Meeting City Council Policy Session-6/13/2023 complete
2023-06-13 · City Council Policy Session
Items: 3
City Council Policy Session
Synced: 2026-05-28 03:37 AZ
Item text
Update on Availability of Colorado River Water 2024-26 and Water Strategy
This report provides an update to the City Council on the following three subjects: 1)
Conditions on the Colorado River, 2) the recently proposed regional plan to use
Colorado River during 2024 through 2026, and 3), the City's strategy to stabilize and
address water resource portfolio challenges.
THIS ITEM IS FOR INFORMATION AND DISCUSSION.
Summary
The Colorado River Basin has been in decline for over a decade, with reservoir levels
dropping to historic low elevations, due to reduced flows in the river, and over
allocation among the 40 million people throughout the Western United States that rely
upon the river for drinking water and agricultural uses. Beginning in 2020 through
2022, the declines were particularly precipitous, resulting in a call from the United
States Bureau of Reclamation (Reclamation) in June of 2022, to Wyoming, Colorado,
Utah, New Mexico, Arizona, Nevada, and California (the Basin States) to take action.
Specifically, Reclamation called for the Basin States to develop a plan to reduce
demand on the Colorado River by two to four million acre-feet (af) by 2024 to save the
reservoir system from collapse. For context, the entire State of Arizona receives a 2.8
million af allocation from the Colorado River. The announcement was particularly
concerning to Phoenix, which receives its Colorado River allocation from the Central
Arizona Project (CAP). The CAP is the most junior priority on the Colorado River, and
the proposed reductions could end deliveries of Colorado River Water to Central
Arizona under many legal interpretations of the cases, and agreements that comprise
the Law of the River.
For over six months in 2022, the Basin States were unable to reach agreement on
reductions to Colorado River deliveries. Last fall, Reclamation announced it would
consider taking unilateral federal action to reduce deliveries, issuing a Supplemental
Environmental Impact Statement (SEIS) with two alternative plans to reduce deliveries.
Neither alternative was acceptable to Arizona water users. On May 2023, the Lower
Basin states of Arizona, California, and Nevada announced a new plan to reduce
Colorado River demand in those states by 1 million af, each year, from 2024 through
2026. The reductions would be largely compensated with federal funding in the form of
Page 5
system conservation agreements such as the one approved by the Phoenix City
Council on May 31, 2023. The plan also relies on run off from the extraordinary winter
snowpack and rainfall from 2022-23. While this plan is likely not sustainable beyond
2026, it does provide the Basin States time to negotiate more permanent operating
rules for the Colorado River that must address sustainable water allocations in a
declining river system.
While the proposal may resolve delivery disputes between 2024 and 2026, the long-
term outlook for Colorado River supplies for Phoenix is still not stable. Staff has
developed a water strategy to strengthen Phoenix's long-term outlook and resilience.
This includes (1) utilizing available alternative water resources; (2) increasing water
efficiency through demand management; (3) promoting sustainable desert
development; and (4) augmenting the Phoenix water resource portfolio.
Responsible Department
This item is submitted by Deputy City Manager Ginger Spencer and the Water
Services Department.
Page 6
Report
This report provides an update to the City Council on the following three subjects: 1)
Conditions on the Colorado River, 2) the recently proposed regional plan to use
Colorado River during 2024 through 2026, and 3), the City's strategy to stabilize and
address water resource portfolio challenges.
THIS ITEM IS FOR INFORMATION AND DISCUSSION.
Summary
The Colorado River Basin has been in decline for over a decade, with reservoir levels
dropping to historic low elevations, due to reduced flows in the river, and over
allocation among the 40 million people throughout the Western United States that rely
upon the river for drinking water and agricultural uses. Beginning in 2020 through
2022, the declines were particularly precipitous, resulting in a call from the United
States Bureau of Reclamation (Reclamation) in June of 2022, to Wyoming, Colorado,
Utah, New Mexico, Arizona, Nevada, and California (the Basin States) to take action.
Specifically, Reclamation called for the Basin States to develop a plan to reduce
demand on the Colorado River by two to four million acre-feet (af) by 2024 to save the
reservoir system from collapse. For context, the entire State of Arizona receives a 2.8
million af allocation from the Colorado River. The announcement was particularly
concerning to Phoenix, which receives its Colorado River allocation from the Central
Arizona Project (CAP). The CAP is the most junior priority on the Colorado River, and
the proposed reductions could end deliveries of Colorado River Water to Central
Arizona under many legal interpretations of the cases, and agreements that comprise
the Law of the River.
For over six months in 2022, the Basin States were unable to reach agreement on
reductions to Colorado River deliveries. Last fall, Reclamation announced it would
consider taking unilateral federal action to reduce deliveries, issuing a Supplemental
Environmental Impact Statement (SEIS) with two alternative plans to reduce deliveries.
Neither alternative was acceptable to Arizona water users. On May 2023, the Lower
Basin states of Arizona, California, and Nevada announced a new plan to reduce
Colorado River demand in those states by 1 million af, each year, from 2024 through
2026. The reductions would be largely compensated with federal funding in the form of
Page 5
system conservation agreements such as the one approved by the Phoenix City
Council on May 31, 2023. The plan also relies on run off from the extraordinary winter
snowpack and rainfall from 2022-23. While this plan is likely not sustainable beyond
2026, it does provide the Basin States time to negotiate more permanent operating
rules for the Colorado River that must address sustainable water allocations in a
declining river system.
While the proposal may resolve delivery disputes between 2024 and 2026, the long-
term outlook for Colorado River supplies for Phoenix is still not stable. Staff has
developed a water strategy to strengthen Phoenix's long-term outlook and resilience.
This includes (1) utilizing available alternative water resources; (2) increasing water
efficiency through demand management; (3) promoting sustainable desert
development; and (4) augmenting the Phoenix water resource portfolio.
Responsible Department
This item is submitted by Deputy City Manager Ginger Spencer and the Water
Services Department.
Page 6
Report
Supporting documents
No supporting documents stored.
View on Agenda Online ↗
Item text
Resolution Adoption - The Sustainable Desert City Development Policy-Water
(Resolution 22129)
Request City Council approval of a resolution to address water consumption of new
development.
THIS ITEM IS FOR DISCUSSION AND POSSIBLE ACTION.
Summary
The history of the City of Phoenix is built on water management and conservation.
From the canals of ancient Hohokam societies through the Salt River Project to the
construction of the Central Arizona Project, human's ability to thrive in the desert has
always depended first and foremost on our ability to use the limited water resources
available with care. For this reason, the City, and Central Arizona more broadly, have
elected to develop on a backbone of renewable surface water resources rather than a
finite resource of groundwater, unlike many other communities in the American West.
Because it is not sustainable to revert to groundwater supplies, the City has taken
great care to protect surface water in the region. In 2014, the Council authorized the
Colorado River Resiliency fund, improving local watershed resiliency and providing for
underground water storage. Water supply is only one side of the equation. Due to the
foresight of current and previous civic leaders, the City has made significant progress
in demand management and conservation. In 1980, the State of Arizona passed the
Groundwater Management Act, becoming the first US state to regulate groundwater
and mandate water conservation measures at that scale. Because of these measures
and other efforts, per-person water use has fallen by more than 30 percent over the
last 30 years. However, hydrologic conditions in the Colorado River, which currently
comprise approximately 40 percent of the water delivered to residents, are currently
experiencing significant reductions in flow. Therefore, the City can no longer depend
on receiving its full allocation from the Colorado River. For this reason, in June 2022,
the Water Services Director declared a "Stage 1 Water Alert" as part of the City's
Drought Management Plan, which means a supply insufficiency is likely in the future.
To adapt to a challenge of this magnitude, the City will have to embrace its heritage of
water-problem solving. Only by adopting institutional water conservation policies will
Page 7
the City be able to maintain a pattern of sustainable growth and efficient water use.
The resolution requested (Attachment A) includes the sections highlighted below:
· Section 1: Conservation Measures for New Development.
· Section 2: Conservation and Restrictions on New Large Water Users.
· Section 3: Annexations outside the current Water Department Service Area.
· Section 4: Applicability and Implementation.
Financial Impact
There is no financial impact from this resolution.
Concurrence/Previous Council Action
· The Transportation, Infrastructure and Planning Subcommittee received an Update
on Supply Shortages in the Colorado River on June 15, 2022.
· The Transportation, Infrastructure and Planning Subcommittee received an Update
on Proposed Water Conservation Measures for New Development on Nov. 16,
2022.
· The Transportation, Infrastructure and Planning Subcommittee received an Update
on Proposed Water Conservation Measures for New Development on Jan. 18,
2023.
Responsible Department
This item is submitted by Deputy City Managers Alan Stephenson and Ginger Spencer
along with the Planning and Development and Water Services departments.
Page 8
ATTACHMENT A
DRAFT
THIS IS A DRAFT COPY ONLY AND IS NOT AN OFFICIAL COPY OF THE FINAL,
ADOPTED RESOLUTION
RESOLUTION #
A RESOLUTION ADDRESSING THE FUTURE WATER CONSUMPTION OF NEW
DEVELOPMENT
WHEREAS, The Council of the City of Phoenix seeks to maintain the City’s
position as the most sustainable desert city in the world.
WHEREAS, The Council of the City of Phoenix recognizes that water security is
the cornerstone of sustainability in desert cities.
WHEREAS, The City identifies that water serves many purposes in a desert city,
providing environmental services such as shade and heat mitigation in addition to being
a critical component in many economic processes.
WHEREAS, The Council of the City of Phoenix has taken significant action to
prepare the City for drought, including supporting construction of Gatewater and New
Conservation Space resources on the Salt and Verde rivers, authorizing the Colorado
River Resiliency Fund, funding “system conservation” to stabilize Lake Mead,
participating in the “500+ Plan,” and constructing the “Drought Pipeline.”
WHEREAS, The Council of the City of Phoenix recognizes that any use of the
City’s precious water resources should consider the economic and community benefits
of that use.
WHEREAS, It is important to protect water resources serving existing customers
in a time of drought.
WHEREAS, A large water user can create significant strain on water resource
and infrastructure planning.
WHEREAS, The Council of the City of Phoenix understands that the City cannot
thrive if it does not use its water resources efficiently.
WHEREAS, The Council of the City of Phoenix wishes to expand upon the water
conservation practices identified by the Ad Hoc Water Conservation Committee.
WHEREAS, The Council of the City of Phoenix understands that the use of the
latest water conservation technologies and practices is key to being the most
sustainable desert city in the world.
Background:
The history of the City of Phoenix is a history of water management and conservation.
From the canals of ancient Hohokam societies through the Salt River Project to the
construction of the Central Arizona Project, human’s ability to thrive in the desert has
-1-
Resolution #
Page 9
ATTACHMENT A
DRAFT
always depended first and foremost on our ability to use the limited water resources
available with care. For this reason, the City, and Central Arizona more broadly, have
elected to develop on a backbone of renewable surface water resources rather than a
finite resource of groundwater, unlike many other communities in the American West.
Because it is not sustainable to revert to groundwater supplies, the City has taken great
care to protect surface water in the region. In 2014, the Council authorized the Colorado
River Resiliency fund, improving local watershed resiliency and providing for
underground water storage. In 2017, the City partnered with the Gila River Indian
Community, State of Arizona, Bureau of Reclamation, and Walton Family Foundation to
fund “system conservation,” which permanently left water in Lake Mead to delay
shortages. In 2022, the City chose to voluntarily forgo 30,000 acre-feet of Colorado
River water use as one of the leading participants in the “500+ Plan.” Perhaps most
importantly, construction of the “Drought Pipeline” is nearing completion, which will
allow the more efficient transport of drought supplies to areas of the City that rely upon
Colorado River supplies.
Water supply is only one side of the equation. Due to the foresight of current and
previous civic leaders, the City has made significant progress in demand management
and conservation. In 1980, the State of Arizona passed the Groundwater Management
Act, becoming the first US state to regulate groundwater and mandate water
conservation measures at scale. Because of these measures and other social forces,
per person water use has fallen by more than 30% over the last 30 years. Since 2000,
the Water Services Department has seen demands fall by more than 19,000 acre-feet,
despite the service population growing by more than 305,000 residents and a thriving
economy. With more yet to accomplish, in 2019 the City adopted the recommendations
of the Ad Hoc Water Conservation Committee for new and enhanced water
conservation programs. These recommendations radically increased the scope and
staffing of the City’s water conservation work, adopting 12 new or expanded
conservation programs and a new Citywide water efficiency goal of 155 gallons of water
delivered per person per day by 2030. If this goal is attained per person water use in the
City will have fallen by more than 35% in the last 30 years.
However, hydrologic conditions in the Colorado River, which currently comprises
approximately 40% of the water delivered to residents, are currently the worst they have
been in over a millennium. As of August 2022, Lakes Mead and Powell were at 26%
and 27% of capacity, respectively. Over the summer of 2022, the Bureau of
Reclamation, who serves as the water master on the Colorado River, stated that it
would be necessary for water users in the Colorado River Basin to radically reduce
water demands on the river and threatened to unilaterally institute water cuts if users
cannot collaboratively agree on a framework to protect hydropower generation and
water deliveries. Therefore, the City can no longer depend on receiving its full allocation
from the Colorado River. For this reason, in June 2022, the Water Services Director
-2-
Resolution #
Page 10
ATTACHMENT A
DRAFT
declared a “Stage 1 Water Alert” as part of the City’s Drought Management Plan, which
means a supply insufficiency is likely in the future.
To adapt to a challenge of this magnitude, the City will have to embrace its heritage of
water-problem solving. Only by adopting institutional water conservation policies will the
City be able to maintain a pattern of sustainable growth and efficient water use. The
policy document below describes these policies in detail.
NOW, THEREFORE, BE IT RESOLVED BY THE COUNCIL OF THE CITY OF
PHOENIX as follows:
Section 1: Conservation Measures for New Development
1. Development of a list of standards for consideration as stipulations for all rezoning
cases that will address best practices related to water usage. Stipulations will be
evaluated for appropriateness on a case-by-case basis and may address the following
best practices:
a. Third-party water efficiency certifications such as EPA WaterSense or an
equivalent.
b. Utilization of drought tolerant and / or native landscaping.
c. Restrictions on the utilization of turf.
d. Outdoor irrigation efficiency standards.
e. Green infrastructure / low-impact development provisions for surface parking
areas, streets and sidewalks.
f. Participation in the City’s Efficiency Checkup program.
g. Enhanced standards for swimming pools.
h. Design standards for wet-cooling systems.
i. Preservation of natural open space.
2. Staff will propose updates to the following ordinances and processes to codify the
water usage best practices that will be implemented initially via rezoning stipulations.
a. Zoning Ordinance
i. Landscaping standards
ii. Open space preservation
iii. Outdoor irrigation efficiency standards
iv. Green infrastructure / low-impact development provisions
-3-
Resolution #
Page 11
ATTACHMENT A
DRAFT
b. Building Code
i. Water efficiency standards
ii. Participation in third-party water efficiency certification
iii. Design standards for wet-cooling systems
c. Drainage Design Manual
i. Green infrastructure / low-impact development provisions
3. Staff will also explore the following:
a. Requirements for separate water meters for indoor and outdoor areas.
b. Framework for the issuance of swimming pool permits that could address the
size and location of pools.
Section 2: Restrictions on New Large Water Users
1. A large water user is defined as a user that is projected to use an average of 250,000
gallons or more of water per day.
2. Proposed large water users would be required to submit a Water Conservation Plan.
The plan shall:
a. Describe the measures the user will take to create water efficiencies specific to
its use, including technologies or best practices that will be implemented to
conserve water, and an estimate of water savings attributable to the technologies
or best practices.
b. For a large water user proposing to use >500,000 gallons per day, the Water
Conservation Plan must include a specific plan that demonstrates that at least
30% of the large water user’s consumptive use is from a recycled or conserved
water source.
3. Staff will evaluate and approve of the plan of the Water Conservation Plan. This
evaluation will include an assessment of following plan aspects:
a. Adequacy
b. Innovation
c. Feasibility
4. The City will evaluate the proposed large water use based on multiple factors,
including water resource availability in the proposed location; consistency with the City’s
planning documents (including General Plan, Water Services’ master plan,
infrastructure plans and Water Resource Plan); the economic value of the proposed
water use to the City and economic impact to the City; consistency with the City’s
-4-
Resolution #
Page 12
ATTACHMENT A
DRAFT
Designation of Assured Water Supply; impact to City water rates based on infrastructure
and resource needs of the project; and whether the project is a key industry identified by
the City as significantly beneficial to the City’s economy.
5. Based on these evaluations, the City may determine the project is incompatible with
available water resources, consistency with planning documents or an insufficient
economic benefit to warrant the large water use.
Section 3: Annexations
1. When the City of Phoenix Drought Management Plan is active, the City of Phoenix
should employ increased level of scrutiny regarding request for annexations.
2. Request for annexation from properties outside of the current Water Services
Department service area should be discouraged to ensure that water resources are
focused on areas within the current service area. County islands located within the
Water Services Department service area will not be affected by this policy.
Section 4: Applicability and Implementation
The policies will be implemented after City Council adoption. Any updates to codes or
ordinances will include specific standards and will be vetted through the public hearing
process and brought forward for City Council consideration and approval.
-5-
Resolution #
Page 13
Report
(Resolution 22129)
Request City Council approval of a resolution to address water consumption of new
development.
THIS ITEM IS FOR DISCUSSION AND POSSIBLE ACTION.
Summary
The history of the City of Phoenix is built on water management and conservation.
From the canals of ancient Hohokam societies through the Salt River Project to the
construction of the Central Arizona Project, human's ability to thrive in the desert has
always depended first and foremost on our ability to use the limited water resources
available with care. For this reason, the City, and Central Arizona more broadly, have
elected to develop on a backbone of renewable surface water resources rather than a
finite resource of groundwater, unlike many other communities in the American West.
Because it is not sustainable to revert to groundwater supplies, the City has taken
great care to protect surface water in the region. In 2014, the Council authorized the
Colorado River Resiliency fund, improving local watershed resiliency and providing for
underground water storage. Water supply is only one side of the equation. Due to the
foresight of current and previous civic leaders, the City has made significant progress
in demand management and conservation. In 1980, the State of Arizona passed the
Groundwater Management Act, becoming the first US state to regulate groundwater
and mandate water conservation measures at that scale. Because of these measures
and other efforts, per-person water use has fallen by more than 30 percent over the
last 30 years. However, hydrologic conditions in the Colorado River, which currently
comprise approximately 40 percent of the water delivered to residents, are currently
experiencing significant reductions in flow. Therefore, the City can no longer depend
on receiving its full allocation from the Colorado River. For this reason, in June 2022,
the Water Services Director declared a "Stage 1 Water Alert" as part of the City's
Drought Management Plan, which means a supply insufficiency is likely in the future.
To adapt to a challenge of this magnitude, the City will have to embrace its heritage of
water-problem solving. Only by adopting institutional water conservation policies will
Page 7
the City be able to maintain a pattern of sustainable growth and efficient water use.
The resolution requested (Attachment A) includes the sections highlighted below:
· Section 1: Conservation Measures for New Development.
· Section 2: Conservation and Restrictions on New Large Water Users.
· Section 3: Annexations outside the current Water Department Service Area.
· Section 4: Applicability and Implementation.
Financial Impact
There is no financial impact from this resolution.
Concurrence/Previous Council Action
· The Transportation, Infrastructure and Planning Subcommittee received an Update
on Supply Shortages in the Colorado River on June 15, 2022.
· The Transportation, Infrastructure and Planning Subcommittee received an Update
on Proposed Water Conservation Measures for New Development on Nov. 16,
2022.
· The Transportation, Infrastructure and Planning Subcommittee received an Update
on Proposed Water Conservation Measures for New Development on Jan. 18,
2023.
Responsible Department
This item is submitted by Deputy City Managers Alan Stephenson and Ginger Spencer
along with the Planning and Development and Water Services departments.
Page 8
ATTACHMENT A
DRAFT
THIS IS A DRAFT COPY ONLY AND IS NOT AN OFFICIAL COPY OF THE FINAL,
ADOPTED RESOLUTION
RESOLUTION #
A RESOLUTION ADDRESSING THE FUTURE WATER CONSUMPTION OF NEW
DEVELOPMENT
WHEREAS, The Council of the City of Phoenix seeks to maintain the City’s
position as the most sustainable desert city in the world.
WHEREAS, The Council of the City of Phoenix recognizes that water security is
the cornerstone of sustainability in desert cities.
WHEREAS, The City identifies that water serves many purposes in a desert city,
providing environmental services such as shade and heat mitigation in addition to being
a critical component in many economic processes.
WHEREAS, The Council of the City of Phoenix has taken significant action to
prepare the City for drought, including supporting construction of Gatewater and New
Conservation Space resources on the Salt and Verde rivers, authorizing the Colorado
River Resiliency Fund, funding “system conservation” to stabilize Lake Mead,
participating in the “500+ Plan,” and constructing the “Drought Pipeline.”
WHEREAS, The Council of the City of Phoenix recognizes that any use of the
City’s precious water resources should consider the economic and community benefits
of that use.
WHEREAS, It is important to protect water resources serving existing customers
in a time of drought.
WHEREAS, A large water user can create significant strain on water resource
and infrastructure planning.
WHEREAS, The Council of the City of Phoenix understands that the City cannot
thrive if it does not use its water resources efficiently.
WHEREAS, The Council of the City of Phoenix wishes to expand upon the water
conservation practices identified by the Ad Hoc Water Conservation Committee.
WHEREAS, The Council of the City of Phoenix understands that the use of the
latest water conservation technologies and practices is key to being the most
sustainable desert city in the world.
Background:
The history of the City of Phoenix is a history of water management and conservation.
From the canals of ancient Hohokam societies through the Salt River Project to the
construction of the Central Arizona Project, human’s ability to thrive in the desert has
-1-
Resolution #
Page 9
ATTACHMENT A
DRAFT
always depended first and foremost on our ability to use the limited water resources
available with care. For this reason, the City, and Central Arizona more broadly, have
elected to develop on a backbone of renewable surface water resources rather than a
finite resource of groundwater, unlike many other communities in the American West.
Because it is not sustainable to revert to groundwater supplies, the City has taken great
care to protect surface water in the region. In 2014, the Council authorized the Colorado
River Resiliency fund, improving local watershed resiliency and providing for
underground water storage. In 2017, the City partnered with the Gila River Indian
Community, State of Arizona, Bureau of Reclamation, and Walton Family Foundation to
fund “system conservation,” which permanently left water in Lake Mead to delay
shortages. In 2022, the City chose to voluntarily forgo 30,000 acre-feet of Colorado
River water use as one of the leading participants in the “500+ Plan.” Perhaps most
importantly, construction of the “Drought Pipeline” is nearing completion, which will
allow the more efficient transport of drought supplies to areas of the City that rely upon
Colorado River supplies.
Water supply is only one side of the equation. Due to the foresight of current and
previous civic leaders, the City has made significant progress in demand management
and conservation. In 1980, the State of Arizona passed the Groundwater Management
Act, becoming the first US state to regulate groundwater and mandate water
conservation measures at scale. Because of these measures and other social forces,
per person water use has fallen by more than 30% over the last 30 years. Since 2000,
the Water Services Department has seen demands fall by more than 19,000 acre-feet,
despite the service population growing by more than 305,000 residents and a thriving
economy. With more yet to accomplish, in 2019 the City adopted the recommendations
of the Ad Hoc Water Conservation Committee for new and enhanced water
conservation programs. These recommendations radically increased the scope and
staffing of the City’s water conservation work, adopting 12 new or expanded
conservation programs and a new Citywide water efficiency goal of 155 gallons of water
delivered per person per day by 2030. If this goal is attained per person water use in the
City will have fallen by more than 35% in the last 30 years.
However, hydrologic conditions in the Colorado River, which currently comprises
approximately 40% of the water delivered to residents, are currently the worst they have
been in over a millennium. As of August 2022, Lakes Mead and Powell were at 26%
and 27% of capacity, respectively. Over the summer of 2022, the Bureau of
Reclamation, who serves as the water master on the Colorado River, stated that it
would be necessary for water users in the Colorado River Basin to radically reduce
water demands on the river and threatened to unilaterally institute water cuts if users
cannot collaboratively agree on a framework to protect hydropower generation and
water deliveries. Therefore, the City can no longer depend on receiving its full allocation
from the Colorado River. For this reason, in June 2022, the Water Services Director
-2-
Resolution #
Page 10
ATTACHMENT A
DRAFT
declared a “Stage 1 Water Alert” as part of the City’s Drought Management Plan, which
means a supply insufficiency is likely in the future.
To adapt to a challenge of this magnitude, the City will have to embrace its heritage of
water-problem solving. Only by adopting institutional water conservation policies will the
City be able to maintain a pattern of sustainable growth and efficient water use. The
policy document below describes these policies in detail.
NOW, THEREFORE, BE IT RESOLVED BY THE COUNCIL OF THE CITY OF
PHOENIX as follows:
Section 1: Conservation Measures for New Development
1. Development of a list of standards for consideration as stipulations for all rezoning
cases that will address best practices related to water usage. Stipulations will be
evaluated for appropriateness on a case-by-case basis and may address the following
best practices:
a. Third-party water efficiency certifications such as EPA WaterSense or an
equivalent.
b. Utilization of drought tolerant and / or native landscaping.
c. Restrictions on the utilization of turf.
d. Outdoor irrigation efficiency standards.
e. Green infrastructure / low-impact development provisions for surface parking
areas, streets and sidewalks.
f. Participation in the City’s Efficiency Checkup program.
g. Enhanced standards for swimming pools.
h. Design standards for wet-cooling systems.
i. Preservation of natural open space.
2. Staff will propose updates to the following ordinances and processes to codify the
water usage best practices that will be implemented initially via rezoning stipulations.
a. Zoning Ordinance
i. Landscaping standards
ii. Open space preservation
iii. Outdoor irrigation efficiency standards
iv. Green infrastructure / low-impact development provisions
-3-
Resolution #
Page 11
ATTACHMENT A
DRAFT
b. Building Code
i. Water efficiency standards
ii. Participation in third-party water efficiency certification
iii. Design standards for wet-cooling systems
c. Drainage Design Manual
i. Green infrastructure / low-impact development provisions
3. Staff will also explore the following:
a. Requirements for separate water meters for indoor and outdoor areas.
b. Framework for the issuance of swimming pool permits that could address the
size and location of pools.
Section 2: Restrictions on New Large Water Users
1. A large water user is defined as a user that is projected to use an average of 250,000
gallons or more of water per day.
2. Proposed large water users would be required to submit a Water Conservation Plan.
The plan shall:
a. Describe the measures the user will take to create water efficiencies specific to
its use, including technologies or best practices that will be implemented to
conserve water, and an estimate of water savings attributable to the technologies
or best practices.
b. For a large water user proposing to use >500,000 gallons per day, the Water
Conservation Plan must include a specific plan that demonstrates that at least
30% of the large water user’s consumptive use is from a recycled or conserved
water source.
3. Staff will evaluate and approve of the plan of the Water Conservation Plan. This
evaluation will include an assessment of following plan aspects:
a. Adequacy
b. Innovation
c. Feasibility
4. The City will evaluate the proposed large water use based on multiple factors,
including water resource availability in the proposed location; consistency with the City’s
planning documents (including General Plan, Water Services’ master plan,
infrastructure plans and Water Resource Plan); the economic value of the proposed
water use to the City and economic impact to the City; consistency with the City’s
-4-
Resolution #
Page 12
ATTACHMENT A
DRAFT
Designation of Assured Water Supply; impact to City water rates based on infrastructure
and resource needs of the project; and whether the project is a key industry identified by
the City as significantly beneficial to the City’s economy.
5. Based on these evaluations, the City may determine the project is incompatible with
available water resources, consistency with planning documents or an insufficient
economic benefit to warrant the large water use.
Section 3: Annexations
1. When the City of Phoenix Drought Management Plan is active, the City of Phoenix
should employ increased level of scrutiny regarding request for annexations.
2. Request for annexation from properties outside of the current Water Services
Department service area should be discouraged to ensure that water resources are
focused on areas within the current service area. County islands located within the
Water Services Department service area will not be affected by this policy.
Section 4: Applicability and Implementation
The policies will be implemented after City Council adoption. Any updates to codes or
ordinances will include specific standards and will be vetted through the public hearing
process and brought forward for City Council consideration and approval.
-5-
Resolution #
Page 13
Report
Supporting documents
No supporting documents stored.
View on Agenda Online ↗
Item text
Results on Yellow Light Timing Field Study
This report provides the field study results on the Street Transportation Department's
efforts to investigate and evaluate the "before" and "after" impacts of a focused
implementation of the new Institute of Transportation Engineers' guidelines on yellow
change intervals at signalized intersections in comparison with Phoenix's current
practices. The report further requests Council approval of staff's recommendation on
the implementation of new yellow change interval timing based on the results of the
field study.
THIS ITEM IS FOR DISCUSSION AND POSSIBLE ACTION.
Summary
The Street Transportation Department (Streets) conducted a field study in partnership
with the University of Arizona to examine whether implementing Institute of
Transportation Engineers’ (ITE) 2020 guidelines on yellow change intervals can
enhance safety at signalized intersections. This report addresses relevant background
information, how the field study was designed and implemented, the field study results
and recommendations.
Background
Red-light running (RLR) is one of the riskiest behaviors at signalized intersections.
According to a report published by the American Automobile Association (AAA)
Foundation for Traffic Safety, more than two people were killed every day across the
U.S. due to noncompliance with red signal indications (AAA Foundation for Traffic
Safety, 2020). According to a report published by the Insurance Institute for Highway
Safety (IIHS), RLR violations caused 928 fatalities in 2020 in the United States. In
addition, an estimated 116,000 people suffered injuries in RLR collisions (IIHS, 2022).
Similar to cities across the nation, RLR-related violations in the Phoenix metropolitan
area have become one of the most severe causes of fatal crashes, with 144 fatalities
and 10,685 injuries reported from 2014 to 2021.
The basic purpose for the yellow change interval is to inform the driver that the green
phase has ended. The yellow change interval provides time for the driver to either stop
before entering the intersection or to proceed and clear the intersection. The basic
Page 14
purpose of the red clearance interval is to provide the driver who decides to enter the
intersection during the yellow change interval adequate time to clear the intersection
prior to a conflicting (or opposing) green phase beginning at the intersection. The red
clearance interval is typically called the “all-red” time.
Streets' Current Signal Timing Practices
Streets has a standard operating procedure (SOP) for determining the duration of
traffic signal intervals. The SOP utilizes the pre-2020 ITE kinematic equation and
calculates yellow change intervals based on posted speed limits. The current City of
Phoenix equations for calculating the yellow change and red clearance intervals are
included in Attachment A.
ITE 2020 Guidelines
The updated ITE guidelines for calculating traffic signal timing were released in March
2020. Since 1965, ITE has developed a variety of methods for calculating yellow
change and red clearance intervals, all of which are based on the kinematic equation
method. According to ITE, the kinematic equation method is the most popular and
widely accepted technique for determining yellow change intervals (Noble, 2020). In
comparing the new ITE 2020 guidelines to the prior ones, there are three key
modifications.
· Change in the speed at which a reasonable driver approaches an intersection. If a
speed study is not completed and the 85th percentile speed is not available, the
85th percentile approach speed for through movements may be estimated and
substituted by the value of Posted Speed Limit + 7 miles per hour. For the left-turn
movements, the Posted Speed Limit can be used as the 85th percentile approach
speed.
· Change in the method for yellow change interval calculations for left-turn
movements.
· Change in maximum yellow change interval for left-turn movements. ITE advises
use of 7.0 seconds as the maximum yellow change interval for left-turn movements.
The current 2020 ITE-recommended equations for calculating the yellow change and
red clearance intervals are included in Attachment A.
Traffic signal timings have long been an area of study to determine the proper traffic
signal timings to ensure intersection safety while maintaining an acceptable level of
travel efficiency. However, there is still no broad consensus on the most appropriate
method for calculating yellow change and red clearance intervals.
Page 15
In order to effectively reduce the total number of RLR-related crashes and maintain a
safe journey for all road users, it was crucial for Streets to perform a field study to
explore RLR behavior at local intersections, understand the impact of different signal
timing parameters (e.g., yellow change and red clearance intervals) on RLR frequency,
and ultimately develop appropriate countermeasures.
Signal Timing Field Study
Objectives
Streets’ purpose in performing this field study was to examine the ITE 2020 guidelines
for yellow change intervals and identify the relationship between signal timing
parameters and RLR violations. Initially, based on several criteria, including the
frequency and severity of RLR-related crashes as well as infrastructure feasibility, 12
intersections were selected to be part of the field study. Then, at each study
intersection, smart sensor equipment was installed. Finally, to determine the
relationship between signal timing parameters and RLR violations, an experimental
design for before-and after analysis was conducted and implemented.
Baseline Condition Data - Intersection Through Movements
At each of the 12 intersection study locations, baseline data was collected on
weekdays between Sept. 1 and Nov. 21, 2022. Over this 12-week period, a total of
144,795 RLR incidents were observed. Among the study sites, two intersections
experienced the most RLR incidents at more than 300 per day, eight of the
intersections experienced between 200 and 300 RLR incidents per day, and the
remaining two intersections had less than 200 RLR incidents per day.
It was found that the majority of RLR violations (88.5 percent or 128,164 events)
occurred during the red clearance interval, while the remaining (11.5 percent or 16,631
events) RLR violations occurred after the red clearance time elapsed when opposing
green phase movement began. The figure in Attachment B shows the percentage of
RLR incidents that passed through the intersection on a red light both during and after
the red clearance time.
Study Design to Implement and Analyze ITE 2020 Guidelines
The “before-and-after” aspects of this study were intended to statistically determine
whether the ITE 2020 guidelines for yellow change and red clearance intervals can
improve intersection safety by reducing the number of RLR violations. Moreover, the
potential relationship between different signal timing parameters and the potential
impact of signal timing parameters on RLR frequency will be identified. Finally, a
statistical method was developed to identify the appropriate amount of yellow change
and red clearance intervals that will result in reduction in RLR frequency.
Page 16
With respect to the 12 study intersections, for the through and left-turn movements,
some intersections were used as the control sites, and the yellow change and red
clearance intervals for these control intersections was not changed from their current
timing. The control sites were used to eliminate the effects of traffic volume and pattern
variation during the holiday seasons in our statistical analysis.
The remaining intersections were then considered as treatment sites, and the yellow
change intervals were changed for all the treatment sites. The new ITE 2020
guidelines were used to calculate the yellow change intervals for through and left-turn
movements for the experimental design at the treatment sites. To make the study
conclusions statistically sound, the study timeline included twelve weeks to collect
sufficient data, which occurred over six, two-week time periods as outlined below.
· Period 1: Nov. 21, 2022 - Dec. 5, 2022;
· Period 2: Dec. 5, 2022 - Dec. 19, 2022;
· Period 3: Dec. 19, 2022 - Jan. 2, 2023;
· Period 4: Jan. 2, 2023 - Jan. 16, 2023;
· Period 5: Jan. 16, 2023 - Jan. 30, 2023; and
· Period 6: Jan. 20, 2023 - Feb. 13, 2023.
Through Movements - Treatment Site Changes
In accordance with the ITE 2020 guidelines, due to the absence of approach speed at
the intersections, for this study, the Posted Speed Limit + 7 miles per hour guidance
was used in lieu of the through movement's 85th percentile of approach speed. Using
the Posted Speed Limit + 7 miles per hour guidance resulted in an increase between
0.4 seconds and 0.6 seconds for the yellow change interval in comparison to the
current yellow change interval for through movements.
For evaluation of through movements at the twelve study intersections, three of the
intersections were used as the control sites, and the yellow change and red clearance
intervals for these three control intersections were not be changed from their current
timing. The remaining nine intersections were considered treatment sites. The yellow
change intervals for the through movements were changed for all the treatment sites.
To better understand driver behaviors and the influence of the yellow change interval
over the short-term and long-term, the nine treatment intersections were divided into
three equal groups for implementation using the methodology outlined below.
· Incremental Intersections Group: For this group of three intersections, the increase
in the yellow change interval was implemented at the selected treatment sites over
five two-week periods. Therefore, at each of the three incremental sites, the yellow
change interval was increased by 0.1 to 0.2 seconds at the start of each two-week
Page 17
period, depending on how much the total calculated yellow change interval
increased.
· Periodically Intersections Group: For this group of three intersections, the yellow
change interval was adjusted at the beginning of each two-week period. That is, the
yellow change interval alternated between the new calculated yellow change
interval and the baseline (current) yellow change interval every two weeks to study
the drivers’ compliance behavior over a short period. During the first, third, and fifth
two-week periods, the new yellow change intervals were implemented at sites for
the entire two-week period. During the second, fourth, and sixth two-week periods,
the yellow change interval was returned to the baseline (current) yellow change
interval.
· Long-Term Intersections Group: For this group of three intersections, the focus was
on studying the impact of increasing the yellow change interval on drivers'
compliance behavior in the long term. The new yellow change intervals were
implemented at the beginning of the first two-week period and were not modified for
the duration of the data collection time frame. These sites were selected to study
the long-term impact of ITE 2020 guidelines on driver behavior.
Left-Turn Movements - Treatment Site Changes
In accordance with the ITE 2020 guidelines, due to the absence of approach speed for
left turns at the study intersection, the Posted Speed Limit + 7 miles per hour guidance
was used in lieu of the left-turn movement's 85th percentile of approach speed. The
estimated intersection entry speed for left-turn movements was 20 miles per hour,
following the ITE 2020 guidelines, which resulted in an increase between 0.3 seconds
and 3.2 seconds for the yellow change interval in comparison to the current yellow
change interval for left-turn movements. Since two of the selected intersections for the
study did not have protected left -turn phase movements, only ten intersections were
used for studying left-turn movements.
Of the ten study intersections for left-turn movements, two of the intersections were
used as the control sites, and the remaining eight intersections were used as treatment
sites. The significant increases in left-turn yellow change intervals calculated under ITE
2020 guidelines for some intersections represented a change in left-turn yellow change
intervals that raised safety concerns. Therefore, four of the eight treatment
intersections were implemented as Incremental Intersections Group and four as Long-
Term Intersections Group as previously outlined; there were no intersections
designated for a Periodically Intersections Group. For the incremental Intersections
Group, the yellow change interval was increased by 0.3 to 0.7 seconds at the start of
each two-week period, depending on how much the total calculated yellow change
interval was increased.
Page 18
Field Study Results
In order to evaluate the comparative differences between the before and after study
groups, a statistical T-test was employed. The T-test is a common method used to
assess the significance of differences observed between two sets of data. The
statistical T-test has been widely used in previous before-and-after studies. In this
study, a 95 percent confidence level is employed to conclude the statistical
significance of the difference in RLR rates between the before and after groups. To
avoid bias in the analysis and ensure a fair comparison regardless of traffic volumes,
the RLR frequency was normalized by dividing the number of RLR violations by the
number of vehicles. This calculated the RLR rate, which was measured as the number
of RLR violations per 1,000 vehicles per day.
Through Movements - Treatment Site Changes
· Incremental Intersections Group: Table 1 in Attachment C shows the statistical T-
test results for the RLR rate at the Incremental Intersections Group sites. When
comparing Periods 3, 4, 5, and 6 with the Baseline Condition Data, it is evident that
the average RLR rate decreased significantly at all treatment sites. However, the
results during the initial implementation (Periods 1 and 2) were inconclusive.
· Periodically Intersections Group: Table 2 in Attachment C shows the statistical T-
test results for the RLR rate at the Periodically Intersections Group sites. These
results indicate a significant decrease in the average RLR rate during periods where
the new yellow change intervals were implemented (Periods 1, 3, and 5), compared
to the periods with the current yellow change intervals (Periods 2, 4, and 6).
· Long-Term Intersections Group: Table 3 in Attachment C shows the statistical T-
test results for the RLR rate at the Long-Term Intersections Group sites. The results
indicate a significant decrease in the average RLR rate during all six periods,
particularly in Period 1 when the new yellow change interval was first implemented.
Left-Turn Movements - Treatment Site Changes
· Incremental Intersections Group: Table 4 in Attachment C shows the statistical T-
test results for the RLR rate at the Incremental Intersections Group sites. It is
evident from the comparison of Periods 3, 4, 5, and 6 with the Baseline Condition
Data that the average RLR rate decreased at all treatment sites. However, the
reduction was not statistically significant for some periods and study sites.
· Long-Term Intersections Group: Table 5 in Attachment C shows the statistical T-
test results for the RLR rate at the Long-Term Intersections Group sites. The results
indicate a significant decrease in the average RLR rate during all six periods,
particularly in Period 1 when the new yellow change interval was first implemented.
Page 19
It should be noted that due to a malfunction of the smart sensors at some of the
treatment intersection sites during several of the field study periods, data was not
captured for those field study locations or periods.
According to the statistical analysis of the data, the results for both through and left-
turn movements are summarized below.
· For the control sites, which were kept at the current yellow change intervals, there
was no significant reduction in the average rate of RLR for the through movements
and left-turn movements when comparing with the Baseline Condition Data.
· For all the treatment sites for the through and left-turn movements, the average rate
of RLR significantly decreased during the periods that used the ITE 2020 yellow
change intervals compared to periods with the current yellow change intervals.
· The yellow change intervals for the left-turn movements implemented at the
incremental sites did not show a significantly increased benefit beyond Period 3
when additional yellow time was added. Period 3 closely matched the
recommended intervals from the National Cooperative Highway Research Program
(NCHRP) Report 731 Guidelines for Timing Yellow and All-Red Intervals at
Signalized Intersections. The NCHRP Report 731 recommends using the Posted
Speed Limit - 5 miles per hour as the 85th percentile approach speed for left-turn
movements. This results in a shorter yellow change interval for the left-turn
movement as compared to the ITE 2020 guidelines. However, the NCHRP yellow
change interval is longer than the City's current yellow change intervals for the left-
turn movement. The comparison of all three methods is shown in Attachment D.
The results suggest that using the NCHRP yellow change intervals can be effective,
without the need to implement the ITE 2020 guidelines for calculating yellow
change intervals for the left-turn movements.
Based on the results of the field study, several recommendations were proposed to
improve safety at signalized intersections by better understanding road users'
compliance behavior with the yellow change interval. These recommendations include:
· Implementation of the ITE 2020 Guidelines for the yellow change interval for the
through movements. For calculating through movement yellow change intervals, the
Posted Speed Limit + 7 miles per hour as the 85th percentile approach speed is
recommended when field-measured speed data is unavailable.
· Implementation of the NCHRP Report 731 Guidelines for the yellow change interval
for the left-turn movements. For left-turn movements, it is recommended to use
Posted Speed Limit - 5 miles per hour as an estimation for the 85th percentile left-
turn approach speed.
· As the field study recommendations were based on only 12 weeks of data, further
Page 20
research is necessary to understand the long-term effects of yellow change
intervals on driver behavior. Further research is currently being conducted to
investigate the impact of red clearance intervals, both individually and in conjunction
with yellow change intervals, to gain a more comprehensive understanding of their
combined effects on intersection safety.
Attachment E provides a list of references for this report.
Implementation Timeline
In order to implement the field study recommendations with current staff resources in
the Traffic Management Center (TMC), it is estimated that it will take approximately six
years to implement the new yellow change intervals for the 1,200 traffic signals in
Phoenix. Based on the results of this study and the improved safety benefits related to
RLR, Streets proposes implementing the field study recommendations on an expedited
timeline with a goal to complete the retiming all 1,200 traffic signals within three years.
However, additional staff resources will be needed. Streets is recommending adding
five positions to the TMC, which would include one Traffic Engineer I, one Traffic
Engineer II, two Signal Systems Specialist I's, and one Signal Systems Specialist II.
The new positions would be funded by existing Streets' revenue from the Arizona
Highway User Revenue Fund (HURF), at an estimated cost of $445,502 per year.
Update on the MAG Top 100 Locations
At the Jan. 24, 2023, Policy meeting, Council directed staff to install smart sensor
equipment at the most dangerous intersections in Phoenix taken from the Maricopa
Association of Governments (MAG) Top 100 Intersections by Crash Risk. Staff has
evaluated the list and identified 64 Phoenix intersections from that list. Streets is
currently working on a procurement to enable the purchase of the necessary smart
sensor equipment and anticipates having a contract in place by Fall 2023.
Concurrently, staff is evaluating the infrastructure feasibility of all 64 locations in order
to develop a prioritized list for implementation.
Recommendation
The Street Transportation Department requests City Council approval of the following
actions based on the results of the Yellow Light Timing Field Study:
1. Adoption and implementation of the ITE 2020 Guidelines for calculating the yellow
change interval for the through movements for traffic signal timing;
2. Adoption and implementation of the NCHRP Report 731 Guidelines for calculating
the yellow change interval for the left-turn movements for traffic signal timing; and
3. Approval of five full-time City staff positions to expedite implementation using
existing Department HURF revenues.
Page 21
Concurrence/Previous Council Action
· An update on the Yellow Light Timing Study was provided to the Transportation,
Infrastructure and Planning Subcommittee on Jan. 18, 2023.
· An update on the Yellow Light Timing Study was provided at the Policy meeting on
Jan. 24, 2023.
Responsible Department
This item is submitted by Deputy City Manager Alan Stephenson and the Street
Transportation Department.
Page 22
ATTACHMENT A
Current City of Phoenix equations for calculating the yellow change and red clearance
intervals:
Yellow Change Calculation
1.47𝑉𝑉
𝑌𝑌 ≥ 𝑡𝑡 +
2𝑎𝑎 + 64.4𝑔𝑔
Where:
𝑌𝑌 = minimum yellow change interval (in seconds) with a maximum of 5 seconds (if the
calculation exceeds 5 seconds, any excess time from the calculation is added to the red
clearance interval);
𝑡𝑡 = perception-reaction time (in seconds); the time needed for an approaching driver to
“perceive” the yellow indication and to “react” by braking to a stop or deciding to pass
through the intersection. Default value of 1.0 second.
V = intersection entry speed (mph); the approach speed limit is assumed.
𝑎𝑎 = deceleration (ft/second2); the rate at which it is assumed a driver will slow down
upon seeing the yellow signal. Default value of 10 ft/second2.
𝑔𝑔 = grade of approach (downhill is negative grade)
Red Clearance Calculation
𝑊𝑊
𝑅𝑅 = � �
1.47𝑉𝑉
Where:
𝑅𝑅 = red clearance interval (seconds);
V= intersection entry speed (mph); the approach speed limit is assumed.
𝑊𝑊 = distance to traverse the intersection (width), stop line to far side no-conflict point
along the vehicle path (ft.);
Page 23
Current 2020 ITE-recommended equations for calculating the yellow change and red
clearance intervals:
Yellow Change Calculation
1.47(𝑉𝑉85 − 𝑉𝑉𝐸𝐸 ) 1.47𝑉𝑉𝐸𝐸
𝑌𝑌 ≥ 𝑡𝑡 + +
𝑎𝑎 + 32.2𝑔𝑔 2𝑎𝑎 + 64.4𝑔𝑔
Where:
𝑌𝑌 = minimum yellow change interval (in seconds);
𝑡𝑡 = perception-reaction time (in seconds); the time needed for an approaching driver to
“perceive” the yellow indication and to “react” by braking to a stop or deciding to
pass through the intersection. Default value of 1.0 second.
𝑉𝑉85 = 85th percentile approach speed (mph); the speed at which a “reasonable” driver is
assumed to approach the intersection.
𝑉𝑉𝐸𝐸 = intersection entry speed (mph); the speed at which a “reasonable” driver is
assumed to cross the stop line of the intersection when they have been slowing
down in preparation for making a left turn.
𝑎𝑎 = deceleration (ft/second2); the rate at which it is assumed a driver will slow down
upon seeing the yellow signal. Default value of 10 ft/second2.
𝑔𝑔 = grade of approach (downhill is negative grade)
Red Clearance Calculation
𝑊𝑊 + 𝐿𝐿
𝑅𝑅 = � � − 𝑡𝑡𝑠𝑠
1.47𝑉𝑉𝐸𝐸
Where:
𝑅𝑅 = red clearance interval (seconds);
𝑊𝑊 = distance to traverse the intersection (width), stop line to far side no-conflict point
along the vehicle path (ft.);
𝐿𝐿 = length of vehicle (ft.); 20 ft is often used as the representative length for vehicles
entering the intersection.
𝑡𝑡𝑠𝑠 = conflicting vehicular movement start up delay (seconds); an optional parameter with
an initial value set at 0.0 seconds, values may be used based on engineering
judgment or as supported by an engineering study.
Page 24
ATTACHMENT B
Percentage of red-light running incidents that passed through the
intersection on a red light both during and after the red clearance time
Page 25
ATTACHMENT C
Results
Through Movements
Table 1: Statistical T-Test Results for RLR Rate (RLR per 1,000 Vehicles) for Through
Movements at Incremental Sites
Period Period Period Period Period Period
Intersections Baseline
1 2 3 4 5 6
Intersection #2 5.49 5.88 6.67 3.64 4.05 3.66 3.99
Intersection #4 9.09 8.49 8.19 7.78 5.67 5.95 5.66
Intersection #9 4.99 3.43 3.47 2.84 1.83 2.45 -
Green-highlighted cells show a statistically significant decrease in the RLR rate compared to baseline at a
95% confidence level.
Table 2: Statistical T-Test Results for RLR Rate (RLR per 1,000 Vehicles) for Through
Movements at Periodical Sites
Period Period Period Period Period Period
Intersections Baseline
1 2 3 4 5 6
Intersection #1 - - - - - - -
Intersection #5 9.94 5.97 11.09 6.10 10.1 6.07 9.25
Intersection #6 8.89 3.95 9.37 3.57 5.67 - -
Green-highlighted cells show a statistically significant decrease in the RLR rate compared to baseline at a
95% confidence level.
Table 3: Statistical T-Test Results for RLR Rate (RLR per 1,000 Vehicles) for Through
Movements at Long-term Sites
Period Period Period Period Period Period
Intersections Baseline
1 2 3 4 5 6
Intersection #7 5.42 2.64 2.91 2.60 2.51 2.84 2.92
Intersection #10 5.17 2.27 3.27 2.11 2.75 2.3 -
Intersection #11 6.80 3.55 5.13 3.60 4.08 3.33 -
Green-highlighted cells show a statistically significant decrease in the RLR rate compared to baseline at a
95% confidence level.
Page 26
Left-Turn Movements
Table 4: Statistical T-Test Results for RLR Rate (RLR per 1,000 Vehicles) for Left-Turn
Movements at Incremental Sites
Period Period Period Period Period Period
Intersections Baseline
1 2 3 4 5 6
Intersection #1 - - - - - - -
Intersection #2 5.13 2.36 3.10 2.26 2.15 1.58 2.39
Intersection #4 4.93 3.71 4.17 1.92 3.33 2.65 4.41
Intersection #9 16.13 14.92 17.16 6.97 12.75 5.07 -
Green-highlighted cells show a statistically significant decrease in the RLR rate compared to baseline at a
95% confidence level.
Table 5: Statistical T-Test Results for RLR Rate (RLR per 1,000 Vehicles) for Left-Turn
Movements at Long-term Sites
Period Period Period Period Period Period
Intersections Baseline
1 2 3 4 5 6
Intersection #6 4.00 0.84 2.10 0.97 0.87 - 1.41
Intersection #7 3.87 2.73 3.47 2.30 2.15 2.48 2.21
Intersection #10 4.10 0.76 1.09 0.72 1.18 1.23 -
Intersection #11 17.59 9.14 12.10 9.06 10.69 8.27 -
Green-highlighted cells show a statistically significant decrease in the RLR rate compared to baseline at a
95% confidence level.
Page 27
ATTACHMENT D
Kinematic Equation Kinematic Equation Extended Kinematic NCHRP - City of ITE 2020 - City of
(25 MPH) (Speed Limit - 5 MPH) Equation Phoenix Phoenix
PHOENIX Left-Turn NCHRP Left-Turn ITE 2020 Left-Turn Yellow Change Yellow Change
Posted Speed Limit
Yellow Change Yellow Change Yellow Change Interval Difference Interval Difference
(MPH)
Interval (sec) Interval (sec) Interval (sec) (sec) (sec)
25 3.0 3.0 3.3 0.0 + 0.3
30 3.0 3.0 4.0 0.0 + 1.0
35 3.0 3.3 4.7 + 0.3 + 1.7
Page 28 40 3.0 3.6 5.5 + 0.6 + 2.5
45 3.0 4.0 6.2 + 1.0 + 3.2
50 3.0 4.4 6.9 + 1.4 + 3.9
55 3.0 4.7 7.0 + 1.7 + 4.0
ATTACHMENT E
References
Bonneson, J. A., & Zimmerman, K. H. (2004). Effect of Yellow-Interval Timing on the
Frequency of Red-Light Violations at Urban Intersections. Transportation
research record, 1865(1), 20-27. https://doi.org/10.3141/1865-04
Chiou, Y.-C., & Chang, C.-H. (2010). Driver responses to green and red vehicular signal
countdown displays: Safety and efficiency aspects. Accident Analysis &
Prevention, 42(4), 1057-1065.
Datta, T. K., Schattler, K., & Datta, S. (2000). Red light violations and crashes at urban
intersections. Transportation research record, 1734(1), 52-58.
Freas, R. (2022). 2022-12 Traffic Signal Timing Report.
Gong, Y., Lu, P., & Yang, X. T. (2023). Impact of COVID-19 on traffic safety from the
"Lockdown" to the "New Normal": A case study of Utah. Accident Analysis &
Prevention, 184, 106995.
Hallmark, S., Oneyear, N., & McDonald, T. (2012). Toolbox of countermeasures to
reduce red light running.
IIHS. (2022). Red light running. https://www.iihs.org/topics/red-light-running
ITE. (2020). Guidelines for determining traffic signal change and clearance intervals.
ITE journal, 90(3), 28-31.
Jin, T. G., Saito, M., & Eggett, D. L. (2008). Statistical comparisons of the crash
characteristics on highways between construction time and non-construction
time. Accident Analysis & Prevention, 40(6), 2015-2023.
Karimpour, A., Anderson, J. C., Kothuri, S., & Wu, Y.-J. (2021). Estimating pedestrian
delay at signalized intersections using high-resolution event-based data: a finite
mixture modeling method. Journal of Intelligent Transportation Systems, 1-18.
Kergaye, C., Stevanovic, A., & Martin, P. T. (2009). Comparison of Before–After Versus
Off–On Adaptive Traffic Control Evaluations: Park City, Utah, Case Study.
Transportation research record, 2128(1), 192-201.
Lee, J., Abdel-Aty, A., & Park, J. (2018). Investigation of associations between
marijuana law changes and marijuana-involved fatal traffic crashes: A state-level
analysis. Journal of Transport & Health, 10, 194-202.
Page 29
Lum, K., & Halim, H. (2006). A before-and-after study on green signal countdown device
installation. Transportation Research Part F: Traffic Psychology and Behaviour,
9(1), 29-41.
MAG. (2010). MAG Network Screening Methodology for Intersections.
http://azmag.gov/LinkClick.aspx?fileticket=L0lMsuxQNYU%3d&tabid=527&portali
d=0&mid=3809
Noble, D. E. (2020). Guidelines for determining traffic signal change and clearance
intervals. ITE journal, 90(3), 28-31.
Park, E. S., Park, J., & Lomax, T. J. (2010). A fully Bayesian multivariate approach to
before–after safety evaluation. Accident Analysis & Prevention, 42(4), 1118-
1127.
Retting, R. A., Ferguson, S. A., & Farmer, C. M. (2008). Reducing red light running
through longer yellow signal timing and red light camera enforcement: Results of
a field investigation. Accident analysis and prevention, 40(1), 327-333.
https://doi.org/10.1016/j.aap.2007.06.011
Retting, R. A., & Greene, M. A. (1997). Influence of Traffic Signal Timing on Red-Light
Running and Potential Vehicle Conflicts at Urban Intersections. Transportation
research record, 1595(1), 1-7. https://doi.org/10.3141/1595-01
Slavin, C., Feng, W., Figliozzi, M., & Koonce, P. (2013). Statistical study of the impact of
adaptive traffic signal control on traffic and transit performance. Transportation
research record, 2356(1), 117-126.
Page 30
This report provides the field study results on the Street Transportation Department's
efforts to investigate and evaluate the "before" and "after" impacts of a focused
implementation of the new Institute of Transportation Engineers' guidelines on yellow
change intervals at signalized intersections in comparison with Phoenix's current
practices. The report further requests Council approval of staff's recommendation on
the implementation of new yellow change interval timing based on the results of the
field study.
THIS ITEM IS FOR DISCUSSION AND POSSIBLE ACTION.
Summary
The Street Transportation Department (Streets) conducted a field study in partnership
with the University of Arizona to examine whether implementing Institute of
Transportation Engineers’ (ITE) 2020 guidelines on yellow change intervals can
enhance safety at signalized intersections. This report addresses relevant background
information, how the field study was designed and implemented, the field study results
and recommendations.
Background
Red-light running (RLR) is one of the riskiest behaviors at signalized intersections.
According to a report published by the American Automobile Association (AAA)
Foundation for Traffic Safety, more than two people were killed every day across the
U.S. due to noncompliance with red signal indications (AAA Foundation for Traffic
Safety, 2020). According to a report published by the Insurance Institute for Highway
Safety (IIHS), RLR violations caused 928 fatalities in 2020 in the United States. In
addition, an estimated 116,000 people suffered injuries in RLR collisions (IIHS, 2022).
Similar to cities across the nation, RLR-related violations in the Phoenix metropolitan
area have become one of the most severe causes of fatal crashes, with 144 fatalities
and 10,685 injuries reported from 2014 to 2021.
The basic purpose for the yellow change interval is to inform the driver that the green
phase has ended. The yellow change interval provides time for the driver to either stop
before entering the intersection or to proceed and clear the intersection. The basic
Page 14
purpose of the red clearance interval is to provide the driver who decides to enter the
intersection during the yellow change interval adequate time to clear the intersection
prior to a conflicting (or opposing) green phase beginning at the intersection. The red
clearance interval is typically called the “all-red” time.
Streets' Current Signal Timing Practices
Streets has a standard operating procedure (SOP) for determining the duration of
traffic signal intervals. The SOP utilizes the pre-2020 ITE kinematic equation and
calculates yellow change intervals based on posted speed limits. The current City of
Phoenix equations for calculating the yellow change and red clearance intervals are
included in Attachment A.
ITE 2020 Guidelines
The updated ITE guidelines for calculating traffic signal timing were released in March
2020. Since 1965, ITE has developed a variety of methods for calculating yellow
change and red clearance intervals, all of which are based on the kinematic equation
method. According to ITE, the kinematic equation method is the most popular and
widely accepted technique for determining yellow change intervals (Noble, 2020). In
comparing the new ITE 2020 guidelines to the prior ones, there are three key
modifications.
· Change in the speed at which a reasonable driver approaches an intersection. If a
speed study is not completed and the 85th percentile speed is not available, the
85th percentile approach speed for through movements may be estimated and
substituted by the value of Posted Speed Limit + 7 miles per hour. For the left-turn
movements, the Posted Speed Limit can be used as the 85th percentile approach
speed.
· Change in the method for yellow change interval calculations for left-turn
movements.
· Change in maximum yellow change interval for left-turn movements. ITE advises
use of 7.0 seconds as the maximum yellow change interval for left-turn movements.
The current 2020 ITE-recommended equations for calculating the yellow change and
red clearance intervals are included in Attachment A.
Traffic signal timings have long been an area of study to determine the proper traffic
signal timings to ensure intersection safety while maintaining an acceptable level of
travel efficiency. However, there is still no broad consensus on the most appropriate
method for calculating yellow change and red clearance intervals.
Page 15
In order to effectively reduce the total number of RLR-related crashes and maintain a
safe journey for all road users, it was crucial for Streets to perform a field study to
explore RLR behavior at local intersections, understand the impact of different signal
timing parameters (e.g., yellow change and red clearance intervals) on RLR frequency,
and ultimately develop appropriate countermeasures.
Signal Timing Field Study
Objectives
Streets’ purpose in performing this field study was to examine the ITE 2020 guidelines
for yellow change intervals and identify the relationship between signal timing
parameters and RLR violations. Initially, based on several criteria, including the
frequency and severity of RLR-related crashes as well as infrastructure feasibility, 12
intersections were selected to be part of the field study. Then, at each study
intersection, smart sensor equipment was installed. Finally, to determine the
relationship between signal timing parameters and RLR violations, an experimental
design for before-and after analysis was conducted and implemented.
Baseline Condition Data - Intersection Through Movements
At each of the 12 intersection study locations, baseline data was collected on
weekdays between Sept. 1 and Nov. 21, 2022. Over this 12-week period, a total of
144,795 RLR incidents were observed. Among the study sites, two intersections
experienced the most RLR incidents at more than 300 per day, eight of the
intersections experienced between 200 and 300 RLR incidents per day, and the
remaining two intersections had less than 200 RLR incidents per day.
It was found that the majority of RLR violations (88.5 percent or 128,164 events)
occurred during the red clearance interval, while the remaining (11.5 percent or 16,631
events) RLR violations occurred after the red clearance time elapsed when opposing
green phase movement began. The figure in Attachment B shows the percentage of
RLR incidents that passed through the intersection on a red light both during and after
the red clearance time.
Study Design to Implement and Analyze ITE 2020 Guidelines
The “before-and-after” aspects of this study were intended to statistically determine
whether the ITE 2020 guidelines for yellow change and red clearance intervals can
improve intersection safety by reducing the number of RLR violations. Moreover, the
potential relationship between different signal timing parameters and the potential
impact of signal timing parameters on RLR frequency will be identified. Finally, a
statistical method was developed to identify the appropriate amount of yellow change
and red clearance intervals that will result in reduction in RLR frequency.
Page 16
With respect to the 12 study intersections, for the through and left-turn movements,
some intersections were used as the control sites, and the yellow change and red
clearance intervals for these control intersections was not changed from their current
timing. The control sites were used to eliminate the effects of traffic volume and pattern
variation during the holiday seasons in our statistical analysis.
The remaining intersections were then considered as treatment sites, and the yellow
change intervals were changed for all the treatment sites. The new ITE 2020
guidelines were used to calculate the yellow change intervals for through and left-turn
movements for the experimental design at the treatment sites. To make the study
conclusions statistically sound, the study timeline included twelve weeks to collect
sufficient data, which occurred over six, two-week time periods as outlined below.
· Period 1: Nov. 21, 2022 - Dec. 5, 2022;
· Period 2: Dec. 5, 2022 - Dec. 19, 2022;
· Period 3: Dec. 19, 2022 - Jan. 2, 2023;
· Period 4: Jan. 2, 2023 - Jan. 16, 2023;
· Period 5: Jan. 16, 2023 - Jan. 30, 2023; and
· Period 6: Jan. 20, 2023 - Feb. 13, 2023.
Through Movements - Treatment Site Changes
In accordance with the ITE 2020 guidelines, due to the absence of approach speed at
the intersections, for this study, the Posted Speed Limit + 7 miles per hour guidance
was used in lieu of the through movement's 85th percentile of approach speed. Using
the Posted Speed Limit + 7 miles per hour guidance resulted in an increase between
0.4 seconds and 0.6 seconds for the yellow change interval in comparison to the
current yellow change interval for through movements.
For evaluation of through movements at the twelve study intersections, three of the
intersections were used as the control sites, and the yellow change and red clearance
intervals for these three control intersections were not be changed from their current
timing. The remaining nine intersections were considered treatment sites. The yellow
change intervals for the through movements were changed for all the treatment sites.
To better understand driver behaviors and the influence of the yellow change interval
over the short-term and long-term, the nine treatment intersections were divided into
three equal groups for implementation using the methodology outlined below.
· Incremental Intersections Group: For this group of three intersections, the increase
in the yellow change interval was implemented at the selected treatment sites over
five two-week periods. Therefore, at each of the three incremental sites, the yellow
change interval was increased by 0.1 to 0.2 seconds at the start of each two-week
Page 17
period, depending on how much the total calculated yellow change interval
increased.
· Periodically Intersections Group: For this group of three intersections, the yellow
change interval was adjusted at the beginning of each two-week period. That is, the
yellow change interval alternated between the new calculated yellow change
interval and the baseline (current) yellow change interval every two weeks to study
the drivers’ compliance behavior over a short period. During the first, third, and fifth
two-week periods, the new yellow change intervals were implemented at sites for
the entire two-week period. During the second, fourth, and sixth two-week periods,
the yellow change interval was returned to the baseline (current) yellow change
interval.
· Long-Term Intersections Group: For this group of three intersections, the focus was
on studying the impact of increasing the yellow change interval on drivers'
compliance behavior in the long term. The new yellow change intervals were
implemented at the beginning of the first two-week period and were not modified for
the duration of the data collection time frame. These sites were selected to study
the long-term impact of ITE 2020 guidelines on driver behavior.
Left-Turn Movements - Treatment Site Changes
In accordance with the ITE 2020 guidelines, due to the absence of approach speed for
left turns at the study intersection, the Posted Speed Limit + 7 miles per hour guidance
was used in lieu of the left-turn movement's 85th percentile of approach speed. The
estimated intersection entry speed for left-turn movements was 20 miles per hour,
following the ITE 2020 guidelines, which resulted in an increase between 0.3 seconds
and 3.2 seconds for the yellow change interval in comparison to the current yellow
change interval for left-turn movements. Since two of the selected intersections for the
study did not have protected left -turn phase movements, only ten intersections were
used for studying left-turn movements.
Of the ten study intersections for left-turn movements, two of the intersections were
used as the control sites, and the remaining eight intersections were used as treatment
sites. The significant increases in left-turn yellow change intervals calculated under ITE
2020 guidelines for some intersections represented a change in left-turn yellow change
intervals that raised safety concerns. Therefore, four of the eight treatment
intersections were implemented as Incremental Intersections Group and four as Long-
Term Intersections Group as previously outlined; there were no intersections
designated for a Periodically Intersections Group. For the incremental Intersections
Group, the yellow change interval was increased by 0.3 to 0.7 seconds at the start of
each two-week period, depending on how much the total calculated yellow change
interval was increased.
Page 18
Field Study Results
In order to evaluate the comparative differences between the before and after study
groups, a statistical T-test was employed. The T-test is a common method used to
assess the significance of differences observed between two sets of data. The
statistical T-test has been widely used in previous before-and-after studies. In this
study, a 95 percent confidence level is employed to conclude the statistical
significance of the difference in RLR rates between the before and after groups. To
avoid bias in the analysis and ensure a fair comparison regardless of traffic volumes,
the RLR frequency was normalized by dividing the number of RLR violations by the
number of vehicles. This calculated the RLR rate, which was measured as the number
of RLR violations per 1,000 vehicles per day.
Through Movements - Treatment Site Changes
· Incremental Intersections Group: Table 1 in Attachment C shows the statistical T-
test results for the RLR rate at the Incremental Intersections Group sites. When
comparing Periods 3, 4, 5, and 6 with the Baseline Condition Data, it is evident that
the average RLR rate decreased significantly at all treatment sites. However, the
results during the initial implementation (Periods 1 and 2) were inconclusive.
· Periodically Intersections Group: Table 2 in Attachment C shows the statistical T-
test results for the RLR rate at the Periodically Intersections Group sites. These
results indicate a significant decrease in the average RLR rate during periods where
the new yellow change intervals were implemented (Periods 1, 3, and 5), compared
to the periods with the current yellow change intervals (Periods 2, 4, and 6).
· Long-Term Intersections Group: Table 3 in Attachment C shows the statistical T-
test results for the RLR rate at the Long-Term Intersections Group sites. The results
indicate a significant decrease in the average RLR rate during all six periods,
particularly in Period 1 when the new yellow change interval was first implemented.
Left-Turn Movements - Treatment Site Changes
· Incremental Intersections Group: Table 4 in Attachment C shows the statistical T-
test results for the RLR rate at the Incremental Intersections Group sites. It is
evident from the comparison of Periods 3, 4, 5, and 6 with the Baseline Condition
Data that the average RLR rate decreased at all treatment sites. However, the
reduction was not statistically significant for some periods and study sites.
· Long-Term Intersections Group: Table 5 in Attachment C shows the statistical T-
test results for the RLR rate at the Long-Term Intersections Group sites. The results
indicate a significant decrease in the average RLR rate during all six periods,
particularly in Period 1 when the new yellow change interval was first implemented.
Page 19
It should be noted that due to a malfunction of the smart sensors at some of the
treatment intersection sites during several of the field study periods, data was not
captured for those field study locations or periods.
According to the statistical analysis of the data, the results for both through and left-
turn movements are summarized below.
· For the control sites, which were kept at the current yellow change intervals, there
was no significant reduction in the average rate of RLR for the through movements
and left-turn movements when comparing with the Baseline Condition Data.
· For all the treatment sites for the through and left-turn movements, the average rate
of RLR significantly decreased during the periods that used the ITE 2020 yellow
change intervals compared to periods with the current yellow change intervals.
· The yellow change intervals for the left-turn movements implemented at the
incremental sites did not show a significantly increased benefit beyond Period 3
when additional yellow time was added. Period 3 closely matched the
recommended intervals from the National Cooperative Highway Research Program
(NCHRP) Report 731 Guidelines for Timing Yellow and All-Red Intervals at
Signalized Intersections. The NCHRP Report 731 recommends using the Posted
Speed Limit - 5 miles per hour as the 85th percentile approach speed for left-turn
movements. This results in a shorter yellow change interval for the left-turn
movement as compared to the ITE 2020 guidelines. However, the NCHRP yellow
change interval is longer than the City's current yellow change intervals for the left-
turn movement. The comparison of all three methods is shown in Attachment D.
The results suggest that using the NCHRP yellow change intervals can be effective,
without the need to implement the ITE 2020 guidelines for calculating yellow
change intervals for the left-turn movements.
Based on the results of the field study, several recommendations were proposed to
improve safety at signalized intersections by better understanding road users'
compliance behavior with the yellow change interval. These recommendations include:
· Implementation of the ITE 2020 Guidelines for the yellow change interval for the
through movements. For calculating through movement yellow change intervals, the
Posted Speed Limit + 7 miles per hour as the 85th percentile approach speed is
recommended when field-measured speed data is unavailable.
· Implementation of the NCHRP Report 731 Guidelines for the yellow change interval
for the left-turn movements. For left-turn movements, it is recommended to use
Posted Speed Limit - 5 miles per hour as an estimation for the 85th percentile left-
turn approach speed.
· As the field study recommendations were based on only 12 weeks of data, further
Page 20
research is necessary to understand the long-term effects of yellow change
intervals on driver behavior. Further research is currently being conducted to
investigate the impact of red clearance intervals, both individually and in conjunction
with yellow change intervals, to gain a more comprehensive understanding of their
combined effects on intersection safety.
Attachment E provides a list of references for this report.
Implementation Timeline
In order to implement the field study recommendations with current staff resources in
the Traffic Management Center (TMC), it is estimated that it will take approximately six
years to implement the new yellow change intervals for the 1,200 traffic signals in
Phoenix. Based on the results of this study and the improved safety benefits related to
RLR, Streets proposes implementing the field study recommendations on an expedited
timeline with a goal to complete the retiming all 1,200 traffic signals within three years.
However, additional staff resources will be needed. Streets is recommending adding
five positions to the TMC, which would include one Traffic Engineer I, one Traffic
Engineer II, two Signal Systems Specialist I's, and one Signal Systems Specialist II.
The new positions would be funded by existing Streets' revenue from the Arizona
Highway User Revenue Fund (HURF), at an estimated cost of $445,502 per year.
Update on the MAG Top 100 Locations
At the Jan. 24, 2023, Policy meeting, Council directed staff to install smart sensor
equipment at the most dangerous intersections in Phoenix taken from the Maricopa
Association of Governments (MAG) Top 100 Intersections by Crash Risk. Staff has
evaluated the list and identified 64 Phoenix intersections from that list. Streets is
currently working on a procurement to enable the purchase of the necessary smart
sensor equipment and anticipates having a contract in place by Fall 2023.
Concurrently, staff is evaluating the infrastructure feasibility of all 64 locations in order
to develop a prioritized list for implementation.
Recommendation
The Street Transportation Department requests City Council approval of the following
actions based on the results of the Yellow Light Timing Field Study:
1. Adoption and implementation of the ITE 2020 Guidelines for calculating the yellow
change interval for the through movements for traffic signal timing;
2. Adoption and implementation of the NCHRP Report 731 Guidelines for calculating
the yellow change interval for the left-turn movements for traffic signal timing; and
3. Approval of five full-time City staff positions to expedite implementation using
existing Department HURF revenues.
Page 21
Concurrence/Previous Council Action
· An update on the Yellow Light Timing Study was provided to the Transportation,
Infrastructure and Planning Subcommittee on Jan. 18, 2023.
· An update on the Yellow Light Timing Study was provided at the Policy meeting on
Jan. 24, 2023.
Responsible Department
This item is submitted by Deputy City Manager Alan Stephenson and the Street
Transportation Department.
Page 22
ATTACHMENT A
Current City of Phoenix equations for calculating the yellow change and red clearance
intervals:
Yellow Change Calculation
1.47𝑉𝑉
𝑌𝑌 ≥ 𝑡𝑡 +
2𝑎𝑎 + 64.4𝑔𝑔
Where:
𝑌𝑌 = minimum yellow change interval (in seconds) with a maximum of 5 seconds (if the
calculation exceeds 5 seconds, any excess time from the calculation is added to the red
clearance interval);
𝑡𝑡 = perception-reaction time (in seconds); the time needed for an approaching driver to
“perceive” the yellow indication and to “react” by braking to a stop or deciding to pass
through the intersection. Default value of 1.0 second.
V = intersection entry speed (mph); the approach speed limit is assumed.
𝑎𝑎 = deceleration (ft/second2); the rate at which it is assumed a driver will slow down
upon seeing the yellow signal. Default value of 10 ft/second2.
𝑔𝑔 = grade of approach (downhill is negative grade)
Red Clearance Calculation
𝑊𝑊
𝑅𝑅 = � �
1.47𝑉𝑉
Where:
𝑅𝑅 = red clearance interval (seconds);
V= intersection entry speed (mph); the approach speed limit is assumed.
𝑊𝑊 = distance to traverse the intersection (width), stop line to far side no-conflict point
along the vehicle path (ft.);
Page 23
Current 2020 ITE-recommended equations for calculating the yellow change and red
clearance intervals:
Yellow Change Calculation
1.47(𝑉𝑉85 − 𝑉𝑉𝐸𝐸 ) 1.47𝑉𝑉𝐸𝐸
𝑌𝑌 ≥ 𝑡𝑡 + +
𝑎𝑎 + 32.2𝑔𝑔 2𝑎𝑎 + 64.4𝑔𝑔
Where:
𝑌𝑌 = minimum yellow change interval (in seconds);
𝑡𝑡 = perception-reaction time (in seconds); the time needed for an approaching driver to
“perceive” the yellow indication and to “react” by braking to a stop or deciding to
pass through the intersection. Default value of 1.0 second.
𝑉𝑉85 = 85th percentile approach speed (mph); the speed at which a “reasonable” driver is
assumed to approach the intersection.
𝑉𝑉𝐸𝐸 = intersection entry speed (mph); the speed at which a “reasonable” driver is
assumed to cross the stop line of the intersection when they have been slowing
down in preparation for making a left turn.
𝑎𝑎 = deceleration (ft/second2); the rate at which it is assumed a driver will slow down
upon seeing the yellow signal. Default value of 10 ft/second2.
𝑔𝑔 = grade of approach (downhill is negative grade)
Red Clearance Calculation
𝑊𝑊 + 𝐿𝐿
𝑅𝑅 = � � − 𝑡𝑡𝑠𝑠
1.47𝑉𝑉𝐸𝐸
Where:
𝑅𝑅 = red clearance interval (seconds);
𝑊𝑊 = distance to traverse the intersection (width), stop line to far side no-conflict point
along the vehicle path (ft.);
𝐿𝐿 = length of vehicle (ft.); 20 ft is often used as the representative length for vehicles
entering the intersection.
𝑡𝑡𝑠𝑠 = conflicting vehicular movement start up delay (seconds); an optional parameter with
an initial value set at 0.0 seconds, values may be used based on engineering
judgment or as supported by an engineering study.
Page 24
ATTACHMENT B
Percentage of red-light running incidents that passed through the
intersection on a red light both during and after the red clearance time
Page 25
ATTACHMENT C
Results
Through Movements
Table 1: Statistical T-Test Results for RLR Rate (RLR per 1,000 Vehicles) for Through
Movements at Incremental Sites
Period Period Period Period Period Period
Intersections Baseline
1 2 3 4 5 6
Intersection #2 5.49 5.88 6.67 3.64 4.05 3.66 3.99
Intersection #4 9.09 8.49 8.19 7.78 5.67 5.95 5.66
Intersection #9 4.99 3.43 3.47 2.84 1.83 2.45 -
Green-highlighted cells show a statistically significant decrease in the RLR rate compared to baseline at a
95% confidence level.
Table 2: Statistical T-Test Results for RLR Rate (RLR per 1,000 Vehicles) for Through
Movements at Periodical Sites
Period Period Period Period Period Period
Intersections Baseline
1 2 3 4 5 6
Intersection #1 - - - - - - -
Intersection #5 9.94 5.97 11.09 6.10 10.1 6.07 9.25
Intersection #6 8.89 3.95 9.37 3.57 5.67 - -
Green-highlighted cells show a statistically significant decrease in the RLR rate compared to baseline at a
95% confidence level.
Table 3: Statistical T-Test Results for RLR Rate (RLR per 1,000 Vehicles) for Through
Movements at Long-term Sites
Period Period Period Period Period Period
Intersections Baseline
1 2 3 4 5 6
Intersection #7 5.42 2.64 2.91 2.60 2.51 2.84 2.92
Intersection #10 5.17 2.27 3.27 2.11 2.75 2.3 -
Intersection #11 6.80 3.55 5.13 3.60 4.08 3.33 -
Green-highlighted cells show a statistically significant decrease in the RLR rate compared to baseline at a
95% confidence level.
Page 26
Left-Turn Movements
Table 4: Statistical T-Test Results for RLR Rate (RLR per 1,000 Vehicles) for Left-Turn
Movements at Incremental Sites
Period Period Period Period Period Period
Intersections Baseline
1 2 3 4 5 6
Intersection #1 - - - - - - -
Intersection #2 5.13 2.36 3.10 2.26 2.15 1.58 2.39
Intersection #4 4.93 3.71 4.17 1.92 3.33 2.65 4.41
Intersection #9 16.13 14.92 17.16 6.97 12.75 5.07 -
Green-highlighted cells show a statistically significant decrease in the RLR rate compared to baseline at a
95% confidence level.
Table 5: Statistical T-Test Results for RLR Rate (RLR per 1,000 Vehicles) for Left-Turn
Movements at Long-term Sites
Period Period Period Period Period Period
Intersections Baseline
1 2 3 4 5 6
Intersection #6 4.00 0.84 2.10 0.97 0.87 - 1.41
Intersection #7 3.87 2.73 3.47 2.30 2.15 2.48 2.21
Intersection #10 4.10 0.76 1.09 0.72 1.18 1.23 -
Intersection #11 17.59 9.14 12.10 9.06 10.69 8.27 -
Green-highlighted cells show a statistically significant decrease in the RLR rate compared to baseline at a
95% confidence level.
Page 27
ATTACHMENT D
Kinematic Equation Kinematic Equation Extended Kinematic NCHRP - City of ITE 2020 - City of
(25 MPH) (Speed Limit - 5 MPH) Equation Phoenix Phoenix
PHOENIX Left-Turn NCHRP Left-Turn ITE 2020 Left-Turn Yellow Change Yellow Change
Posted Speed Limit
Yellow Change Yellow Change Yellow Change Interval Difference Interval Difference
(MPH)
Interval (sec) Interval (sec) Interval (sec) (sec) (sec)
25 3.0 3.0 3.3 0.0 + 0.3
30 3.0 3.0 4.0 0.0 + 1.0
35 3.0 3.3 4.7 + 0.3 + 1.7
Page 28 40 3.0 3.6 5.5 + 0.6 + 2.5
45 3.0 4.0 6.2 + 1.0 + 3.2
50 3.0 4.4 6.9 + 1.4 + 3.9
55 3.0 4.7 7.0 + 1.7 + 4.0
ATTACHMENT E
References
Bonneson, J. A., & Zimmerman, K. H. (2004). Effect of Yellow-Interval Timing on the
Frequency of Red-Light Violations at Urban Intersections. Transportation
research record, 1865(1), 20-27. https://doi.org/10.3141/1865-04
Chiou, Y.-C., & Chang, C.-H. (2010). Driver responses to green and red vehicular signal
countdown displays: Safety and efficiency aspects. Accident Analysis &
Prevention, 42(4), 1057-1065.
Datta, T. K., Schattler, K., & Datta, S. (2000). Red light violations and crashes at urban
intersections. Transportation research record, 1734(1), 52-58.
Freas, R. (2022). 2022-12 Traffic Signal Timing Report.
Gong, Y., Lu, P., & Yang, X. T. (2023). Impact of COVID-19 on traffic safety from the
"Lockdown" to the "New Normal": A case study of Utah. Accident Analysis &
Prevention, 184, 106995.
Hallmark, S., Oneyear, N., & McDonald, T. (2012). Toolbox of countermeasures to
reduce red light running.
IIHS. (2022). Red light running. https://www.iihs.org/topics/red-light-running
ITE. (2020). Guidelines for determining traffic signal change and clearance intervals.
ITE journal, 90(3), 28-31.
Jin, T. G., Saito, M., & Eggett, D. L. (2008). Statistical comparisons of the crash
characteristics on highways between construction time and non-construction
time. Accident Analysis & Prevention, 40(6), 2015-2023.
Karimpour, A., Anderson, J. C., Kothuri, S., & Wu, Y.-J. (2021). Estimating pedestrian
delay at signalized intersections using high-resolution event-based data: a finite
mixture modeling method. Journal of Intelligent Transportation Systems, 1-18.
Kergaye, C., Stevanovic, A., & Martin, P. T. (2009). Comparison of Before–After Versus
Off–On Adaptive Traffic Control Evaluations: Park City, Utah, Case Study.
Transportation research record, 2128(1), 192-201.
Lee, J., Abdel-Aty, A., & Park, J. (2018). Investigation of associations between
marijuana law changes and marijuana-involved fatal traffic crashes: A state-level
analysis. Journal of Transport & Health, 10, 194-202.
Page 29
Lum, K., & Halim, H. (2006). A before-and-after study on green signal countdown device
installation. Transportation Research Part F: Traffic Psychology and Behaviour,
9(1), 29-41.
MAG. (2010). MAG Network Screening Methodology for Intersections.
http://azmag.gov/LinkClick.aspx?fileticket=L0lMsuxQNYU%3d&tabid=527&portali
d=0&mid=3809
Noble, D. E. (2020). Guidelines for determining traffic signal change and clearance
intervals. ITE journal, 90(3), 28-31.
Park, E. S., Park, J., & Lomax, T. J. (2010). A fully Bayesian multivariate approach to
before–after safety evaluation. Accident Analysis & Prevention, 42(4), 1118-
1127.
Retting, R. A., Ferguson, S. A., & Farmer, C. M. (2008). Reducing red light running
through longer yellow signal timing and red light camera enforcement: Results of
a field investigation. Accident analysis and prevention, 40(1), 327-333.
https://doi.org/10.1016/j.aap.2007.06.011
Retting, R. A., & Greene, M. A. (1997). Influence of Traffic Signal Timing on Red-Light
Running and Potential Vehicle Conflicts at Urban Intersections. Transportation
research record, 1595(1), 1-7. https://doi.org/10.3141/1595-01
Slavin, C., Feng, W., Figliozzi, M., & Koonce, P. (2013). Statistical study of the impact of
adaptive traffic signal control on traffic and transit performance. Transportation
research record, 2356(1), 117-126.
Page 30
Supporting documents
No supporting documents stored.
View on Agenda Online ↗
3 item(s)