TOWN OF WICKENBURG
CAPITAL IMPROVEMENT PLAN UPDATE
Troy Smith, Town Manger
January 20th, 2026

Wishing Well Park Restroom Reconstruction

• Start date August 25th
Completed on September
19th
• 1 Mile of repaved roadway
• Project was budgeted at
1.2M
• Project Delivered Under
budget
3
Constellation Road

Lewis Addition
• Completed on December 3rd
• Project Budgeted at $200,000
•
Delivered under budget

Bass Road Retention Wall

4
Coffinger Park Improvements
Painted walls, epoxied floors, added
block wall, new LED lights
Replaced infield mix, replaced sprinkler heads,
successful overseed, continuing to reduce the
gopher population

• Budget - $125,000
• Field Upgrades
o Covered dugouts and expand backstop fencing to begin February
o Enhance/Replace field lighting – Completed October
o Irrigation updated – Completed October
o Gopher issue has been minimized
o Add infield mix and new base pegs
5
Coffinger Park – Ball Field Renovation

Last Fiscal Year
• Resurfaced entire pool
• Replaced majority of pool equipment
o Acu Drive on filter and slide pumps
o High-capacity sand filters
o New 10hp and 5hp pumps
■Slide and Raindrop mushroom
• Refurbished and polished pool slide
6
Swimming Pool Improvements

This Fiscal Year
• Pool Heater & Pool Cover
o Budget $142,000 – No
expenditures to date
o Working with SW Gas to extend
natural gas to pool
o Quotes are higher than budgeted –
Looking at options
• Enhance Pool Deck Area
o Budget $80,000
o Complete before seasonal opening
7
Swimming Pool Improvements

• Project Scope – Depends on cost & funding availability
• Replace the trusses in the Great Hall with rustic wood
• Remove the stage to create a new banquet room
• Add a partition at the stage area, but not the existing banquet room
• Upgrade the conference room
• Enclose and renovate the patio area
• Create lobbies at the main and southeast entrance
• Update the kitchen (lean toward commercial)
• Eliminate the drive-under entrance
8
Community Center –Planned Scope of Project

11
Community Center Existing vs Concept Floor Plan

12
Concept Views – Great Hall

13
Renderings – Banquet Rooms

14
Concept Views – Banquet Rooms

15
Concept Views – Enclosed Patio

• Current Budget - $1,800,000 for FY26, $3.5 M planned for FY 27
• Estimated Project Schedule
•
12/1 – 1/26Phase 1 Design Development (60%)
•
2/26 – 4/26  Phase 2 Construction Documents (100%)
•
4/26  Prepare and Approve Construction Contract (GMP)
•
5/26 – 6/26  Caliente Issues Subcontractor Contracts and Mobilizes
•
7/26 – 3/27Demolition & Construction
•
4/27Project Complete
8
Community Center – Estimated Timeline

9
Wickenburg Airport
• Airport Development Update
•
09-15-25 Council selected Volare as a development partner
•
Fall 2025 developed airport committee concept, application
process, and selection of members
•
1st Airport Committee Meeting 01-13-2026
•
Continue to improve & renew lease agreements
• Taxi line Project Update
• 11-03-25 Council Approved a budget increase of $73,060
after bids were received
• Received scope of work from the airport engineer

• Budget $48,000
• Parking lots expanded & leveled
• Worked with CRAW to build a
new access road and add 70,000+
sq. ft. of parking
• Planning for future
barn, stall and picnic area
• Growth will require
extending Town waterline
and wastewater
10
Rodeo Grounds Parking & Road Upgrades

• Budget $25,000
• Parking lot LED lights were installed in November
• New area LED lights are being installed the week of January 19th
11
Rodeo Grounds Lighting
Average 50 Footcandles

• Replacement of Approximately 1100
feet of waterline
• Repaving of Roadway
• Upgrading of 7 ADA Ramps
• Sidewalk and Curb Repair
• Budgeted at 1.735M
• Funded from CDBG,WIFA, Water 1
• Bid awarded to Loenbro – Expected
start pending Council approval
12
Adams/Santa Cruz Waterline

13
South Wastewater
Treatment Plant
• Intensification Project
• UV Disinfection
• Headworks
• Grit Chamber
• Clarifier

•
Intensification 2.9M Project
o
1.4 M WIFA, $900,000 ARPA and Wastewater 1 600K
o
Plans at 95%
o
Potential start date in February
•
UV Disinfection
o 800K Wastewater 1
o 95% Design
o Spring Start Date
•
Grit Chamber/Headworks
o 2.4M WIFA
o 95% Design
o Potential start date in February
14
Treatment Plant

• Budget – Included in New
Park design and engineering.
• Alternative Scope
o Ball field
o Ramada & Picnic Area
o Parking
15
Sunset Park Additions

• Budget - $650,000
• Alternative Scope
o Three multi-purpose fields
o Restrooms
o Food truck lot w/electrical
o Dog park
o One entrance from Hwy 60
o Ability for future expansion
16
New Park Design
Dog
Park

Meet Our New Public Works Director
Cason Chambers is our new Public Works Director Cason brings
over 12 years of experience in public works, utilities, and
operations, most recently serving as the Public Works Operations
Superintendent for the City of El Mirage.
Cason holds a Bachelor’s Degree in Political Science from Idaho
State University and a Master of Science in Management and
Leadership from Western Governors University. He is an APWA
Certified Manager of Facilities and Grounds.
Cason is married to his wife, Katie Jo, and they have 4 beautiful
children. When not at work, Cason enjoys serving in his church,
playing disc golf, and getting beaten at video games by his kids.

Questions & Council Discussion
17

2
Tegner Street Paving Project
Tegner Project -Complete
• 1500 CY of Asphalt
• 1600 lineal feet
• 10 stamped crosswalks
• Refurbished 10 ADA Ramps
• Under budget