy. 
 
 
ARTICLE 6:  BASIS OF COMPENSATION 
 
6.1 
FEES FOR PROFESSIONAL SERVICES: 
 
Owner agrees to pay DP, and DP agrees to accept as payment for all of the Basic Services rendered 
pursuant to this Agreement, a Lump Sum, Not-to-Exceed Fee mutually agreed upon of $2,399,836.00 
as set forth on Exhibit ‘B’, DP’s Proposal, based upon hourly rates and hours, which shall be indicated 
in DP’s proposal and in Exhibit A.  DP Basic Proposal of fees shall indicated positions, hours and rates 
per hour required for each design phase as follows: Programming/Schematic Design, Design

Dunlap Office Space Tenant Improvements 
Page | 21 
CMR Professional Services Contract 
Serial # 240062-ROQ 
 
Development, Construction Document, Construction Administration and Post Construction.  DP shall 
also include a Design Schedule indicating days required for each phase, including days for Owner 
review and permitting of the Construction Documents. 
 
6.1.1 
Payments to DP on account of the Lump Sum Fee shall be made on the percentage of the 
services completed and approved. 
 
6.1.2 
The Lump Sum fee shall include all costs associated with performing the Basic Services 
including but not limited to attendance at all meetings with Owner staff, Project Manager, 
Construction Project Manager, CMR, and Sub-consultants necessary to perform all of the 
Basic Services. 
 
6.1.3 
Owner shall have no obligation or liability to pay any fee, expenditure or cost beyond the 
Lump Sum Compensation agreed to.  Unless specifically authorized in writing in advance 
as part of the approve scope of work, the COUNTY will not pay for any of the following 
expenses of the DP or its Sub-consultant: 1. Vehicle mileage to any COUNTY-owned 
facility located within the State of Arizona, 2. Vehicle mileage for the DP or its sub-
consultants to attend project related meetings located within the State of Arizona. 3.
 
Meal costs for employees of DP or its sub-consultants whether or not employees 
of the COUNTY are in attendance for meetings or other gatherings related to project work 
for the COUNTY, except where authorized in writing in advance for out-of-state 
consultants/sub-consultants traveling to Arizona or out of state travel related to the 
assignment. 
 
6.1.4 
Unless specifically authorized in writing, the DP shall use the COUNTY contracted 
printing vendor for all reproduction work if copies are required by the COUNTY in addition 
to the review document sets required elsewhere in this Agreement. 
 
6.2 
ADDITIONAL SERVICES/REIMBURSABLES FEE: 
 
DP may be authorized to perform Additional Services described under Section 2.3 and Reimbursable 
Costs described in 2.4. The proposal for such services will be a negotiated Lump Sum, Not-to-Exceed 
Fee (negotiated by reference to the hours and hourly rates): 
 
6.2.1 
Hourly rates shall be as defined pursuant to Exhibit A. 
 
6.2.2 
The following principals may be employed on the Project: 
 
Adrienne Lewis                         
 
_______     _____     _ _____ 
 
__________  _     __     _____ 
 
_______     ___     __ ______ 
 
_________     _____      _ ___ 
 
___________      _     ______ 
 
_____________            _____ 
 
_________      __     _______ 
 
6.2.3 
Personnel directly engaged on a Project by DP may include architects, engineers, 
designers, job captains, draftsmen, specification writers, field accountants and 
manufacturer representatives engaged in consultation, research and design, production of 
drawings, specifications and related documents construction inspection and other services 
pertinent to a project during all phases therein.  
 
6.2.4 
Any authorized reimbursable services fee shall not include charges for office rent or 
overhead expenses of any kind, including local telephone and utility charges, office and

Dunlap Office Space Tenant Improvements 
Page | 22 
CMR Professional Services Contract 
Serial # 240062-ROQ 
 
drafting supplies, depreciation of equipment, professional dues, internet services, 
subscriptions, etc., reproduction of drawings and specifications, mailing, stenographic, 
clerical, or other employees time or travel and subsistence not directly related to a project. 
For all reimbursable services Owner will pay DP the direct cost of the service without a 
multiplier. Authorized reproductions and duplicate BIM models in excess of sets required 
at each phase of the work will be a Reimbursable Service. 
 
6.2.5 
Owner upon recommendation of the Director or Director’s Designee will reimburse DP for 
authorized Reimbursable Services as verified by appropriate bills, invoices or statements, 
pursuant to Article 7.2. 
 
6.3 
Absent an Amendment to the Agreement, the aggregate total of Reimbursable Costs under Section 
2.4 shall not exceed $0, without the prior written approval of the Director or Director’s designee. In 
the event that sum is exceeded, Owner shall have no liability or responsibility for paying any such 
excess which will be DP’s own cost and expense.  
 
 
ARTICLE 7:  PAYMENTS TO DP 
 
7.1 
PAYMENT FOR BASIC SERVICES: 
 
Payments for Basic Services will be made monthly in proportion to the professional services 
performed during each Phase of DP Services. 
 
7.2 
PAYMENT FOR ADDITIONAL/REIMBURSABLE SERVICES: 
 
7.2.1 
Payment for Additional Services may be requested monthly in proportion to the services 
performed. When such services are authorized as an hourly rate, DP shall submit for 
approval by the Director or Director’s designee, a duly certified invoice, giving names, 
classification, salary rate per hour, hours worked and total charge for all personnel directly 
engaged on a project or task. To the sum thus obtained, any authorized Reimbursable 
Services Cost may be added. DP shall attach to the invoice all supporting data for 
payments made to the Sub-consultants engaged on the Project or task.  
 
7.2.2 
In addition to the invoice, DP shall, for Hourly Rate authorizations, submit a progress report 
giving the percentage of completion of the Project development and the total estimated fee 
to completion. 
 
7.3 
DEDUCTIONS: 
 
No deductions shall be made from the DP’s compensation on account of liquidated damages 
assessed against CMR or other sums withheld from payments to CMR. 
 
 
ARTICLE 8:  INDEMNIFICATION AND INSURANCE 
 
8.1 
INDEMNIFICATION: 
 
8.1.1 
DP’s Duty to Indemnify and Defend.  To the fullest extent permitted by law, the DP shall 
defend, indemnity and hold harmless the Owner, its agents, representatives, officers, 
directors, officials, and employees from and against all claims, damages losses, and 
expenses, including but not limited to attorney fees, court costs, expert witness fees, and 
the cost of appellate proceedings, relating to, arising out of, or alleged to have resulted 
from the negligent, reckless, or intentionally wrongful acts, errors, omissions or mistakes 
of the DP, its agents, representatives, employees, or Subcontractors relating to the

Dunlap Office Space Tenant Improvements 
Page | 23 
CMR Professional Services Contract 
Serial # 240062-ROQ 
 
performance of this Contract.  DP’s duty to defend, indemnify and hold harmless the 
Owner, its agents, representatives, officers, directors, officials, and employees shall arise 
in connection with any claim, damage loss or expense that is attributable to bodily injury, 
sickness, disease, death or injury to, impairment, or destruction of property, including loss 
of use resulting therefrom, caused by the referenced acts, errors, omissions or mistakes in 
the performance of this Contract, including those made by any person for whose acts, 
errors, omissions or mistakes, the DP may be legally liable.   
 
8.1.2 
The amount and type of insurance coverage requirements set forth below will in  no way 
be construed as limiting the scope of the indemnity  
 
8.2 
INSURANCE REQUIREMENTS: 
 
DP, at DP’s own expense, shall purchase and maintain the herein stipulated minimum insurance 
from a company or companies duly licensed by the State of Arizona and possessing a current A.M. 
Best, Inc., rating of B++. In lieu of State of Arizona licensing, the stipulated insurance may be 
purchased from a company or companies, which are authorized to do business in the State of 
Arizona, provided that said insurance companies meet the approval of Owner. The format of any 
insurance policies and related forms must be acceptable to Owner. 
 
8.2.1 
All insurance required herein shall be maintained in full force and effect until all work or 
service required to be performed under the terms of the Agreement is satisfactorily 
completed and formally accepted. Failure to do so may, at the sole discretion of Owner, 
constitute a material breach of this Agreement. 
 
8.2.2 
DP’s insurance shall be primary insurance as respects Owner, and any insurance or self-
insurance maintained by Owner shall not contribute to it. 
 
8.2.3 
Any failure to comply with the claim reporting provisions of the insurance policies or any 
breach of an insurance policy warranty shall not affect Owner’s right to coverage afforded 
under the insurance policies.  
 
8.2.4 
The insurance policies may provide coverage that contains deductibles or self-insured 
retentions. Such deductible and/or self-insured retentions shall not be applicable with 
respect to the coverage provided to Owner. DP shall be solely responsible for the 
deductible and/or self-insured retention and Owner, at its option may require DP to secure 
payment of such deductibles or self-insured retentions by a surety bond or an irrevocable 
and unconditional letter of credit. 
 
8.2.5 
Owner reserves the right to request and to receive, within ten (10) working days, certified 
copies of any and all of the herein required insurance policies and/or endorsements. Owner 
shall not be obligated, however, to review such policies and/or endorsements or to advise 
DP of any deficiencies in such policies and endorsements, and such receipt shall not 
relieve DP from, or be deemed a waiver of Owner’s right to insist on strict fulfillment of DP’s 
obligations under this Agreement.  
 
8.2.6 
The insurance policies required by this Agreement, except Workers’ Compensation, and 
Errors and Omissions, shall name Owner, its agents, representatives, officers, directors, 
officials and employees as Additional Insureds. 
 
8.2.7 
The policies required hereunder, except Worker’s Compensation, and Errors and 
Omissions, shall contain a waiver of transfer of rights of recovery (subrogation) against 
Owner, its agents, representatives, officers, directors, officials and employees for any 
claims arising out of DP’s work or service. 
 
8.3 
REQUIRED COVERAGE:

Dunlap Office Space Tenant Improvements 
Page | 24 
CMR Professional Services Contract 
Serial # 240062-ROQ 
 
 
DP is required to procure and maintain the following coverage’s: 
 
8.3.1 
Commercial General Liability. Commercial General Liability insurance and, when 
necessary, Commercial Umbrella insurance with a limit of not less than $2,000,000 for 
each occurrence, $2,000,000 Personal/Advertising Injury, $4,000,000 Products/ 
Completed Operations Aggregate, and $4,000,000 General Aggregate Limit. The policy 
shall include coverage for bodily injury, broad form property damage, and blanket 
contractual coverage, and shall not contain any provision that would serve to limit third 
party action over claims. There shall be no endorsement or modification of the CGL limiting 
the scope of coverage for liability arising from explosion, collapse, or underground property 
damage.  
 
8.3.2 
Automobile Liability. Commercial/Business Automobile Liability insurance and, if 
necessary, Commercial Umbrella insurance with a combined single limit for bodily injury 
and property damage of not less than $2,000,000 each occurrence with respect to any of 
DP’s owned, hired and non-owed vehicles assigned to or used in performance of DP’s 
work or services under this Agreement.  
 
8.3.3 
Worker’s Compensation: Workers’ Compensation insurance to cover obligations imposed 
by federal and state statutes having jurisdiction of DP’s employees engaged in the 
performance of the work or services under this Contract; and Employer’s Liability insurance 
of not less than $1,000,000 for each accident, $1,000,000 disease for each employee, and 
$1,000,000 disease policy limit. 
 
8.3.4 
Errors and Omissions (Professional Liability) Insurance. Errors and Omissions 
(Professional Liability) insurance and, if necessary, Commercial Umbrella insurance, which 
will insure and provide coverage for errors or omissions or professional liability of DP, with 
limits of no less than $2,000,000 for each claim. 
 
8.4 
COVERAGES: 
 
➢ Commercial General Liability 
$2,000,000 
Each Occurrence 
 
$2,000,000 
Personal & Advertising Injury 
 
$4,000,000 
General Aggregate 
 
$4,000,000 
Products/Completed Operations 
 
➢ Automotive Liability 
$2,000,000 
Each Occurrence 
 
➢ Workers’ Compensation 
$1,000,000 
Each Accident 
 
$1,000,000 
Disease for Each Employee  
 
$1,000,000 
Disease Policy Limit 
➢ Errors and Omissions 
$2,000,000 
Each Claim 
 
8.5 
CERTIFICATES OF INSURANCE: 
 
Prior to commencing work or services under this Agreement, DP shall furnish Owner with 
Certificates of Insurance in a form acceptable to Owner, or formal endorsements as required by 
the Contract in the form provided by Owner, issued by DP’s insurer(s), as evidence that policies 
providing the required coverage’s, conditions and limits required by this Agreement are in full force 
and effect. Such certificates shall identify this contract number and title. 
 
8.5.1 
In the event any insurance policy(ies) required by this contract is(are) written on a “claims 
made” basis, coverage shall extend for two years past completion and acceptance of DP’s 
work or services and as evidenced by annual Certificates of Insurance.

Dunlap Office Space Tenant Improvements 
Page | 25 
CMR Professional Services Contract 
Serial # 240062-ROQ 
 
 
8.5.2 
If a policy does expire during the life of the Agreement, a renewal certificate must be sent 
to Owner within fifteen (15) calendar days prior to the expiration date. 
 
8.6 
CANCELLATION AND EXPIRATION NOTICES: 
 
Insurance required herein shall not expire, be cancelled, or materially changed without thirty (30) 
calendar day’s prior written notice to Owner.  
 
 
ARTICLE 9:  PERFORMANCE 
 
9.1 
PERFORMANCE AND DELEGATION: 
 
9.1.1 
DP services to be performed hereunder shall be performed by DP's own staff, unless 
otherwise approved in writing by Owner. Said approval shall not be construed as 
constituting an agreement between Owner and said other person or firm. DP’s services 
shall be performed in all respects in a manner consistent with that degree of skill and care 
ordinarily exercised by practicing design professionals performing such services in 
Maricopa County under the same or similar circumstances and conditions and in a 
reasonable and non-negligent way.  
 
9.1.2 
DP agrees, within fourteen (14) calendar days of receipt of a written request from Owner, 
to promptly remove and replace any personnel employed or retained by DP, any Sub-
consultants or subcontractors or any personnel of any such Sub-consultants or 
subcontractors engaged by DP, to provide and perform services or work pursuant to the 
requirements of this Agreement, whom Owner shall request in writing to be removed, which 
request may be made by Owner with or without cause. 
 
9.2 
TIME FOR PERFORMANCE: 
 
9.2.1 
DP agrees to start all work hereunder upon receipt of an Authorization to Proceed issued 
by the Director or Director’s designee and to complete each Phase within the time 
stipulated in the Authorization to Proceed. Time is of the essence with respect to 
Performance of this Agreement. 
 
9.2.2 
The Project schedule establishes the critical time limit of DP’s services. DP shall not, except 
for cause beyond the reasonable control of DP, exceed time limits established by this 
Agreement. Any adjustments in the schedule must be approved in writing by Owner and 
must be requested in writing by DP within ten (10) days after the occurrence upon which 
DP’s request for adjustment is based. 
 
9.3 
NO WAIVER OF PERFORMANCE: 
 
The failure of the Owner to insist, in any one or more instances, on the performance of any of the 
terms, covenants or conditions of this Agreement or to exercise any of its rights hereunder, shall 
not be construed as a waiver or relinquishment of such term, covenant, condition or right with 
respect to further performance.  
 
9.4 
Any failure of Owner to make a decision within the time limits set forth herein shall not be construed 
as acquiescence in all or any part of a subsequent DP claim for relief or remedy.  
 
 
ARTICLE 10:  OWNERSHIP OF DOCUMENTS 
 
10.1 
OWNERSHIP OF DOCUMENTS:

Dunlap Office Space Tenant Improvements 
Page | 26 
CMR Professional Services Contract 
Serial # 240062-ROQ 
 
 
 
10.1.1 By execution of this Agreement, DP assigns all copyright ownership and other intellectual 
property interest in the Design Documents and Construction Documents prepared by DP 
and further agrees to execute and to cause any Sub-consultant to execute any separate 
assignment agreement necessary to implement such assignment.  
 
10.1.2 The Drawings and Project Specifications as instruments of service are and shall become 
the property of Owner whether the Project for which they are made is executed or not. DP 
shall be permitted to retain copies of the Drawings and Project Specifications for 
information and reference in connection with Owner's use and occupancy of the Project. 
 
10.1.3 Submission or distribution of Contract Documents to meet official regulatory requirements 
or for other purposes in connection with the Project is not to be construed as publication in 
derogation of DP's rights. 
 
10.1.4 To extent allowed by law, DP agrees not to divulge, furnish or make available to any third 
person, firm or organization, without Owner’s prior written consent, or unless incidental to 
the proper performance of DP’s obligations hereunder, or in the course of judicial or 
legislative proceedings where such information has been properly subpoenaed, any non-
public information concerning the services to be rendered by DP hereunder, and DP shall 
require all of its employees, agents and Sub-consultants to comply with the provisions of 
this paragraph.  
 
10.1.5 In the event of future reuse of the Construction Documents by Owner, DP’s name and seal 
shall be removed and DP shall not be liable to Owner or third parties in their reuse.  
 
10.1.6 DP shall not use, or allow to be used, the Contract Documents, Drawings, Project 
Specifications and reports or the unique aspects of this Project in any other project without 
the prior written approval of Owner. DP’s use of standard specifications texts and details 
are specifically excluded from the provisions of this paragraph.  
 
 
ARTICLE 11:  ALTERNATIVE DISPUTE RESOLUTION 
 
11.1 
Scope.  Notwithstanding anything to the contrary provided elsewhere in the Contract, the alternative 
dispute resolution (“ADR”) process provided herein shall be the exclusive means for resolution of 
claims or disputes arising under or related to the Contract, the interpretation thereof or the 
performance or breach by any party thereto, including but not limited to original claims or disputes 
asserted as cross claims, counterclaims, third party claims or claims for indemnity or subrogation, 
in any threatened or ongoing litigation or arbitration with third parties, if such disputes involve 
parties to contracts containing this ADR provision.  No changes can be made to this process without 
the mutual assent of the County and the claimant.  The parties have structured this procedure with 
the goal of providing for the prompt, efficient and final resolution of all disputes falling within the 
purview of this ADR process. 
 
11.2 
Meeting of Principals.  When a claim is made or a dispute (hereafter “dispute”) as described in 
Paragraph 11.1 arises, senior representatives of the County and the claimant will meet personally 
within ten (10) business days to discuss the dispute and attempt to resolve it.  If, after good faith 
efforts, resolution is not achieved, the dispute will proceed to mediation. 
 
11.3 
Qualifications of Mediator and Arbitrators.  Any person selected as mediator or arbitrator, either as 
single arbitrator as a member or Chair of the arbitration panel, shall be a member of the State Bar 
of Arizona and have experience in construction law. 
 
11.4 
Mediation.  If the parties have been unable to resolve the dispute after a meeting of principals, the 
parties may enter into mediation.  The parties shall jointly select a mediator.  The parties may

Dunlap Office Space Tenant Improvements 
Page | 27 
CMR Professional Services Contract 
Serial # 240062-ROQ 
 
mutually agree to waive mediation and proceed directly to arbitration.  If the mediation process is 
requested by either party, the mediation period shall be informal and shall not exceed sixty (60) 
calendar days from the selection of the mediator.  During the mediation process either party may 
terminate mediation on written notice to the other party and the mediator. 
 
11.5 
Binding Arbitration Procedure.  The following binding arbitration procedure shall serve as the 
exclusive method to resolve a dispute if mediation is unsuccessful, if mediation has been waived 
by the parties, or if a party requests arbitration during the mediation process.  Except as provided 
in Section 11.7.5 and 11.7.9, the decision of the arbitrator or arbitrator panel is final and binding on 
the parties and not subject to further judicial review. 
 
11.5.1 A party requesting binding arbitration shall notify the other party of their demand for 
arbitration in writing within seven (7) calendar days of (1) the failure of mediation; (2) waiver 
of mediation;  or (3) of the party’s demand to terminate mediation. 
 
11.5.2 If the Architect requests arbitration it shall post a cash bond with the arbitrator in an amount 
agreed upon by the parties or, in the event of no agreement, the arbitrator shall establish 
the amount of the cash bond to defray the cost of the arbitration and the proceeds from the 
bond shall be allocated in accordance with paragraph 1.7.7.  The bond must be in the full 
amount agreed upon or as established by the Arbitrator to pay the potential cost of the full 
arbitration proceeding.  The bond must be posted with and received by the arbitrator within 
five (5) calendar days after the demand for arbitration. 
 
11.5.3 Disputes involving less than $200,000 shall be heard by one single arbitrator chosen by 
agreement of the parties.  If the parties cannot agree on the single arbitrator, then the 
parties shall each submit two names to a Judge designated by Maricopa County who shall 
select the single arbitrator. 
 
11.5.4 For disputes in excess of $200,000, the arbitration panel shall consist of three arbitrators:  
the Architect’s appointed arbitrator, the CMR's appointed arbitrator and a third arbitrator 
who shall be selected by the parties' arbitrators and serve as the Chair of the arbitration 
panel. 
 
11.5.5 The arbitration is to be convened and administered under the Revised Uniform Arbitration 
Act (“RUAA”) (A.R.S. § 12-3001 et seq.) and the American Arbitration Association 
Construction Rules shall serve as a guideline for proceedings, thus as a supplement to the 
RUAA. 
 
11.6 
Expedited Hearing.  Any party can request the single arbitrator or the Chair of the arbitration panel 
to set an expedited hearing. If the single arbitrator or the Chair of the arbitration panel determines 
that the circumstances justify it, the single arbitrator or the Chair of the arbitration panel will arrange 
for scheduling of the arbitration at the earliest possible date.  In any event, the hearing of any 
dispute not expedited will commence as soon as practical but in no event later than thirty (30) 
calendar days after notification of request for arbitration having been received.  This deadline can 
be extended only with the consent of all the parties to the dispute, or by decision of the single 
arbitrator or the Chair of the arbitration panel upon a showing of good cause.  
 
11.7 
Procedure.  The single arbitrator or the arbitration panel will conduct the hearing in such a manner 
that will resolve disputes in a prompt, cost efficient manner giving regard to the rights of all parties.  
Each party shall supply to the single arbitrator or arbitration panel a written pre-hearing statement 
which shall contain a brief statement of the nature of the claim or defense, a list of witnesses and 
exhibits, a brief description of the subject matter of the testimony of each witness who will be called 
to testify, and an estimate as to the length of time that will be required for the arbitration hearing 
The single arbitrator or the Chair of the arbitration panel shall determine the nature and scope of

Dunlap Office Space Tenant Improvements 
Page | 28 
CMR Professional Services Contract 
Serial # 240062-ROQ 
 
discovery, if any, and the manner of presentation of relevant evidence consistent with deadlines 
provided herein, and the parties’ objective that disputes be resolved in a prompt and efficient 
manner.  No discovery may be had of any materials or information for which a privilege is 
recognized by Arizona law. The single arbitrator or the Chair upon proper application shall issue 
such orders as may be necessary and permissible under law to protect confidential, proprietary or 
sensitive materials or information from public disclosure or other misuse.  Any party may make 
application to the Maricopa County Superior Court to have a protective order entered as may be 
appropriate to confirm or enforce such orders of the Chair. 
 
11.7.1 Hearing Days.  In order to effectuate parties’ goals, the hearing once commenced, will 
proceed from working day to working day until concluded, absent a showing of good cause. 
 
11.7.2 Award.  The single arbitrator shall within ten (10) calendar days of the conclusion of a 
hearing issue an award.  The arbitration panel shall, within ten (10) calendar days from the 
conclusion of any hearing, by majority vote, issue its award.  The award shall include an 
allocation of fees and costs pursuant to 11.7.7 herein.  The award is to be in accordance 
with the Contract and the law of the State of Arizona. 
 
11.7.3 Scope of Award.  Regardless of the provisions of the RUAA, the arbitration panel shall be 
without authority to award punitive damages, and any such punitive damage award shall 
be void. If an award is made against any party in excess of one hundred thousand dollars 
($100,000), exclusive of interest, arbitration fees, costs and attorneys’ fees, it shall be 
supported by written findings of fact, conclusions of law and a statement as to how 
damages were calculated. 
 
11.7.4 Jurisdiction.  The arbitration panel shall not be bound for jurisdictional purposes by the 
amount asserted in any party’s claim, but shall conduct a preliminary hearing into the 
question of jurisdiction over the claim as regards its amount upon application of any party 
at the earliest convenient time, but not later than the commencement of the arbitration 
hearing.  If the dispute is determined to involve less than $200,000, the arbitration shall 
continue before the Neutral Arbitrator as a single arbitrator, with the party appointed 
arbitrators being excused. 
 
11.7.5 Entry of Judgment.  As provided in the RUAA, any party can make application to the 
Maricopa County Superior Court for confirmation of an award, and for entry of judgment on 
it. 
 
11.7.6 Severance and Joinder.  To reduce the possibility of inconsistent adjudications, the 
Mediator or the single arbitrator or arbitration panel, may: (i) at the request of any party, 
join and/or sever parties, and/or claims arising under other contracts containing this ADR 
provision, and (ii) the Mediator, on his own authority, or the single arbitrator or arbitration 
panel may, on its own authority, join or sever parties and/or claims subject to this ADR 
process as deemed necessary for a just resolution of the dispute, consistent with the 
parties’ goal of the prompt and efficient resolution of disputes, provided; however, that the 
A/E, OWNER and Project Professionals shall not be joined as a party to any claim made 
by an Architect.  Nothing herein shall create the right by any party to assert claims against 
another party not arising under or related to the Contract or not recognized under the 
substantive law as applicable to the dispute.  Neither the Mediator nor the single arbitrator 
or arbitration panel is authorized to join to the proceeding parties not in privity with the 
County.  The Architect cannot be joined to any pending arbitration proceeding, without 
Architect’s express written consent and unless Architect is given the opportunity to 
participate in the selection of the single arbitrator or non-County appointed arbitrator.

Dunlap Office Space Tenant Improvements 
Page | 29 
CMR Professional Services Contract 
Serial # 240062-ROQ 
 
11.7.7 Fees and Costs.  Each party shall bear its own fees and costs in connection with any 
informal hearing before the mediation.  All fees and costs associated with any arbitration 
before the single panel or arbitration panel, including without limitation the arbitrator fees, 
and the prevailing party’s reasonable attorneys’ fees, expert witness fees and costs, will 
be paid by the non-prevailing party, except as provided for herein.  In the event that 
Architect is the non-prevailing party, all fees and costs as noted above shall first be paid 
out of the bond posted with the arbitrator.  In no event shall the Architect’s obligation to pay 
fees and costs be limited to the amount of the bond posted herein.  In no event shall any 
arbitrator’s hourly fees be awarded in an amount in excess of $250 per hour and (i) costs 
shall not include any travel expenses in excess of mileage at the rate paid by Maricopa 
County, not to exceed a one way trip of 150 miles, and (ii) all travel expenses, including 
meals, shall be reimbursed pursuant to the travel policy of Maricopa County in effect at the 
time of the hearing.  The determination of prevailing and non-prevailing parties, and the 
appropriate allocation of fees and costs, will be included in the award by the single arbitrator 
or arbitration panel. 
 
11.7.8 Confidentiality.  Any proceeding initiated under this ADR provision shall be deemed 
confidential to the maximum extent allowed by Arizona law and, except for disclosures to 
a party’s attorneys or accountants, no party shall make any disclosure related to the 
disputed matter or to the outcome of any proceeding except to the extent required by law, 
or to seek interim equitable relief, or to enforce an agreement reached by the parties or an 
award made hereunder.  This provision does not affect the County’s right to inform the 
County Supervisors of the dispute. 
 
11.7.9 Equitable Litigation.  Notwithstanding any other provision of ADR to the contrary, any party 
can petition the Maricopa County Superior Court for interim equitable relief as may become 
necessary to preserve the status quo and prevent immediate and irreparable harm to a 
party or to the Project pending resolution of a dispute pursuant to ADR provided herein.  
No court may order any permanent injunctive relief except as may be necessary to enforce 
an order entered by the arbitration panel.  The fees and costs incurred in connection with 
any such equitable proceeding shall be determined and assessed in ADR. 
 
11.7.10 Change Order.  Any award in favor of the Architect against the County or in favor of the 
County against the Architect shall be reduced to a Change Order and executed by the 
parties in accordance with the award and the provisions of the Contract or a settlement 
agreement as appropriate. 
 
11.7.11 Merger and Bar.  Any claim asserted pursuant to this ADR process shall be deemed to 
include all claims, demands, and requests for compensation for costs and losses or other 
relief, including the extension of the Contract performance period which reasonably should 
or could have been brought against any party that was or could have been brought into 
this ADR process, with respect to the subject claim.  The arbitration panel shall apply legal 
principles commonly known as merger and bar to deny any claim or claims against any 
party regarding which claim or claims recovery has been sought or should have been 
sought in a previously adjudicated claim for an alleged cost, loss, breach, error, or 
omission.  
 
11.8 
Inclusion in Other Contracts.  The Architect shall cooperate with the County in efforts to include this 
ADR provision in all other Project contracts. 
 
 
ARTICLE 12:  SUSPENSION AND TERMINATION 
 
12.1 
PROJECT SUSPENSION:

Dunlap Office Space Tenant Improvements 
Page | 30 
CMR Professional Services Contract 
Serial # 240062-ROQ 
 
 
Owner may suspend the Project and DP’s services without cause but if the Project is suspended 
for more than one-hundred eighty (180)  days, DP shall be paid for all Basic Services and 
Reimbursables that have been authorized by an Authorization to Proceed and that were performed 
by DP and accepted by Owner prior to the date of such suspension. If the Project is resumed after 
having been suspended for more than 180 days, DP’s further compensation shall be subject to 
renegotiation.  
 
12.2 
TERMINATION OF AGREEMENT: 
 
12.2.1 
Owner has the right to terminate this Agreement for its convenience upon seven (7) days 
written notice to DP. Upon such termination, all charts, sketches, studies, drawings, 
models and other documents related to services performed under this Agreement, 
whether finished or not, shall be turned over to Owner within ten (10) days of notice of 
termination provided that DP has been paid in full for services rendered and approved by 
Owner as of the date of termination and reasonable termination costs supported by 
documentation. 
 
12.2.2 
Owner has the right to terminate this Agreement for default upon seven (7) days written 
notice stating the grounds for default or material breach. If DP has not cured the default 
or breach to the satisfaction of Owner, Owner shall receive ownership of all design 
documents upon request of Owner and Owner has the right to use, renovate and to make 
derivative works of the design documents in order to complete the Project. 
 
12.2.3 
Termination, for whatever cause or on whatever basis, shall not result in DP’s  being 
entitled to claim any lost profits as a result of the termination.   
 
ARTICLE 13:  MISCELLANEOUS 
 
13.1 
MAINTENANCE OF RECORDS:  
 
DP shall maintain and require Sub-consultant to retain adequate records and supporting 
documentation which concern or reflect its services hereunder. The records and documentation 
will be retained by DP for a minimum of six (6) years from the date of termination of this Agreement 
or the date the Project is completed, whichever is later. Owner, or any duly authorized agents or 
representatives of Owner, shall have the right to audit, inspect, and copy all such records and 
documentation as often as they deem necessary during the period of this Agreement and during 
the six (6) year period noted above. Refusal of DP to comply with the provisions of this section shall 
be grounds for termination for cause of this Agreement by Owner.  
 
13.2 
CANCELLATION: 
 
Owner may cancel this Agreement without penalty or further obligation under A.R.S. § 38-511 if 
any person significantly involved with this Agreement on behalf of Owner is or becomes a 
consultant to DP or a Sub-consultant with respect to the subject matter of the Agreement or an 
employee of DP does so.  
 
 
13.3 
PAYMENT OBLIGATIONS: 
 
All payment obligations of Owner are conditioned on the availability of funds which are approved 
and allocated for such obligation. If funds are not allocated and available for continuation of DP’s 
services, this Agreement may be terminated or suspended at the end of the time period for which 
funds are available. No liability or penalty shall accrue or be attributable to Owner in the event it 
becomes necessary to exercise rights under this provision.

Dunlap Office Space Tenant Improvements 
Page | 31 
CMR Professional Services Contract 
Serial # 240062-ROQ 
 
13.4 
NON-DEFINED TERMS: 
 
If not specifically defined herein, terms, words and phrases will have their ordinary and common 
meaning and they, together with abbreviations, shall be interpreted consistent with the design 
professional industry standards and technical and trade meanings.  
 
13.5 
NON-WAIVER PROVISIONS: 
 
The failure of the Owner to insist, in any one or more instances, on the performance of any of the 
terms, covenants or conditions of the Agreement, or to exercise any of its rights hereunder, shall 
not be construed as a waiver or relinquishment of such terms, covenant, conditions or right with 
respect to further performance.  
 
13.6 
NO HAZARDOUS SUBSTANCES OR PRODUCTS: 
 
DP shall use reasonable care not to specify for use in the Project any product known by DP to 
contain hazardous substances as deemed in 42 U.S.C 9601, et seq., unless no reasonable 
alternative is available and in that case Owner consent to sue shall first be obtained.  
 
13.7 
ENVIRONMENTAL CONTAMINATION: 
 
DP shall immediately notify Owner both verbally and in writing of the presence of and location of 
any environmental contamination of the site which it becomes aware of or reasonably should 
become aware, including, but not limited to, hazardous substances and petroleum releases.  
 
13.8 
ADA REQUIREMENTS: 
 
The Americans with Disabilities Act (“ADA”) is applicable to the Project. DP will use its skill and 
training as a design professional and exercise the applicable standard of care to design the Project 
in compliance with ADA requirements.  
 
13.9 
SUCCESSORS AND ASSIGNS: 
 
13.9.1 
The performance of this Agreement shall not be transferred, pledged, sold, delegated or 
assigned, in whole or in part, by DP without the written consent of Owner.  
 
13.9.2 
DP and Owner each binds one another, their partners, successors, legal representatives 
and authorized assigns to the other party of this Agreement and to the partners, 
successors, legal representatives and assigns of such party in respect to all covenants of 
this Agreement. 
 
13.10 
CERTIFICATION OF WAGE RATES AND UNIT COSTS: 
 
For any Authorization to Proceed for a project to be compensated under the Lump Sum method, 
DP shall certify that wage rates and other factual unit costs supporting the compensation are 
accurate, complete, and current at the time of said Authorization to Proceed. The original Project 
price and any addition thereto will be adjusted to exclude any significant sums by which Owner 
determines the project price was increased due to inaccurate, incomplete or noncurrent wage rates 
and other factual unit costs. All such price adjustments will be made within one (1) year following 
the end of the Project. 
 
13.11 
NOTICES: 
 
Whenever any party is required to give notice unto the other, such notice must be in writing, sent 
by registered United States mail, return receipt requested, addressed to the party for whom it is 
intended at the place last specified; and the place for giving of notice shall remain such until it shall

Dunlap Office Space Tenant Improvements 
Page | 32 
CMR Professional Services Contract 
Serial # 240062-ROQ 
 
have been changed by written notice in compliance with the provisions of this paragraph. For the 
present, the parties designate the following as the respective places for giving of notice:  
 
➢ FOR OWNER: 
 
 
Director, Maricopa County Facilities Management Department 
 
401 W. Jefferson Street 
 
Phoenix, Arizona 85003 
 
 
➢ FOR DP: 
 
Dekker Design, LLC, ATTN: Adrienne Lewis 
 
3110 N. Central Ave, Suite G140 
  
Phoenix, AZ 85012 
 
 
13.12 
SEVERABILITY: 
 
If any term, covenant, condition or provision of this Agreement (or the application thereof to any 
circumstance or person) shall be invalid or unenforceable to any extent, the remaining terms, 
covenants, conditions and provisions of this Agreement shall not be affected thereby; and each 
remaining term, covenant, condition and provision of this Agreement shall be valid and shall be 
enforceable to the fullest extent permitted by law unless the enforcement of the remaining terms, 
covenants, conditions and provisions of this Agreement would prevent the accomplishment of the 
original intent of the agreement between the parties. 
 
13.13 
SURVIVAL OF PROVISIONS: 
 
All terms, conditions, covenants and obligations of Owner and DP hereunder shall survive the 
termination or expiration of this Agreement as necessary and appropriate for such parties to fulfill 
their obligations that accrued during the Term of this Agreement. 
 
13.14 
EXTENT OF AGREEMENT: 
 
This Agreement represents the entire and integrated agreement between Owner and DP and 
supersedes all prior negotiations, representations or agreements, written or oral. This Agreement 
may not be amended, changed, modified, or otherwise altered in any way, at any time after the 
execution hereof, except by a written document executed with the same formality and equal dignity 
herewith. Waiver by either party of a breach of any provision of this Agreement shall not be deemed 
to be a waiver of any other breach of any provision of this Agreement. 
 
13.15 
NO CONTINGENT FEE: 
 
DP (or registered surveyor and mapper or professional engineer, as applicable) warrants that he or 
she has not employed or retained any company or person, other than a bona fide employee working 
solely for DP (or registered surveyor and mapper, or professional engineer, as applicable) to solicit 
or secure this Agreement and that he or she has not paid or agreed to pay any person, company, 
corporation, individual, or firm, other than a bona fide employee working solely for DP (or registered 
surveyor and mapper or professional engineer, as applicable) any fee, commission, percentage, gift, 
or other consideration contingent upon or resulting from the award or making of this Agreement. For 
the breach or violation of this provision, Owner shall have the right to terminate the Agreement 
without liability and, at its discretion, to deduct from the contract price, or otherwise recover, the full 
amount of such fee, commission, percentage, gift, or consideration. 
 
13.16 
APPLICABLE LAW AND VENUE OF LITIGATION:  
 
This Agreement shall be enforced, interpreted, and construed in accordance with and governed by 
the laws of the State of Arizona, including the Revised Uniform Arbitration Act (A.R.S. § 12-3001 et

Dunlap Office Space Tenant Improvements 
Page | 33 
CMR Professional Services Contract 
Serial # 240062-ROQ 
 
seq.), which is applicable hereto. Any suit or action brought by any party concerning this Agreement, 
or arising out of this Agreement, shall be brought in Maricopa County, Arizona.  
 
13.17 
INTERPRETATION:  
 
The language of this Agreement has been agreed to by both parties to express their mutual intent 
and no rule of strict construction shall be applied against either party hereto. The headings contained 
in this Agreement are for reference purposes only and shall not affect in any way the meaning or 
interpretation of this Agreement. All personal pronouns used in this Agreement shall include the 
other gender, and the singular shall include the plural, and vice versa, unless the context otherwise 
requires. Terms such as “herein,” ‘hereof,” “hereunder,” and “hereinafter” refer to this Agreement as 
a whole and not to any particular sentence, paragraph, or section where they appear, unless the 
context otherwise requires. Whenever reference is made to a Section or Article of this Agreement, 
such reference is to the Section or Article as a whole, including all of the subsections of such Section, 
unless the reference is made to a particular subsection or subparagraph of such Section or Article.  
 
13.18 
PRIORITY OF PROVISIONS: 
 
If there is a conflict or inconsistency between any term, statement, requirement, or provision of any 
exhibit attached hereto, any document or events referred to herein, or any document incorporated 
into this Agreement by reference and a term, statement, requirement, or provision of this Agreement, 
the term, statement, requirement, or provision contained in this Agreement shall prevail and be given 
effect.  
 
13.19 
COMPLIANCE WITH LAWS: 
 
DP shall comply with all applicable laws, codes, ordinances, rules, regulations and resolutions in 
performing its duties, responsibilities and obligations related to this Agreement.  
 
13.20 
PRIOR AGREEMENTS: 
 
This document incorporates and includes all prior negotiations, correspondence, conversations, 
agreements and understandings applicable to the matters contained herein and the parties agree 
that there are no commitments, agreements or understandings concerning the subject matter of 
this Agreement that are not contained in this document. Accordingly, the parties agree that no 
deviation from the terms hereof shall be predicated upon any prior representations or agreements, 
whether oral or written. It is further agreed that no modification, amendment or alternation in the 
terms or conditions contained herein shall be effective unless set forth in writing. 
 
13.21 
LEGAL WORKER REQUIREMENTS: 
 
As required by A.R.S. § 41-4401, Owner is prohibited after September 30, 2008 from awarding a 
contract to any service or construction contractor who fails, or whose subcontractors fail, to comply 
with A.R.S. § 23-214-A. CMR warrants that it complies fully with all federal immigration laws and 
regulations that relate to its employees, that it shall verify, through the employment verification pilot 
program as jointly administrated by the U.S. Department of Homeland Security and the Social 
Security Administration or any of its successor programs, the employment eligibility of each 
employee hired after December 31, 2007, and that it shall require its subcontractors and sub-
subcontractors to provide the same warranties to CMR. CMR acknowledges that a breach of this 
warranty by CMR or by any subcontractor or sub-subcontractor under this Agreement shall be 
deemed a material breach of this Agreement, and is grounds for penalties, including termination of 
this Agreement by Owner. Owner retains the right to inspect the records of any DP, subcontractor 
and sub-subcontractor employee who performs work under this Agreement, and to conduct random 
verification of the employment records of CMR any subcontractor and sub-subcontractor who works 
on this Contract, to ensure that CMR and each subcontractor and sub-subcontractor is complying 
with the warranties set forth above. CMR shall be responsible for all costs associated with 
compliance with this requirement.

Dunlap Office Space Tenant Improvements 
Page | 34 
CMR Professional Services Contract 
Serial # 240062-ROQ 
 
 
13.22 
INFLUENCE: 
 
As prescribed in MC1-1203 of the Maricopa County Procurement Code, any effort to influence an 
employee or agent to breach the Maricopa County Ethical Code of Conduct or any ethical conduct, 
may be grounds for Disbarment or Suspension under MC1-902. An attempt to influence includes, 
but is not limited to: 
 
13.22.1 A person offering or providing a gratuity, gift, tip, present, donation, money, entertainment, 
educational passes, tickets, or any type of valuable contribution or subsidy,  
  
13.22.2 That is offered or given with the intent to influence a decision, obtain a contract, garner 
favorable treatment, or gain favorable consideration of any kind.  
 
13.23 
AMENDMENTS: 
 
All amendments to this Contract shall be in writing and approved/signed by both parties. Maricopa 
County Office of Procurement Services shall be responsible for approving all amendments for 
Maricopa County. 
 
13.24 
NON-DISCRIMINATION: 
 
CONTRACTOR agrees to comply with all provisions and requirements of Arizona Executive Order 
2009-09 including flow down of all provisions and requirements to any subcontractors. Executive 
Order 2009-09 supersedes Executive order 99-4 and amends Executive order 75-5 and may be 
viewed 
and 
downloaded 
at 
the 
Governor 
of 
the 
State 
of 
Arizona’s 
website 
http://www.azgovernor.gov/dms/upload/EO_2009_09.pdf  which is hereby incorporated into this 
contract as if set forth in full herein. During the performance of this contract, CONTRACTOR shall 
not discriminate against any employee, client or any or any other individual in any way because of 
that person’s age, race, creed, color, religion, sex, disability or national origin. 
 
13.25 
UNIFORM ADMINISTRATIVE REQUIREMENTS: 
 
When applicable and by entering into this Contract the Contractor agrees to comply with all 
applicable provisions of Title 2, Subtitle A, Chapter II,  PART 200—UNIFORM ADMINISTRATIVE 
REQUIREMENTS, COST PRINCIPLES, AND AUDIT REQUIREMENTS FOR FEDERAL 
AWARDS contained in Title 2 C.F.R. § 200 et seq. 
 
13.26 
FORCED LABOR 
 
13.26.1 By submitting a bid for this solicitation and/or entering into a contract as a result of this 
solicitation, contractor agrees to comply with all applicable portions of Arizona Revised 
Statutes Section 35-394. Contracting; procurement; prohibition; written certification; 
remedy; termination; exception; definitions. 
 
13.26.2 Contractor certifies that it does not currently, and agrees for the duration of the contract, 
that it will not use:  
 
13.26.2.1 
The forced labor of ethnic Uyghurs in the People’s Republic of China. 
 
13.26.2.2 
Any goods or services produced by the forced labor of ethnic Uyghurs in the 
People’s Republic of China.

Dunlap Office Space Tenant Improvements 
Page | 35 
CMR Professional Services Contract 
Serial # 240062-ROQ 
 
13.26.2.3 
Any contractors, subcontractors or suppliers that use the forced labor or any 
good or services produced by the forced labor of ethnic Uyghurs in the 
People’s Republic of China. 
 
13.26.3 If contractor becomes aware during the term of the agreement that contractor is not in 
compliance with this paragraph, the contractor shall notify the County within five business 
days after becoming aware of the noncompliance. If the contractor fails to provide a written 
certification to the County that the contractor has remedied the noncompliance within 180 
days after notifying the County of its noncompliance, then the agreement terminates, 
except that if the agreement termination date occurs before the end the 180 day period, 
the agreement terminates on the agreement termination date. 
 
13.27 
WRITTEN CERTIFICATION PURSUANT TO A.R.S. § 35-393.01 
 
If vendor engages in for-profit activity and has 10 or more employees, and if this agreement has a 
value of $100,000 or more, vendor certifies it is not currently engaged in, and agrees for the duration 
of this agreement to not engage in, a boycott of goods or services from Israel. This certification 
does not apply to a boycott prohibited by 50 U.S.C. § 4842 or a regulation issued pursuant to 50 
U.S.C. § 4842. 
 
13.28 UNIQUE 
ENTITY 
IDENTIFIER 
(UEI) 
AND 
SYSTEM 
FOR 
AWARD 
MANAGEMENT 
REGISTRATION 
 
All 
contractors 
that 
receive 
funding 
must 
have 
a 
UEI 
number 
through 
https://sam.gov/content/entity-registration. Contractor must also remain current with the System for 
Award Management www.sam.gov throughout the term of the contract. 
 
13.29 
UNIFORM ADMINISTRATIVE REQUIREMENTS 
 
By entering into a contract, the contractor agrees to comply with all applicable provisions of Title 2, 
Subtitle A, Chapter II, Part 200—UNIFORM ADMINISTRATIVE REQUIREMENTS, COST 
PRINCIPLES, AND AUDIT REQUIREMENTS FOR FEDERAL AWARDS contained in Title 2 
C.F.R. § 200 et seq. 
 
13.30 
RELIGIOUS ACTIVITIES 
 
The contractor agrees that costs, planned or claimed, including costs incurred, shall not include 
any expense for any religious activity. 
 
13.31 
POLITICAL ACTIVITY PROHIBITED 
 
None of the funds, materials, property, or services contributed by the County or the contractor under 
the agreement shall be used in the performance of this agreement for any partisan political activity, 
or to further the election or defeat of any candidate for public office. 
 
13.32 
EQUAL EMPLOYMENT OPPORTUNITY 
 
.1 
The contractor shall not discriminate against any employee or applicant for employment 
because of race, age, disability, color, religion, sex, or national origin. The contractor shall take 
affirmative action to ensure applicants are employed and that employees are treated during 
employment without regard to their race, age, disability, color, religion, sex, or national origin. Such 
action shall include but is not limited to the following: employment, upgrading, demotion or transfer, 
recruitment, or recruitment advertising, lay-off or termination, rates of pay or other forms of 
compensation, and selection for training, including apprenticeship.

Dunlap Office Space Tenant Improvements 
Page | 36 
CMR Professional Services Contract 
Serial # 240062-ROQ 
 
 
.2 
Contractor shall comply with the following provisions: 
 
. 
2.1 
Title VI and VII of the Civil Rights Act of 1964, as amended (42 U.S.C. §§ 2000a, 
et seq.); 
.2.2 
The Rehabilitation Act of 1973, as amended (29 U.S.C. §§ 701, et seq.); 
.2.3 
The Age Discrimination in Employment Act of 1967, as amended (29 U.S.C. §§ 
621, et seq.); 
.2.4 
The Americans With Disabilities Act of 1990 (42 U.S.C. §§ 12101, et seq.); and 
Arizona Executive Order 2009-09, as amended, et seq. which mandates that all persons 
shall have equal access to employment opportunities. 
.2.5 
Contractor understands that the United States has the right to seek judicial 
enforcement of this assurance. 
 
13.33 
CERTIFICATION REGARDING LOBBYING 
 
.1 
Contractor certifies, to the best of their knowledge and belief, that: 
 
.1.1 
No federal appropriated funds have been paid or will be paid, by or on behalf of 
the contractor, to any person for influencing or attempting to influence an officer or 
employee of any agency. This applies to a Member of Congress, an officer or employee of 
Congress, or an employee of a Member of Congress in connection with the awarding of 
any federal contract, the making of any federal grant. Including the making of any federal, 
loan the entering into of any cooperative agreement, and the extension, continuation, 
renewal, amendment, or modification of any federal contract, grant, loan, or cooperative 
agreement. 
 
.2 
If any funds other than federal appropriated funds, have been paid or will be paid to any 
person for influencing or attempting to influence an officer or employee of any agency, member of 
Congress, an officer or employee of Congress, or an employee of a member of Congress in 
connection with this federal contract, grant, loan, or cooperative agreement, the undersigned shall 
complete and submit Standard Form-LLL, “Disclosure Form to Report Lobbying,” in accordance 
with its instructions. 
 
.3 
Contractor shall include Lobbying Certification language in the award documents for all 
subcontractors (including sub-grants, and contract under grants, loans, and cooperative 
agreements) and that all sub-recipients shall certify and disclose accordingly. 
 
.3.1 
The Lobbying Certification is a material representation of fact upon which reliance 
was placed when this transaction is made or entered into. Submission of this certification 
is prerequisite for making or entering into this transaction imposed by section 1352, Title 
31, U.S. Code. Any successful proposer(s) who fail to file the required certification shall be 
subject to a civil penalty of not less than $10,000.00 and not more than $100,000.00 for 
each such failure. 
 
13.34 
CLEAN AIR ACT & CLEAN WATER ACT 
 
Contractor must comply with all applicable standards, orders, or requirements issued under section 
306 of the Clean Air Act (42 U.S.C. 1857(h), section 508 of the Clean Water Act (33 U.S.C. 1368) 
Executive Order 11738, and Environmental Protection Agency regulations (40 CFR part 15).

Dunlap Office Space Tenant Improvements 
Page | 37 
CMR Professional Services Contract 
Serial # 240062-ROQ 
 
13.35 
ENERGY POLICY AND CONSERVATION ACT 
 
Contractor must adhere to the standards and policies relating to energy efficiency, which are 
contained in the State energy conservation plan issued in compliance with the Energy Policy and 
Conservation Act (Pub. L. 94-163, 89 Stat.871).  
 
13.36 
REPORTING STANDARDS 
 
Contracts must comply with the Reporting standards as presented by the US. Treasury Final Rule 
and work with Maricopa County to provide compliance information regarding labor certification 
documentation and keep records of employees funded through American Rescue Plan Act Funds 
private, separate, and discrete.  
  
A Quarterly Reporting Calendar will be provided to the recipient.  
 
Programmatic Compliance and Reporting monitoring process is required with the American Rescue 
Plan Act funding. 
 
Reporting dates and programmatic Quarterly Report deadlines follow the calendar year quarterly 
cycle. The Quarterly report will be due according to the date provides in the ARPA Reporting 
Calendar. 
 
Coronavirus State and Local Fiscal Recovery Funds- Final Rule (31 CFR Part 35) 
https://www.ecfr.gov/current/title-31/subtitle-A/part-35   
 
Coronavirus State and Local Fiscal Recovery Funds Guidance on Recipient Compliance and 
Reporting Responsibilities (General Guidance). 
 
13.37 
REQUIREMENTS FOR SUBRECIPIENTS OF FEDERAL FUNDING OF NON-RESEARCH 
GRANTS AND COOPERATIVE AGREEMENTS: 
 
Notice is hereby given that this contract is a result of funding received by The Department of Health 
and Human Services (HHS),  and as such, Contractor agrees to comply with all applicable terms 
and conditions contained in this section as well as in the Prime Contractor’s Notice of Funding 
Opportunity (NOFO) or Notice of Award (NOA), grants policy contained in applicable HHS Grants 
Policy Statements, 45 CFR Part 75, requirements imposed by program statutes and regulations, 
Executive Orders, and HHS grant administration regulations, as applicable; as well as any 
requirements or limitations in any applicable appropriations acts. If any requirement in the HHS 
Grants Policy Statement, 45 CFR Part 75, or applicable statutes/appropriations acts conflict, then 
statutes and regulations take precedence. In addition, Contractor shall comply with all applicable 
terms and conditions contained in the “CDC’s General Terms and Conditions for Non-Research 
Grant and Cooperative Agreements (rev 08/21)” as supplied in Exhibit E and can also be found at 
https://www.cdc.gov/grants/documents/General-Terms-and-Conditions-Non-Research-
Awards.pdf 
 
The County shall provide reasonable technical assistance to the Contractor to assist in complying 
with state and federal laws and regulations, and accountability for diligent performance and 
compliance with the terms and conditions of this Contract and all applicable laws, regulations, and 
standards. However, this assistance in no way relieves the Contractor of full responsibility and 
accountability for its actions and performance in compliance with the terms of this Contract.  
 
Contracts must comply with the Reporting standards as presented by the US. Treasury Final Rule 
and work with Maricopa County to provide compliance information regarding labor certification

Dunlap Office Space Tenant Improvements 
Page | 38 
CMR Professional Services Contract 
Serial # 240062-ROQ 
 
documentation and keep records of employees funded through American Rescue Plan Act Funds 
separate and discrete.   
 
A Quarterly Reporting Calendar will be provided to the recipient upon execution of contract 
 
Programmatic Compliance and Reporting monitoring process is required with the American Rescue 
Plan Act. 
 
Reporting dates and programmatic Quarterly Report deadlines follow the calendar year quarterly 
cycle. The Quarterly report will be due according to the date provides in the ARPA Reporting 
Calendar.

Dunlap Office Space Tenant Improvements 
Page | 39 
CMR Professional Services Contract 
Serial # 240062-ROQ 
 
IN WITNESS WHEREOF, this agreement shall be in full force and effect only when the 
Board of Supervisors of Maricopa County, Arizona has approved it, and when executed 
by the Chairman of the Board of Supervisors or when applicable, the Chief Procurement 
Officer. 
 
 
 
 
 
 
Design Professional Firm Name 
Federal Tax Identification Number 
 
18887-0 
 
Arizona State Board of Technical Registration # 
 
 
 
 
 
Principal (Signature) 
Date 
 
 
 
 
 
Printed Name 
Title 
 
Net 30 days 
 
 
Vendor’s/Firm’s Payment Terms 
 
 
 
COUNTY OF MARICOPA, ARIZONA 
 
RECOMMENDED BY: 
 
 
 
___________________________________  
Department Head 
Date
 
 
 
ACCEPTED AND APPROVED: 
 
___________________________________ 
Chairman, 
Date 
Board of Supervisors 
 
ATTEST: 
 
___________________________________ 
Clerk of the Board  
Date 
 
 
 
 
 
 
LEGAL REVIEW: 
 
Approved as to form and within the powers and 
authority granted under the laws of the State of 
Arizona to Maricopa County. 
 
 
By: ______________________________________ 
   Deputy County Attorney   
   Date 
 
 
_906-07_____________________________ 
 
 NIGP Commodity Code (Advantage) 
Dekker Design, LLC
85-0367023
Adrienne Lewis
Principal / Architect
8/29/2024

Dunlap Office Space Tenant Improvements 
Page | 40 
CMR Professional Services Contract 
Serial # 240062-ROQ 
EXHIBIT “A”:  HOURLY RATES AND HOURS and 
EXHIBIT “B”: LUMP SUM AMOUNT
See Dekker Design, LLC fee proposal dated 08-19-24

August 19, 2024 
 
Corry Slama 
301 W. Jefferson Street, Suite 700 
Phoenix, AZ 85003 
Sent via Email: corry.slama@maricopa.gov 
 
 
Re:  
Dunlap Office Space Tenant Improvements, 240062-DBB 
 
Corry, 
 
                                                                              
Dekker is pleased to submit this proposal for professional services for the Dunlap Office 
Space Tenant Improvements project.  Our scope of work includes architectural design, 
landscape design, civil, structural, mechanical, plumbing, and electrical engineering as well 
as technology and cost estimating. This proposal includes the proposed scope of work, 
proposed fees, and exclusions. We appreciate the opportunity to work with the County again. 
Project Information 
Dekker understands the project to consist of the following: 
 
The intention of this project is to renovate the Dunlap Office building located at 2233 W. Dunlap 
Ave in Phoenix, Arizona. This tenant improvement project includes all four (4) stories of the 
building consisting of approximately 93,000sf of general office space for the Maricopa County 
Public Health and Human Services Department. It is our understanding that the project scope 
also includes security, access control, and lighting upgrades to the adjacent county owned 
parking structure. Additionally, site improvements are to include recommendations from the 
assessment report to address grading and drainage issues, as well as provide landscaping and 
irrigation design as required.    
Proposed Scope of Work 
Programming Phase  
Per our scope of work, we will carry out the following: 
• 
Conduct of one (1) project kick-off meeting to define and align the strategic goals and 
desired outcomes and obtain information and/or standards regarding the current and 
desired work environment, space utilization, work processes, key adjacencies, image and 
department identity. 
• 
Review any existing programmatic information and develop and/or confirm baseline 
space needs and overall metrics for circulation, densities, ratios of open to closed 
space, personnel, support spaces, and services.  
• 
Dekker will conduct one (1) programming interview session with each of the 
designated department representatives and other stakeholders, including OET and 
O&M to establish project goals and programmatic requirements. 
• 
Dekker will assemble and review all necessary legal requirements including codes, 
ordinances, and ADA analysis for the project. Code review to include evaluation of the 
capacities, fixture counts, means of egress, and other mandated code requirements. 
• 
Dekker will provide a detailed programming document to establish headcount and 
department specific support space for approval and use for the final design.

Schematic Design Phase  
Dekker will establish an overall design direction including preparation and submission of 
Schematic Design (SD) documents illustrating the scale and relationship of project 
components. Maricopa County will provide written approval of the scope authorizing the 
design team to move forward into the Design Development (DD) phase.  
Per our scope of work, we will carry out the following: 
• 
Field verification of existing architectural and MEP building elements and creation of 
a Revit base model to be shared with the project team. 
• 
Comprehensive preliminary drawings in sufficient detail to illustrate the size and character 
of the project including kinds of materials, types of construction and systems, and any 
other features specified by the County or as determined by the programming 
requirements and test fits. 
• 
Assume one (1) major revision (more than 65%) and one (1) minor revision (less than 50%) to 
schematic space plans.  
• 
Establish major building mechanical, electrical, and plumbing systems and 
components. 
• 
Build 3D model / walk-through imagery to provide design clarity for user groups. 
• 
Lead two (2) project review meetings with the project team for development and approval 
of the SD before proceeding with further phases. 
• 
Provide SD book for approval and use in the final design. 
Design Development Phase 
Develop the approved SD documents to finalize and describe the size and character of the 
project as to architectural, structural, mechanical, and electrical systems, and landscape and 
civil site development. Maricopa County will provide written approval of the scope 
authorizing the design team to move forward into the Construction Documents (CD) phase.  
Per our scope of work, we will carry out the following. 
• 
Participate in the evaluation and selection of a qualified construction management 
firm to serve as CMR including attending presentations and interviews with CMR 
candidates. 
• 
Develop interior elevations, reflected ceiling plans, design details, and coordination of 
furniture plans with FMD Interiors to convey overall DD intent which should comply 
with all Maricopa County standards and code requirements.  
• 
Provide finish selections based on Maricopa County standards. 
• 
Develop 3D model imagery / walk-through videos of all levels. 
• 
Civil, landscape, and architectural site plans, including signage and lighting.  
• 
Involvement of the selected CMR to allow for ongoing constructability, bidding 
reviews, and value engineering proposals. 
• 
Develop outline specifications to further identify major materials and systems to 
establish their general quality levels.  
• 
Provide a third-party estimate of probable cost based on 100% DD documents. 
Construction Documents Phase  
Develop the approved DD documents with drawings and specifications setting forth in detail 
the quality levels of materials and systems and/or other requirements for the construction of 
the work. Maricopa County will provide written approval of the 50% Construction Documents 
(50% CD) authorizing the design team to move forward with the 100% Construction 
Documents (100% CD).

Our scope of work includes: 
• 
Prepare working drawings and specifications required to build out the space 
including, but not limited to demolition plans, architectural plans, floor plans, 
coordination of furniture plans with FMD Interiors, finish plans, reflected ceiling plans, 
details, and elevations.  Coordinate mechanical, electrical, and plumbing engineering 
drawings required for permit.  
• 
Compile a project manual that includes contract documents provided by Maricopa 
County and CSI based technical specifications.  
• 
Submit 50% and 100% CD sets for the CMR to review. Design team to incorporate CMR 
comments prior to submitting 50% & 100% CD sets to the County for approval. 
• 
Facilitate two (2) project review meetings with the project team for development and 
approval of 50% CDs prior to proceeding with 100% CDs.  
• 
Provide updated Estimate of probable cost at 50% CDs. 
• 
Review the CMR GMP and coordinate all necessary assurance and approvals from 
governing agencies having jurisdiction over the project. Perform all revisions to CDs 
required to comply with governing authorities. Include all meetings and 
documentation necessary to accomplish the above listed requirements.  Issue 
addenda to bid documents as needed. 
Construction Administration Phase 
Our scope of work includes: 
• 
Facilitate pre-construction meeting with Contractor. 
• 
Attend weekly Contractor led Owner/Architect/Contractor (OAC) meetings. 
• 
Visit the construction site weekly to observe if the work is being performed in 
accordance with the CDs and report to the County any known deviations from the 
CDs and/or the most recent construction schedule, as well as any defects and 
deficiencies observed in the work.  
• 
Review and certify amounts due to the Contractor and issue certificates for payment.  
• 
Review the Contractor’s submittal schedule. Approve or take other appropriate action 
upon the Contractor’s submittals to check conformance with CDs.  
• 
Respond to Requests for Information (RFIs).  Use Contractor-provided RFI process and 
software as instructed by the County. 
• 
Review and approve subcontractor submittals within 14 days of receipt. Use 
contractor-provided RFI process and software as instructed by the County. 
• 
Conduct inspections with Maricopa County to determine the dates of Substantial and 
Final Completion, issue certificates of Substantial Completion, review written 
warranties and related documents from the contractor, and issue a final certificate for 
payment based upon a final inspection indicating the work complies with the 
requirements of the contract documents. 
• 
Coordinate closeout submittals including as-builts with CMR.  
• 
Provide record drawings base on CMR’s as-built drawings and provide AutoCAD and 
matching PDF files.  
• 
Assist the County in conducting a post-construction inspection at least (30) thirty days 
prior to the expiration of the one-year, post-construction warranty period. Provide a 
written report of observations.

Proposed Design Schedule 
We propose to provide the following milestone dates which include two (2) weeks for County 
review: 
Phase 
Duration 
Completion Date 
Notice to Proceed 
- 
08/22/24 
Programming 
8 weeks 
10/17/24 
Schematic Design 
10 weeks 
12/26/24 
Design Development 
10 weeks 
03/06/25 
50% Construction Documents 
8 weeks 
05/01/25 
100% Construction Documents 
8 weeks 
6/26/25 
Construction Administration (est.) 
72 weeks 
TBD 
 
Proposed Fee  
We propose to provide these services for a lump sum fee as broken out below:   
Discipline 
Firm 
Lump Sum 
Architecture  
Dekker 
$1,261,980.00 
Cost Estimator 
Associated Construction Economists (ACE) 
$57,680.00 
Civil Engineering 
Dibble 
$40,434.00 
Landscape Architecture  
Dekker 
$74,810.00 
Structural  
Advanced Structural Engineers (ASE) 
$18,837.00 
Mechanical  
Bridgers & Paxton 
$401,250.00 
Electrical  
Bridgers & Paxton 
$255,635.00 
Technology  
Bridgers & Paxton 
$232,510.00 
 
Sub Total of Basic Services 
$2,343,136.00 
Allowances: 
 
 
          Fire Flow Test 
Dibble 
$700.00 
         Special Inspections  
Advanced Structural Engineers (ASE) 
$6,000.00 
         General Allowance  
To be used as approved by FMD 
$50,000.00 
 
Total Compensation w/Allowances 
$2,399,836.00 
 
Exclusions & Assumptions 
1. 
A geotechnical engineering report is not included in this proposal. If a new report is 
required, Dekker can assist the County with the procurement of this work.  
2. Entitlements, plan review, and permit fees, traffic analyses, air quality analyses, or 
testing of any kind required by the authorities having jurisdiction and Maricopa 
County are excluded.  
3. Selection and specification of furnishings. Should you wish, Dekker can aid with 
selection and specification of new furnishings. 
4. Specialty consultant fees (not listed herein). 
5. Planning, design, and procurement of furnishings, fixtures, and equipment, (FFE), 
wayfinding, and signage other than code required signage are excluded. 
6. Early or multiple work package(s) are not included in this scope of work.  
7. Commissioning services are excluded.

Thank you for the opportunity to submit this proposal. As always, feel free to contact me if 
you have any questions about anything contained herein. If this proposal is acceptable, 
please sign below and return via email as an acknowledgment.  
 
Regards,  
Dekker Ltd.                                                                      Accepted:  
 
 
 
 
 
 
 
 
 
 
 
 
___________________________________________ 
Adrienne Lewis, AIA, NCARB, LEED AP 
 
Signature 
 
 
 
Date 
Client Focus Leader / Principal, Public Safety 
 
 
 
 
      
 
 
 
 
 
 
___________________________________________ 
 
 
 
 
 
 
Printed Name & Title 
 
 
CC: Felipe Mancero, Dekker file 
 
Attachments:  
Dekker Hourly Rates 
 
Fee Summary Worksheet 
 
Fee Cash Flow Schedule 
 
ACE (Cost Estimator) 
 
Dibble Proposal (Civil) 
 
ASE Proposal (Structural and Special Inspections) 
 
Bridgers & Paxton Proposal (MEP & Technology)

Valid thru 12/31/24 
Principal III: 
$260.00 per hour 
Principal II: 
$225.00 per hour 
Principal I: 
$190.00 per hour 
Architect III: 
$175.00 per hour 
Architect II: 
$140.00 per hour 
Architect I: 
$110.00 per hour 
Construction Administrator III: 
$150.00 per hour 
Construction Administrator II: 
$130.00 per hour 
Construction Administrator I: 
$100.00 per hour 
Design Associate III: 
$155.00 per hour 
Design Associate II: 
$125.00 per hour 
Design Associate I: 
$95.00 per hour 
Intern Architect II: 
$90.00 per hour 
Intern Architect I: 
$75.00 per hour 
Planner III: 
$150.00 per hour 
Planner II: 
$115.00 per hour 
Planner I: 
$80.00 per hour 
Structural Engineer III: 
$175.00 per hour 
Structural Engineer II: 
$155.00 per hour 
Structural Engineer I: 
$125.00 per hour 
Engineering Intern II: 
$105.00 per hour 
Engineering Intern I: 
$95.00 per hour 
Interior Designer III: 
$150.00 per hour 
Interior Designer II: 
$120.00 per hour 
Interior Designer I: 
$100.00 per hour 
Interior Design Intern II: 
$85.00 per hour 
Interior Design Intern I: 
$75.00 per hour 
Landscape Architect III: 
$150.00 per hour 
Landscape Architect II: 
$125.00 per hour 
Landscape Architect I: 
$105.00 per hour 
Landscape Designer II: 
$95.00 per hour 
Landscape Designer I: 
$80.00 per hour 
CAD/Revit Technician III: 
$110.00 per hour 
CAD/Revit Technician II: 
$90.00 per hour 
CAD/Revit Technician I: 
$65.00 per hour 
Administrative Assistant II: 
$85.00 per hour 
Administrative Assistant I: 
$70.00 per hour 
Notes: 
1.
Rates are subject to annual adjustment
Dekker
Standard Hourly Rates

Dekker
Subtotal
ACE
Dibble
Dekker
ASE
Bridgers & Paxton
Bridgers & Paxton
Bridgers & Paxton
Total Fee for Phase
Architect
Consultants
Estimator
Civil
Landscape
Structural
Mechanical
Electrical
Technology
$121,202.00
$98,080.00
$23,122.00
$0.00
$9,542.00
$0.00
$0.00
$5,790.00
$3,960.00
$3,830.00
$320,560.00
$191,000.00
$129,560.00
$0.00
$7,218.00
$17,080.00
$3,477.00
$41,930.00
$30,575.00
$29,280.00
$477,215.00
$243,400.00 
$233,815.00
$28,000.00
$5,866.00
$19,720.00
$3,969.00
$76,100.00
$51,900.00
$48,260.00
$387,657.00
$176,080.00
$211,577.00
$29,680.00
$6,286.00
$12,560.00
$3,261.00
$69,320.00
$47,250.00
$43,220.00
$354,730.00
$172,480.00
$182,250.00
$0.00
$6,426.00
$12,560.00
$3,474.00
$69,320.00
$47,250.00
$43,220.00
$681,772.00
$380,940.00
$300,832.00
$0.00
$5,096.00
$12,890.00
$4,656.00
$138,790.00
$74,700.00
$64,700.00
$2,343,136.00
$1,261,980.00
$1,081,156.00
$57,680.00
$40,434.00
$74,810.00
$18,837.00
$401,250.00
$255,635.00
$232,510.00
Dekker
Subtotal
ACE
Dibble
Dekker
ASE
Bridgers & Paxton
Bridgers & Paxton
Bridgers & Paxton
Total Fee for Phase
Architect
Consultants
Estimator
Civil
Landscape
Structural
Mechanical
Electrical
Technology
$0 
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0 
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0 
$0 
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0
$0
$0
$0
$0
$0
$0
$0
$0
$0
Dekker
Subtotal
ACE
Dibble
Dekker
ASE
Bridgers & Paxton
Bridgers & Paxton
Bridgers & Paxton
Total Fee for Phase
Architect
Consultants
Estimator
Civil
Landscape
Structural
Mechanical
Electrical
Technology
$700.00
$0.00
$700.00
$0.00
$700.00
$0.00
$0.00
$0.00
$0.00
$0.00
$6,000.00
$0.00
$6,000.00
$0.00
$0.00
$0.00
$6,000.00
$0.00
$0.00
$0.00
$50,000.00
$50,000.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$56,700.00
$50,000.00
$6,700.00
$0.00
$700.00
$0.00
$6,000.00
$0.00
$0.00
$0.00
Dekker
Subtotal
ACE
Dibble
Dekker
ASE
Bridgers & Paxton
Bridgers & Paxton
Bridgers & Paxton
All Phases Total
Architect
Consultants
Estimator
Civil
Landscape
Structural
Mechanical
Electrical
Technology
$2,399,836.00
$1,311,980.00
$1,087,856.00
$57,680.00
$41,134.00
$74,810.00
$24,837.00
$401,250.00
$255,635.00
$232,510.00
*Totals from fee summary sheets should roll to a cost summary total sheet
**Use of Additional Services and Reimbursable Expenses shall be in accordiance with procedures outlined in the Professional Services Contract
Additional Services (If Necessary)
Total Summary
Fee Service Totals
Example #3
Example #2
Example #1
Allowances
Fire Flow Test
Special Inspections
General Allowance
Dunlap Office Space Tenant Improvements - 240062-DBB
TOTAL
TOTAL
TOTAL
Schematic Design
Programming
Basic Services                                  
 8/9/2024
Revised 8/19/2024
Cost Summary Sheet
Dekker 
Construction Administration
100% Construction Documents
50% Construction Documents
Design Development

Hourly Rate
Programming 
Hours
Programming Fee
SD Hours
SD Fee
DD Hours
DD Fee
50% CD 
Hours
50% CD Fee
100% CD 
Hours 
100% CD Fee
CA Hours
CA Fee
$225.00
144.00
$32,400.00
160.00
$36,000.00
120.00
$27,000.00
64.00
$14,400.00
64.00
$14,400.00
288.00
$64,800.00
$155.00
128.00
$19,840.00
220.00
$34,100.00
200.00
$31,000.00
128.00
$19,840.00
128.00
$19,840.00
720.00
$111,600.00
$175.00
80.00
$14,000.00
160.00
$28,000.00
200.00
$35,000.00
160.00
$28,000.00
160.00
$28,000.00
576.00
$100,800.00
$120.00
192.00
$23,040.00
240.00
$28,800.00
320.00
$38,400.00
192.00
$23,040.00
192.00
$23,040.00
720.00
$86,400.00
$125.00
0.00
$0.00
60.00
$7,500.00
80.00
$10,000.00
96.00
$12,000.00
96.00
$12,000.00
12.00
$1,500.00
$125.00
0.00
$0.00
240.00
$30,000.00
320.00
$40,000.00
320.00
$40,000.00
320.00
$40,000.00
0.00
$0.00
$90.00
0.00
$0.00
100.00
$9,000.00
200.00
$18,000.00
40.00
$3,600.00
0.00
$0.00
0.00
$0.00
$110.00
80.00
$8,800.00
160.00
$17,600.00
400.00
$44,000.00
320.00
$35,200.00
320.00
$35,200.00
144.00
$15,840.00
624.00
$98,080.00
1340.00
$191,000.00
1840.00
$243,400.00
1320.00
$176,080.00
1280.00
$172,480.00
2460.00
$380,940.00
$1,261,980.00
Hourly Rate
Programming 
Hours
Programming Fee
SD Hours
SD Fee
DD Hours
DD Fee
50% CD 
Hours
50% CD Fee
100% CD 
Hours 
100% CD Fee
CA Hours
CA Fee
$210.00
0.00
$0.00
8.00
$1,680.00
4.00
$840.00
6.00
$1,260.00
8.00
$1,680.00
4.00
$840.00
$172.00
0.00
$0.00
4.00
$688.00
8.00
$1,376.00
8.00
$1,376.00
8.00
$1,376.00
8.00
$1,376.00
$140.00
0.00
$0.00
10.00
$1,400.00
10.00
$1,400.00
10.00
$1,400.00
8.00
$1,120.00
12.00
$1,680.00
$150.00
0.00
$0.00
23.00
$3,450.00
15.00
$2,250.00
15.00
$2,250.00
15.00
$2,250.00
8.00
$1,200.00
$192.00
12.00
$2,304.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
$107.00
34.00
$3,638.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
$200.00
18.00
$3,600.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
64.00
$9,542.00
45.00
$7,218.00
37.00
$5,866.00
39.00
$6,286.00
39.00
$6,426.00
32.00
$5,096.00
$40,434.00
Hourly Rate
Programming 
Hours
Programming Fee
SD Hours
SD Fee
DD Hours
DD Fee
50% CD 
Hours
50% CD Fee
100% CD 
Hours 
100% CD Fee
CA Hours
CA Fee
$190.00
0.00
$0.00
8.00
$1,520.00
8.00
$1,520.00
8.00
$1,520.00
8.00
$1,520.00
4.00
$760.00
$125.00
0.00
$0.00
40.00
$5,000.00
40.00
$5,000.00
32.00
$4,000.00
32.00
$4,000.00
90.00
$11,250.00
$110.00
0.00
$0.00
96.00
$10,560.00
120.00
$13,200.00
64.00
$7,040.00
64.00
$7,040.00
8.00
$880.00
0.00
$0.00
144.00
$17,080.00
$168.00
$19,720.00
104.00
$12,560.00
104.00
$12,560.00
72.00
$12,890.00
$74,810.00
CAD/Revit Technician II
Land Surveyor
Survey Tech
Architect Total Fee
Civil Total Fee
Landscape Total Fee
Assitant Engineer (EIT)
Designer
Architect Fee Summary                  
Project Manager/Design Assoc III
Project Architect III
Spec Writer
Design Associate II
Interior Designer II
CAD/Revit Technician III
Principal II
Phase Totals
CAD/Revit Technician III
Phase Totals
Civil Fee Summary                        
Phase Totals
Landscape Fee Summary               
Principal
Landscape Architect II
Survey Crew
Project Manager
Project Engineer (PE)

Hourly Rate
Programming 
Hours
Programming Fee
SD Hours
SD Fee
DD Hours
DD Fee
50% CD 
Hours
50% CD Fee
100% CD 
Hours 
100% CD Fee
CA Hours
CA Fee
$273.00
0.00
$0.00
1.00
$273.00
1.00
$273.00
1.00
$273.00
2.00
$546.00
4.00
$1,092.00
$201.00
0.00
$0.00
4.00
$804.00
4.00
$804.00
4.00
$804.00
4.00
$804.00
4.00
$804.00
$138.00
0.00
$0.00
8.00
$1,104.00
10.00
$1,380.00
8.00
$1,104.00
6.00
$828.00
20.00
$2,760.00
$108.00
0.00
$0.00
12.00
$1,296.00
14.00
$1,512.00
10.00
$1,080.00
12.00
$1,296.00
0.00
$0.00
0.00
$0.00
25.00
$3,477.00
29.00
$3,969.00
23.00
$3,261.00
24.00
$3,474.00
28.00
$4,656.00
$18,837.00
Hourly Rate
Programming 
Hours
Programming Fee
SD Hours
SD Fee
DD Hours
DD Fee
50% CD 
Hours
50% CD Fee
100% CD 
Hours 
100% CD Fee
CA Hours
CA Fee
$225.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
$210.00
14.00
$2,940.00
58.00
$12,180.00
80.00
$16,800.00
72.00
$15,120.00
72.00
$15,120.00
30.00
$6,300.00
$155.00
12.00
$1,860.00
90.00
$13,950.00
140.00
$21,700.00
120.00
$18,600.00
120.00
$18,600.00
158.00
$24,490.00
$110.00
9.00
$990.00
80.00
$8,800.00
160.00
$17,600.00
160.00
$17,600.00
160.00
$17,600.00
0.00
$0.00
$100.00
0.00
$0.00
70.00
$7,000.00
200.00
$20,000.00
180.00
$18,000.00
180.00
$18,000.00
36.00
$3,600.00
$145.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
720.00
$104,400.00
35.00
$5,790.00
298.00
$41,930.00
580.00
$76,100.00
532.00
$69,320.00
532.00
$69,320.00
944.00
$138,790.00
$401,250.00
Hourly Rate
Programming 
Hours
Programming Fee
SD Hours
SD Fee
DD Hours
DD Fee
50% CD 
Hours
50% CD Fee
100% CD 
Hours 
100% CD Fee
CA Hours
CA Fee
$225.00
7.00
$1,575.00
27.00
$6,075.00
36.00
$8,100.00
34.00
$7,650.00
34.00
$7,650.00
24.00
$5,400.00
$210.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
$155.00
9.00
$1,395.00
60.00
$9,300.00
80.00
$12,400.00
80.00
$12,400.00
80.00
$12,400.00
100.00
$15,500.00
$110.00
9.00
$990.00
80.00
$8,800.00
140.00
$15,400.00
120.00
$13,200.00
120.00
$13,200.00
0.00
$0.00
$100.00
0.00
$0.00
64.00
$6,400.00
160.00
$16,000.00
140.00
$14,000.00
140.00
$14,000.00
16.00
$1,600.00
$145.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
360.00
$52,200.00
25.00
$3,960.00
231.00
$30,575.00
416.00
$51,900.00
374.00
$47,250.00
0.00
$47,250.00
500.00
$74,700.00
$255,635.00
Hourly Rate
Programming 
Hours
Programming Fee
SD Hours
SD Fee
DD Hours
DD Fee
50% CD 
Hours
50% CD Fee
100% CD 
Hours 
100% CD Fee
CA Hours
CA Fee
$225.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
$210.00
13.00
$2,730.00
28.00
$5,880.00
36.00
$7,560.00
32.00
$6,720.00
32.00
$6,720.00
10.00
$2,100.00
$155.00
0.00
$0.00
60.00
$9,300.00
60.00
$9,300.00
60.00
$9,300.00
60.00
$9,300.00
0.00
$0.00
$110.00
10.00
$1,100.00
70.00
$7,700.00
140.00
$15,400.00
120.00
$13,200.00
120.00
$13,200.00
0.00
$0.00
$100.00
0.00
$0.00
64.00
$6,400.00
160.00
$16,000.00
140.00
$14,000.00
140.00
$14,000.00
104.00
$10,400.00
$145.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
360.00
$52,200.00
23.00
$3,830.00
222.00
$29,280.00
396.00
$48,260.00
352.00
$43,220.00
352.00
$43,220.00
474.00
$64,700.00
$232,510.00
Hourly Rate
Programming 
Hours
Programming Fee
SD Hours
SD Fee
DD Hours
DD Fee
50% CD 
Hours
50% CD Fee
100% CD 
Hours 
100% CD Fee
CA Hours
CA Fee
$150.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
$140.00
0.00
$0.00
0.00
$0.00
200.00
$28,000.00
212.00
$29,680.00
0.00
$0.00
0.00
$0.00
$125.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
200.00
$28,000.00
212.00
$29,680.00
0.00
$0.00
0.00
$0.00
$57,680.00
Electrical Total Fee
Technology Total Fee
Estimator Total Fee
Phase Totals
Estimator
Principal
Estimator
Designer/Drafter
Electrical Fee Summary                  
Mechanical & Plumbing Fee 
Summary                        
Principal
Project Manager
Structural Fee Summary                 
Principal
Structural Total Fee
Mechanical & Plumbing Total Fee
Principal
Phase Totals
Phase Totals
Technology Fee Summary              
Engineer in Training (EIT)
Designer/Drafter
Construction Inspector/Observer
Project Manager
Project Engineer
Principal
Project Manager
Project Engineer
Phase Totals
Phase Totals
Project Manager
Designer/Drafter
Construction Inspector/Observer
Designer/Drafter
Engineer in Training (EIT)
Project Engineer
Project Engineer
Engineer in Training (EIT)
Designer/Drafter
Construction Inspector/Observer

Dunlap Office Space Tenant Improvements - 240062-DBB
Proposed Fee Schedule
19-Aug-24
Phase
Start Date
End Date
Duration 
(Weeks)
TOTAL Fee
Programming
22-Aug-24
17-Oct-24
8
$121,202
Schematic Design
18-Oct-24
26-Dec-24
10
$320,560
Design Development
27-Dec-24
6-Mar-25
10
$477,215
Construction Documents
7-Mar-25
26-Jun-25
16
$742,387
Construction Administration
tbd
tbd
72
$681,772
Fee Schedule
$2,343,136
$6
Notes:
22.32%
27.68%
26.79%
44.29%
40.00%
8.57%
7.14%
FEB 
2025
MAR 
2025
APR 
2025
MAY 
2025
SEPT 
2024
OCT 
2024
NOV 
2024
DEC 
2024
JAN 
2025
17.54%
52.63%
29.83%
CA to be billed the same amount each month
Totals do not include Allowances
$198,885
$21,259
$63,789
$100,267
$137,392
$153,129
$211,359
$190,886
$206,598
$37,497
Aug '25-
Dec '26
JUN 
2025
JUL
2025
$205,493
$172,308
23.21%
$2,343,136.00
5.50%
20.00%
42.86%
37.14%

Associated Construction Economists 
8730, E Appaloosa Trail Scottsdale, AZ 85258 
Office:  480- 596-1882 
Cell:  602-369-7698 
e-mail:  acebill@cox.net 
 
 
Adrienne Lewis, AIA 
Principal, Public Safety 
Dekker Architecture 
2375 E Camelback Rd # 760  
Phoenix, AZ 85016 
 
 
 
                                       15th August 2024 
adriennel@dpsdesign.org 
 
Re:  Fee Proposal for Professional Cost Estimating Services for Maricopa County 
Office , Parking & Sitework Tenant Improvements;   Dunlap Office Building 2233 
West Dunlap Avenue, Phoenix, Az  
 
Adrienne, 
 
Further to our recent correspondence we are pleased to offer the following revised fee 
proposal for providing two Design stage Independent Cost Estimates as requested. 
 
1. 100% Design Development Estimate                                   $28,000.00 
2. 50% Construction Document Estimate                               $29,680.00 
                  Total Fee:                                                             $57,680.00 
 
This proposal is based upon the scope of works outlined in the email’s received including 
the  DWL Architects Facility report and is based on an  estimated Construction Cost 
Budget of $25.8 million and a CMAR procurement method. 
 
Please contact us if you have any queries or require any further information. 
 
Thank you for inviting us to propose this project.  
 
 
Yours sincerely, 
 
 
 
 
 
William H. Green 
Associated Construction Economists

Maricopa County Facilities Management
Dekker Architecture
Dunlap Office TI, Phoenix, Az
Associated Construction Economists Fee Proposal:
for Dekker Architecture; August 14th 2024
Dunlap Office Building 2233 W. Dunlap Avenue Phoenix Az
100% DESIGN DEVELOPMENT ESTIMATE
Senior Estimator Cost Manager; 
Hours
Unit
Rate
Total; $'s
Arch/Struct
88
              
hrs
140.00
$        
12,320.00
$      
MEP
60
              
hrs
140.00
$        
8,400.00
$        
Siteworks/Utilities
28
              
hrs
140.00
$        
3,920.00
$        
Design Meetings/Reviews/CMAR Reviews/Reconciliation
24
              
hrs
140.00
$        
3,360.00
$        
200
            
-
$                 
28,000.00
$      
Miscellaneous expenses; printing/mileage etc
incl
-
                   
 Total Fee Proposal for 100% DD Estimate
28,000.00
$      
-
                   
-
                   
50% CONSTRUCTION  DOCUMENT ESTIMATE
Senior Estimator Cost Manager; 
Hours
Unit
Rate
Total; $'s
Arch/Struct
90
              
hrs
140.00
$        
12,600.00
$      
MEP
68
              
hrs
140.00
$        
9,520.00
$        
Siteworks/Utilities
30
              
hrs
140.00
$        
4,200.00
$        
Design Meetings/Reviews/CMAR Reviews/Reconciliation
24
              
hrs
140.00
$        
3,360.00
$        
212
            
-
$                 
29,680.00
$      
Miscellaneous expenses; printing/mileage etc
incl
-
                   
 Total  Fee Proposal for 50% CD Estimate
29,680.00
$      
-
                   
-
                   
August 14th 2024
Associated Construction Economists

ASSOCIATED CONSTRUCTION ECONOMISTS LLC; Fee Proposal for Dekker Architecture; Dunlap Office Building, Parking & Sitework Improvements for Maricopa County; Est Construction Budget $25.8 million 
Hourly Rate
Programming 
Hours
Programming Fee
SD Hours
SD Fee
DD Hours
DD Fee
50% CD 
Hours
50% CD Fee
100% CD 
Hours 
100% CD Fee
CA Hours
CA Fee
0.00
$0.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
$140.00
0.00
$0.00
0.00
$0.00
200.00
$28,000.00
212.00
$29,680.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
0.00
$0.00
200.00
$28,000.00
212.00
$29,680.00
0.00
$0.00
0.00
$0.00
$57,680.00
 Total Fee
totals
Estimator
Cosr Estimating/ ACE as breakdown

p 602.957.1155 
3020 East Camelback Road, Suite 201 
dibblecorp.com 
f 602.957.2838 
Phoenix, AZ 85016 
 
August 15, 2024 
 
Adrienne Lewis, AIA, NCARB, LEED AP  
Dekker 
3110 N Central Ave Suite G-140 
Phoenix, AZ 85012  
 
 
RE: 
Maricopa County Dunlap  
 
2233 W Dunlap Ave, Phoenix, AZ 85021  
 
Survey & Civil Engineering Services Proposal-revision 1 
 
 
Adrienne, 
 
Thank you for the opportunity to submit this proposal to provide survey and civil engineering services.  This proposal 
has been prepared based on our understanding of the project as described in the Project Understanding and Scope 
of Services sections.  We look forward to partnering with your team for a successful project. 
 
PROJECT UNDERSTANDING: 
Project summary 
• 
Maricopa County is renovating a 4-story office building previously used as a commercial office building 
• 
Civil site improvements include repairs to specific areas as noted in the property condition report prepared 
by DWL Architects including: 
o 
Pavement patch, surface crack sealing and seal coat, restriping parking stalls 
o 
Sidewalk improvements for ADA accessibility  
o 
Replacement of trench grate 
o 
Flap gate valve repair 
o 
Pavement and curb repairs 
• 
The total property site area is 6.3 acres.  No improvements are anticipated at parking garage 
• 
The existing site is fully developed as a medical office building with full parking, utility and drainage 
improvements 
• 
A fully developed site to the south includes a building with parking lot access interconnecting the properties 
• 
Dibble will perform aerial topographic survey with a drone for the initial design base file. Dibble will also do 
onsite field review of sidewalk improvements and civil improvements and identify areas where further 
ground topographic survey will be needed for detailed ADA design 
 
Grading & Drainage 
• 
Per the property condition report, the site appears to be short of the required retention volume per City of 
Phoenix and Maricopa County requirements.  The report references a waiver reducing the retention 
requirement. The improvements will not impact drainage patterns or volumes provided. Therefore, it’s not 
anticipated that additional retention will be required.  
• 
Off-site flows are not expected 
 
Existing/proposed utilities: 
• 
Fire service is already provided to the building and further improvements are not anticipated or included 
• 
Domestic water service is already provided to the building and further improvements are not anticipated or 
included.   
• 
Sewer service is already provided to the building and further improvements are not anticipated or included.  
The repairs to the sewer line that are noted in the property condition report are assumed to have been 
completed or will not be required as part of this project per direction from the owner. 
• 
Utility relocations are not expected 
• 
Off-site utility improvements are not expected

2
Adjacent roadway infrastructure: 
• 
Adjacent roadways are fully developed and no improvements are anticipated 
• 
Parking lot improvement include crack sealing, seal coat and restriping 
 
Parcel summary 
• 
Replat/Lot Combo/Easements new or abandonment are not expected 
 
CONDITIONS: 
• 
Submittals will be made via pdf documents and printing if required will be done by others or reimbursed at 
cost to Dibble  
• 
Submittal and review fees will be paid by Owner/Architect at the time of submittal 
• 
Meetings and construction phase site observations are as noted in each section.  Should the required meeting 
attendance exceed the expected number of meetings additional compensation will be requested. 
 
DESIGN STANDARDS/PERMITTING AGENCY 
Design will conform to the following Authorities Having Jurisdiction (AHJ). 
• 
City of Phoenix 
• 
Maricopa County  
Design will be reviewed and permitted by the following AHJ(s) 
• 
Maricopa County  
 
SCHEDULE: 
• 
Dibble is prepared to begin immediately and will coordinate with the Owner/Architect to establish a project 
schedule. 
 
SCOPE OF SERVICES: 
1.0 
Programming 
1.1 
Topographic Survey 
Project Control 
Dibble will perform Project Control Survey services including: 
• 
Dibble will confirm the project control for the site 
• 
Basis of Elevation: Elevations shall be tied to the City of Phoenix datum 
• 
Basis of Coordinates: Coordinates (Northing and Easting) shall be based upon the City of 
Phoenix datum 
 
Topographic Survey & Basemap Preparation 
Dibble will perform Topographic Survey & Basemap services including: 
• 
Prepare design ready AutoCAD base file including existing utilities and existing site 
features based on available utility as-built and quarter section drawings as well as aerial 
drone survey.   
• 
Limits of survey are per the attached exhibit. 
• 
One (1) day of additional topographic survey is included once critical areas are identified 
during design 
 
2.0 
Schematic Design Phase 
2.1 
Schematic Design Documents 
 
Dibble will prepare Schematic Design documents including: 
• 
Develop on-site plans including site demolition plan, civil site & grading plan, and utility 
plan 
• 
Develop design of horizontal control of the site elements of the project including hardscape 
and parking lot improvements 
• 
Coordination with Owner, Contractor, Architect, & Landscape Architect 
2.2 
Meetings & Coordination 
• 
3 ea. - 1 hour meetings

3
3.0 
Design Development Phase 
3.1 
Design Development Documents 
 
Dibble will prepare Design Development documents including: 
• 
Refine on-site plans including site demolition plan, civil site & grading plan, and utility plan, 
and details 
• 
Refine design of horizontal control and vertical design & control of the site elements of the 
project including hardscape and parking lot improvements 
• 
Coordinate dry utilities by acquiring design plans from design team and illustrating dry 
utility alignment on civil plans, for reference only 
• 
Coordination with Owner, Contractor, Architect, & Landscape Architect 
3.2 
Meetings & Coordination 
• 
3 ea. - 1 hour meetings 
 
4.0 
50% Construction Document Phase 
4.1 
50% Construction Documents 
Dibble will prepare Construction Documents including: 
• 
Finalize on-site plans including site demolition plan, civil site & grading plan, and utility 
plan, and details 
• 
Finalize design of horizontal control and vertical design & control of the site elements of the 
project including hardscape and parking lot improvements 
• 
Prepare drainage statement for the site for inclusion on the civil cover sheet 
• 
Coordination with Owner, Contractor, Architect, & Landscape Architect 
4.2 
Meetings & Coordination 
• 
3 ea. - 1 hour meetings 
 
5.0 
100% Construction Document Phase 
5.1 
100% Construction Documents 
Dibble will prepare Construction Documents including: 
• 
Update on-site plans including site demolition plan, civil site & grading plan, and utility 
plan, and details 
• 
Update design of horizontal control and vertical design & control of the site elements of the 
project including hardscape and parking lot improvements 
• 
Finalize drainage statement for the site for inclusion on the civil cover sheet 
• 
Coordination with Owner, Contractor, Architect, & Landscape Architect 
5.2 
Permitting 
Dibble will perform Bidding/Permitting services including: 
• 
Coordinate AHJ provided civil review comments and meet with AHJ staff to resolve civil 
comments 
• 
Respond/address AHJ civil comments 
• 
Prepare civil permit resubmittal 
• 
Assist Owner/ Contractor in acquiring civil construction permits 
• 
Respond to bidding Contractor/Sub-Contractor civil related questions  
5.3 
Meetings & Coordination 
• 
3 ea. - 1 hour meetings 
 
6.0 
Construction Phase Services 
Dibble will perform Construction Phase Services including: 
6.1 
Limited Construction Administration 
• 
Respond to Contractor requests for information (RFI’s) 
• 
Review civil related Contractor submittals 
6.2 
Record Drawings 
• 
Prepare civil related Record Drawings based on Contractor mark-ups 
6.3 
Meetings/Site Visits 
• 
3 ea. - 2 hour meetings/site visits including punch walk 
 
ALLOWANCE/SUB-CONSULTANTS 
7.0 
Fire Flow Test (allowance)

4
• 
Fire flow test for building fire flow calculations 
 
EXCLUSIONS: 
Unless noted otherwise within the Scope of Services the following services are excluded from this proposal 
• 
Cost of permits or fees 
• 
Survey Services including: Replat/Lot Combinations, ALTA survey, legal descriptions & exhibits 
• 
Traffic study/Traffic impact analysis/Signal design 
• 
Roadway signing & striping design 
• 
Sub-surface exploration (utility pot-holing) 
• 
Environmental investigations 
• 
Geotechnical investigation 
• 
Pavement section design & percolation tests (To be provided by Geotechnical Engineer) 
• 
Design of off-site/public street, sidewalk, water, or sewer improvements 
• 
Off-site flow analysis, floodplain analysis/modification/permitting, 404 permitting, off-site 
hydrology/hydraulics study 
• 
Electrical design, mechanical design, natural gas design, landscaping, and irrigation design 
• 
Site structural design including walls  
• 
Street light plan/street light design 
• 
Construction staking/Construction inspection 
• 
As-built survey / Record document preparation 
• 
Certification of finish floor elevation 
• 
NOI (Notice of Intent) application by Contractor 
 
FEES: 
1.0 
Pre-Design/Program Verification  
$ 
9,542 
2.0 
Schematic Design Phase 
$ 
7,218 
3.0 
Design Development Phase 
$ 
5,866 
4.0 
50% Construction Document Phase 
$ 
6,286 
5.0 
100% Construction Document Phase 
$ 
6,426 
 
6.0 
Construction Phase Services 
$ 
5,096 
 
Subtotal  
$ 40,434 
 
ALLOWANCE/SUB-CONSULTANTS 
7.0 
Fire Flow Test 
$ 
700 
 
Subtotal  
$ 
700 
 
Project Total  
$ 41,134 
 
STANDARD BILLING RATES (January 1, 2024) 
Project Manager 
210.00 
QA/QC Manager 
210.00 
Project Engineer (PE) 
172.00 
Assistant Project Engineer (EIT) 
140.00 
Senior Designer 
150.00 
Land Surveyor (RLS) 
192.00 
Survey Technician 
107.00 
Survey Crew  
200.00 
Project Coordinator 
128.00

5
ADDITIONAL SERVICES: 
If the Consultant/Engineer is required to perform services in addition to those outlined in the Scope of Services, by 
reason of substantial changes ordered by the Owner or Architect or for any reason beyond the 
Consultant’s/Engineer’s control, they are to receive compensation for such services.  Compensation for additional 
services not included in the Scope of Services for the basic services shall be based on time expended.  Additional 
services must be approved by the Owner prior to the start of such work. 
 
Invoices will be submitted monthly based on the percentage of the survey and civil engineering services that are 
complete.  These invoices will be due and payable upon receipt and will be considered past due if not paid within 
seven days after Client’s receipt of payment from the Owner. 
 
If you have any questions, please feel free to call us at (602) 957-1155.  
 
 
Sincerely, 
 
 
 
 
 
 
 
 
 
Jeffrey L. McBride, PE 
 
 
 
 
Adrian Carvajal, PE 
Vice President, Land Development  
 
 
Senior Project Manager, Land Development 
Dibble  
 
 
 
 
 
Dibble

6
Site Exhibit/Limits of Survey

Hourly Rate
Programming 
Hours
Programming 
Fee
SD Hours
SD Fee
DD Hours
DD Fee
50% CD 
Hours
50% CD Fee
100% CD 
Hours 
100% CD Fee
CA Hours
CA Fee
$210.00
$0.00
8.00
$1,680.00
4.00
$840.00
6.00
$1,260.00
8.00
$1,680.00
4.00
$840.00
$172.00
$0.00
4.00
$688.00
8.00
$1,376.00
8.00
$1,376.00
8.00
$1,376.00
8.00
$1,376.00
$140.00
$0.00
10.00
$1,400.00
10.00
$1,400.00
10.00
$1,400.00
8.00
$1,120.00
12.00
$1,680.00
$150.00
$0.00
23.00
$3,450.00
15.00
$2,250.00
15.00
$2,250.00
15.00
$2,250.00
8.00
$1,200.00
$192.00
12.00
$2,304.00
$0.00
$0.00
$0.00
$0.00
$0.00
$107.00
34.00
$3,638.00
$0.00
$0.00
$0.00
$0.00
$0.00
$200.00
18.00
$3,600.00
$0.00
$0.00
$0.00
$0.00
0.00
$0.00
64.00
$9,542.00
45.00
$7,218.00
37.00
$5,866.00
39.00
$6,286.00
39.00
$6,426.00
32.00
$5,096.00
$40,434.00
Civil Total Fee
Civil Fee Summary                        
Phase Totals
Survey Crew
Project Manager
Project Engineer (PE)
Designer
Land Surveyor
Survey Tech
Assistant Engineer (EIT)

AGREEMENT FOR PROFESSIONAL SERVICES 
 
CLIENT: 
Ms. Adrienne Lewis, AIA, NCARB, LEED AP 
DATE:  
August 8, 2024 
 
Davidson Communities 
PROPOSAL NO:  P24080 
 
3110 N Central Ave, Suite G-140 
PROJECT NO:  TBD 
 
Phoenix, AZ 85012 
 
 
 
                     
PROJECT: 
Dunlap Office Building Tenant Improvement 
 
2233 W Dunlap Avenue, Phoenix, AZ 85021 
 
SCOPE OF SERVICES:  
Structural engineering design and drafting, sealed calculations, and construction 
documents, construction contract administration (review submittals, contractor clarifications (RFI’s), special 
structural inspections) for the Dunlap Office TI in Phoenix, AZ.  The following items are included in the scope 
of services: 
 
Project Notes: 
o Client has requested structural engineering and special structural inspections for the Dunlap 
Office TI. 
o Design services to include repair based on Dunlap Condition Assessment Report dated 
01/2024. 
o Fee Proposal will include line item breakdown for design of repair structural components in 
building, support for site items detailing, and miscellaneous TI support design. 
o Design exports design evaluation of building lateral systems. 
 
Initial site investigation: 
o Perform site visit to review extent of components requiring repair. 
 
Provide structural design: 
o Verify and detail exterior wall bracing. 
o Verify and design replacement grating. 
o Verify and design roof deck replacement 
o Provide coordination and design for miscellaneous site elements requiring reinforcement. 
o Miscellaneous design for support of TI items. 
 
To account for miscellaneous bracing, support from existing structure, or minor 
modification to the existing structure. 
 
Assemble construction documents: 
o Formalize and seal structural calculations. 
o Draft, assemble, and seal structural drawings. 
o Mark-up/provide project specifications. 
 
Coordination/Discussion/Meetings: 
o To discuss, coordinate, or review design requirements/intent/direction/existing site 
conditions. 
 
Technical Review: 
o Internal review of submittal documents.

Dunlap Office Building Tenant Improvement – P24080 
Ms. Adrienne Lewis, AIA, NCARB, LEED AP 
August 9, 2024 
Page 2 of 5 
 
Construction Administration 
o Review of shop drawings and submittals to address contractor questions on interpretation 
(not to exceed 2 reviews per submittal section) 
o Review and respond to contractor clarifications (RFI’s) regarding interpretation of drawings 
or unforeseen field condition (not intended for redesign due to construction errors or other 
similar changes in design) 
o Special Structural Inspection, estimated 8 site visits, line items to provide allowance for 
special structural inspections, reports, and certificate. 
 
SPECIAL CONDITIONS:  None. 
 
SERVICES FEE: 
 
 
Design and Construction Documents 
 
     Initial Site Walk 
$1,557.00 
     Structural Design and Drawings 
 
          Wall Bracing 
$2,799.00 
          Grating Replacement 
$3,075.00 
          Roof Deck 
$1,182.00 
          Site Elements 
$1,386.00 
          Miscellaneous TI Support 
$4,182.00 
Design and Construction Documents Sub-Total 
$14,181.00 
 
 
Construction Administration 
 
     Contractor Clarification (RFI’s) 
$2,472.00 
     Shop Drawings/Submittal Review 
$2,184.00 
     Special Structural Inspection Allowance 
$6,000.00 
Construction Administration Sub-Total 
$10,656.00 
 
 
Overall Total Fee 
$24,837.00 
 
EXPENSES:  
Anticipated minor expenses for messengers, in-house printing and plotting, and 
local travel are included in our lump sum fee.  Major expenses such as milestone printing for end of phase 
permit submittals or bid sets, while not anticipated, would be billed at our cost with markup (x1.20) if 
required.

Dunlap Office Building Tenant Improvement – P24080 
Ms. Adrienne Lewis, AIA, NCARB, LEED AP 
August 9, 2024 
Page 3 of 5 
We are available to start the work upon execution of this agreement by signing below and returning via email 
to Eric.Domingo@AdvancedStructuralEng.com. 
 
We are looking forward to working with you on this project.  If there are any questions or need for further 
information, please feel free to contact me or Mr. Brian Raji, PE, SE, Managing Principal. 
 
By:   Advanced Structural Engineering 
Agreed to by:   CLIENT 
 
  
Signed:   
 
Signed:   
 
 
 
By:   
Eric Domingo 
 
By:   
 
 
 
Principal 
Print Name/Title/Date 
 
This agreement includes the Terms and Conditions in Exhibit A. 
 
Attachments: 
Exhibit A:  Terms and Conditions on the next page 
 
 
Exhibit B:  Hourly Rate Schedule 
 
cc: 
Brian B. Raji, PE, SE, Managing Principal, ASE 
 
Michael S. Puhlmann, PE, SE, Principal, ASE 
 
Karen Ratliff, Principal, Marketing, ASE

Dunlap Office Building Tenant Improvement – P24080 
Ms. Adrienne Lewis, AIA, NCARB, LEED AP 
August 9, 2024 
Page 4 of 5 
EXHIBIT A 
TERMS AND CONDITIONS 
 
Advanced Structural Engineering (ASE) shall perform the services outlined in this agreement pursuant to the stated fee 
arrangement. 
1. 
Additional Services 
Should the Scope of Services change from those set forth in the Agreement for Professional 
Services, the fee for such additional services will be negotiated between CLIENT and ASE. 
2. 
Limitation of Liability 
To the greatest extent allowed by law, the aggregate liability of ASE for any and all injuries, claims, 
demands, losses, expenses or damages, of whatever kind, arising out of or in any way related to this Agreement or the 
services provided by ASE on this project, shall be limited to $50,000 or the total fee received by ASE pursuant to this 
Agreement, whichever is greater.  Further, no officer, director, shareholder or employee of ASE shall bear any personal 
liability to CLIENT for any and all injuries, claims, demands, losses, expenses or damages, of whatever kind or character, 
arising out of or in any way related to this Agreement or the services provided by ASE on this project. 
3. 
Mediation 
All disputes between CLIENT and ASE arising out of or relating to this Agreement shall be submitted to 
nonbinding mediation prior to commencement of any other judicial proceeding. 
4. 
Dispute Handling 
ASE shall make no claim against CLIENT without first providing CLIENT with a written notice of 
damages and providing CLIENT thirty (30) days to cure before an action is commenced.  CLIENT shall make no claim either 
directly or in a third party claim, against ASE unless CLIENT has first provided ASE with a written certification executed by an 
independent professional currently practicing in the same discipline as ASE and licensed in the state of the subject project.  
This certification shall a) contain the name and license number of the certifier; b) specify each and every act or omission 
that the certifier contends is a violation of the standard of care expected of a professional performing professional services 
under similar circumstances; and c) state in complete detail the basis for the certifier's opinion that each such act or omission 
constitutes such a violation.  This certificate shall be provided to ASE not less than thirty (30) calendar days prior to the 
presentation of any claim or the institution of any judicial proceeding. 
5. 
Suspension of Services If CLIENT fails to make payments to ASE in accordance with this Agreement, such failure shall 
provide ASE the option to suspend performance of services under this Agreement upon seven (7) days written notice to 
CLIENT.  In the event of a suspension of services, ASE shall have no liability for any delays or damages caused because of 
such suspension.  Before resuming services, ASE shall be paid all sums due prior to suspension and any expenses incurred 
by ASE in the interruption and resumption of its services.  ASE’s fees for the remaining services and time schedules shall be 
equitably adjusted.  If any invoice is in dispute, CLIENT shall pay under written protest to keep the project on schedule and 
resolve the payment dispute after substantial completion. 
6. 
Termination This Agreement may be terminated by either party with seven (7) days written notice to the other in the 
event of a substantial failure of performance by the other party through no fault of the terminating party.  If this Agreement 
is terminated, ASE shall be paid for services performed to the termination notice date, including reimbursable expenses due. 
7. 
Ownership of Documents 
The drawings, calculations and specifications are instruments of service and are, and shall 
remain, the property of ASE, whether the project for which they are made is executed or not.  They are not to be used on 
other projects or extensions to this project except by agreement in writing. 
8. 
Contract Administration 
It is understood that ASE will not provide design and construction review services relating 
to safety measures of any contractor or subcontractor on the project.  Further, it is understood that ASE will not provide any 
supervisory services relating to the construction for the project.  Any opinions solicited from ASE relating to any such review 
or supervisory services shall be considered only as general information and shall not be the basis for any claim against ASE. 
9. 
No Third Party Beneficiary 
Nothing in this Agreement shall create a contractual relationship with or a cause of action 
in favor of any third party against ASE or CLIENT. 
10. No Assignments 
Neither party to this Agreement shall transfer, sublet or assign any rights under or interest in this 
Agreement (including but not limited to monies that are due or monies that may be due) without the prior written consent 
of the other party. 
11. Payments 
ASE will submit monthly invoices.  Payment is due on the date of the invoice and becomes delinquent one 
month thereafter.  A late charge will be added to delinquent amounts at the rate of one-and-one-half percent (1 ½ %) for 
each one month of delinquency (or the maximum allowable by law, whichever is lower).  If ASE initiates suit to recover 
delinquent sums owed by CLIENT, ASE shall be entitled to recover all reasonable costs incurred, including staff time, court 
costs, attorney’s fees, expert fees and other related costs and expenses. 
12. Composite Systems/Carbon Fiber Structural Reinforcement 
ASE is in collaboration with Pipe Reconstruction Inc (PRI) 
and Composite Wrap (CW) to provide turn-key service for the material procurement, design, installation, and inspection of 
advanced composite/carbon fiber reinforcement systems.  Design provided shall be based on our turn-key operation, 3rd 
party substitutions bear all responsibility in opposing design and verification of equality.

Dunlap Office Building Tenant Improvement – P24080 
Ms. Adrienne Lewis, AIA, NCARB, LEED AP 
August 9, 2024 
Page 5 of 5 
EXHIBIT B 
 
2024 HOURLY RATE SCHEDULE  
 
STRUCTURAL ENGINEERING SERVICES 
 
Senior Principal 
$312.00 
Principal 
$273.00 
Project Manager 
$201.00 
Sr. Project Engineer 
$186.00 
Project Engineer/Sr. Inspector 
$152.00 
Engineer/Inspector 
$138.00 
CADD Technician/Drafter 
$108.00 
Clerical 
$88.00 
 
Note:  Hourly rates for employees are subject to annual adjustments.  Services will be billed at the 
employee’s hourly rate in place at the time the service is provided. 
 
IRS Mileage Rate Allowance as of 1/1/24: $0.67/mile 
 
Markup on expenses (mileage, travel, subsistence, reprographics, courier, express mail): 20%

Hourly Rate
Programming 
Hours
Programming Fee
SD Hours
SD Fee
DD Hours
DD Fee
50% CD 
Hours
50% CD Fee
100% CD 
Hours 
100% CD Fee
CA Hours
CA Fee
$273.00
0.00
$0.00
1.00
$273.00
1.00
$273.00
1.00
$273.00
2.00
$546.00
4.00
$1,092.00
$201.00
0.00
$0.00
4.00
$804.00
4.00
$804.00
4.00
$804.00
4.00
$804.00
4.00
$804.00
$138.00
0.00
$0.00
8.00
$1,104.00
10.00
$1,380.00
8.00
$1,104.00
6.00
$828.00
20.00
$2,760.00
$108.00
0.00
$0.00
12.00
$1,296.00
14.00
$1,512.00
10.00
$1,080.00
12.00
$1,296.00
0.00
$0.00
0.00
$0.00
25.00
$3,477.00
29.00
$3,969.00
23.00
$3,261.00
24.00
$3,474.00
28.00
$4,656.00
$18,837.00
Phase Totals
Structural Total Fee
Project Engineer
Structural Fee Summary                 
Principal
Project Manager
Designer/Drafter

8/15/2024 
 
Client:  
 
Ms. Adrienne Lewis, AIA, NCARB, LEED AP 
Principal / Architect 
Dekker 
3110 North Central Ave, Suite G140 
Phoenix, AZ 85012 
602-842-5600 
adriennel@dpsdesign.org 
 
Project:  
 
Maricopa County Dunlap Office Space Tennant Improvement 
2233 W. Dunlap Ave 
Phoenix, AZ 85021 
  
 
 
 
 
 
SUBJECT: Maricopa County Dunlap Office Space Tennant Improvement – REV 1 
B&P Prop No. – 24P-069 
 
Dear Adrienne: 
 
Thank you for the opportunity to submit this proposal to provide consulting engineering services 
for the referenced project. This proposal includes the Project Description, as we understand it, 
B&P’s proposed Scope of Services, Compensation, and our Terms & Conditions. 
 
Project Description 
 
Maricopa County will undergo an office tenant improvement for the 92,000 s.f.  office building located 
at 2233 W Dunlap Ave.  The anticipated construction budget is $25.8 Million.  The building is 4 levels  
mainly shell space with lobby and hallway improvements.   The general scope is to provide offices for 
Public Heath and Human Services.  Clinical spaces is being reviewed but not anticipated at this time. 
The adjacent parking garage located to the East of the building will also be part of the project.    
 
Information to be Provided by Client 
 
• 
Client shall provide the following information to B&P: 
o Criteria, constraints and definitions applicable to this project 
o Electronic REVIT files. 
o Design and construction standards. 
 
Included Services 
 
B&P proposes to provide consulting engineering services for the above referenced project.  Our 
services will include: 
 
1839 S. Alma School Rd, Suite 300 
Mesa, AZ  85210 
main 602.996.6399  www.bpce.com

8/15/2024 
Page 2 
 
 
 
• 
Pre-design site investigation. 
• 
Attend design team coordination meetings. 
• 
Attend County review meetings.  Each discipline will be represented. 
• 
Provide recommendations regarding existing HVAC equipment and Electrical Distribution 
Equipment 
• 
Engineering for Mechanical, Electrical, Plumbing, Technology and Fire Protection 
(performance based) systems within the building and to 5 ft outside the building footprint. 
• 
Production of signed and stamped Construction Documents including drawings and 
specifications for bidding and permitting purposes. 
• 
Construction Administration Services:  Review shop drawing submittals, Respond to RFI’s, 
Weekly site visits (total of 72 site visits based on 18 month construction schedule). 
Mechanical: 
1. Review of existing Record drawings. 
2. Proposal assumes reusing existing Mechanical Yard equipment (closed circuit cooling tower, 
building pumps and heating HW boiler. 
3. Evaluate and access all existing building interior ceiling-mounted, water-source heat pump units to 
determine if they can be re-used or if all new will be required. Some additional water-source heat 
pump fan coils will be required. 
4. Provide new supply & return ductwork, grilles and diffusers. 
5. Prepare heat load calculations for all new proposed interior spaces to determine equipment sizes. 
6. Provide new EMS building management system controls. 
 
Plumbing: 
1. Review of existing Record drawings. 
2. Confirm existing domestic water service is adequately sized for the T.I. 
3. Confirm existing waste water piping is adequately sized for the T.I. 
4. We anticipate keeping the existing building core restrooms.   
5. Coordinate existing and possible new fixtures in restrooms, break rooms, etc.  
6. Design for condensate piping and all piping to indoor heat pump units. 
 
Electrical: 
1. Review of existing Record drawings. 
2. Identify location of all existing distribution and panel boards.  The service entrance section and 
downstream panelboards are old.  We anticipate replacing the existing equipment. 
3. Provide new LED lighting and lighting controls throughout. 
4. Provide point by point lighting calculations. 
5. Replace existing parking lot lighting with LED luminaires. 
6. Provide new receptacle layouts, power for HVAC and plumbing equipment. 
7. Provide branch circuits for owner provided equipment. 
8. Provide design for new Fire Alarm system and device layouts. 
9. Provide AIC and voltage drop calculations. 
10. Coordinate with Salt River Project Electric (SRP) Utility 
11. Review any possible SRP rebates. 
 
Technology: 
1. Review of existing Record drawings. 
2. All designs will comply with Maricopa County OET standards. 
3. Provide design layouts for pathway and building Equipment Rooms (ER), Entrance Facilities (EF) 
and Telecom Rooms (TR). 
4. Design for Building Information and communication technology (ICT) cabling. 
5. Design for building security access control and security cameras. 
6. Design for Audio/Visual systems for general building way finding and conference/meeting room TV

8/15/2024 
Page 3 
 
 
 
monitors, speakers, microphones. 
7. Access control and security camera design for the parking garage. 
 
 
Excluded Services 
 
B&P proposes to provide consulting engineering services for the above referenced project.  Our 
services DO NOT include: 
 
• 
On-site civil utility design beyond 5'-0" from the building, including domestic water, fire main, 
sanitary sewer, storm sewer, natural gas and all associated meters, backflow preventers, 
vaults, structures and enclosures (to be provided by Civil Engineer to extent as may be 
necessary 
• 
Design of off-site utility system improvements or expansion including connections to utilities 
beyond the property line and/or within the public right-of-way (to be provided by Civil 
Engineer to the extent as may be necessary). 
• 
Special on-site observation/inspection which may be required by the City of Phoenix, 
County or State Building Department/Officials. 
• 
Energy analysis and/or life cycle cost studies or system alternatives. 
• 
LEED participation and documentation for typical MEP credits. 
• 
Preparation of any additional work typically included as "Additional Services" in the standard AIA 
Agreement between Architect and Consultants. This includes life cycle cost analyses. 
• 
Extensive revisions to our work due to changes outside B&P’s control, including redesign of 
systems after approval by the Owner or Owner’s Representative. 
 
Compensation 
We propose to provide these services for a lump sum fee as indicated in the attached task 
breakout.  We will invoice monthly during design and construction.  If you request additional 
services, we could provide them either on a lump sum fee basis or hourly per our attached 
hourly rate schedule 
 
We anticipate the following milestones:  Programming, Schematic Design, Design 
Development, 50% Construction Documents, 100% Construction Documents. 
 
Terms & Conditions 
 
This proposal is based on our understanding of the project and the Owner’s expectations. 
Please forward us a copy of your prime agreement when it becomes available. We reserve 
the right to modify this proposal if your prime agreement differs significantly from our 
expectations. 
 
By signing this proposal document, client agrees to all attached Terms and Conditions and all 
included sheets prior to this signature sheet.  
 
This proposal is considered valid for 90 days from date above. 
 
Thank you for the opportunity to submit this proposal. We look forward to working with you on 
this project. Please call me if you would like to discuss any aspects of it.

8/15/2024 
Page 4 
 
 
 
 
 
 
 
Sincerely, 
 
BRIDGERS & PAXTON 
CONSULTING ENGINEERS, INC. 
 
 
 
John Montaño, P.E. 
Principal 
 
 
cc: 
B&P Accounting 
 
File 
 
ACCEPTED BY:   
 
 
 
 
 
DATE:  
 
             
 
Accounting:  
Date:     
 
 
 
 
M:\PHX\PROPOSAL\2024\24P-069 MARICOPA COUNTY DUNLAP OFFICE SPACE TENANT IMPROVEMENTS (AWARDED)\FEE PROPOSAL\BP FEE MCF DUNLAP OFFICE SPACE 
TENNANT IMPROVEMENTS.DOCX

8/15/2024 
Page 5 
 
 
 
PROFESSIONAL FEE SCHEDULE OF HOURLY RATES 
MECHANICAL/ELECTRICAL/PLUMBING/TECHNOLOGY/CONTROLS 
 
November 15, 2023 – November 14, 2024 
 
PRINCIPAL 
$225.00 
 
PROJECT MANAGER 
$210.00 
 
SENIOR ENGINEER 
$185.00 
 
PROJECT ENGINEER 
$155.00 
 
ENGINEER 
$130.00 
 
ENGINEER INTERN 
$105.00 
 
SENIOR DESIGNER 
$165.00 
 
PROJECT DESIGNER 
$120.00 
 
DESIGNER 
$100.00 
 
BIM SERVICES 
$120.00 
 
CADD TECH 
$  90.00 
 
ESTIMATING/CONSTRUCTION SERVICES 
$145.00

BRIDGERS & PAXTON CONSULTING ENGINEERS
Mechanical & Plumbing  Fee Summary - Bridgers & Paxton
programming hours
programming fee
SD Hours
SD Fee
DD Hours
DD Fee
50% CD Hours
50% CD Fee
100% CD Hours
100% CD Fee
CA Hours
CA Fee
Hourly Rate
(in contract)
(in contract)
(in contract)
(in contract)
Principal
$225.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0
Project Manager
$210.00
14.00
$2,940.00
58.00
$12,180.00
80.00
$16,800.00
72.00
$15,120.00
72.00
$15,120.00
30.00
$6,300
Project Engineer
$155.00
12.00
$1,860.00
90.00
$13,950.00
140.00
$21,700.00
120.00
$18,600.00
120.00
$18,600.00
158.00
$24,490
Engineer in Training (EIT)
$110.00
9.00
$990.00
80.00
$8,800.00
160.00
$17,600.00
160.00
$17,600.00
160.00
$17,600.00
$0
Designer / Drafter
$100.00
$0.00
70.00
$7,000.00
200.00
$20,000.00
180.00
$18,000.00
180.00
$18,000.00
36.00
$3,600
Construction Inspector/Observer
$145.00
$0.00
$0.00
$0.00
$0.00
$0.00
720.00
$104,400
Phase Totals
35.00
$5,790.00
298.00
$41,930.00
580.00
$76,100.00
532.00
$69,320.00
532.00
$69,320.00
944.00
$138,790.00
Mechanical  Fee Total
$401,250
Electrical  Fee Summary - Bridgers & Paxton
programming hours
programming fee
SD Hours
SD Fee
DD Hours
DD Fee
50% CD Hours
50% CD Fee
100% CD Hours
100% CD Fee
CA Hours
CA Fee
Hourly Rate
(in contract)
(in contract)
(in contract)
(in contract)
Principal
$225.00
7.00
$1,575.00
27.00
$6,075.00
36.00
$8,100.00
34.00
$7,650.00
34.00
$7,650.00
24.00
$5,400.00
Project Manager
$210.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
Project Engineer
$155.00
9.00
$1,395.00
60.00
$9,300.00
80.00
$12,400.00
80.00
$12,400.00
80.00
$12,400.00
100.00
$15,500.00
Engineer in Training (EIT)
$110.00
9.00
$990.00
80.00
$8,800.00
140.00
$15,400.00
120.00
$13,200.00
120.00
$13,200.00
$0.00
Designer / Drafter
$100.00
$0.00
64.00
$6,400.00
160.00
$16,000.00
140.00
$14,000.00
140.00
$14,000.00
16.00
$1,600.00
Construction Inspector/Observer
$145.00
$0.00
$0.00
$0.00
$0.00
$0.00
360.00
$52,200.00
Phase Totals
25.00
$3,960.00
231.00
$30,575.00
416.00
$51,900.00
374.00
$47,250.00
374.00
$47,250.00
500.00
$74,700.00
Electrical  Fee Total
$255,635
Technology Fee Summary - Bridgers & Paxton 
programming hours
programming fee
SD Hours
SD Fee
DD Hours
DD Fee
50% CD Hours
50% CD Fee
100% CD Hours
100% CD Fee
CA Hours
CA Fee
Hourly Rate
(in contract)
(in contract)
(in contract)
(in contract)
Principal
$225.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
Project Manager
$210.00
13.00
$2,730.00
28.00
$5,880.00
36.00
$7,560.00
32.00
$6,720.00
32.00
$6,720.00
10.00
$2,100.00
Project Engineer
$155.00
$0.00
60.00
$9,300.00
60.00
$9,300.00
60.00
$9,300.00
60.00
$9,300.00
$0.00
Engineer in Training (EIT)
$110.00
10.00
$1,100.00
70.00
$7,700.00
140.00
$15,400.00
120.00
$13,200.00
120.00
$13,200.00
$0.00
Designer / Drafter
$100.00
$0.00
64.00
$6,400.00
160.00
$16,000.00
140.00
$14,000.00
140.00
$14,000.00
104.00
$10,400.00
Construction Inspector/Observer
$145.00
$0.00
$0.00
$0.00
$0.00
$0.00
360.00
$52,200.00
Phase Totals
23.00
$3,830.00
222.00
$29,280.00
396.00
$48,260.00
352.00
$43,220.00
352.00
$43,220.00
474.00
$64,700.00
Technology  Fee Total
$232,510
BRIDGERS & PAXTON TOTAL FEE:
$889,395

Dunlap Office Space Tenant Improvements 
Page | 42 
CMR Professional Services Contract 
Serial # 240062-ROQ 
 
EXHIBIT ‘C’:  Record Drawing Procedures  
 
Introduction 
 
These guidelines are issued to promote the development of electronic drawings suitable for use in the 
Maricopa County Facilities Management Department CAD environment. Consistency and compatibility with 
existing Maricopa County documents can only be achieved when these standards are strictly adhered to. 
Electronic drawings produced and submitted in accordance with these standards have significantly greater 
value to Maricopa County. Design Professionals (DP), their Sub-consultants, CMR's delivering 
documentation to Maricopa County must ensure these standards are reviewed, understood and followed 
by those people responsible for preparing electronic drawings. 
 
Renovations and Space Change Projects Requirements 
 
For typical Renovation and Space Planning projects, the DP is responsible for submitting a complete set of 
Construction Documents (CDs) to Maricopa County prior to the beginning of construction. Upon completion 
of construction, CMRs are responsible for submitting complete As-Built documentation (per definitions 
included in the Agreement Between The County of Maricopa, Arizona and Design Professional) to the 
Owner (in both electronic and hardcopy formats) and DP is responsible for submitting the Record Drawings 
to the Owner based on this As-Built documentation. Construction Documents and Record Drawings 
submitted to the Owner need to adhere the criteria outlined in this document. 
 
All “DWG” files and AutoCAD drawing entities submitted at the end of a project must be able to be 
manipulated using standard AutoCAD drafting procedures. Non-compliance with this policy may result in 
the rejection of AutoCAD files submitted at project closeout, in addition to delayed rendering of final project 
payment. “DXF” files will not be accepted at project closeout as a substitution for “DWG” AutoCAD file 
deliverables.  Projects using Building Information Modeling (BIM) software are still required to 
submit “DWG” formats for their projects. 
 
Electronic File Format 
 
CAD drawings must be submitted in full compliance with AutoCAD software 2007 drawing file format (file 
extension = .DWG).  
 
All Construction and Record Document project drawings must be submitted to Maricopa County Facilities 
Management Department in all file formats listed below; other formats are not acceptable without the prior 
consent of Maricopa County Facilities Management Department. 
 
• 
AutoCAD® 2007 or higher – DWG format only.  
• 
Adobe® PDF version 6.0 or higher.  
 
Scale, Units, Coordinate System and Orientation 
 
AutoCAD drawings should be drafted at full scale in architectural or engineering units, such that one 
drawing unit equals one inch. The User Coordinate System (UCS) for all AutoCAD drawings should be set 
to “World”.  
 
Tolerances 
 
When projects require creation of new AutoCAD floor plans from field measurements, exterior building 
dimensions should reconcile to within one (1) inch of actual building dimensions as measured in the field. 
Interior building dimensions must reconcile to within half (1/2) inch of actual field dimensions. However, 
individual project requirements may vary. Please confirm requirements with the Project Manager 
designated by Maricopa County. 
 
Blocks 
 
The following rules must be employed when handling block entities:  
1. All entities within a block must be created on layer 0.

Dunlap Office Space Tenant Improvements 
Page | 43 
CMR Professional Services Contract 
Serial # 240062-ROQ 
 
2. Drawing entities translated into AutoCAD blocks from non-AutoCAD systems must revert to 
layer 0 when exploded within AutoCAD.  
 
Policy on External Reference Files (XREFs) 
 
Maricopa County will not accept the submission of any AutoCAD drawing deliverable which contains 
unbound references to external source drawing files. All externally referenced data sources that were used 
during the AutoCAD drawing production phase should be incorporated as a block within a single drawing 
file, including the title block and all identifying information visible in the printed image, upon project 
completion and prior to submission to Maricopa County. Layers contained in XREF’s inserted as blocks 
should conform to Maricopa County guidelines. The resulting self-contained drawing file is an acceptable 
deliverable to Maricopa County. 
  
Owner Supplied CAD Files 
 
Prior to commencement of design and construction services, Maricopa County will provide past Record 
Drawings in AutoCAD per the Contract Agreement that can be used as the background for space 
documentation projects. These have been generated using a variety of methods and may require field 
verification. When no pre-existing Record Drawings in AutoCAD are available, consultants will be required 
to produce drawings entirely from field measurements. AutoCAD files are transmitted for the convenience 
and expediency of the DP, their Sub-consultants and the CMR but bear no implicit or explicit guarantee of 
accuracy, reliability or correctness”. It is recommended to all recipients of Owner-supplied drawing files to 
perform their own verifications as necessary to develop drawings for each phase of the project. 
 
Layers for CAD Files 
 
All AutoCAD Files shall include but not be limited to the following building features that define the physical 
boundaries necessary to define space, such as: 1) exterior walls; 2) vertical elevations & sections; 3) details; 
4) schedules; 5)  doors; 6) glazing; 7) elevator shafts; 8) stair wells and other changes in floor elevation; 9) 
built-in furniture and/or modular systems. The DP, their Sub-consultants and the CMR shall adhere to these 
layer standards as much as possible, although additional layers, conforming to standard formats, may be 
necessary, while some layers may not be applicable to every space documentation project (furniture, roof 
lines, etc.).  
 
AutoCAD layers should be named in accordance with the latest U.S. National CAD Standard (NCS) which 
can be obtained from the National Institute of Building Sciences. Custom layers added by Maricopa County 
begin with MC-. The specific name of custom layers may vary slightly by Maricopa County owner. 
 
AIA CAD Layer Guidelines 
 
See U.S. National CAD Standard Version 3 (attached). 
 
USE OF BUILDING INFORMATION MODELING (BIM) 
 
Although projects may utilize Building Information Modeling (BIM) for conveying three-dimensional design, 
two-dimensional deliverables are still required as outlined in this guideline and as specified in Maricopa 
County Agreements with the DP, their Sub-consultants and CMRs.  
 
BIM Execution Plan 
 
Projects utilizing BIM are required to provide a BIM Execution Plan to document modeling practices. This 
document declares what is being modeled, the accuracy of the models, the intent of the models, and how 
project teams work within the models.  
 
BIM Standards 
 
Modeling practices and standards should be declared and agreed upon in the Project’s BIM Execution Plan. 
 
BIM Models and Deliverables

Dunlap Office Space Tenant Improvements 
Page | 44 
CMR Professional Services Contract 
Serial # 240062-ROQ 
 
Models turned over to Maricopa County as a deliverable must meet the requirements of the agreed upon 
BIM Execution Plan. 
 
Use of Revit 
 
Models are to be created in the most current version of Autodesk Revit. Modeling practices are to be 
declared in the project’s BIM Execution Plan.