JOB ORDER CONTRACT 
 
 
 
 
BETWEEN 
 
FLOOD CONTROL DISTRICT of MARICOPA COUNTY 
 
AND 
 
AMES CONSTRUCTION, INC. 
 
FOR 
 
EARTHWORK SERVICES AND DEBRIS REMOVAL 
 
FCD CONTRACT NO.  2024C006 
Serial # 240008 
 
 
AGENDA NO.  C-69-24
DocuSign Envelope ID: 53FC961F-8000-45E0-9314-223CB81F3ADF

Contract No.  2024C006 
Page 2 of 22 
FLOOD CONTROL DISTRICT of MARICOPA COUNTY 
CONTRACT NO. 2024C006 
TABLE OF CONTENTS 
 
ARTICLE I - EARTHWORK SERVICES AND DEBRIS REMOVAL ...........3 
ARTICLE II - CONTRACT DOCUMENTS  ...............................................3 
ARTICLE III - TIME OF COMPLETION .................................................3 
ARTICLE IV - WORK ASSIGNMENTS AND PERIOD OF SERVICE ........4 
ARTICLE V - PAYMENTS .......................................................................4 
ARTICLE VI -TERMINATION ................................................................4 
ARTICLE VII - NEGOTIATION CLAUSE ................................................5 
ARTICLE VIII - COMPLIANCE WITH LAWS .........................................5 
ARTICLE IX – INFLUENCE ....................................................................6 
ARTICLE X - DEBARMENT AND SUSPENSION……………………………….…..6 
ARTICLE XI - SBE PROGRAM ...............................................................7 
ARTICLE XII - ANTI-DISCRIMINATION PROVISION: ..................... 7 
ARTICLE XIII – INDEMNIFICATION……………………………………….7 
 
ARTICLE XIV - INSURANCE REQUIREMENTS…………………………….7 
 
SIGNATURE PAGE ............................................................................ 10 
STATUTORY PAYMENT BOND .......................................................... 11 
STATUTORY PERFORMANCE BOND ................................................. 12 
CERTIFICATE OF INSURANCE ......................................................... 13 
NO COLLUSION AFFIDAVIT ............................................................. 14 
VERIFICATION OF LICENSE ............................................................ 15 
AFFIDAVIT OF COMPLIANCE ........................................................... 16 
SBE PARTICIPATION REPORTING FORM ........................................ 17 
CERTIFICATE OF PERFORMANCE AND PAYMENT OF ALL CLAIMS .. 18 
 
 
ON CALL CONSTRUCTION PAYMENT REQUEST ............................... 19 
 
EXHIBIT A – EARTHWORK SERVICES AND DEBRIS REMOVAL 
EXHIBIT B – FEE SCHEDULE 
DocuSign Envelope ID: 53FC961F-8000-45E0-9314-223CB81F3ADF

Contract No.  2024C006 
Page 3 of 22 
CONTRACT NO. 2024C006 
Job Order Contract for Earthwork Services and Debris Removal 
 
The Flood Control District of Maricopa County, hereinafter called the DISTRICT, is 
desirous of having Job Order Contract for EARTHWORK SERVICES AND DEBRIS REMOVAL 
performed when requested by the District through a specific Work Assignment for those 
services more fully described in Exhibit A, General Earthwork Services and Debris 
Removal, and Exhibit B, Unit Price List; and Ames Construction, Inc. hereinafter called 
“CONTRACTOR”, with its principal offices located at 8333 E. Hartford Dr., Scottsdale 
AZ 85255 & (602-431-2111) is desirous of performing said services; 
 
THIS AGREEMENT, made and entered into this __________ day of ________________, 
20 ___, by and between the District acting by and through its BOARD OF DIRECTORS, 
and CONTRACTOR.   
 
WITNESSETH:  The contract term will be for a period of five (5) consecutive year(s). 
The overall construction cost shall not exceed five million dollars ($5,000,000.00) 
per contract year, maximum $2,000,000 limit per individual project task order 
and no splitting work assignments. Furthermore, the total possible not-to-exceed 
fee earned for the entire contract duration is twenty-five Million Dollars and no cents 
(25,000,000.00). Complete and satisfactory performance of work under this contract in 
accordance with the Earthwork Services and Debris Removal and the detailed Scope(s) of 
Work in the manner and at the times hereinafter provided, and of the other covenants 
and agreements herein contained, hereby agrees for himself, heirs, executors, 
administrators, successors, and assigns as follows: 
 
       
ARTICLE I - EARTHWORK SERVICES AND DEBRIS REMOVAL:  The 
CONTRACTOR, under the general supervision of the District Director, shall perform 
Earthwork Services and Debris Removal as are necessary for the Work Assignment and 
according to the directions and designated standards of the COUNTY, and in accordance 
with Exhibit A, General Earthwork Services and Debris Removal.  It is understood and 
agreed that the COUNTY’s authorized representative shall be the District Director or 
his/her duly authorized representative, hereinafter called the “Agent”.  For purposes of this 
contract, the Agent’s duly authorized representative shall be the Project Manager and 
he/she shall be the sole contact for administering this contract.  
 
CONTRACTOR shall provide services, and complete in a workmanlike and substantial 
manner and to the satisfaction of the District Director, project Earthwork Services and 
Debris Removal assignments for the District and furnish at its own cost and expense all 
necessary machinery, equipment, tools, apparatus, and labor to complete the work in the 
most substantial and workmanlike manner according to the Specifications and Work 
Assignment on file with the District, and such modifications of the same and other 
directions that may be made by the District as provided herein.  The CONTRACTOR shall 
meet periodically with the District Agent so as to keep the District informed of the 
progress of the work in accordance with each work assignment. 
  
 
       
ARTICLE II - CONTRACT DOCUMENTS: The Contract Documents (Plans, 
Specifications, Addenda, if any, Affidavits, Performance Bond, Payment Bond, Certificates 
of Insurance, and Change Orders, if any) are by this reference made a part of this 
Contract and shall have the same effect as though all of the same were fully inserted 
herein. 
       
 
  
ARTICLE III - TIME OF COMPLETION: CONTRACTOR further covenants and 
agrees at its own proper cost and expense, to complete all work for the construction of 
assigned Earthwork Services and Debris Removal and to completely construct the same 
and provide the services therein, as called for by this agreement free and clear of all 
DocuSign Envelope ID: 53FC961F-8000-45E0-9314-223CB81F3ADF

Contract No.  2024C006 
Page 4 of 22 
claims, liens, and charges whatsoever, in the manner and under the conditions specified 
within the time, or times, stated in the Work Assignment. 
 
 
 
  
ARTICLE IV - WORK ASSIGNMENTS AND PERIOD OF SERVICE:  Within 
the guidelines set forth in Exhibit A, General Earthwork Services and Debris Removal, a 
detailed Earthwork Services and Debris Removal will be developed for each Work 
Assignment and incorporated herein by reference, and if applicable, a Small Business 
Enterprise goal will be established.  A not-to-exceed fee will be negotiated for each 
Work Assignment consistent with Exhibit B, Unit Price List. 
 
The CONTRACTOR shall complete all work in accordance with the provisions of Exhibit 
A, General Earthwork Services and Debris Removal and the detailed Earthwork Services 
and Debris Removal as negotiated for each specific Work Assignment.  Performance for 
a Work Assignment shall commence only upon receipt of the Agent’s written notice to 
proceed.  Work Assignments may be issued at any time during the term of this Contract. 
This Contract will remain in full force and effect during the performance of any Work 
Assignment. 
 
This contract shall be effective for a period of five (5) years from the Board award date 
with no annual renewals.  
 
ARTICLE V – PAYMENTS:  For and in consideration of the satisfactory 
performance of the work herein embraced as set forth in the Contract Documents, 
which are a part hereof, and in accordance with the directions of the DISTRICT, 
through its Engineer and to its satisfaction, the DISTRICT agrees to pay the said 
CONTRACTOR the amount earned, computed from actual quantities of work 
performed and accepted, or materials furnished at the price listed on the Work 
Assignment Proposal made a part hereof, and to make such payment in accordance 
with the requirements of A.R.S. Sec. 34-607, as amended.  CONTRACTOR agrees to 
discharge its obligations and make payments to its subcontractors and suppliers in 
accordance with A.R.S. Sec. 34-607.  
 
The DISTRICT does not guarantee any minimum or maximum fee during the period 
of this contract, and Contractor, in accepting this contract, does not anticipate any 
minimum or maximum fee. Market escalations in material costs may be reviewed by 
DISTRICT upon written request from Contractor at annual anniversary date of contract. 
 
The DISTRICT shall pay the CONTRACTOR in full for each Work Assignment upon 
satisfactory completion and acceptance by the DISTRICT, provided the Contractor 
returns the executed Certificate of Performance furnished by the Agent.  Should an 
assignment require more than thirty (30) days to complete, the Contractor may invoice 
progress payments based on DISTRICT-approved monthly progress reports and 
subject to the limitations set forth in the Earthwork Services and Debris Removal 
negotiated for each Work Assignment.   
 
Upon completion of each Work Assignment under this contract, the CONTRACTOR will 
furnish to the DISTRICT an executed Certificate of Performance.  The Certificate of 
Performance must be notarized. 
DocuSign Envelope ID: 53FC961F-8000-45E0-9314-223CB81F3ADF

Contract No.  2024C006 
Page 5 of 22 
 
       
ARTICLE VI - TERMINATION:  The COUNTY hereby gives notice that pursuant 
to A.R.S. Sec. 38-511 A, this contract may be canceled without penalty or further 
obligation within three years after execution if any person significantly involved in 
initiation, negotiation, securing, drafting or creating the contract on behalf of the 
DISTRICT is, at any time while the contract or any extension of the contract is in effect, 
an employee or agent of any other party to the contract in any capacity or a Contractor to 
any other party of the contract with respect to the subject matter of the contract.  
Cancellation under this section shall be effective when written notice from the 
Transportation Director of the DISTRICT is received by all of the parties to the contract.  
In addition, the DISTRICT may recoup any fee or commission paid or due to any person 
significantly involved in initiation, negotiation, securing, drafting or creating the contract 
on behalf of the DISTRICT from any other party to the contract arising as a result of the 
contract. 
 
       
ARTICLE VII - NEGOTIATION CLAUSE: Recovery of damages related to 
expenses incurred by CONTRACTOR for a delay for which the DISTRICT is responsible, 
which is unreasonable under the circumstances and which was not within the 
contemplation of the parties to the contract, shall be negotiated between CONTRACTOR 
and the DISTRICT.  This provision shall be construed so as to give full effect to any 
provision in the contract, which requires notice of delays, provides for arbitration or other 
procedure for settlement or provides for liquidated damages. 
 
       
ARTICLE VIII - COMPLIANCE WITH LAWS:  CONTRACTOR is required to 
comply with all Federal, State and local ordinances and regulations.   CONTRACTOR'S 
signature on this contract certifies compliance with the provisions of the I-9 requirements 
of the Immigration Reform Control Act of 1986 for all personnel that CONTRACTOR and 
any subcontractors employ to complete this project.  It is understood that the DISTRICT 
shall conduct itself in accordance with the provisions of the Maricopa County Procurement 
Code. 
 
The CONTRACTOR warrants that it is in compliance with A.R.S. §41-4401 and further 
acknowledges: 
 
(1) 
That the CONTRACTOR and its sub-contractors, if any, warrant their 
compliance with all federal immigration laws and regulations that relate to their 
employees and their compliance with A.R.S. §23-214, subsection A; 
 
(2) 
That a breach of a warranty under subsection 1 above, shall be deemed a 
material breach of the contract that is subject to penalties up to and including 
termination of the contracts; 
 
(3) 
That the contracting government entity retains the legal right to inspect the 
papers of any CONTRACTOR or sub-contractor employee who works on the 
contract to ensure that the CONTRACTOR or sub-contractor is complying with 
the warranty provided under subsection 1 above and that the CONTRACTOR 
DocuSign Envelope ID: 53FC961F-8000-45E0-9314-223CB81F3ADF

Contract No.  2024C006 
Page 6 of 22 
agrees to make all papers and employment records of said employee(s) 
available during normal working hours in order to facilitate such an inspection. 
 
(4) 
That nothing herein shall make any CONTRACTOR or sub-contractor an 
agent or employee of the contracting government entity.  
 
ARTICLE IX – INFLUENCE: - As prescribed in Article 12, of the Maricopa County 
Procurement Code, any effort to influence an employee or agent to breach the Maricopa 
County Ethical Code of Conduct or any unethical conduct, may be grounds for Disbarment 
or Suspension under Article 9 of the Maricopa County Procurement Code.   
 
An attempt to influence includes, but is not limited to: 
 
A Person offering or providing a gratuity, gift, tip, present, donation, money, 
entertainment or educational passes or tickets, or any type valuable contribution or 
subsidy, that is offered or given with the intent to influence a decision, obtain a contract, 
garner favorable treatment, or gain favorable consideration of any kind. 
 
If a Person attempts to influence any employee or agent of Maricopa County, the Chief 
Procurement Officer, or his designee, reserves the right to seek any remedy provided by 
the Maricopa County Procurement Code, any remedy in equity or in the law, or any 
remedy provided by this contract.   
 
ABSOLUTELY NO CONTACT BETWEEN THE RESPONDENT AND ANY COUNTY 
PERSONNEL, OTHER THAN THE OFFICE OF PROCUREMENT SERVICES, IS ALLOWED 
DURING THE SOLICITATION PROCESS UNLESS THE COMMUNICATION IS IN REGARDS 
TO PRE-EXISTING BUSINESS WITH THE COUNTY. ANY COMMUNICATIONS REGARDING 
THE SOLICITATION, ITS PARTICIPANTS OR ANY DOCUMENTATION PRIOR TO THE 
CONTRACT AWARD MAY BE GROUNDS FOR DISMISSAL OF THE RESPONDENT FROM 
THE EVALUATION PROCESS. 
 
ARTICLE X-CERTIFICATION REGARDING DEBARMENT AND SUSPENSION 
The undersigned (authorized official signing for the contractor/bidder) certifies to the best 
of his or her knowledge and belief, that the contractor/bidder, and its principals: 
 
1) 
Are not presently debarred, suspended, proposed for debarment, declared 
ineligible, or voluntarily excluded from covered transactions by any Federal Department or 
agency; 
 
2) 
Have not within 3-year period preceding this solicitation/contract been convicted of 
or had a civil judgment rendered against them for commission of fraud or a criminal 
offense in connection with obtaining, attempting to obtain, or performing a public 
(Federal, State or local) transaction or contract under a public transaction; violation of 
Federal or State antitrust statues or commission of embezzlement, theft, forgery, bribery, 
falsification or destruction of records, making false statements, or receiving stolen 
property; 
 
DocuSign Envelope ID: 53FC961F-8000-45E0-9314-223CB81F3ADF

Contract No.  2024C006 
Page 7 of 22 
3) 
Are not presently indicted or otherwise criminally or civilly charged by a 
government entity (Federal, State or local) with commission of any of the offenses 
enumerated in this paragraph of this certification; and 
 
4) 
Have not within a 3-year period preceding this solicitation and/or agreement had 
one or more public transactions (Federal, State or local) terminated for cause of default. 
 
Should the contractor/bidder not be able to provide this certification, a comprehensive 
explanation as to why should be attached to its bid. 
 
The contractor/bidder agrees to include, without modification, this clause in all lower tier 
covered transactions (i.e. transactions with subcontractors) and in all solicitations for lower 
tier covered transactions related to this contract. 
 
       
ARTICLE XI - SBE PROGRAM:   It is Maricopa County’s policy to endeavor to 
ensure in every way possible that small business participation firms shall have the 
opportunity to provide professional services, materials, and contractual services to the 
County in a nondiscriminatory manner. 
 
       
ARTICLE XII - ANTI-DISCRIMINATION PROVISION: CONTRACTOR agrees 
not to discriminate against any employee or applicant for employment because of race, 
age, color, religion, sex, disability, or national origin, and further agrees not to engage in 
any unlawful employment practices.  CONTRACTOR further agrees to insert the 
foregoing provision in all subcontracts hereunder.  
 
FORCED LABOR 
 
By submitting a bid for this solicitation and/or entering into a contract as a result of this 
solicitation, contractor agrees to comply with all applicable portions of Arizona Revised 
Statutes Section 35-394. Contracting; procurement; prohibition; written certification; 
remedy; termination; exception; definitions. Contractor certifies that it does not currently, 
and agrees for the duration of the contract, that it will not use: 
 
The forced labor of ethnic Uyghurs in the People’s Republic of China. 
Any goods or services produced by the forced labor of ethnic Uyghurs in the People’s 
Republic of China. 
 
Any contractors, subcontractors or suppliers that use the forced labor or any good or 
services produced by the forced labor of ethnic Uyghurs in the People’s Republic of China. 
If contractor becomes aware during the term of the agreement that contractor is not in 
compliance with this paragraph, the contractor shall notify the County within five business 
days after becoming aware of the noncompliance. If the contractor fails to provide a 
written certification to the County that the contractor has remedied the noncompliance 
within 180 days after notifying the County of its noncompliance, then the agreement 
terminates, except that if the agreement termination date occurs before the end the 180 
day period, the agreement terminates on the agreement termination date. 
 
DocuSign Envelope ID: 53FC961F-8000-45E0-9314-223CB81F3ADF

Contract No.  2024C006 
Page 8 of 22 
  ARTICLE XIII - INDEMNIFICATION:  To the fullest extent permitted by 
law, CONTRACTOR shall defend, indemnify, and hold harmless DISTRICT, 
MARICOPA COUNTY and its agents, representatives, officers, directors, officials, and 
employees from and against all claims, damages, losses and expenses, including, but 
not limited to, attorney fees, court costs, expert witness fees, and the cost of appellate 
proceedings, relating to, arising out of, or alleged to have resulted from the negligent 
acts, errors, omissions or mistakes relating to the performance of this Contract.  
CONTRACTOR’S duty to defend, indemnify and hold harmless DISTRICT, MARICOPA 
COUNTY and its agents, representatives, officers, directors, officials, and employees 
shall arise in connection with any claim, damage, loss or expense that is attributable to 
bodily injury, sickness, disease, death, or injury to, impairment, or destruction of 
property, including loss of use resulting there from, caused by any negligent acts, 
errors, omissions or mistakes in the performance of this Contract including any person 
for whose acts, errors, omissions or mistakes CONTRACTOR may be legally liable. 
 
The amount and type of insurance coverage requirements set forth herein will in no 
way be construed as limiting the scope of the indemnity in this paragraph. 
 
The scope of this indemnification does not extend to the sole negligence of COUNTY. 
 
ARTICLE 
XIV 
- INSURANCE 
REQUIREMENTS: 
CONTRACTOR, 
at 
CONTRACTOR'S own expense, shall purchase and maintain the herein stipulated 
minimum insurance from a company or companies duly licensed by the State of Arizona 
and possessing a current A.M. Best, Inc. rating of B++. In lieu of State of Arizona 
licensing, the stipulated insurance may be purchased from a company or companies, 
which are authorized to do business in the State of Arizona, provided that said 
insurance companies meet the approval of DISTRICT. The form of any insurance 
policies and forms must be acceptable to DISTRICT. 
 
All insurance required herein shall be maintained in full force and effect until all work or 
service required to be performed under the terms of the Contract is satisfactorily 
completed and formally accepted. Failure to do so may, at the sole discretion of 
DISTRICT, constitute a material breach of this Contract. 
 
CONTRACTOR’S insurance shall be primary insurance as respects DISTRICT and any 
insurance or self-insurance maintained by DISTRICT shall not contribute to it. 
 
Any failure to comply with the claim reporting provisions of the insurance policies or any 
breach of an insurance policy warranty shall not affect the DISTRICTS right to 
coverage afforded under the insurance policies. 
 
The insurance policies may provide coverage that contains deductibles or self-insured 
retentions. Such deductible and/or self-insured retentions shall not be applicable with 
respect to the coverage provided to DISTRICT under such policies. CONTRACTOR 
shall be solely responsible for the deductible and/or self-insured retention and 
DISTRICT, at its option, may require CONTRACTOR to secure payment of such 
DocuSign Envelope ID: 53FC961F-8000-45E0-9314-223CB81F3ADF

Contract No.  2024C006 
Page 9 of 22 
deductibles or self-insured retentions by a surety bond or an irrevocable and 
unconditional letter of credit. 
 
The DISTRICT reserves the right to request and to receive, within 10 working days, 
certified copies of any or all of the herein required insurance policies and/or 
endorsements. The DISTRICT shall not be obligated, however, to review such policies 
and/or endorsements or to advise CONTRACTOR of any deficiencies in such policies 
and endorsements, and such receipt shall not relieve CONTRACTOR from, or be 
deemed a waiver of DISTRICT’S right to insist on strict fulfillment of CONTRACTOR’S 
obligations under this Contract. 
 
The insurance policies required by this Contract, except Workers’ Compensation, and 
Errors and Omissions, shall name The DISTRICT,  its agents, representatives, officers, 
directors, officials and employees as Additional Insureds. 
 
The policies required hereunder, except Workers’ Compensation, and Errors and 
Omissions, shall contain a waiver of transfer of rights of recovery (subrogation) against 
DISTRICT, its agents, representatives, officers, directors, officials and employees for 
any claims arising out of CONTRACTOR’S work or service. 
 
CONTRACTOR is required to procure and maintain the following coverages indicated 
by a checkmark: 
 
Commercial General Liability 
Commercial General Liability insurance and, if necessary, Commercial Umbrella 
insurance with a limit of not less than $2,000,000 for each occurrence, $4,000,000 
Products/Completed Operations Aggregate, and $4,000,000 General Aggregate Limit. 
The policy shall include coverage for bodily injury, broad form property damage, 
personal injury, products and completed operations and blanket contractual coverage, 
and shall not contain any provision which would serve to limit third party action over 
claims. There shall be no endorsement or modification of the CGL limiting the scope of 
coverage for liability arising from explosion, collapse, or underground property damage. 
Automobile Liability 
Commercial/Business Automobile Liability insurance and, if necessary, Commercial 
Umbrella insurance with a combined single limit for bodily injury and property damage 
of not less than $2,000,000 each occurrence with respect to any of the 
CONTRACTOR’S owned, hired, and non-owned vehicles assigned to or used in 
performance of the CONTRACTOR’S work or services under this Contract. 
Workers’ Compensation   
Workers’ Compensation insurance to cover obligations imposed by federal and state 
statutes having jurisdiction of CONTRACTOR’S employees engaged in the performance 
of the work or services under this Contract; and Employer’s Liability insurance of not 
less than $1,000,000 for each accident, $1,000,000 disease for each employee, and 
$1,000,000 disease policy limit.  
 
DocuSign Envelope ID: 53FC961F-8000-45E0-9314-223CB81F3ADF

Contract No.  2024C006 
Page 10 of 22 
CONTRACTOR waives all rights against DISTRICT and its agents, officers, directors 
and employees for recovery of damages to the extent these damages are covered by 
the Workers’ Compensation and Employer’s Liability or commercial umbrella liability 
insurance obtained by CONTRACTOR pursuant to this agreement. 
 
CERTIFICATES OF INSURANCE 
Prior to commencing work or services under this Contract, CONTRACTOR shall furnish 
DISTRICT with Certificates of Insurance in a form acceptable to DISTRICT, or formal 
endorsements as required by the Contract in the form provided by the County, issued 
by CONTRACTOR’S insurer(s), as evidence that policies providing the required 
coverages, conditions and limits required by this Contract are in full force and effect. 
Such certificates shall identify this contract number and title. 
 
In the event any insurance policy (ies) required by this contract is (are) written on a 
“claims made” basis, coverage shall extend for two years past completion and 
acceptance of CONTRACTOR’S work or services and as evidenced by annual 
Certificates of Insurance. 
 
If a policy does expire during the life of the Contract, a renewal certificate must be sent 
to DISTRICT fifteen (15) days prior to the expiration date. 
 
CANCELLATION AND EXPIRATION NOTICE 
Insurance required herein shall not expire, be canceled, or materially changed without 
thirty (30) days prior written notice to DISTRICT. 
 
 
(END OF SECTION) 
DocuSign Envelope ID: 53FC961F-8000-45E0-9314-223CB81F3ADF

…溜耕詳謹砦つ某詣繊措辞鴇群議措器薄霊詫8f轟き
Pa巾es he「einabove named, On the date and year
Ames
¶tie: P「esident - Southwest Region
Date:   AD刑8. 2024
41-087137与
丁ax Identification Number
above wr虻en,
FLOOD CONTROL DISTRICT OF MARICOPA COUNTY
RECOMMENDED BY:
Chief Engineer and Gene「al Manager Date
LEGAL REVIEW
Approved as to form and wjthin the powers
and authority granted under the laws ofthe
State of Arizona to the Fiood ControI
DiSTRICT of Maricopa County.
ACCEPTED AND APPROVED:
Chai「man, Boa「d of Directors Date
ATTEST:
Clerk of the Board
FLOOD CONTRO」 DISTRICT GENERAL COUNCIL Date
Contract No. 2024COO6       Page = of22
DocuSign Envelope ID: 53FC961F-8000-45E0-9314-223CB81F3ADF
4/8/2024
4/8/2024

Contract No.  2024C006 
Page 12 of 22 
STATUTORY PAYMENT BOND 
PURSUANT TO TITLE 34 CHAPTER 6, ARTICLE 1, OF THE ARIZONA REVISED 
STATUTES (Penalty of this bond must be 100% of the Work Assignment 
amount) 
 
 
KNOW ALL MEN BY THESE PRESENTS: 
 
That,  
 (hereinafter called 
the Principal), As Principal, and  
 
 a 
corporation organized and existing under the laws of the State of  
 
, 
with its principal office in the City of  
 (hereinafter called 
the Surety), as Surety, are held and firmly bound unto Maricopa County (hereinafter called 
the Obligee), in the amount of ($_________________________) themselves, and 
their heirs, administrators, executors, successors and assigns, jointly and severally, firmly 
by these presents. 
 
 
WHEREAS, the Principal has entered into a certain written contract with the 
Obligee, dated the  
 day of  
, 20 
, for 2024C006, Job Order 
Contract for, Work Assignment No. _____, which contract is hereby referred to and 
made a part hereof as fully and to the same extent as if copied at length herein. 
 
 
NOW, THEREFORE, THE CONDITION OF THIS OBLIGATION IS SUCH, that if the 
said Principal promptly pays all monies due to all persons supplying labor or materials to 
the Principal or the Principal's subcontractors in the prosecution of the work provided 
for in the contract, this obligation is void.  Otherwise it remains in full force and effect. 
 
 
PROVIDED, HOWEVER, that this bond is executed pursuant to the provisions of 
Title 34, Chapter 6, Article 1, of the Arizona Revised Statutes, and all liabilities on this 
bond shall be determined in accordance with the provisions, conditions and limitations 
of Title 34, Chapter 6, Article 1, Arizona Revised Statutes, to the same extent as if it 
was copied at length in this Agreement. 
 
 
The prevailing party in a suit on this bond shall recover as a part of the judgment 
reasonable attorney's fees that may be fixed by the court or a judge thereof. 
 
 
Witness our hands this  
 day of  
, 20 
. 
 
 
  
 
 
 
 
 
 
 
  
 
 
 
 
 
PRINCIPAL 
 
 
SEAL 
 
 
 
BY:  
 
AGENT OF RECORD, STATE OF AZ 
 
 
 
 
 
AGENT ADDRESS 
 
 
 
SURETY  
 
SEAL 
 
BOND NUMBER:  
 
BY:  
 
 
DocuSign Envelope ID: 53FC961F-8000-45E0-9314-223CB81F3ADF

Contract No.  2024C006 
Page 13 of 22 
STATUTORY PERFORMANCE BOND 
PURSUANT TO TITLE 34 CHAPTER 6, ARTICLE 1, OF THE ARIZONA REVISED 
STATUTES (Penalty of this bond must be 100% of the Work Assignment 
amount) 
 
KNOW ALL MEN BY THESE PRESENTS: 
 
That,  
(hereinafter called 
the Principal), as Principal, and  
 a 
corporation 
organized and existing under the laws of the State of  
, with its principal 
office in the City of  
 (hereinafter 
called the Surety), as Surety, are held and firmly bound unto Maricopa County, 
(hereinafter called the Obligee) in the amount of ($_________________________) 
for the payment whereof, the said Principal and Surety bind themselves, and their heirs, 
administrators, executors, successors and assigns, jointly and severally, firmly by these 
presents. 
 
 
WHEREAS, the Principal has entered into a certain written contract with the 
Obligee, dated the  
 day of  
, 20 
, for 2024C006, Job Order 
Contract for   , Work Assignment No. _____, which contract is hereby referred to and 
made a part hereof as fully and to the same extent as if copied at length herein. 
       
 
 
NOW, THEREFORE, THE CONDITION OF THIS OBLIGATION IS SUCH, that 
if the said Principal shall faithfully perform and fulfill all the undertakings, covenants, 
terms, conditions and agreements of said contract during the original term of said 
contract and any extension thereof, with or without notice to the Surety, and during the 
life of any guaranty required under the contract, and shall also perform and fulfill all the 
undertakings, covenants, terms, conditions, and agreements of any and all duly 
authorized modifications of said contract that may hereafter be made, notice of which 
modifications to the Surety being hereby waived; then the above obligation shall be 
void, otherwise to remain in full force and effect; 
 
  
PROVIDED, HOWEVER, that this bond is executed pursuant to the provisions of 
Title 34, Chapter 6, Article 1, of the Arizona Revised Statutes, and all liabilities on this 
bond shall be determined in accordance with the provisions of said Title, Chapter, and 
Article, to the extent as if it was copied at length herein. 
 
  
The prevailing party in a suit on this bond shall be entitled to such reasonable 
attorney's fees as may be fixed by a judge of the court. 
 
  
Witness our hands this  
 day of  
, 20 
. 
 
 
  
 
 
 
 
 
___________________________________ 
  
 
 
 
 
 
PRINCIPAL 
 
 
SEAL 
______________________________ 
 
 AGENT OF RECORD, STATE OF AZ  
By: _________________________________ 
 
 ______________________________ 
AGENT ADDRESS 
 
 
 
___________________________________ 
  
 
 
 
 
 
SURETY  
 
SEAL 
BOND NUMBER: _________________ 
 
  
 
 
 
 
 
BY: _________________________________ 
DocuSign Envelope ID: 53FC961F-8000-45E0-9314-223CB81F3ADF

Contract No.  2024C006 
Page 14 of 22 
Flood Control District of Maricopa County 
CERTIFICATE OF INSURANCE 
CONTRACT NO 2024C006 
                          PROJECT TITLE: Job Order Contract for Earthwork Services and Debris Removal  
NAME AND ADDRESS OF INSURANCE AGENCY: 
*COMPANIES AFFORDING COVERAGES: 
Company 
Letter 
A  
Company 
Letter 
B  
Company 
Letter 
C  
NAME AND ADDRESS OF INSURED: 
Company 
Letter 
D  
Company 
Letter 
E  
Company 
Letter 
F 
 
This certificate of insurance certifies that policies of insurance listed below have been issued to the insured named above and are in full force at this 
time. 
*CO. 
LTR. 
TYPE OF INSURANCE 
POLICY 
NUMBER 
EFFECTIVE 
DATE 
(MM/DD/Y
Y) 
EXPIRATION 
DATE 
(MM/DD/YY) 
 
LIMITS 
 
GENERAL LIABILITY: 
 COMMERCIAL GENERAL LIABILITY 
 
: Claims Made : Occur 
: PREMISES OPERATIONS 
: BLANKET CONTRACTURAL 
: BROAD FORM PROPERTY 
 
DAMAGE 
: PERSONAL INJURY 
: PRODUCTS AND COMPLETED 
 
OPERATIONS HAZARD 
: XCU HAZARDS 
: INDEPENDENT CONTRACTORS 
: OWNER’S AND CONTRACTOR’S 
 
PROTECTIVE LIABILITY 
 
 
 
 
GENERAL AGGREGATE 
 
PRODUCTS/COMPLETED 
OPERATIONS AGGREGATE 
 
EACH OCCURRENCE  
 
 
$4,000,000 
 
$2,000,000 
 
 
$2,000,000 
 
 
AUTOMOBILE LIABILITY: 
 
: ANY AUTO 
: ALL OWNED AND NON-OWNED 
AUTOS 
 
 
 
 
Combined Single Limit 
Bodily Injury 
Property Damage 
Per person/Per accident 
 
$2,000,000 
$2,000,000 
$2,000,000 
$2,000,000 
 
:  EXCESS LIABILITY 
: Umbrella Form 
: Other than Umbrella Form 
 
 
 
 
Each occurrence 
Aggregate 
 
$ 
$ 
 
: WORKERS’ COMPENSATION 
 
AND EMPLOYERS’ LIABILITY 
 
 
 
STATUTORY LIMITS AND 
EMPLOYER’S LIABILITY: 
 
EACH ACCIDENT 
DISEASE: EACH EMPLOYEE 
DISEASE: POLICY LIMIT 
 
$1,000,000 
$1,000,000 
$1,000,000 
 
: PROFESSIONAL LIABILITY 
 
 
 
 
 
 
: OTHER: 
Except for Workers’ Compensation and Professional Liability Insurance, the Maricopa County, and  
their agents, representatives, officers, Directors, Officials, and employees are named as Additional 
Insured’s. 
Except for Workers’ Compensation and Professional Liability Insurance, Flood Control District of Maricopa County (District), Maricopa County and their agents, 
representatives, officers, Directors, Officials, and employees are named as Additional Insured’s on those types of policies described herein which are required to 
be furnished by this contract entered into between the insured and the District. To the extent provided in Contract, insured shall hold harmless the District from 
liability arising out of any services provided or duty performed by insured as required by statute, law, purchase order or otherwise required, with the exception 
of liability for loss or damage resulting from the sole negligence of the District, its agents, employees, or indemnities.  It is agreed that any insurance available to 
the named insured shall be primary of other sources that may be available.  It is further agreed that no policy shall expire, be cancelled, or materially changed to 
affect the coverage available to the District without thirty (30) days written notice to the District.  THIS CERTIFICATE IS NOT VALID UNLESS 
COUNTERSIGNED BY AN AUTHORIZED REPRESENTATIVE OF THE INSURANCE COMPANY. 
FLOOD CONTROL DISTRICT OF MARICOPA COUNTY  
2801 WEST DURANGO STREET 
PHOENIX, ARIZONA 85009 
 
DATE ISSUED:  
 
 
 
 
 
 
 
 
 
 
 
AUTHORIZED REPRESENTATIVE 
DocuSign Envelope ID: 53FC961F-8000-45E0-9314-223CB81F3ADF

Contract No.  2024C006 
Page 15 of 22 
 
NO COLLUSION AFFIDAVIT 
BY CONTRACTOR 
CERTIFYING THAT THERE WAS NO COLLUSION 
IN SUBMITTING FOR CONTRACT 
 
 
 
STATE OF ARIZONA  
) 
 
 
 
 
)§ 
COUNTY OF MARICOPA 
) 
 
 
 
 being first duly sworn, deposes and says: 
 
That he is  
 of 
 
 
 
(Title) 
(Name of Business) 
 
submitting on Contract No. 2024C006 for the construction of Job Order Contract for 
Earthwork Services and Debris Removal in the County of Maricopa, State of Arizona. 
 
That, in connection with the above-mentioned project, neither he, nor anyone associated 
with the aforesaid business, has, directly or indirectly, participated in any collusion, 
entered into any contract, combination, conspiracy or other act in restraint of trade or 
commerce in violation of the provisions of A.R.S. § 34-251, Article 4, as amended. 
 
 
 
 
 
 
(Signature of Affiant) 
 
 
 
Subscribed and sworn to before me this  
 day of  
, 20 
. 
 
 
My Commission Expires: 
 
 
 
 
 
 
 
 
(Notary Public) 
DocuSign Envelope ID: 53FC961F-8000-45E0-9314-223CB81F3ADF

Contract No.  2024C006 
Page 16 of 22 
VERIFICATION OF LICENSE 
 
 
Pursuant to A.R.S. § 32-1169, I hereby state that I hold a current contractor's license, duly 
issued by the office of the Registrar of Contractors for the State of Arizona, said license 
has not been revoked, that the license number, classification, and expiration date is: 
;  
that my privilege license number (as required by A.R.S. § 42-1305) is:  
 
; and 
that, if any exemption to the above licensing requirements is claimed; 
 
(1) The basis for the claimed exemption is:  
 and; 
 
(2) The names(s) and license number(s) of any general, mechanical, electrical, or 
plumbing contractor(s) to be employed on the work are: 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
IT IS UNDERSTOOD THAT THE FILING OF AN APPLICATION CONTAINING FALSE OR 
INCORRECT INFORMATION CONCERNING AN APPLICANT'S CONTRACTOR'S LICENSE OR 
PRIVILEGE LICENSE WITH THE INTENT TO VOID SUCH LICENSING REQUIREMENTS IS 
UNSWORN FALSIFICATION PUNISHABLE ACCORDING TO A.R.S. § 13-2704. 
 
 
 
 
 
 
 
DATE 
SIGNATURE OF LICENSEE 
 
 
 
 
 
 
 
 
 
COMPANY 
 
DocuSign Envelope ID: 53FC961F-8000-45E0-9314-223CB81F3ADF

Contract No.  2024C006 
Page 17 of 22 
AFFIDAVIT OF COMPLIANCE 
 
AFFIDAVIT BY CONTRACTOR CERTIFYING COMPLIANCE WITH HOUSE BILL 2745, CHAPTER 
152 REQUIRING USE OF E-VERIFY 
 
STATE OF  
 
 
 
) 
 
 
 
 
 
)§ 
County of  
 
 
 
) 
 
 
 
 
 
 
 
 
 being first duly sworn, deposes and says: 
 
That he/she is  
 
 
 
 
 of  
 
 
 
 
 
 
bidding on Contract No.  2024C006, JOC – Earthwork Services and Debris Removal, in 
the County of Maricopa, State of Arizona. 
That, in connection with the above-referenced project, the contractor warrants that it is in 
compliance with A.R.S. §41-4401 and further acknowledges that the contractor and its sub-
contractors, if any, warrant their compliance with all federal immigration laws and regulations 
that relate to their employees and their compliance with A.R.S. §23-214, subsection A; 
 
 
 
 
 
 
 
 
 
 
 
 
(Signature of Affiant) 
 
 
Subscribed and sworn to before me this  
 
 day of_____  
, 20 
. 
 
 
 
 
 
 
 
(Notary Public) 
 
 
 
 
 
 
My Commission Expires
DocuSign Envelope ID: 53FC961F-8000-45E0-9314-223CB81F3ADF

Contract No.  2024C006 
Page 18 of 22 
MARICOPA COUNTY SBE PARTICIPATION REPORTING FORM 
 
 
 
This form is to be submitted with each pay application or invoice.  Any pay application 
or invoice without this form attached is subject to rejection as not being a completed 
pay application or invoice pursuant to the terms of the contract. 
 
_____________________________ 
 
 
2024C006/240008 
Name of Prime Consultant/Contractor 
 
 
Contract No. 
 
________________________ 
 
 
_______________________________ 
Contact Person 
 
 
 
 
 
Project No. 
 
_________  
 
 
_ 
 
$ 
 
 
 
 
 
 
Street Address 
 
 
 
 
  Amount of this Pay Application/Invoice 
 
_____________________________ 
City, State, ZIP 
 
Complete 
below 
with 
information 
on 
the 
SBE 
firms 
utilized 
as 
subconsultants/subcontractors for this pay application/invoice.  If work was self-
performed and your firm, as the prime, is an SBE firm pursuant to A.R.S. § 41-1001, et 
seq., then you may list your firm as the SBE firm. 
SBE Firm Name 
SBE Firm Address 
Type of Work 
Performed 
$ Pd to SBE this 
App/Inv 
 
 
 
$ 
 
 
 
$ 
 
 
 
$ 
 
 
 
$ 
 
 
 
$ 
 
 
 
$ 
 
 
 
$ 
 
 
 
$ 
 
 
 
$ 
 
 
 
$ 
 
□ A mark in this box certifies that no SBE firms were utilized as the prime, 
subconsultant or subcontractor with respect to this pay application/invoice. 
 
Date: ___________________ 
________________________________________ 
 
 
 
 
 
 
 
Signature 
___________________________________________ 
Printed Name & Telephone Number 
DocuSign Envelope ID: 53FC961F-8000-45E0-9314-223CB81F3ADF

Contract No.  2024C006 
Page 19 of 22 
FLOOD CONTROL DISTRICT OF MARICOPA COUNTY  
Certificate of Performance and Payment of ALL Claims 
 
PROJECT NAME: JOC – EARTHWORK SERVICES AND DEBRIS REMOVAL 
 
 
 
 
 
 
 
, hereby certifies to the Flood Control District (FCD) of  
(Name of Signer)  
Maricopa County that all lawful claims for labor, rental of equipment, material used, and any other claims 
by ________________ or its subconsultants in connection with the project described in FCD Contract 
2024C006 have been paid.  
 
____________________________________ understands that with receipt of payment for any previously 
invoiced amounts, plus any retained monies, this is a settlement of all claims of every nature and kind 
against FCD arising out of the performance of FCD Contract 2024C006 relating to the material, 
equipment and work covered in and required by the contract.  
 
The undersigned hereby certifies that to his/her knowledge, no contractual disputes exist in regard to this 
contract and that he/she has no knowledge of any pending or potential claims in regard to this contract.  
 
Upon submission of this document and a separate invoice for any retained funds to Flood Control District 
Maricopa County, invoice processing will be completed within sixty (60) calendar days. 
 
State of Arizona 
) 
)§ 
County of Maricopa 
) 
 
Signed this _______ day of   
 
, 20 
 . 
 
 
 
 
 
 
 
 
 
Signature 
 
 
 
 
 
 
 
 
 
 
 
 
 
Title 
 
Subscribed and Sworn to before me this  
            day of  
            
, 20 
. 
 
 
 
 
 
 
 
 
Notary Public 
 
My Commission Expires:  
 
 
 
 
 
 
 
 
 
 
 
 
 
DocuSign Envelope ID: 53FC961F-8000-45E0-9314-223CB81F3ADF

Contract No.  2024C006 
Page 20 of 22 
SUBCONTRACTOR LISTING 
 
The following is a listing of Subcontractors and material suppliers (including any minority and 
women-owned business enterprises participation) that may to perform the work outlined in this 
Contract.  Although this list will not be considered a final commitment on the Contractor's part, 
any Subcontractor changes from those listed must have the District’s written approval before the 
commencement of Subcontractor work on site. 
The contractor certifies that subcontractor selection has been conducted in accordance with the 
approved subcontractor selection plan (attached), and that the Contractor will perform, with its 
organization, construction work that amounts to not less than Fifty percent (50%) of the total 
Contract price for construction. 
 
 
_________________________________________________________________________ 
 
_________________________________________________________________________ 
 
_________________________________________________________________________ 
 
_________________________________________________________________________ 
 
_________________________________________________________________________ 
 
_________________________________________________________________________ 
 
_________________________________________________________________________ 
_________________________________________________________________________ 
_________________________________________________________________________ 
_________________________________________________________________________ 
 
 
 
 
 
 
 
 
 
 
___________________________________ 
 
 
 
 
 
 
 
 
(Signature) 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
DocuSign Envelope ID: 53FC961F-8000-45E0-9314-223CB81F3ADF

Contract No.  2024C006 
Page 21 of 22 
FLOOD CONTROL DISTRICT 
ON CALL CONSTRUCTION PAYMENT REQUEST 
 
Submit to: 
FLOOD CONTROL DISTRICT OF MARICOPA COUNTY 
 
 
Attention:  Contracts Branch Services 
2801 West Durango Street 
 
 
Phoenix, Arizona 85009-6357 
 
CONTRACTOR’S NAME: ______________________________________  DATE:__________________ 
 
CONTRACTOR’S ADDRESS:___________________________________________________________ 
 
PROJECT NAME: _______________________________ PAYMENT REQUEST NO.:______________ 
 
CONTRACT No.:_______________________________    WORK ASSIGNMENT NO.:_____________ 
Work Assignment 
TIME PERIOD_________ TO ____________    FCD  Project Manager:_______________________ 
 
A. 
CONTRACTOR’S CONTRACT DATA 
 
1. 
Maximum Contract Amount 
 
 
 
 
$_______________ 
 
2. 
Prior Contract Work Assignments 
 
 
 
$_______________ 
 
3. 
Total Remaining Contract Amount 
 
 
 
 
 
 
(A.1 minus A.2 minus B.1) 
 
 
 
 
$_______________ 
 
B. 
CONTRACTOR’S NTE FEE, THIS CONTRACT ASSIGNMENT 
 
1. 
NTE Fee, this Contract Work Assignment 
 
 
$_______________ 
 
2. 
Requested Payment:  (Attach Backup Documentation) 
 
 
1.____________________   3._____________________   5.____________________ 
 
 
2.____________________   4._____________________   6.____________________ 
 
3. 
Total Fee Earned To Date, This Contract Work Assignment 
$_______________ 
 
C. 
PAYMENT REQUEST DATA 
 
1. 
Less Prior Payments, This Contract Work Assignment 
 
$_______________ 
2. 
Total Payment Request (B.3 minus C.1)  
 
 
$_______________ 
 
3. 
Net Payment Request  
 
 
 
 
$_______________ 
 
 
Submitted by: _____________________________________________________ Date: ____________ 
Contractor 
 
Payment Request Verification: ________________________________________ Date: ____________ 
FCD Project Manager 
 
 
Approval to Pay: ___________________________________________________ Date: ____________ 
 
 
 
            FCD Division Manager 
 
 
 
 
DocuSign Envelope ID: 53FC961F-8000-45E0-9314-223CB81F3ADF

Contract No.  2024C006 
Page 22 of 22 
TO THE:  Flood Control District of Maricopa County: 
WHEREAS,  
 
 
 
 
 
 
, an  
 
 
 
 corporation, located at  
 
 
(company name) 
 
 
 
 
 
(Name of State) 
____________________________________________________ is required to execute certain documents that are necessary for the  
                                               (address) 
 
 
prompt and efficient execution of the corporate business. 
NOW, THEREFORE, BE IT RESOLVED, by the Board of Directors of   
 
 
 
 
 
 that the 
parties named below be authorized to execute and sign on behalf of said corporation the following numbered and named documents. 
1. Proposal 
2. Contract 
3. Bond 
4. Claims 
5. Change Orders 
6. Payment Requests 
7. Other (identify)   
 
 
 
 
 
 
 
 
 
 
. 
The powers and duties herein granted shall be and is hereby granted for the duration of the contract for the consultation of services, or
until express notice of revocation has been duly given in writing, whichever is the lesser period. 
Dated and passed by the Board of Directors this  
 day of   
 
 
, 20 
. 
 
 ___  
 
 
 
 
 
 
 
 
 
  
 
 
 
 
 ___  
 
 
 
 
 
 
 
 
 
  
 
 
   
 
____    
 
 
 
 
 
 
 
 
  
 
 
 
 
____  
 
 
 
 
 
 
 
 
  
  
_______ 
PRINT NAME                        (SIGNATURE OF PERSONS AUTHORIZED TO SIGN)                                     (TITLE)                                      (DOCUMENT NO. [see above]) 
CERTIFICATION 
 
STATE OF 
______ ) 
 
)§ 
COUNTY OF 
___________ 
) 
I,  
 
 
 
 
 
, of  
 
 
 
 
 
 
, a corporation, do
hereby certify that the above is a true and correct copy of a resolution adopted by the Board of Directors of said corporation, at a meeting
of said board held on  
 
 
, 20 
, and that the same is in full force and effect at this time. 
DATED:  
 
 
 
 
 
 
 
 
 
 
 
(OFFICER OF CORPORATION) 
(Seal of Corporation) 
STATE OF ________________ 
) 
 
 
)§ 
COUNTY OF ______________) 
This instrument was acknowledged before me this  
 day of  
 
 
, 20 
  
By  
, appearing before the undersigned Notary Public, and stated that he executed such 
instrument on behalf of said corporation for the purpose and consideration therein expressed. 
 
 
 
 
 
 
 
 
(NOTARY PUBLIC) 
My Commission Expires:  
 
 
 
DocuSign Envelope ID: 53FC961F-8000-45E0-9314-223CB81F3ADF

DocuSign Envelope ID: 53FC961F-8000-45E0-9314-223CB81F3ADF

DocuSign Envelope ID: 53FC961F-8000-45E0-9314-223CB81F3ADF

DocuSign Envelope ID: 53FC961F-8000-45E0-9314-223CB81F3ADF

DocuSign Envelope ID: 53FC961F-8000-45E0-9314-223CB81F3ADF

DocuSign Envelope ID: 53FC961F-8000-45E0-9314-223CB81F3ADF

DocuSign Envelope ID: 53FC961F-8000-45E0-9314-223CB81F3ADF

DocuSign Envelope ID: 53FC961F-8000-45E0-9314-223CB81F3ADF

DocuSign Envelope ID: 53FC961F-8000-45E0-9314-223CB81F3ADF

SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE
THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN
ACCORDANCE WITH THE POLICY PROVISIONS.
INSURER(S) AFFORDING COVERAGE
INSURER F :
INSURER E :
INSURER D :
INSURER C :
INSURER B :
INSURER A :
NAIC #
NAME:
CONTACT
(A/C, No):
FAX
E-MAIL
ADDRESS:
PRODUCER
(A/C, No, Ext):
PHONE
INSURED
REVISION NUMBER:
CERTIFICATE NUMBER:
COVERAGES
IMPORTANT:  If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must have ADDITIONAL INSURED provisions or be endorsed.
If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement.  A statement on
this certificate does not confer rights to the certificate holder in lieu of such endorsement(s).
THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS
CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES
BELOW.  THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED
REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER.
OTHER:
(Per accident)
(Ea accident)
$
$
N / A
SUBR
WVD
ADDL
INSD
THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD
INDICATED.  NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS
CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS,
EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS.
$
$
$
$
PROPERTY DAMAGE
BODILY INJURY (Per accident)
BODILY INJURY (Per person)
COMBINED SINGLE LIMIT
AUTOS ONLY
AUTOS
AUTOS ONLY
NON-OWNED
SCHEDULED
OWNED
ANY AUTO
AUTOMOBILE LIABILITY
Y / N
WORKERS COMPENSATION
AND EMPLOYERS' LIABILITY
OFFICER/MEMBER EXCLUDED?
(Mandatory in NH)
DESCRIPTION OF OPERATIONS below
If yes, describe under
ANY PROPRIETOR/PARTNER/EXECUTIVE
$
$
$
E.L. DISEASE - POLICY LIMIT
E.L. DISEASE - EA EMPLOYEE
E.L. EACH ACCIDENT
ER
OTH-
STATUTE
PER
LIMITS
(MM/DD/YYYY)
POLICY EXP
(MM/DD/YYYY)
POLICY EFF
POLICY NUMBER
TYPE OF INSURANCE
LTR
INSR
DESCRIPTION OF OPERATIONS / LOCATIONS / VEHICLES  (ACORD 101, Additional Remarks Schedule, may be attached if more space is required)
EXCESS LIAB
UMBRELLA LIAB
$
EACH OCCURRENCE
$
AGGREGATE
$
OCCUR
CLAIMS-MADE
DED
RETENTION $
$
PRODUCTS - COMP/OP AGG
$
GENERAL AGGREGATE
$
PERSONAL & ADV INJURY
$
MED EXP (Any one person)
$
EACH OCCURRENCE
DAMAGE TO RENTED
$
PREMISES (Ea occurrence)
COMMERCIAL GENERAL LIABILITY
CLAIMS-MADE
OCCUR
GEN'L AGGREGATE LIMIT APPLIES PER:
POLICY
PRO-
JECT
LOC
CERTIFICATE OF LIABILITY INSURANCE
DATE (MM/DD/YYYY)
CANCELLATION
AUTHORIZED REPRESENTATIVE
ACORD 25 (2016/03)
© 1988-2015 ACORD CORPORATION.  All rights reserved.
CERTIFICATE HOLDER
The ACORD name and logo are registered marks of ACORD
HIRED
AUTOS ONLY
2/27/2024
Holmes Murphy & Associates
2727 Grand Prairie Parkway
Waukee IA 50263
Brad Revier
612-322-6045
612-349-2490
brevier@holmesmurphy.com
Arch Insurance Company
11150
AMECONPC6
Arch Indemnity Insurance Company
30830
Ames Construction, Inc.
2500 County Road 42 W
Burnsville, MN 55337
1794478237
A
X
2,000,000
X
300,000
X
Contr Liab Per
10,000
X
Policy Form/XCU
2,000,000
4,000,000
X
Y
Y
41PKG1996100
12/1/2023
12/1/2024
4,000,000
A
2,000,000
X
Y
Y
41PKG1996100
12/1/2023
12/1/2024
B
X
N
Y
44WCI1996100
12/1/2023
12/1/2024
1,000,000
1,000,000
1,000,000
B
Stop Gap
44WCI1996100
12/1/2023
12/1/2024
Applies to
ND, OH, WA, WY
Contract No. 2024C006/240008-JOC - Earthwork Services and Debris Removal
Additional Insured only if required by written contract with respect to General Liability and Automobile Liability applies on a primary basis and the insurance of
the additional insured shall be non-contributory: Flood Control District of Maricopa County (District), Maricopa County and their agents, representatives, officers,
Directors, Officials, and employees.
Waiver of Subrogation only if required by written contract with respect to General Liability, Automobile Liability, Workers Compensation and Umbrella/Excess
Liability applies in favor of: Flood Control District of Maricopa County (District), Maricopa County and their agents, representatives, officers, Directors, Officials,
See Attached...
Flood Control District of Maricopa County
2801 W Durango St
Phoenix AZ 85009
DocuSign Envelope ID: 53FC961F-8000-45E0-9314-223CB81F3ADF

ACORD 101 (2008/01)
The ACORD name and logo are registered marks of ACORD
© 2008 ACORD CORPORATION.  All rights reserved.
THIS ADDITIONAL REMARKS FORM IS A SCHEDULE TO ACORD FORM,
FORM NUMBER:
FORM TITLE:
ADDITIONAL REMARKS
ADDITIONAL REMARKS SCHEDULE
Page           of
AGENCY CUSTOMER ID:
LOC #:
AGENCY
CARRIER
NAIC CODE
POLICY NUMBER
NAMED INSURED
EFFECTIVE DATE:
AMECONPC6
1
1
Holmes Murphy & Associates
Ames Construction, Inc.
2500 County Road 42 W
Burnsville, MN 55337
25
CERTIFICATE OF LIABILITY INSURANCE
and employees.
General Liability, Automobile Liability and Workers Compensation include an endorsement providing 30 days’ notice of cancellation will be furnished to the
certificate holder.
DocuSign Envelope ID: 53FC961F-8000-45E0-9314-223CB81F3ADF

ITEM #
DESCRIPTION
UNIT
PRICE
104 - 1
CQC Testing Allowance
LS
15,000.00
$     
104 - 3
Water Purchase Allowance
LS
TBN
105 - 1
Partnering Allowance
LS
5,000.00
$        
105 - 2
Construction Staking Allowance
LS
13,000.00
$     
105 - 3
Utility Relocation Allowance
LS
TBN
107 - 1
AZDES/SWPPP Permits Allowance
LS
4,500.00
$        
107 - 2
Public Information and Notification Allowance
LS
2,725.00
$        
107 - 3
Project Signs Allowance
LS
1,635.00
$        
107 - 4
Restricted Areas Delineation
LS
4,000.00
$        
107 - 5
Water Management Plan Preparation Allowance
LS
2,725.00
$        
107 - 6
Water Management Plan Implementation Allowance
LS
10,900.00
$     
107 - 7
Hazard Waste/Environmental Assessment Plan Preparation Allowance
LS
3,815.00
$        
107 - 8
Hazard Waste/Environmental Assessment Plan Implementation Allowance
LS
10,900.00
$     
108 - 1
Construction Work Plan Allowance
LS
3,000.00
$        
201 - 1
Clearing and Grubbing
AC
2,348.00
$        
202 - 1
Mobilization
LS
25,000.00
$     
203 - 1
Temporary Access Allowance
LS
17,500.00
$     
203 - 2
Temporary Construction Perimeter Fence Allowance
LS
10,000.00
$     
203 - 3
Temporary Construction Perimeter Fence Gates Allowance
LS
5,500.00
$        
206 - 1
Foundation Surface Preparation 
CY
49.00
$             
206 - 2
Embankment Crack Trenching
LF
7.60
$                
206 - 3
Cofferdam Construction
LS
260,831.70
$   
211 - 1
Common Fill (95% Compaction Min.)
CY
14.00
$             
211 - 2
Embankment Fill (FCDMC Std. Det. 200-1)
CY
14.00
$             
211 - 3
Structural Fill (95% Compaction Min.)
CY
141.50
$           
211 - 4
Select/Import Fill (Low PI of 15 or Less)
CY
141.50
$           
211 - 5
Landscape Fill (90% Compaction Typical)
CY
31.70
$             
211 - 6
Filter Aggregate
CY
347.30
$           
215 - 1
Borrow Excavation
CY
32.70
$             
215 - 2
Channel Excavation
CY
13.70
$             
215 - 3
Basin Excavation
CY
16.20
$             
215 - 4
Drainage Excavation/Low-Flow Swale Construction
CY
5.90
$                
215 - 5
Temporary Ditch/Berm
LF
5.90
$                
215 - 6
Over-Excavation Allowance
LS
40.20
$             
215 - 7
Soil Stabilizer & Dust Control Agent (Gorilla-Snot or approved equal)
SY
3.20
$                
216 - 1
Geomembrane
SY
14.50
$             
219 - 1
Gabion Baskets with Tie-backs & Filter Fabric
CY
755.40
$           
219 - 2
Gabion Wall With Filter Fabric (Height Varies)
CY
747.50
$           
219 - 3
Gabion Mattress with Filter Fabric - 9-inch Thick
CY
982.80
$           
219 - 4
Gabion Mattress with Filter Fabric -12-inch Thick
CY
985.00
$           
220 - 1
Riprap (D50 = 6 inch)
CY
220.10
$           
220 - 2
Riprap (D50 = 9 inch)
CY
220.10
$           
220 - 3
Riprap (D50 = 12 inch)
CY
220.10
$           
220 - 4
Riprap (D50 = 18 inch)
CY
248.20
$           
220 - 5
Riprap (D50 = 24 inch)
CY
248.20
$           
220 - 6
Grouted Riprap (D50 = 9 inch, FCDMC Std. Det. 555-1)
CY
561.30
$           
221 - 1
Sediment Wattles and Anchoring
LF
12.70
$             
231 - 1
Geotextile for Riprap
SY
2.70
$                
231 - 2
Geotextile for Filter
SY
2.70
$                
232 - 1
Geocomposite Wall Drain (FCDMC Std. Det. 552-1)
SY
15.30
$             
310 - 1
4-inch Aggregate Base Course (ABC) Maintenance Road (Chip Seal, 
FCDMC Std. Det. 201-1)
SY
23.80
$             
310 - 2
1/4-inch Decomposed Granite (DG)
SY
16.40
$             
310 - 3
Untreated Base
TON
58.80
$             
310 - 4
Chip Seal over graded/compacted surface (FCDMC Std. Det. 201-1)
SY
TBN
310 - 5
6-inch Aggregate Base Course (ABC) Maintenance Road  (FCDMC Std. 
Det. 201-2)
SY
34.80
$             
321 - 1
Asphalt Concrete (AC) Pavement
TON
TBN
322 - 1
Permanent Pavement Overlay
SY
TBN
330 - 1
Alleyway Plating - Structural Section
SY
33.50
$             
336 - 1
Permanent Pavement Replacement
SY
TBN
336 - 2
Resurface Driveway wih 4 inches of AB
SY
23.80
$             
340 - 10
Object Marker MCDOT M-2
EA
521.50
$           
344 - 1
Decomposed Granite Road Surface
SY
54.30
$             
344 - 2
Embankment/Slope Rockmulch (FCD Std. Det. 555-2)
CY
212.80
$           
350 - 2
Remove Reinforced Concrete Pipe
LF
138.70
$           
350 - 3
Remove Culvert Pipe
LF
138.90
$           
350 - 4
Remove Existing Sanitary Sewer Pipe
LF
128.70
$           
350 - 5
Remove Concrete Headwall
EA
8,201.50
$        
350 - 6
Remove Concrete Apron
EA
3,286.20
$        
350 - 7
Remove Existing Manhole
EA
17,656.20
$     
350 - 8
Remove Existing Catch Basin
EA
16,559.30
$     
350 - 9
Remove Existing Driveway
SF
24.20
$             
EARTHWORK & DEBRIS REMOVAL BID ITEM LIST - AMES 2024C006
DocuSign Envelope ID: 53FC961F-8000-45E0-9314-223CB81F3ADF

350 - 10
Remove Existing Sidewalk
SF
134.70
$           
350 - 11
Remove Existing Scupper and Spillway
EA
7,387.70
$        
350 - 12
Remove Existing Concrete Pavement
SY
1,316.50
$        
350 - 13
Remove Existing Asphalt Concrete
SY
1,136.30
$        
350 - 14
Remove Loose Riprap
CY
781.00
$           
350 - 15
Remove Grouted Riprap
CY
1,599.80
$        
350 - 16
Remove Sign
EA
462.30
$           
350 - 17
Remove Tree
EA
4,644.50
$        
350 - 18
Remove Chain Link Fence
LF
5.30
$                
350 - 19
Remove Rail Fence
LF
20.00
$             
350 - 20
Remove, Salvage and Replace Chink Link Fence
LF
35.50
$             
350 - 21
Remove Existing Bollards
EA
1,446.20
$        
350 - 22
Remove Block Wall
LF
163.40
$           
350 - 23
Remove Existing Valve, Box, and Cover
EA
470.30
$           
350 - 24
Remove Existing Hydrant
EA
742.00
$           
350 - 25
Removal and Disposal of  Debris from Right-of-Way
LS
1,048.60
$        
350 - 26
Removal and Disposal of Miscellaneous Material
LS
1,048.60
$        
351 - 1
Relocate Existing Traffic Signal Equipment
EA
TBN
401 - 1
Traffic Control Allowance
LS
TBN
405 - 1
Survey Marker/Brass Cap (MAG Det. No. 120, Type 'A')
EA
2,105.90
$        
405 - 2
Survey Marker/Brass Cap (MAG Det. No. 120, Type 'B')
EA
2,105.90
$        
430 - 1
Topsoil Plating and Grading
SY
43.80
$             
430 - 2A
Salvage and Relocate Tree - 24-in Box
EA
TBN
430 - 2B
Salvage and Relocate Tree - 36-in Box
EA
TBN
430 - 2C
Salvage and Relocate Tree - 48-in Box
EA
TBN
430 - 2D
Salvage and Relocate Tree - 60-in Box
EA
TBN
430 - 2E
Salvage and Relocate Tree - 72-in Box
EA
TBN
430 - 2F
Salvage and Relocate Tree - 84-in Box
EA
TBN
430 - 3A
Salvage and Relocate Class A Saguaro Cactus
EA
TBN
430 - 3B
Salvage and Relocate Class B Saguaro Cactus
EA
TBN
430 - 3C
Salvage and Relocate Class C Saguaro Cactus
EA
TBN
430 - 3D
Salvage and Relocate Class D Saguaro Cactus
EA
TBN
430 - 4A
Salvage and Relocate Barrel Cactus - under 3-ft tall
EA
TBN
430 - 4B
Salvage and Relocate Barrel Cactus - 3-ft and taller
EA
TBN
430 - 4C
Salvage and Relocate Small Cactus - Hedgehogs, Pincushion, etc
EA
TBN
430 - 4D
Salvage and Relocate Octatillo
EA
TBN
430 - 4E
Salvage and Relocate Cholla
EA
TBN
430 - 5
Tall Pot Tree Planting (Trees to be picked up at the District Durango Yard)
EA
TBN
430 - 6
Landscaping Hydroseed Mix A
AC
TBN
430 - 7
Landscaping Hydroseed Mix B
AC
TBN
430 - 8
Landscaping Hydroseed Mix C
AC
TBN
430 - 9
Landscaping Hydroseed Mix D
AC
TBN
430 - 10
Sod
SY
TBN
430 - 11
Ocotillos (Bare Root)
EA
TBN
430 - 12
Container Cacti (5 Gallon)
EA
TBN
430 - 13
Shrubs (5 Gallon)
EA
TBN
430 - 14
Box Tree (24-inch)
EA
TBN
430 - 15
2' x 2' x 2' Landscape Boulder (0.5 Ton)
EA
2,901.80
$        
430 - 16
4' x 4' x 4' Landscape Boulder (3 Ton)
EA
4,485.60
$        
430 - 17
Erosion Blanket
SY
17.60
$             
430 - 18
Rock Staining (Natina)
SY
9.50
$                
430 - 19
Fence Staining (Natina)
LF
37.90
$             
430 - 20
RCC/Concrete Staining (Natina)
SF
5.70
$                
430 - 21
Metal Handrail Staining (Natina)
LF
7.60
$                
432 - 1
Rock Mulch (3-inch Angular)
AC
195,864.10
$   
440 - 1
Drip Irrigation System
LS
TBN
440 - 2
Landscape Irrigation System
LS
TBN
440 - 3
Irrigation Control System (Calsense)
EA
TBN
440 - 4
Irrigation Control System (LEIT Solar)
EA
TBN
440 - 5
2-inch Water Service Tap & Meter
EA
TBN
440 - 6
2-inch Backflow Preventer Reduced Pressure
EA
TBN
505 - 1
Reinforced Concrete Channel Liner (6-in Min.)
SY
327.80
$           
505 - 2
Reinforced Concrete Channel Liner (8-in Min.)
SY
355.80
$           
505 - 18
Reconstruct Irrigation Ditch
SY
54.50
$             
505 - 25
Fiber-Reinforced Concrete Channel Liner (6-in Min.)
SY
284.60
$           
505 - 26
Fiber-Reinforced Concrete Channel Liner (8-in Min.)
SY
316.40
$           
Miscellaneous Work       
MISC
To Be Negotiated 
TBN
*
The amount to be paid for work items not included in Unit Price List shall 
be negotiated between the contractor and the District.
*
 This should be clearly identified as "To be Negotiated" (TBN) or 
"Miscellaneous (Misc) work".
DocuSign Envelope ID: 53FC961F-8000-45E0-9314-223CB81F3ADF

EXHIBIT A 
 
 
 
 
 
SCOPE OF WORK 
 
CONTRACT FCD 2024C006 
 
JOB ORDER CONTRACT 
 
EARTHWORK SERVICES AND DEBRIS REMOVAL 
 
 
 
 
 
 
 
 
 
 
 
 
 
DocuSign Envelope ID: 53FC961F-8000-45E0-9314-223CB81F3ADF

GENERAL 
 
Under the Director's general supervision, the Contractor shall perform Earthwork and Debris 
Removal services.  In addition, the contractor will perform preconstruction-related services such 
as design review, constructability review, and cost estimates for contracted Work Assignments 
according to the directions and designated standards of the District.  It is understood and 
agreed that the District’s authorized representative shall be the Director or their duly authorized 
representative.  
 
The contractor for construction services is not required to be registered to perform design 
services under A.R.S. Title 32, Chapter 1 if the person or firm performing the design services on 
behalf of the contractor is appropriately documented.  
 
The contractor for construction services shall be licensed to perform construction under A.R.S. 
Title 32, Chapter 10.  
 
The firm performing the construction shall be licensed under the laws of the State of Arizona to 
perform the Work at the time of proposal submission and be familiar with and comply with all 
applicable laws, statutes, ordinances, building codes, rules, and regulations, and lawful orders 
of public authorities in performing the Work, including but not limited to, environmental laws and 
A.R.S. Title 34, as amended.  
 
The amount of work requested during the contract's life is unknown; the least amount is zero, 
and the maximum amount is limited to the "not-to-exceed" amount of each work assignment. 
 
 
SERVICES 
 
Construction and repair services may include, but are not limited to, supplying all labor, material, 
and equipment on an as-needed basis to provide earthwork and related construction services, 
including the following: 
 
Channel and roadway excavation; structural excavation and backfill; fill, subgrade 
preparation; riprap and rock mulch placement; grouted riprap, erosion control; removal 
and disposal services; transparent and grubbing, rock mulch placement. 
 
 
Other services such as maintenance, modification, operation, pre-construction, design, post-
construction as-builts, financial, and other related services may be required. They will be 
negotiated at individual Work Assignment phases. 
 
Before the issuance of a work assignment, the Contractor shall perform pre-construction-related 
services to ensure a smooth project delivery and to work out any constructability matters during 
the design phase.  The pre-construction activities include design reviews, constructability 
reviews, investigations, stakeholder coordination, comment resolution, negotiation of unit item 
costs, preparation of a construction work plan, preparation of an emergency action plan, 
creation of project schedules, and all project coordination.  Additionally, a visit to the jobsite with 
District personnel shall be conducted before the issuance of the Work Assignment.  This allows 
the Contractor to ask questions concerning the Work Assignment, take measurements, and 
address any requirements.   The contractor understands and agrees that this pre-construction 
effort and any work performed before issuance of a work assignment will be completed at the 
Contractor’s own expense and does not guarantee any future work. 
DocuSign Envelope ID: 53FC961F-8000-45E0-9314-223CB81F3ADF

WORK ASSIGNMENTS 
 
Each Work Assignment mutually agreed upon and issued by the District will define specific 
requirements. The Contractor shall not be required to accept any Work Assignment, it being the 
intent that both parties must mutually agree to any particular work before a Work Assignment may 
be issued. 
 
All construction work shall conform to the Uniform Standard Specifications for Public Works 
Construction published by the Maricopa Association of Governments (MAG) 2023 Revision to the 
2020 Edition (or the year indicated in the Work Assignment documents) together with this General 
Scope of Work, and the Work Assignment documents (plans and special provisions). 
 
Work Assignments shall be undertaken only upon issuing a written notice to proceed. Work 
Assignments shall set forth the following: 
 
1. 
Contract number and Work Assignment identification 
2. 
The agreed description of work, including the location, list of work items, and applicable 
special provisions and drawings. 
3. 
The agreed period of performance and a work schedule 
4. 
The place of performance 
5. 
The calculated total price for the work to be performed. 
6. 
Fee proposal signed by the Contractor. 
7. 
Approval Signatures by the District 
 
Work Assignments will be at various locations throughout Maricopa County and at District 
structures outside Maricopa County.  Each Work Assignment shall provide a description and 
parameters for completing the work.   
 
An onsite review of the site with District personnel shall be conducted before issuance of the 
Work Assignment.  This allows the Contractor to ask questions concerning the Work 
Assignment, take measurements, and address any requirements. Work shall be performed once 
the negotiated Work Assignment has been approved by District staff. 
 
 
PAYMENTS 
 
Due to the wide range and variety of potential projects expected to be performed under this 
contract, an entire menu of anticipated scope items could be more practical to list. Materials and 
other direct costs will be negotiated per work assignment. No Work Assignment shall exceed 
$2,000,000 in total cost All Combined Work Assignments shall not exceed $ 5,000,000 during 
any contract year. Payments will be made for the services per the General Scope of Work and 
the Detailed Scope of Work as negotiated for each Work Assignment.  
 
Payment for individual work assignments will be based on unit prices that do not exceed the unit 
prices identified in the Unit Price List of Exhibit B. 
 
DocuSign Envelope ID: 53FC961F-8000-45E0-9314-223CB81F3ADF

The amount of each work assignment will be the summation of the total amounts calculated for 
each item of the work assignment. The total amount for each item shall be the work assignment 
quantity times the unit price. Payment for each work assignment will be the calculated total 
amount for completed and accepted quantities of each item. 
The unit prices identified in the Unit Price List, Exhibit B, include all direct and indirect costs 
associated with each work assignment of this Job Order Contract. The unit prices incorporate 
adjustments for the following: 
 
• 
Direct labor, material, and equipment costs 
• 
Contractor’s jobsite General Conditions 
• 
Contractor's home office overhead and profit 
• 
Subcontractors' overhead and profit 
• 
Insurance 
• 
All costs associated with bonding (specifically including bond premiums) 
• 
Employee payroll taxes, insurance, and fringe benefits 
• 
Business taxes, contributions, memberships, corporate headquarters support (legal, 
financial, etc.) 
 
ORDER OF PRECEDENCE 
 
In the event a conflict exists between the Contract Documents of any Work Assignment, the 
order of precedence shall be as follows: 
 
1. Work Assignment Project Specifications 
2. Work Assignment Project Plans 
3. Work Assignment Project Technical Memorandums 
4. FCD Standard Details 
5. MCDOT Supplement to MAG Uniform Standard Specifications and Details for Public 
Works Construction 
6. MAG Uniform Standard Specifications for Public Works Construction 
7. MAG Uniform Standard Details for Public Works Construction 
8. JOC Contract Exhibit A (This General Scope of Work and its Special Provisions) 
 
DocuSign Envelope ID: 53FC961F-8000-45E0-9314-223CB81F3ADF

SUPPLEMENTARY GENERAL 
CONDITIONS 
 
 
JOB ORDER CONTRACT FCD 2024C006 
 
Earthwork Services and Debris Removal 
 
August 2018 
 
 
Prepared by: 
 
Flood Control District of Maricopa County 
Engineering Division 
2801 West Durango Street 
Phoenix, AZ 85009
FLOOD CONTROL DISTRICT OF MARICOPA COUNTY 
 
 
SUPPLEMENTARY GENERAL CONDITIONS 
 
DocuSign Envelope ID: 53FC961F-8000-45E0-9314-223CB81F3ADF

Job Order Contract FCD 2024C006 
              
               Page 3 of 27 
Supplementary General Conditions 
 
 
 
TABLE OF CONTENTS 
 
SECTION 101 – ABBREVIATIONS AND DEFINITIONS ...................................................................... 4 
SECTION 102 – BIDDING REQUIREMENTS AND CONDITIONS ....................................................... 4 
SECTION 103 – AWARD AND EXECUTION OF CONTRACT .............................................................. 5 
SECTION 104 – SCOPE OF WORK ...................................................................................................... 5 
SECTION 105 – CONTROL OF WORK ............................................................................................... 11 
SECTION 106 – CONTROL OF MATERIALS ..................................................................................... 16 
SECTION 107 – LEGAL REGULATIONS AND RESPONSIBILITY TO PUBLIC ................................. 19 
SECTION 108 – COMMENCEMENT, PROSECUTION AND PROGRESS ......................................... 25 
SECTION 109 – MEASUREMENTS AND PAYMENTS ..................................................................... 26 
SECTION 110 – NOTIFICATION OF CHANGED CONDITIONS AND DISPUTE  
                             RESOLUTION ........................................................................................................... 27 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
DocuSign Envelope ID: 53FC961F-8000-45E0-9314-223CB81F3ADF

Job Order Contract FCD 2024C006 
              
               Page 4 of 27 
Supplementary General Conditions 
 
SUPPLEMENTARY GENERAL CONDITIONS 
 
SPECIFICATIONS 
Except as otherwise amended in these Supplementary General Conditions and the Construction 
Special Provisions, projects performed under this Contract shall be constructed in accordance with all 
applicable Maricopa Association of Governments (MAG) Uniform Standard Specifications and 
Uniform Standard Details, dated 2012, and including revisions through 2018; Maricopa County 
Department of Transportation (MCDOT) English Supplement to the MAG Uniform Standard 
Specifications and Details for Public Works Construction, dated 2011; Manual On Uniform Traffic 
Control Devices For Streets And Highways, 2009 Edition, ADOT Standard Specifications for Road and 
Bridge Construction and Standard Details. All references herein to MAG refer to the Uniform Standard 
Specifications for Public Works Construction by the Maricopa Association of Governments 2012 
edition, including all revisions through 2018. 
 
 
SECTION 101 – ABBREVIATIONS AND DEFINITIONS 
 
Subsection 101.2 – Definitions and Terms: 
 
1) 
Change the definition of the phrase "Board of Supervisors" to, “the Board of Directors of the Flood 
Control District of Maricopa County acting under the authority of the laws of the State of Arizona.” 
 
2) 
Change the definition of the phrase "Budget Project" to, “a project financed by funds set-aside in 
the annual budget or otherwise approved by the Board of Directors of the Flood Control District 
of Maricopa County.” 
 
3) 
Add to the definition of the phrase "Construction Documents," the phrase "Supplementary General 
Conditions." The terms “Contract Documents” and “Construction Documents” shall be used 
interchangeably throughout these Specifications. 
 
4) 
Change the definition of the term "Engineer" to, “the person appointed by the Board of Directors 
of the Flood Control District of Maricopa County to the office of Chief Engineer and General 
Manager of the Flood Control District of Maricopa County acting directly or through its authorized 
representative, the Division Manager of Planning and Project Management Division of the Flood 
Control District of Maricopa County.” 
 
5) 
Change the definition of the term "Owner" to, “the Flood Control District of Maricopa County, 
acting through its legally constituted officials, officers, or employees.” 
 
6) 
Whenever the word "District" is used in these Specifications, it shall mean the Flood Control 
District of Maricopa County. 
 
7) 
Add the definition of the term “Landscape Architect” as “an individual designated by the Engineer 
to review the landscape elements of the work.” 
 
 
SECTION 102 – BIDDING REQUIREMENTS AND CONDITIONS 
 
Subsection 102.6 – Subcontractors' List: 
Add the following: 
A complete list of Subcontractors that are to be employed on the Project shall be submitted with the 
Statement of Qualifications, on the List of Subcontractors’ Form provided in the Request for 
DocuSign Envelope ID: 53FC961F-8000-45E0-9314-223CB81F3ADF

Job Order Contract FCD 2024C006 
              
               Page 5 of 27 
Supplementary General Conditions 
 
Proposals.  No change of the Subcontractors named therein will be made unless first approved in 
writing by the Flood Control District of Maricopa County. 
 
SECTION 103 – AWARD AND EXECUTION OF CONTRACT 
 
Subsection 103.6 – Contractor's Insurance: 
Add the following: 
Concurrently with the execution of the contract, Contractor shall furnish a Certificate of Insurance, 
using the included Certificate that names the additional insureds as set out in the Certificate.  The 
Certificate shall also name the additional insureds as Certificate Holders.  The types of insurance and 
the limits of liability shall be as indicated on the form provided. 
 
Subsection 103.6.1(D) – Additional Insured: 
Add the following: 
Include the Flood Control District of Maricopa County as additional insured as indicated on the 
included Certificate of Insurance Form.   
 
Subsection 103.6.2 – Indemnification of the Contracting Agency Against Liability: 
Add the following: 
Additionally, the Contractor shall execute the Indemnification found in the Contact Documents.  The 
Contractor expressly agrees to hold the Flood Control District of Maricopa County harmless under 
same terms and conditions as the District. 
 
SECTION 104 – SCOPE OF WORK 
 
Subsection 104.1.1 – General: 
Delete paragraph two of this Subsection and replace with the following: 
This Contract and its designated documents, whether taken separately or together, are to be 
interpreted according to full intent, meaning, and spirit, and shall be deemed to mutually explain each 
other and to be descriptive of any materials to be furnished and the work to be performed under this 
Contract.  In the event a conflict exists between the Contract Document the order of precedence listing 
descending order shall be as follows: 
 
• 
Change Orders 
• 
Contract Agreement 
• 
Work Assignment Agreement 
• 
Supplementary General Conditions 
• 
Construction Special Provisions 
• 
Project Plans 
• 
MAG Uniform Standard Specifications and Uniform Details 
• 
Manual on Uniform Traffic Control Devices for Streets and Highways 
• 
Maricopa County Department of Transportation (MCDOT) English Supplement to the MAG       
Uniform Standard Specifications and Details for Public Works Construction, dated 2011 
• 
ADOT Standard Specifications for Road and Bridge Construction and Standard Details 
 
Add the following: 
All water, including construction and potable, lighting, temporary electric power, heat, and telephone 
service shall be arranged and provided for as per the requirements of the work by the Contractor at 
the Contractor’s expense. 
DocuSign Envelope ID: 53FC961F-8000-45E0-9314-223CB81F3ADF

Job Order Contract FCD 2024C006 
              
               Page 6 of 27 
Supplementary General Conditions 
 
Dust control and noise will be of great concern to the adjacent neighborhoods.  The Contractor shall 
take extreme care while excavating and transporting material and shall minimize dust.  The Contractor 
will take all necessary steps to avoid excessive noise, and will abide by all local jurisdiction 
requirements for allowable working hours.  Night work will not be allowed within residential areas. 
 
The Flood Control District of Maricopa County and Contractor shall have weekly meetings at times 
agreed upon during the pre-construction meeting. Additional meetings may be held prior to 
commencement of major work elements, if required by the Engineer.  The Engineer's approval shall be 
obtained before commencing work. 
 
The Contractor shall maintain access for homes and businesses adjacent to a Project site at all times. 
 
All construction activities may occur in areas that are subject to flooding.  Flows can occur at any 
time.  The Contractor will remove all of their equipment from the construction area whenever flows 
could occur that would inundate the equipment or equipment storage areas.  Protection from flooding 
of Contractor’s equipment, construction items to be furnished by the Contractor and the work area is 
the Contractor’s responsibility. 
 
Any excavated material in excess of what is needed for a Project becomes property of the Contractor 
and Contractor shall remove the excavated material from the Project site and dispose of it at a site 
approved by the Engineer.   
 
Electronic MicroStation (.dgn) CADD files of the Project will be provided to the Contractor for reference 
for each Project Work Assignment.  The Owner and its design consultant assume no responsibility for 
data supplied in electronic format.  Such data is provided for convenience only and the Contractor 
accepts full responsibility for verifying the accuracy and completeness of the data.  The information 
on the plans shall take precedence over the electronic files should there be any discrepancy between 
the two. If there is any discrepancy between the plans and the electronic files, the Contractor shall 
bring it to the Engineer’s attention immediately to determine if corrections to the plans or files are 
necessary. 
 
Native Plants: 
Removal of any protected native plant material shall follow applicable federal, state and local 
regulations. This is of particular importance as it applies to cacti, such as saguaro and barrel cacti. 
The laws governing removal, salvage, or destruction of native plant material are found in Arizona 
Revised Statutes: Title 3, Chapter 7, “Arizona Native Plants”.  The Owner is responsible for filing the 
“Notice of Intent to Clear Land”, or the “Application for Arizona Protected Native Plants and Wood 
Removal”, whichever is appropriate, with the Arizona Department of Agriculture. 
 
Birds and Other Wildlife Species of Concern: 
All birds, except pigeons, house sparrows, european starlings, doves and quail, are protected by the 
Migratory Bird Treaty Act (16 U.S.C. 703-712; Chapter 128; as amended).  It is especially important to 
avoid disturbing active bird nests (those with eggs or hatchlings present) during Arizona’s breeding 
bird season (roughly February through June in Maricopa County, however an individual nest is only 
active for thirty (30) to forty-five (45) days). Additionally, burrowing owls are present in many project 
sites where vegetation is sparse.  The District, in advance of construction, will have a biologist assess 
the potential impact of the Project on bird species and where necessary, has taken action to minimize 
the impact.  However, it is the responsibility of the Contractor to be aware of the existence of nesting 
birds and burrowing owls, and to notify the Engineer immediately if they are found within the Project 
DocuSign Envelope ID: 53FC961F-8000-45E0-9314-223CB81F3ADF

Job Order Contract FCD 2024C006 
              
               Page 7 of 27 
Supplementary General Conditions 
 
limits.  The Contractor will also notify the Engineer in advance of any planned removal of vegetation 
where such birds or owls may be present. 
 
Burrowing Owls:  
Burrowing owls are protected under the federal Migratory Bird Act, therefore it is illegal to harm, 
harass, pursue, take, capture, or kill any migratory bird, nest, or egg.  The District will make its best 
effort to relocate the owls out of the Project area prior to commencement of the Contract, but some 
may remain and/or return to their burrows and nesting areas.  The District has contracted with Bob 
Fox, a wildlife rehabilitation specialist, to relocate the owls.  The Contractor shall keep Bob Fox and 
the Engineer apprised of the Project schedule and notify them two (2) weeks prior to commencing 
excavation, backfilling or stockpiling of material in a new Project area, so that Bob Fox can survey for 
owls and relocate any that remain, to avoid injuring and disturbing the owls because of the 
construction activities.  If the Contractor discovers a burrowing owl habitat or owl(s) during 
construction, he shall stop construction immediately without disturbing the habitat or owl(s), and 
notify the Engineer and Bob Fox.  Bob Fox can be reached at (480) 595-5047. 
 
Gila Monsters and Desert Tortoises: 
Most wildlife species are able to move away from on-coming construction activity, although some 
incidental loss of underground-dwelling small mammals and reptiles can be expected.  However, two 
species are of concern in the state, the Gila monster, and the desert tortoise. Because the presence 
of these two species is not always obvious during a biological assessment, the Arizona Game and 
Fish Department has guidelines for handling these two species when encountered at construction 
projects. 
 
Tortoises found during construction that are actually moving in harm’s way (such as in front of a 
dozer) may be picked up and moved only in accordance with the guidelines.  
 
http://www.azgfd.gov/hgis/pdfs/Tortoisehandlingguidelines.pdf 
  
Gila Monsters are venomous and should not be touched. While the guidelines aim mostly at home 
owners, the best thing to do if a Gila Monster is in harm’s way at a project site is to notify the Engineer 
who will get AZGFD or their designated wildlife handler out there to relocate the animal.  The guide in 
the link below has some important information about rattlesnakes and other animals. 
 
http://www.azgfd.gov/w_c/documents/LWVR.pdf 
  
 
Inspection and Testing: 
The Contractor will be responsible for all quality control for each Project Work Assignment and will 
provide the Engineer with copies of the results of all tests performed by the Contractor Quality Control 
(CQC).  The Owner and Engineer will provide quality assurance for the Project. 
 
Quality Control (QC) refers to those actions taken by the Contractor, and those parties charged with 
the procurement and installation of manufactured materials, and the placement and compaction of 
the soil materials, which provide a means to determine and sometimes quantify the characteristics of 
the product.  The results of a quality control program are compared to the Special Provisions of other 
contractual or regulatory requirements for each Project Work Assignment.  During each aspect of the 
handling of these materials, quality control is provided by the manufacturer, fabricator, or installer of 
the materials, or the supplier and earthworks contractor for the soils, to ensure that the materials and 
DocuSign Envelope ID: 53FC961F-8000-45E0-9314-223CB81F3ADF

Job Order Contract FCD 2024C006 
              
               Page 8 of 27 
Supplementary General Conditions 
 
workmanship conform to the plans and Special Provisions.  The Contractor and his suppliers and 
manufacturers retain quality control responsibility. 
 
Quality Assurance (QA) is a planned and systematic pattern of all means and actions intended to 
provide adequate confidence that the materials and procedures conform to the plans and Special 
Provisions, and any applicable regulatory requirements for each Project Work Assignment.  The Owner 
or their designated representative provides quality assurance. 
Failing test results are the responsibility of the Contractor and any retesting shall be at the Contractor’s 
expense. Failing tests are tests that do not meet the minimum requirements identified in the Special 
Provisions for either quality assurance or quality control testing.   
 
Payment for preparation of an approved CQC Plan and performance of CQC testing will be on a lump 
sum basis and shall be full compensation for supplying and furnishing all materials, equipment, 
facilities, services and performing all work necessary to complete the work. Partial payments may be 
issued monthly based upon the progress of work and actual cost invoices as determined by the 
Engineer. The total of all partial payments for CQC Plan and Testing shall not exceed the lump sum 
amount shown in the fee schedule for this item. 
 
ITEM 104-1   CQC PLAN AND TESTING ALLOWANCE 
 
Subsection 104.1.2 – Maintenance of Traffic: 
Add the following: 
For each Project Work Assignment, all traffic and/or control devices shall be provided, maintained 
and/or controlled as specified in Part VI of the Manual of Uniform Traffic Control Devices, 2009 Edition 
(U.S. Department of Transportation, Federal Highway Division), and the manual/policies of the agency 
in which work is being performed. In all cases during construction, access will be provided for 
emergency vehicles, trash collection, and school buses as required.  The Contractor will notify schools, 
trash collection, emergency services, etc. at least thirty (30) calendar days in advance of implementing 
the traffic control plans that may affect their activities.  Full closure of any public road or multi-use 
trail is not permitted during the construction of this Project without prior approval of the Engineer or 
agency in which the work is being performed in. The Contractor shall refer to Section 401 of the Special 
Provisions. 
 
Subsection 104.1.3 – Cleanup and Dust Control: 
Add the following: 
(A) It is the Contractor’s responsibility to minimize dust during all phases of each Project Work 
Assignment by taking all precautions necessary. In the event that it is determined by the Engineer 
that control of dust is not sufficient, the work will be terminated until the issue is resolved to the 
satisfaction of the Engineer.  The Owner will not be responsible for any costs or construction 
delays incurred for termination or suspension of work due to insufficient dust control measures. 
 
(B) Salvage material shall be stored at designated areas. 
 
(C) Materials not salvaged shall be disposed of properly at a location and in a manner acceptable to 
the Engineer.   
(D) The Contractor at all times shall keep the premises free from accumulation of waste materials 
or rubbish caused by his operations. At the completion of the work, the Contractor shall remove 
all equipment, tools, and surplus materials. The Contractor shall completely clean the premises, 
removing and disposing of all debris and rubbish, and cleaning all stains, spots, marks, dirt, 
smears, etc. 
 
DocuSign Envelope ID: 53FC961F-8000-45E0-9314-223CB81F3ADF

Job Order Contract FCD 2024C006 
              
               Page 9 of 27 
Supplementary General Conditions 
 
Subsection 104.2 – Alteration of Work: 
Add the following: 
Cost estimates or pricing proposals shall be itemized to include direct labor by man-hours, individual 
craft, hourly wage rate and verifiable labor burden. Other direct costs shall include rental and operator 
rates for rented or owned equipment, material trucking expenses and other costs clearly identified and 
directly allocable to contract performance. Material costs shall be itemized by item description, 
quantity(s) for each item, unit price per item, including applicable sales tax markup, and extended total 
price per item.  
The Contractor shall provide copies of material supplier quote sheets, invoices or purchase orders, as 
appropriate. In the case of a conflict between the unit price and the extended total for a specific item, 
the unit price will govern. 
 
Unless otherwise authorized or directed by the Engineer, lump sum cost estimates or price proposals 
shall be rejected and returned to the Contractor for itemization as described above. Failure of the 
Contractor to submit properly itemized cost estimates or price proposals shall not constitute an 
excusable delay. 
 
Subsection 104.2.1 – By the Contracting Agency: 
Add the following: 
The Flood Control District of Maricopa County may at any time, by written order, and without notice to 
the sureties, if any, make changes within the general scope of this contract in any one or more of the 
following: 
 
A) 
Drawings, designs, or specifications; 
B) 
Method or manner of performance of the work; 
C) 
Owner-furnished facilities, equipment, materials, services, or site; and/or 
D) 
Directing acceleration in the performance of the work. 
 
Any other written order from the Flood Control District of Maricopa County that causes a change shall 
be treated as a change order under this section provided that the Contractor gives the Flood Control 
District of Maricopa County written notification within two (2) working days after receipt of such 
direction stating: 
 
A) 
The date, nature, and circumstances of the conduct regarded as a change; 
B) 
The particular elements of the contract performance for which the Contractor is seeking an 
equitable adjustment under this section, including any price or schedule adjustments; and 
C) 
The Contractor’s estimate of the time by which the Flood Control District of Maricopa County 
must respond to the Contractor’s notice to minimize cost, delay, or disruption of 
performance. 
 
The Contractor shall diligently continue performance of this contract to the maximum extent possible 
in accordance with its provisions.  Except as provided in this section, no order, statement, or conduct 
of the Flood Control District of Maricopa County shall be treated as a change or entitle the Contractor 
to an equitable adjustment.  If any change under this section causes an increase or decrease in the 
Contractor’s cost of, or the time required for, the performance of any part of the work under this 
contract, the Flood Control District of Maricopa County shall make an equitable adjustment and 
modify the contract in writing.  The equitable adjustment shall not include increased costs or time 
extensions for delay resulting from the Contractor’s failure to provide notice or to diligently continue 
DocuSign Envelope ID: 53FC961F-8000-45E0-9314-223CB81F3ADF

Job Order Contract FCD 2024C006 
              
               Page 10 of 27 
Supplementary General Conditions 
 
performance.  No proposal for the Contractor for an equitable adjustment shall be allowed if asserted 
after final payment under this contract. 
 
Subsection 104.2.4 – At the Contractor’s Request: 
Add the following: 
 
Cost Estimate or Price Proposals: 
The Contractor and any lower-tier subcontractors shall submit itemized cost estimates or price 
proposals for any owner-directed change order or Contractor-initiated claim. 
 
Cost estimates or pricing proposals shall be itemized to include direct labor by man-hours, individual 
craft, hourly wage rate, and verifiable labor burden.  Other direct costs shall include rental and operator 
rates for rented or owned equipment, material trucking expenses and other costs clearly identified and 
directly allocable to contract performance.  Material costs shall be itemized by item description, 
quantity for each item, unit price per item, including applicable sales tax markup, and extended total 
price per item.  The Contractor shall provide copies of material supplier quote sheets, invoices or 
purchase orders, as appropriate. 
 
Lump sum cost estimates or price proposals shall be rejected and returned to the Contractor for 
itemization as described above.  Failure of the Contractor to submit properly itemized cost estimates 
or price proposals shall not constitute an excusable delay. 
 
Add the Following Subsection: 
Subsection 104.2.6  – Value Engineering: 
 
The Contractor is encouraged to or may be required to review, develop, prepare, and submit value 
engineering change proposals (VECPs).   
 
The VECP shall include the following: 
 
1) A description of the difference between the existing contract requirement and that proposed, 
the comparative advantages and disadvantages of each, a justification when an item’s 
function or characteristics are being altered, and the effects of the change on the end item’s 
performance.   
 
2) A list and analysis of the contract requirements that must be changed if the VECP is accepted, 
including any suggested specification revision. 
 
3) A separate, detailed cost estimate for the affected portions of the existing contract 
requirements and the VECP.  The cost reduction associated with the VECP shall take into 
account the Contractor’s allowable development and implementation costs, including any 
amount attributable to subcontracts. 
 
4) A description and estimate of costs the Owner may incur implementing the VECP, such as 
test and evaluation and operating and support costs.  This is an estimate based only on the 
Contractor’s understanding of additional efforts to be expended by the Owner, should the 
VECP be accepted.  The Owner will determine the final cost. 
 
5) A prediction of any effects the proposed change would have on collateral costs to the agency, 
i.e., costs of operation or maintenance. 
DocuSign Envelope ID: 53FC961F-8000-45E0-9314-223CB81F3ADF

Job Order Contract FCD 2024C006 
              
               Page 11 of 27 
Supplementary General Conditions 
 
6) A statement of the time by which a contract modification accepting the VECP must be issued 
in order to achieve the maximum cost reduction, noting any effect on the contract completion 
time or delivery schedule. 
 
Any VECP may be accepted, in whole or in part, through continuous coordination between the 
Contractor and Flood Control District of Maricopa County.   
 
 
SECTION 105 – CONTROL OF WORK 
 
Subsection 105.1 – Authority of the Engineer: 
 
Add the following Subsection: 
Subsection 105.1.1 – Engineer's Evaluation:   
The Engineer will be allowed a reasonable time within which to evaluate each proposal or submittal 
made pursuant to Subsections 105.3.1 and 106.4 of the Supplementary General Conditions.  The 
Engineer will be the sole judge of acceptability.  No "or-equal" or substitute will be ordered, installed, 
or utilized without the Engineer's prior written acceptance that will be evidenced by either a Change 
Order or an approved Shop Drawing.  The Flood Control District of Maricopa County may require the 
Contractor to furnish at the Contractor's expense a special performance guarantee or other surety 
with respect to any "or-equal" or substitute.   
 
The Engineer will record time required by the Engineer and Engineer's Consultants in evaluating 
substitutes proposed or submitted by the Contractor pursuant to subparagraphs 105.3.1 and 106.4(B) 
and in making changes in the Construction Documents  (or in the provisions of any other direct 
contract with Owner for work on the Project) occasioned thereby. Whether or not the Engineer accepts 
a substitute item so proposed or submitted by the Contractor, the Contractor shall reimburse the Flood 
Control District of Maricopa County for the charges of the Engineer and the Engineer's Consultants for 
evaluating each such proposed substitute item. 
 
All submissions (plans, specifications, etc.) prepared and/or submitted by the Contractor that involves 
an engineering change to the original construction plan and specifications shall be sealed by an 
Engineer registered in the State of Arizona. 
 
Subsection 105.2 – Plans and Shop Drawings: 
Add the following paragraphs: 
Shop drawings means drawings, submitted to the Engineer by the Contractor pursuant to the contract, 
showing in detail (i) the proposed fabrication and assembly of structural elements and (ii) the 
installation (i.e., form, fit and attachment details) of materials or equipment.  It includes drawings, 
diagrams, layouts, schematics, descriptive literature, illustrations, schedules, performance and test 
data, and similar materials furnished by the Contractor to explain in detail specific portions of the work 
required by the contract. 
 
Product Data is information on manufactured items, either stock or modified, and includes descriptive 
literature, operating data, performance curves, certified dimensional drawings, wiring or schematic 
control diagrams, piping, instrumentation, parts lists, and operating, maintenance and lubrication 
manuals. 
 
Subsection 105.3 – Conformity with Plans and Specifications: 
DocuSign Envelope ID: 53FC961F-8000-45E0-9314-223CB81F3ADF

Job Order Contract FCD 2024C006 
              
               Page 12 of 27 
Supplementary General Conditions 
 
 
Add the following Subsection: 
105.3.1 - Substitute Construction Methods or Procedures:   
If a specific means, method, technique, sequence or procedure of construction is shown or indicated 
and expressly required by the Construction Documents, the Contractor may furnish or utilize a 
substitute means, method, technique, sequence or procedure of construction acceptable to the 
Engineer.  The Contractor shall submit sufficient information to allow the Engineer, in the Engineer's 
sole discretion, to determine that the substitute proposed is equivalent to that expressly called for by 
the Construction Documents.  The procedure for review by Engineer will be similar to that provided in 
subparagraph 106.4(B). 
 
 
Subsection 105.5 – Cooperation of Contractor: 
 
Add the following Subsection: 
Subsection 105.5.1 – Partnering: 
The Flood Control District of Maricopa County intends to encourage the foundation of a partnering 
relationship with the Contractor and its subcontractors. This partnering relationship will be structured 
to draw on the strength of each organization to identify and achieve reciprocal goals.  The objectives 
are effective and efficient contract performance, intended to achieve completion within budget, on 
schedule, and in accordance with plans and specifications. 
 
This partnering relationship will be bilateral in makeup. Any cost associated with effectuating partnering 
will be covered by the Unit Item and limited by this specification. An initial partnering workshop may be 
scheduled prior to the Notice to Proceed for each Project Work Assignment, and may be required to 
be facilitated by a third party competent in the fundamentals of partnering, and mutually acceptable 
to Contractor and Flood Control District of Maricopa County.   
 
The Contractor shall be responsible for scheduling, coordinating, and hiring the third party facilitator, 
and planning all of the partnering meetings in consultation with the Engineer. The Contractor shall 
obtain specific prior written approval of the Flood Control District of Maricopa County for all initial 
partnering workshop expenditures with the exception of facilitator and facility costs. The Flood Control 
District of Maricopa County shall be responsible to notify and coordinate attendance at the partnering 
meetings by other agencies.  To achieve the desired partnering relationships, the Contractor shall 
encourage attendance by its major subcontractors on a Project.  Follow-up workshops shall be held 
periodically throughout the duration of the contract as agreed to by the Contractor and Flood Control 
District of Maricopa County.  Any expenditure requested for these follow-up meetings shall require the 
specific prior written approval of the Flood Control District of Maricopa County. 
 
An integral aspect of partnering is the resolution of disputes in a timely, professional, and non-
adversarial manner.  Alternative dispute resolution (ADR) methodologies will be encouraged in place 
of the more formal dispute resolution procedures. ADR will assist in promoting and maintaining an 
amicable working relationship to preserve the partnering relationship.  ADR in this context is intended 
to be a voluntary, non-binding procedure available for use by the parties to this contract to resolve any 
dispute that may arise during performance. 
 
Payment for the Partnering Allowance will be made on a lump sum basis.  Partial payments may be 
issued upon the progress of work based on invoices of actual costs as determined by the Engineer. 
No Prime Contractor mark-up will be allowed.  The cost for attendance at partnering meetings shall 
be incidental to the Project and no payment will be made for personnel time in attendance. The total 
DocuSign Envelope ID: 53FC961F-8000-45E0-9314-223CB81F3ADF

Job Order Contract FCD 2024C006 
              
               Page 13 of 27 
Supplementary General Conditions 
 
of all partial payments for Partnering Allowance shall not exceed the lump sum amount shown in the 
fee schedule for this item. 
 
ITEM 105-1 – PARTNERING ALLOWANCE 
 
 
Add the following Subsection: 
Subsection 105.5.2 – Pre-Construction Meeting: 
After notice-to-proceed of each Project Work Assignment, a pre-construction meeting shall be 
scheduled at a location and time (prior to mobilization and start of construction) to be agreed upon 
between the Flood Control District of Maricopa County and the Contractor.  The Contractor shall make 
all necessary arrangements to have key personnel of his company and of his principal subcontractors 
present at the meeting. Each representative shall have authority to make commitments and act for his 
firm.   
 
The purpose of the pre-construction meeting is to discuss any specific concerns or potential problems 
that the Contractor is aware of, to provide general information appropriate to the contract, to identify 
responsible individuals for various functions within each organization, and to develop tentative dates 
for the start of construction.  The Contractor shall submit to the Engineer during the pre-construction 
meeting the following documents: 
 
• 
Preliminary work schedule/sequence of construction; 
• 
Preliminary traffic control plan and Contractor contract; 
• 
Emergency telephone numbers; 
• 
Signature Authority/Authorization letter; 
• 
Name and telephone number of the Certified Safety Professional; 
• 
Preliminary copies of the NOI and SWPPP as per Subsection 107.2.1; 
• 
Estimated billing schedule; 
• 
Shop Drawings; 
• 
Manufacturer’s certification of all materials; 
• 
Material data safety sheets; 
• 
Preliminary survey layout, staking and excavation plans; 
• 
Contractor bid item cost breakdown as noted in the Special Provisions; 
• 
Proposed pavement mix design composition; and 
• 
Any other required documents as specified in the SGC’s and SP’s. 
 
The pre-construction meeting will cover topics such as critical elements of the work schedule, 
payment application and processing of invoices.  Additionally, a scheduled start date for the work will 
be determined. 
 
The Contractor shall be responsible to take minutes of the pre-construction meeting and distribute 
copies to all meeting participants.  The meeting minutes shall be distributed within forty-eight (48) 
hours of the meeting.  At the subsequent construction progress meeting, the minutes will be attested 
or revised, as appropriate.  The cost for attendance at the pre-construction meeting, and preparation 
and distribution of meeting minutes shall be incidental to a Project and no extra payment will be made. 
 
Add the following Subsection: 
Subsection 105.5.3 –Construction Progress Meetings: 
Construction progress meetings may need to be scheduled weekly, or as considered necessary by the 
Flood Control District of Maricopa County.  If required by the Engineer, the Contractor shall make all 
arrangements to have key personnel of his company and of his principal subcontractors present at all 
DocuSign Envelope ID: 53FC961F-8000-45E0-9314-223CB81F3ADF

Job Order Contract FCD 2024C006 
              
               Page 14 of 27 
Supplementary General Conditions 
 
progress meetings; representatives shall have authority to make commitments and act for their firms.  
The Contractor shall assume full responsibility to act for and commit any subcontractor employed by 
the Contractor, whether or not such subcontractor is represented at the meeting. 
 
During the construction progress meeting the Flood Control District’s representative will act as 
chairman and will advise the Contractor of any administrative matters connected with the contract.  
The Contractor shall submit for review his two-week rolling schedule. The Contractor’s representative 
at these meetings shall be prepared to discuss and resolve construction problems and concerns, 
material delivery, and vendor data submittals status, construction progress as measured against the 
Contractor's accepted construction schedule and the Contractor’s short range construction activities 
as provided on his two (2) week rolling schedule.  The Contractor shall not be relieved of his 
responsibility to fulfill all of the terms of the contract as a result of any inferences drawn or 
suggestions made available at these meetings. 
 
The Contractor shall be responsible to take minutes of the construction progress meetings and 
distribute copies to all meeting participants.  The meeting minutes shall be distributed within forty-
eight (48) hours of the meeting.  At the subsequent construction progress meeting, the minutes will 
be attested or revised, as appropriate.  The cost for attendance at meetings, and preparation and 
distribution of meeting minutes shall be incidental to the Project and no extra payment will be made. 
 
Subsection 105.6 - Cooperation with Utilities: 
Add the following: 
For each Project, an attempt has been made to determine the location of all underground utilities, 
drainage pipes, and structures; however, if unexpected conflicts are encountered in the field, the 
Contractor shall be responsible for scheduling and coordinating the construction at these locations 
with the concerned utility companies so that they can relocate their facilities prior to or concurrent 
with the installation of the proposed improvements.  
 
The location of the underground and overhead utilities as shown on the plans is based on the best 
available information.  However, it shall be the Contractor’s responsibility to field-verify all utility 
locations and to coordinate in a timely manner with the pertinent utility companies so that any 
obstructing utility installation can be adjusted without causing any delay in the Contractor’s project 
schedule, including performing utility locating operations in advance of the work location as 
necessary.  In addition, the Flood Control District of Maricopa County will not consider additional 
compensation requests from the Contractor to perform any potholing, utility company coordination, 
etc. needed to locate and/or verify utility locations, adjust contract work items as necessary to avoid 
utility line conflicts, cooperate with utilities in adjusting schedule as needed to allow for utility 
company work, relocations, etc.  The Contractor’s bid shall allow for/include the above 
coordination/work/adjustments.   
 
There also exists the strong likelihood that other abandoned older and undocumented underground 
utility and irrigation lines exist within the project area.  Contractor shall contact Arizona Blue Stake 
(telephone number 602-263-1100) a minimum of two (2) working days before beginning any 
underground work.  In addition, Blue Stake notification(s) shall be maintained on a current basis. 
 
All existing utilities, unless otherwise noted shall be protected-in-place (PIP). Should Contractor's 
operations result in damage to any utility the location of which has been brought to its attention, he 
shall assume full responsibility for such damage.   
DocuSign Envelope ID: 53FC961F-8000-45E0-9314-223CB81F3ADF

Job Order Contract FCD 2024C006 
              
               Page 15 of 27 
Supplementary General Conditions 
 
The Contractor shall ensure that utility interruptions are kept to a minimum.  The Contractor shall 
notify the Engineer and affected landowners of utility interruptions at least two (2) days in advance of 
any interruptions or as required by the utility company and Contractor shall ensure all utilities are 
connected and operable by the end of the workday that the interruption occurs. 
 
It shall be the responsibility of the Contractor to verify the location of all utilities prior to any 
construction activities in a particular area where such facilities exist.  All existing overhead and 
underground utilities shall be protected-in-pace unless otherwise noted on the plans, these 
Supplementary General Conditions and/or Special Provisions. 
 
At all times during construction, the Contractor shall comply with all laws, ordinances, rules, 
regulations, and safety requirements, including, but not limited to, the National Electric Safety Code 
and the Occupational Safety  and Health Standards for General Industry when working in the vicinity 
of utilities.  
 
Note: The cost for the repair of any damage to utilities, and any loss of revenue due to the loss of 
service of a utility that is in any way caused by the Contractor’s actions shall be the sole responsibility 
of the Contractor at no cost to the Project, Flood Control District of Maricopa County, or Engineer. 
 
Payment for the Unforeseen Utility Service Line Relocation Allowance will be made on a lump sum 
basis.  Partial payments may be issued upon completion of work based on invoices of actual costs as 
determined by the Engineer.  The total of all partial payments for Unforeseen Utility Service Line 
Relocation Allowance shall not exceed the lump sum amount shown in the fee schedule for this item. 
 
 
ITEM 105-2   UNFORESEEN UTILITY SERVICE LINE RELOCATION ALLOWANCE 
 
 
Add the following Subsection: 
Subsection 105.6.3 – Construction Water: 
The cost for construction water from any source is considered incidental to a Project.  Any cost for 
installing meters, monthly service charges, fees, permits, obtaining, transporting, distributions and use 
of water for construction activities will be the sole responsibility of the Contractor.  No payment of any 
kind will be made for construction water.   
 
Subsection 105.7 – Cooperation Between Contractors: 
Add the following: 
The Contractor shall coordinate and cooperate with other contractors and subcontractors working in 
the Project area.  There may be capital improvement projects and private development projects 
constructed in the immediate vicinity of the Project, during the same time period as the Project 
construction. 
Subsection 105.8 - Construction Stakes, Lines, and Grades: 
Delete this Subsection and replace with the following: 
The Contractor must obtain in advance the approval of the Engineer to begin construction of any 
channel, basin, embankment or drainage features. Before such construction can begin the Contractor 
will perform a survey check of existing ground elevations at the upstream and downstream ends of a 
Project and provide such survey to the Engineer for review.  This survey will be compared against the 
plan and finished grade elevations required at the upstream and downstream end of a Project to 
ensure that the Project features can be constructed as shown in the plans and will match the design 
elevations without the need to make any adjustments in the profile and grade. 
DocuSign Envelope ID: 53FC961F-8000-45E0-9314-223CB81F3ADF

Job Order Contract FCD 2024C006 
              
               Page 16 of 27 
Supplementary General Conditions 
 
 
A) 
The Engineer will furnish a Benchmark, which the Contractor will use to set line and grade for all 
construction.  All other surveying required for the Project shall be the Contractor's responsibility.  
The Engineer will not set any construction stakes.  The Contractor shall be held responsible for 
the preservation of all stakes and marks. 
 
B) 
Before any construction work is started, the Contractor shall perform all base surveys and cross 
sections of existing conditions that may be required as a basis for quantity determination.  Cross 
sections shall be performed at a minimum of fifty (50) foot stations, at angle points, and the 
beginning and ending of curves.  
 
C) 
It is mandatory that prior to the commencement of any construction activities, the Contractor and 
the Engineer field verify Project control identified on the plans. The physical location and 
description will be verified.  The horizontal and vertical monument data relative to the assigned 
datums will be verified using conventional electronic measurement techniques.  Traditional field 
notes will be compiled and the original field notes will be provide to the Engineer.  Such field 
verification will not be accomplished solely using GPS technology and equipment. 
 
D) 
Record Drawings for each Project shall be prepared by the Contractor utilizing red-line working 
drawings maintained on the Project site by the Contractor.  The paper red-line working drawings 
shall be maintained by the Contractor in a current condition at all times, and updated at least 
weekly until completion of the work and shall be available for review by the Engineer and the 
Engineer of Record at all times.  The final red-line working drawings shall be provided by the 
Contractor to the Engineer or Flood Control District of Maricopa County prior to Project close out 
and prior to the final contract payment.  Final Project Work Assignment payment may be delayed 
if it is found that the red-line working drawings are incomplete or inaccurate, and until appropriate 
corrections are made by the Contractor to the red-line working drawings. 
 
E) 
Final surveyor as-built drawings sealed by a Land Surveyor registered in the State of Arizona may 
need to be provided by the Contractor to the Engineer for review and approval prior to a Project 
close out. Final Project Work Assignment payment may be delayed if it is found that the surveyor 
as-built drawings are incomplete or inaccurate, and until appropriate corrections are made. The 
sealed as-built drawings shall be prepared on durable bond paper. 
Payment for the Construction Staking will be made on a lump sum basis and shall be full 
compensation for supplying and furnishing all materials, survey stakes, control, and services and 
performing all work necessary to complete the work. 
 
 
ITEM 105-3   CONSTRUCTION STAKING 
 
Subsection 105.11 - Source of Materials and Quality: 
Delete the first sentence of paragraph two and replace with the following: 
No work shall be done without lines and grades having been established by the Contractor. 
 
SECTION 106 – CONTROL OF MATERIALS 
 
Subsection 106.1 - Source of Materials and Quality: 
Add the following: 
DocuSign Envelope ID: 53FC961F-8000-45E0-9314-223CB81F3ADF

Job Order Contract FCD 2024C006 
              
               Page 17 of 27 
Supplementary General Conditions 
 
Select Material, Aggregate Base, Mineral Aggregate, concrete, steel products and pipe shall be 
obtained from commercial sources.  Contractor shall pay all royalties, or any other charges or 
expenses, incurred in connection with the securing and hauling of the material.  Contractor will be 
required to furnish Engineer with a list of its proposed commercial sources prior to use, and shall 
present certificates stating that the material produced from any commercial sources is in accordance 
with the MAG Uniform Standard Specifications and the Contract Documents. 
 
Subsection 106.2 – Samples and Tests of Materials: 
Add the following: 
The Contractor is responsible for all quality control in accordance with these Supplementary General 
Conditions, Special Provisions and Construction Documents. The locations (station, elevation, offset 
from construction centerline) of all field quality control testing shall be recorded by the Contractor and 
submitted to the Engineer in accordance with the Special Provisions. 
 
The Contractor shall be required to calibrate all material testing apparatus outlined in these 
specifications, or which may be required for quality control testing, in accordance with the 
requirements of the equipment manufacturer. 
 
Subsection 106.4 - Trade Names and Substitutions: 
Delete this subsection in its entirety and replace with the following: 
Whenever an item of material or equipment is specified or described in the Construction Plans by 
using the name of a proprietary item or the name of a particular Supplier, the specification or 
description is intended to establish the type, function, and quantity required.  Unless the specification 
or description contains or is followed by words such as, “equivalent”, "or-equal" or “or equivalent” no 
substitution is permitted.  Other items of material or equipment from other suppliers or manufacturers 
may be accepted by Engineer under the following circumstances: 
 
A) 
"Or-Equal":  If in the Engineer's sole discretion an item of material or equipment proposed by the 
Contractor is functionally equal to that named and sufficiently similar so that no change in related 
work will be required, it may be considered by the Engineer as an "or-equal" item, in which case 
review and approval of the proposed item may, in the Engineer's sole discretion, be accomplished 
without compliance with some or all of the requirements for acceptance of proposed substitute 
items. 
 
B) 
Substitute Items:  If in the Engineer's sole discretion an item does not qualify as an "or-equal" 
item under subparagraph 106.4 (A), it will be considered a proposed substitute item.  The 
Contractor shall submit sufficient information as provided below to allow the Engineer to 
determine that the item of material or equipment proposed is essentially equivalent to that named 
and an acceptable substitute therefore. The procedure for review by the Engineer will include the 
following and may be supplemented in the Special Provisions.  The Engineer may decide what is 
appropriate under the circumstances.  The Engineer will not accept any requests from anyone 
other than the Contractor for review of proposed substitute items of material or equipment.   
 
If the Contractor wishes to furnish or use a substitute item of material or equipment, the 
Contractor shall first make written application to the Engineer for acceptance thereof, certifying 
that the proposed substitute will perform adequately the functions and achieve the results called 
for by the general design, be similar in substance to that specified and be suited to the same use 
as that specified.  The application will state the extent, if any, to which the evaluation and 
acceptance of the proposed substitute will prejudice the Contractor's achievement of completion 
on time, whether or not acceptance of the substitute for use in the Work will require a change in 
DocuSign Envelope ID: 53FC961F-8000-45E0-9314-223CB81F3ADF

Job Order Contract FCD 2024C006 
              
               Page 18 of 27 
Supplementary General Conditions 
 
any of the Construction Documents (or in the provisions of any other direct contract with the 
Owner for work on the Project) to adapt the design to the proposed substitute and whether or not 
incorporation or use of the substitute in connection with the work is subject to payment of any 
license fee or royalty.   
 
All variations of the proposed substitute from that specified will be identified in the application 
and available maintenance, repair and replacement service will be indicated.  The application will 
also contain an itemized estimate of all costs or credits that will result directly or indirectly from 
acceptance of such substitute, including costs of redesign and claims of other Contractors 
affected by the resulting change, all of which will be considered by the Engineer in evaluating the 
proposed substitute.  The Engineer may require the Contractor to furnish additional data about 
the proposed substitute. 
 
C) 
Contractor's Expense:  All data to be provided by the Contractor in support of any proposed 
"or-equal" or substitute item will be at the Contractor's expense. 
 
D) 
If the final placement of a product will remain the property of the municipality or utility and/or 
owned by the municipality or utility, that entity is responsible for issuing written approval for any 
equivalent or “or-equal” products.  The Contractor or Supplier will submit to that entity the request 
and documentation for written approval of a product substitution.  The Contractor will provide 
the entity’s written approval to the Engineer at the Pre-Construction Meeting. 
 
Subsection 106.5 – Storage of Materials: 
Add the following: 
The Contractor shall obtain approval of the Engineer when using private property to park and service 
equipment and store materials for use.  The Contractor shall obtain prior written approval of the 
property owner for such use and submit a copy of the approval to the Engineer prior to use of the 
property. 
 
The Contractor will monitor on a daily basis all activities within the Contractor Work Area (CWA), 
whether on Flood Control District of Maricopa County or private property, that may result in the leakage 
of oils, fuels, etc., which may contaminate soils, and promptly report any suspected leaks to the 
Engineer.  The Contractor will be solely responsible at his cost to correct and clean up any such 
leakage or other related problems. 
 
The Contractor shall grade all construction yards, easements and limits of construction which are 
disturbed by construction or construction related activities to the lines and grades shown on the plans; 
or as a minimum, where no line or grade is shown, to a condition similar to or better than the pre-
existing condition. 
 
The Contractor understands that use of District property, or private property, for a CWA is solely at his 
own risk.  No compensation will be made to the Contractor for any damage to or loss of equipment 
and/or other valuables with the CWA.  
 
Add the following Subsection: 
Subsection 106.5.1 – Contractor Access: 
The Contractor shall have rights to access those lands shown in the plans as being within the Project 
boundary.  Access generally will be at the section line roads along the Project.  The Contractor shall 
not use private property to access the Project area without first obtaining written permission of the 
property owner, and providing evidence of such permission to the Engineer. 
DocuSign Envelope ID: 53FC961F-8000-45E0-9314-223CB81F3ADF

Job Order Contract FCD 2024C006 
              
               Page 19 of 27 
Supplementary General Conditions 
 
SECTION 107 – LEGAL REGULATIONS AND RESPONSIBILITY TO PUBLIC 
 
Subsection 107.2 - Permits: 
Delete this Subsection in its entirety and replace with the following: 
The Contractor shall obtain all permits and licenses, including those required by a City, Town, State of 
Arizona, Maricopa County, U.S. Government, or any other local or federal agency, and shall pay all 
charges, fees, taxes and provide all notices necessary and incidental to due and lawful prosecution of 
the work.  Permits for earth moving may be obtained from Air Pollution Control, Maricopa County 
Department of Environmental Management, 2406 South 24th Street, Suite E-214, Phoenix, Arizona 
85034, telephone number 602-506-6700.  It is the responsibility of the Contractor to verify permit 
application fees. 
 
Add the following Subsection: 
Subsection 107.2.1 - AZPDES Permit Requirements: 
A) 
This Project is subject to the Arizona Pollutant Discharge Elimination System (AZPDES) storm 
water requirements for construction sites under the Arizona Department of Environmental Quality 
(ADEQ) General Permit for Arizona and the Maricopa County Storm Quality Management 
Regulation.  Under provisions of the State and County permits, the Contractor shall be designated 
as permittee, and shall take all necessary measures to assure compliance with the AZPDES 
General Permit for Arizona as well as all other applicable Federal, State and local laws, 
ordinances, statutes, rules and regulations pertaining to storm water discharge.   
 
As the permittee, the Contractor is responsible for preparing, in a manner acceptable to the ADEQ, 
all documents required by this regulation, including but not necessarily limited to: 
 
1) Storm Water Pollution Prevention Plan (SWPPP) for the Project, including certification of 
compliance form.  Contractor shall be required to develop, implement, update, and revise the 
SWPPP, as necessary, in order to assure compliance with the ADEQ permit requirements.  
The SWPPP shall be retained on the Project site at all times during construction. 
 
2) Notice of Intent (NOI) to assure compliance with the AZPDES General Permit for Arizona, 
including certification of signatures. 
 
3) Notice of Termination (NOT) of coverage under AZPDES General Permit for Arizona. 
 
B) Preliminary copies of the NOI and the SWPPP shall be submitted to Owner during the pre-
construction meeting and shall be subject to review by Owner prior to implementation. 
 
C) The Contractor shall submit the completed and duly signed NOI forms to ADEQ no later than seven 
(7) business days after the contract award.  Proof of the submittal date must be provided to the 
Owner.  If the work is within one-quarter (¼) mile of an Impaired or Unique Water, the SWPPP needs 
to be submitted with the NOI to ADEQ.  If the location is farther away than that, no SWPPP needs 
to be submitted to ADEQ but it still must be available on site.   
 
D) If the work has the potential to discharge to a municipal separate storm sewer system (MS4), the 
Contractor shall also forward a copy of the completed NOI to the owner/operator of the MS4 
system at the time it is submitted to ADEQ. Whenever the owner/operator changes or another is 
added during the construction project, the Contractor shall submit a copy of the completed NOI to 
be authorized under this permit to the new owner/operator. 
 
E) When the discharge is to an Impaired or Unique Water or is in or near endangered species habitat 
as identified by ADEQ's smart NOI permitting system, applicants are not authorized under this 
DocuSign Envelope ID: 53FC961F-8000-45E0-9314-223CB81F3ADF

Job Order Contract FCD 2024C006 
              
               Page 20 of 27 
Supplementary General Conditions 
 
permit for a minimum of thirty-two (32) business days following the receipt of the NOI and SWPPP.  
ADEQ may notify operators within this timeframe that there is cause for SWPPP amendment, or 
denial of coverage as specified in Parts 1.D.5 and 1.D.6 of the general permit.  If notification is not 
received in the thirty-two (32) business day time-frame, the Contractor may assume coverage 
under this permit according to ADEQ requirements.  Contractor must notify Owner of the status of 
the NOI prior to commencing work.  The applicant shall submit the NOI (application) to: 
 
Arizona Department of Environmental Quality 
Water Permits Section/Stormwater NOI (5415B-3) 
1110 W. Washington Street 
Phoenix, Arizona  85007 
 
Failure by the Contractor (or Subcontractors of any tier) to submit NOI’s within the mandated time 
frame shall result in delay of the construction start date, and no claim for extension of time will 
be granted for such delay.  A copy of the completed NOI shall be posted at the construction site 
and a copy of the general permit and SWPPP should be on-site at all times. 
 
F) Inspections of all storm water pollution control devices on the Project shall be performed by 
Contractor every seven (7) days or at least once every fourteen (14) calendar days, and also within 
twenty-four (24) hours of the end of a storm event of one-half (0.50) inches or greater as required 
under provisions of the AZPDES General Permit for Arizona.  A reduced inspection frequency may 
be used provided the conditions in Part IV.H.2. of the general permit have been met.   
Contractor shall prepare reports on such inspections and retain the reports for a period of three 
(3) years after permit coverage expires or is terminated.  Inspection reports shall be submitted 
monthly to Owner along with progress payment requests.  Additionally, Contractor shall maintain 
all storm water pollution control devices on the Project in proper working order, which shall 
include cleaning and/or repair during the duration of the Project. 
 
G) 
The Contractor warrants that its employees and Subcontractors of any tier and their employees 
shall at all times comply with all applicable laws, ordinances, statutes, rules and regulations set 
forth by all federal, state and local governments and the ADEQ in connection with AZPDES 
Permitting requirements and laws and regulations pertaining to air, groundwater, and surface 
water quality. Fines and penalties imposed by the ADEQ against Owner or the Contractor for 
Contractor's failure to comply with any of the requirements of AZPDES General Permit of Arizona 
shall be borne by the Contractor. 
 
H) 
Upon each Project completion, acceptance and demobilization, Contractor shall submit its 
completed, duly executed NOT form to the ADEQ at the address listed in Section (C) above, 
thereby terminating all AZPDES permit coverage for a Project.  Contractor shall then surrender to 
Owner copies of the SWPPP, inspection information and all other documents prepared and 
maintained by the Contractor in compliance of the AZPDES General Permit. Contractor shall 
retain the originals of such documents for a period of three (3) years following the completion of 
a Project. 
 
I) 
The Lump Sum price for the SWPPP shall include all material, labor, and all other costs relating 
to the preparation, installation and maintenance of the SWPPP during Project construction, 
including assuring proper operation of the pollution control devices installed, and all 
maintenance, cleaning, and disposal costs associated with clean-up and repair following storm 
events, runoff or releases on the Project.  The Lump Sum price for the SWPPP shall be inclusive 
of all costs, and the Contractor shall make no additional claims under any other specification 
DocuSign Envelope ID: 53FC961F-8000-45E0-9314-223CB81F3ADF

Job Order Contract FCD 2024C006 
              
               Page 21 of 27 
Supplementary General Conditions 
 
provision of these documents, including Changed Conditions.  Payment of fifty percent (50%) for 
this bid item shall be made at the beginning of the Project, and the remaining payment made 
upon final completion and acceptance of the Project, as per MAG Subsection 109.7. 
 
J) 
Copies of all required forms and guidance for preparing the SWPPP are available in the "Drainage 
Design Manual for Maricopa County, Volume III Erosion Control."  The manual is available at the 
Flood Control District, 2801 West Durango Street, Phoenix, Arizona 85009 and is available on the 
District website at http://www.fcd.maricopa.gov/Pub/manuals/erosionControl.apsx.  For 
appropriate guidance and forms as provided by ADEQ the Contractor should refer to the ADEQ 
website at: http://www.adeq.state.az.us/environ/water/permits/stormwater.html#const. 
 
Payment for AZPDES / SWPPP permit requirements shall be made on the basis of lump sum for all 
work described in Subsection 107.2 .1 of these Supplementary General Conditions. 
 
ITEM 107-1   AZPDES / SWPPP PERMITS 
 
Subsection 107.4 - Archeological Reports: 
Add the following: 
Any cultural and/or paleontological resource (historic or prehistoric site or object) discovered by the 
Contractor, or any person working on his/her behalf, shall be immediately reported to the Engineer.  
The Contractor shall suspend all operations in the immediate area of such discovery until written 
authorization to proceed is issued by the Engineer.  
An evaluation of the discovery will be made by authorized personnel and the Engineer to determine 
appropriate actions to prevent the loss of significant cultural or scientific resources.  The Contractor 
shall prevent his employees from trespassing on, removing, or otherwise disturbing such resources. 
 
Subsection 107.5 – Safety, Health & Sanitation Provisions: 
Add the following: 
The entire construction site shall be considered a "Hard Hat Area" and all personnel in the area will be 
required to wear a hard hat.  This includes all Contractor personnel and Subcontractor’s employees. 
 
Add the following Subsection: 
Subsection 107.5.3 - Compliance with the Arizona Communication Standard: 
The Flood Control District of Maricopa County will provide the Contractor with Material Safety Data 
Sheets (MSDS) for any products known to exist on the site that are deemed to be health hazards.  The 
Contractor will provide a copy of Owner-provided MSDS to all Subcontractors. 
 
The Contractor will provide the Flood Control District of Maricopa County and all Subcontractors with 
MSDS for any products that have or are deemed health hazards that will be brought onto the site or 
created on the site either by Contractor or by any Subcontractors. 
 
The Contractor will provide the Flood Control District of Maricopa County with a statement certifying 
that all personnel (Contractor and Subcontractor) employed by Contractor or by a Subcontractor on 
the job site have received the required Hazard Communication Standard training. 
 
Subsection 107.6 – Public Convenience and Safety: 
Add the following: 
The work area is within and adjacent to areas of public use, including roadways and businesses. The 
Contractor shall provide protection measures, including, but not limited to, temporary fencing, as 
required to ensure the safety of the public in areas adjacent to the work area. 
DocuSign Envelope ID: 53FC961F-8000-45E0-9314-223CB81F3ADF

Job Order Contract FCD 2024C006 
              
               Page 22 of 27 
Supplementary General Conditions 
 
Add the following Subsection: 
Subsection 107.6.3 - Public Information and Notification: 
Informing the public on a regular basis of construction activities and associated disruptions and 
inconveniences will be extremely important on this Project.  The Contractor shall employ a specialty 
public information service as a subcontractor to provide the community relations program for the 
Project as described herein.  Contractor shall work closely with his subcontractor in developing and 
carrying out the community relations program.  Contractor shall submit a history of the 
subcontractor's qualifications and experience in public information services at the pre-construction 
conference for acceptance by the Engineer.  The community relations program shall be designed to 
run the full length of calendar days in the contract for this Project.  The program will include but not 
be limited to: 
 
1) 
Distributing a pre-construction information letter to all residents, businesses, etc. within one-half 
mile of the Project site, in all directions, or as agreed to by the Engineer.  All printed materials 
must be in English and Spanish. 
 
2) 
Printing and distribution of public notices and/or newsletters (at least monthly) as required or as 
directed by the Engineer.  All printed materials must be in both English and Spanish as agreed to 
by the Engineer. 
 
3) 
All public involvement and information activities will be in accordance with the Flood Control 
District of Maricopa County “Public Involvement and Public Information Guidelines, Latest Edition 
(August 2006)”, a copy of which can be obtained from the Flood Control District Public 
Involvement Office at 602-506-2983. 
 
The Contractor will use these or other means to inform the local citizens of necessary operations 
which create high noise levels, street closures, limited access, water and sewer service disruption, 
detour locations, haul route and material delivery routes, hours of construction and disruption of bus, 
trash, school bus and other delivery/pick-up routes. 
 
The Contractor may be required to furnish a private line telephone to be used solely for receiving 
incoming calls from local citizens with questions or complaints concerning construction operations 
or procedures for a project.  The Contractor shall publish this phone number and maintain a twenty-
four (24) hour answering service.  The answering service must be fluent in both English and Spanish 
and shall be operated by Contractor personnel during all hours that work is being performed on the 
job site.  The Contractor shall maintain a log of incoming calls, responses, and action taken that shall 
be submitted to the Engineer weekly and/or upon request. 
 
Prior to the start of work, the Contractor may be required to notify, by letter, all affected businesses 
and residents of construction plans and schedules within the geographic area identified above.  In 
addition, all schools and emergency services which serve the geographic area will also be notified 
even though they may be located outside the geographic area described above.  The letter shall 
contain, as a minimum, the following information: 
 
1. Name of Contractor; 
2. Contractor twenty-four (24) hour telephone complaint number; 
3. Brief description of the Project; 
4. Name of Contractor Project superintendent; 
5. Name of Engineer; 
DocuSign Envelope ID: 53FC961F-8000-45E0-9314-223CB81F3ADF

Job Order Contract FCD 2024C006 
              
               Page 23 of 27 
Supplementary General Conditions 
 
6. Name of area supervisor; 
7. Construction schedule including anticipated work hours; 
8. Traffic regulations including lane restrictions; and 
9.  City/Town Project Manager phone number  
 
If required for a project, the Contractor shall submit a Public Information and Notification Plan to the 
Engineer at the pre-construction meeting.  No payments shall be made for this item until the Engineer 
approves the plan. 
 
The plan and work which is eligible for reimbursement shall include:  meetings with impacted 
businesses, schools, emergency services, residents, etc.; scheduling; preparation and distribution of 
newsletter at least monthly; and maintaining a twenty-four (24) hour telephone hot line for complaints. 
 
In the Temporary Construction Easement areas, the Contractor shall meet with residents and property 
owners in advance of construction activities to coordinate relocations or confinement of livestock, 
installation of temporary fencing, construction activities and schedule, and restoration of fencing and 
gates.  Any upgrades to existing fencing and gates that are restored for such properties arranged by 
the owners and Contractor shall be at no additional cost to the Flood Control District of Maricopa 
County, unless approved in writing by the Engineer. 
 
The Contractor shall submit a final report/evaluation of the Public Information and Notification 
process performed for this Project.  This report shall be submitted before the Contractor receives final 
payment. 
 
Payment for the Public Information and Notification Allowance will be made on a lump sum basis.  
Partial payments may be issued upon the progress of work based on invoices of actual costs as 
determined by the Engineer. No Prime Contractor mark-up will be allowed.  The total of all partial 
payments for Public Information and Notification Allowance shall not exceed the lump sum amount 
shown in the fee schedule for this item. 
 
ITEM 107-2   PUBLIC INFORMATION AND NOTIFICATION ALLOWANCE 
 
Add the following Subsection: 
Subsection 107.6.4 - Project Signs: 
Contractor may be required to provide and install Project information signs, at locations to be 
determined by the Engineer, at the start of construction to inform the public of a forthcoming Project, 
construction dates, and suggested alternate travel routes.  Signs shall be located at the downstream 
end and at the upstream end of the Project.  The other sign shall be placed on the major north-south 
mile streets in both directions of traffic.  In any case, the Engineer at any time may ask the Contractor 
to remove and relocate the signs as he/she deems appropriate.  Project signs shall include the names 
of all agencies participating in the Project.  The signs shall be in English and Spanish and include the 
24-hour hotline complaint telephone number.  Signs shall be constructed in accordance with the 
Project Sign Information drawing to be provided to the Contractor at the pre-construction meeting.  
The signs shall be installed at the location(s) approved by the Engineer.  The Contractor shall maintain 
the signs as necessary, and update the information as requested by the Engineer.   
 
Payment for Project Signs Allowance shall be made on the basis of actual costs incurred not to exceed 
the lump sum allowance indicated the fee schedule. 
 
DocuSign Envelope ID: 53FC961F-8000-45E0-9314-223CB81F3ADF

Job Order Contract FCD 2024C006 
              
               Page 24 of 27 
Supplementary General Conditions 
 
ITEM 107-3   PROJECT SIGNS ALLOWANCE 
 
Subsection 107.8 – Use of Explosives: 
Delete this subsection in its entirety and replace with the following: 
The use of explosives will NOT be permitted for any construction activities on the Project. 
 
Subsection 107.9 - Protection and Restoration of Property and Landscape: 
Add the following: 
Under no circumstances shall the disposal of debris from construction operations create a blemish 
on the landscape. Material, which is to be stockpiled or disposed of off-site, shall not encroach on 
running or intermittent streams, or other waters of the U.S. unless the Contractor has obtained the 
appropriate permits in accordance with applicable state and federal regulations. 
The Contractor shall protect-in-place all existing structures and other features along the Project 
corridor and as may be identified on the plans, including but not limited to existing utilities, mail boxes, 
chain link fences, irrigation facilities, roadways, traffic signs, fencing, block walls, signs, railroad, and 
other structures and features near construction activities and existing vegetation outside of the right-
of-way limits.  
The Contractor will grade all Temporary Construction and Permanent Easement areas, and Project 
areas which are disturbed during construction to the lines and grades shown on the plans, or as a 
minimum, where no lines and grades are shown, to a condition similar to or better than the pre-existing 
condition. Any disturbed areas resulting from the construction activities shall be appropriately re-
vegetated upon completion of the Project. 
Areas and features shown on the plans as restricted areas shall not be encroached upon by the 
Contractor. The Restricted Areas will be shown on the Project plans identified as “Project limits” and 
are areas to be protected during construction. Any encroachment into these areas by the Contractor 
may result in penalties to the Contractor from the Engineer. The Contractor will be responsible for 
replacement of any habitat within the restricted areas that is disturbed during construction to the 
satisfaction of the Engineer. Prior to any activities, the Contractor shall schedule with a minimum 
seven (7) days advance notice a field demarcation of the restricted areas with the owner’s 
representative. The Contractor shall provide labor and materials to delineate these areas, as directed 
by the owners representative, and shall maintain these through construction. These areas will be 
delineated using two (2) strands of one-quarter (¼”) inch yellow rope, flagging, and steel T posts to 
accurately delineate the area. This delineation shall be maintained during the duration of the Project, 
and shall be reset by the Contractor if washed out or otherwise damaged.   
 
Payment for the Restricted Areas Delineation will be made on a lump sum basis and shall include full 
compensation for supplying and furnishing all materials, equipment, tools, and services necessary to 
complete the work.  Partial payments may be issued upon the progress of work based on invoices of 
actual costs as determined by the Engineer. No Prime Contractor mark-up will be allowed.  The total 
of all partial payments for Restricted Areas Delineation shall not exceed the lump sum amount shown 
in the fee schedule for this item. 
 
ITEM 107-4 – RESTRICTED AREAS DELINEATION 
 
Subsection 107.10 - Contractor's Responsibility for Work: 
Add the following: 
 
DocuSign Envelope ID: 53FC961F-8000-45E0-9314-223CB81F3ADF

Job Order Contract FCD 2024C006 
              
               Page 25 of 27 
Supplementary General Conditions 
 
Contractor shall maintain dust control measures at all times during the Project.  This is especially 
important along the Project in the vicinity of residential areas.  The Engineer reserves the right to direct 
the Contractor to maintain dust control measures.  Contractor shall take all necessary action to 
protect the public from the construction work area. The Contractor will also notify the Engineer of any 
unauthorized personnel in the Project area, including the presence of the general public. 
 
Contractor is advised that work may be subject to storm water flows of varying amounts and shall be 
responsible for controlling and handling storm water and other flows throughout the construction site, 
both surface drainage and channel flows.  Contractor shall take all necessary precautions to protect 
his/her work from damage that may be caused by such runoff and ponding. 
 
Management of surface flows, subsurface flows, and groundwater within the Project limits will be 
necessary in order to construct a Project.  The Contractor may be required to develop a plan for each 
Project Work Assignment for such water management and submit it to the Engineer for review.   
 
Payment for Storm Water Management will be made on a lump sum basis and shall include full 
compensation for all equipment, labor, materials, and restoration of any disturbed areas.  No payment 
will be made for providing excavation protective works for items such as dewatering.  The cost thereof 
shall be included in the price for the construction or installation of the items to which said excavation 
protective works are incidental or appurtenant.  Partial payments may be issued upon the progress of 
work based on invoices of actual costs as determined by the Engineer. No Prime Contractor mark-up 
will be allowed.  The total of all partial payments for Storm Water Management shall not exceed the 
lump sum amount shown in the fee schedule for this item. 
   
  
 
ITEM 107-5   STORM WATER MANAGEMENT  
 
SECTION 108 – COMMENCEMENT, PROSECUTION AND PROGRESS 
 
Subsection 108.1 - Notice to Proceed: 
Add the following: 
(C)  For each Project Work Assignment, prior to beginning of mobilization work, the Contractor shall 
prepare and submit a Project Construction Work Plan for review and approval by the Engineer. 
The Construction Work Plan shall describe in detail the means and methods of work, level of 
effort, safety plan, access plan, and project schedule.  Mobilization work shall not be initiated 
until the Work Plan has been approved by the Engineer. 
 
 
 
Payment for the Work Plan Allowance will be made on the basis of Lump Sum amount. 
 
 
 
ITEM 108-1   CONSTRUCTION WORK PLAN ALLOWANCE 
 
 
Subsection 108.2 - Subletting of Contract: 
Add the following: 
For this Project, the Contractor shall perform, with its own organization, work amounting to fifty 
percent (50%) or more of the total contract cost. 
 
Subsection 108.4 - Contractor's Construction Schedule: 
Delete this Subsection in its entirety and replace with the following: 
Contractor shall submit a proposed cost loaded Critical Path Method (CPM) work schedule to 
Engineer at the pre-construction meeting for review before starting work using a software program 
DocuSign Envelope ID: 53FC961F-8000-45E0-9314-223CB81F3ADF

Job Order Contract FCD 2024C006 
              
               Page 26 of 27 
Supplementary General Conditions 
 
that is acceptable to the Engineer. The Contractor shall supply the Engineer with a copy of the 
scheduling software and valid license for use during construction. The Contractor shall submit 2-week 
look-ahead schedules to Engineer at the weekly coordination meeting. The Contractor shall be 
responsible for the preparation and submittal to the Engineer, fully updated Project schedules on a bi-
monthly basis. 
 
Contractor shall be solely responsible for the planning, scheduling and execution of the work to assure 
timely completion of the Project. 
 
Add the following Subsection: 
Subsection 108.4.1 - Contractor's Billing Schedule: 
The Contractor shall furnish the Engineer an Estimated Billing Schedule, which shall include the 
estimated amount of each billing for the total Project at the pre-construction conference, and 
thereafter at monthly intervals as agreed to between the Contractor and Engineer. 
 
Subsection 108.5 - Limitation of Operations: 
Add the following: 
The normal workweek shall be forty (40) hours, Monday through Friday, and the work hours will be 
determined at the pre-construction meeting.  This does not imply that this contract can be completed 
on time utilizing normal working hours.  The Contractor shall furnish sufficient forces and shall work 
such hours including overtime operations as necessary to ensure the completion of the work within 
the time required.  No night work will be allowed on this Project unless approved by the Engineer.  
 
Subsection 108.9 - Failure to Complete on Time: 
Add the following: 
The actual cost per calendar day incurred by the District for Administrative and Inspection Services on 
this Project will be added to the daily charges as shown in MAG TABLE 108-1, LIQUIDATED DAMAGES, 
and will be deducted from money due or to become due to the Contractor for each and every calendar 
day that work shall remain incomplete after the time specified for the completion of the work in the 
proposal, or as adjusted by the Engineer.  Nothing contained in this provision shall prohibit the Owner 
from deducting from money due or to become due to the Contractor for any other costs incurred by 
the Owner directly attributable to the delay in completing this contract. 
 
SECTION 109 – MEASUREMENTS AND PAYMENTS 
 
Subsection 109.1 – Measurement of Quantities: 
Add the following: 
The term “Neat Lines” as used in the Special Provisions shall be: the line or plane defining the limits 
of work, particularly in excavation and/or fill placement of earth or rock.  Excavation and/or fill 
placement beyond the neat lines are not entitled to payment unless authorized in advance by the 
Engineer. 
 
Subsection 109.2 - Scope of Payment: 
Add the following: 
In addition to the contained provisions, the work under this section shall consist of preparatory work 
and operations, including but not limited to, the movement of personnel, equipment, supplies and 
incidentals to the Project site, the establishment of all offices, buildings and other facilities necessary 
for work on the Project, and for all other work operations that must be performed and costs incurred 
prior to beginning work on the various items on the Project site. 
 
DocuSign Envelope ID: 53FC961F-8000-45E0-9314-223CB81F3ADF

Job Order Contract FCD 2024C006 
              
               Page 27 of 27 
Supplementary General Conditions 
 
The “complete-in-place” rate shall include but not necessarily be limited to all labor, material and 
equipment costs for preparation, installation, construction, modification, alteration or adjustment of 
the items, which shall include all costs for salaries and wages, all payroll additives to cover employee 
benefits, allowances for vacation and sick leave, company portion of employee insurance, social and 
retirement benefits, all payroll taxes, contribution and benefits imposed by any applicable law or 
regulation and any other direct or indirect payroll-related costs.  The rate shall also include but not 
necessarily be limited to all costs for indirect charges or overhead, mileage, travel time, subsistence, 
materials, freight charges for material to Contractor’s facility or Project site, equipment rental, 
consumables, tools, insurance to the levels specified in Section 103.6 CONTRACTOR’S INSURANCE, 
all applicable taxes, as well as Contractor’s fee and profit.  This rate shall further include all site clean-
up costs and hauling of construction debris to disposal sites designated by the Engineer. 
 
It is the responsibility of the Contractor to contact all municipalities in the area to determine if they 
will charge Contractor sales taxes or any fees for work on this Project.  The Contractor shall pay any 
such taxes or fees. 
 
Delete the second and third paragraphs of (B) and replace with the following: 
For each Project Work Assignment, the final payment will be made to the Contractor by the Flood 
Control District of Maricopa County within thirty (30) days following receipt of the As-Built plans, and 
Certificate of Performance.  If payment will be longer than thirty (30) days as aforesaid, the Flood 
Control District of Maricopa County will provide Contractor specific written findings for reasons 
justifying the delay in payment. 
 
Subsection 109.10 – Payment for Mobilization/Demobilization: 
Delete this subsection in its entirety and replace with the following: 
The work under this section shall consist of preparatory work and operations, including but not limited 
to, the movement of personnel, equipment, supplies and incidentals to the Project site; and for all other 
work and operations that must be performed and costs incurred prior to beginning work on various 
items on the Project site.  The payment basis, details and schedule for Mobilization/Demobilization 
will be at the discretion of the Flood Control District of Maricopa County.  Refer to Section 202 of the 
Special Provisions for additional information. 
 
SECTION 110 – NOTIFICATION OF CHANGED CONDITIONS AND DISPUTE RESOLUTION 
 
Keep this Section in its entirety:  
The Contractor and Flood Control District of Maricopa County shall follow the established rules of the 
latest revisions/updates to MAG Uniform Standard Specifications. 
DocuSign Envelope ID: 53FC961F-8000-45E0-9314-223CB81F3ADF

SUBMITTED TO:
Flood Control District
of Maricopa County
STATEMENT OF QUALIFICATIONS FOR
Job Order Contractor
Serial #240008-JOC
Contract #2025C003-2024C010
Due Date: Thursday, January 25, 2024
Due Time: 2:00 p.m. MST
DocuSign Envelope ID: 53FC961F-8000-45E0-9314-223CB81F3ADF

8333 E. Hartford Drive, Scottsdale, AZ 85255 
Phone (602) 431-2111 | Fax (602) 431-5952
An Equal Opportunity Employer
Burnsville MN | Scottsdale AZ | Corona CA | Aurora CO | West Valley City UT | Carlin NV
January 25, 2024
 
Flood Control District of Maricopa County
Mr. Paul Shamrock, Procurement Officer
paul.shamrock@maricopa.gov
Re: Request for Qualifications – Job Order Contractor 
       Serial #240008-JOC, Contract #2025C003-2024C010 	
	
	
	
Dear Mr. Shamrock and Members of the Selection Committee:
The rehabilitation of aging infrastructure is critical. To best safely and cost effectively provide the 
repair and modification services to various flood control structures throughout Maricopa County, it is 
important that FCDMC team with construction professionals who will work as an extension of your 
staff and provide the highest caliber services for your projects. Ames Construction is that team. 
Safety is NUMBER 1 at Ames Construction, and this is why Ames makes Early Partnering a priority 
for any job we undertake. Without effective communication and leadership, even the best team can 
fall short of its goals. For this JOC, Dayna Duffy will lead a team of superintendents and estimators 
for Concrete Placement and Repair, Earthwork and Debris Removal, and Storm Drain Repair and 
Replacement. 
Since 2016, Dayna has been the Project Manager on 10 JOCs for 5 clients, including FCDMC, 
MCDOT, and the cities of Peoria, Mesa, and Surprise. She has successfully led teams on 114 
jobs in the last 8 years alone! These numbers speak to Dayna's ability to integrate all members 
of a project team to hit all project goals and deliver projects on time and within budget. Dayna will 
oversee a thorough assessment of all project areas and, in partnership with FCDMC, develop cost 
effective recommendations to deliver lasting improvements, just as Ames has successfully done for 
other clients for over 60 years. 
If you need additional information, please contact me by phone at (602) 431-2111 or by email  
at jerrymiller@amesco.com. On behalf of Ames Construction, I look forward to your favorable  
consideration and the opportunity to build a strong partnership with the Flood Control District of 
Maricopa County. 
Sincerely,
Ames Construction, Inc., a Minnesota Corporation 
Gerard F. Miller
President, Southwest Region
DocuSign Envelope ID: 53FC961F-8000-45E0-9314-223CB81F3ADF

Qualifications for  JOC for the Flood Control District of Maricopa County
1
Concrete  
Placement and  
Repair Services
Earthwork  
Services and  
Debris Removal
Storm Drain  
Repair and  
Replacement
INTRODUCTION OF AMES CONSTRUCTION
For over 60 years, Ames has maintained a successful and safe record of self-
performance and management of heavy civil projects including flood control, 
municipal roadway improvements, and drainage projects. Our experience 
and the experience of our management staff, field supervision, and craft 
workers ties closely with three of the four scopes of work identified in this Job 
Order Contract. The Scopes of Work (SOW) for which Ames is submitting our 
qualifications include Concrete Placement & Repair Services, Earthwork 
Services & Debris Removal, and Storm Drain Repair & Replacement.  
Ames has not performed a project with the JOC delivery method, but we 
have extensive experience with CMAR, Progressive Design-Build, Design-Build, and Early Contractor 
Involvement for our private clients. Experience with these delivery methods translates to the JOC 
process because they all include pre-construction management, multiple cost estimates, and fast-paced 
construction delivery.
Our commitment to starting a JOC group within Ames started by hiring Dayna Duffy. She has the extensive 
JOC experience needed to manage our JOC pursuits, starting with the Flood Control District of Maricopa 
County. Dayna will be the primary point of contact, supported by superintendents who have a long history 
with Ames.  
Since establishing a regional office in Arizona in 1986, Ames continues to maintain a superior record of 
safety with alternative methods of project delivery. We have performed numerous City, County, and DOT 
projects that have components of work relative to the services needed for this FCDMC JOC solicitation. 
Our significant alternative delivery experience allows us to provide award winning projects, as we have for 
Maricopa County, ADOT, and the City of Peoria, where we proved our ability to be a true partner not just to 
the Owners but to all stakeholders. 
In addition, Ames has a large network of subcontractors that we can count on to ensure that we 
consistently deliver projects on time and within budget. We have the management, manpower, and 
equipment ready to start work today. 
We have put together a management team that is experienced working with municipalities on JOC, CMAR, 
and hard bid work. Our team is committed to partnering and working through the cost model with full 
transparency.
Qualifications for Job Order Contractor for 
the Flood Control District of Maricopa County
Ames Construction 
hold a Class A 
General Commercial 
License, 
#074995
Ames has self-perform 
capabilities to make many 
of the concrete placement 
and repairs identified in this 
JOC SOW. This includes box 
culverts, junction boxes, 
retaining walls, and drop 
structures. Work including 
sidewalks, curb and gutter, 
and valley gutter aprons can 
be self-performed or subcon-
tracted out.
Ames has the ability to 
self-perform every scope 
identified and we have the 
crews and equipment avail-
able at a moment's notice 
to tackle emergency repair 
services. This includes ex-
cavation and backfill opera-
tions, riprap and rock mulch 
placement, erosion control 
work, and debris removal and 
disposal services.
Our experience building box 
culverts, catch basins, and 
storm drainage systems 
makes this SOW a perfect fit 
for our labor and equipment 
resources. Our foremen and 
superintendents know how to 
work in confined spaces, and 
how to work safely and pro-
ductively in the challenging 
work environments presented 
for this type of work.
DocuSign Envelope ID: 53FC961F-8000-45E0-9314-223CB81F3ADF

Qualifications for  JOC for the Flood Control District of Maricopa County
2
The 27th Avenue Retention Basin project was a joint 
project between the City of Phoenix and Flood Control 
District of Maricopa County. The project used fast-
tracked construction activities to provide relief for 
homeowners and businesses impacted by torrential 
flooding in 2014. The construction elements for this project 
represent the type of work that will be encountered with all 
the JOC Scopes of Work for which Ames is submitting, and 
was built with the high level of quality that Ames will provide 
on any Work Assignment assigned by the FCDMC.
Owner: City of Phoenix / FCDMC
Original/Final Constr. Cost:  
$4.5M / $4.3M
Construction Dates:  
10/2015-12/2016
Reference:  
Joel McCarty, Stanley Consultants 
(602) 333-2590
 1. PRIOR EXPERIENCE
27th Avenue & South Mountain Avenue Retention Basin 
City of Phoenix Administered - Joint Project with Flood Control Dist. of Maricopa County
 Concrete
 Earthwork
 Stormwater
Ames installed 760 lft of concrete 
maintenance ramps and 1600 
lft of low flow concrete channel 
for the storm drainage system 
to empty into. The project had 
multiple storm drain catch 
basins, headwalls, and outlet 
structures. In addition, grouted 
rip rap and rock mulch was 
installed to prevent future 
erosion.
Ames excavated 610,000 cy of 
embankment material resulting in 
a 36-acre/128-acre-foot basin that 
can retain water in torrential rainfall 
events. This included coordination 
of haul routes, obtaining haul route 
permits, and coordinating traffic 
control that provided a safe haul 
environment for people living in the 
neighborhood.
Installation of 960 lft of storm 
drain that ranged from 24 
to 60 inches in diameter. 
This included the installation 
of catch basins and outlet 
structures. Grouted riprap 
and rock mulch was installed 
to protect areas that would 
be subject to erosion during 
future rainfall events.
DocuSign Envelope ID: 53FC961F-8000-45E0-9314-223CB81F3ADF

Qualifications for  JOC for the Flood Control District of Maricopa County
3
This project had many elements relevant to the JOC 
including constructing the east-west arterial crossing of the 
Agua Fria River, as well as roadway improvements, utility 
relocations, and arterial streets on Deer Valley Road. Ames 
widened a portion of Williams Drive, built the bridge between 
the east end of Williams Drive and the west end of Deer Valley 
Road, installed two roundabouts, added a pedestrian-activated 
crosswalk signal, and upgraded drainage facilities on the McMicken 
Dam Outlet Wash. Ames coordinated with several stakeholders, 
including FCDMC, ADOT, MCDOT, City of Peoria, APS, other utility 
companies, local businesses, and residents. Ames managed issues 
with overhead power on the project and seasonal water flows in the 
river, delivering the bridge and roadway opening one month before 
schedule. 
Owner: Maricopa County DOT
Original/Final Constr. Cost:  
$32.6M / $33.1M
*Over budget due to owner  
increased scope during  
construction.
Construction Dates:  
5/2021-8/2022
Reference:  
Zack Davis, MCDOT 
(602) 290-4215
Deer Valley Road: El Mirage to 109th Avenue |  
Maricopa County Department of Transportation
 Concrete
 Earthwork
 Stormwater
An 11 barrel 10’ x 6’ concrete 
box culvert was extended 
45 feet upstream in the 
McMicken Dam Outlet Wash 
to accommodate widening of 
Williams Drive. In addition, 
Ames installed multiple 
concrete headwalls and catch 
basins to control storm drain 
runoff. 
This project included clearing and 
grubbing and removal of debris from 
existing box culverts. Ames removed and 
salvaged a large quantity of riprap for 
reuse out of the McMicken Dam Outlet 
Channel for reuse when the box culvert 
extension was completed. For earthwork, 
there was approximately 13,000 cy of 
channel excavation and 82,000 cy of 
roadway excavation.
The storm drain system 
was upgraded with 3200 
lft of new RGRCP pipe 
ranging from 15 to 24 
inches. Ames also installed 
approximately 60,000 cy of 
riprap for channel and bank 
protection.
 1. PRIOR EXPERIENCE
DocuSign Envelope ID: 53FC961F-8000-45E0-9314-223CB81F3ADF

Qualifications for  JOC for the Flood Control District of Maricopa County
4
Ames led the Design-Build for the reconstruction of 3.75 miles of 
Mariposa Road (SR 189) to improve international trade and safety, 
with a new connection that links the port of entry at Mariposa 
Road with Interstate 19. Upgrades to Mariposa Road included 
flyover ramps that connect the busy Nogales city street with I-19, 
which is helping speed the flow of commerce between Mexico 
and Arizona. This project crossed Mariposa Wash and had flood 
control components that are relevant to this JOC. As a Design-
Build, Ames worked closely with designers to develop a new storm 
drainage system for the project. Ames also developed critical 
scour protection for the bridge structures that crossed Mariposa 
Wash.
Owner: Arizona Department 
of Transportation
Original/Final Constr. Cost:  
$82.1M / $83.9M
*Over budget due to owner 
increased scope during  
construction.
Construction Dates:  
3/2020-9/2023
Reference:  
Jeremy Moore, ADOT 
(520) 310-7693
SR 189: International Border to Grande Avenue | ADOT
 Concrete
 Earthwork
 Stormwater
Ames coordinated the design 
and installed three cast-in-
place concrete box culverts 
consisting of 10x5, 10x4, 
and 8x4 box culverts. These 
were installed while working 
through winter and summer 
storm events.
This project had 72,000 CY of roadway and 
drainage excavation. In conjunction with 
this was the installation of bridge abutment 
scour protection in the Mariposa Wash. This 
work was critical and had to be constructed 
between heavy rainfall events in steep/
rugged terrain adjacent to the mountainous 
region around Nogales.
Ames coordinated design 
and installation of a new 
storm drainage system 
using HDPE pipe ranging 
from 18 inches to 54 inches.  
In total 6081 lft of new storm 
drain was installed.
 1. PRIOR EXPERIENCE
DocuSign Envelope ID: 53FC961F-8000-45E0-9314-223CB81F3ADF

Qualifications for  JOC for the Flood Control District of Maricopa County
5
Ames Construction is a BNSF preferred contractor 
with experience working on fast-track repair 
projects and emergency jobs. On this recent 
project in Holbrook, AZ, we worked with BNSF to 
replace existing rail crossings with new 80-foot grade 
crossing surfaces. This project was completed in 3 days, including the 
completion of the grade crossings in two 12-hour shifts. Ames self-performed 
removals of the existing rail crossings, after BNSF crews cut the rail. We 
installed underdrain systems, 6-inch GEOWEB with subballast, all approach 
grading work, and managed paving and striping subcontractors. During the 
process, Ames’ Superintendent Rusty Hutchison coordinated with BNSF 
flaggers for trains passing through and with BNSF track crews who would 
install ballast and rail. This is a recent relevant example of the expertise 
Ames brings when it comes to working for and coordinating with BNSF using a 
procurement process that is very similar to the JOC process. 
Owner: BNSF
Original/Final Constr. Cost:  
$255K / $314K 
*Over budget due to owner 
increased scope during  
construction.
Construction Dates:  
10/2022-10/2022
Reference:  
Rafer Nichols
(817) 471-6614
Navajo Boulevard Crossing | BNSF
The 2-mile-long project from Loop 303 to Lake 
Pleasant Parkway (LPP) included widening and 
transportation improvements of this major east-
west arterial roadway between north Peoria and 
the Vistancia Development. Construction was scheduled to accommodate 
high volumes of traffic, making it possible to keep cars moving while still 
achieving an aggressive 1-year construction schedule. The project added 
two lanes to the LPP and widened the bridge across the Agua Fria River 
to accommodate six lanes of traffic; improved traffic signals; added and 
upgraded street lighting, stormwater control (extending and improving catch 
basins, box culverts, and project grading), and water quality (first flush 
basins); and upgraded landscaping and decorative fencing to reflect the 
community. Construction was meticulously detailed around the very busy 
retail intersection of Lake Pleasant Parkway and Happy Valley Road. This project is relevant to the JOC for the 
amount of storm drain work & scour/bank protection that was installed in the Agua Fria river.
Owner: City of Peoria
Original/Final Constr. Cost:  
$19.4M / $20.3M
*Over budget due to owner 
increased scope during  
construction.
Construction Dates:  
8/2019-8/2020
Reference:  
Chris Anderson, City of Peoria 
(623) 773-8439
Happy Valley Improvements | City of Peoria
 Concrete
 Earthwork
 Stormwater
Concrete replacement and repairs were 
done on multiple existing storm drainage 
catch basins, multiple driveways were 
rebuilt, and first flush structures were 
installed throughout the project. New 
cast-in-place box culverts were also 
installed to manage storm drainage.
This project had 46,000 
CY of roadway excavation, 
riprap bank protection, and 
scour protection at the bridge 
abutment locations. It also 
included new landscaping 
throughout the project.
This project had 1321 lft of 
RGRCP storm drainage pipe 
ranging from 15 inches to 18 
inches. Ames also extended and 
improved multiple catch basins 
and we installed first-flush-
basins to improve water quality.
 Concrete
 Earthwork
 Stormwater
Ames relationship with the BNSF Railway has been in place since 1995 and this is a prime example of a 
client that we do complete projects for ranging from $300K up to $200M and everything in between. To date 
we have finished over 100 projects with them including emergency work projects that are typically the result 
of storm damage and flooding. This is relevant to this JOC because it shows that we can provide quick turn 
around times on estimates and quickly transition to construction, providing expedited delivery where every 
minute has a financial impact on the BNSF. Ames will bring those capabilities to the FCDMC for any or all of 
the Scopes of Work for which we are submitting.
 1. PRIOR EXPERIENCE
DocuSign Envelope ID: 53FC961F-8000-45E0-9314-223CB81F3ADF

Qualifications for  JOC for the Flood Control District of Maricopa County
6
KEY  
PERSONNEL
CURRENT MAJOR ASSIGNMENT |  
TIME COMMITTED | END DATE
TIME AVAILABLE FOR 
THIS PROJECT (%)
PRECON
CONSTRUC-
TION
Dayna Duffy
In-House BD | Available Immediately
100
100
Casper Boyer
Fine Ore Stockpile | 50% | Available as Needed
30
100
Rusty Hutchinson
Lone Tree Overpass | 30% | Available as Needed
30
100
Nick Chaddock
Morenci Mines | 50% | Available as Needed
30
100
Ken Hudson
Regional Estimator | Available Immediately
100
30
David Maximoff
Regional Estimator | Available Immediately
100
30
Mike McGilton
Regional Estimator | Available Immediately
100
30
PROJECT MANAGER
DAYNA DUFFY
FLOOD CONTROL DISTRICT 
OF MARICOPA COUNTY
PROJECT MANAGER
EXECUTIVE SUPPORT
CHRIS KANE
ESTIMATOR
DAVID MAXIMOFF
SUPERINTENDENT
RUSTY HUTCHISON
ESTIMATOR
KEN HUDSON
SUPERINTENDENT
CASPER BOYER
ESTIMATOR
MIKE McGILTON
SUPERINTENDENT
NICK CHADDOCK
Key Personnel
2. PROJECT TEAM
Ames has assembled an experienced project team that appreciates the needs and expectations of 
FCDMC. We know collaboration is key to successfully delivering solutions that:
	
¾ have minimal impact to the public
	
¾ maintain all levels of service throughout construction
	
¾ keep costs and the project schedule in check
Project Manager Dayna Duffy will ensure teamwork through open lines of communication with FCDMC 
to protect your interests at all times. Project Superintendents Casper Boyer, Rusty Hutchison, and 
Nick Chaddock will be hands on alongside Dayna, supervising construction of the projects and offering 
construction solutions during design, cost, and schedule developments. Casper, Rusty, and Nick together 
bring an average of over 31 years of construction experience to the table, and have a working relationshp 
that spans nearly 20 years at Ames Construction. This kind of experience working together, under the 
leadership of Dayna, means our teams will be on the same page, reliable, and ultimately will provide the 
best and most cost effective solutions to the FCDMC. 
DocuSign Envelope ID: 53FC961F-8000-45E0-9314-223CB81F3ADF

Qualifications for  JOC for the Flood Control District of Maricopa County
7
Casper Boyer  
Superintendent - 
Concrete
Rusty Hutchison  
Superintendent - 
Earthwork
Nick Chaddock  
Superintendent - 
Stormwater
For 38 years, Casper has honed 
his experience to include mill 
expansion, bridges, retaining walls, 
sound walls, concrete junction 
structures, box culverts, and 
channel linings. He has proven his 
ability to forecast, schedule, and 
plan the work, and has resolved 
challenges at the field level 
through detailed strategies for 
formwork and complex concrete 
placements. He approaches every 
project as a partnership and will 
use this experience to assist 
Dayna to ensure project success 
for all job assignments. 
Throughout his 30-year career, 
Rusty has safely excavated over 
1 billion cubic yards of earthwork. 
This experience of tackling the 
logistics of moving large volumes 
of excavation makes him the 
ideal superintendent to partner 
with the Flood Control District. 
His accurate project scheduling, 
budget control, training, and 
leadership in collaborative work 
environments benefit project 
owners and stakeholders alike.
Nick’s 26 years of experience 
supervising complex stormwater 
system projects includes 
extensive experience installing 
storm drain in varying soil 
conditions and varying depths 
of excavations. He is familiar 
with shoring methods so 
workers and inspectors are safe 
throughout the storm drainage 
installation process. Nick also 
has experience overseeing 
Ames’ structure foremen for 
associated concrete work on 
this project.s includes cast-in-
place box culverts, catch basins, 
inlet and outlet structures, and 
outfall structures. Nick will work 
closely with Dayna on 
any stormwater related 
projects.
DAYNA DUFFY
Your Project Manager
Dayna brings 25 years of construction industry experience, from her 
start as a construction office administrator to project coordination, 
public relations, and project management. Her experience and 
strong relationships with owners and project personnel are the 
result of partnering with many local agencies and municipalities, 
including the Flood Control District of Maricopa County. She has the 
extensive experience that is needed to successfully manage and complete all Job Orders for 
the FCDMC, on time and on budget, due to her impeccable and thorough strategic planning 
and communication skills. For this JOC, Dayna will be responsible for logistics planning, 
project administration, cost and schedule control, construction management, and consistent 
coordination with the District across all job orders to ensure that Ames meets the expectations 
of all stakeholders. In addition, her knowledge of the pre-construction process gives her a 
greater awareness of how to create efficiencies for her crews that work in and around residential 
neighborhoods and businesses. Dayna will lead the development of accurate schedules and 
budgets, and make certain that construction activities operate efficiently.
10 JOCs
114
5 Clients
Project Manager for
Total Jobs
FCDMC, MCDOT, Peoria, 
Mesa, Surprise
— David Wilkins, P.E., 
Engineering Program Manager (JOC Program) City of Mesa
“
”
Dayna has shown her understanding of the process to have a 
successful JOC program which includes working together as a 
team with owners, designers, subcontractors, outside utilities, the 
community in general, and many other Stakeholders working toward 
a common successful goal.
DocuSign Envelope ID: 53FC961F-8000-45E0-9314-223CB81F3ADF

Qualifications for  JOC for the Flood Control District of Maricopa County
8
3. SUBCONTRACTOR SELECTION PLAN
SUBCONTRACTOR SELECTION / 
ENGAGEMENT
Ames’ Subcontractor Selection Plan selects 
subcontractors through a qualifications-based 
selection following ARS 34-603. Our extensive 
network of local subcontractors will allow us to 
efficiently provide the Flood Control District of 
Maricopa County with competitive pricing and 
provides opportunities to the local subcontractor 
community. During preconstruction, Ames will work 
with the FCDMC to establish a list of prequalified 
subcontractors.
Ames’ presence in the Valley for almost 40 years 
has enabled us to build an extensive local bidders 
list derived from subcontractors registered with 
Ames, team experience on similar scopes, and other 
subcontractor databases available from the FCDMC, 
ADOT, and other local agencies. The subcontractor 
solicitations will summarize important bid information, 
including the scope of work, bid conference details 
when applicable, deadlines, and contact information. 
SELF-PERFORMED
SUBCONTRACTED
	
9 Roadway Grading
	
9 Aggregate Base  
Installation
	
9 Survey & Utility  
Locates
	
9 Drainage Excavation
	
9 Storm Drainage Work
	
9 SWPPP & Environ-
mental Installation & 
Monitoring
	
9 Removals &  
Demolition
	
9 Asphalt Paving
	
9 Micro Seal /  
Surfacing
	
9 Asphalt Milling
	
9 Curb & Gutter / 
Concrete Sidewalks
	
9 Electrical & Signal 
Work
	
9 Signage & Striping
	
9 Landscape
PROPOSED SELECTION METHOD
Our rigorous prequalification process ensures that 
the best value and most qualified subcontractors 
are used for your project. This plan provides a 
framework for Ames to work with the FCDMC to 
select subcontractors based on qualifications alone 
versus qualifications and price. Once prequalified 
and chosen, each subcontractor will be integrated 
into our project team to create a collaborative culture 
that demands safety, delivers quality, and celebrates 
milestone achievements. For this project, Ames does 
not foresee the need to have any subcontractors 
selected on qualifications alone. We have the 
knowledge to coordinate with design for all scopes of 
work. Our plan is to prequalify subcontractors and get 
competitive pricing for all scopes of work so you get 
the best value out of the JOC process. 
FLOOD CONTROL PROCEDURE  
FAMILIARITY
Ames’ Project Manager Dayna Duffy is very familiar 
with your procedures, having served as a Project 
Manager on multiple FCDMC projects including 
4 years on JOC projects. This includes Sun City 
Access Ramp at Spanish Garden Dr & Dysart 
Road alignment. This section of the channel had 
no ingress/egress access, which made it difficult 
for FCDMC to maintenance the area. The project 
consisted of cutting into the existing channel to create 
a reinforced concrete ramp for access, shotcrete 
channel lining, safety railing, subgrade prep, traffic 
control, and constant communication with FCDMC 
and the residents that surrounded the project. 
Ames works with multiple municipalities. Even though 
this is our first JOC proposal, we do not anticipate an 
issue fitting within FCDMC procedural requirements. 
Our team is familiar with MAG guidelines, the 
importance of working with FCDMC inspection staff, 
and the value of promoting a partnering approach as 
we build our relationship with you.
	
9 Invite three to five subcontractors  
per trade for each scope
	
9 Verify scope capture is complete
	
9 Manpower, schedule, and commitment 
review
	
9 Flood Control District input
	
9 Subcontractor award
	
9 Track schedule
	
9 Monitor performance
	
9 Daily quality control 
verification
	
9 Frequent and open 
communication
	
9 Document results
	
9 Safety record
	
9 Performance history
	
9 Financial integrity
	
9 Bonding capacity
	
9 Quality
	
9 Claims history
1
2
3
PREQUALIFICATION
BID PROCESS
POST AWARD
SUBCONTRACTOR SELECTION PROCESS
DocuSign Envelope ID: 53FC961F-8000-45E0-9314-223CB81F3ADF

Qualifications for  JOC for the Flood Control District of Maricopa County
9
4. PROJECT MANAGEMENT PLAN
TASKS
P R E C O N S T R U C T I O N
Ames Contacted  
by FCD
Ames' Initial Review of  
Project Information
Scope of Work is identified to 
select Superintendent and  
Estimator with best qualifications 
for the work assignment.
On-site meeting is important to 
get all involved on the same page. 
Provides a better understanding of 
the proposed assignment and the 
best-value that benefits FCDMC.
Ames Estimating 
Process
Estimate  
Refinement/  
Value Engineering
Coordinate an On-site  
Meeting 2-3 Days  
from Initial Contact
Ames Generates  
Open Book Estimate
Open Book Estimate  
Review Meeting
Work Assignment  
Issued to Ames
 
Ames Construction, Inc.
17099
CMGC UPRR VAFB Bridge
Bryan Mueller
Direct Cost Report
 
 
Activity
Desc
Quantity
 
Unit
 
Perm
  Constr
   Equip
   Sub-
 
Resource
 
Pcs
Unit
Cost
   Labor Material Matl/Exp
  Ment Contract
Total
 
 
 
BID ITEM
=       100
CLIENT# = 100
Land Item       SCHEDULE:
1
100
 
 
 
Description =
STRUCTURAL STEEL (A709 GRADE 50) DECK PL
Unit =
LBS
Takeoff Quan: 1,000,000.000
Engr Quan:
 
1,000,000.000
 
STRUCTURAL STEEL (A709 GRADE 50) DECK PLATE GIRDER SPANS - WITH METALIZED COATING
 
508060
Unload & Stage Material
Quan:
25.00 LD
Hrs/Shft:
8.00
Cal: 40
WC: CA6217
 
**Unreviewed
  
Unloading material.
Total Weight = 1,000,000 LBS
Loads = 1,000,000 LBS / 40,000 LBS = 25 LDS
3FW01
(Mod) Falsework Crew - 5 Men
24.00
CH
Prod:
0.9600 HU
Lab Pcs:
6.00
Eqp Pcs:
3.00
8CR100C
100 TON CRAWLER
1.00
24.00 HR
 
91.000
2,184
2,184
8PICKUPH
FOREMAN PICKUP
1.00
24.00 HR
 
10.000
240
240
8TH103
CAT TH103 FORKLIFT
1.00
24.00 HR
 
35.000
840
840
C1
CARPENTER-JOURNEY
3.00
72.00 MH
 
40.530
5,277
5,277
CF
CARP FOREMAN
1.00
24.00 MH
 
43.530
2,090
2,090
OPC2
C11 CRANE OPER 100 T
1.00
24.00 MH
 
49.350
2,246
2,246
OPCO
C01 CRANE OILER
1.00
24.00 MH
 
45.350
2,116
2,116
$14,992.65
5.7600 MH/LD
144.00 MH
[ 249.427 ]
11,729
3,264
14,993
 
508070
Erect Structural Steel Deck Plate Girder
Quan:
  
1,000,000.00
 
LBS Hrs/Shft:
10.00
Cal: 50
WC: CA6217
 
**Unreviewed
  
Subcontractor for Deck Plate Girder Erection.
Qty = 1,000,000 LBS
4Z40745
Bridge Erection
1.00
 
1,000,000.00
 
LBS
 
0.850
850,000
850,000
 
508080
Field Welding
Quan:
1.00 LS
Hrs/Shft:
10.00
Cal: 50
WC: CA6217
 
**Unreviewed
  
Figure field welding for 10 shifts.
3WELD
(Mod) Welder
100.00
CH
Prod:
100.0000 HU
Lab Pcs:
6.00
Eqp Pcs:
4.00
8W400
400 AMP WELDER
2.00
200.00 HR
 
8.270
1,654
1,654
8WR
WELDER'S RIG
2.00
200.00 HR
 
8.270
1,654
1,654
W1
G06 WELDER
6.00
600.00 MH
 
46.780
57,401
57,401
$60,708.56
600.0000 MH/LS
600.00 MH
[ 30874.8 ]
57,401
3,308
60,709
 
508100
Unload & Install Metal Decks
Quan:
1.00 LS
Hrs/Shft:
10.00
Cal: 50
WC: CA6217
 
**Unreviewed
  
Unload and install metal decks during curfews.
PILE3
(Mod) PILE DRIVING SUPPORT CREW
50.00
CH
Prod:
5.0000 S
Lab Pcs:
7.00
Eqp Pcs:
3.00
8CR100C
100 TON CRAWLER
1.00
50.00 HR
 
91.000
4,550
4,550
8TH103
CAT TH103 FORKLIFT
1.00
50.00 HR
 
35.000
1,750
1,750
8W400
400 AMP WELDER
1.00
50.00 HR
 
8.270
414
414
CPW
CARP WELDER/PILEMA 5.00
250.00 MH
 
41.530
19,900
19,900
OPC2
C11 CRANE OPER 100 T
2.00
100.00 MH
 
49.350
9,946
9,946
$36,558.80
350.0000 MH/LS
350.00 MH
[ 16849.25 ]
29,845
6,714
36,559
 
508940
Waterproofing
Quan: 11,000.00 SF
Hrs/Shft:
8.00
Cal: 40
WC: CA6217
 
**Unreviewed
  
Subcontrator for waterproofing application.
4Z40820
Waterproofing
1.00
11,000.00 SF
 
20.000
220,000
220,000
 
508950
Thermal Spray Coating
Quan:
100.00 GAL Hrs/Shft:
8.00
Cal: 40
WC: CA6217
 
**Unreviewed
  
Subcontractor for thermal spraying.
4Z40480
Painting
1.00
100.00 GAL
 
500.000
50,000
50,000
 
508960
Risk & Contingency
Quan:
  
1,000,000.00
 
LBS Hrs/Shft:
10.00
Cal: 50
WC: CA6217
 
**Unreviewed
  
Risk mitigated through workshops & design review meetings.
3Z42000
Risk & Conting@107.75%
1.00
 
1,000,000.00
 
LBS
 
0.000 
OPEN-
OPEN-
BOOK  
BOOK  
ESTIMATE
ESTIMATE
D. Duffy
D. Duffy
D. Duffy C. Kane
D. Duffy
D. Duffy
Estimator
Estimator
FCD
FCD
Super.
SUBCONTRACTOR SELECTION PLAN – PROCEDURES
For each Work Assignment that is issued by FCDMC, Ames will follow the subcontractor selection plan that is 
outlined in Section 3 with the following additional steps.
1.	Ames will identify specific scopes to be subcontracted out and develop a scope of work, start date, and 
schedule duration for the work.
2.	With this work falling within a short duration schedule, we will confirm that subcontractors quoting have the 
“Current Resources” needed to begin as well as to finish their respective scope of work on time.
3.	Ames will work with FCDMC to determine if there are issues that need to be addressed with any one of the 
subcontractors. If a subcontractor is currently having a performance issue, they may be disqualified from 
quoting on a specific work assignment.
4.	Once subcontractors are selected, our Superintendents will support their efforts and make sure we are 
successful through construction.
PROJECT MANAGEMENT PLAN – INTRODUCTION
Ames does not have municipal JOC experience, but we do have experience delivering projects with similar 
delivery methods, including CMAR, CMGC, Progressive Design-Build, Design-Build, Best Value, and Early 
Contractor Involvement. We identified that the JOC process will have nuances that we need familiarity with, 
so we hired Dayna Duffy to run our JOC program. Her experience on 114 JOC projects leaves no doubt that 
Ames' JOC project with the FCDMC will be successful. The following is an outline of how the process will be 
managed, along with an explanation of what is happening behind the scenes to make this a success.
DocuSign Envelope ID: 53FC961F-8000-45E0-9314-223CB81F3ADF

Qualifications for  JOC for the Flood Control District of Maricopa County
10
TASKS
C O N S T R U C T I O N
•	 Materials
•	 Site Specific Safety Plan
•	 TC Plans (if needed)
•	 Schedule
•	 Permits (if needed)
•	 Arizona 811 (formerly Blue 
Stake)
•	 Long-lead Items
Superintendent leads day to day 
construction activities.
Dayna and the Superintendent 
will hold weekly/bi-weekly  
meetings.
Post construction close-out  
of documents. Starts from the  
onset of each work assignment,  
continues through final site walks 
with FCD, quantity verification, 
and final As-Built drawings.
Submittal Process
Construction
Submit Closeout Docs
Work Assignment  
Complete
Request Substantial  
Completion & Project  
Walk Through
Kick-Off Meeting
D. Duffy
D. Duffy
D. Duffy
D. Duffy
Crews
FCD
Super.
Super.
4. PROJECT MANAGEMENT TEAM
— Matt Oller, Operations Branch Manager, 
     Flood Control District of Maricopa County
“
”
Dayna's meticulous approach to JOC procurement 
processes has significantly contributed to the efficiency 
of our project acquisition, ensuring that the selection of 
contractors aligns seamlessly with project requirements.
DocuSign Envelope ID: 53FC961F-8000-45E0-9314-223CB81F3ADF

Qualifications for  JOC for the Flood Control District of Maricopa County
11
6. TEAM APPROACH CAPABILITY
5. BUDGET AND SCOPE MANAGEMENT CAPABILITY
Ames has built relationships with our public and private clients through our performance, integrity, and 
selection of projects that we build. We will hold partnering meetings to establish a collaborative environment, 
establish a communication matrix, and set project goals based on FCDMC and the project’s needs. We will 
foster this effective communication from day one, because we believe in EARLY PARTNERING. This effort 
gives all parties inolved an opportunity to engage with one another to proactively identify any challenges as 
well as solutions to those challenges. A Project Partnering/Kickoff Workshop is the ideal platform to establish 
an open, collaborative, and transparent environment for all team members. 
Common objectives for Partnering include promoting safety, claims avoidance, eliminating delays, delivering 
higher quality, environmental compliance, on budget performance, and public approval. We strongly believe 
that Partnering is a relationship in which:
	
¾ Trust and open communications are encouraged and expected from all participants.
	
¾ All parties address and resolve issues and problems promptly and at the lowest possible level.
	
¾ All parties have identified common goals.
	
¾ Partners seek input from each other to find the best solutions to problems that may arise.
Under the management of Dayna Duffy, Ames will hold weekly progress meetings to address any issues or 
concerns, discuss the project schedule, coordinate work, and plan the week ahead. Ames does not work in 
a vacuum. FCDMC and all subcontractors will be kept well informed of all project progress. 
Ames’ record of successful partnering has resulted in 18 partnering awards!
Ames has systems in place that allow us to manage budget and scope from projects with small scopes of 
work to large scale projects. Our construction phase approach will allow our project manager, Dayna Duffy, 
to work with superintendents and foremen to make sure the project stays on track. We have found that 
construction planning and risk management can be used to develop accurate construction schedules. This 
results in allowing Ames to manage field operations without interruption when we are in the field, resulting 
in work assignments that are completed on budget without scope creep.
To support the efforts that make us successful in Budget and Scope Management, Ames utilizes software 
programs to develop reports, document meetings, perform constructability reviews and risk assessments, 
schedule work activities, and manage cost. These include:
	
¾ Microsoft Office Suite
	
¾ Adobe Creative Cloud
	
¾ Blue Beam
	
¾ Primavera P6 and Expedition
	
¾ On Screen Takeoff Software
	
¾ Terramodel
	
¾ AGTEK
	
¾ HCSS Bid Software 
	
¾ eCMS Financial Reporting
	
¾ BIM/Navisworks
	
¾ FAA Registered Drones
	
¾ Sharepoint
CONSTRUCTION
ACTIVITIES FOR BUDGET & SCOPE APPROACH
Planning
Preparing for Closeout from Day 1 Gets Us to the  
Finish Line on Time and Maximizes Design-Build
Scheduling
Managing
	
¾ Work Planning 
Matrix
	
¾ Pre-Activity 
Mtgs
	
¾ Op. Work Plans
	
¾ Hazard 
Analysis
	
¾ Survey Plan
	
¾ Safety Plan
	
¾ Quality Plan
	
¾ Env. Plan
	
¾ CPM Schedule 
Updates
	
¾ 90-Day Work 
Schedule
	
¾ 3-Week Look 
Aheads
	
¾ Daily Jobsite 
Meetings
	
¾ Staging and 
Just in Time 
Materials 
Delivery
	
¾ Risk
	
¾ Safety, Quality, 
Env. Compliance 
Programs
	
¾ Safety and Quality 
Audits
	
¾ Cost and Quantity 
Tracking 
	
¾ Weekly Labor 
Reports
	
¾ Monthly Cost 
Reports
	
¾ DBE/Sub.  
Utilization
	
¾ Doc. Constrol 
Systems
CLOSEOUT
DocuSign Envelope ID: 53FC961F-8000-45E0-9314-223CB81F3ADF

Qualifications for  JOC for the Flood Control District of Maricopa County
12
8. SAFETY
7. EXPEDITED COMPLETION OF PROJECT
Ames’ culture of safety places an emphasis on personal responsibility and accountability for all employees 
and subcontractors. Our objective of Zero Incidents begins at the top, is driven through the regional ranks, 
and ultimately to local field crews. Ames’ craft and front-line supervision is empowered to lead daily safety 
briefings with all employees under their supervision to maintain maximum hazard awareness. Our goal 
is to be an industry leader in setting the bar for safety standards and achieving best-in-class results.Our 
commitment to safety is reflected in Ames' EMR of 0.80 for 2023. Copies of Ames’ OSHA 300A logs for 2022 
and 2023, Safety Manual, and Substance Abuse Program are included as attachments at the end of this 
Statement of Qualifications.  
2022 OSHA Form 300A
2023 OSHA Form 300A
PRACTICES, PROCEDURES, AND RESOURCES
Our Project Management Plan in Section 4 outlines the process that Dayna will implement to save time on 
any project work assignment that is issued to Ames as a JOC. In addition, we will save time by having the 
appropriate labor, equipment, and material resources to finish any given work assignment.
Dayna Duffy is Ames #1 resource with regard to carrying out the practices and procedures outlined in this 
proposal. She knows FCDMC’s JOC process extremely well, and Ames’ regional management will make 
sure she has all the support she needs to perform the requested work in a safe, timely, and cost-effective 
manner. This includes Superintendents Rusty Hutchison, Casper Boyer, and Nick Chaddock, depending on 
the Scope of Work. In addition, Dayna has engineering resources available to her from our regional office, as 
well as the labor and equipment resources that have made us successful on previous projects.
SIMILAR PROJECTS
The projects listed in Section 1 are examples of projects that had the same practices and procedures 
employed to complete the project on time or ahead of schedule that relate to this project. The following are 
examples from Section 1:
	
¾ Deer Valley Road: El Mirage to 109th Avenue – Finished 1 Month Ahead of Schedule
	
¾ BNSF Navajo Boulevard Crossing – Fast Track, Finished in 3 Days
	
¾ 27th Avenue & South Mountain Retention Basin – Fast Track, Finished within Contract Time
LOCAL PERMITTING AGENCIES
Dayna Duffy understands the permitting process with local permitting agencies and she will make sure that 
schedules reflect the time needed for permits. The approach of having realistic permitting durations allows 
Dayna to work with FCDMC management during preconstruction to develop accurate deliverable schedules.
DocuSign Envelope ID: 53FC961F-8000-45E0-9314-223CB81F3ADF

General Contractor Arizona License
Resumes
Attachment 1 – References
     	 Projects
     	 Subcontractors 
Attachment 2 – Legal Worker Certification
Attachment 3 – Surety Bond
Attachment 4 – Non-Collusion Affidavit
Attachment 6 – Scope of Work Checklist
Attachment 7 – Subcontractor Listing
Safety Information
	
2022 and 2023 OSHA 300A Summary Forms
	
Safety Manual
	
Substance Abuse Program
Signed Addendums
attachments
DocuSign Envelope ID: 53FC961F-8000-45E0-9314-223CB81F3ADF

DocuSign Envelope ID: 53FC961F-8000-45E0-9314-223CB81F3ADF

DAYNA DUFFY 
Project Manager 
 
PROFESSIONAL SUMMARY  
Dayna brings 25 years of construction industry experience, from her 
start as a construction office administrator to project coordination, 
public relations, and project management. These positions have 
reinforced Dayna’s organization and project management skills as 
well as heightened her awareness of how critical communication is 
to the success of a project, beginning to end. She has the extensive 
JOC experience that is needed to successfully manage and 
complete any project on time and on budget due to her impeccable 
and thorough strategic planning and communication skills, from 
preconstruction to close out. Her deep bench of experience and 
strong relationships with owners and project personnel are the result 
of partnering with many local agencies and municipalities, including 
the Flood Control District of Maricopa County where Dayna was the 
Project Manager on several projects. This includes the ACDC 
Channel; Sun City Ramp; Chip Seal (various locations); Signal Butte 
FRS Slide Gate; Guadalupe FRS Interim Condition; Agua Fria 
Levee; and Loop 303 Outfall Channel Box Culvert Cleaning and 
Concrete Floor Repairs. For this JOC, Dayna will be responsible for 
logistics planning, project administration, cost and schedule control, 
construction management, and consistent coordination with the 
District across all job orders to ensure that Ames meets the 
expectations of all stakeholders. 
JOC PROJECT EXPERIENCE 
Flood Control District of Maricopa County  
Project Manager 
 Concrete Placement and Repair Services | 2019 – 2023 
 Surface Treatment and Installation Services | 2019 – 2023 
Maricopa County Department of Transportation 
Project Manager 
 Roadway Paving and Stabilization | 2021 – 2023 
 Concrete Placement Services | 2020 – 2023  
 ADA Modernization Services | 2018 – 2023 
 Concrete Placement Services | 2016 – 2020 
City of Peoria 
Project Manager 
 Citywide Civil / Site Work | 2022 – 2023 
 Pavement Maintenance and Repair | 2017 – 2022  
City of Mesa 
Project Manager 
 Transportation Construction Services | 2019 – 2023 
City of Surprise 
Project Engineer 
 Pavement Maintenance and Repair | 2017 – 2022 
 
YEARS OF 
EXPERIENCE 
25 
YEARS WITH AMES 
1 
TRAINING/ 
CERTIFICATIONS 
Construction 
Management, Associates 
in Applied Science 
CJP, Center for JOC 
Excellence   
Erosion Control 
Coordinator  
OSHA 30 
First Aid / CPR 
DocuSign Envelope ID: 53FC961F-8000-45E0-9314-223CB81F3ADF

Sun City Access Ramp at Spanish Garden Drive and Dysart Road Alignment | FCDMC  
Project Manager. This section of the channel had no ingress/egress access which made it difficult for 
FCD to maintenance this area. The project consisted of cutting into the existing channel to create a 
reinforced concrete ramp for access, shotcrete channel lining, safety railing, subgrade prep, traffic 
control and constant communication with FCD and the residents that surrounded the project. 
ACDC Channel (three phases) 48th Street and Camelback to 51st Avenue and Cactus and the Cave 
Creek Arm | FCDMC  
Project Manager. This was a safety project that required concrete pilasters, wrought iron fencing and 
concrete bases to be replaced. Each pilaster, wrought iron post and fencing had to be checked for 
erosion due to outside elements over the years. 
Signal Butte FRS | FCDMC  
Project Manager. This project required the stem, gate, and wheel to be replaced, a cell tower was 
installed for this project too. It allowed FCD to get a bird’s eye view of the water flow in this area during 
storms. 
Guadalupe FRS Interim Condition | FCDMC  
Project Manager. This project is located on the AZ Grand Resort on the 2nd hole. This project required 
the existing building to be demoed, slide gate replaced, new walls, fencing around structure to protect 
new slide gate and keep golfers out. 
Chip Seal-Various Locations | FCDMC  
Project Manager. Clean and Chip Seal Maintenance Roads at several locations.  
Concrete/Sidewalk Repairs (various locations) | MCDOT  
Project Manager. The work required the contractor to provide all the necessary labor, equipment, 
materials, and traffic control to repair ~1700SF of damaged sidewalks/ADA ramps. Sidewalk repair will 
include removing broken/buckled sidewalks, subgrade preparation and concrete placement. 
Anthem Gate, Liberty Bell Way and Desert Hill Gate Addition | MCDOT  
Project Manager. This project was to raise the clearance of the gate/fence line and close off access by 
stepping over the gate, which minimized the safety concern and protected the gate opener and 
electronic equipment. Work included clearing vegetation around the gate and welding a 3’ panel to raise 
the height of the gate. 
Castano Drive Drainage | MCDOT  
Project Manager. This project is to improve the drainage on southbound Castano Dr. between San 
Miguel Ave and San Juan Ct the sidewalk and asphalt are heaving and causing a ponding issue. This 
area is known to have unsuitable subgrade with fat clay. The intent of this project will be to repair the 
drainage issue with to allow flow to the scupper to the south and remove and replace the sidewalk on the 
west side of Castano Dr. and a section that is damaged on the east side of the road.  The damaged 
sidewalks pose a tripping hazard to the public, replacing the sidewalk panels will provide safe and 
convenient travel for the public. 
16th Street ROW Realignment | MCDOT  
Project Manager. This project pioneered a new roadway segment on an undisturbed area of less than 
1/4 of an acre, realigned new road segment onto MCDOT ROW with a maximum grade of 18%, placed a 
minimum of 4” of millings with copolymer mixed in to stabilize the roadway surface, and provided 
adequate drainage. In addition, scarified old roadway segment and provided native plant hydro-seeding 
as needed. 
Old US 80 Mile Marker 30.9 Drainage | MCDOT  
Project Manager. This project was for the removal of an existing outlet headwall and wings, doweling 
into the remaining concrete structure covering pipe and form, and pouring new headwall with wing-walls. 
In addition, the crew slurry backfilled the headwall, repaired existing upstream check dams (2), and 
removed boulders/debris from the channel to allow proper flow. They added grouted rip rap floor with 
turndown at each check dam, repaired/ reshaped channel/shoulder (upstream), and removed and 
replaced object markers at both headwalls. 
 
DocuSign Envelope ID: 53FC961F-8000-45E0-9314-223CB81F3ADF

CASPER BOYER 
Superintendent – Concrete 
 
PROFESSIONAL SUMMARY  
Casper Boyer’s nearly 40 years of structural experience includes mill 
expansion structures, bridges, retaining walls, sound walls, concrete 
junction structures, box culverts, and channel linings. He is able to 
effectively support, manage, and train crews to any site-specific 
requirements and conditions. Casper has proven his ability to 
forecast, schedule, and plan the work, and has resolved challenges 
at the field level through developing detailed strategies for formwork 
and complex concrete placements. He approaches every project as 
a partnership to gain consensus on constructability expectations and 
performance. Casper’s concrete experience directly benefits a 
project’s quality control program through smooth inspection and 
testing of placed concrete. 
PROJECT EXPERIENCE 
Bethany Home Outfall Channel Reach 2C | Glendale, AZ | Flood 
Control District of Maricopa County | 2007  
Structures Superintendent. This 1-1/2-mile reach of the Bethany 
Home Outfall Channel passes under 75th Avenue and Camelback 
Road in Glendale, Arizona. The channel is comprised of 6900 feet of 
double 9'x9' concrete box culvert and 1350 feet of 20' x 12' vertical wall open concrete channel.  
Relocation of a 48" sanitary sewer required sewer bypass pumping to maintain operations. Mr. Boyer 
was responsible for constructing the box culvert with a traveler, as well as the vertical wall open channel 
and miscellaneous structures. 
White Tanks North Inlet Channel | Phoenix, AZ | Flood Control District of Maricopa County | 2006  
Structures Superintendent. This project included the construction of reinforced concrete box culvert 
structures under the active Beardsley Canal and Northern and Olive Avenues. The construction 
included a new 5,800-foot reach of new earth channel with three multi-cell reinforced concrete box 
culverts totaling 850 feet in length. Also included were three special concrete diversion and inlet 
structures, eight grouted rip-rap drop structures, and over 24,500 square yards of reno mattress bank 
protection. Casper was responsible for the inlet and outlet structures as well as related miscellaneous 
structures.  
White Tanks Flood Retarding Structure #3 | Phoenix, AZ | Flood Control District of Maricopa 
County | 2006  
Structures Superintendent. This construction contract was the first of a two-phase project for the 
rehabilitation of an existing flood control dam, White Tanks FRS No. 3. The work included 
reconstruction of an earthen embankment approximately 2,500 feet long by 33 feet high with a soil 
cement core of approximately 84,000 cubic yards. Structural and common earth fill was also used and 
the project included construction of three parallel fissure cutoff walls in the foundation beneath the 
structure. Two of these walls were constructed of a native soil-cement-bentonite material. A remedial 
third cutoff wall was constructed of cement and imported aggregate. A cast-in-place outlet works was 
also included with two reinforced concrete steel cylinder pipelines that emptied into a stilling basin. 
 
 
YEARS OF 
EXPERIENCE 
38 
YEARS WITH AMES 
18 
TRAINING/ 
CERTIFICATIONS 
OSHA 30-Hour   
Certified Rigging, 
Scaffolding, Commercial 
Diver 
MSHA Competent Person 
MSHA 24  
CPR / First Aid 
DocuSign Envelope ID: 53FC961F-8000-45E0-9314-223CB81F3ADF

SR 347 Maricopa Road / UP Grade Separation | Maricopa, AZ | Arizona Department of 
Transportation | 2019  
Concrete Superintendent. This project was for the reconstruction of nearly 2 miles of SR 347 in Maricopa 
on a new alignment, including replacing the existing at-grade intersection of  
SR 347 and the Union Pacific Railroad tracks with an overpass. MSE walls (20,000 SF of MSE walls, 30 
feet high) were used to reduce the overall project footprint and eliminate slopes which would have 
impacted local businesses. The MSE walls require unique methods to place fill material in an isolated 
space. Casper’s knowledge and experience to utilize the right equipment to place the fill material in the 
appropriate number of lifts to achieve the correct level of compaction was instrumental in knowing what 
needs to be built and the best means and methods to build it. Ames crews custom-made block-out to 
use inside a steel form to create the columns for the project. The columns begin as a hexagon and twist 
to turn into a seven-sided polygon. This challenging and detailed aspect was completed in under 5 
weeks with approximately five columns being completed each week. 
I-19 / Ajo Way Traffic Interchange, Nogales-Tucson | Tucson, AZ | Arizona Department of 
Transportation | 2018  
Concrete Superintendent Reconstruction of an existing "partial clover leaf" built in 1965 to a single point 
interchange (SPUI) with new on and off ramps to I-19. Work included installing ramp metering and traffic 
signal system, improving major drainage crossings on I-19, and using aesthetically-treated retaining and 
sound walls to buffer adjacent residential and commercial areas from construction and traffic noise 
generated by the interstate (60,000 sf of retaining walls and 88,000 sf of sound walls). Construction 
featured a widened, new 218-foot bridge over I-19, and widening Ajo Way from two to three lanes in 
each direction between 16th Avenue and the Santa Cruz River bridge and other arterial road 
improvements. Lightweight concrete was used on the retaining walls due to space limitations as 
construction was confined to the narrow ADOT right-of-way. The retaining walls are tall, with undersized 
footings. By using 2-foot lifts in 12-hour increments to place the concrete, Ames met quality and 
schedule requirements. With 100,000 vehicles passing through this project location every day, advanced 
means and methods were used to accommodate construction by taking the project vertical in order to 
minimize impacts to the traveling public. 
Highway 76 East Segment, I-15 to South Mission Road | Fallbrook, CA | Caltrans | 2017  
Structures Superintendent. Widening Highway 76 East Segment from the I-15 interchange to South 
Mission Road from an existing two-lane road to a four-lane divided highway with upgrades to drainage, 
sewer, water lines, street lighting, animal crossings, and the addition of two bridges and retaining walls. 
Structural work included 1,000 sf of retaining walls; 8,600 cy of structural concrete; and 1,000 tons of 
structural steel. Casper was responsible for the construction and quality of the structural elements. The 
existing park-and-ride facility at the intersection of 395 and Hwy 76 was totally reconstructed to increase 
parking and improve lighting, drainage and access. 
SR 260 Doubtful Canyon | Gila County, AZ | Arizona Department of Transportation | 2013  
Structures General Superintendent. Located on a scenic highway through the Tonto National Forest in 
Gila County, work for this project consisted of reconstructing the existing two-lane undivided roadway 
into a four-lane divided highway. Included with the work was the realignment of local crossroads to align 
with new median crossover locations. Work consisted of installing asphaltic concrete and asphaltic 
concrete friction course; six concrete bridge structures; three new reinforced concrete box culverts; pipe 
culverts; riprap and gabions; fence; pavement marking; signing; guardrail; seeding; and other incidental 
work. 
 
 
 
DocuSign Envelope ID: 53FC961F-8000-45E0-9314-223CB81F3ADF

RUSTY HUTCHISON 
Superintendent – Earthwork 
 
PROFESSIONAL SUMMARY  
In Rusty Hutchison’s 30 years in the industry, he has gained 
progressive supervision and construction management skills through 
his work on a diverse range of projects, large and small. His focused 
approach to excavation has benefitted flood control, mining, and 
transportation clients throughout the Southwest. Rusty excels at 
building teamwork in his field supervision, subcontractor oversight, 
and safety management. Throughout his career, Rusty has safely 
excavated over 1 billion cubic yards of earthwork. This experience of 
tackling the logistics of moving large volumes of excavation makes 
him the ideal superintendent to partner with the Flood Control 
District. His accurate project scheduling, budget control, training, 
and leadership in collaborative work environments benefit project 
owners and stakeholders alike. 
PROJECT EXPERIENCE 
SR 189: International Border to Grand Avenue | Nogales, AZ | 
Arizona Department of Transportation | 2022  
Superintendent. Ames led the widening of 3.75 miles of Mariposa Road (SR 189) to improve 
international trade and safety, with a new connection that links the port of entry at Mariposa Road with 
Interstate 19. Upgrades to Mariposa Road included flyover ramps that connect the city street with I-19, 
which is helping speed the flow of commerce between Mexico and Arizona. The project also benefits 
Nogales residents and businesses by reducing congestion on one of the community’s primary roads, 
which passes by Nogales High School. This includes a new phased-construction roundabout at Target 
Range Road and improved drainage and traffic signals, and the construction of two bridges that total 
2800 feet in length. Challenges on this project included the amount of local residential/commercial traffic 
as well as high volumes of trucks moving in/out of Arizona, and the number of employees, sub-
contractors, and operations ongoing at all times within a limited amount of work area. 
Deer Valley Road: El Mirage to 109th Avenue | Peoria, AZ | Maricopa Department of  
Transportation | 2022  
Superintendent. This project included constructing the east-west arterial crossing of the Agua Fria River 
as well as roadway improvements, utility relocations, and arterial streets on Deer Valley Road. Ames 
widened a portion of Williams Drive, built the bridge between the east end of Williams Drive and the west 
end of Deer Valley Road, installed two roundabouts, and added a pedestrian-activated crosswalk signal. 
Ames coordinated with several stakeholders, including ADOT, MCDOT, City of Peoria, APS, other utility 
companies, local businesses, and residents. Ames managed issues with overhead power on the project 
and seasonal water flows in the river, delivering the bridge and roadway opening one month before 
schedule. 
Happy Valley Improvements | Peoria, AZ | City of Peoria | 2021  
Superintendent. project involved construction of a new freeway in the West Valley. The scope included 
more than 2.1 million cubic yards of roadway excavation, 8 million pounds of reinforced steel, 341,300 
square yards of Portland Cement Concrete Pavement and 20,306 tons of asphaltic concrete. Other 
project elements included a total of 18 bridges spanning the Beardsley Canal, the Agua Fria River, and 
several major traffic interchanges, 9 box culverts, retaining walls, cement stabilized bank protection, lift 
station(s), irrigation/reclaimed water and sewer line installation, and signage and landscaping. 
 
YEARS OF 
EXPERIENCE 
30 
YEARS WITH AMES 
29 
TRAINING/ 
CERTIFICATIONS 
OSHA 30-Hour   
OSHA 10-Hour  
Maricopa County 310 
Dust Control 
DocuSign Envelope ID: 53FC961F-8000-45E0-9314-223CB81F3ADF

SR 347 at UPRR | Maricopa, AZ | Arizona Department of Transportation | 2020  
Project Superintendent. This project included reconstructing existing SR 347 on a new alignment and a 
new six-lane section with realignments of Honeycutt Avenue, Honeycutt Road, Maricopa & Casa Grande 
Highway (MCGH), construction of a grade separation structure at the UP, and a new connection 
between MCGH and Honeycutt Road. Work consisted of grading, furnishing, and installing aggregate 
base and asphaltic concrete, concrete bridge structures, retaining walls, pipe culverts, curb and gutter, 
raised medians, sidewalks, fence, striping, signing, lighting, seeding, landscaping, utility trenching, traffic 
signals, and other related work. The MSE walls total 20,000 SF, two at the far end abutments of each 
bridge and one in between the structures. Rusty worked with the Ames crews on a custom-made block-
out to use inside a steel form to create the columns for the project. The columns begin as a hexagon and 
twist to turn into a seven-sided polygon. This challenging construction was completed in under 5 weeks. 
I-10 Improvements, I-8 to Earley Road | Casa Grande, AZ | Arizona Department of  
Transportation | 2020  
Project Superintendent. This project includes widening Interstate 10 between Casa Grande and Tucson, 
from just south of Earley Road to Interstate 8. The project added one lane in each direction adjacent to 
the median, effectively widening I-10 from existing four lanes to six lanes for 3 miles. The project also 
replaced the two existing bridges over Jimmie Kerr Boulevard and the UP. The completed project 
increases freeway capacity, improves auxiliary lanes, and enhances aesthetics of the new roadway. 
Lake Pleasant Parkway Design-Build | Peoria, AZ | City of Peoria | 2014  
Project Superintendent. This project was for the design and construction of 3 miles of new four-lane 
arterial roadway along a new alignment for Lake Pleasant Parkway from West Wing to the Loop 303 
intersection. This Included the underground relocation of existing overhead APS power and installation 
of street lighting and the West Wing Parkway signalized intersection. A new utility joint trench (15,000 
LF) installation required close coordination with APS, Century Link, and Cox Communication to enable 
relocation of the existing utilities to the new roadway alignment and removal of the existing overhead 
power conflicting with the new roadway construction. The new RCBC at Unnamed Wash #9 was built as 
an equestrian underpass to allow for a pedestrian path crossing under the new roadway and at the same 
time raise the new road grades above the flood plain. The new walking path on both sides of the road 
now provides an aesthetically pleasing connection to both sides of the parkway. 
Southside Canal | Coolidge, AZ | Gila River Indian Community | 2012  
Superintendent. This project extended the runway and taxiway by approximately 1800 feet. The main 
objective was to limit the down-time of the Runway and Instrument Landing System during 
construction. By double shifting specific work items with the right people and equipment, we were able 
to excavate and place 952,000 cubic yards of rock and soil in just 12 weeks without disrupting normal 
operations. Rusty was responsible for excavation, AB grading and infill, as well as pavement 
preparation. 
All American Canal Lining | El Centro, CA | Imperial Irrigation District | 2009  
Superintendent. This project provided concrete canal lining for over 10 miles of irrigation canal in 
Imperial County, California. Approximately 850,000 square yards of 4-inch-thick concrete canal lining 
was placed. Specialty concrete work included four reinforced concrete transition structures, one 
reinforced concrete flow measurement and Bureau of Land Management road crossing structure, one 
reinforced concrete inlet structure, and a reinforced concrete storage outlet structure and pipeline. 
Rusty oversaw scraper excavation work for the channel and structures, sheet pile tie-ins and 
excavation, watering, and fine grading of the channel. He also supervised the fine grading of the 
access roads after project completion. The All American Canal Lining Project was awarded the 2010 
APWA Project of the Year. 
  
DocuSign Envelope ID: 53FC961F-8000-45E0-9314-223CB81F3ADF

NICK CHADDOCK 
Superintendent – Stormwater 
 
PROFESSIONAL SUMMARY  
Nick Chaddock has extensive experience with installing and 
supervising complex pipe networks associated with major projects. 
His expertise includes all types of pipe installation, such as: 
reinforced concrete pipe, PVC, CPVC, ductile iron, HDPE, 
corrugated metal and steel pipe. Nick has performed all types of 
welding processes and non-destructive testing, and is a consistent 
member of Ames’ supervision and management crews on water, 
industrial, mechanical, and mining projects. 
PROJECT EXPERIENCE 
White Tanks Flood Retarding Structure #3 | Phoenix, AZ | Flood 
Control District of Maricopa County | 2006  
Pipe Foreman. This construction contract was the first of a two-
phase project for the rehabilitation of an existing flood control dam, 
White Tanks FRS No. 3. The work included reconstruction of an 
earthen embankment approximately 2,500 feet long by 33 feet high 
with a soil cement core of approximately 84,000 cubic yards. 
Structural and common earth fill was also used and the project included construction of three parallel 
fissure cutoff walls in the foundation beneath the structure. Two of these walls were constructed of a 
native soil-cement-bentonite material. A remedial third cutoff wall was constructed of cement and 
imported aggregate. A cast-in-place outlet works was also included with two reinforced concrete steel 
cylinder pipelines that emptied into a stilling basin. Nick was responsible for all piping and the inlet 
structure, trash racks, sluice gates, and slide. 
Lone Star Leach Pad | Safford, AZ | Freeport-McMoRan | 2020  
Mechanical and Pipe Superintendent. Work on the Lone Star mine included the construction of the 
following: Leach Pad (clearing and grubbing, installing clay, fine overliner, ROM overliner, and 
associated conveyance and collection piping); three Diversion Channels to divert water away from the 
new Leach Pad; PLS solution collection and NSW collection ponds; and solution, PLS and Raffinate 
Pipe Lines. Additional work at the mine included concrete work inside the wash settlers (retaining walls, 
culverts, catch basins, truck offload pad, stairs and walkways, settler slabs, Aux and Mix tank Slabs) and 
modifications to the existing SX and RO Plant, and the existing Electrowinning Tankhouse. 
PLS and RAF Solutions Handling | Morenci, AZ | Freeport-McMoRan | 2019  
Mechanical and Pipe Superintendent. PLS and RAF line upgrades included HDPE and SST lines from 
new pump station to SX, other PLS lines and new RAF lines feeding the leach pad. There were also 
pump station upgrades; replacing old pumps and motors; rerouting SST lines; modifying SST headers; 
installing new flow meters, air vents, and instruments; and upgrading electrical. 
Crafton Hills Pump Station Rehabilitation | Mentone, CA | California Department of Water 
Resources | 2017  
Superintendent. This project work included the installation of large diameter steel pipe, valves, fittings, 
pumps, motors, VFD’s, fire detection systems, automation and controls, mechanical, HVAC, electrical, 
communications, and site civil improvements. The work took place at three significant pump station 
locations – Citrus, Crafton Hills, and Cherry Valley. Nick supervised pump can and vertical turbine 
pump installations and mechanical piping fit up.  
YEARS OF 
EXPERIENCE 
26 
YEARS WITH AMES 
23 
TRAINING/ 
CERTIFICATIONS 
OSHA 30-Hour   
MSHA Competent 
Person: Confined Spaces 
and Trench Safety  
CPR / First Aid 
DocuSign Envelope ID: 53FC961F-8000-45E0-9314-223CB81F3ADF

Southwest Mine for Leach | Morenci, AZ | Freeport-McMoRan | 2015  
Pipe Superintendent. This project consisted of a soil lined base on top of a previously developed  
run-of-mine (ROM) dumped and leached stockpile. The existing stockpile was approximately  
7,200 feet in length and 3,000 ft. in width (495 Acres) with approximately 8.5 million cy of earthwork cut 
and fill. The project also included the construction of a 100-foot-wide by 12,000-foot-long haul road, the 
hauling and placement of four million cy of fine and ROM over liner, the construction of two HDPE 
solution ponds, the crushing of 1.6 million CY of fine over liner material, and the installation of 
approximately 1.4 million LF of solution collection piping. 
Southside Canal | Coolidge, AZ | Gila River Indian Community | 2012  
Pipe Foreman. This project included the installation of all mechanical, such as 84-inch welded steel 
siphon pipe. The project required completing all in-channel work for the 6.91-mile stretch of canal 
within scheduled dry-up periods to avoid disruption of irrigation services to the surrounding farmlands, 
maintaining water flows to Gila Farms, minimizing disturbance to the Santa Cruz Wash, flood 
protection, coordinating with San Carlos Irrigation Project for power line relocations, and being in 
compliance with Tribal Employment Rights Office. 
Deer Valley Water Treatment Plant, East Basins Reconstruction | Phoenix, AZ |  
City of Phoenix | 2010  
Pipe Foreman. This project included excavation, fine grading, CSA processing and backfilling, site 
work and utility demolition, installation of temporary utilities and new underground utilities, and new 
chemical facilities. Excessive settlement at the East Plant required structural shoring, over-excavation 
of 160,000 CY of native material, and 120,000 CY of CSA processing and placement. Utility work 
included 6,000 feet of ductile iron and steel pipe and valves ranging in diameter from 4 to 66 inches. 
The chemical facilities included the installation of a tank, pump and ancillary equipment. Over 2,500 
feet of ½- to 4-inch CPVC/Alloy 20 chemical piping was required for the chemical facilities. Nick was 
responsible for installing the steel, ductile, copper, and CPVC piping and related valves. He also 
installed the yard piping ranging from 4 to 54 inches in diameter and the mechanical piping ranging 
from 6 to 66 inches in diameter.  
All American Canal Lining | El Centro, CA | Imperial Irrigation District | 2009  
Pipe Foreman. This project provided concrete canal lining for over 10 miles of irrigation canal in 
California. Over 5,000,000 cy of earth was excavated, hauled and placed in embankments. 
Approximately 850,000 SY of 4-inch-thick concrete canal lining was placed. Specialty concrete work 
included four reinforced concrete transition structures, one reinforced concrete flow measurement and 
BLM road crossing structure, one reinforced concrete inlet structure, and a reinforced concrete storage 
outlet structure and pipeline. Nick was responsible for the steel, waterline and 96-inch RCP piping 
systems. 
Glendale Water Oasis | Glendale, AZ | City of Glendale | 2007  
Pipe Foreman. The scope of work on this new potable water treatment plant included site 
grading and paving, underground utilities, and mechanical/chemical piping and equipment. 
Site work included 140,000 CY of structure and site excavation, 40,000 CY of export, and 
25,000 SY of AC and AB roadways. Underground piping consisted of 24,000 feet of steel, 
ductile, and PVC/CPVC pipe. This also included a 230-foot, 66-inch diameter Jack & Bore 
casing under US 60, a six-lane highway through Phoenix. The mechanical scope included 
welded steel pipe, ductile piping, and CPVC chemical piping, ranging in diameter from 1 to 
30 inches. Also included were seven chemical tanks and other pumps and equipment for 
chemical, water, air, and sludge processes. Nick oversaw the installation of all piping and 
valve systems including RCP, HDPE, corrugated metal, steel, PVC, ductile, fire lines, fresh 
and raw waterlines, and temporary waterlines. 
DocuSign Envelope ID: 53FC961F-8000-45E0-9314-223CB81F3ADF

KEN HUDSON 
Estimator – Concrete 
 
PROFESSIONAL SUMMARY  
Ken Hudson’s construction experience spans more than 35 years 
and includes time as carpentry foreman and structures 
superintendent before bringing his expertise to project estimating. 
His experience in the field provides him with the first-hand and 
practical knowledge that is needed to accurately forecast and 
budget for any project. He analyzes designs to better perform 
accurate cost analyses, and uses specialty software to create 
estimates that are easily understood and shareable. Ken routinely 
designs, implements, and facilitates the training of estimators to 
ensure consistency across all project elements.  
PROJECT HISTORY 
Bagdad Tailings Launder Upgrade | Bagdad, AZ | Freeport-
McMoRan | 2023  
Estimator. The upgrade includes two components: 1) installation 
of a fabricated transition piece from the existing concrete channel 
to the RCp pipe, and 2) installation of precast invert sections into the  
existing channel to change the existing flat bottom 3.5% channel to a V-bottom 2% slope channel. 
Upset Tailings Pump Station | Morenci, AZ | Freeport-McMoRan | 2023  
Estimator. Construction of the Upset Tailings Pump Station to move tailings that can no longer gravity 
feed due to the expansion of the W/E TSF. 
Queen Creek Bridge Replacement | Queen Creek, AZ | Arizona Department of 
Transportation | 2023  
Estimator. Arch bridge over Queen Creek just east of Superior, AZ. Replacing Queen Creek Arch 
Bridge with a new steel girder bridge and replacing Waterfall Canyon Bridge with a new box culvert. 
The team will be repairing spalling inside the tunnel. 
PROJECT BID HISTORY PRIOR TO AMES 
 Cushing Street Bridge over the Santa Cruz River – City of Tucson 
 EB 202 Mile Long AASHTO Girder Bridge – Arizona Department of Transportation 
 WB 202 Mile Long AASHTO Girder Bridge – Arizona Department of Transportation 
 Queen Creek Road over Roosevelt Water Conservation District – Town of Queen Creek 
 Loop 303 over US 60 and the UP – Arizona Department of Transportation  
 US 89 over Del Rio Ranch Wash – Arizona Department of Transportation 
 US 89 over Little Colorado River – Arizona Department of Transportation 
 
 
 
YEARS OF EXPERIENCE 
35 
YEARS WITH AMES 
1 
TRAINING/ 
CERTIFICATIONS 
HCSS Heavy Bid   
On Screen Takeoff 
Viewpoint 
Microsoft Suite 
DocuSign Envelope ID: 53FC961F-8000-45E0-9314-223CB81F3ADF

DAVID MAXIMOFF 
Estimator – Earthwork 
PROFESSIONAL SUMMARY 
David began his career in design and inspection consultation, 
followed by 5 years of progressive leadership working for the City of 
Tucson before moving into construction, where he has filled the 
roles of project manager, estimator, and preconstruction coordinator. 
His 28 years of heavy-civil construction experience comes with the 
ability to understand the perspective of everyone involved with a 
project, including design engineers, Owners, inspection staff, 
estimating, and construction project management. David 
understands the process of working with Owners to support design 
activities, develop cost models, and identify risks involved with 
different aspects of construction. He will develop cost models, 
identify risks involved with all aspects of construction, and will lead 
our team of estimators who are experts in underdrainage systems 
and earthwork modeling using AGTEK, to produce an open book 
approach to provide the best value to FCDMC. 
PROJECT EXPERIENCE 
SR 189: International Border to Grand Avenue, Design-Build | Nogales, AZ | ADOT | 2022  
Estimator. The project widened 3.75 miles of SR 189 to improve international trade and safety, with a 
new connection that links the port of entry at Mariposa Road with I-19. Flyover ramps connect the busy 
Nogales city street with I-19, a new phased-construction roundabout, improved drainage and traffic 
signals, and two bridges totaling 2,800 feet in length. SR 189 averages approximately 4,000 commercial 
vehicles a day in addition to local businesses and the motoring public. 
Happy Valley Improvements | Peoria, AZ | City of Peoria | 2021  
Estimator. The project provided transportation improvements to Happy Valley Parkway, from Loop 303 
to Lake Pleasant Parkway, approximately 2 miles. Improvements included adding two lanes to widen the 
bridge across the Agua Fria River; adding bicycle and pedestrian improvements for the length of the 
project; improving the function and appearance of the bridge; improving traffic signals; adding/upgrading 
street lights; extending and improving catch basins, box culverts, and project grading; and upgrading the 
landscaping to reflect the community. 
I-10 and Houghton Traffic Reconstruction | Tucson, AZ | ADOT | 2021
Chief Estimator. Reconfiguration of the interchange into a Diverging Diamond Interchange (DDI), the first 
of its kind in the city and second in the state. Designed to safely handle heavier traffic, the DDI moves 
traffic over the bridge while briefly switching to the opposite side of the road to facilitate traffic flow. 
Crews constructed a new, wider Houghton Road Bridge over I-10 just west of the existing bridge, 
widened Houghton Road to three lanes in each direction through the interchange, realigned Rocket 
Road on the north side of the interchange and improved accessibility for bicyclists and pedestrians. 
Work included 15 drilled shaft foundations, storm drainage, retaining walls, and box culvert extensions.
I-10 Earley Road to I-8 | Casa Grande, AZ | ADOT | 2019
Estimator. This project included widening the I-10 between Casa Grande and Tucson, adding one lane 
in each direction adjacent to the median, effectively widening I-10 from existing four lanes to six lanes for 
3 miles. The project also replaced the existing bridges over Jimmie Kerr Boulevard and the Union Pacific 
Railroad. The completed project increases freeway capacity, improves auxiliary lanes, and enhances the 
aesthetics of the new roadway.
YEARS OF 
EXPERIENCE 
28 
YEARS WITH AMES 
12 
TRAINING/ 
CERTIFICATIONS 
Project Management  
Construction Quality 
Management for 
Contractors 
Field Testing Technician 
DocuSign Envelope ID: 53FC961F-8000-45E0-9314-223CB81F3ADF

MIKE McGILTON 
Estimator – Stormwater 
PROFESSIONAL SUMMARY 
Mike McGilton’s career is built on work specifically related to the 
construction management of water and wastewater treatment 
facilities, in support of water agency and municipal water operations. 
Having completed many water and wastewater treatment projects, 
he recognizes the broader implications and challenges working with 
water facilities in the Southwest. Mike’s strengths include developing 
and implementing the construction schedule based on the safety 
environment of the job, quality requirements, and impacts on 
existing operations. He efficiently tracks labor, material, and 
subcontractor costs to accurately price a job for projects that include 
pump stations, waste water treatment plants, gravity sewers, water 
pipeline, bore casing installations, stormwater channel crossings, 
rock excavation, concrete structures, pipeline flushing and 
disinfection, demolition of existing facilities, and tie-ins to existing 
systems. 
PROJECT EXPERIENCE 
Solutions Handling Phase 3 | Morenci, AZ | 
Freeport-McMoRan | 2021  
Superintendent. The project has three main components; construction of a new PLS facility near the old 
Silver Basin Reservoir dam, construction of an off-site pipeline from the new PLS facility to the existing 
Stargo SX facility, and work to add an additional pump skid at the Ponderosa Raffinate Booster Station. The 
new PLS facility and the pipeline to the Stargo facility will occur in the same general work area while the 
Ponderosa Booster Station site is a significant distance away located inside the pit area. 
San Juan Creek Levee Protection | Dana Point, CA | Orange County Public Works | 2019  
Project Manager & Estimator. The project consisted of furnishing and installing marine grade steel sheet pile 
at the existing hinge point of the concrete-lined trapezoidal Levee, and installing marine grade pipe pile 
parallel to the sheets connected with high-strength stainless steel cable and hardware. Work also included 
constructing a reinforced structural concrete cap, a masonry splash wall with modified cable railing on top, 
and final grading. 
Crafton Hills Pump Station Rehab | Mentone, CA | California Department of Water Resources | 2018 
Project Manager & Estimator. Project work includes installation of large diameter steel pipe, valves, 
fittings, pumps, motors, VFD’s, fire detection systems, automation and controls, mechanical, HVAC, 
electrical, communications and site civil improvements. The work took place at three significant pump 
station locations – Citrus, Crafton Hills, and Cherry Valley. As the Project Manager, Mike was 
responsible for managing project resources and equipment at all locations, client reporting, and 
adherence to schedule and budget. 
Porterville Water Supply | Porterville, CA | California Department of Water Resources | 2017  
Project Manager & Estimator. Ames worked quickly and effectively to install over 150,000 lineal feet of 8” 
to 18” PVC pipe with service stubs, fire hydrant stubs, and pavement repair to provide municipal water 
service for the residents of Porterville. The previous wells ran dry due to the long period of drought. Over 
2,000 homes were serviced. Mike worked with the City of Porterville and the County of Tulare to 
implement a construction plan to install the waterlines while maintaining access to homes. 
YEARS OF 
EXPERIENCE 
41 
YEARS WITH AMES 
8 
TRAINING/ 
CERTIFICATIONS 
OSHA 30-Hour   
OSHA 10-Hour 
MSHA 24-Hour Above 
Ground 
MSHA New Miner 
Training 
CPR / First Aid 
DocuSign Envelope ID: 53FC961F-8000-45E0-9314-223CB81F3ADF

Request For Qualifications
Page 26
Job Order Contractor for the Flood Control District of Maricopa County
Thursday, December 21, 2023
Job Order Contractor
Serial# 240008-JOC
Attachment 1 - REFERENCE FORMAT
Maricopa County requires a minimum of THREE references and or a maximum of five (most recently) 
completed projects that are similar in magnitude, complexity, and dollar value. This form may be replicated 
as needed to be responsive to the RFQ.
1.
Company Name:
Address:
Phone Number:
Fax Number:
Person to Contact:
Email Address:
Owner’s Bid # or Project #:
Date of Completion:
Brief Project Description (including partnering team and owner’s project name):
2.
Company Name:
Address:
Phone Number:
Fax Number:
Person to Contact:
Email Address:
Owner’s Bid # or Project #:
Date of Completion:
Brief Project Description (including partnering team and owner’s project name):
3.
Company Name:
Address:
Phone Number:
Fax Number:
Person to Contact:
Email Address:
Owner’s Bid # or Project #:
Date of Completion:
Brief Project Description (including partnering team and owner’s project name):
4.
Company Name:
Address:
Phone Number:
Fax Number:
Person to Contact:
Email Address:
Owner’s Bid # or Project #:
Date of Completion:
Brief Project Description (including partnering team and owner’s project name):
5.
Company Name:
Address:
Phone Number:
Fax Number:
Person to Contact:
Email Address:
Owner’s Bid # or Project #:
Date of Completion:
Brief Project Description (including partnering team and owner’s project name):
City of Phoenix / FCDMC
(602) 333-2590
n/a
Joel McCarty, Stanley Consultants
12/2016
27th Ave & South Mtn. Retention Basin
Fast-tracked construction activities to provide relief for homeowners and businesses impacted by torrential flooding in 2014.
mccartyjoel@stanleygroup.com
Maricopa County DOT
n/a
Zack Davis, MCDOT
zack.davis@maricopa.gov
(602) 290-4215
8/2022
Deer Valley Rd: El Mirage to 109th Ave
Constructing the east-west arterial crossing of the Agua Fria River, roadway improvements, utility relocations, and arterial streets on 
Deer Valley Rd. Extensive coordination with stakeholders.
Arizona Department of Transportation
(520) 310-7693
n/a
Jeremy Moore, ADOT
jmoore@azdot.gov
9/2023
SR 189: International Border - Grande Ave
Reconstruct 3.75 miles of SR 189 to improve international trade and safety. New connection that links the port of entry at  
Mariposa Rd with I-19. Project included flood control components.
City of Peoria
(623) 773-8439
n/a
Chris Anderson, City of Peoria
chris.anderson@peoriaaz.gov
8/2020
Happy Valley Improvements
Widen and improve transportation to accommodate high volume traffic. SOW included stormwater control and water quality. 
BNSF Railway
(817) 471-6614
n/a
Rafer Nichols
rafer.nichols@bnsf.com
10/2022
Navajo Blvd. Crossing
Fast-track repair to replace existing rail crossings with new crossing surfaces. Install underdrain systems, grading work, and 
managed paving and striping subcontractors.
ST83120047
2021-031
H804501C
LCON02619
BF20224663
200 W. Washington Street, Phoenix, AZ 85003
2901 W. Durango Street, Phoenix, AZ 85009
Southcentral District Office  1221 S. 2nd Ave., Tucson, AZ 85713
9875 N. 85th Avenue, Peoria, AZ 85345
2650 Lou Mink Drive, Fort Worth, Texas 76131
PROJECTS
DocuSign Envelope ID: 53FC961F-8000-45E0-9314-223CB81F3ADF

Request For Qualifications
Page 26
Job Order Contractor for the Flood Control District of Maricopa County
Thursday, December 21, 2023
Job Order Contractor
Serial# 240008-JOC
Attachment 1 - REFERENCE FORMAT
Maricopa County requires a minimum of THREE references and or a maximum of five (most recently) 
completed projects that are similar in magnitude, complexity, and dollar value. This form may be replicated 
as needed to be responsive to the RFQ.
1.
Company Name: ACS Services, LLC
Address: 2235 W. Broadway Road, Mesa, AZ 85202
Phone Number: (480) 968-0190
Fax Number: n/a
Email Address: info@acsservicesllc.com
Owner’s Bid # or Project #:
Date of Completion:
Brief Project Description:
2.
Company Name: Endo Steel Inc
Address: 127 West Juanita Avenue, Mesa, AZ 85210
Phone Number: (480) 898-1750
Fax Number: n/a
Owner’s Bid # or Project #:
Date of Completion:
Brief Project Description :
3.
Company Name: Hunter Guardrail & Fence, Inc.
Address: 21620 North 19th Avenue, Suite A12, Phoenix, AZ 85027
Phone Number: (623) 580-1581
Fax Number: (623) 580-1582
Owner’s Bid # or Project #:
Date of Completion:
Brief Project Description:
Loop 202 South Mountain: 
11/2019
22 Miles of new alignment 3 GP/1 HOV in Each Direction I-10 
Interchange and 4 miles of widening on existing I-10 Salt River Crossings (2 2,500' bridges over the Salt River) 
H882701C
F012101C
3/2022
SR 101 Loop I-17 to Pima: Construct outside widening from I-17 to Princess Drive in the EB 
and WB Directions. Add one GP lane in each direction and New Miller Road Bridge Construction. 
38991200628-075
4/2021
American Mountain Bebo Demo: Demolition of a roadway tunnel of a state highway. 
The foundation, tie slab, and concrete lined arches were hauled off to the waste dump. The MSE walls, after having 
rebar sticking out of the concrete cut off, were hauled to the waste dump.  
SUBCONTRACTORS
DocuSign Envelope ID: 53FC961F-8000-45E0-9314-223CB81F3ADF

Request For Qualifications
Page 27
Job Order Contractor for the Flood Control District of Maricopa County
Thursday, December 21, 2023
Job Order Contractor
Serial# 240008-JOC
Attachment 2 - LEGAL WORKER CERTIFICATION
(Date)
Maricopa County
Office of Procurement Services
301 W. Jefferson Street, Suite 700
Phoenix, Arizona 85003
As required by Arizona Revised Statutes (A.R.S.) §41-4401, Maricopa County (County) is prohibited, after 
September 30, 2008, from awarding a contract to any contractor who fails, or whose subcontractors fail, to 
comply with A.R.S. § 23-214-A. The undersigned entity warrants that it complies fully with all Federal 
immigration laws and regulations that relate to its employees, that it shall verify, through the employment 
verification pilot program as jointly administered by the U.S. Department of Homeland Security and the 
Social Security Administration or any of its successor programs, the employment eligibility of each 
employee hired after December 31, 2007, and that it shall require its subcontractors and sub-subcontractors 
to provide the same warranties to the below entity.
The undersigned acknowledges that a breach of this warranty by the below entity or by any subcontractor 
or sub-subcontractor under any contract resulting from this solicitation shall be deemed a material breach 
of the contract, and is grounds for penalties, including termination of the contract, by the County. The County 
retains the right to inspect the records of the below entity, subcontractor and sub-subcontractor employee 
who performs work under the contract, and to conduct random verification of the employment records of 
the below entity and any subcontractor and sub-subcontractor who works on the contract, to ensure that 
the below entity and each subcontractor and sub-subcontractor is complying with the warranties set forth 
above.
(Firm) 
(Address Line 1)
(Print Name)
(Address Line 2)
(Print Title)
(Phone Number)
(Signature Required)
(Fax Number)
(Email Address)
(Federal Taxpayer ID Number)
January 12, 2024
Ames Construction, Inc.                                   8333 E. Hartford Drive
Gerard F. Miller                                                Scottsdale, AZ 85255
President, Southwest Region                         (602) 431-2111
(602) 431-5952
JerryMiller@amesco.com                                41-0871375
DocuSign Envelope ID: 53FC961F-8000-45E0-9314-223CB81F3ADF

DocuSign Envelope ID: 53FC961F-8000-45E0-9314-223CB81F3ADF

DocuSign Envelope ID: 53FC961F-8000-45E0-9314-223CB81F3ADF

DocuSign Envelope ID: 53FC961F-8000-45E0-9314-223CB81F3ADF

DocuSign Envelope ID: 53FC961F-8000-45E0-9314-223CB81F3ADF

DocuSign Envelope ID: 53FC961F-8000-45E0-9314-223CB81F3ADF

Request For Qualifications
Page 37
Job Order Contractor for the Flood Control District of Maricopa County
Thursday, December 21, 2023
Job Order Contractor
Serial# 240008-JOC
ATTACHMENT 7-SUBCONTRACTOR LISTING
The following is a listing of Subcontractors and material suppliers (including any minority and women-owned 
business enterprises participation) that may to perform the work outlined in this Contract. Although this list will 
not be considered a final commitment on the Contractor's part, any Subcontractor changes from those listed 
must have the District’s written approval before the commencement of Subcontractor work on site.
The contractor certifies that subcontractor selection has been conducted in accordance with the approved 
subcontractor selection plan (attached), and that the Contractor will perform, with its organization, construction 
work that amounts to not less than 50 percent of the total Contract price for construction. Include this document 
with your submittal.
_________________________________________________________________________
_________________________________________________________________________
_________________________________________________________________________
_________________________________________________________________________
_________________________________________________________________________
_________________________________________________________________________
_________________________________________________________________________
_________________________________________________________________________
_________________________________________________________________________
_________________________________________________________________________
___________________________________
(Signature)
SUBCONTRACTORS
CS Construction, ACS Services, DBA Construction, *TEC, *Picacho Concrete, Valente
*RGG, *Endo, CMC (rebar), Olson Precast, SW Environmental, American Fence
*Hunter Guardrail & Fence, Hot Az Hell, Insituform, Grate Solutions, Hanes Geo, Ferguson,
Eagle Environmental, WSP, Metro Traffic Control
MATERIAL SUPPLIERS
Vulcan, Kilauea Crushers, Cemex, Martin Marietta, Paloma Ready Mix, West Valley Rock,
Blue Dot Steel
NOTE: *DBE/SBE
*
*
DocuSign Envelope ID: 53FC961F-8000-45E0-9314-223CB81F3ADF

Year
2022
Street
City
Zip
55337
0
5
0
15
1
6
1
1
(G)
(H)
(I)
(J)
OR
2
3
7
3
1
0
470
15
(K)
(L)
Total number of…
Knowingly falsifying this document may result in a fine.
(M)
(1)  Injury
20
(4)  Poisoning
0
(2)  Skin Disorder
0
(5)  Hearing Loss
0
(3)  Respiratory 
Condition
0
(6) All Other Illnesses
0
Total number of 
other recordable 
cases
Number of Days
Total hours worked by all employees last 
year
Standard Industrial Classification (SIC), if known (e.g., SIC 3715)
Annual average number of employees
North American Industrial Classification (NAICS), if known (e.g., 336212)
3,067
Form approved OMB no. 1218-0176
Title
Date
Director of Safety & Health 
1/9/2023
  
Highway Heavy Construction
Establishment information
Total number of 
deaths
Number of Cases
Burnsville
Your establishment name
2500 County Road 42 West 
Minnesota
952-887-8649
U.S. Department of Labor
OSHA's Form 300A (Rev. 01/2004)
Summary of Work-Related Injuries and Illnesses
Occupational Safety and Health Administration
Industry description (e.g., Manufacture of motor truck trailers)
Post this Summary page from February 1 to April 30 of the year following the year covered by the form
All establishments covered by Part 1904 must complete this Summary page, even if no injuries or 
illnesses occurred during the year.  Remember to review the Log to verify that the entries are complete 
Using the Log, count the individual entries you made for each category.  Then write the totals below, 
making sure you've added the entries from every page of the log.  If you had no cases write "0."
Employees former employees, and their representatives have the right to review the OSHA Form 300 in 
its entirety.  They also have limited access to the OSHA Form 301 or its equivalent.  See 29 CFR 
1904.35, in OSHA's Recordkeeping rule, for further details on the access provisions for these forms.
Total number of 
cases with days 
away from work
Total number of cases 
with job transfer or 
restriction
Total number of 
days away from 
work
Total number of days of 
job transfer or restriction
Public reporting burden for this collection of information is estimated to average 58 minutes per response, including time to review the instruction, search and 
gather the data needed, and complete and review the collection of information.  Persons are not required to respond to the collection of information unless it 
displays a currently valid OMB control number.  If you have any comments about these estimates or any aspects of this data collection, contact:  US 
Department of Labor, OSHA Office of Statistics, Room N-3644, 200 Constitution Ave, NW, Washington, DC 20210.  Do not send the completed forms to this 
Injury and Illness Types
Phone
Company Executive
I certify that I have examined this document and that to the best of my knowledge the entries are true, accurate, and complete.
6,379,492
Ames Construction
Sign here
State
Employment information
DocuSign Envelope ID: 53FC961F-8000-45E0-9314-223CB81F3ADF

Year
2023
Street
City
Zip
55337
0
0
1
17
1
6
1
1
(G)
(H)
(I)
(J)
OR
2
3
7
3
1
0
0
85
(K)
(L)
Total number of…
Knowingly falsifying this document may result in a fine.
(M)
(1)  Injury
18
(4)  Poisoning
0
(2)  Skin Disorder
0
(5)  Hearing Loss
0
(3)  Respiratory 
Condition
0
(6) All Other Illnesses
0
Director of Safety and Health 
6,643,453
Ames Construction, Inc.
Sign here
State
Employment information
Post this Summary page from February 1 to April 30 of the year following the year covered by the form
All establishments covered by Part 1904 must complete this Summary page, even if no injuries or 
illnesses occurred during the year.  Remember to review the Log to verify that the entries are complete 
Using the Log, count the individual entries you made for each category.  Then write the totals below, 
making sure you've added the entries from every page of the log.  If you had no cases write "0."
Employees former employees, and their representatives have the right to review the OSHA Form 300 in 
its entirety.  They also have limited access to the OSHA Form 301 or its equivalent.  See 29 CFR 
1904.35, in OSHA's Recordkeeping rule, for further details on the access provisions for these forms.
Total number of 
cases with days 
away from work
Total number of cases 
with job transfer or 
restriction
Total number of 
days away from 
work
Total number of days of 
job transfer or restriction
Public reporting burden for this collection of information is estimated to average 58 minutes per response, including time to review the instruction, search and 
gather the data needed, and complete and review the collection of information.  Persons are not required to respond to the collection of information unless it 
displays a currently valid OMB control number.  If you have any comments about these estimates or any aspects of this data collection, contact:  US Department 
of Labor, OSHA Office of Statistics, Room N-3644, 200 Constitution Ave, NW, Washington, DC 20210. Do not send the completed forms to this office.
Injury and Illness Types
Phone
952-435-7106
U.S. Department of Labor
OSHA's Form 300A (Rev. 01/2004)
Summary of Work-Related Injuries and Illnesses
Occupational Safety and Health Administration
Industry description (e.g., Manufacture of motor truck trailers)
Company Executive
I certify that I have examined this document and that to the best of my knowledge the entries are true, accurate, and 
complete.
Form approved OMB no. 1218-0176
Title
Date
1/8/2024
  
Highway Heavy Construction
Establishment information
Total number of 
deaths
Number of Cases
Burnsville
Your establishment name
2500 County Road 42 W
Minnesota
Total number of 
other recordable 
cases
Number of Days
Total hours worked by all employees last 
year
Standard Industrial Classification (SIC), if known (e.g., SIC 3715)
Annual average number of employees
North American Industrial Classification (NAICS), if known (e.g., 336212)
3,193
DocuSign Envelope ID: 53FC961F-8000-45E0-9314-223CB81F3ADF

Addendum No 1 To Job Order Contractor for the Flood Control District of Maricopa County - 240008-JOC
 
 
Page 1 of 3  
 
Office of Procurement Services – Article 5 
301 W. Jefferson Street, 7th Floor 
Phoenix, Arizona 85003 
 
 
ADDENDUM NO.  1 
TO Job Order Contractor for the Flood Control District of Maricopa County 
SERIAL # 240008-JOC 
PROJECT OWNERS PROJECT/CONTRACT # 240008-JOC 
 
 
Addendum Date:  December 21, 2023 
  
County Project Owner: FCD 
 
Job Order Contractor for the Flood Control District of Maricopa County, 240008-JOC is 
herein modified.  The provisions of said documents applicable to these modifications 
remain unchanged unless specifically indicated otherwise. 
 
This Addendum No. 1 forms a part of the solicitation/contract documents and modifies 
the clauses/provisions as follows: 
 
 
 
 
1. To All Interested Respondents: 
 
The following paragraph under Content of Submittal, Article 4 Project 
Management Plan appears twice. This addendum modifies by removing the 
duplicated language from the referenced article (Pg20/21): 
 
 
4. Project Management Plan 
 
 
Provide information on how the firm would propose to apply the firm’s and the proposed project team 
experience and qualifications for this project. 
 
 
a) Describe the procedures the firm, as JOC, proposes to use to select subcontractors under the firm 
Subcontractor Selection Plan. 
 
b) Describe the schedule management and control process the firm proposes to apply to this 
Project. Among other items, specifically address submittals, sub-contractor management, and 
critical path aspects of project and material availability. 
 
In addition, each Proposer may address the following Owner Project Management Plan high-
priority areas: 
• 
Current local construction market material supply/cost forecasting ability. 
DocuSign Envelope ID: 53FC961F-8000-45E0-9314-223CB81F3ADF

Addendum No 1 To Job Order Contractor for the Flood Control District of Maricopa County - 240008-JOC
Page 2 of 3
Provide information on how the firm would propose to apply the firm’s and the proposed project team 
experience and qualifications for this project.
a)
Describe the procedures the firm, as JOC, proposes to use to select subcontractors under the firm
Subcontractor Selection Plan.
b)
Describe the schedule management and control process the firm proposes to apply to this
Project. Among other items, specifically address submittals, sub-contractor management, and 
critical path aspects of project and material availability.
In addition, each Proposer may address the following Owner Project Management Plan high-
priority areas:
•
Current local construction market material supply/cost forecasting ability.
ALL OTHER PROVISIONS SHALL REMAIN IN FULL FORCE AND EFFECT.
Project Owner Approval:
Registrant Approval and Seal:
By:
Firm Name: N/A
Signature:
By:
Title:
Signature:
Date:
Title:
Date:
Sharon Rogers
Contracts Officer
12/21/2023
Sharon Rogers
DocuSign Envelope ID: 53FC961F-8000-45E0-9314-223CB81F3ADF

Addendum No 1 To Job Order Contractor for the Flood Control District of Maricopa County - 240008-JOC
Page 3 of 3
Included with your offer, your firm/company is required to acknowledge this addendum,
and every addendum, relating to this solicitation by completing the following information: 
Addendum No. 1 Acknowledgement:
__________________________________
Firm Name
__________________________________
Signature 
__________________________________
Title
__________________________________
Signatory Printed Name 
__________________________________
Date
Ames Construction, Inc.
President, Southwest Region
Gerard F. Miller
January 2, 2024
DocuSign Envelope ID: 53FC961F-8000-45E0-9314-223CB81F3ADF

Addendum No 240008-JOC To Job Order Contractor for the Flood Control District of Maricopa County - 
240008-JOC 
 
Page 1 of 2  
 
Office of Procurement Services – Article 5 
301 W. Jefferson Street, 7th Floor 
Phoenix, Arizona 85003 
 
 
ADDENDUM NO.  240008-JOC 
TO Job Order Contractor for the Flood Control District of Maricopa County 
SERIAL # 240008-JOC 
PROJECT OWNERS PROJECT/CONTRACT # 240008-JOC 
 
 
Addendum Date:  January 5, 2024 
  
County Project Owner: FCD 
 
Job Order Contractor for the Flood Control District of Maricopa County, 240008-JOC is 
herein modified.  The provisions of said documents applicable to these modifications 
remain unchanged unless specifically indicated otherwise. 
 
This Addendum No. 240008-JOC forms a part of the solicitation/contract documents 
and modifies the clauses/provisions as follows: 
 
 
1. To All Interested Respondents: 
 
Under “Content of Submittal”, Article 8 Safety, the submitting firm’s OSHA 300A 
Summary Log information, firm’s Safety and Health Plan, and firm’s Drug-Free 
Workplace programs will be identified as an attachment and included in firm’s 
proposal submittal package and will not be included in the proposal page limit.  
 
8. Safety 
  
a) Provide Safety Information  
 
• 
Safety Record - Contractors must provide Occupational Safety and Health Administration (OSHA) 
300A Summary log information for the past two calendar years. This information can be compared 
to Bureau of Labor Statistics (BLS) rates to determine whether a contractor has below average or 
above average accident/injury rates. Bureau of Labor Statistics information may be obtained 
through Risk Management.  
 
Safety and Health Plan - Contractors shall provide a copy of their company’s safety and health 
plan.  
 
Drug-Free Workplace - Contractors’ submittal shall include information related to established Drug-
Free Workplace programs.  
 
 
 
DocuSign Envelope ID: 53FC961F-8000-45E0-9314-223CB81F3ADF

Addendum No 240008-JOC To Job Order Contractor for the Flood Control District of Maricopa County -
240008-JOC
Page 2 of 2
ALL OTHER PROVISIONS SHALL REMAIN IN FULL FORCE AND EFFECT.
Project Owner Approval:
Registrant Approval and Seal:
By:
Firm Name: N/A
Signature:
By:
Title:
Signature:
Date:
Title:
Date:
Included with your offer, your firm/company is required to acknowledge this addendum,
and every addendum, relating to this solicitation by completing the following information: 
Addendum No. 240008-JOC Acknowledgement:
__________________________________
Firm Name
__________________________________
Signature 
__________________________________
Title
__________________________________
Signatory Printed Name 
__________________________________
Date
Sharon Rogers
Contracts Officer
1/8/2024
Sharon Rogers
Ames Construction, Inc.
President, Southwest Region
Gerard F. Miller
January 9, 2024
DocuSign Envelope ID: 53FC961F-8000-45E0-9314-223CB81F3ADF

Addendum No 3 To Job Order Contractor for the Flood Control District of Maricopa County - 240008-JOC
Page 1 of 2
Office of Procurement Services – Article 5
301 W. Jefferson Street, 7th Floor
Phoenix, Arizona 85003
ADDENDUM NO.  3
TO Job Order Contractor for the Flood Control District of Maricopa County
SERIAL # 240008-JOC
PROJECT OWNERS PROJECT/CONTRACT # 240008-JOC
Addendum Date:  January 10, 2024
County Project Owner: FCD
Job Order Contractor for the Flood Control District of Maricopa County, 240008-JOC is
herein modified.  The provisions of said documents applicable to these modifications 
remain unchanged unless specifically indicated otherwise.
This Addendum No. 3 forms a part of the solicitation/contract documents and modifies 
the clauses/provisions as follows:
1. To all interested Respondents:
For clarification purposes, the amount of the Surety Bond to be included in 
Respondents submittal shall be $200,000.00. Which is 10% of the estimated budget 
for construction for the 1st year which is $2,000,000.00 regardless of the amount of
scopes of work a Respondent is submitting for.
ALL OTHER PROVISIONS SHALL REMAIN IN FULL FORCE AND EFFECT.
Project Owner Approval:
Registrant Approval and Seal:
By:
Firm Name: N/A
Signature:
By:
Title:
Signature:
Date:
Title:
Date:
Sharon Rogers 
Contracts Officer
1/10/2024
Sharon Rogers
DocuSign Envelope ID: 53FC961F-8000-45E0-9314-223CB81F3ADF

Addendum No 3 To Job Order Contractor for the Flood Control District of Maricopa County - 240008-JOC
Page 2 of 2
Included with your offer, your firm/company is required to acknowledge this addendum,
and every addendum, relating to this solicitation by completing the following information: 
Addendum No. 3 Acknowledgement:
__________________________________
Firm Name
__________________________________
Signature 
__________________________________
Title
__________________________________
Signatory Printed Name 
__________________________________
Date
Ames Construction, Inc.
President, Southwest Region
Gerard F. Miller
January 11, 2024
DocuSign Envelope ID: 53FC961F-8000-45E0-9314-223CB81F3ADF

Addendum No 4 To Job Order Contractor for the Flood Control District of Maricopa County - 240008-JOC
 
 
Page 1 of 2  
 
Office of Procurement Services – Article 5 
301 W. Jefferson Street, 7th Floor 
Phoenix, Arizona 85003 
 
 
ADDENDUM NO.  4 
TO Job Order Contractor for the Flood Control District of Maricopa County 
SERIAL # 240008-JOC 
PROJECT OWNERS PROJECT/CONTRACT # 240008-JOC 
 
 
Addendum Date:  January 12, 2024 
  
County Project Owner: FCD 
 
Job Order Contractor for the Flood Control District of Maricopa County, 240008-JOC is 
herein modified.  The provisions of said documents applicable to these modifications 
remain unchanged unless specifically indicated otherwise. 
 
This Addendum No. 4 forms a part of the solicitation/contract documents and modifies 
the clauses/provisions as follows: 
 
1. To all interested Respondents: 
 
The Proposal Due Date has been changed to January 25th, 2024. Time and 
method of submittal has not changed. The Q/A portal closing date will not be 
extended from what is in Periscope S2G.
 
ALL OTHER PROVISIONS SHALL REMAIN IN FULL FORCE AND EFFECT. 
 
 
 
Project Owner Approval:  
 
 
Registrant Approval and Seal: 
 
By: 
 
 
 
 
 
 
Firm Name: N/A 
 
 
 
 
Signature:  
 
 
 
 
By: 
 
 
 
 
 
 
 
Title:  
 
 
 
 
 
Signature:  
 
 
 
 
 
Date:  
 
 
 
 
 
Title:  
 
 
 
 
 
 
 
 
 
 
 
 
 
Date:  
 
 
 
 
 
 
 
 
DocuSign Envelope ID: 53FC961F-8000-45E0-9314-223CB81F3ADF

Addendum No 4 To Job Order Contractor for the Flood Control District of Maricopa County - 240008-JOC
Page 2 of 2
Included with your offer, your firm/company is required to acknowledge this addendum,
and every addendum, relating to this solicitation by completing the following information: 
Addendum No. 4 Acknowledgement:
__________________________________
Firm Name
__________________________________
Signature 
__________________________________
Title
__________________________________
Signatory Printed Name 
__________________________________
Date
Ames Construction, Inc.
President, Southwest Region
Gerard F. Miller
January 15, 2024
DocuSign Envelope ID: 53FC961F-8000-45E0-9314-223CB81F3ADF