(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
Organization
2
Mentions
24
Meetings
1
Jurisdictions
2020-02-18 – 2024-12-05
Activity range
All 2 Mentions
(24 meetings, 1 jurisdiction)
City of Scottsdale ·
Scottsdale City Council
· 2024-12-05
#2
The City Manager, or designee, to execute any other documents and take such other actions as necessary to carry out the intent of this Resolution and Agreement. Location: Southeast corner of Pima Road and Los Gatos Drive (Parcel No. 217-07-944A Staff Contact(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
Staff
City of Scottsdale ·
Scottsdale City Council
· 2024-12-03
#16
WestWorld of Scottsdale Wireless License Agreement – Approved on Consent. Revocable License Agreement No. 2024-168-COS with Cellco Partnership, doing business as Verizon Wireless, permitting wireless telecommunications facilities on certain portions of land the City owns or has an interest in known as WestWorld of Scottsdale. Location: 16601 N. Pima Road Staff Contact(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
Staff
City of Scottsdale ·
Scottsdale City Council
· 2024-11-25
#1
Repair Lakes and Irrigation at Vista del Camino Park in the Indian Bend Wash Construction Phase Services Contract Modification – Approved on Consent. 2023-006-COS-A2 with Valley Rain Construction Corporation, in an amount not to exceed $15,177,170.56, to provide phase three construction services for Bond 2019 Project 23 – Repair Lakes and Irrigation at Vista del Camino Park in the Indian Bend Wash, McDowell Road to Roosevelt Street Irrigation System Replacement phase. Staff Contact(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
Staff
City of Scottsdale ·
Scottsdale City Council
· 2024-10-08
#8
Gravity Sewer – Tournament Players Club (TPC) Golf Course to North Pumpback Station Project Construction Phase Contract Modification – Approved on Consent. 2023-201-COS-A3 with Achen-Gardner Construction, LLC, in an amount not to exceed $5,948,834.56, to provide phase four construction phase services for the Gravity Sewer – TPC Golf Course to the North Pumpback Station Project. Location: South of Bell Road and on the West Side of Pima Road Staff Contact(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
Staff
City of Scottsdale ·
Scottsdale City Council
· 2024-09-24
#11
Outdoor Dining Patio Revocable License Agreement Amendment – Approved on Consent. amendment to the Outdoor Dining Patio Revocable License Agreement with Equity Partners Group, LLC, for an outdoor dining patio on city property. Location: 7333 E. Indian Plaza Staff Contact(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
Staff
City of Scottsdale ·
Scottsdale City Council
· 2024-09-10
#7
Thompson Peak Park Dog Park Construction Phase Services Contract – Approved on Consent. 2024-145-COS with Valley Rain Construction Corporation, in an amount not to exceed $5,686,140.07, to provide construction services for the Bond 2019 Project 42 – Add a Dog Park to Thompson Peak Park. Location: 19900 N. Hayden Road Staff Contact(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
Staff
#8
Sports Field Lighting and Installation Job Order Contract Extension – Approved on Consent. extension to the agreement with Musco Sports Lighting, LLC, in an amount not to exceed $2,500,000, for a one-year term, for sports lighting, installation, and related material construction projects throughout the city. Staff Contact(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
Staff
#9
Aquifer Storage and Recovery Wells Project Construction Phase Services Contract – Approved on Consent. Contractors, Inc., a modification to the Construction Manager at Risk Contract, in an amount not to exceed $18,121,671.96, for Phase 6, Phase 7, and Phase 8 of the construction phase services to construct the Aquifer Storage and Recovery Wells and related infrastructure at a guaranteed maximum price. Staff Contact(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
Staff
City of Scottsdale ·
Scottsdale City Council
· 2024-08-21
#3
Contract No. 2024-136-COS with K2 Electric, LLC Staff Contact(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
Staff
City of Scottsdale ·
Scottsdale City Council
· 2024-08-20
#11
Arizona Department of Transportation Certification Acceptance Agreement – Approved on Consent. Department of Transportation to allow the City to administer Federal-aid Highway Program Projects funded by the Federal Highway Administration within the City of Scottsdale. Staff Contact(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
Staff
#14
Gravity Sewer – Tournament Players Club (TPC) Golf Course to North Pumpback Station Project Construction Phase Contract Modification – Approved on Consent. 2023-201-COS-A2 with Achen-Gardner Construction, LLC, in an amount not to exceed $10,670,201.24, to provide phase three construction phase services for the Gravity Sewer – TPC Golf Course to the North Pumpback Station Project. Location: South of Bell Road and on the West Side of Pima Road Staff Contact(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
Staff
City of Scottsdale ·
Scottsdale City Council
· 2024-06-04
#9
Solid Waste Transfer Station Expansion and Renovation Preconstruction Phase Services Contract – Approved on Consent. 2024-081-COS with Cambridge Companies, Inc., in an amount not to exceed $212,218, to provide preconstruction phase services for the expansion and renovation of the Solid Waste Transfer Station. Location: 8417 E. Union Hills Drive Staff Contact(s): Dan Worth, Public Works Director, 480-312-5555,dworth@scottsdaleaz.gov
(s): Dan Worth, Public Works Director, 480-312-5555,dworth@scottsdaleaz.gov
Staff
City of Scottsdale ·
Scottsdale City Council
· 2020-12-07
#11
Multi-Use Sports Fields Construction Phase Services Contract (Offsite Water System) – Approved on Consent. Hunter Contracting Co. in the amount of $727,480.23 to provide phase one construction services for Bond 2019 Project 53 – Build Multi-Use Sports Fields in the Area of Bell Road. Staff Contact(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
Staff
#12
Multi-Use Sports Fields Construction Phase Services Contract (Construction of Fields) – Approved on Consent. Valley Rain Construction Corporation in the amount of $1,223,345.28 to provide phase one construction services for Bond 2019 Project 53 – Build Multi-Use Sports Fields in the Area of Bell Road. Staff Contact(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
Staff
#8
Princess Metering Station Rehabilitation Project Construction Phase Services Contract – Approved on Consent. Currier Construction, Inc., in the amount of $1,227,719.92, to provide construction phase services for the Princess Metering Station Rehabilitation project. Staff Contact(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
Staff
City of Scottsdale ·
Scottsdale City Council
· 2020-11-30
#1
Fountain Plaza Shopping Center Revocable Occupancy Agreement – Approved on Consent. Weingarten Nostat, Inc., for the occupation of a vacant tenant suite within Fountain Plaza Shopping Center. Location: 7750 E. McDowell Road, Suite #104 Staff Contact(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
Staff
#2
Wireless License Agreement with Verizon Wireless (VAW) LLC – Approved on Consent. Wireless (VAW) LLC, permitting the continued operation of a wireless site on the northeast corner of Hayden and Indian School roads. Location: 4201 N. Hayden Road Staff Contact(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
Staff
City of Scottsdale ·
Scottsdale City Council
· 2020-11-23
#11
Well Site 159 Land Purchase and Municipal Use Master Site Plan – Approved on Consent. Arizona State Land Department and initiating a Municipal Use Master Site Plan for the construction of well site 159 located approximately one-half mile east of the intersection of Scottsdale Road and Legacy Boulevard. Staff Contact(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
Staff
#13
Underground Fuel Storage Construction Services Job Order Contract – Approved on Consent. Contractors, Inc., in an amount not to exceed $2,000,000 for a one-year contract extension for fuel underground storage tank removal and new fuel system installation. Staff Contact(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
Staff
#20
Fiscal Year 2020/21 Capital Improvement Plan Mid-Year Budget Adjustments – Approved on Consent. budget adjustments. Staff Contact(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
Staff
City of Scottsdale ·
Scottsdale City Council
· 2020-11-10
#12
Transit Services Intergovernmental Agreement – Approved on Consent. amendment to the agreement with the Regional Public Transportation Authority, for FY 2020/21 transit services. Staff Contact(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
Staff
#15
SOHO Phase 2 Public Art Budget Transfer – Approved on Consent. Development, Planning and Development Department Special Programs Fund Operating Budget Transfer in the amount of $231,000 to a newly created Capital Improvement Project to be titled “SOHO Phase 2 Public Art” and funded by the Airpark Cultural Trust and installed within the greater Airpark area. Staff Contact(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
Staff
#8
Underground Fuel Storage On-Call Engineering Services – Approved on Consent. Fleming, Inc., for a one-year extension in an amount not to exceed $1,000,000, for permanent underground fuel storage tank closures and new fuel system design related services. Staff Contact(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
Staff
City of Scottsdale ·
Scottsdale City Council
· 2020-10-20
#4
Multi-Use Sports Fields Preconstruction Phase Services Contract (Construction of Fields) – Approved on Consent. Valley Rain Construction Corporation in the amount of $72,400.38, to provide preconstruction phase services for Bond 2019 Project 53 – Build Multi-Use Sports Fields in the Area of Bell Road. Staff Contact(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
Staff
#6
Electric Vehicle Charging Pilot Agreement (One Civic Center) – Approved on Consent. Public Service Company for the installation and maintenance of Level 2 electric vehicle charging stations and infrastructure. Location: 7447 E. Indian School Road Staff Contact(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
Staff
#7
Electric Vehicle Charging Pilot Agreement (North Corp Yard) – Approved on Consent. Public Service Company for the installation and maintenance of Level 2 electric vehicle charging stations and infrastructure. Location: 9191 E. San Salvador Drive Staff Contact(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
Staff
City of Scottsdale ·
Scottsdale City Council
· 2020-10-06
#10
Paradise Valley Farms Waterline Replacement – Approved on Consent. & Sons, Inc., the lowest responsive bidder, in the amount of $1,160,904.83 for the construction of the Paradise Valley Farms Waterline Replacement project. Staff Contact(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
Staff
#9
Site 43 1.0 MG Reservoir – Approved on Consent. Building Corp., the lowest responsive bidder, in the amount of $2,263,800 for construction of the Site 43 1.0 MG reservoir. Staff Contact(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
Staff
City of Scottsdale ·
Scottsdale City Council
· 2020-09-22
#10
Transit Regional Support Services Intergovernmental Agreement – Approved on Consent. Phoenix for Transit Regional Support Services for the City of Scottsdale’s 21 trolley buses in an estimated amount of $81,000 annually, effective July 1, 2020, through June 30, 2040. Staff Contact(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
Staff
#3
Arizona Canal Banks Land Use License Agreement – Approved on Consent. River Project Agricultural Improvement and Power District for the continued recreational use of the Arizona Canal Banks located between Scottsdale Road and Goldwater Boulevard. Staff Contact(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
Staff
#4
Aquifer Storage and Recovery Wells Project Construction Phase Services Contract – Approved on Consent. MGC Contractors, Inc., in an amount not to exceed $1,471,172.09, for the construction (drilling) of the City of Scottsdale’s Aquifer Storage and Recovery Well 54. Staff Contact(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
Staff
#5
WestWorld Drainage Study Budget Transfer – Approved on Consent. Budget transfer in the amount of $40,000 to a newly created Capital Improvement Project to be titled “WestWorld Drainage Study” and funded by the Stormwater In-Lieu Fees Fund. Staff Contact(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
Staff
#6
Fiscal Year 2020/21 Mid-Year CIP Budget Adjustments – Approved on Consent Agenda. Capital Improvement Plan. Staff Contact(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
Staff
City of Scottsdale ·
Scottsdale City Council
· 2020-09-08
#7
Princess Metering Station Repairs Project Preconstruction Phase Services Contract – Approved on Consent. Currier Construction, Inc., in an amount not to exceed $129,904.14, to provide preconstruction phase services for the Princess Metering Station Repairs project. Staff Contact(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
Staff
City of Scottsdale ·
Scottsdale City Council
· 2020-08-25
#12
Scottsdale Road Utility Corridor Agreement – Approved on Consent. Public Service Company (APS) and Five Star Development Resort Communities, LLC, to create and regulate a protected utility corridor along a portion of Scottsdale Road at East Indian Bend Road for the undergrounding of 69kV electric power lines by APS. Staff Contact(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
Staff
#13
Raintree Drive Extension Project Construction Phase Services Contract – Approved on Consent. Achen-Gardner Construction, LLC, in an amount not to exceed $14,587,109.33, to provide construction phase services for Phase 1 of the Raintree Drive Extension Project from Scottsdale Road to Hayden Road. Staff Contact(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
Staff
#15
Bond 2019, Project 1 Engineering Services Contract – Approved on Consent. and Associates in the amount of $1,188,047.73, for design services for the Bond 2019, Project 1, Replace Aging Infrastructure and Improve Public and Event Spaces on Civic Center Plaza. Staff Contact(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
Staff
City of Scottsdale ·
Scottsdale City Council
· 2020-07-01
#10
Sewer Collection System Rehabilitation Preconstruction Phase Services Contract – Approved on Consent. F Contracting, Inc., in the amount of $45,148.85 to provide preconstruction phase services for the Sewer Collection System Rehabilitation of 24, 30, and 36-inch Diameter Pipes and Manholes project. Staff Contact(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
Staff
#11
Scottsdale Road – Jomax Road to Dixileta Drive Project Engineering Services Contract– Approved on Consent. & Associates Consulting Engineers, Inc., in the amount of $1,593,260.90 to provide engineering services for the Scottsdale Road – Jomax Road to Dixileta Drive project. Staff Contact(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
Staff
#12
The Drunk Munk Outdoor Dining Revocable License Agreement – Approved on Consent. amendment to the agreement with Scottsdale Canal Project, LLC, and Hermosa Inn Restaurant, LLC, to allow their tenant OTTB, LLC, dba The Drunk Munk, to increase the size of the patio based on an existing outdoor dining license agreement. Location: 7133 E. Stetson Drive, Suite 1 Staff Contact(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
Staff
#13
Balcony Air Rights Easement Agreement – Approved on Consent. Ventures, LLC, permitting the construction of balconies within the right-of-way. Location: 4238 N. Craftsman Court Staff Contact(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
Staff
#14
Stetson Plaza Splash Pad Enhancement Project Budget Transfer – Approved on Consent. Budget Appropriation transfer in the amount of $65,000 to a newly created CIP project titled “Stetson Plaza Splash Pad Enhancement Project” to be funded by the Downtown Cultural Trust. Staff Contact(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
Staff
#6
Acquisition of Right-of-Way for the Osborn Road Complete Street Project – Approved on Consent. access easements, and temporary construction easements for the Osborn Road Complete Street Project from Hayden Road to Scottsdale Road. Staff Contact(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
Staff
#7
Pima Dynamite Trailhead Improvements – Approved on Consent. Construction Southwest, LLC, the lowest responsive bidder, in the amount of $5,632,312.95 for construction of Pima Dynamite Trailhead improvements. Staff Contact(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
Staff
#8
Booster Pump Station 57 Rehabilitation – Approved on Consent. Constructors, LLC, the lowest responsive bidder, in the amount of $6,426,133.20 for construction of the rehabilitation of Booster Pump Station 57 and associated reservoir. Staff Contact(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
Staff
#9
Osborn Road Parallel Sewer Main Project Construction Phase Services Contract – Approved on Consent. first amendment to the contract with B & F Contracting, Inc., in the amount of $1,839,550.01 to provide construction services for Phase 2 of the Osborn Road Parallel Sewer Main – Bishop Lane to Miller Road project. Staff Contact(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
Staff
City of Scottsdale ·
Scottsdale City Council
· 2020-06-16
#16
Shea Boulevard Intersections Capital Project Intergovernmental Agreement – Approved on Consent. Maricopa Association of Governments for project administration and reimbursement of Proposition 400 Regional Transportation Sales Tax funds for eligible costs incurred by the City for the Shea Boulevard Intersections capital project. Staff Contact(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
Staff
City of Scottsdale ·
Scottsdale City Council
· 2020-05-19
#5
Sewer Line Easement – Approved on Consent. a sewer line easement dedication from the Maricopa County Flood Control District within the Indian Bend Wash, south of Curry Road in Tempe, Arizona. Staff Contact(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
Staff
#6
Osborn Road Parallel Sewer Main Project Construction Phase Services Contract – Approved on Consent. F Contracting, Inc., in the amount of $1,762,913.83, to provide construction phase services for the Osborn Road Parallel Sewer Main – Bishop Lane to Miller Road project. Staff Contact(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
Staff
#7
Aquifer Storage and Recovery Wells Project Preconstruction Phase Services Contract – Approved on Consent. MGC Contractors, Inc., in the amount of $324,908.48, to provide preconstruction phase services for the Aquifer Storage and Recovery Wells project. Staff Contact(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
Staff
#8
Phase 1C of the Granite Reef Watershed Storm Drain Improvements – Approved on Consent. Lincoln Constructors, Inc., in the amount of $1,337,776, for construction of Phase 1C of the Granite Reef Watershed Storm Drain Improvements, Indian School Road Storm Drain Laterals. Staff Contact(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
Staff
#9
Scottsdale Road – Jomax Road to Dixileta Drive Capital Project Intergovernmental Agreement Maricopa Association of Governments for project administration and reimbursement of Proposition 400 Regional Transportation Sales Tax and Surface Transportation Program Block Grant funds for eligible costs incurred by the City for the Scottsdale Road – Jomax Road to Dixileta Drive capital project. Staff Contact(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
Staff
City of Scottsdale ·
Scottsdale City Council
· 2020-04-07
#11
Old Town Scottsdale Bicycle Master Plan Agreement – Approved on Consent. Association of Governments for the development of the Old Town Scottsdale Bicycle Master Plan for a total program cost of $173,215.16 with a City of Scottsdale match in the amount of $34,643.03. Staff Contact(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
Staff
#12
Transit Services Intergovernmental Agreement – Approved on Consent. amendment to the agreement with the Regional Public Transportation Authority, in the amount of $195,186, for FY 2019/20 transit services, effective July 1, 2019. Staff Contact(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
Staff
#3
Water Line Easement – Approved on Consent. dedication from Paradise Valley Plaza Owners Association to allow for the construction of waterline and fire protection improvements. Location: Southeast corner of Shea Boulevard and Scottsdale Road Staff Contact(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
Staff
#4
Wireless Communications Antenna Site Revocable License Agreement – Approved on Consent. Partnership dba Verizon Wireless permitting the continued operation of a wireless site. Location: 7337 E. Indian Bend Road Staff Contact(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
Staff
#5
Wireless Communications Antenna Site Revocable License Agreement – Approved on Consent. Partnership dba Verizon Wireless permitting the continued operation of a wireless site. Location: 10701 E. Bell Road Staff Contact(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
Staff
City of Scottsdale ·
Scottsdale City Council
· 2020-03-03
#9
Wireless Communications Antenna Site Revocable License Agreement – Approved on Consent. Spectrum L.P. permitting the continued operation of a wireless site on the northwest corner of Thunderbird Road and 92nd Street. Location: 9170 E. Thunderbird Road Staff Contact(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
Staff
City of Scottsdale ·
Scottsdale City Council
· 2020-02-18
#11
Osborn Road Parallel Sewer Main Preconstruction Phase Services Contract – Approved on Consent. B & F Contracting, Inc., in an amount not to exceed $40,594.50, to provide preconstruction phase services for the Osborn Road Parallel Sewer Main from Bishop Lane to Miller Road project. Staff Contact(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
Staff
#12
Intelligent Transportation Systems Engineering Services Contract – Approved on Consent. and Associates, Inc., for a one-year contract extension, in an amount not to exceed $1,000,000, for on-call intelligent transportation system engineering services. Staff Contact(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
Staff
Activity by Jurisdiction
× clear filter
| Jurisdiction | Meetings | Items | Withdrawn |
|---|---|---|---|
| City of Scottsdale | 24 | 60 | — |
Meeting Timeline
Filtered by City of Scottsdale
Regular Meeting
Item 2
The City Manager, or designee, to execute any other documents and take such other actions as necessary to carry out the intent of this Resolution and Agreement. Location: Southeast corner of Pima Road and Los Gatos Drive (Parcel No. 217-07-944A Staff Contact(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
Regular Meeting
Item 16
WestWorld of Scottsdale Wireless License Agreement – Approved on Consent. Revocable License Agreement No. 2024-168-COS with Cellco Partnership, doing business as Verizon Wireless, permitting wireless telecommunications facilities on certain portions of land the City owns or has an interest in known as WestWorld of Scottsdale. Location: 16601 N. Pima Road Staff Contact(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
Regular Meeting
Item 1
Repair Lakes and Irrigation at Vista del Camino Park in the Indian Bend Wash Construction Phase Services Contract Modification – Approved on Consent. 2023-006-COS-A2 with Valley Rain Construction Corporation, in an amount not to exceed $15,177,170.56, to provide phase three construction services for Bond 2019 Project 23 – Repair Lakes and Irrigation at Vista del Camino Park in the Indian Bend Wash, McDowell Road to Roosevelt Street Irrigation System Replacement phase. Staff Contact(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
Regular Meeting
Item 8
Gravity Sewer – Tournament Players Club (TPC) Golf Course to North Pumpback Station Project Construction Phase Contract Modification – Approved on Consent. 2023-201-COS-A3 with Achen-Gardner Construction, LLC, in an amount not to exceed $5,948,834.56, to provide phase four construction phase services for the Gravity Sewer – TPC Golf Course to the North Pumpback Station Project. Location: South of Bell Road and on the West Side of Pima Road Staff Contact(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
Regular Meeting
Item 11
Outdoor Dining Patio Revocable License Agreement Amendment – Approved on Consent. amendment to the Outdoor Dining Patio Revocable License Agreement with Equity Partners Group, LLC, for an outdoor dining patio on city property. Location: 7333 E. Indian Plaza Staff Contact(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
Regular Meeting
Item 7
Thompson Peak Park Dog Park Construction Phase Services Contract – Approved on Consent. 2024-145-COS with Valley Rain Construction Corporation, in an amount not to exceed $5,686,140.07, to provide construction services for the Bond 2019 Project 42 – Add a Dog Park to Thompson Peak Park. Location: 19900 N. Hayden Road Staff Contact(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
(+2 more mentions)
(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
All mentions in this meeting
#7
Thompson Peak Park Dog Park Construction Phase Services Contract – Approved on Consent. 2024-145-COS with Valley Rain Construction Corporation, in an amount not to exceed $5,686,140.07, to provide construction services for the Bond 2019 Project 42 – Add a Dog Park to Thompson Peak Park. Location: 19900 N. Hayden Road Staff Contact(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
Staff
#8
Sports Field Lighting and Installation Job Order Contract Extension – Approved on Consent. extension to the agreement with Musco Sports Lighting, LLC, in an amount not to exceed $2,500,000, for a one-year term, for sports lighting, installation, and related material construction projects throughout the city. Staff Contact(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
Staff
#9
Aquifer Storage and Recovery Wells Project Construction Phase Services Contract – Approved on Consent. Contractors, Inc., a modification to the Construction Manager at Risk Contract, in an amount not to exceed $18,121,671.96, for Phase 6, Phase 7, and Phase 8 of the construction phase services to construct the Aquifer Storage and Recovery Wells and related infrastructure at a guaranteed maximum price. Staff Contact(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
Staff
Regular Meeting
Item 3
Contract No. 2024-136-COS with K2 Electric, LLC Staff Contact(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
Regular Meeting
Item 11
Arizona Department of Transportation Certification Acceptance Agreement – Approved on Consent. Department of Transportation to allow the City to administer Federal-aid Highway Program Projects funded by the Federal Highway Administration within the City of Scottsdale. Staff Contact(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
(+1 more mention)
(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
All mentions in this meeting
#11
Arizona Department of Transportation Certification Acceptance Agreement – Approved on Consent. Department of Transportation to allow the City to administer Federal-aid Highway Program Projects funded by the Federal Highway Administration within the City of Scottsdale. Staff Contact(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
Staff
#14
Gravity Sewer – Tournament Players Club (TPC) Golf Course to North Pumpback Station Project Construction Phase Contract Modification – Approved on Consent. 2023-201-COS-A2 with Achen-Gardner Construction, LLC, in an amount not to exceed $10,670,201.24, to provide phase three construction phase services for the Gravity Sewer – TPC Golf Course to the North Pumpback Station Project. Location: South of Bell Road and on the West Side of Pima Road Staff Contact(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
Staff
Regular Meeting
Item 9
Solid Waste Transfer Station Expansion and Renovation Preconstruction Phase Services Contract – Approved on Consent. 2024-081-COS with Cambridge Companies, Inc., in an amount not to exceed $212,218, to provide preconstruction phase services for the expansion and renovation of the Solid Waste Transfer Station. Location: 8417 E. Union Hills Drive Staff Contact(s): Dan Worth, Public Works Director, 480-312-5555,dworth@scottsdaleaz.gov
(s): Dan Worth, Public Works Director, 480-312-5555,dworth@scottsdaleaz.gov
Regular Meeting
Item 8
Princess Metering Station Rehabilitation Project Construction Phase Services Contract – Approved on Consent. Currier Construction, Inc., in the amount of $1,227,719.92, to provide construction phase services for the Princess Metering Station Rehabilitation project. Staff Contact(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
(+2 more mentions)
(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
All mentions in this meeting
#11
Multi-Use Sports Fields Construction Phase Services Contract (Offsite Water System) – Approved on Consent. Hunter Contracting Co. in the amount of $727,480.23 to provide phase one construction services for Bond 2019 Project 53 – Build Multi-Use Sports Fields in the Area of Bell Road. Staff Contact(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
Staff
#12
Multi-Use Sports Fields Construction Phase Services Contract (Construction of Fields) – Approved on Consent. Valley Rain Construction Corporation in the amount of $1,223,345.28 to provide phase one construction services for Bond 2019 Project 53 – Build Multi-Use Sports Fields in the Area of Bell Road. Staff Contact(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
Staff
#8
Princess Metering Station Rehabilitation Project Construction Phase Services Contract – Approved on Consent. Currier Construction, Inc., in the amount of $1,227,719.92, to provide construction phase services for the Princess Metering Station Rehabilitation project. Staff Contact(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
Staff
Regular Meeting
Item 1
Fountain Plaza Shopping Center Revocable Occupancy Agreement – Approved on Consent. Weingarten Nostat, Inc., for the occupation of a vacant tenant suite within Fountain Plaza Shopping Center. Location: 7750 E. McDowell Road, Suite #104 Staff Contact(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
(+1 more mention)
(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
All mentions in this meeting
#1
Fountain Plaza Shopping Center Revocable Occupancy Agreement – Approved on Consent. Weingarten Nostat, Inc., for the occupation of a vacant tenant suite within Fountain Plaza Shopping Center. Location: 7750 E. McDowell Road, Suite #104 Staff Contact(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
Staff
#2
Wireless License Agreement with Verizon Wireless (VAW) LLC – Approved on Consent. Wireless (VAW) LLC, permitting the continued operation of a wireless site on the northeast corner of Hayden and Indian School roads. Location: 4201 N. Hayden Road Staff Contact(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
Staff
Item 11
Well Site 159 Land Purchase and Municipal Use Master Site Plan – Approved on Consent. Arizona State Land Department and initiating a Municipal Use Master Site Plan for the construction of well site 159 located approximately one-half mile east of the intersection of Scottsdale Road and Legacy Boulevard. Staff Contact(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
(+2 more mentions)
(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
All mentions in this meeting
#11
Well Site 159 Land Purchase and Municipal Use Master Site Plan – Approved on Consent. Arizona State Land Department and initiating a Municipal Use Master Site Plan for the construction of well site 159 located approximately one-half mile east of the intersection of Scottsdale Road and Legacy Boulevard. Staff Contact(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
Staff
#13
Underground Fuel Storage Construction Services Job Order Contract – Approved on Consent. Contractors, Inc., in an amount not to exceed $2,000,000 for a one-year contract extension for fuel underground storage tank removal and new fuel system installation. Staff Contact(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
Staff
#20
Fiscal Year 2020/21 Capital Improvement Plan Mid-Year Budget Adjustments – Approved on Consent. budget adjustments. Staff Contact(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
Staff
Regular Meeting
Item 8
Underground Fuel Storage On-Call Engineering Services – Approved on Consent. Fleming, Inc., for a one-year extension in an amount not to exceed $1,000,000, for permanent underground fuel storage tank closures and new fuel system design related services. Staff Contact(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
(+2 more mentions)
(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
All mentions in this meeting
#12
Transit Services Intergovernmental Agreement – Approved on Consent. amendment to the agreement with the Regional Public Transportation Authority, for FY 2020/21 transit services. Staff Contact(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
Staff
#15
SOHO Phase 2 Public Art Budget Transfer – Approved on Consent. Development, Planning and Development Department Special Programs Fund Operating Budget Transfer in the amount of $231,000 to a newly created Capital Improvement Project to be titled “SOHO Phase 2 Public Art” and funded by the Airpark Cultural Trust and installed within the greater Airpark area. Staff Contact(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
Staff
#8
Underground Fuel Storage On-Call Engineering Services – Approved on Consent. Fleming, Inc., for a one-year extension in an amount not to exceed $1,000,000, for permanent underground fuel storage tank closures and new fuel system design related services. Staff Contact(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
Staff
Regular Meeting
Item 4
Multi-Use Sports Fields Preconstruction Phase Services Contract (Construction of Fields) – Approved on Consent. Valley Rain Construction Corporation in the amount of $72,400.38, to provide preconstruction phase services for Bond 2019 Project 53 – Build Multi-Use Sports Fields in the Area of Bell Road. Staff Contact(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
(+2 more mentions)
(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
All mentions in this meeting
#4
Multi-Use Sports Fields Preconstruction Phase Services Contract (Construction of Fields) – Approved on Consent. Valley Rain Construction Corporation in the amount of $72,400.38, to provide preconstruction phase services for Bond 2019 Project 53 – Build Multi-Use Sports Fields in the Area of Bell Road. Staff Contact(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
Staff
#6
Electric Vehicle Charging Pilot Agreement (One Civic Center) – Approved on Consent. Public Service Company for the installation and maintenance of Level 2 electric vehicle charging stations and infrastructure. Location: 7447 E. Indian School Road Staff Contact(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
Staff
#7
Electric Vehicle Charging Pilot Agreement (North Corp Yard) – Approved on Consent. Public Service Company for the installation and maintenance of Level 2 electric vehicle charging stations and infrastructure. Location: 9191 E. San Salvador Drive Staff Contact(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
Staff
Regular Meeting
Item 9
Site 43 1.0 MG Reservoir – Approved on Consent. Building Corp., the lowest responsive bidder, in the amount of $2,263,800 for construction of the Site 43 1.0 MG reservoir. Staff Contact(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
(+1 more mention)
(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
All mentions in this meeting
#10
Paradise Valley Farms Waterline Replacement – Approved on Consent. & Sons, Inc., the lowest responsive bidder, in the amount of $1,160,904.83 for the construction of the Paradise Valley Farms Waterline Replacement project. Staff Contact(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
Staff
#9
Site 43 1.0 MG Reservoir – Approved on Consent. Building Corp., the lowest responsive bidder, in the amount of $2,263,800 for construction of the Site 43 1.0 MG reservoir. Staff Contact(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
Staff
Regular Meeting
Item 3
Arizona Canal Banks Land Use License Agreement – Approved on Consent. River Project Agricultural Improvement and Power District for the continued recreational use of the Arizona Canal Banks located between Scottsdale Road and Goldwater Boulevard. Staff Contact(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
(+4 more mentions)
(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
All mentions in this meeting
#10
Transit Regional Support Services Intergovernmental Agreement – Approved on Consent. Phoenix for Transit Regional Support Services for the City of Scottsdale’s 21 trolley buses in an estimated amount of $81,000 annually, effective July 1, 2020, through June 30, 2040. Staff Contact(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
Staff
#3
Arizona Canal Banks Land Use License Agreement – Approved on Consent. River Project Agricultural Improvement and Power District for the continued recreational use of the Arizona Canal Banks located between Scottsdale Road and Goldwater Boulevard. Staff Contact(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
Staff
#4
Aquifer Storage and Recovery Wells Project Construction Phase Services Contract – Approved on Consent. MGC Contractors, Inc., in an amount not to exceed $1,471,172.09, for the construction (drilling) of the City of Scottsdale’s Aquifer Storage and Recovery Well 54. Staff Contact(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
Staff
#5
WestWorld Drainage Study Budget Transfer – Approved on Consent. Budget transfer in the amount of $40,000 to a newly created Capital Improvement Project to be titled “WestWorld Drainage Study” and funded by the Stormwater In-Lieu Fees Fund. Staff Contact(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
Staff
#6
Fiscal Year 2020/21 Mid-Year CIP Budget Adjustments – Approved on Consent Agenda. Capital Improvement Plan. Staff Contact(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
Staff
Regular Meeting
Item 7
Princess Metering Station Repairs Project Preconstruction Phase Services Contract – Approved on Consent. Currier Construction, Inc., in an amount not to exceed $129,904.14, to provide preconstruction phase services for the Princess Metering Station Repairs project. Staff Contact(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
Regular Meeting
Item 12
Scottsdale Road Utility Corridor Agreement – Approved on Consent. Public Service Company (APS) and Five Star Development Resort Communities, LLC, to create and regulate a protected utility corridor along a portion of Scottsdale Road at East Indian Bend Road for the undergrounding of 69kV electric power lines by APS. Staff Contact(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
(+2 more mentions)
(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
All mentions in this meeting
#12
Scottsdale Road Utility Corridor Agreement – Approved on Consent. Public Service Company (APS) and Five Star Development Resort Communities, LLC, to create and regulate a protected utility corridor along a portion of Scottsdale Road at East Indian Bend Road for the undergrounding of 69kV electric power lines by APS. Staff Contact(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
Staff
#13
Raintree Drive Extension Project Construction Phase Services Contract – Approved on Consent. Achen-Gardner Construction, LLC, in an amount not to exceed $14,587,109.33, to provide construction phase services for Phase 1 of the Raintree Drive Extension Project from Scottsdale Road to Hayden Road. Staff Contact(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
Staff
#15
Bond 2019, Project 1 Engineering Services Contract – Approved on Consent. and Associates in the amount of $1,188,047.73, for design services for the Bond 2019, Project 1, Replace Aging Infrastructure and Improve Public and Event Spaces on Civic Center Plaza. Staff Contact(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
Staff
Regular Meeting
Item 6
Acquisition of Right-of-Way for the Osborn Road Complete Street Project – Approved on Consent. access easements, and temporary construction easements for the Osborn Road Complete Street Project from Hayden Road to Scottsdale Road. Staff Contact(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
(+8 more mentions)
(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
All mentions in this meeting
#10
Sewer Collection System Rehabilitation Preconstruction Phase Services Contract – Approved on Consent. F Contracting, Inc., in the amount of $45,148.85 to provide preconstruction phase services for the Sewer Collection System Rehabilitation of 24, 30, and 36-inch Diameter Pipes and Manholes project. Staff Contact(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
Staff
#11
Scottsdale Road – Jomax Road to Dixileta Drive Project Engineering Services Contract– Approved on Consent. & Associates Consulting Engineers, Inc., in the amount of $1,593,260.90 to provide engineering services for the Scottsdale Road – Jomax Road to Dixileta Drive project. Staff Contact(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
Staff
#12
The Drunk Munk Outdoor Dining Revocable License Agreement – Approved on Consent. amendment to the agreement with Scottsdale Canal Project, LLC, and Hermosa Inn Restaurant, LLC, to allow their tenant OTTB, LLC, dba The Drunk Munk, to increase the size of the patio based on an existing outdoor dining license agreement. Location: 7133 E. Stetson Drive, Suite 1 Staff Contact(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
Staff
#13
Balcony Air Rights Easement Agreement – Approved on Consent. Ventures, LLC, permitting the construction of balconies within the right-of-way. Location: 4238 N. Craftsman Court Staff Contact(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
Staff
#14
Stetson Plaza Splash Pad Enhancement Project Budget Transfer – Approved on Consent. Budget Appropriation transfer in the amount of $65,000 to a newly created CIP project titled “Stetson Plaza Splash Pad Enhancement Project” to be funded by the Downtown Cultural Trust. Staff Contact(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
Staff
#6
Acquisition of Right-of-Way for the Osborn Road Complete Street Project – Approved on Consent. access easements, and temporary construction easements for the Osborn Road Complete Street Project from Hayden Road to Scottsdale Road. Staff Contact(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
Staff
#7
Pima Dynamite Trailhead Improvements – Approved on Consent. Construction Southwest, LLC, the lowest responsive bidder, in the amount of $5,632,312.95 for construction of Pima Dynamite Trailhead improvements. Staff Contact(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
Staff
#8
Booster Pump Station 57 Rehabilitation – Approved on Consent. Constructors, LLC, the lowest responsive bidder, in the amount of $6,426,133.20 for construction of the rehabilitation of Booster Pump Station 57 and associated reservoir. Staff Contact(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
Staff
#9
Osborn Road Parallel Sewer Main Project Construction Phase Services Contract – Approved on Consent. first amendment to the contract with B & F Contracting, Inc., in the amount of $1,839,550.01 to provide construction services for Phase 2 of the Osborn Road Parallel Sewer Main – Bishop Lane to Miller Road project. Staff Contact(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
Staff
Regular Meeting
Item 16
Shea Boulevard Intersections Capital Project Intergovernmental Agreement – Approved on Consent. Maricopa Association of Governments for project administration and reimbursement of Proposition 400 Regional Transportation Sales Tax funds for eligible costs incurred by the City for the Shea Boulevard Intersections capital project. Staff Contact(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
Regular Meeting
Item 5
Sewer Line Easement – Approved on Consent. a sewer line easement dedication from the Maricopa County Flood Control District within the Indian Bend Wash, south of Curry Road in Tempe, Arizona. Staff Contact(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
(+4 more mentions)
(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
All mentions in this meeting
#5
Sewer Line Easement – Approved on Consent. a sewer line easement dedication from the Maricopa County Flood Control District within the Indian Bend Wash, south of Curry Road in Tempe, Arizona. Staff Contact(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
Staff
#6
Osborn Road Parallel Sewer Main Project Construction Phase Services Contract – Approved on Consent. F Contracting, Inc., in the amount of $1,762,913.83, to provide construction phase services for the Osborn Road Parallel Sewer Main – Bishop Lane to Miller Road project. Staff Contact(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
Staff
#7
Aquifer Storage and Recovery Wells Project Preconstruction Phase Services Contract – Approved on Consent. MGC Contractors, Inc., in the amount of $324,908.48, to provide preconstruction phase services for the Aquifer Storage and Recovery Wells project. Staff Contact(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
Staff
#8
Phase 1C of the Granite Reef Watershed Storm Drain Improvements – Approved on Consent. Lincoln Constructors, Inc., in the amount of $1,337,776, for construction of Phase 1C of the Granite Reef Watershed Storm Drain Improvements, Indian School Road Storm Drain Laterals. Staff Contact(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
Staff
#9
Scottsdale Road – Jomax Road to Dixileta Drive Capital Project Intergovernmental Agreement Maricopa Association of Governments for project administration and reimbursement of Proposition 400 Regional Transportation Sales Tax and Surface Transportation Program Block Grant funds for eligible costs incurred by the City for the Scottsdale Road – Jomax Road to Dixileta Drive capital project. Staff Contact(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
Staff
Regular Meeting
Item 3
Water Line Easement – Approved on Consent. dedication from Paradise Valley Plaza Owners Association to allow for the construction of waterline and fire protection improvements. Location: Southeast corner of Shea Boulevard and Scottsdale Road Staff Contact(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
(+4 more mentions)
(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
All mentions in this meeting
#11
Old Town Scottsdale Bicycle Master Plan Agreement – Approved on Consent. Association of Governments for the development of the Old Town Scottsdale Bicycle Master Plan for a total program cost of $173,215.16 with a City of Scottsdale match in the amount of $34,643.03. Staff Contact(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
Staff
#12
Transit Services Intergovernmental Agreement – Approved on Consent. amendment to the agreement with the Regional Public Transportation Authority, in the amount of $195,186, for FY 2019/20 transit services, effective July 1, 2019. Staff Contact(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
Staff
#3
Water Line Easement – Approved on Consent. dedication from Paradise Valley Plaza Owners Association to allow for the construction of waterline and fire protection improvements. Location: Southeast corner of Shea Boulevard and Scottsdale Road Staff Contact(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
Staff
#4
Wireless Communications Antenna Site Revocable License Agreement – Approved on Consent. Partnership dba Verizon Wireless permitting the continued operation of a wireless site. Location: 7337 E. Indian Bend Road Staff Contact(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
Staff
#5
Wireless Communications Antenna Site Revocable License Agreement – Approved on Consent. Partnership dba Verizon Wireless permitting the continued operation of a wireless site. Location: 10701 E. Bell Road Staff Contact(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
Staff
Regular Meeting
Item 9
Wireless Communications Antenna Site Revocable License Agreement – Approved on Consent. Spectrum L.P. permitting the continued operation of a wireless site on the northwest corner of Thunderbird Road and 92nd Street. Location: 9170 E. Thunderbird Road Staff Contact(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
Regular Meeting
Item 11
Osborn Road Parallel Sewer Main Preconstruction Phase Services Contract – Approved on Consent. B & F Contracting, Inc., in an amount not to exceed $40,594.50, to provide preconstruction phase services for the Osborn Road Parallel Sewer Main from Bishop Lane to Miller Road project. Staff Contact(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
(+1 more mention)
(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
All mentions in this meeting
#11
Osborn Road Parallel Sewer Main Preconstruction Phase Services Contract – Approved on Consent. B & F Contracting, Inc., in an amount not to exceed $40,594.50, to provide preconstruction phase services for the Osborn Road Parallel Sewer Main from Bishop Lane to Miller Road project. Staff Contact(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
Staff
#12
Intelligent Transportation Systems Engineering Services Contract – Approved on Consent. and Associates, Inc., for a one-year contract extension, in an amount not to exceed $1,000,000, for on-call intelligent transportation system engineering services. Staff Contact(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
(s): Dan Worth, Public Works Director, 480-312-5555, dworth@scottsdaleaz.gov
Staff